id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
027311e2-ceab-42c2-b06c-2f7721fc6c91 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI1T01
16 MC1.A02: Lepton Circular CollidersMOI1T01 : MC1 : Colliders and Related Accelerators
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 2 |
5aabed35-93d8-4f1b-a3e9-e5a840f4c03e | PL is quite different from conventional electron linacs.
Its front -end section t is designed to capture positrons with
an extremely large momentum range and large transverse
emittance . Therefore , a large- aperture accelerating
structure with a diameter of 30 mm is used, instead of the
usuaul 20 mm for stand... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 3 |
f3093bc1-4cfe-4876-8423-7c14773c159c | (23 ms in the transverse planes ) and provide the low
equilibrium emittance (H: 9.62 nm.rad , V: 0.1 nm.rad) [13].
The two long straight sections are for injection, extraction
and hosting two RF cavit ies. The dipole magnets adopt a
hybrid structure with permanent magnet blocks to save the
power supplies.
... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 3 |
8ed69e4f-3d8b-4566-9aba-b5c6e3f27200 | development and prototyping of these key technologies.
IR Superconducting M agnets
The superconducting quadrupole doublets (FF
quadupoles) are key to archieving a very small
𝛽𝛽𝑦𝑦∗ of ≤1 mm. D ue to the large crossing angle of 60 mrad
and a very short L * of 0.9 m , they must be of twin- aperture
desig... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 3 |
dc5810e9-78f2-4bc4-9769-fa075bc34241 | result, the entire IR superconducting magnet system is very
compl ex.
A prototype of the QD1 quadrupole (the closest to IP ,
shown in Fig. 5) based on the CCT technique , has been
built and tested [14-15]. The field measurement show that
the field quality is satisfactory and consistent to the design
speci... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 3 |
a051d529-5add-4594-aad6-1a910e856bdd | approximately 5×10-9 Pa. Meanwhile , the unprecedented
high synchrotron radiation power density of 17 kW/m at its peak in the arcs - corresponding to the e -/e+ beams at 3.5
GeV and 2 A , poses significant challenges for the design of
the vacuum chambers, particular ly in terms of cooling. A
vacuum model of an ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 3 |
18c85d57-8ea0-4135-a158-2602893eef65 | for synchrotron radiation loss. The cavities are required to
have deep HOM damping and a low R/Q value to avoid
beam instabilities. A room -temporature RF cavity type
operating in the TM020 mode has been adopted, a design
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 3 |
c03a7898-3e72-46db-a332-4a8d595981b4 | first developed and used in Japan. However, the
requirement for STCF is even more demanding in terms of
input RF power, with 300 kW per cavity. A prototype of the
cavity has been built and is currently undergoing high-
power test to master the fabrication techniques [16-18], see
Fig. 7.
Figure 7: A prototype ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
efbb028f-f6e6-40d7-bb19-dc1737336300 | groundbreaking anticipated in 2028. In the mean time, the
feasibility study report and engineering design report must
be submitted to the relevant authorities within a short
timeframe . Should approcal not be granted, a low profile
approach will be adopted , constinu ing the design and less -
intens ive key technol... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
74ac5470-36fd-478b-8de3-1767f9cf02f4 | [2] X.-C. Ai et al., “Conceptual design report of the Super Tau-
Charm Facility: the accelerator,” Nucl. Sci. Tech., vol. 36,
no. 12, Dec. 2025.
doi:10.1007/s41365- 025- 01833- x
[3] Y. Zou et al. , “Optics design of the Super Tau-Charm
Facility collider rings,” Nucl. Instrum. Methods Phys. Res., Sect. A , vol... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
47c7dfe2-4e47-46cd-bebf-b7a0084af54f | [7] T. He et al. , “Impact of coherent wiggler radiation
impedance in Tau -Charm factories,” Phys. Rev. Accel.
Beams , vol. 28, no. 10, Oct. 2025.
doi:10.1103/yqdj-
r617
[8] L. Zhang, T. Liu, S. Li, Y. Zou, Q. Luo, and J. Tang,
“Longitudinal beam dynamics and collective effects at the
STCF collider rings,” Mod. ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
51d9492c-d170-4690-9771-b6954e1c8d4d | for electron beam in the STCF injector”, presented at the
IPAC'26, Deauville, France, May 2026, paper THP5603,
this conference.
[12] X. Xu, A. Zhang, G. Pei, J. Tang, H. Peng, and Q. Luo,
“Design of the positron accelerators for STCF,” Journal of
Instrumentation, vol. 20, no. 03, p. T03003, Mar. 2025.
doi:10.108... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
367c23e7-f3fb-4fe0-9209-81e6324f08b5 | Supercond. , vol. 36, no. 5, pp. 1 –5, Aug. 2026.
doi:10.1109/tasc.2026.3661931
[15] W. Ma et al. , “Design and construction of the twin-aperture
superconducting quadrupole full -size prototype for the
STFC IRSM”, presented at the IPAC'26, Deauville, France, May 2026, paper TUP7657, this conference.
[16] C.-Z.... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
8cc636d5-bf38-45e7-a984-85f7a773d23d | [18] C. Wang, Z. Huang, L. Sun, Y . Wei, and Y . Zhang, “Design, Fabrication, and Test of A TM020-mode Cavity with Elliptical Choke for Super Tau-charm Facility”, presented at
the IPAC'26, Deauville, France, May 2026, paper TUP7609,
this conference.
17th International Particle Accelerator Conference, Deauville, Fra... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T01.pdf | 4 |
57d54115-26d3-4851-9396-daa9d3b4faec | LINEAR COLLIDER STUDIES AND PROSPECT S
S. Stapnes, University of Oslo, Norway
Abstract
Linear e⁺e- colliders can provide a broad physics pro-
gramme spanning centre -of-mass energies from the Z pole
to the TeV scale, enabling precision measurements of the
Higgs boson, top quark, and the electroweak sector with
po... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
c51b6cbf-5168-46cd-9d1e-ae5b4cfc686b | 250-380 GeV range, upgrades in energy and/or luminosity
enabled by R&D on cool copper structures, higher gradient
SCRF, energy recovery and plasma wakefield options can
be considered. This paper summarises the status of the
studies and associated technology developments, potential
long -term upgrade paths, and ke... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
c2e97427-b983-4ecf-9d14-79ca184b9a10 | chrotron radiation backgrounds at the interaction point, and
inherent upgradability in energy and luminosity without or
with limited additional civil construction. A li near collider
is uniquely able to realise a true multi -stage Higgs factory
while providing a natural path to the multi -TeV energy
frontier.
A... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
8a6bd9eb-9796-4e13-b047-cc100cd8fa3c | pling (2.8%) and the trilinear Higgs self -coupling (11%) .
Beam polarisation aids the analyses at every stage [1]. The
multi -stage design is a key asset: anomalies at one energy
can be verified at the next, providing the robustness needed
to establish genuine discoveries from precision measure-
ments [1,2].
Two... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
c473893d-2e0b-48cb-97b0-c55a94469b78 | an SCRF based collider has been studie d, with a choice of
higher luminosities and hence power consumption com-
pared to parameters chosen for the ILC in Japan. Both are
compatible with a civil -engineering footprint of approxi-
mately 30 -34 km length near CERN. Advanced upgrade
technologies - C³, HELEN, Nb₃Sn coat... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
6b4ea59b-ff15-4d79-aeb0-e025d382ac71 | A comprehensive cost update was com pleted in December
2024 by an international expert committee, confirming the
technical maturity and establishing updated cost estimates
consistent with the original TDR. Key technical advances
since 2013 include the two -step baking surface treatment
(seque ntial heat treatment ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
ea49fc79-ee98-49ec-9de5-e97b6d6d9654 | adapts the ILC SCRF linac design for the CERN environ-
ment (Fig.1), combining it with the civil -engineering foot-
print and infrastructure standards developed over many
years for CLIC. The baseline LCF configuration uses a
33.5 km tunnel that includes a 4-5 km beam -delivery re-
gion (BDS), with two interaction re... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 0 |
40d130e4-f11b-4a77-b47f-cba40ba486a4 | implementation at CERN operate at 31.5 MV/m with qual-
ity factor Q₀ = 2×10¹⁰, trains of 1312 bunches (2×10¹⁰ elec-
trons per bunch) at a repetition rate of 10 Hz. The resulting
instantaneous luminosity at 250 GeV is 2.7×10³⁴ cm⁻²s⁻¹.
Both beams are polarised with P(e⁻, e⁺) = 80%/30 %. The
total construction cost is... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
1d426a74-5c00-4c84-abdb-54f43d8b8570 | under ICFA auspices to advance the engineering studies re-
quired for construction readiness. KEK acts as lead labor-
atory with dedicated budget; CERN ser ves as European
hub under a formal KEK –CERN agreement, facilitating
participation by European institutes. Fifteen work pack-
ages across three technical areas ar... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
1d47a301-4f81-4837-b910-f9252828186f | INFN) and South Korea. All completed single -cell cavities
have met or exceeded the ILC specification. WPP -2 (cry-
omodule design) develops the assembly procedures, align-
ment and RF interconnects for full cryomodules . WPP -3
addresses crab cavities, the transverse RF deflectors essen-
tial for the crab -crossing ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
adcf6db9-d158-4a56-9aa3-be00ade8f3b5 | sources. In the Nano -beam area, WPP -12 and WPP -14 ad-
dress the damping ring design and injection/extraction
kicker systems needed to achieve the ultra -low vertical
emittance at the interaction point. WPP -15 and WPP -16
study the final -focus quadrupole design and magnetic vi-
bration mitigation, while WPP -17... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
c14cffde-abbb-4c2c-b77e-1a81d44bfccb | collider based on a unique two -beam acceleration scheme
(Fig.3). This technology could also serve as a starting point
for a linear collider facility at CERN and its implementa-
tion at CERN has been studied in detail. A dedicated high -
current drive beam, produced in a separate linac at low RF
frequency, is tran... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
5cefac81-2e77-402d-a1a1-af55d0a16499 | The 2025 CLIC baseline for the initial stage is 380 GeV
centre -of-mass energy with a 100 Hz repetition rate and a
dual beam -delivery system (BDS) serving two interaction
regions simultaneously. The total luminosity is 4.5×10³⁴
cm⁻²s⁻¹ (2.2×10³⁴ per detecto r on average), the site length
11.4 km, and the AC power... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
f833cdb5-5ac3-4961-b8b3-408e82f0c315 | cremental cos t of ≈7.1 BCHF [2].
Figure 3: Schematic layout of the CLIC complex at 380
GeV, with a double beam -delivery system operating with
two detectors.
The CLIC footprint near CERN has been optimised for
both the 380 GeV and 1.5 TeV stages, placing the main -
beam and drive -beam production complex... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 1 |
ec7d6ebd-e807-40f0-b159-1668d630735e | site avoiding existing infrastructure s as much as possible
[2]. An energy option at 250 GeV is obtained by removing
35% of two -beam modules; a 550 GeV option with 100 Hz
and two IPs is achievable with a modest 5 km tunnel ex-
tension. The dual BDS design provides two IPs with a
transverse separation of ≈10 m and ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
c72a7a61-619a-48ed-87b2-8d3cd724b56e | band linac at LNF - provide large -scale demonstrations of
normal -conducting, high -frequency, low -emittance linac
technology. Precision pre-alignment using active remote
alignment systems, nm -level vibration stabilisation of fi-
nal-focus quadrupoles with inertial sensors and actuators,
and CLIC -level vertica... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
33ee2caf-1187-4725-87c5-0457291eb573 | that energy upgrades beyond the initial stage can be
achieved by replacing or supplementing the linac technol-
ogy within the existing tunnel, and/or if needed adding new
civil construction. The common civil -engineering footprint
- a 33–34 km tunnel with a 4 -5 km BDS sized for multi -
TeV operation - can be design... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
0f549041-7f64-4d79-a406-fe656228d65d | beam efficiency. First bench tests have c onfirmed the gra-
dient principle. Depending on the achievable gradient and
the efficiency of high -power RF sources, centre -of-mass
energies of 1.5 -3 TeV are projected for the LCF tunnel. C³
represents one of the most promising paths to a compact
TeV-scale c ollider.
T... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
a28be3d9-a875-4b65-95cb-a49ee341df9e | ERLC or similar concepts recirculate the spent beam, re-
covering its kinetic energy and the beam particles them-
selves. The resulting near -continuous beam power enables
luminosities approaching 10³⁶ cm⁻²s⁻¹, orders of magnitude
above standard designs, opening access to rare processes at
high statistics.
Plasma... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
e7f374cc-d219-4181-8958-b8df3bd09d71 | Higgs self -coupling measurement at lower centre -of-mass
energy.
All these upgrade options need to be considered care-
fully for compatibility with the initial civil -engineering
footprint and can be developed in parallel with the initial
stage implementation [1].
5. KEY IMPLEMENTATION PARAME-
TERS
Table 1 su... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
f99d2c91-ec67-4684-81bf-45c1c03853a2 | by the European Strateg y Preparatory Group [4].
Table 1: Key Parameters for the Main LC Configurations
[1, 2]
Parameter LCF
250
LP LCF
550
FP CLIC
380 CLIC
1500
√s (GeV) 250 550 380 1500
Lumi.
(10³⁴cm⁻²s⁻¹) 2.7 7.7 4.5 3.7†
Power (MW) 143 322 166 287
Energy/yr
(TWh) 0.8 1.8 0.8 1.4
Const. cost... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
4f19d643-1a1f-443c-a042-4e181d401cf9 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI1T02
MC1.A03: Linear Lepton Colliders 21: MC1 : Colliders and Related Accelerators MOI1T02
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 2 |
d709e4d1-0612-40b2-9f97-46b301c0a3b2 | A decade of systematic effort has reduced the power con-
sumption of both projects. For a SCRF based collider this
includes optimisation of SCRF cavity gradients and Q -val-
ues, cryogenic system efficiency, klystron and modulator
performance, RF -to-beam efficiency through improved fill
factors, heat recovery schem... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
7b6e7880-4152-4f3a-9a8f-66d5fc3868f2 | construction, plus operational energy) [5]. For LCF 250
(LP), the total embodied carbon in underground civil engi-
neering is approximately 380 kton CO₂eq, and machine el-
ements (including injectors) contribute a further 236 kton.
For CLIC 380, underground civil engineering accounts for
286 kton and machine hardw... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
8a3155b6-a881-4b2d-9e06-4a699c119a90 | optimisation t ools — informing choices of materials, sup-
pliers, and construction methods — and hardware remains
the dominant contribution to embodied carbon in both
cases [ 5].
Operation costs cover personnel, electricity, and mainte-
nance and component replacement. For LCF 250 these are
estimated at 170 MCHF/y... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
be1c9e8a-f00a-4485-835e-e472eef18d4c | struction , allowing commissioning and first physics a dec-
ade later [1,2,4].
6. NEXT STEPS AND CONCLUSIONS
The path to a construction decision for a linear collider
at CERN is structured in two preparation phases following
ESPPU finalisation in 2026 [1,2]. Phase 1 (2026 -2028) in-
tegrates and extends the ongoi... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
a0b9f912-b569-481b-855a-c54629244661 | collider and upgrade interface studies (plasma, energy re-
covery, and γγ options, civil -engineering compatibility
with baseline); and WP5 - management, integration, cost-
ing, power, and LCA estimates, wi th risk management and
preparation for Phase 2 decision -making. It should be
noted that the priority placed o... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
175ff4c4-310b-45cd-baac-8b2b61e7acf1 | trial pre -series production, and site preparation, including
environmental integration with host states. For SCRF tech-
nology, a significant fraction of Phase 2 activities can be
distributed globally through the existing ILC indus trialisa-
tion network: cryomodule assembly facilities at KEK,
DESY, CERN and other ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
79fb9d12-c842-4064-bc65-d1cca7f0039f | lider technologies - SCRF or NCRF based - are ready for
detailed implementation studies at CERN. Both offer an in-
itial construction cost of 7 -9 BCHF, a comprehensive
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IP... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 3 |
39333ebf-a3c3-49d1-a70c-d91ef44b9ba3 | physics programme from the Z pole to 550 GeV and be-
yond, polarised beams, two interaction regions, and well -
defined upgrade paths extending to 1.5 TeV and beyond
within the same civil -engineering footprint. The combined
international R&D programme - the IT N for a SCRF based
collider technology, implementation ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 4 |
58c0cf3f-600e-4b8d-b69e-981fdf4ee2af | [physics.acc -ph] (2025);
doi:10.48550/arXiv.2503.19983 see also
https://agenda.linearcollider.org/event/10624/
[2] E. Adli et al. , “CLIC readiness report,” Eur . Phys. J. Spec.
Top., vol. 234, no. 22, pp. 6473 –6652, Dec. 2025.
doi:10.1140/epjs/s11734 -025-02016 -w, see also:
https://indico.cern.ch/event/1439... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 4 |
534bc0c4-a59b-473d-a9ba-0bf1e51d7202 | and ILC, whole accelerator, 2025 ;
https://edms.cern.ch/document/3283864/1 . 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI1T02
MC1.A03: Linear Lepton Colliders 23: MC1 : Colliders and Related Accelerators... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI1T02.pdf | 4 |
9af0fe79-2094-4884-8d41-e37f8da918e1 | GANIL -SPIRAL2 FACILITY - RECENT ACHIEVEMENTS AND
UPGRADES
R. Ferdinand, P. Anger, P -E. Bernaudin, F. Chautard, H. Franberg- Delahaye, M. Lewitowicz,
X. Ledoux, F. Lutton, A. Orduz, H. S avajols, A. Savalle, J -C. Thomas
Grand Accélérateur National d’Ions Lourds, Caen, France
Abstract
The Grand Accélérateu... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
6e6a18d6-5e66-43bc-9ddc-d3b9aece9fcd | cyclotron operation and the initial operational challenges
and lessons learned in the first years of operation of the
LINAC and Neutrons For Science (NFS) facilities are pre-
sented . The physics program at GANIL -SPIRAL2 is
briefly presented. The ongoing upgrades and developments
essential to sustain increasingl... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
a7049a4a-1d2f-40c3-87f2-4e94aa6010f0 | ious facilities in Europe such as GANIL in France, GSI -
FAIR in Germany, ISOLDE at CERN, JYFL in Finland and
LNL & LNS in Italy and worldwide facilities in Canada ,
China , Japan, Korea, Russia, USA . These results have fur-
ther motivated very ambitious efforts worldwide to pro-
duce and study nuclei far from stab... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
b677cac5-892b-4219-a86d-fef23ca02bc3 | via both in- flight fragmentation and the ISOL (Isotope Sep-
aration On -Line) technique through the SPIRAL1 facility.
Radioactive beams from SPIRAL1 can be used directly or
re-accelerated while preserving high optical quality. To-
gether with facilities such as SPIRAL2 , ISOLDE , and
JYFL , and in the future SPES a... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
d9b46224-77e2-4922-a631-03550f9528f3 | radioactive ion beams are available. The GANIL facility is
a multi- beam facility, operating up to 5 simultaneous
beams: IRRSUD, SME, CSS high energy, CIME, SPI-
RAL2, which renders GA NIL unique in the world. Com-
plementary atomic physic studies are also made in ARIBE.
The paper will briefly summarize the cyclotr... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
75a07f0e-1127-4863-98d5-3ccc383a06a6 | CO1,2=30, K CSS1=400, K CSS2=400).
There is a rebuncher between the injectors and the first sep-
arate sectors cyclotron (CSS1) and a stripper between
CSS1 and CSS2 . A wide spectrum of stable and radioactive
ion beams ha ve been delivered s ince 1983.
The five cyclotrons of GANIL allow the acceleration of
io... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
ca0529d6-0cbf-48d0-b13d-425349fdc8db | drivers for the production of radioactive species, using sta-ble beams fragmented in a thick carbon target according to
the ISOL technique.
These beams are delivered to different experimental ar-
eas hosting a large variety of detectors and spectrometers
that allow detailed studies of nuclear structure and reac-... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
f54ba829-974f-4dc8-b976-a06f90152e6d | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M01
MC4.A08: Hadron accelerators: Linear Accelerators 1: MC0 : opening session MOI4M01
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 0 |
8a7c238f-7382-473a-a152-fb0f4fce381d | active -target designed for experiments with very low -in-
tensity radioactive ion beams. It uses a gas volume that acts
simultaneously as the reaction target and as a detector, al-
lowing the three -dimensional tracking of charged particles
produced in nuclear r eactions. ACTAR TPC is particularly
suited to studyin... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 1 |
7fcbe674-518a-4125-b8d8-7ebe571f4084 | tion at energies around the C oulomb barrier. It provi des
new avenues to nuclear structure and reaction studies .
The European AGATA detector is a highly segmented
high- purity germanium detector array using γ-ray tracking.
When coupled with V AMOS++ and other ancillary detec-
tors including EXOGAM , it allows ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 1 |
c8202c93-e11e-433b-9255-1373cfbc9e5f | RFQ 1 accelerates beams to 0.73 MeV/u , followed by the
SC LINAC with 26 cavities and the high energy lines
(HEBT). This SC LINAC can accelerate both CW light and
heavy ions up to energies shown in table 1. The SPIRAL2
SC LINAC [6, 8] includes 12 A -type cry omodules, each
comprising one low -beta cavity (... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 1 |
77da7467-136f-4734-a91f-7272de3495ba | Particles H+ D+ Ions NEW-
GAIN
A/Q 1 2 3 7
Max I (mA) 5 5 1 1
Max E (MeV/A) 33 20 15 7
Beam power (kW) 165 200 45 49
The number of cryomodules (19) is comparable to those
of the larger and more powerful SNS accelerator (23), how-
ever, the latter has a much larger number of accelerating
gaps. The choice of ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 1 |
ed036368-bbfb-40c8-a8b9-aa4dded3ad52 | therefore carefully monitored, as we observe limiting field
emission for two cavities down from 6.5MV/m to
5.8MV/m . No further degradation ha s been observed since
2022.
Among t he main achievement of the 2019- 21 commis-
sioning was the SC LINAC design validation by demon-
strating duty cycle of 10% of the no... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 1 |
3290ebd7-7640-4db8-bf8f-264dd1cccaaa | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M01
2 MC4.A08: Hadron accelerators: Linear AcceleratorsMOI4M01 : MC0 : opening session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 1 |
80732ba1-e024-40d7-8d63-fd8421d7c04e | comprehensive analysis of the transverse and longitudinal
tuning and the improvement of the LLRF feedback and
feedforward systems. S tudies were also made using alpha
beams. The last step of the commissioning was the power
ramp -up to 10 kW with a 5 mA deuteron beam transported
to the beam dump in CW mode [ 12,1... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
7b5ff699-b728-461b-b935-5b7c877c77fe | beams, at energies of 7 and 14.5 MeV/A , were also suc-
cessfully carried out in 2022 [14].
The Neutrons for Science (NFS) hall [ 15], using high-
intensity primary proton or deuteron beams from SC LINAC on a Be convertor provides the most intense q uasi-
mono- energetic neutron beams up to 33 MeV and continu-
ous ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
f850359e-0223-49e8-a2be-a8c3b9c0e1c9 | diotherapy accelerators [23]. The proton and alpha -particle
beams from LINAC have also been used in the NFS hall,
to optimiz e production isotopes for medical use, like
155Tb
[24] and innovative α -emitting 211At isotopes [25]. De-
tailed studies were also performed of the fission process
and of pygmy resonance... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
3b46ad61-d033-4cc5-a29f-85b8da56afc7 | techniques. It will receive radioactive beams from both
SPIRAL1 and S3. The construction of the associated build-
ing was completed in 2025 and we expect to start the facil-
ity operation in 2028.
The main asset of the DESIR facility is the high purity
and optical quality of the secondary beams. A RFQ cooler ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
4f9b4e0b-4501-4a5a-bb85-61c3e87cd76e | acceptance magnetic separator under installation, designed to study nuclei produced by fusion- evaporation reaction s
with extremely small cross sections using the high- inten-
sity heavy- ion beams (Fig. 2). Its primary goal is the nu-
clear structure study of superheavy nuclei and neutron -de-
ficient isotopes n... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
2d4dfcac-20d0-44c4-bacb-161ef01896fa | Multipole Triplet (SMT) magnets , based on NbTi Technol-
ogy. Each SMT integrates dipole, quadrupole, sextupole,
and octupole field components within a single compact
cryogenic assembly [32]. This multifunctional magnet con-
cept enables strong focusing while simultaneously correct-
ing up to the third -order optic... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
d5952ee3-60b0-43a5-9002-aa462e36a8e9 | Both the cyclotrons complex and the SPIRAL2 facility
are connected through the DESIR building completed at
the end of 2025.
OPERATIONAL EXPERIENCE
Cyclotrons
From the beginning of operation, the cyclotrons at
GANIL typically delivered ≈4000 hours of beam per year.
Investigations on downtime causes (Fig. 3 ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
2adc9cd4-7e4e-4bf0-901b-af8f89aa264d | replacement strategies and to estimate the associated
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M01
MC4.A08: Hadron accelerators: Linear Accelerators 3: MC0 : opening session MOI4M01
Content from this ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 2 |
757d298e-6cfd-4892-994f-ec46b32da666 | maintenance time.
Figure 3: Distribution of the 5 main reasons for the cyclo-
tron downtime .
SPIRAL2 SC LINAC
Since 2022, SPIRAL2 is operating for ≈3 months a year,
providing beams not only for physics experiments at NFS
- but also for dedicated studies of beam dynamics, diagnos-
tics development , and RF s... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 3 |
520f55aa-1ff5-4da9-a201-7cf1f6bab6f9 | quirements) . Thus each remaining bunch contains particles
equivalent to a CW 188kW beam at 40 MeV .
Two methods have been successively developed for the
SC LINAC tuning [33]. The “advanced method” deter-
mines the voltage and phase of each cavity using an im-
proved phase -scan technique designed to reduce phase... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 3 |
f6bb4dd7-90cc-4520-aac9-1de6d0dabe1a | hours using the new reference -based method. Since 2024,
the SC LINAC is tuned using a single cali bration, reducing
the overall tuning time by nearly 42%, as shown in Fig. 4 .
This also improved beam reproducibility and increased re-
liability [ 35].
Figure 4: Availability of SPIRAL2 LINAC. The availability (... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 3 |
5b8e7444-0e27-49a9-b906-0a999d1ab130 | a single faulty power inverter, an effect amplified by the
limited total SC LINAC operating time ( Fig. 5 ). Additional
incidents included a failure of a rebuncher tuner system and
a beam tuning error that damage d the SBS.
Figure 6: Cavity field comparison between nominal tuning
with all cavities and test ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 3 |
3f2e0cd2-37d0-4b01-aa42-f345fe57c8ef | uum leak during a shutdown period. In 2025 the CMA11
was removed. Its faulty coupler has since been replaced,
and the cryomodule is scheduled for reinstallation in the
near future and should be available by mid -2026.
FUTURE DIRECTIONS
Several new projects are ongoing to further improve the
scientific, socie... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 3 |
81b7a7d9-0ea1-4dbe-bd02-db5e534dc85e | stable and radioactive ion beams for fundamental, applied,
and industrial research using the five cyclotrons. Since
2010, however, maintenance and refurbishment of the cy-
clotrons ha d been reduced to a minimum mainly due to the
construction of the SPIRAL2 facility and also the imple-
mentation of additional compli... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
68d6ba6d-2a50-440b-9d2a-0c3f8e672ce2 | sis on water leaks in various equipment such as the RF cav-
ities, improvements of the associated beam lines and ex-
perimental hall, as well as building infrastructure, technical
utilities, and safety, security, and radiation -protection sys-
tems. Addressing these problems will require partial disas-
sembly of the ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
95a9abf7-5030-4840-82af-3ee0309142d3 | gun the construction phase in May 2023.
The injector includes several key components: a high-
performance superconducting ECR ion source, ASTER-
ICS [ 39], developed in collaboration with the Laboratoire
de Physique Subatomique et de Cosmologie (LPSC Greno-
ble), and a heavy -ion RFQ designed by CEA Paris -Saclay
[... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
cb0af27c-44d2-4183-be13-0d7d09bcbfd5 | Three RFQ modules have already been manufactured and
are currently undergoing qualification tests [41].
During Phase 1, the injector will be installed at GANIL
using the Phoenix V3 source, while the ASTERICS source will be installed and commissioned in parallel at LPSC
Grenoble. A significant milestone was reached... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
7ae6893e-4886-45af-88de-a7b5dd2e9ecf | cessible at GANIL . SAGA promotes the development of
new experimental programs in fields such as space radia-
tion effects and material science. By enabling these new
activities, SAGA strengthens the multidisciplinary role of GANIL and expands the user community to re searchers
from applied physics and engineering.... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
b6f377ad-f9ac-4701-90ec-db60d82fa516 | optimizing the use of the accelerator infrastructure. Opti-
mized organization which is required for parallel opera-
tion, will be put in place, the objective being to allow 2000
hours of ind ustrial application , out of about 10000 hours of
beam time per year by 2031.
Longer -term R ecommendations
Longer -ter... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
f3a4836a-0acd-4709-ae24-fc1799888b55 | ing and early operation of the SPIRAL2 facility, demon-
strated beam delivery over a wide range of particles, ener-
gies and intensities. Operational experience has high-
lighted both the strong performance of the superconducting
LINAC and the challenges associated with system com-
plexity and aging cyclotron infrast... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
3d267aa6-d408-4483-8ec6-5e460c8576f5 | evolution by promoting diversification toward applied and interdisciplinary research.
Together, these developments position GANIL as a
unique multi -beam facility, capable of addressing both fun-
damental nuclear physics and a broad spectrum of emerg-ing scientific and industrial applications in the coming dec-ade. ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 4 |
dcc710db-e08f-42e5-8266-b7d5df3662ef | REFERENCES
[1] GANIL, https://www.ganil- spiral2.eu
[2] Héloϊse Goutte and A. Navin, “Microscopes for the Physics
at the Femtoscale: GANIL -SPIRAL2,” Nucl. Phys. News ,
vol. 31, no. 1, pp. 5– 12, Jan. 2021.
doi:10.1080/10619127.2021.1881363
[3] A. Savalle and O. Kamalou, “History and Prospectives of
GANIL”,... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
fc09a3d9-4866-4448-8ae4-1ea16eee2234 | https://cerncourier.com/a/spiralling- into-
the-femtoscale/
[6] R. Ferdinand et al. , “The SPIRAL2 superconducting
LINAC ”, in Proc. LINAC’08 , Victoria, BC, Canada, Sep.
2008, pp. 196- 198.
[7] J-M. Lagniel et al ., “Advances of the SPIRAL2 Project”, in
Proc. HIAT’15 , Yokohama, Japan, Sep. 2015, pp. 148-152 ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
97c3025b-ad74-4bdc-8a7f-4b2571571cc2 | Proc. SRF'13, Paris, France, sept 2013, pp. 95– 99,
https://hal.archives- ouvertes.fr/in2p3-
00867506
[11] A.K. Orduz et al. , “Commissioning of a high power LINAC
at GANIL: Beam power ramp -up,” Phys. Rev. Accel. Beams ,
vol. 25, pp. 060101, 2022.
doi:10.1103/PhysRevAccelBeams.25.060101
[12] A.K. Orduz et... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
2155e69a-f5a9-40ab-81fe-f8944383423d | May 2024. doi:10.1088/1748 -0221/19/05/t05006
[15] X. Ledoux et al. , “First beams at neutrons for science,” Eur.
Phys. J. A , vol. 57, no. 8, Aug. 2021.
doi:10.1140/epja/s10050- 021-00565-x
[16] L. de Arruda et al. , “Reconstruction of the GANIL -NFS
spectral neutron flux with Medley using elastically scattere... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
dd73e215-eafb-412c-b3f5-bdcc576c5686 | doi:10.1051/epjconf/202429401008
[19] M. Avrigeanu, E. Šimečková, J. Mrázek, C. Costache, and
V . Avrigeanu, “Modeling of Deuteron-Induced Reactions on
Molybdenum at Low Energies,” J. Fusion Energy , vol. 43,
no. 1, May 2024. doi:10.1007/s10894- 024-00407-w
[20] E. Šimečková et al. , “Deuteron -induced neutron e... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
ca676bb6-69b1-4bda-9c8e-c6487250a875 | 2026. doi:10.1109/tns.2026.3652349
[23] V . Blideanu et al. , “Experimental assessment and analysis
of calculations accuracy for the neutron -induced radio -iso-
topes in copper parts of radiotherapy accelerators,” Nucl. In-
strum. Methods Phys. Res., Sect. B , vol. 557, p. 165553,
Dec. 2024. doi:10.1016/j.nimb.20... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
e19120dd-54f8-4f4f-b937-a29317c270fb | Isot., vol. 225, p. 112061, Nov. 2025.
doi:10.1016/j.apradiso.2025.112061
[26] M. Vandebrouck et al., “Study of the pygmy dipole reso-
nance using neutron inelastic scattering at GANIL -SPI-
RAL2/NFS.”, Il NUOVO CIMENTO 47 C (2024) 19
doi:10.1393/ncc/i2024- 24019-x
[27] J.-C. THOMAS and B. BLANK, “THE DESIR FA... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
df80e856-9f31-4797-99cd-f83460d4c374 | 1046, p. 167631, Jan. 2023.
doi:10.1016/j.nima.2022.167631
[30] P. Ascher et al. , “PIPERADE: A double Penning trap for
mass separation and mass spectrometry at DESIR/SPI-
RAL2,” Nucl. Instrum. Methods Phys. Res., Sect. A , vol.
1019, p. 165857, Dec. 2021.
doi:10.1016/j.nima.2021.165857 17th International Par... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 5 |
5bffae6b-fcb2-433d-94d2-539f5d23ae02 | [31] F. Déchery et al. , “The Super Separator Spectrometer S3 and
the associated detection systems: SIRIUS & LEB -
REGLIS3,” Nucl. Instrum. Methods Phys. Res., Sect. B , vol.
376, pp. 125– 130, Jun. 2016.
doi:10.1016/j.nimb.2016.02.036
[32] A. Esper et al. , “Superconducting multipole triplet field
measurements... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 6 |
29f79991-7191-4605-88f6-7178aba0425c | doi:10.18429/JACoW- IBIC2025- WEPMO12
[35] M. Di Giacomo, A. Orduz, C. Jamet, J. -F. Leyge, and P.
Salou, “Phase setting issues for the SPIRAL2 LINAC”, in
Proc. LINAC'24 , Chicago, IL, USA, Aug. 2024, pp. 383 -
386. doi:10.18429/JACoW- LINAC2024- TUPB025
[36] A. Orduz et al. , “SPIRAL2 operations and future plans”,... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 6 |
1545d726-f1cd-4ef3-91da-9df4923f343d | [39] T. Thuillier et al. , “ASTERICS, a new 28 GHz electron cy-
clotron resonance ion source for the SPIRAL2 accelerator,”
J. Phys. Conf. Ser. , vol. 2743, no. 1, p. 012059, May 2024.
doi:10.1088/1742- 6596/2743/1/012059
[40] P. Hamel, M. J. Desmons, O. Piquet, B. Prevet, and N.
Sellami, “RFQ NEWGAIN: RF and Therm... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 6 |
fb071090-e327-4182-92ce-fd649eba59f9 | doi:10.1016/j.nima.2025.171148
[43] H. Franberg Delahaye, E. Petit, P. Gastinel, and S. Grevy,
“Future upgrades for GANIL”, in Proc. IP AC'24 , Nashville,
TN, USA, May 2024, pp. 1199- 1201.
doi:10.18429/JACoW- IPAC2024- TUPC79 17th International Particle Accelerator Conference, Deauville, France JACoW Publishin... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M01.pdf | 6 |
f71aeeeb-9d69-41f7-b488-3e0bc90c07f6 | COMMISSIONING PROGRESS OF THE ESS LINEAR ACCELERATOR
N. Milas, on behalf of the commissioning team
European Spallation Source, Lund, Sweden
Abstract
The European Spallation Source (ESS) is in the final
stagesofcommissioningitslinearaccelerator(linac),which
willdeliverahigh-powerprotonbeamforneutronproduc-
tion. Thecomm... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
140e2da6-12f0-4206-895e-00b5fd7351f8 | given.
THE ESS FACILITY
TheEuropeanSpallationSourceisapan-Europeanproject
with13Europeannationsasmembers,includingthehostna-
tions Sweden and Denmark. The ESS facility is under com-
missioninginLund,whiletheESSDataManagementand
ScientificComputingcentre(DMSC)islocatedinCopen-
hagen. The construction of the facility beg... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
da86e43e-a18b-4683-aa08-91762de7c452 | while maintaining a low pulse repetition rate that enables
the production of high-flux, low-energy neutrons.
The ESS facility is a huge and highly complex jigsaw
puzzle. The13ESSmemberstatescontributedtothecon-
struction of ESS via financial and in-kind contributions,
exchanging knowledge and know-how. An in-kind contr... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
97270034-e9da-4f8f-9fe2-c7fc8fba3938 | LINAC. The 3.62 MeV bunched beam pulse matched in
theMediumEnergyBeamTransport(MEBT)totheDrift
TubeLINAC(DTL)section,comprisedoffiveDTLtanks
accelerating the beam up to 90 MeV.
Figure1: PhotooftheESSsitefromJune2022. Construc-
tion work is finished and it is possible to see the linac (or-
ange), the Target building (ye... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
75d8b146-d973-4209-a80f-72528029069e | beamto216MeV.Boththe36medium- 𝛽cavities(MBL)
and 84 high- 𝛽cavities (HBL) are arranged four cavities
per cryomodule and operate at a frequency of 704.42 MHz,
twicetheSPKfrequency,andtogehterbringthebeamtoa
maximum energy of 877 MeV. Note that during the 2025
commissioning, only 5 cryomodules of HBL, were installed
an... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
213ce729-3c0e-4b98-b5f6-30f8ac7d0abd | that can take the full design power.
The ESS Target
The spallation process at ESS will take place when the
accelerated protons beam hits the tungsten bricks of the
4.9 tonne target wheel, producing neutrons for scientific
experimentsacross multipledisciplines [ 1]. Thefirststepin
this process is production of high-ener... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
a74e20ad-a879-4429-959e-3006bb679da4 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M03
8 MC4.A14: Neutron Spallation FacilitiesMOI4M03 : MC0 : opening session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of th... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 0 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.