Based upon submitted discussions it was decided to dispose of the turbine, compressor and auxillary box as a PCB contaminated waste and move the contaminated articles to a PCB landfill.
dev45
36,575
The quarterly Transwestern/SoCal PCB management committee mtg was held via conference call.
dev45
36,576
Invoices and charges were discussed which So cal had charged to their management and handling of PCB's on their system.
dev45
36,577
At 86%, Transwestern's responsibility was $71,208.61.
dev45
36,578
Clearances were received from the F&W and SHPO for the additional areas for the powerline transmission corridor of the Gallup C/S which is in progress.
dev45
36,579
A custom fuel monitoring request wqas submitted to Region VI EPA for the Installation and testing has been initiated on the precombustion chambers for the Superiors at the Atoka No. 3 C/S.
dev45
36,580
While fabrication is in progress for the correct chamber, temporary Waukesha chambers were installed.
dev45
36,581
Even though the chambers were not of the correct size and configuration, a 12.5% fuel savings was achieved and emissions were reduced by over 56%.
dev45
36,582
The correct chambers will be available and installed sometime next week.
dev45
36,583
Mike I wanted to give a short update on the latest events related to the PCB issue with PG&E.
dev45
36,584
Transwestern met with PG&E this last Wednesday with an agenda that included some sharing of sampling results collected downstream of their first C/S (Topock) and on out west toward their main distribution areas.
dev45
36,585
With respect to the most recent sampling data, Low PCB concentrations (N.D. to 38 ppm) have been detected in drips and interconnects between Topock and Hinckley C/S.
dev45
36,586
The good news is that PCB's have not been detected downstream of Hinckley which is approx.
dev45
36,587
160 miles from the Topock C/S.
dev45
36,588
PG&E has also initiated construction and installation of some drips and small separators at locations where their gas feeds into other lines or directly into customers.
dev45
36,589
the proposed installation date for the large mainline filter separators is still on target for 6/1/00.
dev45
36,590
Now for the bad news.
dev45
36,591
At the conclusion of the meeting, PG&E has stated that they want their Topock C/S decontaminated.
dev45
36,592
This includes all piping and equipment.
dev45
36,593
I stated to them the impractabibility and zero success rate of removing all the PCB's from their system and that there would be no quarantees that the deconning would be successful.
dev45
36,594
The contract PCB deconning companies only have permits which would guarantee cleanup to 10 ug.
dev45
36,595
They were told that it would be impossible to clean everything and that in all probability the PCB concentrations would be showing up as the gas continues to move through the system.
dev45
36,596
Additionally, the better remediation approach would be to continue to remove PCB containing liquids at strategic locations.
dev45
36,597
Even with this, they were pretty insistent that their management wanted the facility cleaned.
dev45
36,598
Preliminary $$ estimates range to approx.
dev45
36,599
3-5 million.
dev45
36,600
I think that this is only the "tip of the iceberg".
dev45
36,601
If they are successful with this action, the pipeline system will be next.
dev45
36,602
Their pipeline is not piggable and to make it such would require replacement of pipe, valves etc. Ill keep you informed on this,,,,,,,
dev45
36,603
Michael, our liquids data collections have been pretty lean.
dev45
36,604
Its only been in the last couple of months where we have actually collected any arsenic data.
dev45
36,605
I will send to you what data have have with respect to arsenic, including some historic reserch in the Abo field of southeast New Mexico where the arsenic is generated from down hole.
dev45
36,606
The source is not so much from what is coming out of the wells (catalyst towers were installed in the late 80's to trap the arsenic) as the residual which has collected in the pipeline prior to the installation of the catalyst towers.......
dev45
36,607
As a reminder, the state of Texas requires releases of natural gas greater than 119 mscf to the atmosphere (in a 24 hour period), to be reported to the Regional Offices of the TNRCC.
dev45
36,608
These releases include but may not be limited to the following: ESD's, startups, shutdowns, pipeline ruptures and maintenance activities.