GlobalID stringlengths 36 36 | InfraYear int64 2.02k 2.03k | Region stringclasses 16 values | Province stringclasses 98 values | Municipality stringlengths 11 52 ⌀ | ImplementingOffice stringclasses 203 values | ProjectID stringlengths 11 11 | ProjectDescription stringlengths 37 314 | ProjectComponentID stringlengths 15 15 | ProjectComponentDescription stringlengths 74 359 | Program float64 | TypeofWork stringclasses 18 values | infra_type stringclasses 1 value | Longitude float64 117 127 | Latitude float64 5.77 20.5 | ContractID stringlengths 8 8 | ABC float64 1.16M 311M | ContractCost float64 1.15M 290M | CompletionDateOriginal float64 1,539B 1,770B ⌀ | CompletionYear int64 2.02k 2.03k | Contractor stringlengths 10 199 | ObjectId int64 1 9.86k | CreationDate int64 1,754B 1,754B | Creator stringclasses 1 value | EditDate int64 1,754B 1,754B | Editor stringclasses 1 value | FundingYear int64 2.02k 2.03k | LegislativeDistrict stringclasses 252 values | DistrictEngineeringOffice stringclasses 199 values | ABC_String stringlengths 7 72 | ContractCost_String stringlengths 7 72 | CompletionDateActual stringdate 2022-07-01 00:00:00 2025-05-30 00:00:00 | StartDate stringclasses 739 values | type stringclasses 1 value | slug stringlengths 44 273 | _geo stringclasses 1 value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
c15a07b1-329c-49d0-873e-1f667bb1984a | 2,022 | Region X | MISAMIS OCCIDENTAL | BONIFACIO (MISAMIS OCCIDENTAL) | Misamis Occidental 2nd District Engineering Office | P00630587MN | Construction of Usugan River Control (Upstream), Bonifacio, Misamis Occidental | P00630587MN-CW1 | Construction of Flood Mitigation Structure - Construction of Usugan River Control (Upstream), Bonifacio, Misamis Occidental | null | Construction of Flood Mitigation Structure | Flood Control Structures | 123.590489 | 8.019233 | 22KJ0037 | 19,600,000 | 19,300,519.14 | 1,664,236,800,000 | 2,023 | VICENTE T. LAO CONSTRUCTION | 301 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MISAMIS OCCIDENTAL (SECOND LEGISLATIVE DISTRICT) | Misamis Occidental 2nd District Engineering Office | 19600000 | 19300519.14 | 2023-04-23 | 04/04/2022 | flood_control | construction-of-usugan-river-control-upstream-bonifacio-misamis-occidental-22kj0037 | [object Object] |
db296241-69bc-42e0-9dcb-b608448b281b | 2,022 | Region XIII | AGUSAN DEL SUR | ROSARIO (AGUSAN DEL SUR) | Agusan del Sur 2nd District Engineering Office | P00620299MN | Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 - Sta. 0+090.00, Rosario, Agusan del Sur | P00620299MN-CW1 | Construction of Flood Mitigation Structure - Construction of Bank Protection of Solibao River Protecting Solibao Bridge (Upstream), Sta. 0+000.00 - Sta. 0+090.00, Rosario, Agusan del Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 126.006402 | 8.373423 | 22NC0034 | 29,400,000 | 29,399,995.42 | 1,678,579,200,000 | 2,023 | INNOVATI CONSTRUCTION & DEVELOPMENT CORPORATION | 302 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | AGUSAN DEL SUR (SECOND LEGISLATIVE DISTRICT) | Agusan del Sur 2nd District Engineering Office | 29400000 | 29399995.42 | 2023-03-13 | 07/11/2022 | flood_control | construction-of-bank-protection-of-solibao-river-protecting-solibao-bridge-upstream-sta-000000---sta-009000-rosario-agusan-del-sur-22nc0034 | [object Object] |
fb8d5b78-0356-4562-a02c-051d31a1586a | 2,022 | Region X | BUKIDNON | SAN FERNANDO (BUKIDNON) | Bukidnon 1st District Engineering Office | P00620114MN | Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Bonacao Stream - Bonacao Bridge, Tributary to Pulangui River), Brgy. Bonacao, Sta. 0+200 - Sta. 0+400 (BS), San Fernando, Bukidnon | P00620114MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Bonacao Stream - Bonacao Bridge, Tributary to Pulangui River), Brgy. Bonacao, Sta. 0+200 - Sta. 0+400 (BS), San Fernando, Bukidnon | null | Construction of Flood Mitigation Structure | Flood Control Structures | 125.393616 | 7.800405 | 22KA0038 | 49,000,000 | 48,999,994.29 | 1,667,779,200,000 | 2,022 | RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE | 303 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BUKIDNON (SECOND LEGISLATIVE DISTRICT) | Bukidnon 1st District Engineering Office | 49000000 | 48999994.29 | 2022-10-26 | 01/28/2022 | flood_control | construction-of-flood-mitigation-structure-along-kapalong-talaingod-valencia-road-bonacao-stream---bonacao-bridge-tributary-to-pulangui-river-brgy-bonacao-sta-0200---sta-0400-bs-san-fernando-bukidnon-22ka0038 | [object Object] |
72845369-24fb-4176-b85b-86b45e05233a | 2,022 | Region XIII | SURIGAO DEL SUR | CITY OF BISLIG (SURIGAO DEL SUR) | Surigao del Sur 2nd District Engineering Office | P00632322MN | Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+750 | P00632322MN-CW1 | Rehabilitation / Major Repair of Slope Protection Structure - Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+750 | null | Rehabilitation / Major Repair of Slope Protection Structure | Flood Control Structures | 126.358205 | 7.90878 | 22NI0069 | 96,500,000 | 96,399,243.69 | 1,696,291,200,000 | 2,023 | HGG BUILDERS & SUPPLY | 304 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT) | Surigao del Sur 2nd District Engineering Office | 96500000 | 96399243.69 | 2023-09-15 | 06/22/2022 | flood_control | rehabilitation-and-road-slope-protection-structures-along-bislig-trento-road-k1508510--k1508750-22ni0069 | [object Object] |
2a4c81f8-c7f9-414d-8bf4-3dc9a724a5b9 | 2,022 | Region I | PANGASINAN | BOLINAO (PANGASINAN) | Pangasinan 1st District Engineering Office | P00631081LZ | Construction of Bolinao Seawall, Brgy. Poblacion, Bolinao, Pangasinan | P00631081LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Bolinao Seawall, Brgy. Poblacion, Bolinao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 119.891439 | 16.393694 | 22AG0021 | 34,300,000 | 34,299,548.02 | 1,662,422,400,000 | 2,022 | JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S) | 305 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FIRST LEGISLATIVE DISTRICT) | Pangasinan 1st District Engineering Office | 34300000 | 34299548.02 | 2022-09-06 | 02/10/2022 | flood_control | construction-of-bolinao-seawall-brgy-poblacion-bolinao-pangasinan-22ag0021 | [object Object] |
9241a1c8-10e7-4d23-a110-587a8d0cda5c | 2,023 | Region I | ILOCOS SUR | SANTA CATALINA (ILOCOS SUR) | Region I | P00725616LZ | Construction of Flood Control Structure along Govantes River, Cabittaogan, Sta. Catalina, Ilocos Sur | P00725616LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Govantes River, Cabittaogan, Sta. Catalina, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.346041 | 17.565903 | 23A00089 | 67,550,000 | 67,549,992.23 | 1,696,636,800,000 | 2,023 | SATRAP CONSTRUCTION CO., INC. | 306 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 67550000 | 67549992.23 | 2023-10-08 | 02/14/2023 | flood_control | construction-of-flood-control-structure-along-govantes-river-cabittaogan-sta-catalina-ilocos-sur-23a00089 | [object Object] |
9007e952-eb6b-4b51-a587-8a784d6a1597 | 2,024 | Region I | LA UNION | NAGUILIAN (LA UNION) | La Union 2nd District Engineering Office | P00824812LZ | Construction of Flood Control structure along Bauang River Basin (Package 10), Naguilian, La Union | P00824812LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 10), Naguilian, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.401368 | 16.505633 | 24AF0126 | 82,410,999.95 | 82,403,230.11 | 1,734,998,400,000 | 2,025 | UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. | 307 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 82410999.95 | 82403230.11 | 2025-03-16 | 04/18/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-10-naguilian-la-union-24af0126 | [object Object] |
063e775c-de8c-4aac-9c37-b976e58c64ce | 2,022 | Region I | ILOCOS SUR | SANTA MARIA (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00639420LZ | Construction of Pinsal Falls Flood Control Structure, Sta Maria, Ilocos Sur | P00639420LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Pinsal Falls Flood Control Structure, Sta Maria, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.549398 | 17.375802 | 22AD0109 | 4,900,000 | 4,899,720.46 | 1,654,300,800,000 | 2,023 | MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) | 308 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 4900000 | 4899720.46 | 2023-08-29 | 04/04/2022 | flood_control | construction-of-pinsal-falls-flood-control-structure-sta-maria-ilocos-sur-22ad0109 | [object Object] |
e4e59588-a525-4618-9ec2-5237ee4e822e | 2,024 | Region I | ILOCOS NORTE | BACARRA (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00838484LZ | Construction of Flood Control Structure along Sitio Kabaywasan, Barangay Bani, Bacarra, Ilocos Norte | P00838484LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sitio Kabaywasan, Barangay Bani, Bacarra, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.561059 | 18.263152 | 24AA0204 | 4,899,984.16 | 4,899,978.15 | 1,712,880,000,000 | 2,024 | BJMJB CONSTRUCTION & SUPPLY | 309 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 4899984.16 | 4899978.15 | 2024-04-13 | 02/27/2024 | flood_control | construction-of-flood-control-structure-along-sitio-kabaywasan-barangay-bani-bacarra-ilocos-norte-24aa0204 | [object Object] |
c0f25036-48c3-4b80-9a68-8c89ace8417f | 2,023 | Region III | BULACAN | CITY OF MALOLOS (CAPITAL) (BULACAN) | Bulacan 1st District Engineering Office | P00742158LZ | Construction of Flood Mitigation Structures along Bgry. Pamarawan, Malolos, Bulacan | P00742158LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structures along Bgry. Pamarawan, Malolos, Bulacan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.809685 | 14.757415 | 23CC0248 | 59,399,680.02 | 59,358,779.56 | 1,703,116,800,000 | 2,023 | JTC CRUZ CONSTRUCTION CO., INC. | 310 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BULACAN (FIRST LEGISLATIVE DISTRICT) | Bulacan 1st District Engineering Office | 59399680.02 | 59358779.56 | 2023-12-22 | 03/28/2023 | flood_control | construction-of-flood-mitigation-structures-along-bgry-pamarawan-malolos-bulacan-23cc0248 | [object Object] |
077b91aa-3ea4-459a-aace-738d538a6f8c | 2,024 | Region III | BULACAN | CITY OF MALOLOS (CAPITAL) (BULACAN) | Bulacan 1st District Engineering Office | P00820227LZ | Construction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan | P00820227LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Atlag, Malolos City, Bulacan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.820479 | 14.827436 | 24CC0261 | 72,374,911.43 | 72,374,895.37 | 1,732,579,200,000 | 2,024 | SYMS CONSTRUCTION TRADING | 311 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BULACAN (FIRST LEGISLATIVE DISTRICT) | Bulacan 1st District Engineering Office | 72374911.43 | 72374895.37 | 2024-06-11 | 04/02/2024 | flood_control | construction-of-flood-control-structure-barangay-atlag-malolos-city-bulacan-24cc0261 | [object Object] |
79c6c88b-5002-4e3b-a481-7622c8fbd6c0 | 2,023 | Region III | BULACAN | MARILAO (BULACAN) | Bulacan 2nd District Engineering Office | P00727363LZ | Rehabilitation of Pumping Stations at Marilao, Bulacan | P00727363LZ-CW1 | Rehabilitation / Major Repair of Flood Mitigation Facility - Rehabilitation of Pumping Stations at Marilao, Bulacan | null | Rehabilitation / Major Repair of Flood Mitigation Facility | Flood Control Structures | 120.951773 | 14.753638 | 23CD0056 | 4,898,928.32 | 4,825,444.4 | 1,689,984,000,000 | 2,023 | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | 312 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BULACAN (FOURTH LEGISLATIVE DISTRICT) | Bulacan 2nd District Engineering Office | 4898928.32 | 4825444.4 | 2023-05-16 | 03/13/2023 | flood_control | rehabilitation-of-pumping-stations-at-marilao-bulacan-23cd0056 | [object Object] |
c1b0ab52-215b-4c4c-955b-9ed7ef84c6ad | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00740278LZ | Construction of Pumping Station at Barangay 182, Tondo, Manila | P00740278LZ-CW1 | Construction of Flood Mitigation Facility - Construction of Pumping Station at Barangay 182, Tondo, Manila | null | Construction of Flood Mitigation Facility | Flood Control Structures | 120.970972 | 14.631083 | 23OE0060 | 96,499,104.19 | 96,419,364.54 | 1,714,780,800,000 | 2,024 | EIGHT J'S CONSTRUCTION SERVICES / JIIK CONSTRUCTION SERVICES | 313 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 96499104.19 | 96419364.54 | 2024-05-05 | 03/28/2023 | flood_control | construction-of-pumping-station-at-barangay-182-tondo-manila-23oe0060 | [object Object] |
007d1d7a-fcf8-4032-9727-42fc26978033 | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00737403LZ | Rehabilitation of Drainage, Barangay 179, Zone 16, Manila City | P00737403LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation of Drainage, Barangay 179, Zone 16, Manila City | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 120.97274 | 14.629625 | 23OE0101 | 4,948,968.77 | 4,948,482.78 | 1,691,107,200,000 | 2,023 | DENNREY CONSTRUCTION AND TRADING COMPANY | 314 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 4948968.77 | 4948482.78 | 2023-07-23 | 03/08/2023 | flood_control | rehabilitation-of-drainage-barangay-179-zone-16-manila-city-23oe0101 | [object Object] |
91bccfd7-a51c-47d8-9154-9f4673721f04 | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00737404LZ | Rehabilitation of Drainage, Barangay 181, Zone 16, Manila City | P00737404LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation of Drainage, Barangay 181, Zone 16, Manila City | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 120.973333 | 14.631274 | 23OE0104 | 9,898,703.16 | 9,892,991.03 | 1,693,440,000,000 | 2,023 | DENNREY CONSTRUCTION AND TRADING COMPANY | 315 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 9898703.16 | 9892991.03 | 2023-09-01 | 03/08/2023 | flood_control | rehabilitation-of-drainage-barangay-181-zone-16-manila-city-23oe0104 | [object Object] |
fc0c33c1-2653-498c-ae68-3804cd92f9db | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00740287LZ | Installation of Booster Pump at Estero de Maypajo (Phase I), Tondo, Manila City | P00740287LZ-CW1 | Construction of Flood Mitigation Facility - Installation of Booster Pump at Estero de Maypajo (Phase I), Tondo, Manila City | null | Construction of Flood Mitigation Facility | Flood Control Structures | 120.973685 | 14.634801 | 23OE0061 | 96,499,285.72 | 93,973,783.55 | 1,688,428,800,000 | 2,023 | EIGHT J'S CONSTRUCTION SERVICES | 316 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 96499285.72 | 93973783.55 | 2023-07-12 | 03/28/2023 | flood_control | installation-of-booster-pump-at-estero-de-maypajo-phase-i-tondo-manila-city-23oe0061 | [object Object] |
94dca5d0-42a6-4dc0-ae7a-7820679ecbde | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00740288LZ | Installation of Booster Pump at Estero de Maypajo (Phase II), Tondo, Manila City | P00740288LZ-CW1 | Construction of Flood Mitigation Facility - Installation of Booster Pump at Estero de Maypajo (Phase II), Tondo, Manila City | null | Construction of Flood Mitigation Facility | Flood Control Structures | 120.973685 | 14.634801 | 23OE0062 | 96,499,390.45 | 93,855,667.56 | 1,693,612,800,000 | 2,023 | EIGHT J'S CONSTRUCTION SERVICES | 317 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 96499390.45 | 93855667.56 | 2023-07-25 | 03/28/2023 | flood_control | installation-of-booster-pump-at-estero-de-maypajo-phase-ii-tondo-manila-city-23oe0062 | [object Object] |
cf9d4d06-4700-45cb-834c-5ea954a4501f | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00740289LZ | Installation of Booster Pump at Estero de Maypajo (Phase III), Tondo, Manila City | P00740289LZ-CW1 | Construction of Flood Mitigation Facility - Installation of Booster Pump at Estero de Maypajo (Phase III), Tondo, Manila City | null | Construction of Flood Mitigation Facility | Flood Control Structures | 120.973685 | 14.634801 | 23OE0063 | 96,499,089.29 | 93,950,837.84 | 1,693,612,800,000 | 2,023 | EIGHT J'S CONSTRUCTION SERVICES | 318 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 96499089.29 | 93950837.84 | 2023-07-26 | 03/28/2023 | flood_control | installation-of-booster-pump-at-estero-de-maypajo-phase-iii-tondo-manila-city-23oe0063 | [object Object] |
62da1181-9038-481e-908a-521d110e3cd5 | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00737405LZ | Rehabilitation of Drainage, Barangay 186, Zone 16, Manila City | P00737405LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation of Drainage, Barangay 186, Zone 16, Manila City | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 120.974258 | 14.63075 | 23OE0105 | 9,898,819.64 | 9,879,998.59 | 1,701,216,000,000 | 2,023 | DENNREY CONSTRUCTION AND TRADING COMPANY | 319 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 9898819.64 | 9879998.59 | 2023-11-24 | 03/08/2023 | flood_control | rehabilitation-of-drainage-barangay-186-zone-16-manila-city-23oe0105 | [object Object] |
bf87abe9-f8d0-4b99-ba43-74d3d71050c9 | 2,023 | Region IV-A | CAVITE | BACOOR CITY (CAVITE) | Region IV-A | P00742425LZ | Construction of Flood Control Structures along Zapote River at Barangay San Nicolas 1, Bacoor, Cavite | P00742425LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Zapote River at Barangay San Nicolas 1, Bacoor, Cavite | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.977679 | 14.436324 | 23D00168 | 19,800,000 | 19,797,210.25 | 1,712,188,800,000 | 2,024 | E. F. CHUA CONSTRUCTION, INC. | 320 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | CAVITE (SECOND LEGISLATIVE DISTRICT) | Cavite 3rd District Engineering Office | 19800000 | 19797210.25 | 2024-04-05 | 07/17/2023 | flood_control | construction-of-flood-control-structures-along-zapote-river-at-barangay-san-nicolas-1-bacoor-cavite-23d00168 | [object Object] |
9734b533-ac4d-4142-a96d-03d7ac431168 | 2,023 | National Capital Region | CITY OF MANILA | CITY OF MANILA (METROPOLITAN MANILA) | North Manila District Engineering Office | P00725996LZ | Construction of Retarding Basin at Estero de Maypajo, (Phase II), Tondo, Manila | P00725996LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Retarding Basin at Estero de Maypajo, (Phase II), Tondo, Manila | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.978434 | 14.634319 | 23OE0051 | 34,299,867.73 | 34,298,030.64 | 1,706,486,400,000 | 2,024 | G.F. FABIAN CONSTRUCTION | 321 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MANILA CITY (SECOND LEGISLATIVE DISTRICT) | North Manila District Engineering Office | 34299867.73 | 34298030.64 | 2024-01-30 | 02/13/2023 | flood_control | construction-of-retarding-basin-at-estero-de-maypajo-phase-ii-tondo-manila-23oe0051 | [object Object] |
aeb24cdc-f910-4abc-846c-d342017d952f | 2,022 | National Capital Region | PARAÑAQUE CITY | CITY OF PARAÑAQUE (METROPOLITAN MANILA) | Metro Manila 2nd District Engineering Office | P00620370LZ | Rehabilitation / Upgrading and Drainage Improvement at Tramo II & its vicinity, Brgy. San Dionisio, Parañaque City | P00620370LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation / Upgrading and Drainage Improvement at Tramo II & its vicinity, Brgy. San Dionisio, Parañaque City | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 120.989657 | 14.488739 | 22OC0062 | 24,500,000 | 24,495,923.62 | 1,670,371,200,000 | 2,022 | GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. | 322 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | CITY OF PARAÑAQUE (FIRST LEGISLATIVE DISTRICT) | Metro Manila 2nd District Engineering Office | 24500000 | 24495923.62 | 2022-12-08 | 02/09/2022 | flood_control | rehabilitation-upgrading-and-drainage-improvement-at-tramo-ii-its-vicinity-brgy-san-dionisio-paraaque-city-22oc0062 | [object Object] |
875f6e86-0820-4143-b08c-41e4b8e51dfe | 2,022 | National Capital Region | LAS PIÑAS CITY | CITY OF LAS PIÑAS (METROPOLITAN MANILA) | Las Piñas-Muntinlupa District Engineering Office | P00620906LZ | Construction of Flood Control Structure at Zapote River, Las Piñas City | P00620906LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Zapote River, Las Piñas City | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.00206 | 14.394145 | 22OI0038 | 29,397,955.97 | 28,158,400.47 | 1,659,744,000,000 | 2,022 | E. F. CHUA CONSTRUCTION, INC. | 323 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | CITY OF LAS PIÑAS (LEGISLATIVE DISTRICT) | Las Piñas-Muntinlupa District Engineering Office | 29397955.97 | 28158400.47 | 2022-08-07 | 02/09/2022 | flood_control | construction-of-flood-control-structure-at-zapote-river-las-pias-city-22oi0038 | [object Object] |
6a684c87-e0cf-4316-a8dd-018d53e16312 | 2,024 | National Capital Region | QUEZON CITY | QUEZON CITY (METROPOLITAN MANILA) | Quezon City 1st District Engineering Office | P00821458LZ | Construction of Flood Control Structure at Talayan Creek, Barangay Sto. Domingo, Quezon City | P00821458LZ-CW1 | Construction of Revetment - Construction of Flood Control Structure at Talayan Creek, Barangay Sto. Domingo, Quezon City | null | Construction of Revetment | Flood Control Structures | 121.012121 | 14.630019 | 24OF0026 | 48,999,608.72 | 48,508,612.63 | 1,732,924,800,000 | 2,024 | AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. | 324 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | QUEZON CITY (FIRST LEGISLATIVE DISTRICT) | Quezon City 1st District Engineering Office | 48999608.72 | 48508612.63 | 2024-12-01 | 02/06/2024 | flood_control | construction-of-flood-control-structure-at-talayan-creek-barangay-sto-domingo-quezon-city-24of0026 | [object Object] |
f4a883c3-e053-48bb-8369-a73645bc1a09 | 2,021 | Region IV-A | LAGUNA | null | Laguna 2nd District Engineering Office | P00561774LZ | Construction of Revetment along Narra Road, San Pedro City, Laguna | P00561774LZ-CW1 | Construction of Revetment - Construction of Revetment along Narra Road, San Pedro City, Laguna | null | Construction of Revetment | Flood Control Structures | 121.023133 | 14.345685 | 21DI0053 | 29,700,000 | 28,809,112.3 | 1,661,212,800,000 | 2,022 | NEWBIG FOUR J CONSTRUCTION INC., (FORMERLY FOUR J | 325 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | LAGUNA (FIRST LEGISLATIVE DISTRICT) | Laguna 2nd District Engineering Office | 29700000 | 28809112.3 | 2022-08-24 | 12/07/2021 | flood_control | construction-of-revetment-along-narra-road-san-pedro-city-laguna-21di0053 | [object Object] |
c92d5ee3-21e2-4919-bbb5-a764c4d27779 | 2,023 | Region IX | SULU | MAIMBUNG (SULU) | Region IX | P00735025MN | Construction of Flood Control Structure along Sapah Maluwang River, Kandang Poblacion, Maimbung, Sulu | P00735025MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sapah Maluwang River, Kandang Poblacion, Maimbung, Sulu | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.027815 | 5.928805 | 23J00187 | 48,250,000 | 48,192,075.61 | 1,705,622,400,000 | 2,024 | ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | 326 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | SULU (FIRST LEGISLATIVE DISTRICT) | Sulu 1st District Engineering Office | 48250000 | 48192075.61 | 2024-01-20 | 08/03/2023 | flood_control | construction-of-flood-control-structure-along-sapah-maluwang-river-kandang-poblacion-maimbung-sulu-23j00187 | [object Object] |
b160f4a1-3c02-4921-a6ec-f2651d7b1071 | 2,022 | National Capital Region | MUNTINLUPA CITY | CITY OF MUNTINLUPA (METROPOLITAN MANILA) | Las Piñas-Muntinlupa District Engineering Office | P00620763LZ | Construction of Flood Control Structure along Laguna de Bay, Barangay Putatan, Muntinlupa City | P00620763LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Laguna de Bay, Barangay Putatan, Muntinlupa City | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.052231 | 14.400642 | 22OI0049 | 91,673,632.46 | 91,568,484.81 | 1,661,299,200,000 | 2,022 | E. F. CHUA CONSTRUCTION, INC. | 327 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | CITY OF MUNTINLUPA (LEGISLATIVE DISTRICT) | Las Piñas-Muntinlupa District Engineering Office | 91673632.46 | 91568484.81 | 2022-08-25 | 02/17/2022 | flood_control | construction-of-flood-control-structure-along-laguna-de-bay-barangay-putatan-muntinlupa-city-22oi0049 | [object Object] |
6af8429c-5a08-45d1-b201-be0a6fc4ec40 | 2,022 | National Capital Region | MUNTINLUPA CITY | CITY OF MUNTINLUPA (METROPOLITAN MANILA) | Las Piñas-Muntinlupa District Engineering Office | P00620764LZ | Construction of Flood Control Structure, Aplaya, Barangay Poblacion, Muntinlupa City | P00620764LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Aplaya, Barangay Poblacion, Muntinlupa City | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.05405 | 14.389618 | 22OI0045 | 92,636,132.18 | 92,570,039.77 | 1,670,716,800,000 | 2,022 | E. F. CHUA CONSTRUCTION, INC. | 328 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | CITY OF MUNTINLUPA (LEGISLATIVE DISTRICT) | Las Piñas-Muntinlupa District Engineering Office | 92636132.18 | 92570039.77 | 2022-12-12 | 04/07/2022 | flood_control | construction-of-flood-control-structure-aplaya-barangay-poblacion-muntinlupa-city-22oi0045 | [object Object] |
2b4dabee-d519-4b26-ab31-a2cace9dc114 | 2,024 | National Capital Region | TAGUIG CITY | TAGUIG CITY (METROPOLITAN MANILA) | Metro Manila 1st District Engineering Office | P00821069LZ | Construction of Slope Protection at Lakeshore, Barangay Hagonoy, Taguig City | P00821069LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Lakeshore, Barangay Hagonoy, Taguig City | null | Construction of Slope Protection Structure | Flood Control Structures | 121.06903 | 14.505083 | 24OB0186 | 144,749,873.5 | 141,782,501.1 | 1,747,699,200,000 | 2,025 | TOPNOTCH CATALYST BUILDERS INC. / BEAM TEAM DEVELOPER SPECIALIST INC. | 329 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TAGUIG CITY (FIRST LEGISLATIVE DISTRICT) | Metro Manila 1st District Engineering Office | 144749873.51 | 141782501.1 | 2025-01-07 | 05/29/2024 | flood_control | construction-of-slope-protection-at-lakeshore-barangay-hagonoy-taguig-city-24ob0186 | [object Object] |
fa2ec9b8-b955-4f31-b05c-5fe8868349fd | 2,022 | Region IV-A | LAGUNA | CITY OF BIÑAN (LAGUNA) | Laguna 2nd District Engineering Office | P00620218LZ | Construction of Flood Mitigation Structure along Biñan River, Brgy. Malaban, Biñan City, Laguna | P00620218LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Biñan River, Brgy. Malaban, Biñan City, Laguna | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.09413 | 14.35614 | 22DI0080 | 92,640,000 | 92,594,196.37 | 1,694,908,800,000 | 2,023 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 330 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | CITY OF BIÑAN (LEGISLATIVE DISTRICT) | Laguna 2nd District Engineering Office | 92640000 | 92594196.37 | 2023-09-18 | 04/04/2022 | flood_control | construction-of-flood-mitigation-structure-along-bian-river-brgy-malaban-bian-city-laguna-22di0080 | [object Object] |
e6dc6b7e-3085-4901-80a3-1b9228adb078 | 2,023 | National Capital Region | PASIG CITY | CITY OF PASIG (METROPOLITAN MANILA) | Metro Manila 1st District Engineering Office | P00725939LZ | Rehabilitation of Flood Mitigation Structure, Buli Creek at Barangay San Miguel and Pinagbuhatan, Pasig City | P00725939LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Flood Mitigation Structure, Buli Creek at Barangay San Miguel and Pinagbuhatan, Pasig City | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 121.098963 | 14.569633 | 23OB0090 | 32,045,188.35 | 26,918,501.97 | 1,693,612,800,000 | 2,023 | ST. TIMOTHY CONSTRUCTION CORPORATION | 331 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PASIG CITY (LEGISLATIVE DISTRICT) | Metro Manila 1st District Engineering Office | 32045188.35 | 26918501.97 | 2023-09-03 | 02/06/2023 | flood_control | rehabilitation-of-flood-mitigation-structure-buli-creek-at-barangay-san-miguel-and-pinagbuhatan-pasig-city-23ob0090 | [object Object] |
65e2b580-0683-4ac1-86c6-9db29b02e176 | 2,022 | National Capital Region | PASIG CITY | CITY OF PASIG (METROPOLITAN MANILA) | Metro Manila 1st District Engineering Office | P00620365LZ | Maintenance and Rehabilitation of Flood Control Structure along Ilugin River, Pasig City | P00620365LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Maintenance and Rehabilitation of Flood Control Structure along Ilugin River, Pasig City | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 121.104079 | 14.551402 | 22OB0073 | 48,249,709.4 | 45,822,749.02 | 1,665,187,200,000 | 2,022 | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) | 332 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PASIG CITY (LEGISLATIVE DISTRICT) | Metro Manila 1st District Engineering Office | 48249709.4 | 45822749.02 | 2022-10-03 | 03/14/2022 | flood_control | maintenance-and-rehabilitation-of-flood-control-structure-along-ilugin-river-pasig-city-22ob0073 | [object Object] |
75c53e14-b7c5-4a54-9bea-2bd72a91b70a | 2,023 | National Capital Region | PASIG CITY | CITY OF PASIG (METROPOLITAN MANILA) | Metro Manila 1st District Engineering Office | P00727008LZ | Rehabilitation of Flood Mitigation Structure, Nagcruz Creek at Barangay Rosario and vicinity, Pasig City | P00727008LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation of Flood Mitigation Structure, Nagcruz Creek at Barangay Rosario and vicinity, Pasig City | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 121.106119 | 14.59189 | 23OB0098 | 3,918,778.99 | 3,717,255 | 1,683,072,000,000 | 2,023 | 1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) | 333 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PASIG CITY (LEGISLATIVE DISTRICT) | Metro Manila 1st District Engineering Office | 3918778.99 | 3717255 | 2023-05-04 | 03/06/2023 | flood_control | rehabilitation-of-flood-mitigation-structure-nagcruz-creek-at-barangay-rosario-and-vicinity-pasig-city-23ob0098 | [object Object] |
a58d5001-13f5-4497-90f2-165af2a35d7d | 2,023 | National Capital Region | PASIG CITY | CITY OF PASIG (METROPOLITAN MANILA) | Metro Manila 1st District Engineering Office | P00725958LZ | Rehabilitation of Flood Mitigation Structure, Nagcruz Creek at Barangay Rosario, Pasig City | P00725958LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation of Flood Mitigation Structure, Nagcruz Creek at Barangay Rosario, Pasig City | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 121.106359 | 14.591034 | 23OB0097 | 14,699,439.76 | 13,917,186 | 1,688,428,800,000 | 2,023 | 1HB CONSTRUCTION CORP. (FORMERLY: HB CONSTRUCTION) | 334 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PASIG CITY (LEGISLATIVE DISTRICT) | Metro Manila 1st District Engineering Office | 14699439.76 | 13917186 | 2023-07-05 | 02/06/2023 | flood_control | rehabilitation-of-flood-mitigation-structure-nagcruz-creek-at-barangay-rosario-pasig-city-23ob0097 | [object Object] |
3fd4ca3e-8620-4a63-bc0b-f6bef94b5ea5 | 2,022 | Region IV-A | RIZAL | TAYTAY (RIZAL) | Rizal 1st District Engineering Office | P00620644LZ | Construction/Rehabilitation of Flood Control Structure at Patoto Creek, (Phase 2), Sta. 0+141.6 - Sta. 0+440, Taytay, Rizal | P00620644LZ-CW1 | Construction of Flood Mitigation Structure - Construction/Rehabilitation of Flood Control Structure at Patoto Creek, (Phase 2), Sta. 0+141.6 - Sta. 0+440, Taytay, Rizal | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.137907 | 14.532123 | 22DN0082 | 39,200,000 | 38,092,846.4 | 1,667,174,400,000 | 2,022 | C.F. TRINIDAD CONSTRUCTION AND SUPPLIES CORP. (FOR | 335 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | RIZAL (FIRST LEGISLATIVE DISTRICT) | Rizal 1st District Engineering Office | 39200000 | 38092846.4 | 2022-09-26 | 04/06/2022 | flood_control | constructionrehabilitation-of-flood-control-structure-at-patoto-creek-phase-2-sta-01416---sta-0440-taytay-rizal-22dn0082 | [object Object] |
9f5d37ad-e837-46b7-a4a5-ac65cfaf71e8 | 2,021 | Region IV-A | RIZAL | null | Rizal 1st District Engineering Office | P00561394LZ | Construction of Drainage System along Botong Francisco Ave. Ext. Brgy. Mahabang Parang, Angono, Rizal | P00561394LZ-CW1 | Construction of Drainage Structure - Construction of Drainage System along Botong Francisco Ave. Ext. Brgy. Mahabang Parang, Angono, Rizal | null | Construction of Drainage Structure | Flood Control Structures | 121.14881 | 14.53781 | 21DN0125 | 44,550,000 | 44,510,754.03 | 1,679,011,200,000 | 2,023 | AARCON BUILDERS | 336 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | RIZAL (FIRST LEGISLATIVE DISTRICT) | Rizal 1st District Engineering Office | 44550000 | 44510754.03 | 2023-02-15 | 03/24/2022 | flood_control | construction-of-drainage-system-along-botong-francisco-ave-ext-brgy-mahabang-parang-angono-rizal-21dn0125 | [object Object] |
79dea211-8d55-45ae-ac33-77547db30284 | 2,023 | Region IX | SULU | OLD PANAMAO (SULU) | Region IX | P00721663MN | Construction of Flood Control Structure along Seit-Tayungan-Camp Andres Road, Panamao, Sulu | P00721663MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Seit-Tayungan-Camp Andres Road, Panamao, Sulu | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.215098 | 5.979381 | 23J00153 | 67,550,000 | 67,212,246.7 | 1,714,176,000,000 | 2,024 | ST. TIMOTHY CONSTRUCTION CORPORATION / ZHEREB CONSTRUCTION | 337 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | SULU (SECOND LEGISLATIVE DISTRICT) | Sulu 2nd District Engineering Office | 67550000 | 67212246.7 | 2024-04-28 | 08/03/2023 | flood_control | construction-of-flood-control-structure-along-seit-tayungan-camp-andres-road-panamao-sulu-23j00153 | [object Object] |
999e6de5-556a-4244-9ecb-fc323db7cf06 | 2,023 | Region IX | SULU | LUUK (SULU) | Region IX | P00721236MN | Construction of Flood Control Structure along Romandier-Camp Andres-Tanduh Bato Road, Luuk, Sulu | P00721236MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Romandier-Camp Andres-Tanduh Bato Road, Luuk, Sulu | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.31338 | 5.967259 | 23J00118 | 48,250,000 | 48,008,750.33 | 1,701,820,800,000 | 2,023 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 338 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | SULU (SECOND LEGISLATIVE DISTRICT) | Sulu 2nd District Engineering Office | 48250000 | 48008750.33 | 2023-12-07 | 04/17/2023 | flood_control | construction-of-flood-control-structure-along-romandier-camp-andres-tanduh-bato-road-luuk-sulu-23j00118 | [object Object] |
460b0778-2896-494f-a794-c4ce7403e9bc | 2,023 | Region IV-A | BATANGAS | SAN JUAN (BATANGAS) | Batangas 4th District Engineering Office | P00737497LZ | Construction of Drainage System in Barangay Calit-Calit, San Juan, Batangas | P00737497LZ-CW1 | Construction of Drainage Structure - Construction of Drainage System in Barangay Calit-Calit, San Juan, Batangas | null | Construction of Drainage Structure | Flood Control Structures | 121.3992 | 13.8267 | 23DD0076 | 4,950,000 | 4,801,496 | 1,684,281,600,000 | 2,023 | TONIJON CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: TONIJON CONSTRUCTION) | 339 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BATANGAS (FOURTH LEGISLATIVE DISTRICT) | Batangas 4th District Engineering Office | 4950000 | 4801496 | 2023-05-18 | 02/13/2023 | flood_control | construction-of-drainage-system-in-barangay-calit-calit-san-juan-batangas-23dd0076 | [object Object] |
583f395c-b3ad-4aef-bac0-be145d12f7d6 | 2,022 | Region II | ISABELA | ROXAS (ISABELA) | Isabela 2nd District Engineering Office | P00631118LZ | Construction of Siffu River Flood Control Structure (Sitio Pag-asa Section Phase II) Brgy. Simimbaan, Roxas, Isabela | P00631118LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Siffu River Flood Control Structure (Sitio Pag-asa Section Phase II) Brgy. Simimbaan, Roxas, Isabela | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.564964 | 17.1346 | 22BF0003 | 42,140,000 | 41,663,887.47 | 1,669,852,800,000 | 2,022 | DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION) | 340 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ISABELA (FIFTH LEGISLATIVE DISTRICT) | Isabela 2nd District Engineering Office | 42140000 | 41663887.47 | 2022-12-02 | 02/28/2022 | flood_control | construction-of-siffu-river-flood-control-structure-sitio-pag-asa-section-phase-ii-brgy-simimbaan-roxas-isabela-22bf0003 | [object Object] |
d5262733-0331-4568-9278-b583c44e5930 | 2,023 | Region II | ISABELA | ROXAS (ISABELA) | Isabela 2nd District Engineering Office | P00726426LZ | Construction of Siffu River Flood Control Project (Sitio Pag-asa Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Simimbaan, Roxas, Isabela, | P00726426LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Siffu River Flood Control Project (Sitio Pag-asa Section), Phase II, Sta. 0+000 - Sta. 0+400, Barangay Simimbaan, Roxas, Isabela, | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.566533 | 17.135401 | 23BF0004 | 48,250,000 | 48,229,649.53 | 1,699,488,000,000 | 2,023 | DANYSONS CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: DANYSONS CONSTRUCTION) / JWU CONSTRUCTION AND SUPPLY | 341 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ISABELA (FIFTH LEGISLATIVE DISTRICT) | Isabela 2nd District Engineering Office | 48250000 | 48229649.53 | 2023-07-02 | 02/27/2023 | flood_control | construction-of-siffu-river-flood-control-project-sitio-pag-asa-section-phase-ii-sta-0000---sta-0400-barangay-simimbaan-roxas-isabela-23bf0004 | [object Object] |
9130479d-4c44-48e5-a072-1847792f81cc | 2,023 | Region II | CAGAYAN | LASAM (CAGAYAN) | Cagayan 2nd District Engineering Office | P00726115LZ | Construction of CSU-Lasam River Control Structure along Kikking River, Lasam, Cagayan | P00726115LZ-CW1 | Construction of Flood Mitigation Structure - Construction of CSU-Lasam River Control Structure along Kikking River, Lasam, Cagayan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.606624 | 18.077401 | 23BC0015 | 4,900,000 | 4,847,996.84 | 1,684,886,400,000 | 2,023 | HHK CONSTRUCTION | 342 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | CAGAYAN (SECOND LEGISLATIVE DISTRICT) | Cagayan 2nd District Engineering Office | 4900000 | 4847996.84 | 2023-05-25 | 02/22/2023 | flood_control | construction-of-csu-lasam-river-control-structure-along-kikking-river-lasam-cagayan-23bc0015 | [object Object] |
73e08039-1a2f-4400-8b52-cb70d2e184eb | 2,023 | Region II | ISABELA | REINA MERCEDES (ISABELA) | Isabela 3rd District Engineering Office | P00727355LZ | Construction of Cagayan River Flood Control Project, Brgy. Dangan (Sta. 0+000 - Sta. 0+550), Reina Mercedes, Isabela | P00727355LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Cagayan River Flood Control Project, Brgy. Dangan (Sta. 0+000 - Sta. 0+550), Reina Mercedes, Isabela | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.752095 | 17.005545 | 23BG0078 | 48,679,453.7 | 48,659,086.18 | 1,698,105,600,000 | 2,023 | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 343 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ISABELA (SECOND LEGISLATIVE DISTRICT) | Isabela 3rd District Engineering Office | 48679453.7 | 48659086.18 | 2023-10-25 | 03/15/2023 | flood_control | construction-of-cagayan-river-flood-control-project-brgy-dangan-sta-0000---sta-0550-reina-mercedes-isabela-23bg0078 | [object Object] |
34283052-7dc0-493d-9c4f-b5532f628e36 | 2,021 | Region II | ISABELA | null | Isabela 3rd District Engineering Office | P00525960LZ | Construction of Cagayan River Flood Control Project Brgy. Labinab Grande, Reina Mercedes, Isabela | P00525960LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Cagayan River Flood Control Project Brgy. Labinab Grande, Reina Mercedes, Isabela | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.807308 | 16.979236 | 21BG0023 | 47,225,210.54 | 46,493,250.44 | 1,670,976,000,000 | 2,022 | RRC CO. INC. (FORMERLY: R R C CONSTRUCTION) | 344 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | ISABELA (SECOND LEGISLATIVE DISTRICT) | Isabela 3rd District Engineering Office | 47225210.54 | 46493250.44 | 2022-12-15 | 01/19/2022 | flood_control | construction-of-cagayan-river-flood-control-project-brgy-labinab-grande-reina-mercedes-isabela-21bg0023 | [object Object] |
39fea0da-acc3-46b1-9704-b28e997a1e3c | 2,022 | Region IX | BASILAN | MALUSO (BASILAN) | Isabela City District Engineering Office | P00630472MN | Construction of Flood Control Structure at Fuente Maluso along Basilan Circumferential Rd, Sta. 0 + 000 - Sta. 0 + 400, Maluso, Basilan | P00630472MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Fuente Maluso along Basilan Circumferential Rd, Sta. 0 + 000 - Sta. 0 + 400, Maluso, Basilan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.8948 | 6.5479 | 22JH0016 | 53,075,000 | 53,034,576.67 | 1,671,235,200,000 | 2,023 | RCDG CONSTRUCTION CORPORATION / BOSH MEGATRADE AND SERVICES CO. | 345 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 53075000 | 53034576.67 | 2023-05-15 | 02/26/2022 | flood_control | construction-of-flood-control-structure-at-fuente-maluso-along-basilan-circumferential-rd-sta-0-000---sta-0-400-maluso-basilan-22jh0016 | [object Object] |
e844a68a-a8dd-4763-8e17-7b1ab7318807 | 2,022 | Region IV-A | QUEZON | ATIMONAN (QUEZON) | Quezon 4th District Engineering Office | P00620616LZ | Construction of Seawall Atimonan, Quezon | P00620616LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall Atimonan, Quezon | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.925564 | 14.002923 | 22DL0148 | 24,500,000 | 24,500,000 | 1,668,988,800,000 | 2,022 | R.T.Y. CONSTRUCTION | 346 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | QUEZON (FOURTH LEGISLATIVE DISTRICT) | Quezon 4th District Engineering Office | 24500000 | 24500000 | 2022-08-03 | 03/24/2022 | flood_control | construction-of-seawall-atimonan-quezon-22dl0148 | [object Object] |
4ed5c796-1ed3-4308-b6b3-384301836675 | 2,024 | Region IV-A | QUEZON | ATIMONAN (QUEZON) | Quezon 4th District Engineering Office | P00820910LZ | Construction of Breakwater, Atimonan, Quezon | P00820910LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Breakwater, Atimonan, Quezon | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.925879 | 14.003703 | 24DL0030 | 19,600,000 | 19,579,679.37 | 1,730,764,800,000 | 2,024 | R.T.Y. CONSTRUCTION | 347 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | QUEZON (FOURTH LEGISLATIVE DISTRICT) | Quezon 4th District Engineering Office | 19600000 | 19579679.37 | 2024-06-10 | 03/12/2024 | flood_control | construction-of-breakwater-atimonan-quezon-24dl0030 | [object Object] |
fd7ea7f5-8ec0-40d2-9359-af61277108ce | 2,024 | Region IV-A | QUEZON | ATIMONAN (QUEZON) | Quezon 4th District Engineering Office | P00820925LZ | Construction of Seawall, Atimonan, Quezon | P00820925LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall, Atimonan, Quezon | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.926065 | 14.003966 | 24DL0099 | 9,800,000 | 9,796,174.35 | 1,728,259,200,000 | 2,024 | R.T.Y. CONSTRUCTION | 348 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | QUEZON (FOURTH LEGISLATIVE DISTRICT) | Quezon 4th District Engineering Office | 9800000 | 9796174.35 | 2024-06-10 | 03/13/2024 | flood_control | construction-of-seawall-atimonan-quezon-24dl0099 | [object Object] |
dc3bcb4e-63b0-4d1d-b281-8ccd5aae0e6b | 2,020 | Region IX | BASILAN | null | Region IX | P00420382MN | Construction of revetment, Kumalarang River, Isabela City, Basilan | P00420382MN-CW1 | Construction of Revetment - Construction of revetment, Kumalarang River, Isabela City, Basilan | null | Construction of Revetment | Flood Control Structures | 121.931877 | 6.618078 | 20J00047 | 107,725,803.8 | 105,571,270.5 | 1,642,291,200,000 | 2,022 | RCDG CONSTRUCTION CORPORATION / HHH DEVELOPER AND CONSTRUCTION | 349 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,020 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 107725803.83 | 105571270.46 | 2022-07-17 | 11/23/2020 | flood_control | construction-of-revetment-kumalarang-river-isabela-city-basilan-20j00047 | [object Object] |
b8195d3e-d04e-4612-a0f2-6f066458a72e | 2,023 | Region II | BATANES | MAHATAO (BATANES) | Batanes District Engineering Office | P00727341LZ | Construction of Seawall (Busbusan), Barangay Hañib, Mahatao, Batanes | P00727341LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall (Busbusan), Barangay Hañib, Mahatao, Batanes | null | Construction of Flood Mitigation Structure | Flood Control Structures | 121.945008 | 20.416922 | 23BA0030 | 20,580,000 | 16,445,177.1 | 1,716,768,000,000 | 2,024 | STRONGLANE BUILDERS AND TRADING CORPORATION (FORMERLY: STRONGLANE CONSTRUCTION & TRADING) | 350 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BATANES (LEGISLATIVE DISTRICT) | Batanes District Engineering Office | 20580000 | 16445177.1 | 2024-08-15 | 05/16/2023 | flood_control | construction-of-seawall-busbusan-barangay-haib-mahatao-batanes-23ba0030 | [object Object] |
052d3be2-ac94-4ddb-a809-a9263c0af9ee | 2,023 | Region IX | BASILAN | SUMISIP (BASILAN) | Isabela City District Engineering Office | P00733983MN | Construction of Flood Control Structure, Bohe-Bacung Bridge, Sumisip, Basilan | P00733983MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Bohe-Bacung Bridge, Sumisip, Basilan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 122.0213 | 6.4737 | 23JH0031 | 49,143,590 | 49,113,586.1 | 1,698,883,200,000 | 2,024 | RCDG CONSTRUCTION CORPORATION / BOSH MEGATRADE AND SERVICES CO. | 351 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 49143590 | 49113586.1 | 2024-04-01 | 05/11/2023 | flood_control | construction-of-flood-control-structure-bohe-bacung-bridge-sumisip-basilan-23jh0031 | [object Object] |
77afe46a-77c6-4391-8b71-2f119b5422e1 | 2,024 | Region IX | BASILAN | SUMISIP (BASILAN) | Isabela City District Engineering Office | P00835755MN | Construction of Slope Protection, Barangay Buli Buli, Sumisip, Basilan | P00835755MN-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection, Barangay Buli Buli, Sumisip, Basilan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 122.0433 | 6.4205 | 24JH0034 | 24,125,000 | 24,107,610.26 | 1,731,456,000,000 | 2,024 | BOSH MEGATRADE AND SERVICES CO. | 352 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 24125000 | 24107610.26 | 2024-11-14 | 06/06/2024 | flood_control | construction-of-slope-protection-barangay-buli-buli-sumisip-basilan-24jh0034 | [object Object] |
564843bb-6d14-4f79-b3f9-26a30edc0f1d | 2,023 | Region IX | BASILAN | SUMISIP (BASILAN) | Isabela City District Engineering Office | P00732467MN | Construction of Flood Control Structure, Barangay Buli-Buli, Sumisip, Basilan | P00732467MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Buli-Buli, Sumisip, Basilan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 122.0433 | 6.4205 | 23JH0003 | 39,600,000 | 39,595,356.53 | 1,706,572,800,000 | 2,024 | BOSH MEGATRADE AND SERVICES CO. | 353 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 39600000 | 39595356.53 | 2024-03-31 | 03/02/2023 | flood_control | construction-of-flood-control-structure-barangay-buli-buli-sumisip-basilan-23jh0003 | [object Object] |
5fe5bcdb-4df1-4148-aa8a-96de2ffdec34 | 2,023 | Region IX | BASILAN | TIPO-TIPO (BASILAN) | Isabela City District Engineering Office | P00733984MN | Construction of Flood Control Structure, Bohe Basilan Bridge, Tipo-Tipo, Basilan | P00733984MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Bohe Basilan Bridge, Tipo-Tipo, Basilan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 122.087679 | 6.483976 | 23JH0030 | 27,091,410 | 27,040,410 | 1,693,008,000,000 | 2,023 | BOSH MEGATRADE AND SERVICES CO. | 354 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 27091410 | 27040410 | 2023-11-29 | 05/11/2023 | flood_control | construction-of-flood-control-structure-bohe-basilan-bridge-tipo-tipo-basilan-23jh0030 | [object Object] |
a0785077-5975-4d6d-80c0-6a73187dcfde | 2,023 | Region IX | BASILAN | CITY OF LAMITAN (BASILAN) | Isabela City District Engineering Office | P00734382MN | Construction of Seawall, Barangay Balas, Lamitan City, Basilan | P00734382MN-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall, Barangay Balas, Lamitan City, Basilan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 122.1298 | 6.6934 | 23JH0015 | 9,800,000 | 9,779,883.56 | 1,688,428,800,000 | 2,023 | MMP CONSTRUCTION AND SUPPLIES | 355 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BASILAN (LEGISLATIVE DISTRICT) | Isabela City District Engineering Office | 9800000 | 9779883.56 | 2023-07-05 | 03/23/2023 | flood_control | construction-of-seawall-barangay-balas-lamitan-city-basilan-23jh0015 | [object Object] |
f62eacb8-4489-4af1-aba4-ae0b0c49d446 | 2,021 | Region VI | NEGROS OCCIDENTAL | null | Negros Occidental 3rd District Engineering Office | P00538301VS | Repair/ Rehabilitation/ Reconstruction of Langub Bridge Protection and Approaches damaged by Typhoon Odette, Sipalay City, Negros Occidental | P00538301VS-CW1 | Rehabilitation / Major Repair of Slope Protection Structure - Repair/ Rehabilitation/ Reconstruction of Langub Bridge Protection and Approaches damaged by Typhoon Odette, Sipalay City, Negros Occidental | null | Rehabilitation / Major Repair of Slope Protection Structure | Flood Control Structures | 122.3972 | 9.775 | 22GM0062 | 5,751,010.1 | 5,751,010.14 | 1,660,003,200,000 | 2,022 | RHT CONSTRUCTION AND SUPPLIES | 356 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | NEGROS OCCIDENTAL (SIXTH LEGISLATIVE DISTRICT) | Negros Occidental 3rd District Engineering Office | 5751010.1 | 5751010.14 | 2022-08-31 | 04/13/2022 | flood_control | repair-rehabilitation-reconstruction-of-langub-bridge-protection-and-approaches-damaged-by-typhoon-odette-sipalay-city-negros-occidental-22gm0062 | [object Object] |
70748920-87a2-4ba9-979b-d90b7bd77736 | 2,022 | Region VII | NEGROS ORIENTAL | CITY OF TANJAY (NEGROS ORIENTAL) | Negros Oriental 2nd District Engineering Office | P00620279VS | Construction of Tanjay River Control, Tanjay City, Negros Oriental | P00620279VS-CW1 | Construction of Flood Mitigation Structure - Construction of Tanjay River Control, Tanjay City, Negros Oriental | null | Construction of Flood Mitigation Structure | Flood Control Structures | 123.162869 | 9.526856 | 22HK0045 | 59,904,305 | 59,904,305 | 1,671,321,600,000 | 2,022 | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) / MIGHTY HOK SUMMIT CONSTRUCTION & DEVELOPMENT CORP. | 357 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | NEGROS ORIENTAL (SECOND LEGISLATIVE DISTRICT) | Negros Oriental 2nd District Engineering Office | 59904305 | 59904305 | 2022-12-19 | 02/18/2022 | flood_control | construction-of-tanjay-river-control-tanjay-city-negros-oriental-22hk0045 | [object Object] |
d7096a5e-3587-443f-b212-55d4e6fae0cf | 2,023 | Region VII | CEBU | BARILI (CEBU) | Cebu 3rd District Engineering Office | P00746103VS | Reconstruction of Flood Control along Santander-Barili-Toledo Road, K0065+400 - K0065+700 | P00746103VS-CW1 | Construction of Flood Mitigation Structure - Reconstruction of Flood Control along Santander-Barili-Toledo Road, K0065+400 - K0065+700 | null | Construction of Flood Mitigation Structure | Flood Control Structures | 123.476029 | 10.107193 | 23HF0113 | 92,108,285 | 92,108,285 | 1,731,110,400,000 | 2,024 | QM BUILDERS | 358 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | CEBU (THIRD LEGISLATIVE DISTRICT) | Cebu 3rd District Engineering Office | 92108285 | 92108285 | 2024-11-08 | 01/09/2024 | flood_control | reconstruction-of-flood-control-along-santander-barili-toledo-road-k0065400---k0065700-23hf0113 | [object Object] |
4eb16779-53db-4f76-b346-94aa9a037e72 | 2,024 | Region XII | SULTAN KUDARAT | LEBAK (SULTAN KUDARAT) | Sultan Kudarat 2nd District Engineering Office | P00833602MN | Construction of Flood Control Structure, Barangay Tran, Lebak, Sultan Kudarat | P00833602MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Tran, Lebak, Sultan Kudarat | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.041 | 6.7499 | 24MH0029 | 4,950,000 | 4,924,487.07 | 1,719,792,000,000 | 2,024 | JV CONSTECH | 359 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | SULTAN KUDARAT (SECOND LEGISLATIVE DISTRICT) | Sultan Kudarat 2nd District Engineering Office | 4950000 | 4924487.07 | 2024-09-02 | 03/25/2024 | flood_control | construction-of-flood-control-structure-barangay-tran-lebak-sultan-kudarat-24mh0029 | [object Object] |
0cdb3589-5017-44ee-a193-ff89ffa988bf | 2,023 | Region XII | SULTAN KUDARAT | LEBAK (SULTAN KUDARAT) | Sultan Kudarat 2nd District Engineering Office | P00734416MN | Construction of Flood Control, Brgy. Tran, Lebak, Sultan Kudarat | P00734416MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control, Brgy. Tran, Lebak, Sultan Kudarat | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.041 | 6.7499 | 23MH0080 | 4,950,000 | 4,950,000 | 1,692,144,000,000 | 2,023 | JV CONSTECH | 360 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | SULTAN KUDARAT (SECOND LEGISLATIVE DISTRICT) | Sultan Kudarat 2nd District Engineering Office | 4950000 | 4950000 | 2023-09-15 | 03/24/2023 | flood_control | construction-of-flood-control-brgy-tran-lebak-sultan-kudarat-23mh0080 | [object Object] |
b0a5d367-4cb9-439b-ad4d-d597fa1e50d6 | 2,023 | Region XII | MAGUINDANAO DEL NORTE | DATU ODIN SINSUAT (DINAIG) (CAPITAL) (MAGUINDANAO) | Region XII | P00721320MN | Construction of Riverbank Protection (Revetment) along Tamontaka River, (Semba- Linek River Section- Phase II), Datu Odin Sinsuat, Maguindanao | P00721320MN-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection (Revetment) along Tamontaka River, (Semba- Linek River Section- Phase II), Datu Odin Sinsuat, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.21513 | 7.19098 | 23M00096 | 109,696,375 | 109,380,392.3 | 1,714,694,400,000 | 2,024 | FFJJ CONSTRUCTION | 361 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MAGUINDANAO DEL NORTE (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 109696375 | 109380392.33 | 2024-05-04 | 07/20/2023 | flood_control | construction-of-riverbank-protection-revetment-along-tamontaka-river-semba--linek-river-section--phase-ii-datu-odin-sinsuat-maguindanao-23m00096 | [object Object] |
b2647001-9476-4037-907d-803fb271d8b6 | 2,022 | Region XII | MAGUINDANAO DEL NORTE | DATU PIANG (MAGUINDANAO) | Region XII | P00620244MN | Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase I), Datu Odin Sinsuat, Maguindanao | P00620244MN-CW1 | Construction of Revetment - Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase I), Datu Odin Sinsuat, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.22178 | 7.18013 | 22M00020 | 82,024,859 | 81,574,238.89 | 1,693,008,000,000 | 2,023 | FFJJ CONSTRUCTION | 362 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL NORTE (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 82024859 | 81574238.89 | 2023-07-25 | 10/12/2022 | flood_control | construction-of-river-bank-protection-revetment-along-tamontaka-capiton-tanuel-river-tamontaka-section-phase-i-datu-odin-sinsuat-maguindanao-22m00020 | [object Object] |
aada7833-5526-48e0-8dbd-1450eec367aa | 2,022 | Region XII | MAGUINDANAO DEL NORTE | DATU PIANG (MAGUINDANAO) | Region XII | P00620245MN | Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase II), Datu Odin Sinsuat, Maguindanao | P00620245MN-CW1 | Construction of Revetment - Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase II), Datu Odin Sinsuat, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.22379 | 7.17737 | 22M00021 | 82,024,542.28 | 81,999,595.28 | 1,688,947,200,000 | 2,023 | AMPLEX CONSTRUCTION AND SUPPLIES / KEY GENERAL MERCHANDISE AND CONSTRUCTION SERVICES | 363 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL NORTE (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 82024542.28 | 81999595.28 | 2023-08-10 | 10/26/2022 | flood_control | construction-of-river-bank-protection-revetment-along-tamontaka-capiton-tanuel-river-tamontaka-section-phase-ii-datu-odin-sinsuat-maguindanao-22m00021 | [object Object] |
6c7cbca7-5b97-447b-a133-6d5ed155b18c | 2,022 | Region XII | MAGUINDANAO DEL NORTE | DATU PIANG (MAGUINDANAO) | Region XII | P00620246MN | Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase III), Datu Odin Sinsuat, Maguindanao | P00620246MN-CW1 | Construction of Revetment - Construction of River Bank Protection (Revetment) along Tamontaka-Capiton-Tanuel River (Tamontaka Section, Phase III), Datu Odin Sinsuat, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.22695 | 7.17508 | 22M00022 | 82,024,630.37 | 81,223,898.37 | 1,698,710,400,000 | 2,023 | DCD BUILDERS & ENTERPISES / CORICS CONSTRUCTION | 364 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL NORTE (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 82024630.37 | 81223898.37 | 2023-12-22 | 10/12/2022 | flood_control | construction-of-river-bank-protection-revetment-along-tamontaka-capiton-tanuel-river-tamontaka-section-phase-iii-datu-odin-sinsuat-maguindanao-22m00022 | [object Object] |
d9db37e5-33bc-4ed5-8c38-c03aaea85718 | 2,023 | Region XII | MAGUINDANAO DEL NORTE | SULTAN KUDARAT (NULING) (MAGUINDANAO) | Region XII | P00734032MN | Repair of riverbank revetment, Brgy. Macaguiling, Sultan Kudarat, Maguindanao | P00734032MN-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Repair of riverbank revetment, Brgy. Macaguiling, Sultan Kudarat, Maguindanao | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 124.25524 | 7.26545 | 23M00183 | 9,800,000 | 9,505,468.74 | 1,704,499,200,000 | 2,024 | ISFB CONSTRUCTION | 365 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MAGUINDANAO DEL NORTE (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 9800000 | 9505468.74 | 2024-01-22 | 08/25/2023 | flood_control | repair-of-riverbank-revetment-brgy-macaguiling-sultan-kudarat-maguindanao-23m00183 | [object Object] |
060e0444-7a76-4b82-8891-6b433183438d | 2,024 | Region XII | MAGUINDANAO DEL SUR | DATU PIANG (MAGUINDANAO) | Region XII | P00820356MN | Construction of Riverbank Protection (Phase I), Datu Piang, Maguindanao | P00820356MN-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection (Phase I), Datu Piang, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.46903 | 7.04914 | 24M00052 | 48,250,000 | 47,283,436.87 | 1,738,540,800,000 | 2,025 | ED1SON DEVELOPMENT & CONSTRUCTION INC. / H-ROYAL CONSTRUCTION | 366 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 48250000 | 47283436.87 | 2025-03-03 | 03/18/2024 | flood_control | construction-of-riverbank-protection-phase-i-datu-piang-maguindanao-24m00052 | [object Object] |
2f87b38a-a783-4570-a5d4-a763175d8301 | 2,022 | Region XII | MAGUINDANAO DEL SUR | DATU SALIBO (MAGUINDANAO) | Region XII | P00633902MN | Construction of Flood Control Structure, Butalo, Datu Salibo, Maguindanao | P00633902MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Butalo, Datu Salibo, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.479906 | 6.98946 | 22M00116 | 96,499,647.65 | 91,674,665.27 | 1,693,699,200,000 | 2,023 | JDRC CONSTRUCTION & SUPPLIES, CORP. | 367 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 96499647.65 | 91674665.27 | 2023-08-13 | 09/23/2022 | flood_control | construction-of-flood-control-structure-butalo-datu-salibo-maguindanao-22m00116 | [object Object] |
9a8a931e-10b3-4949-8570-692dbe71bcbb | 2,021 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00522108MN | Construction of Riverbank Protection (Revetment) along Butalo River Phase I, Datu Salibo, Maguindanao | P00522108MN-CW1 | Construction of Revetment - Construction of Riverbank Protection (Revetment) along Butalo River Phase I, Datu Salibo, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.48294 | 6.98845 | 21M00115 | 24,119,799.72 | 23,995,000.03 | 1,670,803,200,000 | 2,022 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 368 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 24119799.72 | 23995000.03 | 2022-12-13 | 06/21/2022 | flood_control | construction-of-riverbank-protection-revetment-along-butalo-river-phase-i-datu-salibo-maguindanao-21m00115 | [object Object] |
44af3f97-33e5-4232-8719-d2171cb0cd62 | 2,022 | Region XII | MAGUINDANAO DEL SUR | DATU PIANG (MAGUINDANAO) | Region XII | P00632318MN | Construction of River Bank Protection (Revetment) Phase 1, Datu Piang, Maguindanao | P00632318MN-CW1 | Construction of Revetment - Construction of River Bank Protection (Revetment) Phase 1, Datu Piang, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.4975 | 7.017778 | 22M00120 | 96,499,372.19 | 91,674,403.59 | 1,693,699,200,000 | 2,023 | JDRC CONSTRUCTION & SUPPLIES, CORP. | 369 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 96499372.19 | 91674403.59 | 2023-07-24 | 09/23/2022 | flood_control | construction-of-river-bank-protection-revetment-phase-1-datu-piang-maguindanao-22m00120 | [object Object] |
d80e0263-69b3-4a2e-ae60-b5cc4ae013b9 | 2,021 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00522107MN | Construction of Riverbank Protection (Revetment) Phase I, Datu Piang, Maguindanao | P00522107MN-CW1 | Construction of Revetment - Construction of Riverbank Protection (Revetment) Phase I, Datu Piang, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.49931 | 7.03017 | 21M00114 | 24,095,997.89 | 23,995,000 | 1,670,803,200,000 | 2,022 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 370 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 24095997.89 | 23995000 | 2022-12-26 | 06/21/2022 | flood_control | construction-of-riverbank-protection-revetment-phase-i-datu-piang-maguindanao-21m00114 | [object Object] |
f23e146d-aa6d-4dca-bc04-dd6c2c964680 | 2,023 | Region XII | COTABATO (NORTH COTABATO) | MIDSAYAP (COTABATO (NORTH COTABATO)) | Cotabato 1st District Engineering Office | P00721448MN | Construction of Rio Grande de Mindanao Flood Control Project along Barangay Olandang-Kadigasan-Damatulan-Lumopog (Olandang Section-Phase IV), Midsayap, Cotabato | P00721448MN-CW1 | Construction of Flood Mitigation Structure - Construction of Rio Grande de Mindanao Flood Control Project along Barangay Olandang-Kadigasan-Damatulan-Lumopog (Olandang Section-Phase IV), Midsayap, Cotabato | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.499711 | 7.032273 | 23MD0044 | 93,219,000 | 92,286,809.99 | 1,706,400,000,000 | 2,024 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / RNS CONSTRUCTION ENGINEERING | 371 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | COTABATO (FIRST LEGISLATIVE DISTRICT) | Cotabato 1st District Engineering Office | 93219000 | 92286809.99 | 2024-01-29 | 02/22/2023 | flood_control | construction-of-rio-grande-de-mindanao-flood-control-project-along-barangay-olandang-kadigasan-damatulan-lumopog-olandang-section-phase-iv-midsayap-cotabato-23md0044 | [object Object] |
c41a7930-e863-4332-9b8a-7d90610df67e | 2,022 | Region XII | MAGUINDANAO DEL SUR | DATU PIANG (MAGUINDANAO) | Region XII | P00620243MN | Construction of Revetment along Rio Grande de Mindanao (Upstream), Brgy. Reina Regente, Datu Piang, Maguindanao | P00620243MN-CW1 | Construction of Revetment - Construction of Revetment along Rio Grande de Mindanao (Upstream), Brgy. Reina Regente, Datu Piang, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.506815 | 7.026585 | 22M00051 | 81,059,111.69 | 78,620,793.02 | 1,677,024,000,000 | 2,023 | JDRC CONSTRUCTION & SUPPLIES, CORP. | 372 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 81059111.69 | 78620793.02 | 2023-07-24 | 04/13/2022 | flood_control | construction-of-revetment-along-rio-grande-de-mindanao-upstream-brgy-reina-regente-datu-piang-maguindanao-22m00051 | [object Object] |
40a8b8b3-166a-4ac4-ae90-12e901ba3092 | 2,022 | Region XII | MAGUINDANAO DEL SUR | DATU PIANG (MAGUINDANAO) | Region XII | P00620242MN | Construction of Revetment along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase II), Datu Piang, Maguindanao | P00620242MN-CW1 | Construction of Revetment - Construction of Revetment along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase II), Datu Piang, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.5081 | 7.024211 | 22M00050 | 81,059,585.8 | 78,992,559.63 | 1,677,024,000,000 | 2,023 | FFJJ CONSTRUCTION | 373 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 81059585.8 | 78992559.63 | 2023-08-14 | 04/13/2022 | flood_control | construction-of-revetment-along-rio-grande-de-mindanao-downstream-brgy-buayan-to-brgy-kinudal-phase-ii-datu-piang-maguindanao-22m00050 | [object Object] |
bc3651db-3964-4485-8b30-d521cdc34241 | 2,022 | Region XII | MAGUINDANAO DEL SUR | DATU PIANG (MAGUINDANAO) | Region XII | P00620241MN | Construction of Revetment along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase I), Datu Piang, Maguindanao | P00620241MN-CW1 | Construction of Revetment - Construction of Revetment along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase I), Datu Piang, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.5118 | 7.022578 | 22M00049 | 82,024,233.29 | 79,932,563.97 | 1,677,196,800,000 | 2,023 | FFJJ CONSTRUCTION | 374 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 82024233.29 | 79932563.97 | 2023-02-27 | 04/13/2022 | flood_control | construction-of-revetment-along-rio-grande-de-mindanao-downstream-brgy-buayan-to-brgy-kinudal-phase-i-datu-piang-maguindanao-22m00049 | [object Object] |
7e1b83ba-fe27-4ec4-b23f-cc89f7239ce1 | 2,023 | Region XII | COTABATO (NORTH COTABATO) | MIDSAYAP (COTABATO (NORTH COTABATO)) | Cotabato 1st District Engineering Office | P00721449MN | Construction of Rio Grande de Mindanao Flood Control Project (Macasendeg Section), Macasendeg, Midsayap, Cotabato | P00721449MN-CW1 | Construction of Flood Mitigation Structure - Construction of Rio Grande de Mindanao Flood Control Project (Macasendeg Section), Macasendeg, Midsayap, Cotabato | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.52027 | 7.031422 | 23MD0043 | 57,900,000 | 57,324,045.23 | 1,695,686,400,000 | 2,023 | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | 375 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | COTABATO (FIRST LEGISLATIVE DISTRICT) | Cotabato 1st District Engineering Office | 57900000 | 57324045.23 | 2023-09-27 | 03/24/2023 | flood_control | construction-of-rio-grande-de-mindanao-flood-control-project-macasendeg-section-macasendeg-midsayap-cotabato-23md0043 | [object Object] |
94f14b1f-a4a0-42a0-b4d2-886cd091191e | 2,023 | Region VIII | LEYTE | CARIGARA (LEYTE) | Region VIII | P00721575VS | Construction of Carigara Tide Embankment, Carigara, Leyte | P00721575VS-CW1 | Construction of Flood Mitigation Structure - Construction of Carigara Tide Embankment, Carigara, Leyte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.685579 | 11.304888 | 23I00014 | 123,519,481 | 123,519,982.6 | 1,721,260,800,000 | 2,024 | LANOY CONSTRUCTION | 376 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LEYTE (SECOND LEGISLATIVE DISTRICT) | Leyte 2nd District Engineering Office | 123519481 | 123519982.59 | 2024-07-19 | 03/15/2023 | flood_control | construction-of-carigara-tide-embankment-carigara-leyte-23i00014 | [object Object] |
61d2db33-b583-48ff-9da1-d5a8699d5278 | 2,021 | Region VIII | LEYTE | null | Region VIII | P00521566VS | Construction of Carigara Tide Embankment, Sta. 0+150-Sta.0+283, Carigara, Leyte | P00521566VS-CW1 | Construction of Flood Mitigation Structure - Construction of Carigara Tide Embankment, Sta. 0+150-Sta.0+283, Carigara, Leyte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.686788 | 11.304773 | 21I00015 | 96,399,769.32 | 92,505,676.69 | 1,712,188,800,000 | 2,024 | LANOY CONSTRUCTION | 377 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | LEYTE (SECOND LEGISLATIVE DISTRICT) | Leyte 2nd District Engineering Office | 96399769.32 | 92505676.69 | 2024-03-22 | 05/08/2021 | flood_control | construction-of-carigara-tide-embankment-sta-0150-sta0283-carigara-leyte-21i00015 | [object Object] |
c8bda320-b121-4e7d-aa08-cf6fb31f303a | 2,023 | Region XII | MAGUINDANAO DEL SUR | PAGAGAWAN (MAGUINDANAO) | Region XII | P00721321MN | Construction of Tunggol Protection Dike, Phase 3, Datu Montawal, Maguindanao | P00721321MN-CW1 | Construction of Flood Mitigation Structure - Construction of Tunggol Protection Dike, Phase 3, Datu Montawal, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.73902 | 7.08379 | 23M00121 | 75,270,000 | 74,329,125 | 1,701,734,400,000 | 2,023 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 378 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 75270000 | 74329125 | 2023-09-25 | 04/03/2023 | flood_control | construction-of-tunggol-protection-dike-phase-3-datu-montawal-maguindanao-23m00121 | [object Object] |
043ae5cd-2848-4986-b157-adb6258ca1df | 2,023 | Region XII | MAGUINDANAO DEL SUR | PAGAGAWAN (MAGUINDANAO) | Region XII | P00721323MN | Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package B-Phase 4, Datu Montawal, Maguindanao | P00721323MN-CW1 | Construction of Flood Mitigation Structure - Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package B-Phase 4, Datu Montawal, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.73995 | 7.08395 | 23M00120 | 48,250,000 | 47,646,875 | 1,697,587,200,000 | 2,023 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 379 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 48250000 | 47646875 | 2023-10-19 | 04/03/2023 | flood_control | construction-of-pulangi-bank-protection-right-bank-of-tunggol-floodway-package-b-phase-4-datu-montawal-maguindanao-23m00120 | [object Object] |
ef266157-00b1-4e02-9c5a-41b7908049fe | 2,023 | Region XII | MAGUINDANAO DEL SUR | PAGALUNGAN (MAGUINDANAO) | Region XII | P00721322MN | Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package A-Phase 2, Pagalungan, Maguindanao | P00721322MN-CW1 | Construction of Flood Mitigation Structure - Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package A-Phase 2, Pagalungan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.74046 | 7.07819 | 23M00119 | 48,250,000 | 47,646,875 | 1,697,587,200,000 | 2,023 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 380 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 48250000 | 47646875 | 2023-09-15 | 04/03/2023 | flood_control | construction-of-pulangi-bank-protection-right-bank-of-tunggol-floodway-package-a-phase-2-pagalungan-maguindanao-23m00119 | [object Object] |
4e913590-a267-4a0e-bbea-798b243988c1 | 2,021 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00522109MN | Construction of River Protection Phase I, Barangay Tumbao, Mangudadatu, Maguindanao | P00522109MN-CW1 | Construction of Revetment - Construction of River Protection Phase I, Barangay Tumbao, Mangudadatu, Maguindanao | null | Construction of Revetment | Flood Control Structures | 124.79156 | 6.63837 | 21M00116 | 24,124,331.49 | 21,591,512.98 | 1,673,395,200,000 | 2,022 | STONELINE CONSTRUCTION (FORMERLY: ABUBAKAR ENGINEERING EXPONENT) | 381 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 24124331.49 | 21591512.98 | 2022-12-27 | 05/31/2022 | flood_control | construction-of-river-protection-phase-i-barangay-tumbao-mangudadatu-maguindanao-21m00116 | [object Object] |
ac389b76-85bd-430d-82e9-0979318fa5ae | 2,022 | Region XII | MAGUINDANAO DEL SUR | BULUAN (MAGUINDANAO) | Region XII | P00633905MN | Construction of Flood Control Structure, Maslabeng Phase II, Buluan, Maguindanao | P00633905MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Maslabeng Phase II, Buluan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.80727 | 6.68203 | 22M00119 | 96,499,984.13 | 96,499,063.51 | 1,689,552,000,000 | 2,023 | JDRC CONSTRUCTION & SUPPLIES, CORP. | 382 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 96499984.13 | 96499063.51 | 2023-04-24 | 10/05/2022 | flood_control | construction-of-flood-control-structure-maslabeng-phase-ii-buluan-maguindanao-22m00119 | [object Object] |
f7f45872-1084-41e7-ad24-7c6d4f8b6fdf | 2,022 | Region XII | MAGUINDANAO DEL SUR | BULUAN (MAGUINDANAO) | Region XII | P00620088MN | Construction of Flood Control, Maslabeng Phase II, Buluan, Maguindanao | P00620088MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control, Maslabeng Phase II, Buluan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.810495 | 6.665469 | 22M00048 | 81,059,935.47 | 81,000,521.2 | 1,676,937,600,000 | 2,023 | FFJJ CONSTRUCTION | 383 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 81059935.47 | 81000521.2 | 2023-02-27 | 04/12/2022 | flood_control | construction-of-flood-control-maslabeng-phase-ii-buluan-maguindanao-22m00048 | [object Object] |
381772ce-0382-40ff-864b-cb7e5100acfd | 2,022 | Region XII | MAGUINDANAO DEL SUR | BULUAN (MAGUINDANAO) | Region XII | P00631075MN | Construction of River Bank Protection (Riprap) at Barangay Maslabeng, Buluan, Maguindanao | P00631075MN-CW1 | Construction of Slope Protection Structure - Construction of River Bank Protection (Riprap) at Barangay Maslabeng, Buluan, Maguindanao | null | Construction of Slope Protection Structure | Flood Control Structures | 124.810588 | 6.667944 | 22M00052 | 49,499,405.92 | 49,399,692.3 | 1,671,235,200,000 | 2,022 | FFJJ CONSTRUCTION | 384 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 49499405.92 | 49399692.3 | 2022-12-18 | 04/13/2022 | flood_control | construction-of-river-bank-protection-riprap-at-barangay-maslabeng-buluan-maguindanao-22m00052 | [object Object] |
4a553912-ab15-4406-b0f4-9caa25ada5eb | 2,024 | Region VIII | SAMAR (WESTERN SAMAR) | GANDARA (SAMAR (WESTERN SAMAR)) | Samar 1st District Engineering Office | P00820418VS | Construction of Flood Control Structure along Gandara River (Downstream), Barangay Minda, Gandara, Samar | P00820418VS-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Gandara River (Downstream), Barangay Minda, Gandara, Samar | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.811734 | 12.01995 | 24IJ0035 | 40,894,420 | 40,694,013.14 | 1,731,283,200,000 | 2,024 | JUPA CONSTRUCTION | 385 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | SAMAR (FIRST LEGISLATIVE DISTRICT) | Samar 1st District Engineering Office | 40894420 | 40694013.14 | 2024-11-21 | 04/22/2024 | flood_control | construction-of-flood-control-structure-along-gandara-river-downstream-barangay-minda-gandara-samar-24ij0035 | [object Object] |
318b2f86-9c6c-467a-9ee4-e65102e14f48 | 2,022 | Region XII | MAGUINDANAO DEL SUR | BULUAN (MAGUINDANAO) | Region XII | P00620087MN | Construction of Flood Control, Maslabeng Phase I, Buluan, Maguindanao | P00620087MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control, Maslabeng Phase I, Buluan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.812763 | 6.663677 | 22M00047 | 81,059,129.86 | 80,831,781.63 | 1,680,480,000,000 | 2,023 | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | 386 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 81059129.86 | 80831781.63 | 2023-04-04 | 05/23/2022 | flood_control | construction-of-flood-control-maslabeng-phase-i-buluan-maguindanao-22m00047 | [object Object] |
e978f826-a15f-4695-b114-c39f57105d1e | 2,020 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00444687MN | Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao | P00444687MN-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.81298 | 6.6639 | 20MA0105 | 48,995,449.04 | 48,512,932.29 | 1,647,302,400,000 | 2,023 | FFJJ CONSTRUCTION | 387 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,020 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 48995449.04 | 48512932.29 | 2023-02-27 | 09/24/2020 | flood_control | construction-of-slope-protection-dike-brgy-maslabeng-buluan-maguindanao-20ma0105 | [object Object] |
5c5860bc-eac5-4e79-940b-07d499d0bc24 | 2,021 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00444687MN | Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao | P00444687MN-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.81298 | 6.6639 | 20MA0105 | 48,995,449.04 | 48,512,932.29 | 1,647,302,400,000 | 2,023 | FFJJ CONSTRUCTION | 388 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | MYCA with Project ID P00444687MN | MYCA with Project ID P00444687MN | 2023-02-27 | 09/24/2020 | flood_control | construction-of-slope-protection-dike-brgy-maslabeng-buluan-maguindanao-20ma0105 | [object Object] |
e06750ab-490c-44bc-98fa-cb8ac982c20c | 2,022 | Region XII | MAGUINDANAO DEL SUR | MANGUDADATU (MAGUINDANAO) | Region XII | P00620086MN | Construction of Flood Control Structure, Calian, Mangudadatu, Maguindanao | P00620086MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Calian, Mangudadatu, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.840923 | 6.692464 | 22M00046 | 81,059,486.75 | 80,300,725.51 | 1,674,432,000,000 | 2,023 | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON / RNS CONSTRUCTION ENGINEERING | 389 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 81059486.75 | 80300725.51 | 2023-01-30 | 03/14/2022 | flood_control | construction-of-flood-control-structure-calian-mangudadatu-maguindanao-22m00046 | [object Object] |
3d895ccc-e63a-4542-8aea-44e5150d4c04 | 2,020 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00444655MN | Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao | P00444655MN-CW1 | Construction of Flood Mitigation Structure - Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.84118 | 6.69234 | 20MA0119 | 48,998,194.27 | 48,600,631.28 | 1,647,302,400,000 | 2,023 | FFJJ CONSTRUCTION | 390 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,020 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 48998194.27 | 48600631.28 | 2023-02-27 | 10/22/2020 | flood_control | construction-of-river-protection-dike-brgy-calian-mangudadatu-maguindanao-20ma0119 | [object Object] |
03463d92-23fe-44e9-974a-87b0441917d3 | 2,021 | Region XII | MAGUINDANAO DEL SUR | null | Region XII | P00444655MN | Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao | P00444655MN-CW1 | Construction of Flood Mitigation Structure - Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.84118 | 6.69234 | 20MA0119 | 48,998,194.27 | 48,600,631.28 | 1,647,302,400,000 | 2,023 | FFJJ CONSTRUCTION | 391 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | MYCA with Project ID P00444655MN | MYCA with Project ID P00444655MN | 2023-02-27 | 10/22/2020 | flood_control | construction-of-river-protection-dike-brgy-calian-mangudadatu-maguindanao-20ma0119 | [object Object] |
21c35646-eb5c-4ff8-88f2-c2caf7de3740 | 2,022 | Region XII | MAGUINDANAO DEL SUR | BULUAN (MAGUINDANAO) | Region XII | P00633904MN | Construction of Flood Control Structure, Maslabeng Phase I, Buluan, Maguindanao | P00633904MN-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Maslabeng Phase I, Buluan, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.8412 | 6.69987 | 22M00118 | 96,499,999.83 | 96,499,939.49 | 1,689,552,000,000 | 2,023 | JDRC CONSTRUCTION & SUPPLIES, CORP. | 392 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 96499999.83 | 96499939.49 | 2023-04-24 | 10/05/2022 | flood_control | construction-of-flood-control-structure-maslabeng-phase-i-buluan-maguindanao-22m00118 | [object Object] |
02735618-26cd-42ba-83f2-946ed40685e1 | 2,024 | Region XII | MAGUINDANAO DEL SUR | DATU PAGLAS (MAGUINDANAO) | Region XII | P00820105MN | Construction of River Bank Protection along Alip River (Phase I), Datu Paglas, Maguindanao | P00820105MN-CW1 | Construction of Flood Mitigation Structure - Construction of River Bank Protection along Alip River (Phase I), Datu Paglas, Maguindanao | null | Construction of Flood Mitigation Structure | Flood Control Structures | 124.86715 | 6.73991 | 24M00051 | 96,500,000 | 96,008,853.82 | 1,738,540,800,000 | 2,025 | PATE-KHAY CONSTRUCTION | 393 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | MAGUINDANAO DEL SUR (LEGISLATIVE DISTRICT) | Cotabato City District Engineering Office | 96500000 | 96008853.82 | 2025-02-11 | 05/20/2024 | flood_control | construction-of-river-bank-protection-along-alip-river-phase-i-datu-paglas-maguindanao-24m00051 | [object Object] |
d001c8c0-cf26-4611-948f-f7744d891bd9 | 2,022 | Region VIII | SAMAR (WESTERN SAMAR) | VILLAREAL (SAMAR (WESTERN SAMAR)) | Samar 2nd District Engineering Office | P00630686VS | Construction of Coastal Dike/Shoreline Protection (Esplanade) in Barangay Poblacion, Villareal, Samar | P00630686VS-CW1 | Construction of Slope Protection Structure - Construction of Coastal Dike/Shoreline Protection (Esplanade) in Barangay Poblacion, Villareal, Samar | null | Construction of Slope Protection Structure | Flood Control Structures | 124.929167 | 11.569722 | 22IK0053 | 14,699,999.97 | 14,847,437.16 | 1,671,062,400,000 | 2,022 | CDU CONSTRUCTION | 394 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | SAMAR (SECOND LEGISLATIVE DISTRICT) | Samar 2nd District Engineering Office | 14699999.97 | 14847437.16 | 2022-12-16 | 02/28/2022 | flood_control | construction-of-coastal-dikeshoreline-protection-esplanade-in-barangay-poblacion-villareal-samar-22ik0053 | [object Object] |
19c5cd2e-66e7-428b-9c41-4113248da1aa | 2,021 | Region VIII | SOUTHERN LEYTE | null | Southern Leyte 1st District Engineering Office | P00549877VS | Construction of Road Slope Protection along Ichon-Sindangan-Guinabonan-Maningning Road, Southern Leyte | P00549877VS-CW1 | Construction of Slope Protection Structure - Construction of Road Slope Protection along Ichon-Sindangan-Guinabonan-Maningning Road, Southern Leyte | null | Construction of Slope Protection Structure | Flood Control Structures | 124.930859 | 10.123653 | 21IL0133 | 96,500,000 | 96,500,000 | 1,665,014,400,000 | 2,022 | S-ANG CONSTRUCTION & GENERAL TRADING, INC. / MORTAR MASTERS & CONCRETE BUILDERS | 395 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | SOUTHERN LEYTE (FIRST LEGISLATIVE DISTRICT) | Southern Leyte 1st District Engineering Office | 96500000 | 96500000 | 2022-10-07 | 11/22/2021 | flood_control | construction-of-road-slope-protection-along-ichon-sindangan-guinabonan-maningning-road-southern-leyte-21il0133 | [object Object] |
2381bd92-cdc4-4ba8-b27d-eb75219ea054 | 2,022 | Region VIII | LEYTE | TACLOBAN CITY (CAPITAL) (LEYTE) | Tacloban City District Engineering Office | P00620235VS | Construction of Shore Protection, Magsaysay Boulevard, Tacloban City | P00620235VS-CW1 | Construction of Flood Mitigation Structure - Construction of Shore Protection, Magsaysay Boulevard, Tacloban City | null | Construction of Flood Mitigation Structure | Flood Control Structures | 125.004252 | 11.252502 | 22IM0036 | 48,996,130.43 | 48,998,750 | 1,683,849,600,000 | 2,023 | LEDA CONSTRUCTION INCORPORATED | 396 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LEYTE (FIRST LEGISLATIVE DISTRICT) | Tacloban City District Engineering Office | 48996130.43 | 48998750 | 2023-05-13 | 02/23/2022 | flood_control | construction-of-shore-protection-magsaysay-boulevard-tacloban-city-22im0036 | [object Object] |
9f69bbc9-9792-438f-8af3-b77766b6969b | 2,021 | Region VIII | SOUTHERN LEYTE | null | Southern Leyte 1st District Engineering Office | P00549876VS | Construction of Slope Protection along Padre Burgos, Southern Leyte | P00549876VS-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Padre Burgos, Southern Leyte | null | Construction of Slope Protection Structure | Flood Control Structures | 125.023401 | 10.055536 | 21IL0137 | 96,500,000 | 96,500,000 | 1,670,198,400,000 | 2,022 | S-ANG CONSTRUCTION & GENERAL TRADING, INC. / MORTAR MASTERS & CONCRETE BUILDERS | 397 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | SOUTHERN LEYTE (FIRST LEGISLATIVE DISTRICT) | Southern Leyte 1st District Engineering Office | 96500000 | 96500000 | 2022-11-20 | 11/22/2021 | flood_control | construction-of-slope-protection-along-padre-burgos-southern-leyte-21il0137 | [object Object] |
b376552d-3109-49e3-8281-13561b7883bb | 2,023 | Region VIII | LEYTE | TACLOBAN CITY (CAPITAL) (LEYTE) | Region VIII | P00721593VS | Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.5 to 4+866.5), Tacloban City, Leyte | P00721593VS-CW1 | Construction of Flood Mitigation Structure - Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.5 to 4+866.5), Tacloban City, Leyte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 125.02789 | 11.212309 | 23I00073 | 151,772,091 | 151,771,943.3 | 1,739,491,200,000 | 2,025 | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | 398 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LEYTE (FIRST LEGISLATIVE DISTRICT) | Tacloban City District Engineering Office | 151772091 | 151771943.33 | 2025-02-15 | 08/09/2023 | flood_control | construction-of-storm-surge-protection-wave-wall-subsection-319-sta-46865-to-48665-tacloban-city-leyte-23i00073 | [object Object] |
bce93b95-2593-4df6-9e81-c159e6833e6c | 2,022 | Region XI | DAVAO DEL SUR | DAVAO CITY (DAVAO DEL SUR) | Davao City District Engineering Office | P00634138MN | Construction of Seawall from San Jose connecting Seawall of Brgy. Leon Garcia, San Jose, IKP & MASEA, Brgy. Gov. Vicente Duterte, Agdao, Davao City | P00634138MN-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall from San Jose connecting Seawall of Brgy. Leon Garcia, San Jose, IKP & MASEA, Brgy. Gov. Vicente Duterte, Agdao, Davao City | null | Construction of Flood Mitigation Structure | Flood Control Structures | 125.635529 | 7.087366 | 22LB0415 | 9,900,000 | 9,900,000 | 1,678,752,000,000 | 2,023 | AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. | 399 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | DAVAO CITY (SECOND LEGISLATIVE DISTRICT) | Davao City District Engineering Office | 9900000 | 9900000 | 2023-03-15 | 06/02/2022 | flood_control | construction-of-seawall-from-san-jose-connecting-seawall-of-brgy-leon-garcia-san-jose-ikp-masea-brgy-gov-vicente-duterte-agdao-davao-city-22lb0415 | [object Object] |
5cc326c7-b50b-4602-a6e6-631708575343 | 2,021 | Region XIII | AGUSAN DEL NORTE | null | Butuan City District Engineering Office | P00538309MN | Rehabilitation of National Roads with Slips, Slope Collapse and Landslide along Daang Maharlika Road - K1240+500 - K1240+746.60, Butuan City | P00538309MN-CW1 | Rehabilitation / Major Repair of Slope Protection Structure - Rehabilitation of National Roads with Slips, Slope Collapse and Landslide along Daang Maharlika Road - K1240+500 - K1240+746.60, Butuan City | null | Rehabilitation / Major Repair of Slope Protection Structure | Flood Control Structures | 125.645759 | 8.913132 | 21ND0106 | 7,085,332.41 | 7,085,328.3 | 1,667,001,600,000 | 2,022 | TRIPARCO DEVELOPMENT CORPORATION | 400 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | AGUSAN DEL NORTE (FIRST LEGISLATIVE DISTRICT) | Butuan City District Engineering Office | 7085332.41 | 7085328.3 | 2022-10-24 | 03/22/2022 | flood_control | rehabilitation-of-national-roads-with-slips-slope-collapse-and-landslide-along-daang-maharlika-road---k1240500---k124074660-butuan-city-21nd0106 | [object Object] |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.