id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
46da50a6-f36b-42a9-9bf8-d79cc341b898
Figure2: ESSlinacschematiclayout. EachsegmentintheDTLandSCsectionsdenotesaDTLtankandacryomodule. The shown figure shows the configurations for the initial operations, where five high- 𝛽cryomodules are included, allowing the capability of 800 MeV beam and 2 MW final power. Figure 3: Schematic layout of the ESS target w...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
1
64b3503d-810e-4edb-a3d9-5c154f5e76b5
alsoincludescryogenichydrogenandwater-coolingsystems. Finallythoseslowerneutronsaredeliveredtotheinstruments through beam ports. Figure 3shows an schematic of the target and moderator at ESS. The ESS Instruments At the European Spallation Source (ESS), fifteen spe- cializedscientificinstrumentsarecurrentlybeinginstalle...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
1
3fe32080-32fc-4fc8-8820-bfc5f76f4a8f
neutrons and cross-check the neutron spectra produced. COMMISSIONING HISTORY For a large machine such as the ESS linac, an obvious challenge of commissioning is to verify functionalities of all the systems. This is one of the reasons for the staged commissioning,todiscoversystem-relatedissuesasearlyas possible [ 5,6]. ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
1
b0fb3c19-5576-4701-a25d-8bc7b459917c
Commissioning to DTL1 2022 21 Commissioning to DTL4 2023 74 Commissioning to Dump 2025-26 800 Commissioning to Target 2027 800 as soon as possible. This lead to the decision of not using any temporary beam dump nor test-bench (except during commissioning of the IS and LEBT). Instead, a comprehen- sive suite of diagnost...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
1
6b9f6c4c-3f1a-4158-a137-63f668e57e1f
to the control system. Diagnostics devices for profile and emittance measurements have been affected, and their re- liable operation has not yet been established. RF systems havebeenalsoaffected; whenthe commissioningupto the MEBT started, only the open-loop operation was supported for the RFQ and the buncher cavities ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
1
09a183ee-d6db-4580-8564-e07b9e97922e
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M03 MC4.A14: Neutron Spallation Facilities 9: MC0 : opening session MOI4M03 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of th...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
1
e010bbd4-d963-47e7-83c9-e34c5da1ab5f
of all commissioning stages so far as wellas the max beam energy achieved. SYSTEMS INSTALLATIONS IntheTarget,thefocusisnowshiftingfrominstallationto integrationtesting. Withessentiallyallcomponentsinplace andthemoderatorcapsealed,theTargetteamhasstartedthe NeutronFactory(NF)test–afull,end-to-endverification of all targ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
0e1afeac-a59e-4771-a9d7-c5f4cf269062
when ESS is in operation. The casks for the moderator- reflector plug and the proton beam window are planned for delivery in 2026, to be followed by site acceptance testing. In the accelerator, during the summer in 2025, 6 extra cryomodules (24 cavities) were installed in the linac [ 7]. In parallel,intheklystrongaller...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
7511f73b-75ca-4e3a-aaf0-76715b5763d2
interruption caused the accelerator cryoplant to trip, which affected the cryogenic distribution to the cavities in the tun- nel. Several cryomodule burst discs released helium into the tunnel. The main control room crew together with rapid on-siteresponsebyon-callstaffquicklystabilizedthecry- oplant and helium supply ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
dd9c9c8a-945d-402c-88e7-d9f21258244b
channelsthatfullyblockedthecoolingchannels. Thislikely causedoneormorecracksinthechannelwallsorelsewhere inthesystemleadingtowaterleakageintoandresultingloss of vacuum in both the monolith vessel and the cryogenic transfer line insulating vacuum. After a thorough investi- gationthecurrent moderatorwasdeemed unrepairabl...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
6ad5a30c-5546-478a-a912-a7d2e6ca5bdd
accumulatedconditioningtimeofaselectionofNCLcav- ities can be seen in Fig. 4. Several cavities reached the nominal RF pulse with less than 1 month of 24/7 RF con- ditioning. The average conditioning time for previously conditioned cavities was ∼27 days of RF Operation. The RF windows of the DTLs have experienced issues...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
704a5281-29f1-4247-86e4-54cf4f504d52
Aftertuning,calibrationandverificationofSCL,cavity conditioning in open loop at full pulse length of 3.2 ms started, with respect previous conditioning only a few cavi- tiesshowedminordegradation andrequiredslightlylonger conditioning time. At the end of SCL conditioning, all cav- ities were configured in closed loop o...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
99622548-32b8-4146-9c97-2c6dd54f2a44
Analysisconfirmedthattheseeventswereradiation-induced, consistent with earlierfindings from Test Stand 2 cryomod- ule testing performed with the CEA in-kind SRF team. The phenomenonoccurswhenelectronsemittedfromthecoupler region traveltowardthe cavity, producing bremsstrahlung radiation, which in turn activates the opt...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
2
fbd88f0e-67f0-4b52-9015-60422960d8db
arcdetectionsystem. Althoughthecouplerdiagnosticsare designed to detect optical light from arcs, the system is also sensitivetothisradiation-inducedsignal,explainingthesi- multaneousinterlocksacrossmultiplechannelsevenwhen only a single cavity is powered. For ESS this effect is intrin- sically connected to the extra lo...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
3
65d88e93-6386-4518-9b6e-908fc0251f7d
the beam pulse length and current about the probe. Table 3: ESS High-Level Parameters for Production and Probe Beam Modes During BOD (Beam on Dump) Com- missioning 2025 Parameter Unit Beam Mode Production Commisisoning Beam Power MW 2 2(200) ⋅10−5 Beam energy GeV 0.8 0.8 Beam current mA 62.5 6 (62.5) Pulse length µs 28...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
3
ca87c838-b52f-43b3-b218-63ee44bb3246
range of cavity phases, as calculated from a field map of thecavityandphaseandamplituderequiredtoachievethe designenergygainandsynchronousphaseweredetermined. Anexampleofmeasurementandfit withthecalculatedset phasevaluecanbeseeninFig. 5. ForthesettingoftheDTL weusethereadingofasingleinternalBPMinordertoset the cavity p...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
3
b6f1cae9-d32f-4966-800b-73b3e2488938
fromthemodelsandformmeasurementshowingwecansee differences in Twiss paramenters between the two cases. in the HEBT section. By blanking downstream cavities, en- ergy measurements of the beam could be conducted from thelastSPKonwards. Theresultingenergymeasurements aftereachcryomodule,startingfromthelastSPKmodule, canbe...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
3
fb620224-a57b-4515-9a8b-1542eb1994f2
During the commissioning in 2026 we started a benchmark- ing camping in order to cross check emittances and twiss parameters using different techniques, namely: quad scan, 3 wires method and using an slit and grid system (EMU). The17th International Particle Accelerator Conference, Deauville, France JACoW Publishing IS...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
3
dd3e8bbb-bcb0-4768-851c-68f9bf9e4127
beamsizewasmeasuredforabeamcurrentsof6and60mA and the resulting emittance compiled and shown on Table 4. More understanding over the measurement limitations is neededhoweverwecanalreadyseethatthetwissparame- tersofthebeamoutoftheRFQfor60mA(seeFig. 7)are nottheonesexpectedfromdesign,speciallyinhorizontal plane. Table 4:...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
4
fe29cf89-f352-4089-a350-2f5935a42632
Beam Loss Experiment Forbeamloss,longitudinaldynamics isfarmoreimpor- tantthanthetransverse[ 6]. Theamplitudeandphaseofeach cavityissetone-by-onewithtime-of-flightmeasurements and model fitting (as explained in section Phase Scan). For ESS the tolerances are set to (0.5%, 0.5°) for rms values in amplitude and phase and...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
4
53ecc334-2b79-4a09-a7e1-2b702b1759d2
Figure8: SimulatedlossesfromtheESslinacforenhance RF errors. Figure9: MeasuredlossesusingBLMswhentheRFQphase was changed by 18°. The losses match quite nicely the expected losses due to RF errors presented in Fig. 8 thecommissioningin2026andusingtheBLMs,notfully installedandcalibrated, wechangedthe RFQphaseby 18° (Fig....
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
4
d8446552-e204-4097-90ad-73be48d6fa96
wereongoinguntiltheaccidentinNovember2025,whenthe theMRPwasdamaged. Sinceitwasnotpossibletorepair theoldmoderatorthe newone isexpectedto arriveatESS site in the 4th quarter of 2026 and the test for the neutron factory to be finalized in 2027 in time for beam on target. On the accelerator side, installations for 3 MW ca...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
4
798abf07-6142-444e-aa63-dae165799c4a
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M03 12 MC4.A14: Neutron Spallation FacilitiesMOI4M03 : MC0 : opening session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of t...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
4
b464719f-67c8-44e0-ac32-92a59b97ed1e
[3]L. Zanini et al., “Design of the cold and thermal neutron moderatorsfortheeuropeanspallationsource”, Nucl.Instrum. Methods Phys. Res. A , vol. 925, pp. 33–52, 2019. doi:1/zero.alt4.1/zero.alt416/j.nima.2/zero.alt419./zero.alt41./zero.alt4/zero.alt43 [4]KH.Andersen etal.,“Theinstrument suiteoftheEuropean Spallation S...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
5
0a8ab688-955a-403f-8e06-42e162eeaf86
3484. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-THPR/zero.alt42 [7]H. Przybilski, “ESS installation progresses”, in Proc. LINAC2024 , Chicago, IL, USA, Aug. 2024, pp. 273–277. doi:1/zero.alt4.18429/JACoW-LINAC2/zero.alt424-TUXA/zero.alt4/zero.alt42[8]D. Nicosia et al., “Technical commissioning of the ess accel- era...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
5
f81d79c1-2b0f-4756-bce0-2df7eb504166
radiation analysis”, in Proc. SRF2025 , Tokyo, Sep. 2025, paper THP57, pp. 738-742, to be published. [12]S. Johannesson et al., “First beam through the superconduct- inglinacofess”,in Proc.HB’25 ,Huizhou,China,Oct.2025, paper TUICC01, pp. 63-68, to be published.17th International Particle Accelerator Conference, Deauvi...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf
5
f15c8648-589d-468a-a97d-947a106a1250
DEVELOPMENT OF LOW PERIOD CRYOGENIC PERMANENT MAGNET UNDULATORS M. Valleau†, Synchrotron- SOLEIL, Gif -sur-Yvette, France Abstr act Undulators are widely employed on accelerator -based light sources. The length of these devices is usually con- strained by the length of the straight sections, and this will be...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
0
f243f010-cd5d-4a4c-a3b4-6cb33bf8ae3c
view of low period CPMU installed on accelerator -based light sources is presented. INTRODUCTION For 30 years, In-Vacuum Undulators (IVUs) are oper- ated on accelerator -based light source, based on the pio- neering work of SPring -8. Nowadays they are in use in nearly every Synchrotron Light Source. In 2005,...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
0
e751f489-14de-4b66-bdd9-79fc0fe3d911
First IVUs were built using SmCo magnets due to their strong coercivity with hard resistance against demagneti-zation induced by electron beam irradiation . Then, to en- hance the magnetic field, NdFeB magnet grades have been used. This magnet gr ade has also been used for the first CPMUs built by SPring -8, ESRF, ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
0
29e68be4-75d6-4e57-b5d9-36e355da76f8
300 K [7], they can be cooled down directly at 77 K which simplifies a lo t the thermal design and the operation with such undulators on storage rings. Before starting the mag-netic design of an undulator, different magnet grades have been tested at low temperatures to be able to evaluate the magnetic field produc...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
0
3dd3dcad-d9c2-46ce-83fb-c6d1cbe48044
uum girders, the global carriage itself and induce heavy load on the gap- drive system. This C -shape type carriage can usually handle magnetic forces up to 30 kN. NEO- MAX Engineering developed spring modules installed on the carriage to reduce the magnetic efforts seen by the car-riage and prevent from phase error ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
0
ba94a311-77d7-499f-a944-9e810cc38c79
Figure 1: Mechanical design of CPMUs at ESRF . ________________________________ ____________ †mathieu .valleau @synchrotron -soleil.fr 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M01 40 MC7.T...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
0
773b0676-f2fd-49c5-856a-41f4ad5bcc3e
Table 1: List of Full- scale Cryogenic Permanent Magnet Undulators Operated Worldwide or in Construction Date Laboratory Beamline Period (mm) Length (m) Gap (mm) Magnet Material Field (T) Cooling system Op. temp . (K) 2008 ESRF ID06 18 2 6 NdFeB 0.88 Closed Loop Cryocooler 150 2010 DLS I07 17.7 2 ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
1
c40b8985-6a09-4d12-bd7e-4c57e83fa09d
2017 SSRF 20 1.6 6 NdFeB 1.04 140 2018 HZB EMIL 17 2 5.5 PrNdFeB 1.12 Closed Loop Cryocooler 80 2018 HZB 15 2 2 PrNdFeB 2.08 Cold head 80 2019 NSRRC 15 2 5.2 PrFeB 1.01 Cold head 83 2020 ESRF ID15 18 1.5 6 PrFeB 0.952 Closed Loop Cryocooler 80 2020 DLS I24 17.7 2 4 NdPrFeB 1.4 Closed Loop Cry...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
1
ce29a068-cdba-4417-9da0-311bbe51844c
2023 ESRF ID03 16.4 2 5 PrFeB 1.1 Closed Loop Cryocooler 80 2023 SSRF 13W 18 2.6 6 PrFeB 0.96 80 2023 ANSTO NANO 18 3 5.2 NdFeB 1.23 Cold head 170 2024 ESRF ID14 18.6 2 6 PrFeB 0.98 Closed Loop Cryocooler 80 2024 DLS VMXm 17.7 2 4 NdPrFeB 1.35 Closed Loop Cryocooler 80 2024 SOLEIL CRISTAL 18 2 5...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
1
179ba814-5c37-4c3e-8ed0-d71beee0523f
2028 ESRF ID11 20.5 2 6 PrFeB 1.096 Closed Loop Cryocooler 80 2028 DLS K02 17.7 2 4 NdPrFeB 1.35 Closed Loop Cryocooler 80 HZB SoTeXS 20 1.46 6 PrNdFeB 1.15 Closed Loop Cryocooler 77 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
1
fb2545ba-faef-4510-b82e-eee3c10e1043
Most of the CPMUs are assembled from individual keepers, each corresponding typically to half a period. The keepers must be stiff enough to handle the magnetic forces and flexible enough to permit the adjustment of the poles to tune the magnetic field errors. The goal of the magnetic field tunning is both improvi...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
0a6433aa-7267-472f-9802-1b6675703d99
tremities. Due to the symmetry and half pole structure, only one module type is needed to build the whole undulator by rotating this module. Some screws inside the module are dedicated to the pole adjustment for phase error and tr ajec- tory distortions corrections. This approach significantly re- duces the number of...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
a9bf3ec0-452b-4743-92ad-59268debe22a
on girders and predictions with SO RT shows an excellent agreement with the magnetic measurement s. Then the poles are inserted and Hall probe scans can be performed. The magnets are adjusted within 20 µ m and poles within 40 µm to compensate the magnetisation errors of the blocks, mechanical and alignment errors...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
63f35208-ba43-4f9b-b9a8-f95db48ba217
doesn’t need any shimming post assembly. Three applica-tions using industrial robotic arms have also been devel- oped to: - position all the modules of an undulator one by one on the girder s to conduct rotating coil and Hall probe measurements; - adjust all the poles o f a supermodule within 20 µ m; - perform t...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
39120eb1-b4e6-41a9-9b8f-94d0fb12233d
error which was previously optimized at room temperature. Usually, field integrals and straightness of trajectories in both planes are not impacted. It is crucial to optimize this phase error at 77 K , for this reason , magnetic measure- ments benches are embedded in side vacuum vessels. Cooling and T hermal D ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
629e52e1-6a7b-4bd1-abd4-bb647670e884
that there is no need of LN 2 or helium connections in the laboratory or in the tunnel so there is no risk of leakage in the undulator vacuum vessel. The c old heads are usually cooling down thermal feedthrough connected to an in -vac- uum copper plate with the same length as the girders to avoid longitudinal ther...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
5d25e820-0dbb-4e5f-b3c5-d6e8887f2e93
girders of the CPMU15 at SPring -8. Another solution to cool down the CPMU is by using closed loop LN 2 cryocoolers. One device is connected to the undulator with a cooling power which is higher than cold heads (typically 1500 W) with no vibrations as this device can be installed far from the undulator or out of ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
9057a603-7c6c-480c-ae08-54a2595952bd
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M01 42 MC7.T36: SustainabilityMOI7M01 : MC7: Accelerator Technology and Sustainability Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
2
ccd3b1ff-7a19-4857-b95c-eb72cbed9bd4
to these weldings that must be tested under high pressure during one or two days to avoid any leakage of LN 2 in the vessel of the undulator that could affect the vacuum pres- sure of the storage ring. The consumption of LN 2 with these systems is around 20 l/hour. At S Pring-8, SLS and ANSTO [3, 13] Oxygen -Free C...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
53879b2b-9516-4f9d-b73b-5b7c5b7a208e
are at cryogenic temperature, are contracting. This contraction can be measured thanks to resistivity measurements using the stretched wire bench or via optical sensors ; - the girders are shrinking by approximately 11 mm for a 2 m long aluminium girder and 8 mm for an OFCH one implying a reduction of the magnetic ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
e5eb3d14-8770-432b-8d64-13df4f500a28
The magnetic field of cryogenic undulators is enhanced at low temperature by 15% typically. For this reason, magnetic measurement benches are em- bedded in the vacuum vessel of the undulator, a Hall probe for the magnetic field profiles and a stretched wire for field integrals measurements. Usually during these meas...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
fadb0246-bbe3-4d54-bf74-3a8b05231b8a
irises on the Hall probe support. This light is then received on Position Sensitive Detectors at the other extremity , de- pending on the Hall probe position. Some piezo- electric stages under the Hall probe corrects on- fly its transverse position regarding the signal measured by the PSD. PERFORMANCES ON THE ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
4b9e0239-b7d8-4461-a769-123a8713bc18
two decades, which compensate the fact that these undulators can not be baked. At S Pring-8, a comparison of the vacuum pressure a non -baked CPMU and a baked IVU show after 5 months of conditionning on the machine pressures reach respectively of 8x10 -8 Pa and 5x10-8 Pa. However in case of a failure of the cooli...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
a0da00f7-d79d-4791-936a-06252e4cb4bf
Several thermal sensors are usually installed on the magnets of the CPMUs to monitor the temperature. At TPS these are also key components of four thermal control feedback loops which enable to maintain the temperature of the magnets within 1 K whatever the gap between 5.2 mm and 25 mm and the stored beam current. ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
22d1094d-172d-461c-9032-3381f9dc7db1
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M01 MC7.T36: Sustainability 43: MC7: Accelerator Technology and Sustainability MOI7M01 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
3
b39f38ee-4b49-4ea5-8c9f-6d1346664968
in good agrement and in all cases, the measured and ideal harmonic line bandwidths are consistant, underlying the low phase error value and the good quality of the undulator magnetic field. Similar measurements have been performed at SLS on CPMU14 [ 3] and the measurements with the beamline show a very good agreme...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
8c43b47a-6356-482a-bc29-d486416b9b66
would be still to shorten the period values using PrFeB at 77 K, some concepts have been proposed to still enhance the magnet ic field values, or even in a more challenging direction, to change the polarization using a CPMU. Some laboratories currently working on this topic, thermal and mechanical studies are r...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
56057434-acd7-4620-b6ae-d8e55dc3f369
REFERENCES [1] T. Hara et al. , “Cryogenic permanent magnet undulators,” Phys. Rev. Spec. Top. Accel Beams , vol. 7, no. 5, May 2004. doi:10.1103/physrevstab.7.050702 [2] J. Chavanne, C. Penel, and P. Elleaume, “Development and Operation of a Prototype Cryogenic Permanent Magnet Un- dulator at the ESRF,” Synchro...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
35a2c14c-5690-4d95-a65d-54158702f2bf
a high spatial resolution x-ray beam line,” Phys. Rev. Accel. Beams , vol. 20, no. 3, Mar. 2017. doi:10.1103/physrevaccelbeams.20.033201 [5] C. Benabderrahmane et al. , “Nd2Fe14B and Pr2Fe14B magnets characterisation and modelling for cryogenic per-manent magnet undulator applications,” Nucl. Instrum. Methods P...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
e8e77e53-90d1-43b3-99b1-23c155e8510c
doi:10.1103/ysbx- qqsc [8] H. Kitamura and S. Mizumoto, Insertion device, U.S. pa- tent 10, 2020, 798, 811 B2 issued October 6 [9] J.-C. Huang, H. Kitamura, C. -K. Yang, C. -H. Chang, C. -H. Chang, and C. -S. Hwang, “Challenges of in -vacuum and cryogenic permanent magnet undulator technologies,” Phys. Rev. Accel...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
2f9d81ef-01a5-431a-ac67-c941d0491133
[12] O. Rudenko and O. Chubar, “An Evolutionary Approach to Shimming Undulator Magnets for Synchrotron Radiation Sources,” in Parallel Problem Solving from Nature - PPSN IX, Ed., 2006, pp. 362 –371. doi:10.1007/11844297_37 [13] Y.-R. E. Tan et al. , “Design and commissioning of the first superconducting undulator...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
833c11ec-1bfd-4e09-909e-7dc5d3a742d5
sia, 2007, pp. 468-471. [16] M. Valléau et al. , “Development of cryogenic undulators with PrFeB magnets at SOLEIL,” in AIP Conference Pro-ceedings, Ed., 2016, p. 020024. doi:10.1063/1.4952803 [17] M. Valléau et al. , “Development of Cryogenic Permanent Magnet Undulators at SOLEIL,” Synchrotron Radiat. News , ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf
4
334d0426-faaa-456a-a0fb-8063b5d7000f
HTS TECHNOLOGY DEVELOPMENT FOR ENERGY EFFICIENT MAGNETS IN PSI LARGE RESEARCH FACILITIES S. Sanfilippo†,1, B. Auchmann1, A. Brem1, C. Calzolaio1, M. Casci ello1,2, M. Duda1, Q. Gorit1, G. Montenero1, J. Kosse1, D. Martins1, K. Puthran1, R. Riccioli1, D. Sotnikov1, C. Zoller1, 1PSI Center for Accelerator Science a...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
de9453cc-16ab-4d2e-adc2-2c85409be98c
facilities. At PSI, this transition is supported by comple-mentary initiatives: CHART, SMILE (Superconducting Magnets to Improve Large Research Facilities Efficiency), and the European project HTS4SRI. They enable the de- velopment of High- Temperature Superconductor (HTS) magnet technologies to improve performance...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
0c901f81-7536-4b40-9ed1-b2a993814712
qualification of energy -efficient superconducting magnets is now being established. The long- term strategy is to pro- gressively install efficient HTS mag nets across PSI’s large research facilities and supporting more sustainable accel- erator technologies. INTRODUCTION Over the past decade, magnet technology ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
40f60da7-3ecf-4d2b-8ed5-1af9caf6a176
as well as by PSI’s strong involvement in CHART (Swiss Accelerator Research and Technology consortium) and in- itiatives such as SMILE (Superconducting Magnets to Im- prove the Efficiency of Large research Facilities) . This ar- ticle presents the context and motivations behind the devel-opment, the key drivers ena...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
2fdee1e7-3461-4668-b2c9-db46da6ba710
matter. Facilities such as the High Intensity of Proton Ac- celerator Complex (HIPA), the Swiss Light Source (SLS 2.0), and the two lines of the Free Electron Laser (SwissFEL ) support fundamental research, materials sci- ence, and medical applications including proton therapy. These facilities are highly energ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
59f4bbfe-2d82-4176-a867-39f40e82a5ed
which increases energy consumption with conventional technologies [5]. HTS T echnology for PSI Magnets PSI magnet section has progressively developed exper- tise in energy -efficient accelerator magnet technologies, particularly through high -temperature superconducting magnets. This evolution reflects a broader...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
880e637d-12d3-4b5f-876b-cc27e92fcc78
† stephane.sanfilippo@psi.ch 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M02 MC7.T10: Superconducting Magnets 45: MC7: Accelerator Technology and Sustainability MOI7M02 Content from this work may be use...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
0
98460e1f-c7e5-43f7-8799-2b6454ebadde
Accelerator magnets must therefore combine high per- formance and stable operation with reduced operating costs and CO₂ footprint. This transition requires selecting the most suitable material for each application. Permanent magnets are well suited to low, f ixed-field, high -density, low-radiation environments, su...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
abc709ed-88ea-4fda-8801-0197b3692dc7
HTS magnets with respect to resistive and LTS ones . Criterion Benefit Limitation Field per- formance High field in compact designs Field quality is harder to optimize with HTS Compact- ness Reduced magnet size for a given performance More complex me- chanical integration AC behav- iour Suitable for de...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
3165537d-039d-42fd-b014-8fcfde8ba2e2
conduction- cooling design Energy ef- ficiency Lower electric- ity consumption than resistive magnets Cryocoolers still con- tribute to power use CAPEX (capital cost) vs OPEX (op- erating costs) Potential sav- ings through re- duced operation costs HTS conductors and associated systems remain costly, w...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
deaa18c8-84a7-4012-8b20-4c8665a08a17
work. The planetary boundaries concept introduced by Jo- han Rockström [ 6] highlights that technologies, including superconducting magnets, create upstream pressures through raw -material extraction, water use, and manufac- turing, while also delivering downstream benefits such as energy savings and societal value. ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
24cef2c1-df7b-4648-9556-cbc5330f0d08
TECHNOLGY AT PSI The adoption of superconducting technology is driven by a dual objective: reducing operational energy consump- tion while enhancing magnet performance and compact- ness. This transition relies on three pillars: a long -term strategy for PSI facilities in operation and upgrades, the de-velopment of ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
72620d4f-64b0-4bc7-9626-2784ab0503dc
plementation. Strong collaborations with CERN, research institutes, industry, and Park Innovaare [ 7] further support technology transfer from R&D to real applications . Long-term Strategy The key elements of the use of HTS technology for PSI efficient magnets include: • reduction of electrical power consumption...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
b62c6a0e-d2d4-41d2-973c-d3a80ee9b869
• development of helium -free magnet demonstrators op- erating with subcooled nitrogen, • integration of sustainability metrics, such as Life Cycle Assessment, into magnet design, These features are well suited to constrained and evolving PSI beamlines, where radiation tolerance, opera- tional flexibility, and...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
1
ad4b619d-68c5-488d-99f9-ae0b50515705
replace high power -consuming resistive magnets in the HIPA beamlines with HTS magnets. These solutions are more compact, significantly more energy -efficient (with energy savings per magnet ranging from ~238 to 725 MWh/year), and in some cases capable of op erating at higher magnetic fields. Over a typical 20- ye...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
56f5730b-0443-46f0-b6cc-23ca70e890e1
Energy saved (MWh/y) 481 238 725 267 PSI P rojects and R&D P rograms The production of two NbTi superconducting superbend dipoles for the second phase of the SLS 2.0 has been a ma- jor catalyst for developing superconducting magnet exper- tise at PSI [8]. These cryogen- free magnets are designed to operate in ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
81bc4f5a-233a-4d97-b4d6-481fa7e368ad
ogy), a strategic PSI project currently underway, provides a major opportunity to develop HTS magnet technologies at PSI. As a major HIPA upgrade, IMPACT is structured around two pillars: High -Intensity Muon Beamlines (HIMB), aimed at in -creasing muon production for funda- mental physics, and the Targeted Alpha ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
73cbb641-aa92-4060-a1b2-2b814f65c072
HTS4SRI project (High Temperature Superconductors for Sustainable Research Infrastructure), funded by the Euro- pean Union under the HORIZON -INFRA -2025- 01-TECH -01 program, starting in September 2026 for four years. HTS4SRI is bringing together PSI, CERN, GSI, CEA, CIEMAT, U NI Milano , INFN, and Bruker . The ce...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
2d4c1302-319b-4f46-896d-087c989405c3
synchrotron and a compact combined -function magnet for CERN FCC- ee. These demonstrators will validate the methodology in diverse operational environments, includ- ing radiation exposure, the potential for more than 30% re- duction in magnet -related electricity consumption com- pared with conventional resistive tec...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
71df253a-a2c9-4061-92d6-7501c7d040c5
sign, fabrication, and testing of demonstrator magnets, sup- ported b y a complete value chain covering electro -mag- netic and mechanical design, conductor and cable develop- ment, coil fabrication, assembly, and testing. CHART has also strengthened PSI’s superconducting magnet infra- structure through the constructi...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
4cfc3985-31f0-49a7-b976-ef9c71de7ac7
ciency of Large Research Facilities) is a PSI magnet sec- tion initiative launched in 2025, focused on magnet tech-nology development related to the energy and environmen- tal needs of PSI accelerators. Its objective is to stimulate the development of supercond ucting magnet technologies and associated systems by add...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
201730ad-6b7d-4517-aa3b-cb9a69e13dd8
pact HTS magnets operating under variable magnetic fields with change s of above 1 T/s. This work focuses also on the development and study of low -losses HTS cables such as CORC with the use striated tapes, including both experi-mental and numerical activities. 17th International Particle Accelerator Conference, ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
2
9da7c0e9-74a1-4120-85fe-a4333a6237d4
Figure 2: Conceptual diagram of the SMILE framework integrating design, fabrication, and testing of superconducting magnets for improved efficiency in large research facilities. The third focuses on advanced cryogenics for efficient magnet cooling. SMILE is currently partially funded : the third pole has benefited ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
3
bcf0aec3-b98b-498c-964b-da2618639718
Technological B uilding B locks and I nfrastruc- ture for M agnet M anufacturing and T ests The development of HTS conductors and cable architec- tures is a key technological building block. Several direc- tions are being pursued to cover a broad range of applica- tions. Relevant directions include d coated tapes...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
3
fb2a0da1-e63b-4598-8465-f3474faaa4a3
agement by the structure itself plays a central role, as the electromagnetic loads are intercep ted directly by the me- chanical support structure rather than being fully transmit- ted to the superconducting conductor [4]. The Canted Co- sine Theta geometry can be regarded as this conce pt pushed to its limit: each ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
3
904f6745-ed57-464e-9e52-33362316cde7
structure and support compact, modul ar magnet systems. Two directions are pursued. First, one - or two -stage 4 K GM cryocoolers, already used in several PSI magnets, can be combined with dual -inverter compressors such as the E- 77A, operating at 6.5/7.5 kW at 50/60 Hz, to enable faster cooldo wn, reduced- speed ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
3
89c00e1b-d801-4998-bae8-4cffef9691a9
able HTS magnet systems . PSI’s laborator ies provide a complete environment for HTS magnet development. Since 2020, the MagDev laboratory has been progressively developed with CHART support as a dedicated infrastruc- ture for super -conducting magnet R&D at PSI. It covers the full value chain of new ma gnet concep...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
3
99c158ed-090e-4c30-95f8-465f0ee26dda
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M02 48 MC7.T10: Superconducting MagnetsMOI7M02 : MC7: Accelerator Technology and Sustainability Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the a...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
3
8efbdd69-057e-4220-8351-45c03c83d702
Figure 3: Panoramic view of the MagDevlab dedicated to the superconducting magnet technology development . Superconducting magnets, with CHART acting as a cata- lyst for expertise, infrastructure, and innovation. A dedicated cryogenic test station for superconducting conductors, coils, and magnets has also been de...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
0f201f43-d429-4562-8bd8-cf0c4747af06
coils, including RRR, Tc, thermal conductivity, AC losses, Pulsating Heat Pipes qualification and high -field testing of HTS and LTS coils. Dedicated electronics provide temper- ature contr ol, voltage measurements, and quench detection using CERN’s uQDS system with customized detection al- gorithms . Magnetic quali...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
a94500e2-d64c-40e2-a646-8f7102839b1f
ogies for future FCC -hh magnets, covering conductor con- cepts, coil fabrication, field quality, AC losses, stress man- agement by structure , and quench protection before scaling toward high -field short models ab 3ove 14 T. Three demon- strators, RS1, RS2, and RS3, are planned within MagDev phase 3. RS1 is a 4 T d...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
e914d99e-ebdb-4029-8ae1-9f71104656f2
low-power, cost -effective nested HTS magnet system for FCC -ee by replacing normal -conducting sextupole and quadrupole magnets with compact superconducting vari-ants. Two CERN and PSI demonstrators explore comple-mentary appro aches: a canted -cosine -theta design based on insulated HTS tapes, and a partially insu...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
c68beef5-4002-4a25-a595-5ec3b3067f19
250 A HTS system, compared with about 21 W for a con- ventional room -temperature supply [18]. CHART MagDev activities also investigate the prom- ising uses of non- insulated (NI) HTS technology as a route toward compact, robust, high- field superconducting mag- nets. This approach is applied to the PSI positron- p...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
89dade1e-4e2f-4078-b969-aee280a0da8d
corresponding to a magnetic field of about 10 T, before in- stallation in the SwissFEL beamline in 2026. The perfor-mance limitations are now understood (mechanical failure of the soldered Field’s metal bond between pancakes) and will be addressed during a second run in 2027. Figure 4: Non -insulated HTS capture s...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
33c9e22f-59ee-4a26-9b96-49604171c722
230 MeV, fluxes up to ~2×10⁹ protons·s⁻¹·cm⁻² and possi- ble measurements at room temperature or in liquid nitro-gen; the PROSCAN Gantry 1 proton -therapy facility, with beams up to 230 MeV and doses larger than ~20 kGy per treatment and the SINQ neutron irradiation service, provid-ing characterized neutron spectra fo...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
4
bce54881-0032-4b06-99a7-70d7bf252d99
temperature using the above -mentioned facilities, after having been characterized in liquid nitrogen before irradi- ation. For the Gantry 1 experiment, a total dose of approx- imately 22.1 kGy was delivered within about 20 s, whereas at the Proton Irradiation Facility (PIF) a dose of about 56 kGy was delivered over ...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5
9f3fa49a-0be5-4941-a7a6-1da9ffca770a
warmed to room temperature before post -irradiation char- acterization, partial recovery may have masked irradiation - induced effects. In parallel, an HTS magnet demonstrator is being developed within SMILE to bridge material stud- ies and real operating conditions. It consists of a dry-wound coil made of 190 turns...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5
3f8c4af1-c510-4b4e-b463-65fd1a008084
combined with modelling of radiation -induced damage in HTS tapes with Politecnico di Torino, will support lifetime predictions for superconducting magnets in high- radiation environments [20]. CONCLUSION PSI is entering a transition where accelerator magnets must combine performance with energy efficiency, susta...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5
2c5aae91-dedc-4c2e-b910-5dada2931d5a
based on insulated and non- insulated HTS technologies supports both high- field magnets and compact HTS mag- nets operating around 1.5 –3 T, with high efficie ncy, radia- tion environment and operation above 20 K . These activi- ties establish HTS as a realistic pathway toward sustaina- ble magnets for current and f...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5
3b04d349-8a40-4557-b8c2-bbed2d834f0d
mentations for advanced light sources”, in Proc. IP AC'25 , Taipei, Taiwan, Jun. 2025, pp. 42- 47. doi:10.18429/JACoW- IPAC2025- MOZN1 [4] D. Araujo et al, “Electromechanical Design of Nb3Sn Stress Managed Asymmetric Common -Coils”, IEEE Trans. Appl. Supercond. , vol. 35, no. 5, p. 4002205, 2025. doi:10.1109...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5
5739988f-9e8a-4298-85b3-994593a4a302
dinal Gradient Bend Magnet for the SLS Upgrade”, IEEE Trans. Appl. Supercond. , vol. 27, no. 4, p. 4000305, 2017. doi:10.1109/TASC.2016.2632103 [9] CHART (Swiss Accelerator Research and Technology), https://chart.ch [10] F. Grilli and A. Kairo , “How filaments can reduce AC losses in HTS coated conductors: a r...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5
fb88e230-ad06-483a-a0cd-ba5d9187c0c2
Canted -Cosine -Theta (CCT) magnet program”, IEEE Trans. Appl. Supercond., vol. 28, no. 3, p. 4002805, 2018. doi:10.1109/TASC.2017.2787596 [14] Sumitomo Heavy Industries, Ltd., https://www.shi.co.jp/english/products/mechatron-ics/cold/index.html. [15] Q. Gorit et al ., "Application of neon pulsating heat pipe...
D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf
5