Pg&E will be responsible for the notification of gas release for their separator and piping....
dev45
36,375
David Roensch
dev45
36,376
Presented Title V training to the Flagstaff Team.
dev45
36,377
The training included responsibilities, recordkeeping and semi annual reporting requirements.
dev45
36,378
A meeting was held with representatives of Transwestern and PG&E to discuss activities related to removing PCB's from the Topock Lateral.
dev45
36,379
Sampling data was reviewed and discussions were held addressing past cleaning efforts.
dev45
36,380
PG&E has stated by letter and verbally that natural gas volumes will be decreased weekly until PCB concentrations fall below 5 ppm.
dev45
36,381
Transwestern will be implementing a pipeline cleaning of the remaining 1850 of pipe between our M/S and the PG&E C/S.
dev45
36,382
Included in this cleaning will be decontamination of the additional filter separators and meter runs.
dev45
36,383
Assisted in the compilation and data gathering of the Title V compliance monitoring and annual certification reports for C/S No. 5, Thoreau.
dev45
36,384
The annual blanket request for the Arizona SHPO was submtted for renewal.
dev45
36,385
Notification letters were submitted to the state of New Mexico notifiying the agency of like for like replacements of recipricating engines at the AToka No. 1 C/S.
dev45
36,386
Additional notifications were submitted to the agency apprising them of engine removal activities at C/S's No. 5 and 9 which would impact emissions fees.
dev45
36,387
James, lets go ahead and provide her with an annual report for Puckett with the information you provided.
dev45
36,388
thanx again
dev45
36,389
Thanx John, I look forward to seeing you at the Doubletree for dinner on the night of the September 3.
dev45
36,390
Let me know your traveling plans
dev45
36,391
In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in natural gas pipelines.
dev45
36,392
Mr. Woodyard has considerable experience in the management of PCB's and works closely in industry associations (INGAA and GRI), Mr. Woodyard also works as a consultant in this capacity.
dev45
36,393
The date of this meeting will be on Friday, September 3rd, beginning at 9:00 am.
dev45
36,394
Lou Soldano will be setting up a meeting room and will notifiy all attendees via lotus notes prior to the September 3rd meeting date.
dev45
36,395
I think this meeting will be very interesting and informative and and encourage all to attend, if possible.
dev45
36,396
Mr. Cates, sir, would you please approve of the attached expense report?
dev45
36,397
You are a kind and generous man.
dev45
36,398
NNG Gomez Plant, Site Cleanup has been completed.
dev45
36,399
All activities associated with the items identified during the sale of the facility have been corrected.
dev45
36,400
Becuse ET&S owns and WGR operates, there is a concern that WGR may not adhear to compliance and housekeeping at the facility.
dev45
36,401
This has been the case in the past.
dev45
36,402
Discussions will be held with Enron Legal to address these concerns.
dev45
36,403
TW Bell Lake Gas Plant, Ground Water Remediation.
dev45
36,404
A revised Water Development Easement from the State Land Office was received.
dev45
36,405
This will allow TW access to install one additional downgradient groundwater monitor well.
dev45
36,406
The tentative schedule to install the well will be the week of September 13th.
dev45
36,407
A construction permit application for installation of an SVE remediation system for the North Crawar C/S was mailed to the TNRCC.
dev45
36,408
The State of New Mexico conducted an air quality inspection of the Atoka No. 2 C/S.
dev45
36,409
No items or deficiencies were identified by the agency.
dev45
36,410
The Title V air permit application for the Atoka No. 3 C/S was mailed to the State of New Mexico, Air Qualtiy Bureau.
dev45
36,411
The Notice of Intent air permit application for the Crawford C/S was mailed to the State of New Mexico, Air Quality Bureau.
dev45
36,412
Annual blanket request letters were submitted to the USFWS in New Mexico and Texas for renewal.
dev45
36,413
A meeting was held in Houston with John Woodyard of Roy F. Weston and ET&S mgt.
dev45
36,414
addressing PCB activity in natural gas pipelines as related to the PG&E PCB Topock Lateral issue.
dev45
36,415
The PCB Annual Document Logs for the facilities that generated PCB waste and stored it at TW's long term storage facility were completed and distributed to locations and entered into Envisions.
dev45
36,416
The 2rd quarter Transwestern/SoCal PCB mgt.
dev45
36,417
committee conference call was completed.
dev45
36,418
This committee meets to discusss PCB management on the SoCal system and review invoices generated by SoCal during each quarter.
dev45
36,419
This quarters invoice amount was $280,633.48 of which Transwestern is 86% responsible or $241,344.79.
dev45
36,420
Final activities are in progress at the Topock Lateral where cleanup of the 1850' pipeline and appurtenances has been completed.
dev45
36,421
Analytical results of the wipe samples and liquid samples taken showed the cleanup to be successful.
dev45
36,422
All wipes after the cleaning showed to be less than 1 microgram/100 cm.
dev45
36,423
sq. Analytical results of the liquids showed to be less than 20 ppb.
dev45
36,424
The next phase of the cleanup activities will be in November when the remaining 11 miles of pipe will be cleaned and have launcher facilities installed at the mainline interconnect.
dev45
36,425
With respect to the September 13, 1999 letter from Richard and Oreane Garcia concerning pipeline integrity and noise issues, Transwestern Pipeline Company offers the following response: Pipeline Integrity.
dev45
36,426
With the construction of the evaporation ponds over Transwestern's right of way and pipline, Transwestern has closely monitored the potential for impacts for the pipeline.
dev45
36,427
This includes a more frequent inspection of the pipeline conditions underlying the ponds by taking potentiometric readings to verify that corrosion is not present.
dev45
36,428
Transwestern has also installed rectifiers to assist in eleminating the potential of pipeline corrosion.
dev45
36,429
As a DOT requirement, Transwestern has cathodically protected the entire pipeline system with an external pipeline coating to further ensure the integrity of the pipeline underlying the evaporation ponds.
dev45
36,430
The pipline safety measures implemented by Transwestern are designed to not only identify corrosion iimpacts to the pipeline system at the inception of detrimental impacts as a result of corrosion, but also allow for long term stability and integrity by conducting state of the art monitoring and detection.
dev45
36,431
Noise Issue.
dev45
36,432
In the initial environmental assessment and study, Transwestern conducted baseline surveys of the area to determine existing noise levels.
dev45
36,433
This study was completed to assist Transwestern in the mitigation measures which will be implemented after construction of the Gallup Compresso Station.
dev45
36,434
Pending completion of the facility, Transwestern will conduct post noise studys to determine whether facility noise levels have increased above those levels mandated by FERC.
dev45
36,435
In the event of operational noise levels exceeding the FERC regulatory level of 55 ldn, Transwestern is committed to performing any and all mitigation measures necessary to ensure that the post noise level of the facility will not be above the level mandated by FERC.
dev45
36,436
Decrepancy of trailer park residents.
dev45
36,437
In the letter by Mr. Garcia, it was stated that Transwestern's assessment of the number of residences in the adjacent trailer park was not 18 as had been stated in our original study, but "more like 35 trailers".
dev45
36,438
The number of mobile home residences currrently in the trailer park may in fact be closer to 35.
dev45
36,439
Transwestern's trailer park residence count was taken in the winter of the year when the fluctuating job market is normally down and the number of residences in the park was low.
dev45
36,440
The transient nature of mobile home residences and the fluctuating job economy of the area is probably a direct reflection of the up and down nature of the residences.
dev45
36,441
It should also be noted that during the time that the trailer park count was made, the owner of the trailer park who is also the operator of the evaporation ponds was experiencing major difficulties in the operation of the ponds and raw sewage had overflowed the pond embankments and had resulted in the raw sewage ponding in the yards of many of the trailer park residents.
dev45
36,442
It was actually noted that many of the spaces normally occupied by mobile homes had been vacated.
dev45
36,443
This unsanitary condition was also identified by the New Mexico Environment Department.
dev45
36,444
The NMED had implemented enforcement actions against the trailer park owner.
dev45
36,445
Kay, the choice is yours as to how you want to clean your oil staining.
dev45
36,446
both technologies will work.
dev45
36,447
I prefer the quicker of the two......in the interest of time ie steam
dev45
36,448
Rich, whats your thoughts on a decent pipeline segment for the modeling study.
dev45
36,449
I kind of like Sta.
dev45
36,450
4 to Sta.
dev45
36,451
3.
dev45
36,452
It encompasses alot of the variablity present on the Transwestern system (elevation, temperature, consistent activities with respect to the rest of the PCB contaminated system).
dev45
36,453
Let me know before the Penn State visit, so I can start rounding up the analytical data for the pipeline and stations.....
dev45
36,454
Butch, you may want to attend this
dev45
36,455
Bret, what do you think about this?
dev45
36,456
We have pretty much proven that we are not the culprits is this activity.
dev45
36,457
I have a problem conducting an ongoing sampling for an issue that were not responsible for, even though we initiated the sampling activity.
dev45
36,458
I plan on visiting the OCD about this issue and either forcing them to justify why we should continue the sampling when the data points to our neighbors.
dev45
36,459
Additionally, because of the turnover and inability to get the guilty party to get moving on this, spending additional money and not receiving any return seems like a waste of time.
dev45
36,460
Thoughts....
dev45
36,461
George Robinson
dev45
36,462
George, after Bret's memo, go ahead and conduct the sampling.
dev45
36,463
the soonest I can discuss the issue with the OCD is in the middle of November.
dev45
36,464
I have reviewed the reports and results of the studies conducted by us and them and the evidence weighs in our favor.
dev45
36,465
At your leisure and prior to the November OCD meeting, prepare a memo to file of the resaons and justification based upon the report results and data why Eunice is not the bad guy in this and why Texaco is.
dev45
36,466
Gradients, plume elevations and characteristics of the contaminants show that this is not our problem.
dev45
36,467
Id like to have sufficient evidence, both mine and yours, to force OCD to go afterTexaco and get us out of this issue.
dev45
36,468
I think this would also help Bret's case for having Texaco (or whoever is responsible) reimburse Northern for the costs we have incurred for what is Texaco's problem.
dev45
36,469
George Robinson
dev45
36,470
George, I will attend this meeting with you on the 16th.
dev45
36,471
George Robinson
dev45
36,472
Mike, I reveiwed the proposal by Adewumi and it is correct and fairly accurate, for the purposes of a historic account and and in as far as what was provided to him in the way of data and history.
dev45
36,473
His proposed scope seems to be conclusive and appears to be what we need.
dev45