text
stringlengths
1
1.9k
employee_id
stringclasses
45 values
__index_level_0__
int64
0
36.6k
This fork will lead you to a stop light where you turn left onto Highway 8 Bragg Creek.
dev25
20,569
On highway 8 you will pass 69st, after the light get in the outside lane and take your next right on Lower Springbank Rd.
dev25
20,570
At the the stop sign turn left onto Lower Springbank, you should now be going parallel to Highway 8.
dev25
20,571
After 85 st and before 101st there is a gravel entrance road on your right, take this road, it is 100 feet long and leads to Slopeview Dr, turn left when the gravel road joins the pavement and go to 133 Slopeview Dr.
dev25
20,572
I'll call him, I have to arrange to be there when he can come since it requires me to lift the TV with him.
dev25
20,573
The import/export units are fine, here is the SD3 SD4 info
dev25
20,574
YES
dev25
20,575
That is the Saturday after the management conference in San Antonio, I was planning to stay down there for the US thanksgiving.
dev25
20,576
So tentatively, I won't be there Conference is Nov 14-16
dev25
20,577
This is correct, except that a significant portion of his cost should be reapplied to Enron Direct
dev25
20,578
Hey Jim and Greg, Jessica and I sent a card to Chris's wife asking about his well-being and this is the unfornate response.
dev25
20,579
Sent: Friday, October 05, 2001 3:04 PM Subject: From Anne Wodenshek Jessica and John, Thanks for the card, yes Chris was in the WTC, 105th floor on Tuesday the 11th...2 days after our 12th wedding anniversary.
dev25
20,580
I hadn't spoken to him at all that day and he wasn't able to call after the attack.
dev25
20,581
I only hope that he wasn't frightened and that he didn't suffer.
dev25
20,582
Is there a reason we think we will need to run station 8.
dev26
20,841
I think with the volumes we will have to move to insure 6 miles and hour for the smart pig will be approx.
dev26
20,842
100 to 200 m2.
dev26
20,843
If my thinking is wrong please let me know.
dev26
20,844
DS
dev26
20,845
Projected flows DS
dev26
20,846
You are correct looking at the models Ken Chow ran before he left was between 175 to 225 this will allow the pig to move approx.
dev26
20,847
between 5 to 6 miles an hour.
dev26
20,848
DS
dev26
20,849
Projected flows for Griffith.
dev26
20,850
Right now it looks like we can run station 9, station 7, station 6 or station 5.
dev26
20,851
We will just have to see what we have scheduled for the day.
dev26
20,852
This will allow us to set our HP accordingly.
dev26
20,853
Unless I'm missing something Station 8 should not be needed.
dev26
20,854
However I will check with OPS team to reverify volumes.
dev26
20,855
DS
dev26
20,856
Please see the attached
dev26
20,857
This is TW pressure at the inlet of the Griffith I/C.
dev26
20,858
This is interesting news.
dev26
20,859
Thought you might want to know.
dev26
20,860
I sent him pressures on TW side for the month of may per his request.
dev26
20,861
Mom, hey what are you up to nothing much here man today i had to mow the lawn man its really hot down here is it really hot there ....................i still dont have a sun tan yet but its getting there u know..............
dev26
20,862
man i miss u so much and i mean hah i dought you miss me u are probably haveing to much fun to even think about me..............
dev26
20,863
>=) thats ok im haveing alot of fun here too .............man i cant wait till i come home i miss u so much..................umm i really dontknow what else to say so i mean i guess iwill talk to you l8er or sometin i have to go get ready to go to the mall and get somemore clothes and a new bathing suit and shorts and ...
dev26
20,864
<3 Kara
dev26
20,865
FYI DS
dev26
20,866
FYI We had to pull unit 2 from Plant held for future use at P-3 on the below date.
dev26
20,867
DS
dev26
20,868
Lindy, You are correct they are physical plant receipt points.
dev26
20,869
The Pecos Diamond plant is the straddle plant located on the Atoka Lateral.
dev26
20,870
Thanks DS
dev26
20,871
Please read I'm sure you will be getting some calls.
dev26
20,872
DS
dev26
20,873
i will be there
dev26
20,874
What is the time frame these units need to be down.
dev26
20,875
There are no postings for volume deductions.
dev26
20,876
Please someone give me some ideas.
dev26
20,877
Thanks Ds
dev26
20,878
Ken, We currently have a unit down at Station 4.
dev26
20,879
If you need to work on something now is the time to do it and not wait until June.
dev26
20,880
DS
dev26
20,881
I need to get with Dave Duff and have him add the new point to the map.
dev26
20,882
Dave can you do this for us.
dev26
20,883
This new point will need to be inserted under the Mapco point on the Ignacio to Blanco column.
dev26
20,884
DS
dev26
20,885
I will be on vacation.
dev26
20,886
DS
dev26
20,887
We need know everyday units need to be taken down and for how long.
dev26
20,888
Depending on system conditions we may have to allocate.
dev26
20,889
DS
dev26
20,890
How long will the unit be down 4 hrs, 8hrs, 12hrs, or all day or longer.
dev26
20,891
DS
dev26
20,892
Spoke to Lynn Blair, Kim Watson, Cynthia Rivers, Linda Ward, and Terry Kowalke, we would like to hold the same scheduled numbers on ID/2 from San Juan Lateral as we had scheduled for ID/1 from San Juan Lateral.
dev26
20,893
We think this will help us minimize our Operator and Shipper imbalances.
dev26
20,894
Please let us know if we start getting complaints from our customers.
dev26
20,895
If anyone has other ideas or comments please let us know.
dev26
20,896
Example: Non-Grid-- San Juan Scheduled 870,000 (we will have to do the right mouse click and update the capacity to the flow rate needed.)
dev26
20,897
I'm sorry tomorrow afternoon is not available for me.
dev26
20,898
I have a ortho.
dev26
20,899
appt.
dev26
20,900
and I get my braces off.
dev26
20,901
On Thursday afternoon I have to back for my retainers.
dev26
20,902
Can we meet sometime in the morning.
dev26
20,903
DS
dev26
20,904
This is a new interconnect into the suction side of WT-1.
dev26
20,905
I think the capacity is going to be approximately 50,000 mmbtu.
dev26
20,906
This may be able to flow sometime this or next.
dev26
20,907
DS
dev26
20,908
I would like to attend.
dev26
20,909
DS Alma Carrillo
dev26
20,910
For Gas Day June 10.
dev26
20,911
Flow Nom.
dev26
20,912
Due to the flooding in Houston there will be no representative available to attend from Gas Control.
dev26
20,913
DS
dev26
20,914
These are pictures of the underground tunnel system.
dev26
20,915
Dave can you please add the new La Plata Red Cedar point to the map.
dev26
20,916
Please add it between Mapco and Red Cedar points.
dev26
20,917
Also please check to see if the Rio Puerco receipt and delivery are added into the totals of the Central Area.
dev26
20,918
If they are in the total please exclude them.
dev26
20,919
Rio Puerco is a stand alone point.
dev26
20,920
Rio Puerco should still be added into the total Transport Receipt and Delivery.
dev26
20,921
If you have questions please call.
dev26
20,922
Thanks Ds
dev26
20,923
I spoke to the guys in the field last week when our deliveries went up and we made the decision to run the pigs.
dev26
20,924
It was passed on to us that the fluids in the line were heavies that were in the gas streams possibly coming from the Bitter Lakes and Red Bluff points.
dev26
20,925
I had them pull moisture readings and they were well below TW's #7 of water.
dev26
20,926