id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
027311e2-ceab-42c2-b06c-2f7721fc6c91
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI1T01 16 MC1.A02: Lepton Circular CollidersMOI1T01 : MC1 : Colliders and Related Accelerators Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
2
5aabed35-93d8-4f1b-a3e9-e5a840f4c03e
PL is quite different from conventional electron linacs. Its front -end section t is designed to capture positrons with an extremely large momentum range and large transverse emittance . Therefore , a large- aperture accelerating structure with a diameter of 30 mm is used, instead of the usuaul 20 mm for stand...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
3
f3093bc1-4cfe-4876-8423-7c14773c159c
(23 ms in the transverse planes ) and provide the low equilibrium emittance (H: 9.62 nm.rad , V: 0.1 nm.rad) [13]. The two long straight sections are for injection, extraction and hosting two RF cavit ies. The dipole magnets adopt a hybrid structure with permanent magnet blocks to save the power supplies. ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
3
8ed69e4f-3d8b-4566-9aba-b5c6e3f27200
development and prototyping of these key technologies. IR Superconducting M agnets The superconducting quadrupole doublets (FF quadupoles) are key to archieving a very small 𝛽𝛽𝑦𝑦∗ of ≤1 mm. D ue to the large crossing angle of 60 mrad and a very short L * of 0.9 m , they must be of twin- aperture desig...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
3
dc5810e9-78f2-4bc4-9769-fa075bc34241
result, the entire IR superconducting magnet system is very compl ex. A prototype of the QD1 quadrupole (the closest to IP , shown in Fig. 5) based on the CCT technique , has been built and tested [14-15]. The field measurement show that the field quality is satisfactory and consistent to the design speci...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
3
a051d529-5add-4594-aad6-1a910e856bdd
approximately 5×10-9 Pa. Meanwhile , the unprecedented high synchrotron radiation power density of 17 kW/m at its peak in the arcs - corresponding to the e -/e+ beams at 3.5 GeV and 2 A , poses significant challenges for the design of the vacuum chambers, particular ly in terms of cooling. A vacuum model of an ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
3
18c85d57-8ea0-4135-a158-2602893eef65
for synchrotron radiation loss. The cavities are required to have deep HOM damping and a low R/Q value to avoid beam instabilities. A room -temporature RF cavity type operating in the TM020 mode has been adopted, a design 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
3
c03a7898-3e72-46db-a332-4a8d595981b4
first developed and used in Japan. However, the requirement for STCF is even more demanding in terms of input RF power, with 300 kW per cavity. A prototype of the cavity has been built and is currently undergoing high- power test to master the fabrication techniques [16-18], see Fig. 7. Figure 7: A prototype ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
efbb028f-f6e6-40d7-bb19-dc1737336300
groundbreaking anticipated in 2028. In the mean time, the feasibility study report and engineering design report must be submitted to the relevant authorities within a short timeframe . Should approcal not be granted, a low profile approach will be adopted , constinu ing the design and less - intens ive key technol...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
74ac5470-36fd-478b-8de3-1767f9cf02f4
[2] X.-C. Ai et al., “Conceptual design report of the Super Tau- Charm Facility: the accelerator,” Nucl. Sci. Tech., vol. 36, no. 12, Dec. 2025. doi:10.1007/s41365- 025- 01833- x [3] Y. Zou et al. , “Optics design of the Super Tau-Charm Facility collider rings,” Nucl. Instrum. Methods Phys. Res., Sect. A , vol...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
47c7dfe2-4e47-46cd-bebf-b7a0084af54f
[7] T. He et al. , “Impact of coherent wiggler radiation impedance in Tau -Charm factories,” Phys. Rev. Accel. Beams , vol. 28, no. 10, Oct. 2025. doi:10.1103/yqdj- r617 [8] L. Zhang, T. Liu, S. Li, Y. Zou, Q. Luo, and J. Tang, “Longitudinal beam dynamics and collective effects at the STCF collider rings,” Mod. ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
51d9492c-d170-4690-9771-b6954e1c8d4d
for electron beam in the STCF injector”, presented at the IPAC'26, Deauville, France, May 2026, paper THP5603, this conference. [12] X. Xu, A. Zhang, G. Pei, J. Tang, H. Peng, and Q. Luo, “Design of the positron accelerators for STCF,” Journal of Instrumentation, vol. 20, no. 03, p. T03003, Mar. 2025. doi:10.108...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
367c23e7-f3fb-4fe0-9209-81e6324f08b5
Supercond. , vol. 36, no. 5, pp. 1 –5, Aug. 2026. doi:10.1109/tasc.2026.3661931 [15] W. Ma et al. , “Design and construction of the twin-aperture superconducting quadrupole full -size prototype for the STFC IRSM”, presented at the IPAC'26, Deauville, France, May 2026, paper TUP7657, this conference. [16] C.-Z....
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
8cc636d5-bf38-45e7-a984-85f7a773d23d
[18] C. Wang, Z. Huang, L. Sun, Y . Wei, and Y . Zhang, “Design, Fabrication, and Test of A TM020-mode Cavity with Elliptical Choke for Super Tau-charm Facility”, presented at the IPAC'26, Deauville, France, May 2026, paper TUP7609, this conference. 17th International Particle Accelerator Conference, Deauville, Fra...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf
4
57d54115-26d3-4851-9396-daa9d3b4faec
LINEAR COLLIDER STUDIES AND PROSPECT S S. Stapnes, University of Oslo, Norway Abstract Linear e⁺e- colliders can provide a broad physics pro- gramme spanning centre -of-mass energies from the Z pole to the TeV scale, enabling precision measurements of the Higgs boson, top quark, and the electroweak sector with po...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
c51b6cbf-5168-46cd-9d1e-ae5b4cfc686b
250-380 GeV range, upgrades in energy and/or luminosity enabled by R&D on cool copper structures, higher gradient SCRF, energy recovery and plasma wakefield options can be considered. This paper summarises the status of the studies and associated technology developments, potential long -term upgrade paths, and ke...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
c2e97427-b983-4ecf-9d14-79ca184b9a10
chrotron radiation backgrounds at the interaction point, and inherent upgradability in energy and luminosity without or with limited additional civil construction. A li near collider is uniquely able to realise a true multi -stage Higgs factory while providing a natural path to the multi -TeV energy frontier. A...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
8a6bd9eb-9796-4e13-b047-cc100cd8fa3c
pling (2.8%) and the trilinear Higgs self -coupling (11%) . Beam polarisation aids the analyses at every stage [1]. The multi -stage design is a key asset: anomalies at one energy can be verified at the next, providing the robustness needed to establish genuine discoveries from precision measure- ments [1,2]. Two...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
c473893d-2e0b-48cb-97b0-c55a94469b78
an SCRF based collider has been studie d, with a choice of higher luminosities and hence power consumption com- pared to parameters chosen for the ILC in Japan. Both are compatible with a civil -engineering footprint of approxi- mately 30 -34 km length near CERN. Advanced upgrade technologies - C³, HELEN, Nb₃Sn coat...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
6b4ea59b-ff15-4d79-aeb0-e025d382ac71
A comprehensive cost update was com pleted in December 2024 by an international expert committee, confirming the technical maturity and establishing updated cost estimates consistent with the original TDR. Key technical advances since 2013 include the two -step baking surface treatment (seque ntial heat treatment ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
ea49fc79-ee98-49ec-9de5-e97b6d6d9654
adapts the ILC SCRF linac design for the CERN environ- ment (Fig.1), combining it with the civil -engineering foot- print and infrastructure standards developed over many years for CLIC. The baseline LCF configuration uses a 33.5 km tunnel that includes a 4-5 km beam -delivery re- gion (BDS), with two interaction re...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
0
40d130e4-f11b-4a77-b47f-cba40ba486a4
implementation at CERN operate at 31.5 MV/m with qual- ity factor Q₀ = 2×10¹⁰, trains of 1312 bunches (2×10¹⁰ elec- trons per bunch) at a repetition rate of 10 Hz. The resulting instantaneous luminosity at 250 GeV is 2.7×10³⁴ cm⁻²s⁻¹. Both beams are polarised with P(e⁻, e⁺) = 80%/30 %. The total construction cost is...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
1d426a74-5c00-4c84-abdb-54f43d8b8570
under ICFA auspices to advance the engineering studies re- quired for construction readiness. KEK acts as lead labor- atory with dedicated budget; CERN ser ves as European hub under a formal KEK –CERN agreement, facilitating participation by European institutes. Fifteen work pack- ages across three technical areas ar...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
1d47a301-4f81-4837-b910-f9252828186f
INFN) and South Korea. All completed single -cell cavities have met or exceeded the ILC specification. WPP -2 (cry- omodule design) develops the assembly procedures, align- ment and RF interconnects for full cryomodules . WPP -3 addresses crab cavities, the transverse RF deflectors essen- tial for the crab -crossing ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
adcf6db9-d158-4a56-9aa3-be00ade8f3b5
sources. In the Nano -beam area, WPP -12 and WPP -14 ad- dress the damping ring design and injection/extraction kicker systems needed to achieve the ultra -low vertical emittance at the interaction point. WPP -15 and WPP -16 study the final -focus quadrupole design and magnetic vi- bration mitigation, while WPP -17...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
c14cffde-abbb-4c2c-b77e-1a81d44bfccb
collider based on a unique two -beam acceleration scheme (Fig.3). This technology could also serve as a starting point for a linear collider facility at CERN and its implementa- tion at CERN has been studied in detail. A dedicated high - current drive beam, produced in a separate linac at low RF frequency, is tran...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
5cefac81-2e77-402d-a1a1-af55d0a16499
The 2025 CLIC baseline for the initial stage is 380 GeV centre -of-mass energy with a 100 Hz repetition rate and a dual beam -delivery system (BDS) serving two interaction regions simultaneously. The total luminosity is 4.5×10³⁴ cm⁻²s⁻¹ (2.2×10³⁴ per detecto r on average), the site length 11.4 km, and the AC power...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
f833cdb5-5ac3-4961-b8b3-408e82f0c315
cremental cos t of ≈7.1 BCHF [2]. Figure 3: Schematic layout of the CLIC complex at 380 GeV, with a double beam -delivery system operating with two detectors. The CLIC footprint near CERN has been optimised for both the 380 GeV and 1.5 TeV stages, placing the main - beam and drive -beam production complex...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
1
ec7d6ebd-e807-40f0-b159-1668d630735e
site avoiding existing infrastructure s as much as possible [2]. An energy option at 250 GeV is obtained by removing 35% of two -beam modules; a 550 GeV option with 100 Hz and two IPs is achievable with a modest 5 km tunnel ex- tension. The dual BDS design provides two IPs with a transverse separation of ≈10 m and ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
c72a7a61-619a-48ed-87b2-8d3cd724b56e
band linac at LNF - provide large -scale demonstrations of normal -conducting, high -frequency, low -emittance linac technology. Precision pre-alignment using active remote alignment systems, nm -level vibration stabilisation of fi- nal-focus quadrupoles with inertial sensors and actuators, and CLIC -level vertica...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
33ee2caf-1187-4725-87c5-0457291eb573
that energy upgrades beyond the initial stage can be achieved by replacing or supplementing the linac technol- ogy within the existing tunnel, and/or if needed adding new civil construction. The common civil -engineering footprint - a 33–34 km tunnel with a 4 -5 km BDS sized for multi - TeV operation - can be design...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
0f549041-7f64-4d79-a406-fe656228d65d
beam efficiency. First bench tests have c onfirmed the gra- dient principle. Depending on the achievable gradient and the efficiency of high -power RF sources, centre -of-mass energies of 1.5 -3 TeV are projected for the LCF tunnel. C³ represents one of the most promising paths to a compact TeV-scale c ollider. T...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
a28be3d9-a875-4b65-95cb-a49ee341df9e
ERLC or similar concepts recirculate the spent beam, re- covering its kinetic energy and the beam particles them- selves. The resulting near -continuous beam power enables luminosities approaching 10³⁶ cm⁻²s⁻¹, orders of magnitude above standard designs, opening access to rare processes at high statistics. Plasma...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
e7f374cc-d219-4181-8958-b8df3bd09d71
Higgs self -coupling measurement at lower centre -of-mass energy. All these upgrade options need to be considered care- fully for compatibility with the initial civil -engineering footprint and can be developed in parallel with the initial stage implementation [1]. 5. KEY IMPLEMENTATION PARAME- TERS Table 1 su...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
f99d2c91-ec67-4684-81bf-45c1c03853a2
by the European Strateg y Preparatory Group [4]. Table 1: Key Parameters for the Main LC Configurations [1, 2] Parameter LCF 250 LP LCF 550 FP CLIC 380 CLIC 1500 √s (GeV) 250 550 380 1500 Lumi. (10³⁴cm⁻²s⁻¹) 2.7 7.7 4.5 3.7† Power (MW) 143 322 166 287 Energy/yr (TWh) 0.8 1.8 0.8 1.4 Const. cost...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
4f19d643-1a1f-443c-a042-4e181d401cf9
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI1T02 MC1.A03: Linear Lepton Colliders 21: MC1 : Colliders and Related Accelerators MOI1T02 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
2
d709e4d1-0612-40b2-9f97-46b301c0a3b2
A decade of systematic effort has reduced the power con- sumption of both projects. For a SCRF based collider this includes optimisation of SCRF cavity gradients and Q -val- ues, cryogenic system efficiency, klystron and modulator performance, RF -to-beam efficiency through improved fill factors, heat recovery schem...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
7b6e7880-4152-4f3a-9a8f-66d5fc3868f2
construction, plus operational energy) [5]. For LCF 250 (LP), the total embodied carbon in underground civil engi- neering is approximately 380 kton CO₂eq, and machine el- ements (including injectors) contribute a further 236 kton. For CLIC 380, underground civil engineering accounts for 286 kton and machine hardw...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
8a3155b6-a881-4b2d-9e06-4a699c119a90
optimisation t ools — informing choices of materials, sup- pliers, and construction methods — and hardware remains the dominant contribution to embodied carbon in both cases [ 5]. Operation costs cover personnel, electricity, and mainte- nance and component replacement. For LCF 250 these are estimated at 170 MCHF/y...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
be1c9e8a-f00a-4485-835e-e472eef18d4c
struction , allowing commissioning and first physics a dec- ade later [1,2,4]. 6. NEXT STEPS AND CONCLUSIONS The path to a construction decision for a linear collider at CERN is structured in two preparation phases following ESPPU finalisation in 2026 [1,2]. Phase 1 (2026 -2028) in- tegrates and extends the ongoi...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
a0b9f912-b569-481b-855a-c54629244661
collider and upgrade interface studies (plasma, energy re- covery, and γγ options, civil -engineering compatibility with baseline); and WP5 - management, integration, cost- ing, power, and LCA estimates, wi th risk management and preparation for Phase 2 decision -making. It should be noted that the priority placed o...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
175ff4c4-310b-45cd-baac-8b2b61e7acf1
trial pre -series production, and site preparation, including environmental integration with host states. For SCRF tech- nology, a significant fraction of Phase 2 activities can be distributed globally through the existing ILC indus trialisa- tion network: cryomodule assembly facilities at KEK, DESY, CERN and other ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
79fb9d12-c842-4064-bc65-d1cca7f0039f
lider technologies - SCRF or NCRF based - are ready for detailed implementation studies at CERN. Both offer an in- itial construction cost of 7 -9 BCHF, a comprehensive 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IP...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
3
39333ebf-a3c3-49d1-a70c-d91ef44b9ba3
physics programme from the Z pole to 550 GeV and be- yond, polarised beams, two interaction regions, and well - defined upgrade paths extending to 1.5 TeV and beyond within the same civil -engineering footprint. The combined international R&D programme - the IT N for a SCRF based collider technology, implementation ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
4
58c0cf3f-600e-4b8d-b69e-981fdf4ee2af
[physics.acc -ph] (2025); doi:10.48550/arXiv.2503.19983 see also https://agenda.linearcollider.org/event/10624/ [2] E. Adli et al. , “CLIC readiness report,” Eur . Phys. J. Spec. Top., vol. 234, no. 22, pp. 6473 –6652, Dec. 2025. doi:10.1140/epjs/s11734 -025-02016 -w, see also: https://indico.cern.ch/event/1439...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
4
534bc0c4-a59b-473d-a9ba-0bf1e51d7202
and ILC, whole accelerator, 2025 ; https://edms.cern.ch/document/3283864/1 . 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI1T02 MC1.A03: Linear Lepton Colliders 23: MC1 : Colliders and Related Accelerators...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf
4
9af0fe79-2094-4884-8d41-e37f8da918e1
GANIL -SPIRAL2 FACILITY - RECENT ACHIEVEMENTS AND UPGRADES R. Ferdinand, P. Anger, P -E. Bernaudin, F. Chautard, H. Franberg- Delahaye, M. Lewitowicz, X. Ledoux, F. Lutton, A. Orduz, H. S avajols, A. Savalle, J -C. Thomas Grand Accélérateur National d’Ions Lourds, Caen, France Abstract The Grand Accélérateu...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
6e6a18d6-5e66-43bc-9ddc-d3b9aece9fcd
cyclotron operation and the initial operational challenges and lessons learned in the first years of operation of the LINAC and Neutrons For Science (NFS) facilities are pre- sented . The physics program at GANIL -SPIRAL2 is briefly presented. The ongoing upgrades and developments essential to sustain increasingl...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
a7049a4a-1d2f-40c3-87f2-4e94aa6010f0
ious facilities in Europe such as GANIL in France, GSI - FAIR in Germany, ISOLDE at CERN, JYFL in Finland and LNL & LNS in Italy and worldwide facilities in Canada , China , Japan, Korea, Russia, USA . These results have fur- ther motivated very ambitious efforts worldwide to pro- duce and study nuclei far from stab...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
b677cac5-892b-4219-a86d-fef23ca02bc3
via both in- flight fragmentation and the ISOL (Isotope Sep- aration On -Line) technique through the SPIRAL1 facility. Radioactive beams from SPIRAL1 can be used directly or re-accelerated while preserving high optical quality. To- gether with facilities such as SPIRAL2 , ISOLDE , and JYFL , and in the future SPES a...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
d9b46224-77e2-4922-a631-03550f9528f3
radioactive ion beams are available. The GANIL facility is a multi- beam facility, operating up to 5 simultaneous beams: IRRSUD, SME, CSS high energy, CIME, SPI- RAL2, which renders GA NIL unique in the world. Com- plementary atomic physic studies are also made in ARIBE. The paper will briefly summarize the cyclotr...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
75a07f0e-1127-4863-98d5-3ccc383a06a6
CO1,2=30, K CSS1=400, K CSS2=400). There is a rebuncher between the injectors and the first sep- arate sectors cyclotron (CSS1) and a stripper between CSS1 and CSS2 . A wide spectrum of stable and radioactive ion beams ha ve been delivered s ince 1983. The five cyclotrons of GANIL allow the acceleration of io...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
ca0529d6-0cbf-48d0-b13d-425349fdc8db
drivers for the production of radioactive species, using sta-ble beams fragmented in a thick carbon target according to the ISOL technique. These beams are delivered to different experimental ar- eas hosting a large variety of detectors and spectrometers that allow detailed studies of nuclear structure and reac-...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
f54ba829-974f-4dc8-b976-a06f90152e6d
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M01 MC4.A08: Hadron accelerators: Linear Accelerators 1: MC0 : opening session MOI4M01 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
0
8a7c238f-7382-473a-a152-fb0f4fce381d
active -target designed for experiments with very low -in- tensity radioactive ion beams. It uses a gas volume that acts simultaneously as the reaction target and as a detector, al- lowing the three -dimensional tracking of charged particles produced in nuclear r eactions. ACTAR TPC is particularly suited to studyin...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
1
7fcbe674-518a-4125-b8d8-7ebe571f4084
tion at energies around the C oulomb barrier. It provi des new avenues to nuclear structure and reaction studies . The European AGATA detector is a highly segmented high- purity germanium detector array using γ-ray tracking. When coupled with V AMOS++ and other ancillary detec- tors including EXOGAM , it allows ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
1
c8202c93-e11e-433b-9255-1373cfbc9e5f
RFQ 1 accelerates beams to 0.73 MeV/u , followed by the SC LINAC with 26 cavities and the high energy lines (HEBT). This SC LINAC can accelerate both CW light and heavy ions up to energies shown in table 1. The SPIRAL2 SC LINAC [6, 8] includes 12 A -type cry omodules, each comprising one low -beta cavity (...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
1
77da7467-136f-4734-a91f-7272de3495ba
Particles H+ D+ Ions NEW- GAIN A/Q 1 2 3 7 Max I (mA) 5 5 1 1 Max E (MeV/A) 33 20 15 7 Beam power (kW) 165 200 45 49 The number of cryomodules (19) is comparable to those of the larger and more powerful SNS accelerator (23), how- ever, the latter has a much larger number of accelerating gaps. The choice of ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
1
ed036368-bbfb-40c8-a8b9-aa4dded3ad52
therefore carefully monitored, as we observe limiting field emission for two cavities down from 6.5MV/m to 5.8MV/m . No further degradation ha s been observed since 2022. Among t he main achievement of the 2019- 21 commis- sioning was the SC LINAC design validation by demon- strating duty cycle of 10% of the no...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
1
3290ebd7-7640-4db8-bf8f-264dd1cccaaa
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M01 2 MC4.A08: Hadron accelerators: Linear AcceleratorsMOI4M01 : MC0 : opening session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
1
80732ba1-e024-40d7-8d63-fd8421d7c04e
comprehensive analysis of the transverse and longitudinal tuning and the improvement of the LLRF feedback and feedforward systems. S tudies were also made using alpha beams. The last step of the commissioning was the power ramp -up to 10 kW with a 5 mA deuteron beam transported to the beam dump in CW mode [ 12,1...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
7b5ff699-b728-461b-b935-5b7c877c77fe
beams, at energies of 7 and 14.5 MeV/A , were also suc- cessfully carried out in 2022 [14]. The Neutrons for Science (NFS) hall [ 15], using high- intensity primary proton or deuteron beams from SC LINAC on a Be convertor provides the most intense q uasi- mono- energetic neutron beams up to 33 MeV and continu- ous ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
f850359e-0223-49e8-a2be-a8c3b9c0e1c9
diotherapy accelerators [23]. The proton and alpha -particle beams from LINAC have also been used in the NFS hall, to optimiz e production isotopes for medical use, like 155Tb [24] and innovative α -emitting 211At isotopes [25]. De- tailed studies were also performed of the fission process and of pygmy resonance...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
3b46ad61-d033-4cc5-a29f-85b8da56afc7
techniques. It will receive radioactive beams from both SPIRAL1 and S3. The construction of the associated build- ing was completed in 2025 and we expect to start the facil- ity operation in 2028. The main asset of the DESIR facility is the high purity and optical quality of the secondary beams. A RFQ cooler ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
4f9b4e0b-4501-4a5a-bb85-61c3e87cd76e
acceptance magnetic separator under installation, designed to study nuclei produced by fusion- evaporation reaction s with extremely small cross sections using the high- inten- sity heavy- ion beams (Fig. 2). Its primary goal is the nu- clear structure study of superheavy nuclei and neutron -de- ficient isotopes n...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
2d4dfcac-20d0-44c4-bacb-161ef01896fa
Multipole Triplet (SMT) magnets , based on NbTi Technol- ogy. Each SMT integrates dipole, quadrupole, sextupole, and octupole field components within a single compact cryogenic assembly [32]. This multifunctional magnet con- cept enables strong focusing while simultaneously correct- ing up to the third -order optic...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
d5952ee3-60b0-43a5-9002-aa462e36a8e9
Both the cyclotrons complex and the SPIRAL2 facility are connected through the DESIR building completed at the end of 2025. OPERATIONAL EXPERIENCE Cyclotrons From the beginning of operation, the cyclotrons at GANIL typically delivered ≈4000 hours of beam per year. Investigations on downtime causes (Fig. 3 ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
2adc9cd4-7e4e-4bf0-901b-af8f89aa264d
replacement strategies and to estimate the associated 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M01 MC4.A08: Hadron accelerators: Linear Accelerators 3: MC0 : opening session MOI4M01 Content from this ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
2
757d298e-6cfd-4892-994f-ec46b32da666
maintenance time. Figure 3: Distribution of the 5 main reasons for the cyclo- tron downtime . SPIRAL2 SC LINAC Since 2022, SPIRAL2 is operating for ≈3 months a year, providing beams not only for physics experiments at NFS - but also for dedicated studies of beam dynamics, diagnos- tics development , and RF s...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
3
520f55aa-1ff5-4da9-a201-7cf1f6bab6f9
quirements) . Thus each remaining bunch contains particles equivalent to a CW 188kW beam at 40 MeV . Two methods have been successively developed for the SC LINAC tuning [33]. The “advanced method” deter- mines the voltage and phase of each cavity using an im- proved phase -scan technique designed to reduce phase...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
3
f6bb4dd7-90cc-4520-aac9-1de6d0dabe1a
hours using the new reference -based method. Since 2024, the SC LINAC is tuned using a single cali bration, reducing the overall tuning time by nearly 42%, as shown in Fig. 4 . This also improved beam reproducibility and increased re- liability [ 35]. Figure 4: Availability of SPIRAL2 LINAC. The availability (...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
3
5b8e7444-0e27-49a9-b906-0a999d1ab130
a single faulty power inverter, an effect amplified by the limited total SC LINAC operating time ( Fig. 5 ). Additional incidents included a failure of a rebuncher tuner system and a beam tuning error that damage d the SBS. Figure 6: Cavity field comparison between nominal tuning with all cavities and test ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
3
3f2e0cd2-37d0-4b01-aa42-f345fe57c8ef
uum leak during a shutdown period. In 2025 the CMA11 was removed. Its faulty coupler has since been replaced, and the cryomodule is scheduled for reinstallation in the near future and should be available by mid -2026. FUTURE DIRECTIONS Several new projects are ongoing to further improve the scientific, socie...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
3
81b7a7d9-0ea1-4dbe-bd02-db5e534dc85e
stable and radioactive ion beams for fundamental, applied, and industrial research using the five cyclotrons. Since 2010, however, maintenance and refurbishment of the cy- clotrons ha d been reduced to a minimum mainly due to the construction of the SPIRAL2 facility and also the imple- mentation of additional compli...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
68d6ba6d-2a50-440b-9d2a-0c3f8e672ce2
sis on water leaks in various equipment such as the RF cav- ities, improvements of the associated beam lines and ex- perimental hall, as well as building infrastructure, technical utilities, and safety, security, and radiation -protection sys- tems. Addressing these problems will require partial disas- sembly of the ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
95a9abf7-5030-4840-82af-3ee0309142d3
gun the construction phase in May 2023. The injector includes several key components: a high- performance superconducting ECR ion source, ASTER- ICS [ 39], developed in collaboration with the Laboratoire de Physique Subatomique et de Cosmologie (LPSC Greno- ble), and a heavy -ion RFQ designed by CEA Paris -Saclay [...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
cb0af27c-44d2-4183-be13-0d7d09bcbfd5
Three RFQ modules have already been manufactured and are currently undergoing qualification tests [41]. During Phase 1, the injector will be installed at GANIL using the Phoenix V3 source, while the ASTERICS source will be installed and commissioned in parallel at LPSC Grenoble. A significant milestone was reached...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
7ae6893e-4886-45af-88de-a7b5dd2e9ecf
cessible at GANIL . SAGA promotes the development of new experimental programs in fields such as space radia- tion effects and material science. By enabling these new activities, SAGA strengthens the multidisciplinary role of GANIL and expands the user community to re searchers from applied physics and engineering....
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
b6f377ad-f9ac-4701-90ec-db60d82fa516
optimizing the use of the accelerator infrastructure. Opti- mized organization which is required for parallel opera- tion, will be put in place, the objective being to allow 2000 hours of ind ustrial application , out of about 10000 hours of beam time per year by 2031. Longer -term R ecommendations Longer -ter...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
f3a4836a-0acd-4709-ae24-fc1799888b55
ing and early operation of the SPIRAL2 facility, demon- strated beam delivery over a wide range of particles, ener- gies and intensities. Operational experience has high- lighted both the strong performance of the superconducting LINAC and the challenges associated with system com- plexity and aging cyclotron infrast...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
3d267aa6-d408-4483-8ec6-5e460c8576f5
evolution by promoting diversification toward applied and interdisciplinary research. Together, these developments position GANIL as a unique multi -beam facility, capable of addressing both fun- damental nuclear physics and a broad spectrum of emerg-ing scientific and industrial applications in the coming dec-ade. ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
4
dcc710db-e08f-42e5-8266-b7d5df3662ef
REFERENCES [1] GANIL, https://www.ganil- spiral2.eu [2] Héloϊse Goutte and A. Navin, “Microscopes for the Physics at the Femtoscale: GANIL -SPIRAL2,” Nucl. Phys. News , vol. 31, no. 1, pp. 5– 12, Jan. 2021. doi:10.1080/10619127.2021.1881363 [3] A. Savalle and O. Kamalou, “History and Prospectives of GANIL”,...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
fc09a3d9-4866-4448-8ae4-1ea16eee2234
https://cerncourier.com/a/spiralling- into- the-femtoscale/ [6] R. Ferdinand et al. , “The SPIRAL2 superconducting LINAC ”, in Proc. LINAC’08 , Victoria, BC, Canada, Sep. 2008, pp. 196- 198. [7] J-M. Lagniel et al ., “Advances of the SPIRAL2 Project”, in Proc. HIAT’15 , Yokohama, Japan, Sep. 2015, pp. 148-152 ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
97c3025b-ad74-4bdc-8a7f-4b2571571cc2
Proc. SRF'13, Paris, France, sept 2013, pp. 95– 99, https://hal.archives- ouvertes.fr/in2p3- 00867506 [11] A.K. Orduz et al. , “Commissioning of a high power LINAC at GANIL: Beam power ramp -up,” Phys. Rev. Accel. Beams , vol. 25, pp. 060101, 2022. doi:10.1103/PhysRevAccelBeams.25.060101 [12] A.K. Orduz et...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
2155e69a-f5a9-40ab-81fe-f8944383423d
May 2024. doi:10.1088/1748 -0221/19/05/t05006 [15] X. Ledoux et al. , “First beams at neutrons for science,” Eur. Phys. J. A , vol. 57, no. 8, Aug. 2021. doi:10.1140/epja/s10050- 021-00565-x [16] L. de Arruda et al. , “Reconstruction of the GANIL -NFS spectral neutron flux with Medley using elastically scattere...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
dd73e215-eafb-412c-b3f5-bdcc576c5686
doi:10.1051/epjconf/202429401008 [19] M. Avrigeanu, E. Šimečková, J. Mrázek, C. Costache, and V . Avrigeanu, “Modeling of Deuteron-Induced Reactions on Molybdenum at Low Energies,” J. Fusion Energy , vol. 43, no. 1, May 2024. doi:10.1007/s10894- 024-00407-w [20] E. Šimečková et al. , “Deuteron -induced neutron e...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
ca676bb6-69b1-4bda-9c8e-c6487250a875
2026. doi:10.1109/tns.2026.3652349 [23] V . Blideanu et al. , “Experimental assessment and analysis of calculations accuracy for the neutron -induced radio -iso- topes in copper parts of radiotherapy accelerators,” Nucl. In- strum. Methods Phys. Res., Sect. B , vol. 557, p. 165553, Dec. 2024. doi:10.1016/j.nimb.20...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
e19120dd-54f8-4f4f-b937-a29317c270fb
Isot., vol. 225, p. 112061, Nov. 2025. doi:10.1016/j.apradiso.2025.112061 [26] M. Vandebrouck et al., “Study of the pygmy dipole reso- nance using neutron inelastic scattering at GANIL -SPI- RAL2/NFS.”, Il NUOVO CIMENTO 47 C (2024) 19 doi:10.1393/ncc/i2024- 24019-x [27] J.-C. THOMAS and B. BLANK, “THE DESIR FA...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
df80e856-9f31-4797-99cd-f83460d4c374
1046, p. 167631, Jan. 2023. doi:10.1016/j.nima.2022.167631 [30] P. Ascher et al. , “PIPERADE: A double Penning trap for mass separation and mass spectrometry at DESIR/SPI- RAL2,” Nucl. Instrum. Methods Phys. Res., Sect. A , vol. 1019, p. 165857, Dec. 2021. doi:10.1016/j.nima.2021.165857 17th International Par...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
5
5bffae6b-fcb2-433d-94d2-539f5d23ae02
[31] F. Déchery et al. , “The Super Separator Spectrometer S3 and the associated detection systems: SIRIUS & LEB - REGLIS3,” Nucl. Instrum. Methods Phys. Res., Sect. B , vol. 376, pp. 125– 130, Jun. 2016. doi:10.1016/j.nimb.2016.02.036 [32] A. Esper et al. , “Superconducting multipole triplet field measurements...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
6
29f79991-7191-4605-88f6-7178aba0425c
doi:10.18429/JACoW- IBIC2025- WEPMO12 [35] M. Di Giacomo, A. Orduz, C. Jamet, J. -F. Leyge, and P. Salou, “Phase setting issues for the SPIRAL2 LINAC”, in Proc. LINAC'24 , Chicago, IL, USA, Aug. 2024, pp. 383 - 386. doi:10.18429/JACoW- LINAC2024- TUPB025 [36] A. Orduz et al. , “SPIRAL2 operations and future plans”,...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
6
1545d726-f1cd-4ef3-91da-9df4923f343d
[39] T. Thuillier et al. , “ASTERICS, a new 28 GHz electron cy- clotron resonance ion source for the SPIRAL2 accelerator,” J. Phys. Conf. Ser. , vol. 2743, no. 1, p. 012059, May 2024. doi:10.1088/1742- 6596/2743/1/012059 [40] P. Hamel, M. J. Desmons, O. Piquet, B. Prevet, and N. Sellami, “RFQ NEWGAIN: RF and Therm...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
6
fb071090-e327-4182-92ce-fd649eba59f9
doi:10.1016/j.nima.2025.171148 [43] H. Franberg Delahaye, E. Petit, P. Gastinel, and S. Grevy, “Future upgrades for GANIL”, in Proc. IP AC'24 , Nashville, TN, USA, May 2024, pp. 1199- 1201. doi:10.18429/JACoW- IPAC2024- TUPC79 17th International Particle Accelerator Conference, Deauville, France JACoW Publishin...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf
6
f71aeeeb-9d69-41f7-b488-3e0bc90c07f6
COMMISSIONING PROGRESS OF THE ESS LINEAR ACCELERATOR N. Milas, on behalf of the commissioning team European Spallation Source, Lund, Sweden Abstract The European Spallation Source (ESS) is in the final stagesofcommissioningitslinearaccelerator(linac),which willdeliverahigh-powerprotonbeamforneutronproduc- tion. Thecomm...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0
140e2da6-12f0-4206-895e-00b5fd7351f8
given. THE ESS FACILITY TheEuropeanSpallationSourceisapan-Europeanproject with13Europeannationsasmembers,includingthehostna- tions Sweden and Denmark. The ESS facility is under com- missioninginLund,whiletheESSDataManagementand ScientificComputingcentre(DMSC)islocatedinCopen- hagen. The construction of the facility beg...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0
da86e43e-a18b-4683-aa08-91762de7c452
while maintaining a low pulse repetition rate that enables the production of high-flux, low-energy neutrons. The ESS facility is a huge and highly complex jigsaw puzzle. The13ESSmemberstatescontributedtothecon- struction of ESS via financial and in-kind contributions, exchanging knowledge and know-how. An in-kind contr...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0
97270034-e9da-4f8f-9fe2-c7fc8fba3938
LINAC. The 3.62 MeV bunched beam pulse matched in theMediumEnergyBeamTransport(MEBT)totheDrift TubeLINAC(DTL)section,comprisedoffiveDTLtanks accelerating the beam up to 90 MeV. Figure1: PhotooftheESSsitefromJune2022. Construc- tion work is finished and it is possible to see the linac (or- ange), the Target building (ye...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0
75d8b146-d973-4209-a80f-72528029069e
beamto216MeV.Boththe36medium- 𝛽cavities(MBL) and 84 high- 𝛽cavities (HBL) are arranged four cavities per cryomodule and operate at a frequency of 704.42 MHz, twicetheSPKfrequency,andtogehterbringthebeamtoa maximum energy of 877 MeV. Note that during the 2025 commissioning, only 5 cryomodules of HBL, were installed an...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0
213ce729-3c0e-4b98-b5f6-30f8ac7d0abd
that can take the full design power. The ESS Target The spallation process at ESS will take place when the accelerated protons beam hits the tungsten bricks of the 4.9 tonne target wheel, producing neutrons for scientific experimentsacross multipledisciplines [ 1]. Thefirststepin this process is production of high-ener...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0
a74e20ad-a879-4429-959e-3006bb679da4
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M03 8 MC4.A14: Neutron Spallation FacilitiesMOI4M03 : MC0 : opening session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of th...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
0