text
stringlengths
1
1.9k
employee_id
stringclasses
45 values
__index_level_0__
int64
0
36.6k
DS
dev26
21,127
I will not be able to attend.
dev26
21,128
Thanks for the invite.
dev26
21,129
DS
dev26
21,130
The below was revised and posted to the TW Internet Site.
dev26
21,131
DS
dev26
21,132
They have a rep.
dev26
21,133
flying in tonight to help evaluate the situation.
dev26
21,134
It has something to do with the variable speed on the unit.
dev26
21,135
They can start it but can't keep it running and speed up.
dev26
21,136
DS
dev26
21,137
The below attached has been reposted to the TW Web Site.
dev26
21,138
We need to make sure that when we have any issues concerning the Griffith plant we put something on the log.
dev26
21,139
It has been brought to our attention that we had a problem on Aug. 6th and Aug. 14th and there is nothing in the logs about anything.
dev26
21,140
I was here on the 6th and know they almost ran themselves out of gas because they started pulling more than our setpoint and did not call to let us know.
dev26
21,141
If anyone can recall what took place on the 14th please drop me and e:mail.
dev26
21,142
Citizens is trying to gather information on these days based on complaints from Griffith plant.
dev26
21,143
Thanks DS
dev26
21,144
Will come and talk to you tomorrow and we might need to pull in Ron Matthews and David Roensch for their expertise.
dev26
21,145
DS
dev26
21,146
I will let you know any updates.
dev26
21,147
We will be allocating until further notice.
dev26
21,148
San Juan: 800,000 Thoreau West 1010,000 DS
dev26
21,149
The attached has been posted.
dev26
21,150
Tim looks good to John and I. Thanks for you help.
dev26
21,151
This is all we know for now.
dev26
21,152
Do you want to be on the call, if so can we use your office.
dev26
21,153
The pressure regulator has been taken out of service at the TW Griffith I/C on the mainline.
dev26
21,154
This is to hopefully minimize the pressure swings to the plant.
dev26
21,155
David if you have any other comments please respond with your ideas.
dev26
21,156
Thanks DS
dev26
21,157
I'm sorry I have a previous meeting scheduled.
dev26
21,158
DS
dev26
21,159
Dannis Bellard is transitioning into the MOPS system and he needs to be there.
dev26
21,160
I will be there if you need me to.
dev26
21,161
DS
dev26
21,162
The measurement tech should be back this week and looking at that point.
dev26
21,163
They control the flow.
dev26
21,164
Will let you know asap.
dev26
21,165
as I find something out.
dev26
21,166
DS
dev26
21,167
Thursday will work best for me.
dev26
21,168
can do.
dev26
21,169
DS
dev26
21,170
Can we use a summation meter for the POI 500168 Westar Ward County Meter # 9089 and Meter # 10187 We can make this a bi-directional point in our system.
dev26
21,171
This will make it transparent to our customers.
dev26
21,172
Thanks DS
dev26
21,173
I will not be able to attend NNG is having their customer meeting in KC.
dev26
21,174
Steve J. or Gary S. will not be here to handle NNG.
dev26
21,175
Therefore I have to be here for both pipes.
dev26
21,176
Thanks DS
dev26
21,177
How does 9:00 work for everyone.
dev26
21,178
This is a very critical topic and needs to be discussed asap.
dev26
21,179
DS
dev26
21,180
I would be glad to play.
dev26
21,181
However I am not a scratch golfer anymore.
dev26
21,182
My handicap is at 15 now that I don't play as much.
dev26
21,183
If you still want me to play let me know.
dev26
21,184
Thanks for the invite.
dev26
21,185
DS
dev26
21,186
POI 500168 has been changed in CAS to 200,000 both receipt and delivery.
dev26
21,187
DS
dev26
21,188
Rich, You did mean September 4th instead of October I hope.
dev26
21,189
I know your doing this to see if anyone really reads your e:mails.
dev26
21,190
DS
dev26
21,191
I just figured this was a new way to test us.
dev26
21,192
DS
dev26
21,193
TEST
dev26
21,194
After talking with Ken and our Gas Control it appears we had and operater error, a setpoint was put in at the TW mainline.
dev26
21,195
The problem was corrected and the plant pressure came back.
dev26
21,196
We think with an open line of communications between the plant and gas control we hope to minimize the mistakes.
dev26
21,197
If any other concerns please call.
dev26
21,198
Thanks DS 713-853-4299
dev26
21,199
We need to keep our communications open to the plant.
dev26
21,200
I know that during their test mode they have had a variance in load projections.
dev26
21,201
Hopefully when they become operational their loads will be more steady.
dev26
21,202
Ken, Sorry about yesterday.
dev26
21,203
Thanks to your quick responce to our gas control so we could correct the problem before the plant went down.
dev26
21,204
If you have any more questions please call.
dev26
21,205
Thanks DS 713-853-4299
dev26
21,206
They had a 35,000 order and Kieth put the setpoint in at the mainline.
dev26
21,207
They sent a schedule for what they intended to pull hourly and he didn't look at it.
dev26
21,208
I got with him yesterday and explained how the spread sheet works they send us and how to figure the hourly takes for a 24 hr period.
dev26
21,209
Guess I should'nt assume they know to do that.
dev26
21,210
I will take the to do to get with each gas controller again and explain how Griffith works both at the power plant controls and the mainline.
dev26
21,211
DS
dev26
21,212
I don't know that for a fact.
dev26
21,213
I assumed since they do the same thing for the lamar power plant they should know to do the same for Griffith and Calpine, that is why we send those daily schedules.
dev26
21,214
DS
dev26
21,215
This is fyi.
dev26
21,216
We need to be more careful on this point and refer to the schedule they send us.
dev26
21,217
Please if you have any questions call.
dev26
21,218
DS
dev26
21,219
FYI
dev26
21,220
Mike can you and Danny get with either Gary or myself to get access to change capacities for the MOPS system in NNG Contract Management System.
dev26
21,221
(CAS) We will show you where and how to do that.
dev26
21,222
You will also need to post outages to the NNG Web Site.
dev26
21,223
Thanks DS
dev26
21,224
This is what Ken sent for gas consumption during the pressure loss.
dev26
21,225
This is the schedule that was sent to gas control.
dev26
21,226