Pg&E will be responsible for the notification of gas release for their separator and piping....
|
dev45
| 36,375
|
David Roensch
|
dev45
| 36,376
|
Presented Title V training to the Flagstaff Team.
|
dev45
| 36,377
|
The training included responsibilities, recordkeeping and semi annual reporting requirements.
|
dev45
| 36,378
|
A meeting was held with representatives of Transwestern and PG&E to discuss activities related to removing PCB's from the Topock Lateral.
|
dev45
| 36,379
|
Sampling data was reviewed and discussions were held addressing past cleaning efforts.
|
dev45
| 36,380
|
PG&E has stated by letter and verbally that natural gas volumes will be decreased weekly until PCB concentrations fall below 5 ppm.
|
dev45
| 36,381
|
Transwestern will be implementing a pipeline cleaning of the remaining 1850 of pipe between our M/S and the PG&E C/S.
|
dev45
| 36,382
|
Included in this cleaning will be decontamination of the additional filter separators and meter runs.
|
dev45
| 36,383
|
Assisted in the compilation and data gathering of the Title V compliance monitoring and annual certification reports for C/S No. 5, Thoreau.
|
dev45
| 36,384
|
The annual blanket request for the Arizona SHPO was submtted for renewal.
|
dev45
| 36,385
|
Notification letters were submitted to the state of New Mexico notifiying the agency of like for like replacements of recipricating engines at the AToka No. 1 C/S.
|
dev45
| 36,386
|
Additional notifications were submitted to the agency apprising them of engine removal activities at C/S's No. 5 and 9 which would impact emissions fees.
|
dev45
| 36,387
|
James, lets go ahead and provide her with an annual report for Puckett with the information you provided.
|
dev45
| 36,388
|
thanx again
|
dev45
| 36,389
|
Thanx John, I look forward to seeing you at the Doubletree for dinner on the night of the September 3.
|
dev45
| 36,390
|
Let me know your traveling plans
|
dev45
| 36,391
|
In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in natural gas pipelines.
|
dev45
| 36,392
|
Mr. Woodyard has considerable experience in the management of PCB's and works closely in industry associations (INGAA and GRI), Mr. Woodyard also works as a consultant in this capacity.
|
dev45
| 36,393
|
The date of this meeting will be on Friday, September 3rd, beginning at 9:00 am.
|
dev45
| 36,394
|
Lou Soldano will be setting up a meeting room and will notifiy all attendees via lotus notes prior to the September 3rd meeting date.
|
dev45
| 36,395
|
I think this meeting will be very interesting and informative and and encourage all to attend, if possible.
|
dev45
| 36,396
|
Mr. Cates, sir, would you please approve of the attached expense report?
|
dev45
| 36,397
|
You are a kind and generous man.
|
dev45
| 36,398
|
NNG Gomez Plant, Site Cleanup has been completed.
|
dev45
| 36,399
|
All activities associated with the items identified during the sale of the facility have been corrected.
|
dev45
| 36,400
|
Becuse ET&S owns and WGR operates, there is a concern that WGR may not adhear to compliance and housekeeping at the facility.
|
dev45
| 36,401
|
This has been the case in the past.
|
dev45
| 36,402
|
Discussions will be held with Enron Legal to address these concerns.
|
dev45
| 36,403
|
TW Bell Lake Gas Plant, Ground Water Remediation.
|
dev45
| 36,404
|
A revised Water Development Easement from the State Land Office was received.
|
dev45
| 36,405
|
This will allow TW access to install one additional downgradient groundwater monitor well.
|
dev45
| 36,406
|
The tentative schedule to install the well will be the week of September 13th.
|
dev45
| 36,407
|
A construction permit application for installation of an SVE remediation system for the North Crawar C/S was mailed to the TNRCC.
|
dev45
| 36,408
|
The State of New Mexico conducted an air quality inspection of the Atoka No. 2 C/S.
|
dev45
| 36,409
|
No items or deficiencies were identified by the agency.
|
dev45
| 36,410
|
The Title V air permit application for the Atoka No. 3 C/S was mailed to the State of New Mexico, Air Qualtiy Bureau.
|
dev45
| 36,411
|
The Notice of Intent air permit application for the Crawford C/S was mailed to the State of New Mexico, Air Quality Bureau.
|
dev45
| 36,412
|
Annual blanket request letters were submitted to the USFWS in New Mexico and Texas for renewal.
|
dev45
| 36,413
|
A meeting was held in Houston with John Woodyard of Roy F. Weston and ET&S mgt.
|
dev45
| 36,414
|
addressing PCB activity in natural gas pipelines as related to the PG&E PCB Topock Lateral issue.
|
dev45
| 36,415
|
The PCB Annual Document Logs for the facilities that generated PCB waste and stored it at TW's long term storage facility were completed and distributed to locations and entered into Envisions.
|
dev45
| 36,416
|
The 2rd quarter Transwestern/SoCal PCB mgt.
|
dev45
| 36,417
|
committee conference call was completed.
|
dev45
| 36,418
|
This committee meets to discusss PCB management on the SoCal system and review invoices generated by SoCal during each quarter.
|
dev45
| 36,419
|
This quarters invoice amount was $280,633.48 of which Transwestern is 86% responsible or $241,344.79.
|
dev45
| 36,420
|
Final activities are in progress at the Topock Lateral where cleanup of the 1850' pipeline and appurtenances has been completed.
|
dev45
| 36,421
|
Analytical results of the wipe samples and liquid samples taken showed the cleanup to be successful.
|
dev45
| 36,422
|
All wipes after the cleaning showed to be less than 1 microgram/100 cm.
|
dev45
| 36,423
|
sq. Analytical results of the liquids showed to be less than 20 ppb.
|
dev45
| 36,424
|
The next phase of the cleanup activities will be in November when the remaining 11 miles of pipe will be cleaned and have launcher facilities installed at the mainline interconnect.
|
dev45
| 36,425
|
With respect to the September 13, 1999 letter from Richard and Oreane Garcia concerning pipeline integrity and noise issues, Transwestern Pipeline Company offers the following response: Pipeline Integrity.
|
dev45
| 36,426
|
With the construction of the evaporation ponds over Transwestern's right of way and pipline, Transwestern has closely monitored the potential for impacts for the pipeline.
|
dev45
| 36,427
|
This includes a more frequent inspection of the pipeline conditions underlying the ponds by taking potentiometric readings to verify that corrosion is not present.
|
dev45
| 36,428
|
Transwestern has also installed rectifiers to assist in eleminating the potential of pipeline corrosion.
|
dev45
| 36,429
|
As a DOT requirement, Transwestern has cathodically protected the entire pipeline system with an external pipeline coating to further ensure the integrity of the pipeline underlying the evaporation ponds.
|
dev45
| 36,430
|
The pipline safety measures implemented by Transwestern are designed to not only identify corrosion iimpacts to the pipeline system at the inception of detrimental impacts as a result of corrosion, but also allow for long term stability and integrity by conducting state of the art monitoring and detection.
|
dev45
| 36,431
|
Noise Issue.
|
dev45
| 36,432
|
In the initial environmental assessment and study, Transwestern conducted baseline surveys of the area to determine existing noise levels.
|
dev45
| 36,433
|
This study was completed to assist Transwestern in the mitigation measures which will be implemented after construction of the Gallup Compresso Station.
|
dev45
| 36,434
|
Pending completion of the facility, Transwestern will conduct post noise studys to determine whether facility noise levels have increased above those levels mandated by FERC.
|
dev45
| 36,435
|
In the event of operational noise levels exceeding the FERC regulatory level of 55 ldn, Transwestern is committed to performing any and all mitigation measures necessary to ensure that the post noise level of the facility will not be above the level mandated by FERC.
|
dev45
| 36,436
|
Decrepancy of trailer park residents.
|
dev45
| 36,437
|
In the letter by Mr. Garcia, it was stated that Transwestern's assessment of the number of residences in the adjacent trailer park was not 18 as had been stated in our original study, but "more like 35 trailers".
|
dev45
| 36,438
|
The number of mobile home residences currrently in the trailer park may in fact be closer to 35.
|
dev45
| 36,439
|
Transwestern's trailer park residence count was taken in the winter of the year when the fluctuating job market is normally down and the number of residences in the park was low.
|
dev45
| 36,440
|
The transient nature of mobile home residences and the fluctuating job economy of the area is probably a direct reflection of the up and down nature of the residences.
|
dev45
| 36,441
|
It should also be noted that during the time that the trailer park count was made, the owner of the trailer park who is also the operator of the evaporation ponds was experiencing major difficulties in the operation of the ponds and raw sewage had overflowed the pond embankments and had resulted in the raw sewage ponding in the yards of many of the trailer park residents.
|
dev45
| 36,442
|
It was actually noted that many of the spaces normally occupied by mobile homes had been vacated.
|
dev45
| 36,443
|
This unsanitary condition was also identified by the New Mexico Environment Department.
|
dev45
| 36,444
|
The NMED had implemented enforcement actions against the trailer park owner.
|
dev45
| 36,445
|
Kay, the choice is yours as to how you want to clean your oil staining.
|
dev45
| 36,446
|
both technologies will work.
|
dev45
| 36,447
|
I prefer the quicker of the two......in the interest of time ie steam
|
dev45
| 36,448
|
Rich, whats your thoughts on a decent pipeline segment for the modeling study.
|
dev45
| 36,449
|
I kind of like Sta.
|
dev45
| 36,450
|
4 to Sta.
|
dev45
| 36,451
|
3.
|
dev45
| 36,452
|
It encompasses alot of the variablity present on the Transwestern system (elevation, temperature, consistent activities with respect to the rest of the PCB contaminated system).
|
dev45
| 36,453
|
Let me know before the Penn State visit, so I can start rounding up the analytical data for the pipeline and stations.....
|
dev45
| 36,454
|
Butch, you may want to attend this
|
dev45
| 36,455
|
Bret, what do you think about this?
|
dev45
| 36,456
|
We have pretty much proven that we are not the culprits is this activity.
|
dev45
| 36,457
|
I have a problem conducting an ongoing sampling for an issue that were not responsible for, even though we initiated the sampling activity.
|
dev45
| 36,458
|
I plan on visiting the OCD about this issue and either forcing them to justify why we should continue the sampling when the data points to our neighbors.
|
dev45
| 36,459
|
Additionally, because of the turnover and inability to get the guilty party to get moving on this, spending additional money and not receiving any return seems like a waste of time.
|
dev45
| 36,460
|
Thoughts....
|
dev45
| 36,461
|
George Robinson
|
dev45
| 36,462
|
George, after Bret's memo, go ahead and conduct the sampling.
|
dev45
| 36,463
|
the soonest I can discuss the issue with the OCD is in the middle of November.
|
dev45
| 36,464
|
I have reviewed the reports and results of the studies conducted by us and them and the evidence weighs in our favor.
|
dev45
| 36,465
|
At your leisure and prior to the November OCD meeting, prepare a memo to file of the resaons and justification based upon the report results and data why Eunice is not the bad guy in this and why Texaco is.
|
dev45
| 36,466
|
Gradients, plume elevations and characteristics of the contaminants show that this is not our problem.
|
dev45
| 36,467
|
Id like to have sufficient evidence, both mine and yours, to force OCD to go afterTexaco and get us out of this issue.
|
dev45
| 36,468
|
I think this would also help Bret's case for having Texaco (or whoever is responsible) reimburse Northern for the costs we have incurred for what is Texaco's problem.
|
dev45
| 36,469
|
George Robinson
|
dev45
| 36,470
|
George, I will attend this meeting with you on the 16th.
|
dev45
| 36,471
|
George Robinson
|
dev45
| 36,472
|
Mike, I reveiwed the proposal by Adewumi and it is correct and fairly accurate, for the purposes of a historic account and and in as far as what was provided to him in the way of data and history.
|
dev45
| 36,473
|
His proposed scope seems to be conclusive and appears to be what we need.
|
dev45
| 36,474
|
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.