GlobalID stringlengths 36 36 | InfraYear int64 2.02k 2.03k | Region stringclasses 16
values | Province stringclasses 98
values | Municipality stringlengths 11 52 ⌀ | ImplementingOffice stringclasses 203
values | ProjectID stringlengths 11 11 | ProjectDescription stringlengths 37 314 | ProjectComponentID stringlengths 15 15 | ProjectComponentDescription stringlengths 74 359 | Program float64 | TypeofWork stringclasses 18
values | infra_type stringclasses 1
value | Longitude float64 117 127 | Latitude float64 5.77 20.5 | ContractID stringlengths 8 8 | ABC float64 1.16M 311M | ContractCost float64 1.15M 290M | CompletionDateOriginal float64 1,539B 1,770B ⌀ | CompletionYear int64 2.02k 2.03k | Contractor stringlengths 10 199 | ObjectId int64 1 9.86k | CreationDate int64 1,754B 1,754B | Creator stringclasses 1
value | EditDate int64 1,754B 1,754B | Editor stringclasses 1
value | FundingYear int64 2.02k 2.03k | LegislativeDistrict stringclasses 252
values | DistrictEngineeringOffice stringclasses 199
values | ABC_String stringlengths 7 72 | ContractCost_String stringlengths 7 72 | CompletionDateActual stringdate 2022-07-01 00:00:00 2025-05-30 00:00:00 | StartDate stringclasses 739
values | type stringclasses 1
value | slug stringlengths 44 273 | _geo stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
db3914c2-3280-47ae-b58e-987b4b149022 | 2,022 | Region I | ILOCOS SUR | CABUGAO (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00640494LZ | Construction of River Promenade (Flood Control) in Brgy. Quezon, Cabugao, Ilocos Sur | P00640494LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Promenade (Flood Control) in Brgy. Quezon, Cabugao, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.457841 | 17.796588 | 22AC0062 | 4,950,000 | 4,950,000 | 1,659,830,400,000 | 2,022 | R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY) | 201 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 4950000 | 4950000 | 2022-08-19 | 04/08/2022 | flood_control | construction-of-river-promenade-flood-control-in-brgy-quezon-cabugao-ilocos-sur-22ac0062 | [object Object] |
9c444d6b-ac23-4c78-9985-5dccb1f7c541 | 2,022 | Region I | ILOCOS SUR | SANTA MARIA (ILOCOS SUR) | Region I | P00620787LZ | Construction of Flood Control Structure along Sta. Maria River (Package 1), Sta. Maria, Ilocos Sur | P00620787LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sta. Maria River (Package 1), Sta. Maria, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.45793 | 17.388055 | 22A00122 | 29,400,000 | 28,949,952.43 | 1,688,342,400,000 | 2,023 | 739 BUILDERS | 202 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 29400000 | 28949952.43 | 2023-05-15 | 10/25/2022 | flood_control | construction-of-flood-control-structure-along-sta-maria-river-package-1-sta-maria-ilocos-sur-22a00122 | [object Object] |
6dbbbc9f-9337-4497-903d-2a80230b56d7 | 2,023 | Region I | PANGASINAN | MAPANDAN (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726070LZ | Construction of Slope Protection along Angalacan River, Barangay Baloling, Mapandan, Pangasinan | P00726070LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Angalacan River, Barangay Baloling, Mapandan, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4581 | 16.03057 | 23AJ0011 | 19,600,000 | 19,221,664.9 | 1,690,156,800,000 | 2,023 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 203 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19221664.9 | 2023-04-18 | 02/13/2023 | flood_control | construction-of-slope-protection-along-angalacan-river-barangay-baloling-mapandan-pangasinan-23aj0011 | [object Object] |
8a3ceb2f-fdcb-47b5-ab96-48139226cc16 | 2,024 | Region I | ILOCOS SUR | SAN JUAN (LAPOG) (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00823312LZ | Construction of Flood Control along San Juan River, Brgy. Resurreccion, San Juan, Ilocos Sur | P00823312LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along San Juan River, Brgy. Resurreccion, San Juan, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.458154 | 17.736667 | 24AC0027 | 83,300,000 | 82,004,907.35 | 1,726,444,800,000 | 2,024 | FIT CONSTRUCTION | 204 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 83300000 | 82004907.35 | 2024-08-27 | 03/05/2024 | flood_control | construction-of-flood-control-along-san-juan-river-brgy-resurreccion-san-juan-ilocos-sur-24ac0027 | [object Object] |
59de092c-c968-4810-a898-ceda728a3a2e | 2,022 | Region III | BATAAN | MARIVELES (BATAAN) | Bataan 2nd District Engineering Office | P00631172LZ | Construction of Flood Control Structure at Barangay Biaan, Mariveles, Bataan | P00631172LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Barangay Biaan, Mariveles, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.45817 | 14.448982 | 22CB0052 | 9,799,999.45 | 9,800,000 | 1,659,484,800,000 | 2,022 | AJA BUILDERS | 205 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 9799999.45 | 9800000 | 2022-08-04 | 03/18/2022 | flood_control | construction-of-flood-control-structure-at-barangay-biaan-mariveles-bataan-22cb0052 | [object Object] |
bb2da91c-36e3-41ff-b47d-bcdfa56ad454 | 2,022 | Region I | ILOCOS SUR | CITY OF CANDON (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00632739LZ | Construction of Slope Protection at Candon City Sports and Convention Center, Barangay Bagani Campo, Candon City, Ilocos Sur | P00632739LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Candon City Sports and Convention Center, Barangay Bagani Campo, Candon City, Ilocos Sur | null | Construction of Slope Protection Structure | Flood Control Structures | 120.45852 | 17.204021 | 22AD0048 | 29,700,000 | 29,695,852.29 | 1,667,347,200,000 | 2,023 | FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. | 206 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 29700000 | 29695852.29 | 2023-03-29 | 04/04/2022 | flood_control | construction-of-slope-protection-at-candon-city-sports-and-convention-center-barangay-bagani-campo-candon-city-ilocos-sur-22ad0048 | [object Object] |
10f30625-dc56-4ed3-94c2-643a91c90dcb | 2,022 | Region I | ILOCOS SUR | CITY OF CANDON (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00639421LZ | Construction of Retaining Wall at Candon City Sports and Convention Center, Candon City, Ilocos Sur | P00639421LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Retaining Wall at Candon City Sports and Convention Center, Candon City, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.458571 | 17.203588 | 22AD0110 | 29,400,000 | 28,517,340.06 | 1,669,593,600,000 | 2,023 | FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. | 207 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 29400000 | 28517340.06 | 2023-09-20 | 05/19/2022 | flood_control | construction-of-retaining-wall-at-candon-city-sports-and-convention-center-candon-city-ilocos-sur-22ad0110 | [object Object] |
06ee1a60-0983-4397-aa27-e447f172922a | 2,023 | Region I | ILOCOS SUR | CITY OF CANDON (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00727074LZ | Construction of Salvador-Bucong Flood Control, Candon City, Ilocos Sur | P00727074LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Salvador-Bucong Flood Control, Candon City, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4589 | 17.23382 | 23AD0041 | 24,500,000 | 23,764,976.32 | 1,695,168,000,000 | 2,024 | FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. | 208 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 24500000 | 23764976.32 | 2024-03-12 | 05/11/2023 | flood_control | construction-of-salvador-bucong-flood-control-candon-city-ilocos-sur-23ad0041 | [object Object] |
2a3bc8c2-caec-40be-95e0-8a0d2ae82bfd | 2,023 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00726906LZ | Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac, | P00726906LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along O'Donnell River, Sta. 9 + 983 to Sta. 10 + 303, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac, | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.459956 | 15.371394 | 23CK0046 | 72,374,261.77 | 72,367,030.12 | 1,702,512,000,000 | 2,023 | 11-16 CONSTRUCTION | 209 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 72374261.77 | 72367030.12 | 2023-12-15 | 04/18/2023 | flood_control | rehabilitation-of-dike-along-odonnell-river-sta-9-983-to-sta-10-303-downstream-of-bueno-bridge-1-left-bank-capas-tarlac-23ck0046 | [object Object] |
20c3c390-ce26-45f8-b912-62bcfbc2a5d3 | 2,023 | Region I | ILOCOS SUR | BANTAY (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00727065LZ | Construction of Flood Control Structure, Barangay Tay-ac, Bantay, Ilocos Sur | P00727065LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Tay-ac, Bantay, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.459965 | 17.606258 | 23AC0059 | 39,200,000 | 39,200,000 | 1,714,780,800,000 | 2,024 | SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 210 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 39200000 | 39200000 | 2024-05-05 | 04/27/2023 | flood_control | construction-of-flood-control-structure-barangay-tay-ac-bantay-ilocos-sur-23ac0059 | [object Object] |
2347e8b7-2cf0-4b41-b4bc-e8ea906e7832 | 2,024 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00845916LZ | Rehabilitation Flood Control Structures along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan | P00845916LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation Flood Control Structures along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.46 | 15.895 | 24AJ0096 | 54,450,000 | 9,807,797.77 | 1,731,888,000,000 | 2,024 | MIGHTYWAY CONSTRUCTION AND SUPPLY | 211 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 54450000 | 9807797.77 | 2024-09-11 | 06/03/2024 | flood_control | rehabilitation-flood-control-structures-along-ingalera-river-brgy-malimpec-malasiqui-pangasinan-24aj0096 | [object Object] |
9d2fdfdb-788a-4ca9-8f1b-b88a5fd80291 | 2,024 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00845923LZ | Construction of Slope Protection Structure along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan (Phase V) | P00845923LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan (Phase V) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.46 | 15.895 | 24AJ0096 | 54,450,000 | 24,120,025.11 | 1,731,888,000,000 | 2,024 | MIGHTYWAY CONSTRUCTION AND SUPPLY | 212 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | Clustered with Contract ID 24AJ0097 | 24120025.11 | 2024-09-11 | 06/03/2024 | flood_control | construction-of-slope-protection-structure-along-ingalera-river-brgy-malimpec-malasiqui-pangasinan-phase-v-24aj0096 | [object Object] |
72333d76-2971-40fc-bb32-d8efe8ca6aa8 | 2,023 | Region I | ILOCOS SUR | BANTAY (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00727062LZ | Construction of Flood Control Structure along Bantaoay River, Barangay Lingsat, Bantay, Ilocos Sur | P00727062LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bantaoay River, Barangay Lingsat, Bantay, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.460002 | 17.622387 | 23AC0056 | 24,500,000 | 24,500,000 | 1,702,080,000,000 | 2,023 | SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION | 213 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 24500000 | 24500000 | 2023-12-10 | 04/27/2023 | flood_control | construction-of-flood-control-structure-along-bantaoay-river-barangay-lingsat-bantay-ilocos-sur-23ac0056 | [object Object] |
68eef149-7a55-4bc8-84d3-e0569101dfe3 | 2,022 | Region I | ILOCOS SUR | SANTA MARIA (ILOCOS SUR) | Region I | P00620788LZ | Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur | P00620788LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.460142 | 17.386548 | 22A00123 | 29,400,000 | 28,949,536.8 | 1,680,480,000,000 | 2,023 | M.A. TEJADA CONSTRUCTION | 214 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 29400000 | 28949536.8 | 2023-03-15 | 11/03/2022 | flood_control | construction-of-flood-control-structure-along-sta-maria-river-package-2-sta-maria-ilocos-sur-22a00123 | [object Object] |
bdfce7fb-7298-4ebc-9b08-c4818661ada6 | 2,024 | Region I | LA UNION | PUGO (LA UNION) | Region I | P00821480LZ | Construction of Flood Mitigation Structure along Aringay River Basin, Barangay Tavora East, Pugo, La Union | P00821480LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Aringay River Basin, Barangay Tavora East, Pugo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.460755 | 16.3192 | 24A00307 | 48,250,000 | 48,249,567.54 | 1,743,033,600,000 | 2,025 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 215 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48250000 | 48249567.54 | 2025-02-26 | 06/10/2024 | flood_control | construction-of-flood-mitigation-structure-along-aringay-river-basin-barangay-tavora-east-pugo-la-union-24a00307 | [object Object] |
66f7f209-48df-41f1-937f-bf205e07812b | 2,021 | Region III | TARLAC | null | Tarlac 2nd District Engineering Office | P00526418LZ | Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac | P00526418LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.461 | 15.3709 | 21CK0035 | 29,399,567.7 | 29,388,967.02 | 1,660,521,600,000 | 2,022 | 11-16 CONSTRUCTION | 216 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 29399567.7 | 29388967.02 | 2022-08-16 | 03/24/2022 | flood_control | rehabilitation-of-existing-dike-along-odonnell-river-sta-lucia-section-right-bank-sta-10036-to-sta-10340-capas-tarlac-21ck0035 | [object Object] |
92c8f703-4415-473c-bf7c-da1d2431f0c7 | 2,024 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00821514LZ | Construction of Protection Works along Agno River, Barangay Tampog, Bayambang, Pangasinan (Phase III) | P00821514LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Protection Works along Agno River, Barangay Tampog, Bayambang, Pangasinan (Phase III) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.461 | 15.744 | 24AJ0025 | 49,000,000 | 48,125,303.6 | 1,724,284,800,000 | 2,024 | RS RODRIGUEZ CONSTRUCTION & SUPPLIES / HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED | 217 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 48125303.6 | 2024-04-08 | 02/06/2024 | flood_control | construction-of-protection-works-along-agno-river-barangay-tampog-bayambang-pangasinan-phase-iii-24aj0025 | [object Object] |
087e411c-a246-4062-b628-85bf963a71b8 | 2,022 | Region I | PANGASINAN | SAN JACINTO (PANGASINAN) | Region I | P00621272LZ | Construction of Flood Mitigation Structures along Bued River, Brgy. Bolo-Labney, San Jacinto, Pangasinan, Sta. 0 + 770 - Sta. 1 + 540 | P00621272LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structures along Bued River, Brgy. Bolo-Labney, San Jacinto, Pangasinan, Sta. 0 + 770 - Sta. 1 + 540 | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.46125 | 16.11713 | 22A00183 | 96,500,000 | 96,498,788.06 | 1,685,664,000,000 | 2,023 | TG SURCON BUILDERS INC. / FRAMECON BUILDERS | 218 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 96500000 | 96498788.06 | 2023-06-03 | 04/07/2022 | flood_control | construction-of-flood-mitigation-structures-along-bued-river-brgy-bolo-labney-san-jacinto-pangasinan-sta-0-770---sta-1-540-22a00183 | [object Object] |
287ffe2b-da4e-4f7f-a35f-5b654f404e5d | 2,023 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726069LZ | Construction of Slope Protection along Ingalera River, Barangay Malimpec, Malasiqui, Pangasinan | P00726069LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Ingalera River, Barangay Malimpec, Malasiqui, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.46142 | 15.89411 | 23AJ0010 | 19,600,000 | 19,207,862.6 | 1,690,156,800,000 | 2,023 | EXTENSIVE STEEL WORKS AND CONSTRUCTION | 219 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19207862.6 | 2023-05-12 | 02/13/2023 | flood_control | construction-of-slope-protection-along-ingalera-river-barangay-malimpec-malasiqui-pangasinan-23aj0010 | [object Object] |
54a1f87e-ac62-4957-bcfe-fd498868a099 | 2,023 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00727337LZ | Construction of Slope Protection along Agno River, Barangay Tampog, Bayambang, Pangasinan | P00727337LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Agno River, Barangay Tampog, Bayambang, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.461574 | 15.745359 | 23AJ0095 | 19,600,000 | 19,011,840.59 | 1,699,574,400,000 | 2,023 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED | 220 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19011840.59 | 2023-07-17 | 06/02/2023 | flood_control | construction-of-slope-protection-along-agno-river-barangay-tampog-bayambang-pangasinan-23aj0095 | [object Object] |
1afadb5a-98b0-49f9-b010-9e68b08f739b | 2,022 | Region I | ILOCOS SUR | SANTA MARIA (ILOCOS SUR) | Region I | P00620789LZ | Construction of Flood Control Structure along Sta. Maria River (Package 3), Sta. Maria, Ilocos Sur | P00620789LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sta. Maria River (Package 3), Sta. Maria, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.461718 | 17.384392 | 22A00124 | 29,400,000 | 28,949,795.51 | 1,679,702,400,000 | 2,023 | MRK-SQUARE CONSTRUCTION AND SUPPLY | 221 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 29400000 | 28949795.51 | 2023-03-26 | 10/25/2022 | flood_control | construction-of-flood-control-structure-along-sta-maria-river-package-3-sta-maria-ilocos-sur-22a00124 | [object Object] |
7953afb8-4efa-4224-ad77-66aee38ca33f | 2,022 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00637768LZ | Construction of Slope Protection along Brgy. Malimpec, Malasiqui, Pangasinan | P00637768LZ-CW1 | Construction of Revetment - Construction of Slope Protection along Brgy. Malimpec, Malasiqui, Pangasinan | null | Construction of Revetment | Flood Control Structures | 120.4618 | 15.8937 | 22AJ0055 | 9,900,000 | 9,899,961.42 | 1,660,176,000,000 | 2,022 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 222 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 9900000 | 9899961.42 | 2022-08-12 | 03/24/2022 | flood_control | construction-of-slope-protection-along-brgy-malimpec-malasiqui-pangasinan-22aj0055 | [object Object] |
2478328c-a799-4c5d-a811-bd5a77cdc9f1 | 2,023 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00727336LZ | Construction of Protection Works along Agno River, Brgy. Tampog, Bayambang Pangasinan | P00727336LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Protection Works along Agno River, Brgy. Tampog, Bayambang Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4618 | 15.7462 | 23AJ0125 | 49,000,000 | 18,983,001.6 | 1,708,128,000,000 | 2,023 | BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 223 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | Clustered with Contract ID 23AJ0125 | 18983001.6 | 2023-12-18 | 06/21/2023 | flood_control | construction-of-protection-works-along-agno-river-brgy-tampog-bayambang-pangasinan-23aj0125 | [object Object] |
f44d0b79-cfd9-4c2d-98fc-69b349ff0a34 | 2,024 | Region I | PANGASINAN | SAN JACINTO (PANGASINAN) | Region I | P00820129LZ | Construction of Flood Mitigation Structure along Bued River, Barangay Bolo, San Jacinto, Pangasinan, Phase II | P00820129LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Bued River, Barangay Bolo, San Jacinto, Pangasinan, Phase II | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.461887 | 16.115618 | 24A00229 | 77,200,000 | 77,197,170.06 | 1,731,196,800,000 | 2,024 | BET CONSTRUCTION & SUPPLY | 224 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 77200000 | 77197170.06 | 2024-07-12 | 02/26/2024 | flood_control | construction-of-flood-mitigation-structure-along-bued-river-barangay-bolo-san-jacinto-pangasinan-phase-ii-24a00229 | [object Object] |
281ff350-9487-4846-9844-04e6817ac51f | 2,023 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00726907LZ | Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac | P00726907LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along O'Donnell River, Sta. 10 + 303 to 10 + 614.20, Downstream of Bueno Bridge 1, Left Bank, Capas Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.462025 | 15.373867 | 23CK0047 | 72,374,946.37 | 72,369,873.3 | 1,702,512,000,000 | 2,023 | 11-16 CONSTRUCTION | 225 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 72374946.37 | 72369873.3 | 2023-12-15 | 04/18/2023 | flood_control | rehabilitation-of-dike-along-odonnell-river-sta-10-303-to-10-61420-downstream-of-bueno-bridge-1-left-bank-capas-tarlac-23ck0047 | [object Object] |
77316bfb-209f-46fe-8edc-e8e103a806d8 | 2,022 | Region I | ILOCOS SUR | SANTIAGO (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00632735LZ | Construction of Baybayabas Flood Control, Barangay Baybayabas, Santiago, Ilocos Sur | P00632735LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Baybayabas Flood Control, Barangay Baybayabas, Santiago, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.462183 | 17.245747 | 22AD0045 | 4,900,000 | 4,897,213.84 | 1,654,732,800,000 | 2,023 | FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. | 226 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 4900000 | 4897213.84 | 2023-01-30 | 02/24/2022 | flood_control | construction-of-baybayabas-flood-control-barangay-baybayabas-santiago-ilocos-sur-22ad0045 | [object Object] |
b26c63b1-f5fb-4df6-a0c9-ad2458a88d3c | 2,022 | Region I | ILOCOS SUR | BANTAY (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00620938LZ | Construction of Flood Control Structure, Barangay Lingsat, Bantay, Ilocos Sur | P00620938LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Lingsat, Bantay, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.462688 | 17.617136 | 22AC0009 | 24,500,000 | 24,500,000 | 1,658,534,400,000 | 2,022 | SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION | 227 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 24500000 | 24500000 | 2022-07-22 | 02/14/2022 | flood_control | construction-of-flood-control-structure-barangay-lingsat-bantay-ilocos-sur-22ac0009 | [object Object] |
5a36cce8-353c-442f-859e-9918f2838a65 | 2,023 | Region I | LA UNION | PUGO (LA UNION) | La Union 2nd District Engineering Office | P00726641LZ | Construction of Flood Control Structure along Aringay River Basin, Barangays Ambalite, Duplas, Tavora East, and Tavora Proper, Pugo, La Union | P00726641LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River Basin, Barangays Ambalite, Duplas, Tavora East, and Tavora Proper, Pugo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.463499 | 16.31689 | 23AF0001 | 48,999,998.49 | 48,607,982.24 | 1,689,638,400,000 | 2,024 | A.I.P. CONSTRUCTION | 228 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48999998.49 | 48607982.24 | 2024-02-11 | 01/31/2023 | flood_control | construction-of-flood-control-structure-along-aringay-river-basin-barangays-ambalite-duplas-tavora-east-and-tavora-proper-pugo-la-union-23af0001 | [object Object] |
24ba4988-f60f-4943-9975-f3958fbe30f1 | 2,024 | Region I | LA UNION | BALAOAN (LA UNION) | Region I | P00838507LZ | Construction of Flood Control Structure, Barangay Nalasin, Balaoan, La Union | P00838507LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Nalasin, Balaoan, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.464938 | 16.817466 | 24A00241 | 28,950,000 | 28,947,643.81 | 1,728,604,800,000 | 2,024 | JMBM CONSTRUCTION | 229 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 28950000 | 28947643.81 | 2024-06-04 | 04/08/2024 | flood_control | construction-of-flood-control-structure-barangay-nalasin-balaoan-la-union-24a00241 | [object Object] |
4648ac33-da4d-4f6f-b167-070b25189520 | 2,022 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00639486LZ | Rehabilitation of Existing Dike along O''Donell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00 to Sta. 11+102.80, Capas, Tarlac, | P00639486LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Existing Dike along O''Donell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00 to Sta. 11+102.80, Capas, Tarlac, | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.465 | 15.372778 | 22CK0103 | 48,999,809.37 | 48,953,097.08 | 1,665,792,000,000 | 2,022 | 11-16 CONSTRUCTION | 230 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 48999809.37 | 48953097.08 | 2022-10-16 | 03/24/2022 | flood_control | rehabilitation-of-existing-dike-along-odonell-river-sta-lucia-section-right-bank-sta-1082000-to-sta-1110280-capas-tarlac-22ck0103 | [object Object] |
9823dff0-ceda-427f-bc82-86121c7bfa38 | 2,024 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00825215LZ | Construction of Flood Control Structure along Agno River, Bongato West Section, Bayambang, Pangasinan | P00825215LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Agno River, Bongato West Section, Bayambang, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.466 | 15.82 | 24AJ0097 | 39,200,000 | 9,533,441.56 | 1,728,864,000,000 | 2,024 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY | 231 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 39200000 | 9533441.56 | 2024-08-05 | 05/06/2024 | flood_control | construction-of-flood-control-structure-along-agno-river-bongato-west-section-bayambang-pangasinan-24aj0097 | [object Object] |
01ee9a1a-cbfa-4c06-91d4-d1b414fd5f36 | 2,023 | Region III | TARLAC | CITY OF TARLAC (CAPITAL) (TARLAC) | Tarlac District Engineering Office | P00725734LZ | Construction of Flood Control Structure Along Moriones River Left Bank, Tibagan Section (Phase III), Tibagan, Tarlac City, Tarlac | P00725734LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure Along Moriones River Left Bank, Tibagan Section (Phase III), Tibagan, Tarlac City, Tarlac | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.466094 | 15.617936 | 23CJ0004 | 72,375,000 | 70,203,779.61 | 1,693,785,600,000 | 2,023 | ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. | 232 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 72375000 | 70203779.61 | 2023-06-15 | 02/06/2023 | flood_control | construction-of-flood-control-structure-along-moriones-river-left-bank-tibagan-section-phase-iii-tibagan-tarlac-city-tarlac-23cj0004 | [object Object] |
7cc9987d-c475-4b23-9902-e60598717a9f | 2,024 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00821512LZ | Construction of Flood Control Structure along Agno River, Pacuan, Malasiqui, Pangasinan | P00821512LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Agno River, Pacuan, Malasiqui, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.467 | 15.853 | 24AJ0021 | 49,000,000 | 48,999,982.32 | 1,724,284,800,000 | 2,024 | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 233 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 48999982.32 | 2024-05-08 | 02/06/2024 | flood_control | construction-of-flood-control-structure-along-agno-river-pacuan-malasiqui-pangasinan-24aj0021 | [object Object] |
1350d91e-7c3d-4a44-9da7-abff5236bd2a | 2,023 | Region I | ILOCOS SUR | CABUGAO (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00726049LZ | Construction of Flood Control Along Cabugao River, Barangay Quezon, Cabugao, Ilocos Sur | P00726049LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Along Cabugao River, Barangay Quezon, Cabugao, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4679 | 17.79798 | 23AC0084 | 29,400,000 | 29,400,000 | 1,702,598,400,000 | 2,023 | N.A. IBARRA CONSTRUCTION(FOR. DIOCLETIANS CONST.) | 234 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 29400000 | 29400000 | 2023-12-15 | 04/27/2023 | flood_control | construction-of-flood-control-along-cabugao-river-barangay-quezon-cabugao-ilocos-sur-23ac0084 | [object Object] |
dd42dbbe-4af9-467c-9b53-64019be20004 | 2,023 | Region I | LA UNION | PUGO (LA UNION) | La Union 2nd District Engineering Office | P00737417LZ | Construction of Flood Control Structure along Aringay River Basin, Barangay Duplas, Pugo, La Union | P00737417LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River Basin, Barangay Duplas, Pugo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.467991 | 16.308801 | 23AF0031 | 4,949,987.72 | 4,946,717.84 | 1,682,553,600,000 | 2,023 | E.E. MADAYAG CONSTRUCTION | 235 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 4949987.72 | 4946717.84 | 2023-06-05 | 02/06/2023 | flood_control | construction-of-flood-control-structure-along-aringay-river-basin-barangay-duplas-pugo-la-union-23af0031 | [object Object] |
7f2cdaa1-598b-4b4d-9f1b-cae745d233be | 2,022 | Region III | BATAAN | HERMOSA (BATAAN) | Bataan 1st District Engineering Office | P00620507LZ | Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+739.50 - Sta. (-)1+111.41, Palihan Section Phase 2AGP, Hermosa, Bataan | P00620507LZ-CW1 | Construction of Flood Mitigation Structure - Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+739.50 - Sta. (-)1+111.41, Palihan Section Phase 2AGP, Hermosa, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.468056 | 14.859444 | 22CA0040 | 48,999,999.6 | 48,999,999.6 | 1,675,728,000,000 | 2,023 | PASCAL CONSTRUCTION | 236 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999999.6 | 48999999.6 | 2023-02-01 | 04/11/2022 | flood_control | constructionrehabilitation-of-flood-control-project-along-colo-river-sta--073950---sta--111141-palihan-section-phase-2agp-hermosa-bataan-22ca0040 | [object Object] |
0bc8d3fa-60b0-434f-bc59-980be8206803 | 2,023 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00737431LZ | Construction of Flood Control Structure at Barangay Pacuan, Malasiqui, Pangasinan | P00737431LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Barangay Pacuan, Malasiqui, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.468118 | 15.852386 | 23AJ0070 | 13,860,000 | 13,546,760.75 | 1,695,686,400,000 | 2,023 | 2-R CONSTRUCTION SUPPLY | 237 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 13860000 | 13546760.75 | 2023-09-27 | 05/12/2023 | flood_control | construction-of-flood-control-structure-at-barangay-pacuan-malasiqui-pangasinan-23aj0070 | [object Object] |
6f08d161-9954-4ec9-b670-567a92d7cbc5 | 2,024 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00846004LZ | Construciton of Slope Protection along Caulaman River, Dampe Section, Floridablanca, Pampanga | P00846004LZ-CW1 | Construction of Slope Protection Structure - Construciton of Slope Protection along Caulaman River, Dampe Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.46835 | 14.94534 | 24CH0066 | 14,849,528.4 | 14,844,483.15 | 1,722,211,200,000 | 2,024 | 120 OVER CONSTRUCTION CO. | 238 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 14849528.4 | 14844483.15 | 2024-05-20 | 03/18/2024 | flood_control | construciton-of-slope-protection-along-caulaman-river-dampe-section-floridablanca-pampanga-24ch0066 | [object Object] |
9ac92519-4d35-45ef-a741-1397563b97ec | 2,024 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00821515LZ | Construction of Slope Protection along Agno River, Barangay Iton, Bayambang, Pangasinan (Phase II) | P00821515LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Agno River, Barangay Iton, Bayambang, Pangasinan (Phase II) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.469 | 15.76 | 24AJ0028 | 49,000,000 | 48,999,990.55 | 1,725,753,600,000 | 2,024 | ALCEL CONSTRUCTION | 239 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 48999990.55 | 2024-08-27 | 02/23/2024 | flood_control | construction-of-slope-protection-along-agno-river-barangay-iton-bayambang-pangasinan-phase-ii-24aj0028 | [object Object] |
4528a5b0-6b27-4753-b4dd-89631d01338c | 2,022 | Region IV-B | OCCIDENTAL MINDORO | PALUAN (OCCIDENTAL MINDORO) | Mindoro Occidental District Engineering Office | P00621623LZ | Construction of River Protection Structures along Calawagan River, Sta. 0+000 - Sta. 0+322, Sta. 0+492 - Sta. 0+772.00, Paluan, Occidental Mindoro | P00621623LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Protection Structures along Calawagan River, Sta. 0+000 - Sta. 0+322, Sta. 0+492 - Sta. 0+772.00, Paluan, Occidental Mindoro | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.469153 | 13.427395 | 22EB0096 | 49,000,000 | 46,100,036.07 | 1,674,950,400,000 | 2,023 | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | 240 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | OCCIDENTAL MINDORO (LEGISLATIVE DISTRICT) | Mindoro Occidental District Engineering Office | 49000000 | 46100036.07 | 2023-03-15 | 05/30/2022 | flood_control | construction-of-river-protection-structures-along-calawagan-river-sta-0000---sta-0322-sta-0492---sta-077200-paluan-occidental-mindoro-22eb0096 | [object Object] |
32233b76-afe7-4a7d-b630-d0aefcc113f0 | 2,024 | Region I | ILOCOS SUR | CITY OF CANDON (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00824651LZ | Construction of Langlangca -Salvador Flood Control Structure, Candon City, Ilocos Sur | P00824651LZ-CW1 | Construction of Revetment - Construction of Langlangca -Salvador Flood Control Structure, Candon City, Ilocos Sur | null | Construction of Revetment | Flood Control Structures | 120.46962 | 17.23444 | 24AD0036 | 49,000,000 | 48,989,188.24 | 1,722,902,400,000 | 2,024 | NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY | 241 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 49000000 | 48989188.24 | 2024-06-25 | 03/14/2024 | flood_control | construction-of-langlangca--salvador-flood-control-structure-candon-city-ilocos-sur-24ad0036 | [object Object] |
7f6e5f9f-0334-4329-a0b3-4d0e131d8f84 | 2,024 | Region III | BATAAN | HERMOSA (BATAAN) | Bataan 1st District Engineering Office | P00820801LZ | Construction of Flood Control Structure along Colo River (Phase 3AGP), Palihan Section, Hermosa, Bataan | P00820801LZ-CW1 | Construction of Revetment - Construction of Flood Control Structure along Colo River (Phase 3AGP), Palihan Section, Hermosa, Bataan | null | Construction of Revetment | Flood Control Structures | 120.469883 | 14.8568 | 24CA0007 | 48,999,999.85 | 48,999,999.85 | 1,735,603,200,000 | 2,024 | PASCAL CONSTRUCTION | 242 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999999.85 | 48999999.85 | 2024-12-26 | 02/21/2024 | flood_control | construction-of-flood-control-structure-along-colo-river-phase-3agp-palihan-section-hermosa-bataan-24ca0007 | [object Object] |
dff2d857-14c1-4402-89a0-ea0d0097bfbd | 2,024 | Region I | ILOCOS SUR | SAN ESTEBAN (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00824650LZ | Construction of San Esteban Flood Control, San Esteban, Ilocos Sur | P00824650LZ-CW1 | Construction of Flood Mitigation Structure - Construction of San Esteban Flood Control, San Esteban, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.47027 | 17.31194 | 24AD0035 | 29,400,000 | 29,399,480.08 | 1,719,878,400,000 | 2,024 | MRK-SQUARE CONSTRUCTION AND SUPPLY | 243 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 29400000 | 29399480.08 | 2024-09-13 | 03/06/2024 | flood_control | construction-of-san-esteban-flood-control-san-esteban-ilocos-sur-24ad0035 | [object Object] |
572d7083-7156-46c7-ae12-f9d5a9386dbb | 2,023 | Region IV-B | OCCIDENTAL MINDORO | PALUAN (OCCIDENTAL MINDORO) | Mindoro Occidental District Engineering Office | P00725871LZ | Construction of Causeway with RORO Ramp and Trestle (Phase II), Sta. 0+000 - Sta. 0+251, Paluan, Occidental Mindoro | P00725871LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Causeway with RORO Ramp and Trestle (Phase II), Sta. 0+000 - Sta. 0+251, Paluan, Occidental Mindoro | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.470451 | 13.389509 | 23EB0020 | 96,500,000 | 96,492,142.55 | 1,713,744,000,000 | 2,024 | F.A. TORRES CONSTRUCTION / C.T. LEONCIO CONSTRUCTION & TRADING | 244 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | OCCIDENTAL MINDORO (LEGISLATIVE DISTRICT) | Mindoro Occidental District Engineering Office | 96500000 | 96492142.55 | 2024-04-23 | 05/02/2023 | flood_control | construction-of-causeway-with-roro-ramp-and-trestle-phase-ii-sta-0000---sta-0251-paluan-occidental-mindoro-23eb0020 | [object Object] |
478d7348-5078-4c77-854a-eb79f759c426 | 2,024 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00823375LZ | Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right side. Package G, Capas Tarlac, Sta. 3+412.40 to Sta. 3+773.40 | P00823375LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right side. Package G, Capas Tarlac, Sta. 3+412.40 to Sta. 3+773.40 | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.471358 | 15.349261 | 24CK0125 | 96,499,769.92 | 95,527,152.18 | 1,735,603,200,000 | 2,024 | RD8 BUILDERS CORPORATION UNDER THE NAME OF RD8 BUILDERS | 245 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 96499769.92 | 95527152.18 | 2024-11-12 | 07/02/2024 | flood_control | rehabilitation-of-existing-dike-along-bangut-river-upstream-of-bangot-bridge-right-side-package-g-capas-tarlac-sta-341240-to-sta-377340-24ck0125 | [object Object] |
5e62f91e-09d2-464b-95f7-46c0bf9f2813 | 2,023 | Region I | ILOCOS SUR | SANTA MARIA (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00726359LZ | Construction of Flood Control Structure along Sta. Maria River (Package 1) Sta. Maria, Ilocos Sur | P00726359LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sta. Maria River (Package 1) Sta. Maria, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.471531 | 17.381871 | 23A00254 | 48,250,000 | 46,808,283.34 | 1,698,278,400,000 | 2,024 | MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) | 246 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 48250000 | 46808283.34 | 2024-12-02 | 04/05/2023 | flood_control | construction-of-flood-control-structure-along-sta-maria-river-package-1-sta-maria-ilocos-sur-23a00254 | [object Object] |
fe6d02db-1bd2-4340-9a1d-862948d8ef4f | 2,022 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00637779LZ | Construction of Slope Protection along Caulaman River Carmencita Section, Floridablanca, Pampanga | P00637779LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Caulaman River Carmencita Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.47158 | 14.942328 | 22CH0070 | 19,799,675.86 | 19,794,566.45 | 1,662,595,200,000 | 2,022 | R.M. VITUG CONSTRUCTION | 247 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 19799675.86 | 19794566.45 | 2022-07-06 | 04/13/2022 | flood_control | construction-of-slope-protection-along-caulaman-river-carmencita-section-floridablanca-pampanga-22ch0070 | [object Object] |
8d643198-b6f6-469a-a2f9-3646825b0737 | 2,022 | Region I | ILOCOS SUR | NARVACAN (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00621525LZ | Construction of San Jose-Sta. Lucia Flood Control Structures, Barangay San Jose- Brgy. Sta. Lucia, Narvacan, Ilocos Sur | P00621525LZ-CW1 | Construction of Flood Mitigation Structure - Construction of San Jose-Sta. Lucia Flood Control Structures, Barangay San Jose- Brgy. Sta. Lucia, Narvacan, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4724 | 17.42001 | 22AD0073 | 9,800,000 | 9,505,483.78 | 1,656,028,800,000 | 2,023 | M.A. TEJADA CONSTRUCTION | 248 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 9800000 | 9505483.78 | 2023-04-06 | 04/04/2022 | flood_control | construction-of-san-jose-sta-lucia-flood-control-structures-barangay-san-jose--brgy-sta-lucia-narvacan-ilocos-sur-22ad0073 | [object Object] |
57afe491-1627-48be-b600-407cec4d89b3 | 2,022 | Region III | BATAAN | DINALUPIHAN (BATAAN) | Bataan 1st District Engineering Office | P00620504LZ | Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+159 - Sta. 0+495.50, Layac Section Phase 1AGP, Dinalupihan, Bataan | P00620504LZ-CW1 | Construction of Flood Mitigation Structure - Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+159 - Sta. 0+495.50, Layac Section Phase 1AGP, Dinalupihan, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.47313 | 14.853273 | 22CA0038 | 48,999,997.98 | 48,999,998.32 | 1,668,211,200,000 | 2,022 | PASCAL CONSTRUCTION | 249 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999997.98 | 48999998.32 | 2022-11-10 | 04/08/2022 | flood_control | constructionrehabilitation-of-flood-control-project-along-colo-river-sta--0159---sta-049550-layac-section-phase-1agp-dinalupihan-bataan-22ca0038 | [object Object] |
813c3d33-88c9-46c9-8a19-bc266d372db1 | 2,024 | Region I | LA UNION | ROSARIO (LA UNION) | Region I | P00843190LZ | Construction of Flood Control Structure, Barangay Concepcion-Tabtabungao, Rosario, La Union | P00843190LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Concepcion-Tabtabungao, Rosario, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4732 | 16.214 | 24A00443 | 115,800,000 | 115,799,701.5 | 1,734,739,200,000 | 2,024 | UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES | 250 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 115800000 | 115799701.49 | 2024-08-19 | 05/03/2024 | flood_control | construction-of-flood-control-structure-barangay-concepcion-tabtabungao-rosario-la-union-24a00443 | [object Object] |
4db0608f-4a0c-4979-a94d-7baf2ad1ec43 | 2,023 | Region I | PANGASINAN | MALASIQUI (PANGASINAN) | Pangasinan 4th District Engineering Office | P00737433LZ | Construction of Box Culvert at Barangay Taloyan, Malasiqui, Pangasinan | P00737433LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Box Culvert at Barangay Taloyan, Malasiqui, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.473202 | 15.928036 | 23AJ0073 | 4,950,000 | 4,840,512.64 | 1,694,649,600,000 | 2,023 | ROCKWELL CONSTRUCTION AND SUPPLY | 251 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 4950000 | 4840512.64 | 2023-07-17 | 03/28/2023 | flood_control | construction-of-box-culvert-at-barangay-taloyan-malasiqui-pangasinan-23aj0073 | [object Object] |
c0fb96a2-554c-4607-b57a-3315e19498d1 | 2,023 | Region I | ILOCOS SUR | SANTA MARIA (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00726360LZ | Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur | P00726360LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sta. Maria River (Package 2), Sta. Maria, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.473466 | 17.386125 | 23A00255 | 48,250,000 | 46,807,469.14 | 1,698,278,400,000 | 2,024 | MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) | 252 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 48250000 | 46807469.14 | 2024-12-02 | 04/05/2023 | flood_control | construction-of-flood-control-structure-along-sta-maria-river-package-2-sta-maria-ilocos-sur-23a00255 | [object Object] |
1ecb44de-dce9-4f68-bc15-ccd3c270487c | 2,022 | Region I | ILOCOS NORTE | BADOC (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00632727LZ | Construction of Flood Control Structure (Integrated Draining System), Poblacion, Barangays Garreta and Alogoog, Badoc, Ilocos Norte | P00632727LZ-CW1 | Construction of Drainage Structure - Construction of Flood Control Structure (Integrated Draining System), Poblacion, Barangays Garreta and Alogoog, Badoc, Ilocos Norte | null | Construction of Drainage Structure | Flood Control Structures | 120.47378 | 17.92661 | 22AB0074 | 4,900,000 | 4,900,000 | 1,657,238,400,000 | 2,022 | BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY | 253 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 4900000 | 4900000 | 2022-07-09 | 02/11/2022 | flood_control | construction-of-flood-control-structure-integrated-draining-system-poblacion-barangays-garreta-and-alogoog-badoc-ilocos-norte-22ab0074 | [object Object] |
ced4f24c-b744-406f-8666-c4ff69b9f6c1 | 2,023 | Region III | BATAAN | CITY OF BALANGA (CAPITAL) (BATAAN) | Bataan 2nd District Engineering Office | P00737451LZ | Construction of Flood Control Structure, Tanato, Balanga City, Bataan | P00737451LZ-CW1 | Construction of Flood Mitigation Structure - ?Construction of Flood Control Structure, Tanato, Balanga City, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.474252 | 14.635722 | 23CB0012 | 9,900,000 | 9,900,000 | 1,685,145,600,000 | 2,023 | E.R. VENZON CONSTRUCTION | 254 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 9900000 | 9900000 | 2023-05-24 | 02/08/2023 | flood_control | construction-of-flood-control-structure-tanato-balanga-city-bataan-23cb0012 | [object Object] |
42cdf859-d47e-4066-a02c-9000f6b53652 | 2,024 | Region IV-B | OCCIDENTAL MINDORO | PALUAN (OCCIDENTAL MINDORO) | Mindoro Occidental District Engineering Office | P00820400LZ | Construction of Flood Protection Structure along Barangays Lumangbayan and Marikit, Paluan, Mindoro Occidental | P00820400LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Protection Structure along Barangays Lumangbayan and Marikit, Paluan, Mindoro Occidental | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.474378 | 13.394094 | 24EB0100 | 96,500,000 | 96,496,449.5 | 1,740,528,000,000 | 2,024 | JIIK CONSTRUCTION SERVICES | 255 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | OCCIDENTAL MINDORO (LEGISLATIVE DISTRICT) | Mindoro Occidental District Engineering Office | 96500000 | 96496449.5 | 2024-09-15 | 04/05/2024 | flood_control | construction-of-flood-protection-structure-along-barangays-lumangbayan-and-marikit-paluan-mindoro-occidental-24eb0100 | [object Object] |
b265d044-df74-4d0b-88e5-25de2d8353d7 | 2,022 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00621486LZ | Construction of Flood Mitigation Structure along Pantingan River Phase 1, Brgy. Pantingan, Pilar, Bataan | P00621486LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Pantingan River Phase 1, Brgy. Pantingan, Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.474543 | 14.628503 | 22CB0074 | 49,000,000 | 49,000,000 | 1,682,380,800,000 | 2,023 | ORACLE CONCRETE AND CONSTRUCTION CORP. / ALCEL CONSTRUCTION | 256 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2023-04-26 | 05/26/2022 | flood_control | construction-of-flood-mitigation-structure-along-pantingan-river-phase-1-brgy-pantingan-pilar-bataan-22cb0074 | [object Object] |
b21e8621-da1b-4b39-a01e-2f307deae88c | 2,022 | Region I | ILOCOS SUR | BANAYOYO (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00640495LZ | Construction of Banayoyo River Control, Banayoyo, Ilocos Sur | P00640495LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Banayoyo River Control, Banayoyo, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.474593 | 17.233574 | 22AD0080 | 19,800,000 | 19,799,995.98 | 1,662,681,600,000 | 2,023 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 257 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 19800000 | 19799995.98 | 2023-04-05 | 04/04/2022 | flood_control | construction-of-banayoyo-river-control-banayoyo-ilocos-sur-22ad0080 | [object Object] |
4982b95c-8ea0-499d-85a5-7f87344e4d16 | 2,022 | Region III | BATAAN | DINALUPIHAN (BATAAN) | Bataan 1st District Engineering Office | P00620505LZ | Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+495.50 - Sta. 0+846.62, Layac Section Phase 2AGP, Dinalupihan, Bataan | P00620505LZ-CW1 | Construction of Flood Mitigation Structure - Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+495.50 - Sta. 0+846.62, Layac Section Phase 2AGP, Dinalupihan, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.476038 | 14.852013 | 22CA0032 | 48,999,999.85 | 48,999,999.85 | 1,670,889,600,000 | 2,022 | PASCAL CONSTRUCTION | 258 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999999.85 | 48999999.85 | 2022-12-12 | 04/08/2022 | flood_control | constructionrehabilitation-of-flood-control-project-along-colo-river-sta-049550---sta-084662-layac-section-phase-2agp-dinalupihan-bataan-22ca0032 | [object Object] |
42b4c251-ff3b-406c-be9b-9ead833db05a | 2,022 | Region III | BATAAN | HERMOSA (BATAAN) | Bataan 1st District Engineering Office | P00620506LZ | Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+441.43 - Sta. (-)0+596.40, Palihan Section Phase 1AGP, Hermosa, Bataan | P00620506LZ-CW1 | Construction of Flood Mitigation Structure - Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+441.43 - Sta. (-)0+596.40, Palihan Section Phase 1AGP, Hermosa, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.476111 | 14.851667 | 22CA0031 | 48,999,999.42 | 48,999,999.42 | 1,667,952,000,000 | 2,022 | PASCAL CONSTRUCTION | 259 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999999.42 | 48999999.42 | 2022-11-08 | 04/08/2022 | flood_control | constructionrehabilitation-of-flood-control-project-along-colo-river-sta-044143---sta--059640-palihan-section-phase-1agp-hermosa-bataan-22ca0031 | [object Object] |
f61bf9d8-3aba-4974-8454-6324d9408f82 | 2,022 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00620169LZ | Construction of Flood Control Structures in Pantingan River Upstream, Pilar, Bataan | P00620169LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures in Pantingan River Upstream, Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.476314 | 14.631781 | 22CB0018 | 93,660,970 | 93,660,970 | 1,675,641,600,000 | 2,023 | BET CONSTRUCTION & SUPPLY | 260 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 93660970 | 93660970 | 2023-02-07 | 03/14/2022 | flood_control | construction-of-flood-control-structures-in-pantingan-river-upstream-pilar-bataan-22cb0018 | [object Object] |
c4357d45-164b-453a-a38a-983b6c3a9774 | 2,023 | Region I | ILOCOS NORTE | BADOC (ILOCOS NORTE) | Region I | P00725586LZ | Construction of River Control Structure, Brgys. Lacuben-Gabut Sur, Badoc, Ilocos Norte | P00725586LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Control Structure, Brgys. Lacuben-Gabut Sur, Badoc, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.47642 | 17.94374 | 23A00071 | 19,300,000 | 19,299,995.86 | 1,688,342,400,000 | 2,023 | BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY | 261 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 19300000 | 19299995.86 | 2023-06-30 | 02/14/2023 | flood_control | construction-of-river-control-structure-brgys-lacuben-gabut-sur-badoc-ilocos-norte-23a00071 | [object Object] |
661cf3f5-9a75-4fdc-affa-23ad9eace756 | 2,024 | Region I | LA UNION | PUGO (LA UNION) | La Union 2nd District Engineering Office | P00821469LZ | Construction of Flood Control Structure along Aringay River Basin, Barangay Cares, Pugo, La Union | P00821469LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River Basin, Barangay Cares, Pugo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.476598 | 16.329895 | 24AF0017 | 48,999,991.11 | 48,655,692.77 | 1,723,766,400,000 | 2,025 | A.I.P. CONSTRUCTION | 262 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48999991.11 | 48655692.77 | 2025-02-16 | 02/12/2024 | flood_control | construction-of-flood-control-structure-along-aringay-river-basin-barangay-cares-pugo-la-union-24af0017 | [object Object] |
2fd4ddc8-2112-4743-9eac-06ee00427566 | 2,022 | Cordillera Administrative Region | BENGUET | TUBA (BENGUET) | Benguet 1st District Engineering Office | P00621001LZ | Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Coplo and Nangalisan Proper), Tuba, Benguet | P00621001LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure within Aringay River Basin: along Aringay River Main Stream (Coplo and Nangalisan Proper), Tuba, Benguet | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.477975 | 16.435551 | 22PE0005 | 24,500,000 | 24,113,608.31 | 1,659,571,200,000 | 2,022 | SEJ CONSTRUCTION & AGGREGATES | 263 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BENGUET (LEGISLATIVE DISTRICT) | Benguet 1st District Engineering Office | 24500000 | 24113608.31 | 2022-08-05 | 01/31/2022 | flood_control | construction-of-flood-mitigation-structure-within-aringay-river-basin-along-aringay-river-main-stream-coplo-and-nangalisan-proper-tuba-benguet-22pe0005 | [object Object] |
398553a2-c20b-47ef-847e-838a524c838e | 2,022 | Region IV-B | OCCIDENTAL MINDORO | PALUAN (OCCIDENTAL MINDORO) | Mindoro Occidental District Engineering Office | P00621624LZ | Construction of River Protection Structures along Katanlawan River, Sta. 0+000 - Sta. 0+840 (L/S), Sta. 0+200 - Sta. 0+360 (R/S), Paluan, Occidental Mindoro | P00621624LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Protection Structures along Katanlawan River, Sta. 0+000 - Sta. 0+840 (L/S), Sta. 0+200 - Sta. 0+360 (R/S), Paluan, Occidental Mindoro | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.478011 | 13.41307 | 22EB0097 | 46,060,000 | 45,141,156.75 | 1,675,382,400,000 | 2,023 | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | 264 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | OCCIDENTAL MINDORO (LEGISLATIVE DISTRICT) | Mindoro Occidental District Engineering Office | 46060000 | 45141156.75 | 2023-03-15 | 07/11/2022 | flood_control | construction-of-river-protection-structures-along-katanlawan-river-sta-0000---sta-0840-ls-sta-0200---sta-0360-rs-paluan-occidental-mindoro-22eb0097 | [object Object] |
d493dca8-41db-4737-8733-da650530cf7c | 2,021 | Region III | PAMPANGA | null | Pampanga 2nd District Engineering Office | P00525587LZ | Construction of Slope Protection along Gumain River, Apalit Section, Sta. 00+000 - Sta. 0+580, Floridablanca, Pampanga | P00525587LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Gumain River, Apalit Section, Sta. 00+000 - Sta. 0+580, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.478287 | 14.981025 | 21CH0086 | 55,969,179.22 | 55,958,985.69 | 1,666,483,200,000 | 2,022 | R.M. VITUG CONSTRUCTION | 265 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 55969179.22 | 55958985.69 | 2022-10-24 | 04/13/2022 | flood_control | construction-of-slope-protection-along-gumain-river-apalit-section-sta-00000---sta-0580-floridablanca-pampanga-21ch0086 | [object Object] |
13520ab4-1eff-430b-a4da-ad67de4a4665 | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00740615LZ | Construction of Slope Protection along Caulaman River, Sto. Rosario Section (down stream), Floridablanca, Pampanga | P00740615LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Caulaman River, Sto. Rosario Section (down stream), Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.4789 | 14.8941 | 23CH0047 | 29,399,936.74 | 29,394,256.81 | 1,700,956,800,000 | 2,023 | MJBZ BUILDERS AND TRADING | 266 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 29399936.74 | 29394256.81 | 2023-10-23 | 04/17/2023 | flood_control | construction-of-slope-protection-along-caulaman-river-sto-rosario-section-down-stream-floridablanca-pampanga-23ch0047 | [object Object] |
626556ae-7633-4991-b4c8-7410efdee72b | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00742351LZ | Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase II), Floridablanca, Pampanga | P00742351LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase II), Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.4789 | 14.8938 | 23CH0049 | 28,709,344.15 | 28,704,277.87 | 1,700,956,800,000 | 2,023 | RADIANS BUILDERS AND SUPPLY CORPORATION | 267 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 28709344.15 | 28704277.87 | 2023-11-27 | 04/17/2023 | flood_control | construction-of-slope-protection-caulaman-river-sto-rosario-section-phase-ii-floridablanca-pampanga-23ch0049 | [object Object] |
392fccc9-cc92-47a4-b614-0159d4fb0249 | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00742355LZ | Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase III), Floridablanca, Pampanga | P00742355LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase III), Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.4792 | 14.8919 | 23CH0050 | 36,629,950.35 | 36,624,784.11 | 1,700,956,800,000 | 2,023 | RADIANS BUILDERS AND SUPPLY CORPORATION | 268 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 36629950.35 | 36624784.11 | 2023-11-27 | 04/17/2023 | flood_control | construction-of-slope-protection-caulaman-river-sto-rosario-section-phase-iii-floridablanca-pampanga-23ch0050 | [object Object] |
e5eae9b5-226e-44d5-b459-ddd92edd1e05 | 2,023 | Region I | LA UNION | PUGO (LA UNION) | La Union 2nd District Engineering Office | P00737416LZ | Construction of Flood Control Structure along Aringay River Basin, Barangay Ambalite, Pugo, La Union | P00737416LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River Basin, Barangay Ambalite, Pugo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.479878 | 16.294355 | 23AF0030 | 4,949,997.64 | 4,946,964.09 | 1,682,553,600,000 | 2,023 | E.E. MADAYAG CONSTRUCTION | 269 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 4949997.64 | 4946964.09 | 2023-06-19 | 02/06/2023 | flood_control | construction-of-flood-control-structure-along-aringay-river-basin-barangay-ambalite-pugo-la-union-23af0030 | [object Object] |
c6c8dd09-4dc5-4ea7-a993-a7df71067a83 | 2,021 | Region I | ILOCOS SUR | null | Ilocos Sur 1st District Engineering Office | P00525862LZ | Construction of Flood Control, Cabugao River, Brgy. Turod-Patac, Cabugao, Ilocos Sur | P00525862LZ-CW1 | Construction of Revetment - Construction of Flood Control, Cabugao River, Brgy. Turod-Patac, Cabugao, Ilocos Sur | null | Construction of Revetment | Flood Control Structures | 120.479933 | 17.788144 | 21AC0001 | 19,600,000 | 19,600,000 | 1,669,852,800,000 | 2,022 | R.B. PANO CONSTRUCTION CORP. (FORMERLY: R.B. PANO CONSTRUCTION AND SUPPLY) | 270 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 19600000 | 19600000 | 2022-12-02 | 02/24/2022 | flood_control | construction-of-flood-control-cabugao-river-brgy-turod-patac-cabugao-ilocos-sur-21ac0001 | [object Object] |
00215236-e324-42bd-85e6-445adcddb822 | 2,024 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00839574LZ | Construction of Flood Control Structure (Phase I), Barangay Pantingan, Pilar, Bataan | P00839574LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure (Phase I), Barangay Pantingan, Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4802 | 14.63628 | 24CB0028 | 5,940,000 | 5,798,658.09 | 1,716,422,400,000 | 2,024 | LEBERN BUILDERS TRADING AND GENERAL SERVICES | 271 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 5940000 | 5798658.09 | 2024-05-24 | 02/21/2024 | flood_control | construction-of-flood-control-structure-phase-i-barangay-pantingan-pilar-bataan-24cb0028 | [object Object] |
64caa9a1-c7a8-4312-9d04-82bf45f13e84 | 2,023 | Region I | PANGASINAN | MANAOAG (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00727091LZ | Construction of Riverbank Protection, Brgy. Poblacion, Manaoag, Pangasinan | P00727091LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection, Brgy. Poblacion, Manaoag, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.480892 | 16.046342 | 23AH0073 | 19,600,000 | 19,595,588.4 | 1,697,328,000,000 | 2,023 | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 272 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 19600000 | 19595588.4 | 2023-09-14 | 05/12/2023 | flood_control | construction-of-riverbank-protection-brgy-poblacion-manaoag-pangasinan-23ah0073 | [object Object] |
a86888bd-3904-4f37-9e2a-a9f25e0ca3ce | 2,024 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00821517LZ | Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan (Phase II) | P00821517LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan (Phase II) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.481 | 15.755 | 24AJ0038 | 49,000,000 | 48,999,982.86 | 1,725,753,600,000 | 2,024 | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 273 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 48999982.86 | 2024-08-27 | 02/23/2024 | flood_control | construction-of-slope-protection-along-agno-river-barangay-san-gabriel-2nd-bayambang-pangasinan-phase-ii-24aj0038 | [object Object] |
aead3a74-e953-46b2-bbd3-a339370c9719 | 2,023 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00727339LZ | Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan | P00727339LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.482659 | 15.755242 | 23AJ0125 | 49,000,000 | 9,491,153.3 | 1,708,128,000,000 | 2,023 | BET CONSTRUCTION & SUPPLY / JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 274 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | Clustered with Contract ID 23AJ0125 | 9491153.3 | 2023-12-18 | 06/21/2023 | flood_control | construction-of-slope-protection-along-agno-river-barangay-san-gabriel-2nd-bayambang-pangasinan-23aj0125 | [object Object] |
f9c32850-9dd1-4f34-96dc-214eb787b2d4 | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00742350LZ | Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase I), Floridablanca, Pampanga | P00742350LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Caulaman River, Sto. Rosario Section (Phase I), Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.4828 | 14.8998 | 23CH0048 | 28,709,903.47 | 28,704,722.99 | 1,700,956,800,000 | 2,023 | RADIANS BUILDERS AND SUPPLY CORPORATION | 275 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 28709903.47 | 28704722.99 | 2023-11-27 | 04/17/2023 | flood_control | construction-of-slope-protection-caulaman-river-sto-rosario-section-phase-i-floridablanca-pampanga-23ch0048 | [object Object] |
f04534c7-f920-4edd-8087-4bbcfdcfdd46 | 2,022 | Region I | PANGASINAN | SISON (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00631098LZ | Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 2) | P00631098LZ-CW1 | Construction of Revetment - Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 2) | null | Construction of Revetment | Flood Control Structures | 120.4834 | 16.1642 | 22AI0024 | 49,000,000 | 48,261,362.1 | 1,662,076,800,000 | 2,022 | W.J.P. CONSTRUCTION AND SUPPLY | 276 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIFTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 49000000 | 48261362.1 | 2022-12-27 | 02/24/2022 | flood_control | construction-of-flood-control-structure-along-bued-river-barangay-amagbagan-tara-tara-sison-pangasinan-package-2-22ai0024 | [object Object] |
37d11804-eeef-4b8f-9168-2c3f285955a0 | 2,023 | Region I | PANGASINAN | MANAOAG (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00727087LZ | Construction of Riverbank Protection, Brgy. Pugaro, Manaoag, Pangasinan | P00727087LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection, Brgy. Pugaro, Manaoag, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.4837 | 16.049935 | 23AH0069 | 29,400,000 | 29,392,643.7 | 1,711,152,000,000 | 2,024 | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 277 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 29400000 | 29392643.7 | 2024-02-15 | 03/17/2023 | flood_control | construction-of-riverbank-protection-brgy-pugaro-manaoag-pangasinan-23ah0069 | [object Object] |
60e9a55c-d5e6-4f75-89d3-25fa3759bdc5 | 2,022 | Region III | BATAAN | DINALUPIHAN (BATAAN) | Bataan 1st District Engineering Office | P00620500LZ | Construction of Flood Control Project along Pagalanggang River, Old San Jose Section, Phase ERD-I, Dinalupihan, Bataan | P00620500LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Project along Pagalanggang River, Old San Jose Section, Phase ERD-I, Dinalupihan, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.483849 | 14.9138 | 22CA0021 | 24,499,999.72 | 24,499,999.72 | 1,663,977,600,000 | 2,022 | VM BUILDERS CONSTRUCTION CORPORATION | 278 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 24499999.72 | 24499999.72 | 2022-09-23 | 02/21/2022 | flood_control | construction-of-flood-control-project-along-pagalanggang-river-old-san-jose-section-phase-erd-i-dinalupihan-bataan-22ca0021 | [object Object] |
c7505c58-c653-4ce7-b229-52f511812c98 | 2,024 | Region I | ILOCOS SUR | SINAIT (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00820101LZ | Construction of Flood Control along Sinait River, Barangay Aguing, Sinait, Ilocos Sur | P00820101LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Sinait River, Barangay Aguing, Sinait, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.484642 | 17.870288 | 24AC0001 | 35,370,145 | 35,065,183.86 | 1,725,494,400,000 | 2,024 | 739 BUILDERS | 279 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 35370145 | 35065183.86 | 2024-09-06 | 02/14/2024 | flood_control | construction-of-flood-control-along-sinait-river-barangay-aguing-sinait-ilocos-sur-24ac0001 | [object Object] |
5edf631a-ab9f-484d-a847-95baea6567d8 | 2,022 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00621458LZ | Construction of Slope Protection along Caulaman River, Sto. Rosario Section, Floridablanca, Pampanga | P00621458LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Caulaman River, Sto. Rosario Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.485214 | 14.902279 | 22CH0043 | 48,852,777.44 | 48,847,004.76 | 1,665,187,200,000 | 2,022 | R.M. VITUG CONSTRUCTION | 280 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 48852777.44 | 48847004.76 | 2022-10-09 | 04/13/2022 | flood_control | construction-of-slope-protection-along-caulaman-river-sto-rosario-section-floridablanca-pampanga-22ch0043 | [object Object] |
0100dbd2-45f8-4940-9329-d28016d1ae60 | 2,022 | Region I | ILOCOS SUR | BANTAY (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00631069LZ | Construction of Flood Control Structure, Barangay San Mariano, Bantay, locos Sur | P00631069LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay San Mariano, Bantay, locos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.485498 | 17.556227 | 22AC0011 | 49,000,000 | 49,000,000 | 1,659,744,000,000 | 2,022 | SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 281 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 49000000 | 49000000 | 2022-08-07 | 02/18/2022 | flood_control | construction-of-flood-control-structure-barangay-san-mariano-bantay-locos-sur-22ac0011 | [object Object] |
8a786b8e-701c-4eab-b0a3-e3a78c6c170c | 2,024 | Region I | PANGASINAN | SANTA BARBARA (PANGASINAN) | Region I | P00821524LZ | Construction of Slope Protection Works along Sinucalan River, Barangay Minien East, Sta. Barbara, Pangasinan | P00821524LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Sinucalan River, Barangay Minien East, Sta. Barbara, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.48604 | 15.982536 | 24A00245 | 48,250,000 | 48,137,413.02 | 1,731,456,000,000 | 2,024 | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 282 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 48250000 | 48137413.02 | 2024-09-20 | 04/19/2024 | flood_control | construction-of-slope-protection-works-along-sinucalan-river-barangay-minien-east-sta-barbara-pangasinan-24a00245 | [object Object] |
6d0f7161-0082-4ae4-92ce-5d1d9915bb21 | 2,022 | Region I | ILOCOS SUR | BANTAY (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00631068LZ | Construction of Flood Control, San Mariano, Bantay, Ilocos Sur | P00631068LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control, San Mariano, Bantay, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.486524 | 17.553873 | 22AC0010 | 29,400,000 | 29,400,000 | 1,668,902,400,000 | 2,022 | SJ MILLENNIUM CONSTRUCTION AND CONSTRUCTION SUPPLY CORPORATION | 283 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 29400000 | 29400000 | 2022-12-16 | 02/10/2022 | flood_control | construction-of-flood-control-san-mariano-bantay-ilocos-sur-22ac0010 | [object Object] |
2144c379-5e94-4c38-97a7-72ed9fd00aab | 2,022 | Region I | ILOCOS SUR | NARVACAN (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00620129LZ | Construction of San Antonio River Control Structure, Barangay San Antonio, Narvacan, Ilocos Sur | P00620129LZ-CW1 | Construction of Flood Mitigation Structure - Construction of San Antonio River Control Structure, Barangay San Antonio, Narvacan, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.487433 | 17.408764 | 22AD0062 | 88,200,000 | 86,849,854.45 | 1,661,731,200,000 | 2,023 | 739 BUILDERS | 284 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 88200000 | 86849854.45 | 2023-04-17 | 02/24/2022 | flood_control | construction-of-san-antonio-river-control-structure-barangay-san-antonio-narvacan-ilocos-sur-22ad0062 | [object Object] |
93446b47-2bc6-4c77-9090-78ea9fb97894 | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00726176LZ | Construction of Carmencita Road Dike, Floridablanca, Pampanga | P00726176LZ-CW1 | Construction of Dike - Construction of Carmencita Road Dike, Floridablanca, Pampanga | null | Construction of Dike | Flood Control Structures | 120.4888 | 14.945689 | 23CH0005 | 29,398,757.7 | 29,393,715.3 | 1,692,835,200,000 | 2,023 | PASCAL CONSTRUCTION | 285 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 29398757.7 | 29393715.3 | 2023-08-25 | 02/27/2023 | flood_control | construction-of-carmencita-road-dike-floridablanca-pampanga-23ch0005 | [object Object] |
8fb0f606-1533-4735-8876-db0a3520afd4 | 2,022 | Region III | BATAAN | HERMOSA (BATAAN) | Bataan 1st District Engineering Office | P00640513LZ | Construction of Flood Control Structure along Pentor, Balsik River, Balsik Section Phase ATR-1, Hermosa, Bataan | P00640513LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Pentor, Balsik River, Balsik Section Phase ATR-1, Hermosa, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.488994 | 14.853122 | 22CA0071 | 39,599,997.96 | 39,599,984.38 | 1,670,716,800,000 | 2,022 | TRICHES CONSTRUCTION & TRADING | 286 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 39599997.96 | 39599984.38 | 2022-12-09 | 06/07/2022 | flood_control | construction-of-flood-control-structure-along-pentor-balsik-river-balsik-section-phase-atr-1-hermosa-bataan-22ca0071 | [object Object] |
80f37296-cc7b-47b9-bb3a-7c0fcea12997 | 2,022 | Region I | ILOCOS NORTE | PAOAY (ILOCOS NORTE) | Region I | P00644722LZ | Repair/Rehabilitation of Flood Control Project along Ubbog River, Brgy. Callaguip, Paoay, Ilocos Norte | P00644722LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Repair/Rehabilitation of Flood Control Project along Ubbog River, Brgy. Callaguip, Paoay, Ilocos Norte | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.489026 | 18.071149 | 22A00335 | 48,250,000 | 47,528,651.6 | 1,689,724,800,000 | 2,023 | RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY / NOSIDE CONSTRUCTION | 287 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48250000 | 47528651.6 | 2023-04-11 | 01/19/2023 | flood_control | repairrehabilitation-of-flood-control-project-along-ubbog-river-brgy-callaguip-paoay-ilocos-norte-22a00335 | [object Object] |
212d5dda-79d5-4589-9f3d-e596298d8572 | 2,024 | Region III | BATAAN | HERMOSA (BATAAN) | Bataan 1st District Engineering Office | P00823392LZ | Construction of Flood Control Project along Pentor - Balsik River, Balsik Section, Phase IV-DMC, Hermosa, Bataan | P00823392LZ-CW1 | Construction of Revetment - Construction of Flood Control Project along Pentor - Balsik River, Balsik Section, Phase IV-DMC, Hermosa, Bataan | null | Construction of Revetment | Flood Control Structures | 120.489723 | 14.852907 | 24CA0047 | 96,499,999.64 | 96,499,998.25 | 1,735,603,200,000 | 2,024 | M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES | 288 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 96499999.64 | 96499998.25 | 2024-12-02 | 04/23/2024 | flood_control | construction-of-flood-control-project-along-pentor---balsik-river-balsik-section-phase-iv-dmc-hermosa-bataan-24ca0047 | [object Object] |
ab9868f9-f3ca-47e0-ab52-1a2810b3c724 | 2,022 | Region I | ILOCOS SUR | SANTA LUCIA (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00640498LZ | Construction of Sta. Lucia River Control, Santiago, Ilocos Sur | P00640498LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Sta. Lucia River Control, Santiago, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.489861 | 17.117877 | 22AD0083 | 19,800,000 | 19,799,998.31 | 1,663,891,200,000 | 2,023 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES / EJIEV CONSTRUCTION SERVICES | 289 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 19800000 | 19799998.31 | 2023-05-01 | 04/04/2022 | flood_control | construction-of-sta-lucia-river-control-santiago-ilocos-sur-22ad0083 | [object Object] |
ea6c1a5f-d5f3-4fb5-bd5c-633888ea79dd | 2,023 | Region I | ILOCOS NORTE | PAOAY (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00726853LZ | Construction of Flood Control Structure along Quiaoit River, Brgy. Callaguip, Paoay, Ilocos Norte | P00726853LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Quiaoit River, Brgy. Callaguip, Paoay, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.49021 | 18.07249 | 23AB0145 | 9,650,000 | 9,650,000 | 1,692,489,600,000 | 2,023 | RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY | 290 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 9650000 | 9650000 | 2023-08-15 | 05/08/2023 | flood_control | construction-of-flood-control-structure-along-quiaoit-river-brgy-callaguip-paoay-ilocos-norte-23ab0145 | [object Object] |
7bd44575-fcba-4ed3-8dde-d91a22762b27 | 2,023 | Region I | ILOCOS NORTE | SAN NICOLAS (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00726850LZ | Construction of Flood Control Structure traversing Manila North Road, Upstream & Downstream of Apatut Bridge, Ilocos Norte | P00726850LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure traversing Manila North Road, Upstream & Downstream of Apatut Bridge, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.49024 | 17.94909 | 23AB0149 | 9,650,000 | 9,215,046.51 | 1,696,377,600,000 | 2,023 | JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT | 291 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 9650000 | 9215046.51 | 2023-10-05 | 05/08/2023 | flood_control | construction-of-flood-control-structure-traversing-manila-north-road-upstream-downstream-of-apatut-bridge-ilocos-norte-23ab0149 | [object Object] |
8a346f9d-e441-493c-98e4-8f15c470d1f9 | 2,022 | Region I | PANGASINAN | SISON (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00631097LZ | Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 1) | P00631097LZ-CW1 | Construction of Revetment - Construction of Flood Control Structure along Bued River, Barangay Amagbagan-Tara-Tara, Sison, Pangasinan (Package 1) | null | Construction of Revetment | Flood Control Structures | 120.49033 | 16.1722 | 22AI0011 | 49,000,000 | 48,255,997.27 | 1,662,076,800,000 | 2,022 | W.J.P. CONSTRUCTION AND SUPPLY | 292 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIFTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 49000000 | 48255997.27 | 2022-12-26 | 02/24/2022 | flood_control | construction-of-flood-control-structure-along-bued-river-barangay-amagbagan-tara-tara-sison-pangasinan-package-1-22ai0011 | [object Object] |
29286a0f-339b-48a8-98f5-11ffbc0d873f | 2,024 | Region IV-B | OCCIDENTAL MINDORO | PALUAN (OCCIDENTAL MINDORO) | Region IV-B | P00823576LZ | Construction of Road Dike/Esplanade along Sitio Katanlawan, Paluan, Occidental Mindoro | P00823576LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Road Dike/Esplanade along Sitio Katanlawan, Paluan, Occidental Mindoro | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.490344 | 13.417712 | 24E00054 | 241,250,000 | 241,246,348.7 | 1,740,268,800,000 | 2,024 | ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. | 293 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | OCCIDENTAL MINDORO (LEGISLATIVE DISTRICT) | Mindoro Occidental District Engineering Office | 241249999.98 | 241246348.72 | 2024-12-07 | 03/02/2024 | flood_control | construction-of-road-dikeesplanade-along-sitio-katanlawan-paluan-occidental-mindoro-24e00054 | [object Object] |
71acd3e3-8e84-4911-98d2-44118a16209d | 2,022 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00639367LZ | Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta.1+082.80 to Sta.1+640 - Right Bank), Capas, Tarlac | P00639367LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta.1+082.80 to Sta.1+640 - Right Bank), Capas, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.49055 | 15.37805 | 22CK0084 | 96,499,939.51 | 94,481,613.13 | 1,663,977,600,000 | 2,022 | ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. | 294 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 96499939.51 | 94481613.13 | 2022-08-08 | 03/26/2022 | flood_control | rehabilitation-of-dike-along-bangut-river-brgy-sta-lucia-section-sta108280-to-sta1640---right-bank-capas-tarlac-22ck0084 | [object Object] |
a89fb74e-38a4-476b-b48a-b48ca3dbd1d2 | 2,024 | Region I | ILOCOS NORTE | BADOC (ILOCOS NORTE) | Region I | P00848604LZ | Construction of Flood Control Structure along Badoc River, Barangay Mabusag Sur, Badoc, Ilocos Norte | P00848604LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Badoc River, Barangay Mabusag Sur, Badoc, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.49084 | 17.927309 | 24A00424 | 53,460,000 | 53,459,995.32 | 1,734,220,800,000 | 2,024 | BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY | 295 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 53460000 | 53459995.32 | 2024-11-30 | 05/03/2024 | flood_control | construction-of-flood-control-structure-along-badoc-river-barangay-mabusag-sur-badoc-ilocos-norte-24a00424 | [object Object] |
b6f17399-d575-4dd5-a25d-bbc9d2ec0931 | 2,022 | Region I | PANGASINAN | ALCALA (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00620461LZ | Construction of Flood Control Structure along Agno River (Package 2), Alcala, Pangasinan | P00620461LZ-CW1 | Construction of Dike - Construction of Flood Control Structure along Agno River (Package 2), Alcala, Pangasinan | null | Construction of Dike | Flood Control Structures | 120.4911 | 15.8331 | 22AI0030 | 34,300,000 | 33,779,643.34 | 1,662,422,400,000 | 2,022 | W.J.P. CONSTRUCTION AND SUPPLY | 296 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIFTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 34300000 | 33779643.34 | 2022-07-02 | 03/08/2022 | flood_control | construction-of-flood-control-structure-along-agno-river-package-2-alcala-pangasinan-22ai0030 | [object Object] |
4750a295-a9f5-4d24-b634-e82428506ccb | 2,022 | Region I | PANGASINAN | MANAOAG (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00631085LZ | Construction of Riverbank Protection at Brgy. Pugaro, Manaoag, Pangasinan | P00631085LZ-CW1 | Construction of Slope Protection Structure - Construction of Riverbank Protection at Brgy. Pugaro, Manaoag, Pangasinan | null | Construction of Slope Protection Structure | Flood Control Structures | 120.491283 | 16.062184 | 22AH0070 | 14,700,000 | 14,260,946.7 | 1,657,411,200,000 | 2,022 | BET CONSTRUCTION & SUPPLY | 297 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 14700000 | 14260946.7 | 2022-07-11 | 02/17/2022 | flood_control | construction-of-riverbank-protection-at-brgy-pugaro-manaoag-pangasinan-22ah0070 | [object Object] |
1c4432d1-0314-441e-989f-0fddf1ee39bc | 2,021 | Region III | BATAAN | null | Bataan 1st District Engineering Office | P00525984LZ | Construction/Rehabilitation of Flood Control Project in Pentor-Balsik River, Daang Bago Section, Phase B, Dinalupihan, Bataan | P00525984LZ-CW1 | Construction of Flood Mitigation Structure - Construction/Rehabilitation of Flood Control Project in Pentor-Balsik River, Daang Bago Section, Phase B, Dinalupihan, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.491383 | 14.864408 | 21CA0048 | 48,999,998.19 | 48,999,998.19 | 1,677,456,000,000 | 2,022 | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | 298 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999998.19 | 48999998.19 | 2022-12-01 | 03/14/2022 | flood_control | constructionrehabilitation-of-flood-control-project-in-pentor-balsik-river-daang-bago-section-phase-b-dinalupihan-bataan-21ca0048 | [object Object] |
96e58133-5de2-4e5b-bb65-6256799f42ee | 2,023 | Region I | ILOCOS NORTE | BADOC (ILOCOS NORTE) | Region I | P00725600LZ | Construction of Flood Control Structure along Badoc River Barangay Lubigan, Badoc, Ilocos Norte | P00725600LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Badoc River Barangay Lubigan, Badoc, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.49331 | 17.92054 | 23A00102 | 48,250,000 | 48,249,992.07 | 1,691,193,600,000 | 2,023 | BADOC BUILDERS & SUPPLY, INC. (FORMERLY: BADOC BUILDER & SUPPLY | 299 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48250000 | 48249992.07 | 2023-08-06 | 02/14/2023 | flood_control | construction-of-flood-control-structure-along-badoc-river-barangay-lubigan-badoc-ilocos-norte-23a00102 | [object Object] |
2344bbfc-5b44-4c5f-aab1-7d6394bafbd6 | 2,022 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00639366LZ | Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta. 1+640 to Sta. 2+200), Capas, Tarlac | P00639366LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along Bangut River (Brgy. Sta. Lucia Section, Sta. 1+640 to Sta. 2+200), Capas, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.493958 | 15.380061 | 22CK0099 | 96,499,799.7 | 96,496,291.64 | 1,673,913,600,000 | 2,023 | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | 300 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 96499799.7 | 96496291.64 | 2023-01-18 | 03/26/2022 | flood_control | rehabilitation-of-dike-along-bangut-river-brgy-sta-lucia-section-sta-1640-to-sta-2200-capas-tarlac-22ck0099 | [object Object] |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.