46da50a6-f36b-42a9-9bf8-d79cc341b898 | Figure2: ESSlinacschematiclayout. EachsegmentintheDTLandSCsectionsdenotesaDTLtankandacryomodule.
The shown figure shows the configurations for the initial operations, where five high- 𝛽cryomodules are included, allowing
the capability of 800 MeV beam and 2 MW final power.
Figure 3: Schematic layout of the ESS target w... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 1 |
64b3503d-810e-4edb-a3d9-5c154f5e76b5 | alsoincludescryogenichydrogenandwater-coolingsystems.
Finallythoseslowerneutronsaredeliveredtotheinstruments
through beam ports. Figure 3shows an schematic of the
target and moderator at ESS.
The ESS Instruments
At the European Spallation Source (ESS), fifteen spe-
cializedscientificinstrumentsarecurrentlybeinginstalle... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 1 |
3fe32080-32fc-4fc8-8820-bfc5f76f4a8f | neutrons and cross-check the neutron spectra produced.
COMMISSIONING HISTORY
For a large machine such as the ESS linac, an obvious
challenge of commissioning is to verify functionalities of
all the systems. This is one of the reasons for the staged
commissioning,todiscoversystem-relatedissuesasearlyas
possible [ 5,6].
... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 1 |
b0fb3c19-5576-4701-a25d-8bc7b459917c | Commissioning to DTL1 2022 21
Commissioning to DTL4 2023 74
Commissioning to Dump 2025-26 800
Commissioning to Target 2027 800
as soon as possible. This lead to the decision of not using
any temporary beam dump nor test-bench (except during
commissioning of the IS and LEBT). Instead, a comprehen-
sive suite of diagnost... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 1 |
6b9f6c4c-3f1a-4158-a137-63f668e57e1f | to the control system. Diagnostics devices for profile and
emittance measurements have been affected, and their re-
liable operation has not yet been established. RF systems
havebeenalsoaffected; whenthe commissioningupto the
MEBT started, only the open-loop operation was supported
for the RFQ and the buncher cavities ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 1 |
09a183ee-d6db-4580-8564-e07b9e97922e | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M03
MC4.A14: Neutron Spallation Facilities 9: MC0 : opening session MOI4M03
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of th... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 1 |
e010bbd4-d963-47e7-83c9-e34c5da1ab5f | of all commissioning stages so far as wellas the max beam
energy achieved.
SYSTEMS INSTALLATIONS
IntheTarget,thefocusisnowshiftingfrominstallationto
integrationtesting. Withessentiallyallcomponentsinplace
andthemoderatorcapsealed,theTargetteamhasstartedthe
NeutronFactory(NF)test–afull,end-to-endverification
of all targ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
0e1afeac-a59e-4771-a9d7-c5f4cf269062 | when ESS is in operation. The casks for the moderator-
reflector plug and the proton beam window are planned for
delivery in 2026, to be followed by site acceptance testing.
In the accelerator, during the summer in 2025, 6 extra
cryomodules (24 cavities) were installed in the linac [ 7]. In
parallel,intheklystrongaller... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
7511f73b-75ca-4e3a-aaf0-76715b5763d2 | interruption caused the accelerator cryoplant to trip, which
affected the cryogenic distribution to the cavities in the tun-
nel. Several cryomodule burst discs released helium into
the tunnel. The main control room crew together with rapid
on-siteresponsebyon-callstaffquicklystabilizedthecry-
oplant and helium supply ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
dd9c9c8a-945d-402c-88e7-d9f21258244b | channelsthatfullyblockedthecoolingchannels. Thislikely
causedoneormorecracksinthechannelwallsorelsewhere
inthesystemleadingtowaterleakageintoandresultingloss
of vacuum in both the monolith vessel and the cryogenic
transfer line insulating vacuum. After a thorough investi-
gationthecurrent moderatorwasdeemed unrepairabl... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
6ad5a30c-5546-478a-a912-a7d2e6ca5bdd | accumulatedconditioningtimeofaselectionofNCLcav-
ities can be seen in Fig. 4. Several cavities reached the
nominal RF pulse with less than 1 month of 24/7 RF con-
ditioning. The average conditioning time for previously
conditioned cavities was ∼27 days of RF Operation. The
RF windows of the DTLs have experienced issues... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
704a5281-29f1-4247-86e4-54cf4f504d52 | Aftertuning,calibrationandverificationofSCL,cavity
conditioning in open loop at full pulse length of 3.2 ms
started, with respect previous conditioning only a few cavi-
tiesshowedminordegradation andrequiredslightlylonger
conditioning time. At the end of SCL conditioning, all cav-
ities were configured in closed loop o... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
99622548-32b8-4146-9c97-2c6dd54f2a44 | Analysisconfirmedthattheseeventswereradiation-induced,
consistent with earlierfindings from Test Stand 2 cryomod-
ule testing performed with the CEA in-kind SRF team. The
phenomenonoccurswhenelectronsemittedfromthecoupler
region traveltowardthe cavity, producing bremsstrahlung
radiation, which in turn activates the opt... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 2 |
fbd88f0e-67f0-4b52-9015-60422960d8db | arcdetectionsystem. Althoughthecouplerdiagnosticsare
designed to detect optical light from arcs, the system is also
sensitivetothisradiation-inducedsignal,explainingthesi-
multaneousinterlocksacrossmultiplechannelsevenwhen
only a single cavity is powered. For ESS this effect is intrin-
sically connected to the extra lo... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 3 |
65d88e93-6386-4518-9b6e-908fc0251f7d | the beam pulse length and current about the probe.
Table 3: ESS High-Level Parameters for Production and
Probe Beam Modes During BOD (Beam on Dump) Com-
missioning 2025
Parameter Unit Beam Mode
Production Commisisoning
Beam Power MW 2 2(200) ⋅10−5
Beam energy GeV 0.8 0.8
Beam current mA 62.5 6 (62.5)
Pulse length µs 28... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 3 |
ca87c838-b52f-43b3-b218-63ee44bb3246 | range of cavity phases, as calculated from a field map of
thecavityandphaseandamplituderequiredtoachievethe
designenergygainandsynchronousphaseweredetermined.
Anexampleofmeasurementandfit withthecalculatedset
phasevaluecanbeseeninFig. 5. ForthesettingoftheDTL
weusethereadingofasingleinternalBPMinordertoset
the cavity p... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 3 |
b6f1cae9-d32f-4966-800b-73b3e2488938 | fromthemodelsandformmeasurementshowingwecansee
differences in Twiss paramenters between the two cases.
in the HEBT section. By blanking downstream cavities, en-
ergy measurements of the beam could be conducted from
thelastSPKonwards. Theresultingenergymeasurements
aftereachcryomodule,startingfromthelastSPKmodule,
canbe... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 3 |
fb620224-a57b-4515-9a8b-1542eb1994f2 | During the commissioning in 2026 we started a benchmark-
ing camping in order to cross check emittances and twiss
parameters using different techniques, namely: quad scan, 3
wires method and using an slit and grid system (EMU). The17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
IS... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 3 |
dd3e8bbb-bcb0-4768-851c-68f9bf9e4127 | beamsizewasmeasuredforabeamcurrentsof6and60mA
and the resulting emittance compiled and shown on Table 4.
More understanding over the measurement limitations is
neededhoweverwecanalreadyseethatthetwissparame-
tersofthebeamoutoftheRFQfor60mA(seeFig. 7)are
nottheonesexpectedfromdesign,speciallyinhorizontal
plane.
Table 4:... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 4 |
fe29cf89-f352-4089-a350-2f5935a42632 | Beam Loss Experiment
Forbeamloss,longitudinaldynamics isfarmoreimpor-
tantthanthetransverse[ 6]. Theamplitudeandphaseofeach
cavityissetone-by-onewithtime-of-flightmeasurements
and model fitting (as explained in section Phase Scan). For
ESS the tolerances are set to (0.5%, 0.5°) for rms values
in amplitude and phase and... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 4 |
53ecc334-2b79-4a09-a7e1-2b702b1759d2 | Figure8: SimulatedlossesfromtheESslinacforenhance
RF errors.
Figure9: MeasuredlossesusingBLMswhentheRFQphase
was changed by 18°. The losses match quite nicely the
expected losses due to RF errors presented in Fig. 8
thecommissioningin2026andusingtheBLMs,notfully
installedandcalibrated, wechangedthe RFQphaseby 18°
(Fig.... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 4 |
d8446552-e204-4097-90ad-73be48d6fa96 | wereongoinguntiltheaccidentinNovember2025,whenthe
theMRPwasdamaged. Sinceitwasnotpossibletorepair
theoldmoderatorthe newone isexpectedto arriveatESS
site in the 4th quarter of 2026 and the test for the neutron
factory to be finalized in 2027 in time for beam on target.
On the accelerator side, installations for 3 MW ca... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 4 |
798abf07-6142-444e-aa63-dae165799c4a | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI4M03
12 MC4.A14: Neutron Spallation FacilitiesMOI4M03 : MC0 : opening session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of t... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 4 |
b464719f-67c8-44e0-ac32-92a59b97ed1e | [3]L. Zanini et al., “Design of the cold and thermal neutron
moderatorsfortheeuropeanspallationsource”, Nucl.Instrum.
Methods Phys. Res. A , vol. 925, pp. 33–52, 2019.
doi:1/zero.alt4.1/zero.alt416/j.nima.2/zero.alt419./zero.alt41./zero.alt4/zero.alt43
[4]KH.Andersen etal.,“Theinstrument suiteoftheEuropean
Spallation S... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 5 |
0a8ab688-955a-403f-8e06-42e162eeaf86 | 3484. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-THPR/zero.alt42
[7]H. Przybilski, “ESS installation progresses”, in Proc.
LINAC2024 , Chicago, IL, USA, Aug. 2024, pp. 273–277.
doi:1/zero.alt4.18429/JACoW-LINAC2/zero.alt424-TUXA/zero.alt4/zero.alt42[8]D. Nicosia et al., “Technical commissioning of the ess accel-
era... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 5 |
f81d79c1-2b0f-4756-bce0-2df7eb504166 | radiation analysis”, in Proc. SRF2025 , Tokyo, Sep. 2025,
paper THP57, pp. 738-742, to be published.
[12]S. Johannesson et al., “First beam through the superconduct-
inglinacofess”,in Proc.HB’25 ,Huizhou,China,Oct.2025,
paper TUICC01, pp. 63-68, to be published.17th International Particle Accelerator Conference, Deauvi... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI4M03.pdf | 5 |
f15c8648-589d-468a-a97d-947a106a1250 | DEVELOPMENT OF LOW PERIOD CRYOGENIC
PERMANENT MAGNET UNDULATORS
M. Valleau†, Synchrotron- SOLEIL, Gif -sur-Yvette, France
Abstr act
Undulators are widely employed on accelerator -based
light sources. The length of these devices is usually con-
strained by the length of the straight sections, and this will
be... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 0 |
f243f010-cd5d-4a4c-a3b4-6cb33bf8ae3c | view of low period CPMU installed on accelerator -based
light sources is presented.
INTRODUCTION
For 30 years, In-Vacuum Undulators (IVUs) are oper-
ated on accelerator -based light source, based on the pio-
neering work of SPring -8. Nowadays they are in use in
nearly every Synchrotron Light Source. In 2005,... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 0 |
e751f489-14de-4b66-bdd9-79fc0fe3d911 | First IVUs were built using SmCo magnets due to their
strong coercivity with hard resistance against demagneti-zation induced by electron beam irradiation . Then, to en-
hance the magnetic field, NdFeB magnet grades have been
used. This magnet gr ade has also been used for the first
CPMUs built by SPring -8, ESRF, ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 0 |
29e68be4-75d6-4e57-b5d9-36e355da76f8 | 300 K [7], they can be cooled down directly at 77 K which
simplifies a lo t the thermal design and the operation with
such undulators on storage rings. Before starting the mag-netic design of an undulator, different magnet grades have been tested at low temperatures to be able to evaluate the
magnetic field produc... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 0 |
3dd3dcad-d9c2-46ce-83fb-c6d1cbe48044 | uum girders, the global carriage itself and induce heavy load on the gap- drive system. This C -shape type carriage
can usually handle magnetic forces up to 30 kN. NEO-
MAX Engineering developed spring modules installed on
the carriage to reduce the magnetic efforts seen by the car-riage and prevent from phase error ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 0 |
ba94a311-77d7-499f-a944-9e810cc38c79 | Figure 1: Mechanical design of CPMUs at ESRF .
________________________________ ____________
†mathieu .valleau @synchrotron -soleil.fr
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M01
40 MC7.T... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 0 |
773b0676-f2fd-49c5-856a-41f4ad5bcc3e | Table 1: List of Full- scale Cryogenic Permanent Magnet Undulators Operated Worldwide or in Construction
Date Laboratory Beamline Period
(mm) Length
(m) Gap
(mm) Magnet
Material Field (T) Cooling system Op.
temp .
(K)
2008 ESRF ID06 18 2 6 NdFeB 0.88 Closed Loop Cryocooler 150
2010 DLS I07 17.7 2 ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 1 |
c40b8985-6a09-4d12-bd7e-4c57e83fa09d | 2017 SSRF 20 1.6 6 NdFeB 1.04 140
2018 HZB EMIL 17 2 5.5 PrNdFeB 1.12 Closed Loop Cryocooler 80
2018 HZB 15 2 2 PrNdFeB 2.08 Cold head 80
2019 NSRRC 15 2 5.2 PrFeB 1.01 Cold head 83
2020 ESRF ID15 18 1.5 6 PrFeB 0.952 Closed Loop Cryocooler 80
2020 DLS I24 17.7 2 4 NdPrFeB 1.4 Closed Loop Cry... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 1 |
ce29a068-cdba-4417-9da0-311bbe51844c | 2023 ESRF ID03 16.4 2 5 PrFeB 1.1 Closed Loop Cryocooler 80
2023 SSRF 13W 18 2.6 6 PrFeB 0.96 80
2023 ANSTO NANO 18 3 5.2 NdFeB 1.23 Cold head 170
2024 ESRF ID14 18.6 2 6 PrFeB 0.98 Closed Loop Cryocooler 80
2024 DLS VMXm 17.7 2 4 NdPrFeB 1.35 Closed Loop Cryocooler 80
2024 SOLEIL CRISTAL 18 2 5... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 1 |
179ba814-5c37-4c3e-8ed0-d71beee0523f | 2028 ESRF ID11 20.5 2 6 PrFeB 1.096 Closed Loop Cryocooler 80
2028 DLS K02 17.7 2 4 NdPrFeB 1.35 Closed Loop Cryocooler 80
HZB SoTeXS 20 1.46 6 PrNdFeB 1.15 Closed Loop Cryocooler 77 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 1 |
fb2545ba-faef-4510-b82e-eee3c10e1043 | Most of the CPMUs are assembled from individual
keepers, each corresponding typically to half a period. The
keepers must be stiff enough to handle the magnetic forces
and flexible enough to permit the adjustment of the poles
to tune the magnetic field errors. The goal of the magnetic
field tunning is both improvi... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
0a6433aa-7267-472f-9802-1b6675703d99 | tremities. Due to the symmetry and half pole structure, only one module type is needed to build the whole undulator by
rotating this module. Some screws inside the module are
dedicated to the pole adjustment for phase error and tr ajec-
tory distortions corrections. This approach significantly re-
duces the number of... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
a9bf3ec0-452b-4743-92ad-59268debe22a | on girders and predictions with SO RT shows an excellent
agreement with the magnetic measurement s. Then the
poles are inserted and Hall probe scans can be performed.
The magnets are adjusted within 20 µ m and poles within
40 µm to compensate the magnetisation errors of the
blocks, mechanical and alignment errors... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
63f35208-ba43-4f9b-b9a8-f95db48ba217 | doesn’t need any shimming post assembly. Three applica-tions using industrial robotic arms have also been devel-
oped to:
- position all the modules of an undulator one by one
on the girder s to conduct rotating coil and Hall
probe measurements;
- adjust all the poles o f a supermodule within 20 µ m;
- perform t... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
39120eb1-b4e6-41a9-9b8f-94d0fb12233d | error which was previously optimized at room temperature.
Usually, field integrals and straightness of trajectories in
both planes are not impacted. It is crucial to optimize this
phase error at 77 K , for this reason , magnetic measure-
ments benches are embedded in side vacuum vessels.
Cooling and T hermal D ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
629e52e1-6a7b-4bd1-abd4-bb647670e884 | that there is no need of LN
2 or helium connections in the
laboratory or in the tunnel so there is no risk of leakage in
the undulator vacuum vessel. The c old heads are usually
cooling down thermal feedthrough connected to an in -vac-
uum copper plate with the same length as the girders to
avoid longitudinal ther... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
5d25e820-0dbb-4e5f-b3c5-d6e8887f2e93 | girders of the CPMU15 at SPring -8.
Another solution to cool down the CPMU is by using
closed loop LN 2 cryocoolers. One device is connected to
the undulator with a cooling power which is higher than cold heads (typically 1500 W) with no vibrations as this
device can be installed far from the undulator or out of ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
9057a603-7c6c-480c-ae08-54a2595952bd | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M01
42 MC7.T36: SustainabilityMOI7M01 : MC7: Accelerator Technology and Sustainability
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 2 |
ccd3b1ff-7a19-4857-b95c-eb72cbed9bd4 | to these weldings that must be tested under high pressure
during one or two days to avoid any leakage of LN 2 in the
vessel of the undulator that could affect the vacuum pres-
sure of the storage ring. The consumption of LN 2 with
these systems is around 20 l/hour. At S Pring-8, SLS and
ANSTO [3, 13] Oxygen -Free C... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
53879b2b-9516-4f9d-b73b-5b7c5b7a208e | are at cryogenic temperature, are contracting. This contraction can be measured thanks to resistivity
measurements using the stretched wire bench or via
optical sensors ;
- the girders are shrinking by approximately 11 mm
for a 2 m long aluminium girder and 8 mm for an OFCH one implying a reduction of the magnetic ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
e5eb3d14-8770-432b-8d64-13df4f500a28 | The magnetic field of cryogenic undulators is enhanced at low temperature by 15% typically.
For this reason, magnetic measurement benches are em-
bedded in the vacuum vessel of the undulator, a Hall probe for the magnetic field profiles and a stretched wire for field integrals measurements. Usually during these meas... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
fadb0246-bbe3-4d54-bf74-3a8b05231b8a | irises on the Hall probe support. This light is then received
on Position Sensitive Detectors at the other extremity , de-
pending on the Hall probe position. Some piezo- electric
stages under the Hall probe corrects on- fly its transverse
position regarding the signal measured by the PSD.
PERFORMANCES ON THE ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
4b9e0239-b7d8-4461-a769-123a8713bc18 | two decades, which compensate the fact that these
undulators can not be baked. At S Pring-8, a comparison of
the vacuum pressure a non -baked CPMU and a baked IVU
show after 5 months of conditionning on the machine
pressures reach respectively of 8x10
-8 Pa and 5x10-8 Pa.
However in case of a failure of the cooli... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
a0da00f7-d79d-4791-936a-06252e4cb4bf | Several thermal sensors are usually installed on the
magnets of the CPMUs to monitor the temperature. At TPS these are also key components of four thermal control
feedback loops which enable to maintain the temperature of the magnets within 1 K whatever the gap between 5.2
mm and 25 mm and the stored beam current. ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
22d1094d-172d-461c-9032-3381f9dc7db1 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M01
MC7.T36: Sustainability 43: MC7: Accelerator Technology and Sustainability MOI7M01
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 3 |
b39f38ee-4b49-4ea5-8c9f-6d1346664968 | in good agrement and in all cases, the measured and ideal
harmonic line bandwidths are consistant, underlying the
low phase error value and the good quality of the undulator
magnetic field. Similar measurements have been performed at SLS on CPMU14 [ 3] and the measurements
with the beamline show a very good agreme... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
8c43b47a-6356-482a-bc29-d486416b9b66 | would be still to shorten the period values using PrFeB at
77 K, some concepts have been proposed to still enhance the magnet ic field values, or even in a more challenging
direction, to change the polarization using a CPMU. Some
laboratories currently working on this topic, thermal and
mechanical studies are r... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
56057434-acd7-4620-b6ae-d8e55dc3f369 | REFERENCES
[1] T. Hara et al. , “Cryogenic permanent magnet undulators,”
Phys. Rev. Spec. Top. Accel Beams , vol. 7, no. 5, May 2004.
doi:10.1103/physrevstab.7.050702
[2] J. Chavanne, C. Penel, and P. Elleaume, “Development and
Operation of a Prototype Cryogenic Permanent Magnet Un-
dulator at the ESRF,” Synchro... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
35a2c14c-5690-4d95-a65d-54158702f2bf | a high spatial resolution x-ray beam line,” Phys. Rev. Accel.
Beams , vol. 20, no. 3, Mar. 2017.
doi:10.1103/physrevaccelbeams.20.033201
[5] C. Benabderrahmane et al. , “Nd2Fe14B and Pr2Fe14B
magnets characterisation and modelling for cryogenic per-manent magnet undulator applications,” Nucl. Instrum.
Methods P... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
e8e77e53-90d1-43b3-99b1-23c155e8510c | doi:10.1103/ysbx- qqsc
[8] H. Kitamura and S. Mizumoto, Insertion device, U.S. pa-
tent 10, 2020, 798, 811 B2 issued October 6
[9] J.-C. Huang, H. Kitamura, C. -K. Yang, C. -H. Chang, C. -H.
Chang, and C. -S. Hwang, “Challenges of in -vacuum and
cryogenic permanent magnet undulator technologies,” Phys. Rev. Accel... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
2f9d81ef-01a5-431a-ac67-c941d0491133 | [12] O. Rudenko and O. Chubar, “An Evolutionary Approach to
Shimming Undulator Magnets for Synchrotron Radiation
Sources,” in Parallel Problem Solving from Nature - PPSN
IX, Ed., 2006, pp. 362 –371. doi:10.1007/11844297_37
[13] Y.-R. E. Tan et al. , “Design and commissioning of the first
superconducting undulator... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
833c11ec-1bfd-4e09-909e-7dc5d3a742d5 | sia, 2007, pp. 468-471.
[16] M. Valléau et al. , “Development of cryogenic undulators
with PrFeB magnets at SOLEIL,” in AIP Conference Pro-ceedings, Ed., 2016, p. 020024.
doi:10.1063/1.4952803
[17] M. Valléau et al. , “Development of Cryogenic Permanent
Magnet Undulators at SOLEIL,” Synchrotron Radiat.
News , ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M01.pdf | 4 |
334d0426-faaa-456a-a0fb-8063b5d7000f | HTS TECHNOLOGY DEVELOPMENT FOR ENERGY EFFICIENT
MAGNETS IN PSI LARGE RESEARCH FACILITIES
S. Sanfilippo†,1, B. Auchmann1, A. Brem1, C. Calzolaio1, M. Casci ello1,2, M. Duda1, Q. Gorit1,
G. Montenero1, J. Kosse1, D. Martins1, K. Puthran1, R. Riccioli1, D. Sotnikov1, C. Zoller1,
1PSI Center for Accelerator Science a... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
de9453cc-16ab-4d2e-adc2-2c85409be98c | facilities. At PSI, this transition is supported by comple-mentary initiatives: CHART, SMILE (Superconducting
Magnets to Improve Large Research Facilities Efficiency),
and the European project HTS4SRI. They enable the de-
velopment of High- Temperature Superconductor (HTS)
magnet technologies to improve performance... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
0c901f81-7536-4b40-9ed1-b2a993814712 | qualification of energy -efficient superconducting magnets
is now being established. The long- term strategy is to pro-
gressively install efficient HTS mag nets across PSI’s large
research facilities and supporting more sustainable accel-
erator technologies.
INTRODUCTION
Over the past decade, magnet technology ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
40f60da7-3ecf-4d2b-8ed5-1af9caf6a176 | as well as by PSI’s strong involvement in CHART (Swiss
Accelerator Research and Technology consortium) and in-
itiatives such as SMILE (Superconducting Magnets to Im-
prove the Efficiency of Large research Facilities) . This ar-
ticle presents the context and motivations behind the devel-opment, the key drivers ena... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
2fdee1e7-3461-4668-b2c9-db46da6ba710 | matter. Facilities such as the High Intensity of Proton Ac-
celerator Complex (HIPA), the Swiss Light Source
(SLS 2.0), and the two lines of the Free Electron Laser
(SwissFEL ) support fundamental research, materials sci-
ence, and medical applications including proton therapy.
These facilities are highly energ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
59f4bbfe-2d82-4176-a867-39f40e82a5ed | which increases energy consumption with conventional
technologies [5].
HTS T echnology for PSI Magnets
PSI magnet section has progressively developed exper-
tise in energy -efficient accelerator magnet technologies,
particularly through high -temperature superconducting
magnets. This evolution reflects a broader... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
880e637d-12d3-4b5f-876b-cc27e92fcc78 | † stephane.sanfilippo@psi.ch 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M02
MC7.T10: Superconducting Magnets 45: MC7: Accelerator Technology and Sustainability MOI7M02
Content from this work may be use... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 0 |
98460e1f-c7e5-43f7-8799-2b6454ebadde | Accelerator magnets must therefore combine high per-
formance and stable operation with reduced operating costs
and CO₂ footprint. This transition requires selecting the
most suitable material for each application. Permanent
magnets are well suited to low, f ixed-field, high -density,
low-radiation environments, su... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
abc709ed-88ea-4fda-8801-0197b3692dc7 | HTS magnets with respect to resistive and LTS ones .
Criterion Benefit Limitation
Field per-
formance High field in
compact designs Field quality is harder
to optimize with HTS
Compact-
ness Reduced magnet
size for a given
performance More complex me-
chanical integration
AC behav-
iour Suitable for de... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
3165537d-039d-42fd-b014-8fcfde8ba2e2 | conduction- cooling
design
Energy ef-
ficiency Lower electric-
ity consumption
than resistive
magnets Cryocoolers still con-
tribute to power use
CAPEX
(capital
cost) vs
OPEX (op-
erating
costs) Potential sav-
ings through re-
duced operation
costs HTS conductors and
associated systems
remain costly, w... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
deaa18c8-84a7-4012-8b20-4c8665a08a17 | work. The planetary boundaries concept introduced by Jo-
han Rockström [ 6] highlights that technologies, including
superconducting magnets, create upstream pressures
through raw -material extraction, water use, and manufac-
turing, while also delivering downstream benefits such as energy savings and societal value. ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
24cef2c1-df7b-4648-9556-cbc5330f0d08 | TECHNOLGY AT PSI
The adoption of superconducting technology is driven
by a dual objective: reducing operational energy consump-
tion while enhancing magnet performance and compact-
ness. This transition relies on three pillars: a long -term
strategy for PSI facilities in operation and upgrades, the de-velopment of ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
72620d4f-64b0-4bc7-9626-2784ab0503dc | plementation. Strong collaborations with CERN, research institutes, industry, and Park Innovaare [ 7] further support
technology transfer from R&D to real applications .
Long-term Strategy
The key elements of the use of HTS technology for
PSI efficient magnets include:
• reduction of electrical power consumption... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
b62c6a0e-d2d4-41d2-973c-d3a80ee9b869 | • development of helium -free magnet demonstrators op-
erating with subcooled nitrogen,
• integration of sustainability metrics, such as Life Cycle
Assessment, into magnet design,
These features are well suited to constrained and
evolving PSI beamlines, where radiation tolerance, opera-
tional flexibility, and... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 1 |
ad4b619d-68c5-488d-99f9-ae0b50515705 | replace high power -consuming resistive magnets in the
HIPA beamlines with HTS magnets. These solutions are
more compact, significantly more energy -efficient (with
energy savings per magnet ranging from ~238 to 725
MWh/year), and in some cases capable of op erating at
higher magnetic fields. Over a typical 20- ye... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
56f5730b-0443-46f0-b6cc-23ca70e890e1 | Energy
saved
(MWh/y) 481 238 725 267
PSI P rojects and R&D P rograms
The production of two NbTi superconducting superbend
dipoles for the second phase of the SLS 2.0 has been a ma-
jor catalyst for developing superconducting magnet exper-
tise at PSI [8]. These cryogen- free magnets are designed to
operate in ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
81bc4f5a-233a-4d97-b4d6-481fa7e368ad | ogy), a strategic PSI project currently underway, provides
a major opportunity to develop HTS magnet technologies
at PSI. As a major HIPA upgrade, IMPACT is structured
around two pillars: High -Intensity Muon Beamlines
(HIMB), aimed at in -creasing muon production for funda-
mental physics, and the Targeted Alpha ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
73cbb641-aa92-4060-a1b2-2b814f65c072 | HTS4SRI project (High Temperature Superconductors for
Sustainable Research Infrastructure), funded by the Euro-
pean Union under the HORIZON -INFRA -2025- 01-TECH -01 program, starting in September 2026 for four
years. HTS4SRI is bringing together PSI, CERN, GSI,
CEA, CIEMAT, U NI Milano , INFN, and Bruker . The ce... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
2d4c1302-319b-4f46-896d-087c989405c3 | synchrotron and a compact combined -function magnet for
CERN FCC- ee. These demonstrators will validate the
methodology in diverse operational environments, includ-
ing radiation exposure, the potential for more than 30% re-
duction in magnet -related electricity consumption com-
pared with conventional resistive tec... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
71df253a-a2c9-4061-92d6-7501c7d040c5 | sign, fabrication, and testing of demonstrator magnets, sup-
ported b y a complete value chain covering electro -mag-
netic and mechanical design, conductor and cable develop-
ment, coil fabrication, assembly, and testing. CHART has
also strengthened PSI’s superconducting magnet infra-
structure through the constructi... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
4cfc3985-31f0-49a7-b976-ef9c71de7ac7 | ciency of Large Research Facilities) is a PSI magnet sec-
tion initiative launched in 2025, focused on magnet tech-nology development related to the energy and environmen-
tal needs of PSI accelerators. Its objective is to stimulate
the development of supercond ucting magnet technologies
and associated systems by add... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
201730ad-6b7d-4517-aa3b-cb9a69e13dd8 | pact HTS magnets operating under variable magnetic fields
with change s of above 1 T/s. This work focuses also on the
development and study of low -losses HTS cables such as
CORC with the use striated tapes, including both experi-mental and numerical activities. 17th International Particle Accelerator Conference, ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 2 |
9da7c0e9-74a1-4120-85fe-a4333a6237d4 | Figure 2: Conceptual diagram of the SMILE framework integrating design, fabrication, and testing of superconducting
magnets for improved efficiency in large research facilities.
The third focuses on advanced cryogenics for efficient
magnet cooling. SMILE is currently partially funded : the
third pole has benefited ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 3 |
bcf0aec3-b98b-498c-964b-da2618639718 | Technological B uilding B locks and I nfrastruc-
ture for M agnet M anufacturing and T ests
The development of HTS conductors and cable architec-
tures is a key technological building block. Several direc-
tions are being pursued to cover a broad range of applica-
tions. Relevant directions include d coated tapes... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 3 |
fb2a0da1-e63b-4598-8465-f3474faaa4a3 | agement by the structure itself plays a central role, as the
electromagnetic loads are intercep ted directly by the me-
chanical support structure rather than being fully transmit-
ted to the superconducting conductor [4]. The Canted Co-
sine Theta geometry can be regarded as this conce pt
pushed to its limit: each ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 3 |
904f6745-ed57-464e-9e52-33362316cde7 | structure and support compact, modul ar magnet systems.
Two directions are pursued. First, one - or two -stage 4 K
GM cryocoolers, already used in several PSI magnets, can be combined with dual -inverter compressors such as the
E- 77A, operating at 6.5/7.5 kW at 50/60 Hz, to enable
faster cooldo wn, reduced- speed ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 3 |
89c00e1b-d801-4998-bae8-4cffef9691a9 | able HTS magnet systems . PSI’s laborator ies provide a
complete environment for HTS magnet development.
Since 2020, the MagDev laboratory has been progressively
developed with CHART support as a dedicated infrastruc-
ture for super -conducting magnet R&D at PSI. It covers the
full value chain of new ma gnet concep... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 3 |
99c158ed-090e-4c30-95f8-465f0ee26dda | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOI7M02
48 MC7.T10: Superconducting MagnetsMOI7M02 : MC7: Accelerator Technology and Sustainability
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the a... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 3 |
8efbdd69-057e-4220-8351-45c03c83d702 | Figure 3: Panoramic view of the MagDevlab dedicated to
the superconducting magnet technology development .
Superconducting magnets, with CHART acting as a cata-
lyst for expertise, infrastructure, and innovation.
A dedicated cryogenic test station for superconducting
conductors, coils, and magnets has also been de... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
0f201f43-d429-4562-8bd8-cf0c4747af06 | coils, including RRR, Tc, thermal conductivity, AC losses,
Pulsating Heat Pipes qualification and high -field testing of
HTS and LTS coils. Dedicated electronics provide temper-
ature contr ol, voltage measurements, and quench detection
using CERN’s uQDS system with customized detection al-
gorithms . Magnetic quali... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
a94500e2-d64c-40e2-a646-8f7102839b1f | ogies for future FCC -hh magnets, covering conductor con-
cepts, coil fabrication, field quality, AC losses, stress man-
agement by structure , and quench protection before scaling
toward high -field short models ab 3ove 14 T. Three demon-
strators, RS1, RS2, and RS3, are planned within MagDev phase 3. RS1 is a 4 T d... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
e914d99e-ebdb-4029-8ae1-9f71104656f2 | low-power, cost -effective nested HTS magnet system for
FCC -ee by replacing normal -conducting sextupole and
quadrupole magnets with compact superconducting vari-ants. Two CERN and PSI demonstrators explore comple-mentary appro aches: a canted -cosine -theta design based on
insulated HTS tapes, and a partially insu... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
c68beef5-4002-4a25-a595-5ec3b3067f19 | 250 A HTS system, compared with about 21 W for a con-
ventional room -temperature supply [18].
CHART MagDev activities also investigate the prom-
ising uses of non- insulated (NI) HTS technology as a route
toward compact, robust, high- field superconducting mag-
nets. This approach is applied to the PSI positron- p... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
89dade1e-4e2f-4078-b969-aee280a0da8d | corresponding to a magnetic field of about 10 T, before in-
stallation in the SwissFEL beamline in 2026. The perfor-mance limitations are now understood (mechanical failure
of the soldered Field’s metal bond between pancakes) and will be addressed during a second run in 2027.
Figure 4: Non -insulated HTS capture s... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
33c9e22f-59ee-4a26-9b96-49604171c722 | 230 MeV, fluxes up to ~2×10⁹ protons·s⁻¹·cm⁻² and possi-
ble measurements at room temperature or in liquid nitro-gen; the PROSCAN Gantry 1 proton -therapy facility, with
beams up to 230 MeV and doses larger than ~20 kGy per treatment and the SINQ neutron irradiation service, provid-ing characterized neutron spectra fo... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 4 |
bce54881-0032-4b06-99a7-70d7bf252d99 | temperature using the above -mentioned facilities, after
having been characterized in liquid nitrogen before irradi-
ation. For the Gantry 1 experiment, a total dose of approx-
imately 22.1 kGy was delivered within about 20 s, whereas
at the Proton Irradiation Facility (PIF) a dose of about 56 kGy was delivered over ... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
9f3fa49a-0be5-4941-a7a6-1da9ffca770a | warmed to room temperature before post -irradiation char-
acterization, partial recovery may have masked irradiation -
induced effects.
In parallel, an HTS magnet demonstrator
is being developed within SMILE to bridge material stud-
ies and real operating conditions. It consists of a dry-wound coil made of 190 turns... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
3f8c4af1-c510-4b4e-b463-65fd1a008084 | combined with modelling of radiation -induced damage in
HTS tapes with Politecnico di Torino, will support lifetime predictions for superconducting magnets in high- radiation
environments [20].
CONCLUSION
PSI is entering a transition where accelerator magnets
must combine performance with energy efficiency, susta... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
2c5aae91-dedc-4c2e-b910-5dada2931d5a | based on insulated and non- insulated HTS technologies
supports both high- field magnets and compact HTS mag-
nets operating around 1.5 –3 T, with high efficie ncy, radia-
tion environment and operation above 20 K . These activi-
ties establish HTS as a
realistic pathway toward sustaina-
ble magnets for current and f... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
3b04d349-8a40-4557-b8c2-bbed2d834f0d | mentations for advanced light sources”, in Proc. IP AC'25 ,
Taipei, Taiwan, Jun. 2025, pp. 42- 47.
doi:10.18429/JACoW- IPAC2025- MOZN1
[4] D. Araujo et al, “Electromechanical Design of Nb3Sn
Stress Managed Asymmetric Common -Coils”, IEEE Trans.
Appl. Supercond. , vol. 35, no. 5, p. 4002205, 2025.
doi:10.1109... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
5739988f-9e8a-4298-85b3-994593a4a302 | dinal Gradient Bend Magnet for the SLS Upgrade”, IEEE
Trans. Appl. Supercond. , vol. 27, no. 4, p. 4000305, 2017.
doi:10.1109/TASC.2016.2632103
[9] CHART (Swiss Accelerator Research and Technology),
https://chart.ch
[10] F. Grilli and A. Kairo , “How filaments can reduce AC
losses in HTS coated conductors: a r... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
fb88e230-ad06-483a-a0cd-ba5d9187c0c2 | Canted -Cosine -Theta (CCT) magnet program”, IEEE
Trans. Appl. Supercond., vol. 28, no. 3, p. 4002805, 2018.
doi:10.1109/TASC.2017.2787596
[14] Sumitomo Heavy Industries, Ltd.,
https://www.shi.co.jp/english/products/mechatron-ics/cold/index.html.
[15] Q. Gorit et al ., "Application of neon pulsating heat pipe... | D:\Daily_ihep\Conferences\IPAC2026\MOI\MOI7M02.pdf | 5 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.