text
stringlengths
1
4.46k
employee_id
stringclasses
45 values
My question is, how does the fuel use compare with what Solar says the fuel use should be?
dev45
If we can get Solar to provide written guarantees and "UP" the fuel use value for the turbine, we can up the fuel value on the permit.
dev45
The state of Colorado perceives increased fuel use beyond manufacturers values as the turbine not operating correctly and in need of mechanical adjustment.
dev45
From their eyes, this would be a strong indication of excess emissions, and I think there evaluation would hold some merit.
dev45
Anyway, I dont want to send up a red flag to the state of Colorado.
dev45
Would you contact Solar and compare their fuel use values with what the monitors say the turbine is burning at La Plata?
dev45
Then let me know.
dev45
If worse gets to worse, I may be able to use another tactic, but only as a last resort.
dev45
Approval was received from the Texas Railroad Commission to discontinue groundwater monitoring at the Pucket Plant.
dev45
As you may remember, Transwestern constructed a permitted landfill to dispose of the entire facility near Ft.
dev45
Stockton.
dev45
Groundwater montioring activities have been ongoing since aprox.
dev45
1988.
dev45
A permit condition states that if three years of groundwater sampling data confirms that the groundwater protection standard has not been exceeded, the groundwater monitoring activities can be terminated.
dev45
A letter from Leslie Savage granting this approval was received on July 14, 1999.
dev45
Ken Gray, all other conditions of the permit are still in effect (noxious weed and mesquite control, monthly site inspections recordkeeping etc.....).
dev45
Continue to keep the records accurate and up to date.
dev45
I anticipate that we will be required to monitor and conduct housekeeping activities at the site
dev45
The environmental clearances are still in effect as long as we stay on our right of way and in our measuring station yard.
dev45
For any construction work at the PG&E station, we will need written aprpoval from PG&E.
dev45
I will notify the state and county of California when we do the construction work.
dev45
Earl, I will need to know the amount of natural gas which will be released during the blowdown of the 1850 feet of pipe, our separator and meter tubes.
dev45
Pg&E will be responsible for the notification of gas release for their separator and piping....
dev45
David Roensch
dev45
Presented Title V training to the Flagstaff Team.
dev45
The training included responsibilities, recordkeeping and semi annual reporting requirements.
dev45
A meeting was held with representatives of Transwestern and PG&E to discuss activities related to removing PCB's from the Topock Lateral.
dev45
Sampling data was reviewed and discussions were held addressing past cleaning efforts.
dev45
PG&E has stated by letter and verbally that natural gas volumes will be decreased weekly until PCB concentrations fall below 5 ppm.
dev45
Transwestern will be implementing a pipeline cleaning of the remaining 1850 of pipe between our M/S and the PG&E C/S.
dev45
Included in this cleaning will be decontamination of the additional filter separators and meter runs.
dev45
Assisted in the compilation and data gathering of the Title V compliance monitoring and annual certification reports for C/S No. 5, Thoreau.
dev45
The annual blanket request for the Arizona SHPO was submtted for renewal.
dev45
Notification letters were submitted to the state of New Mexico notifiying the agency of like for like replacements of recipricating engines at the AToka No. 1 C/S.
dev45
Additional notifications were submitted to the agency apprising them of engine removal activities at C/S's No. 5 and 9 which would impact emissions fees.
dev45
James, lets go ahead and provide her with an annual report for Puckett with the information you provided.
dev45
thanx again
dev45
Thanx John, I look forward to seeing you at the Doubletree for dinner on the night of the September 3.
dev45
Let me know your traveling plans
dev45
In light of the recent PCB issue with PG&E on the Topock Lateral, I have asked Mr. John Woodyard of Roy F. Westin to c ome to Houston and make a presentation on PCB's in natural gas pipelines.
dev45
Mr. Woodyard has considerable experience in the management of PCB's and works closely in industry associations (INGAA and GRI), Mr. Woodyard also works as a consultant in this capacity.
dev45
The date of this meeting will be on Friday, September 3rd, beginning at 9:00 am.
dev45
Lou Soldano will be setting up a meeting room and will notifiy all attendees via lotus notes prior to the September 3rd meeting date.
dev45
I think this meeting will be very interesting and informative and and encourage all to attend, if possible.
dev45
Mr. Cates, sir, would you please approve of the attached expense report?
dev45
You are a kind and generous man.
dev45
NNG Gomez Plant, Site Cleanup has been completed.
dev45
All activities associated with the items identified during the sale of the facility have been corrected.
dev45
Becuse ET&S owns and WGR operates, there is a concern that WGR may not adhear to compliance and housekeeping at the facility.
dev45
This has been the case in the past.
dev45
Discussions will be held with Enron Legal to address these concerns.
dev45
TW Bell Lake Gas Plant, Ground Water Remediation.
dev45
A revised Water Development Easement from the State Land Office was received.
dev45
This will allow TW access to install one additional downgradient groundwater monitor well.
dev45
The tentative schedule to install the well will be the week of September 13th.
dev45
A construction permit application for installation of an SVE remediation system for the North Crawar C/S was mailed to the TNRCC.
dev45
The State of New Mexico conducted an air quality inspection of the Atoka No. 2 C/S.
dev45
No items or deficiencies were identified by the agency.
dev45
The Title V air permit application for the Atoka No. 3 C/S was mailed to the State of New Mexico, Air Qualtiy Bureau.
dev45
The Notice of Intent air permit application for the Crawford C/S was mailed to the State of New Mexico, Air Quality Bureau.
dev45
Annual blanket request letters were submitted to the USFWS in New Mexico and Texas for renewal.
dev45
A meeting was held in Houston with John Woodyard of Roy F. Weston and ET&S mgt.
dev45
addressing PCB activity in natural gas pipelines as related to the PG&E PCB Topock Lateral issue.
dev45
The PCB Annual Document Logs for the facilities that generated PCB waste and stored it at TW's long term storage facility were completed and distributed to locations and entered into Envisions.
dev45
The 2rd quarter Transwestern/SoCal PCB mgt.
dev45
committee conference call was completed.
dev45
This committee meets to discusss PCB management on the SoCal system and review invoices generated by SoCal during each quarter.
dev45
This quarters invoice amount was $280,633.48 of which Transwestern is 86% responsible or $241,344.79.
dev45
Final activities are in progress at the Topock Lateral where cleanup of the 1850' pipeline and appurtenances has been completed.
dev45
Analytical results of the wipe samples and liquid samples taken showed the cleanup to be successful.
dev45
All wipes after the cleaning showed to be less than 1 microgram/100 cm.
dev45
sq. Analytical results of the liquids showed to be less than 20 ppb.
dev45
The next phase of the cleanup activities will be in November when the remaining 11 miles of pipe will be cleaned and have launcher facilities installed at the mainline interconnect.
dev45
With respect to the September 13, 1999 letter from Richard and Oreane Garcia concerning pipeline integrity and noise issues, Transwestern Pipeline Company offers the following response: Pipeline Integrity.
dev45
With the construction of the evaporation ponds over Transwestern's right of way and pipline, Transwestern has closely monitored the potential for impacts for the pipeline.
dev45
This includes a more frequent inspection of the pipeline conditions underlying the ponds by taking potentiometric readings to verify that corrosion is not present.
dev45
Transwestern has also installed rectifiers to assist in eleminating the potential of pipeline corrosion.
dev45
As a DOT requirement, Transwestern has cathodically protected the entire pipeline system with an external pipeline coating to further ensure the integrity of the pipeline underlying the evaporation ponds.
dev45
The pipline safety measures implemented by Transwestern are designed to not only identify corrosion iimpacts to the pipeline system at the inception of detrimental impacts as a result of corrosion, but also allow for long term stability and integrity by conducting state of the art monitoring and detection.
dev45
Noise Issue.
dev45
In the initial environmental assessment and study, Transwestern conducted baseline surveys of the area to determine existing noise levels.
dev45
This study was completed to assist Transwestern in the mitigation measures which will be implemented after construction of the Gallup Compresso Station.
dev45
Pending completion of the facility, Transwestern will conduct post noise studys to determine whether facility noise levels have increased above those levels mandated by FERC.
dev45
In the event of operational noise levels exceeding the FERC regulatory level of 55 ldn, Transwestern is committed to performing any and all mitigation measures necessary to ensure that the post noise level of the facility will not be above the level mandated by FERC.
dev45
Decrepancy of trailer park residents.
dev45
In the letter by Mr. Garcia, it was stated that Transwestern's assessment of the number of residences in the adjacent trailer park was not 18 as had been stated in our original study, but "more like 35 trailers".
dev45
The number of mobile home residences currrently in the trailer park may in fact be closer to 35.
dev45
Transwestern's trailer park residence count was taken in the winter of the year when the fluctuating job market is normally down and the number of residences in the park was low.
dev45
The transient nature of mobile home residences and the fluctuating job economy of the area is probably a direct reflection of the up and down nature of the residences.
dev45
It should also be noted that during the time that the trailer park count was made, the owner of the trailer park who is also the operator of the evaporation ponds was experiencing major difficulties in the operation of the ponds and raw sewage had overflowed the pond embankments and had resulted in the raw sewage ponding in the yards of many of the trailer park residents.
dev45
It was actually noted that many of the spaces normally occupied by mobile homes had been vacated.
dev45
This unsanitary condition was also identified by the New Mexico Environment Department.
dev45
The NMED had implemented enforcement actions against the trailer park owner.
dev45
Kay, the choice is yours as to how you want to clean your oil staining.
dev45
both technologies will work.
dev45
I prefer the quicker of the two......in the interest of time ie steam
dev45
Rich, whats your thoughts on a decent pipeline segment for the modeling study.
dev45
I kind of like Sta.
dev45
4 to Sta.
dev45
3.
dev45