id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
57fc4ebf-0152-4730-817d-9212b8129448 | Beam Screen
Alumina Chamber BusbarFerrite
GFRFigure 3: Quarter-Symmetric 2D ‘quasi-parallel’ kicker
model.
02Y [mm]Time: 2us Time: 50us
0 10 20 30
X [mm]02Y [mm]Time: 100us
0 10 20 30
X [mm]Time: 300us
-0.49 -0.27 -0.06 0.16
Deviation of By [%]Magnetic Field Distribution on Chamber
Figure 4: Field homogeneity with the ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 2 |
f0dcc932-9322-45af-b4a0-afde5a962048 | the flattop and improves as the pulse progresses.
Aconductivebeamchambercoatingisforeseentomin-
imisebeamcouplingimpedanceandreducebeam-induced
heating. However, eddy currents induced in this coating
willpartiallyshieldthefast-risingmagneticfield,negatively
impacting both the field rise time and homogeneity. Con-
seque... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 2 |
388e890c-ae7e-44de-aada-f38333078c4f | quirements,asalongermodulepossessesalargerinductance.
Therefore,achainofmultipleidenticalmagnetmodulesisforeseen for each system. These fundamental dependencies
are described by Eqs. ( 2)–(5).
𝐵𝜌 ≈ 3.3356⋅𝐸( GeV)(2)𝜃def=∫𝐵𝑑𝑙
𝐵𝜌(3)
𝐿kicker≈ 𝜇0⋅𝐻ap
𝑉ap⋅𝑙(4)𝑡rise≈ 5⋅𝐿kicker
𝑍system(5)
Equations (2)and(3)d... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 2 |
4386b1fc-4ef2-46e2-8991-7d82089349d1 | the necessary magnet current.
Assuminganinitialbaselinesystemimpedanceof 10Ω,
Table2summarisestheexpectedminimalnumberofmag-
netsforeachFCC-eekickersystem. Tofacilitateastraightfor-
ward pulse generator design and reliable magnet insulation
forout-of-vacuumoperation,thedrivingvoltageandnom-
inal current were limited to... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 2 |
32327ee7-a990-4a72-89d7-a679b2092e7f | Table 2: Summary of SystemParameters
System Expected
Field[mT]Max. Magnet
Length[m]Min. No.
of Magnets
Booster Extraction 41.89 0.347 9
Collider Injection 41.89 0.347 4
Collider Dump 41.89 0.347 17
Booster Dump 41.89 0.347 17
CONCLUSION
A common lumped-inductance kicker magnet module
design has been proposed to serve m... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 2 |
791468c5-67a6-429b-adbe-52b3f8a68eb7 | so far, future work will focus on 3D electromagnetic model-
ling, beam coupling impedance studies, including the beam
chambercoating,pulsegeneratordesign,andfinalsystem
impedance optimisation.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 d... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 2 |
65f01506-ff45-4539-81e7-eb5bb86087d7 | REFERENCES
[1]P. Janot and C. Grojean, ‘FCC: the physics case’, CERN
Courier, vol. 64, no. 2, pp. 21–24, Mar. 2024. https : / /
cerncourier.com/a/fcc-the-physics-case/
[2]M. Barnes, ‘Kicker systems’, CERN Yellow Rep. School Proc. ,
vol. 5, p. 229, 2018.
doi:1/zero.alt4.2373/zero.alt4/CYRSP-2/zero.alt418-/zero.alt4/zero... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 3 |
51dcc720-cdf6-449e-87c6-628e33aff85d | 338. doi:1/zero.alt4.1/zero.alt4/zero.alt42/9783527839599.ch817th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7129
MC7.T16: Pulsed Technology (magnet and power supplies) 837Monday: Poster session MOP7129
Conten... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf | 3 |
88258465-7f8b-4bf1-94a2-9ff205ec9a50 | HIGH- VOLTAGE COILS OPTIMIZATION FOR THE LHC BEAM DUMP
DILUTOR KICKER MAGNETS
V. Namora†, Ch. Bracco, L. Ducimetière, G. Favia, S. Huon, V . Senaj
European Organization for Nuclear Research (CERN ), Geneva, Switzerland
Abstract
Two sets of 6 fast -pulsed vertical and two sets of 4 fast -
pulsed horizontal ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 0 |
f0625c6e-a006-4f44-a428-13b110212c03 | citation coils, which are immersed in the accelerator vac-
uum. As part of a consolidation program, high- voltage in-
sulated coil spares will be manufactured. The coils are
composed of conductor bars of quasi -rectang ular cross -
section, junction pieces, and conductor contact pieces. The coils are completely insul... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 0 |
e28fa6c4-fb5b-49aa-bee5-5e39bd7204b1 | perform a safe beam dump the dilution kicker magnets
sweep the beam , in a spiral pattern (see Fig. 1), reduc ing
the peak energy density and avoiding damag e to the dump
block [1].
Figure 1: Diluted beam sweep on the dump block.
Blue: nominal particles, red: particles in filled abort gap . To perf... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 0 |
25beee4f-dd1c-4bcc-bbda-a903252bfcb1 | circulating beam line and installed in vacuum tanks ,
typically at a pressure of ~10-8 mbar. Dilution kicker
magnets parameters are show in Table 1.
Table 1: Dilution Kicker Magnets Parameters
MKBV MKBH
Number of magnets per system 6 4
Number of magnets per tank 2 2
Maximum Deflection angle per system... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 0 |
77678d99-9af3-409c-b388-9ce57cf92f5b | steel yoke with a two -turn excitation winding. The yoke is
composed of tape -wound cores made from 50 µm thick Si -
steel, into which a gap is cut, as shown in Fig . 2.
Figure 2: Cross- section of the MKBV magnet.
Three cores are moulded using a charged epoxy into a
unit which form a triple pack.
During the ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 0 |
ddff408d-8481-4d48-b732-029aa6dfc0cc | The two -turn coil comprises four copper bars of quasi -
rectangular cross section, three junction pieces and two
conductor contact pieces , as show in Fig . 3. The coil is
completely insulated with a minimum insulation thickness
of 1.5 mm. On the straight section of the coil , each pair of
conductors have a fur... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 1 |
dab400e3-c457-45b2-ae76-32220e3cd767 | are individually brazed.
The coil insulation system is threefold. First, each indi-
vidual straight conductor is insulated using pre -impreg-
nated tape and hot pressed to calibrated dimensions. Two
such conductors are then assembled and further over -insu-
lated with pre -impregnated mica tape, using the hot -pre... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 1 |
3265c4ec-8b93-4460-a311-cb7697126bee | half. Test voltages of the coil before the moulding of the
contact pieces are 13 kV rms between the inter -turn and
26 kV rms for the assembled coil to ground (graphite coat-
ing), 50 Hz for 5 minute s, 1.5 times the design voltage and
2.7 times the operational voltage .
The completed coil is then subjected to ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 1 |
5c0bbfd8-11b8-462e-a974-b5b0b5b9b617 | mirror current, leading to a doubling of the effective driv-
ing current . This pattern is fully anti- symmetric between
the upper and lower conductor groups, consistent with the
opposing current directions required to generate the m ag-
netic deflecting field in the MKBV magnet. Simulation re-
sults of this effec... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 1 |
18b10373-5b75-418b-8dd8-615f4b36595a | MKBH KICKER MAGNET COIL
The MKB H is a window -frame magnet that consist of a
steel yoke with a one -turn excitation winding. The yoke is
composed of tape -wound cores of 50 µm thick Si- steel,
into which a gap is cut. T wo cores are moulded using a
charged epoxy into a unit which form a twin pack (Fig. 6) .
D... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 2 |
c3ace506-08d2-467e-bd75-e7ea033f7d4f | layer.
Figure 7: MKBH High- V oltage coil schematic.
MKBH COIL FABRICATION PROCESS
The conductors of the high- voltage coils are manufac-
tured from highly conductive electrolytic copper (OFE),
cold-rolled to a half -hard condition, with a chemical composition of Cu ≥ 99.99 % and O₂ ≤ 5 ppm. The j unction
pi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 2 |
c81448e2-329c-4905-ae08-ae29632103f1 | The completed coil is then subjected to a high- voltage
test, between the conductor and the semi -conductive coat-
ing, at 22 kV rms, 50 Hz for 5 minutes.
PERFORMANCE OUTCOMES
Since its installation in 2008 , five flashovers were iden-
tified in the dilution kickers with the most significant one,
on July 14, 2... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 2 |
3db889dd-cb09-42cb-a90d-4c51e48374e1 | voltage test ratio of the coils is below the EN50209 recom-
mendation, years of operation of the MKBH demonstrates
their robustness. Nevertheless, these coils are very critical
components and, in case of an electrical breakdown in solid
insulation , they must be replaced, leading to a long repair
duration. During ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 2 |
9fca8476-275b-48c5-a7eb-44b022131364 | along with inter -turn tests at 13 kV rms, confirm sufficient
insulation margins.
Regarding insulation, both techniques yield excellent re-
sults. The selection of which will be applied for the fabri-
cation of the new coils will ultimately be industry -driven,
with dimensional compatibility as the only constraint.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 2 |
2bcecc23-0be4-46ff-8eac-3bee65df3d24 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7130
840 MC7.T16: Pulsed Technology (magnet and power supplies)MOP7130 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the autho... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 2 |
a048f483-418d-47d8-9a3f-0244455f426d | [2] E. B. V ossenberg et al, "A high current sinusoidal pulse gen-
erator for the diluter magnets of the LHC beam dump sys-
tem", in Conference Record of the 2000 Twenty -fourth Inter-
national Power Modulator Symposium , Norfolk, V A, USA,
2000, pp. 175 -178, doi: 10.1109/MODSYM.2000.896193 [3] A. M. Loebner et al.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf | 3 |
5180af00-cd8e-42d3-b876-bc8adbc3b16b | DESIGN AND OPERATION OF SLS2 THIN SEPTUM
S. Dordevic†, M. Paraliev , M. Aiba
PSI Center for Accelerator Science and Enginee ring, Villigen , Switzerland
Abstract
In the SLS2.0 upgrade project at the Paul Scherrer Insti-
tute (PSI) the injector complex remained mostly un-
changed, but we had to design three new s... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 0 |
6718b70f-1bd6-438a-a036-3a18f0ccb60e | the main field.
To power the thin septum, we designed a pulse generator
based on a two-stage fast thyristors switch and a matrix ca-
pacitor. The latter was built using multiple commercially
available ceramic SMD capacitors to avoid the risk of cat-
astrophic failure of the oil filled foil capacitors. We suc-
ce... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 0 |
5a818a51-43d5-4d55-8155-bc0e98a0187f | serting the injected beam very close (~3 mm) to the stored
beam. Powder cores are chosen for the magnetic circuit to
cover the frequency and the fie ld strength requirements.
Septum should provide the required field and at the same
time extremely low leakage field to limit stored beam dis-
turbance . 3D electro... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 0 |
b4ec092b-f391-40ba-bd46-5902b11b4bb9 | used, fine meshing was necessary to provide reliable re-
sults. Local meshing gives the m inimal number of mesh
cells for geometry with thin layers . Tetrahedral mesh for
the septum model is based on usage of different local mesh-
ing (Fig. 2, top right ).
Figure 2: 3D CST® model and cross -section of a “sa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 0 |
32206786-b78e-402d-8271-42eb0da83eeb | the result, but further increase (using smaller mesh size)
has negligible influence .
For practical excitation pulse (sin wave with T=12. 5 μs)
one mm of co pper does not provide the required screening
(Fig. 3, top plot) . No other engineering material (at room
temperature) could provide significantly larger ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 0 |
86eab9cd-2147-40d3-8550-7c1efd562914 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7131
842 MC7.T16: Pulsed Technology (magnet and power supplies)MOP7131 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the autho... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 0 |
ec6d16d1-ef49-468d-bdb0-efa20d6fc6ea | depends on material conductivity (σ) and permeability (μ).
Using high- µ soft magnetic material [4] we can provide
better screening than copper in the frequency range where
it has significantly large relative permeability , despite of its
lower conductivity. That was the reason to investigate us-
ing a “sandwich... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 1 |
5da675db-fd37-4e3d-b3c5-60baf33529f9 | credibility of the simulation results depends a lot on the
correct material model. Choosing the proper model param-
eters for high -μ soft magnetic materials proved to be diffi-
cult since this information is usually not readily available.
Figure 3: Excitation , main field and l eakage field for dif-
ferent “sand... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 1 |
37ae2add-fd9b-491c-9028-89b1f40d0ed8 | erational , optical trigger link driver decodes the local trig -
ger pulse and the remote one , which return ed from the op-
tical receiver .
Figure 4: Thin septum pulser .
Figure 5: Optical trigger link driver , optical trigger splitter
and solid state switch prototype .
Figure 6: Oil impregnated f oil ca... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 1 |
c29795a8-5041-4770-9afa-e3cfe98b0951 | was built, based on multiple commercially available ce-
ramic SMD capacitors (Fig. 6).
LEAKAGE FIELD MEASUREMENT
Measurement of l eakage field in range of unity μ T is
very difficult . To gain confidence in the results, t wo meas-
urement methods were used (Fig. 7):
• Induction coi l
• Large bandwidth magneto... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 1 |
82582867-cfe7-483e-970f-625d27030789 | Figure 8: Simulation and measurement results for two
“sandwich” configurations (1 mm copper, and copper +
soft magnetic material): e xcitation pulse and main field
(top plot s) and leakage field (bottom plots) .
In Fig. 8 top plot shows thin septum excitation pulse of
3 kA amplitude , that is required to gener... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 2 |
68d0d054-e75b-4ab2-b81d-6d50b26f89ab | ence the main field. We con firmed that such configuration
(copper + μ -metal) can provide better screening perfor-
mance compared to a copper septum with the same thick-
ness, and two layers configuration (0.6 mm thick copper
and 0.35 mm thick μ -metal layers [8]) was adopted.
OPERATION
Figure 9 shows thin sep... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 2 |
c2f36d95-9ada-4b19-9eb6-4d8bfa528783 | Figure 11: Normalized thin septum disturbance (beam
sigma) , orange – on the bump ed orbit (bump kicker contri-
bution subtracted) and blue - on axis ( bump kicker off).
by turn (Fig. 11). Equivalent field disturbance is evaluated
as the magnetic field integral to cause the residual beam
disturbance in one tu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 2 |
b695b286-2933-43af-8656-e13cc3fbbfcb | lows us to surpass performance of traditional copper septa .
In this way we achieved very good screening of the main
field and managed to limit stored beam disturbance . De-
spite the measured equivalent disturbance slightly exceeds
the set target (10% vs. 15% of the beam sigma ), the thin
septum performs fully s... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 2 |
8d7dbec0-dcfd-4fab-a742-1bf1da00464d | REFERENCES
[1] H.-H. Braun et al ., “SLS 2.0 Storage Ring Technical Design
Report”, P aul Scherrer Institut, Villigen, Switzerland,
Rep. 21-02, Nov. 2021 .
[2] R. Ganter et al., "SLS 2.0 storage ring upgrade overview ", in
Proc. IP AC'23 , Venice, Italy, May 2023, pp. 1019- 1022.
doi:10.18429/JACoW- IPAC202... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 3 |
d924b4e4-4392-436a-9cd8-27f3bd352a6b | p. 164904 , 2021 . doi:10.1016/j.nima.2020.164904
[8] https://www.detakta.de17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7131
MC7.T16: Pulsed Technology (magnet and power supplies) 845Monday: Poster session... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf | 3 |
45792d6c-d1c1-43bc-93db-c16bdc37f502 | EVALUATION OF ERROR PROPAGATION IN THE FIRST-ORDER
GEODETIC NETWORK OF THE FCC TUNNEL
USING TOPOGRAPHICAL TECHNIQUES
V. Gerligand1, D. Mergelkuhl, L. Watrelot, CERN, Geneva, Switzerland
S. Durand, Laboratoire Géomatique et Foncier, Cnam, Le Mans, France
1also at Laboratoire Géomatique et Foncier, Cnam, Le Mans, France
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
271474c1-02ff-435b-801f-0c622d5430d3 | networktransferredfrom surfacereferencesmustbeestab-
lished along the entire tunnel. This network should provide
thebasisfortracing,installationandabsolutealignmentof
components prior to the relative alignment phase.
A dedicated simulation tool has been developed to model
the FCC-ee tunnel, including shafts and bypasse... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
5f81a6c5-3804-419e-a890-c8066b18b4b8 | around150μmforcertain components to be aligned in arc
sections [ 1]. To achieve these requirements, a First-Order
Geodetic Network must be installed and measured along
the entire tunnel to provide the reference forinstallationand
absolutealignmentofcomponents,priortotherelativealign-
mentphase. BasedonLHCabsolutealignm... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
f1e83fdd-b5b5-4dcb-8d41-6401d1392978 | propagation along the tunnel a critical issue that needs to be
studied. Thispaperpresentsapreanalysis-basedapproach
toevaluateerrorpropagationandassesswhetherthealign-
ment tolerances can be achieved using polar, gyroscopic,
and leveling measurements.REALISTIC FCC GEOMETRY MODEL
Beforesimulationscanbeperformed,acomplet... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
bc1f518f-5f5a-4bba-a2fb-40c137cb13ab | software tool has been developed, to create a geometry as
realisticaspossiblewithrespecttotheexpectedfinaldesign
of the machine infrastructure. It uses two different inputs:
the integration design derived from CAD models and the
optics design obtained from MAD-X files. From the inte-
grationdata,two-dimensionalcrosssec... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
063afef2-9174-45ea-8002-de6ba4c64c5a | cross sections, with the two dimensions describing a top
view rather than a transverse profile. These elements can
then be inserted and positioned at their nominal locations
by the software user.
Figure 1: Generated FCC infrastructure.
Whiledevelopedandemployedtomodelafinelydetailed
FCC geometry with the most up-to-dat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
a59a882b-e68b-403f-ad54-7bf9ec050132 | Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publisher, and DOI.
This is a preprint - the final version is published with IOP | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 0 |
9bf21b23-b6f8-4fd5-8e2b-c149ee232514 | FIRST-ORDER GEODETIC NETWORK
OncetheFCCgeometryisdefined,thenextstepisthees-
tablishmentoftheFirst-OrderGeodeticNetworkthroughout
thetunnel,correspondingtothedefinitionofnetworkpoints
and observations. In practice, the network originates at the
surface, based on the Primary Surface Geodetic Network
andthegeoiddetermina... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
9d359a2b-66e1-467b-acf5-61e42a594610 | to link specific areas, suchas shafts, to the main tunnel net-
work. Pointsin the main tunnel networkare then generated
byplacingthemonatunnelcrossprofiletypeandreplicating
thislayoutalongthetunnelaxisatuser-specifiedintervals
of x meters. Finally, the user can automatically define polar,
leveling, and gyroscopic obser... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
d498c271-b2bb-40aa-b00a-f8a20e554949 | Allpointsandobservationscanbeextractedfromthesoft-
ware as input for the Logiciel Général de Compensation
(LGC),aCERNin-houseopen-sourcecompensationsoft-
ware able to run least-squares-based simulations [ 7]. These
preanalyses yield 3D covariance matrices of the network
points, from which point uncertainties can be ext... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
76fd511e-df4b-49b0-bd0b-8bf3f620bf3d | ties,aswellasthoseforlevelling,arederivedfromempirical
studiesconductedatCERN[ 8]andCERNalignmentteam
experience. Gyroscopic uncertainties are taken from [ 9],
while those for the laser tracker inclinometer used for in-
strument verticalization come from [ 10]. Furthermore, it is
importanttonotethat,whiletherelativegeo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
1d44c93f-a0fa-4216-8cca-8582a876b2df | as atmospheric refraction. The primary focus is to under-
stand the propagation of random errors within such network
geometries.
SIMULATIONS AND RESULTS
Since the simulation frame is purely theoretical, the co-
variance matrix provided by LGC has been transformed,
using the 2-dimensional rotation matrix, to get longitu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
72f1484c-5669-4e74-ae11-4f70f0bb9f05 | resulting network point uncertainties are shown in Fig. 2as
a functionof the cumulativedistance. This baseline simu-
lation shows a similar error behavior along the FCC arcs.
However, a pronounced error increase is observed around
point F due to the 800mlong transfer between the access
shaftandtheFCCtunnel. Anotherincr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
a0210b64-bb3f-4940-a8a1-eb22b32002fd | function of the tunnel longitudinal dimension, along the
radial (red) and longitudinal (blue) axis.
curvature. Theuncertaintyalongtheverticalaxis,notshown
here for scaling reasons, is addressed later in the paper.
Toassesspotentialimprovementsofthenetwork,thebase-
line simulation was repeated with modified parameters t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 1 |
7b13202b-52ed-4c55-803d-04815ba79c9c | evaluatetheir impact on the overallerror propagation. The
sameconfigurationwasthussimulatedwithpointprofiles
and stations spaced every 10m(case a), 8-point profiles
(case b), and an increased measurement range of 90m, cor-
responding to observations of five profiles per side (case
c). The results shown in Table 2indica... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
38ed2082-4577-427e-b11d-d347b2912cdb | thepolarinstrument. However,empiricalstudiesreported
in[8]showthat,forlasertrackerlinesofsightlongerthan
55m, the impact of systematic errors arising from atmo-
spheric refraction on vertical angle measurements should
be considered. Further investigations are therefore required
to assess the impact of this effect and t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
8ab334d8-51a4-40f5-89b9-de8a6c17b64e | so far been deliberately omitted: gyroscopic observations.
Theircontributionisthereforeinvestigatedbyre-runningthe
baselinesimulationwiththeadditionofgyroscopemeasure-
ments. For simulation purposes, gyroscope observations
were assigned to existing polar station points. In practice,
gyroscopes are mounted on theodolite... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
c2980d9c-8eae-42d4-aed8-2c29ecd65c53 | nario. Considering that a single azimuth observation re-
quires approximately 8 to 10 minutes and must be repeated
2 to 3 times for control, this would correspond to more than
360 hours of pure measurement time. In addition, gyro-
scopesarefragileinstrumentandneedtobeoftencalibrated
andcontrolled. This represents asubs... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
c8eac7eb-94b3-4853-bff1-5b1f6cff5335 | instruments. Forthesamereasons,closed-looplevelingsim-
ulations show similar uncertainties, also remaining below
0.8mm. To evaluate the impact of realistic verticalization
imperfections,additionalsimulationsincludinginclinometer
measurements of instruments roll and pitch were performed.
Thesesimulations,whichincludeave... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
19044fa1-6501-4655-b5ef-72187cae9988 | arisingfromverticaldeflectionandgeoidmodelimperfec-
tions cannot be neglected and still need to be assessed.
CONCLUSION
Asoftwaretoolhasbeendevelopedtogenerateandtunere-
alisticFCCnetworksimulations. Thesimulationstudyhigh-
lights the key parameters affecting the first-order FCC-ee
tunnelnetwork. Whilethemaximumuncerta... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
4b6a6fd6-b3f8-4421-af98-59441d01415f | suggestthatcombininggyroscope observationswithan in-
creasedlasertrackerrangeandhighernetworkdensitycould
reducetheradialerrorbelowthe 5mmtolerancestargeted
here.
Future work will focus on estimating dominant system-
atic effects, including geoid model imperfections and atmo-
sphericrefraction,toprovideamorerealisticer... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
dd6e6294-ce04-4a6e-b944-19067d2f5059 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7132
848 MC7.T17: Technology: Alignment and SurveyMOP7132 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title o... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 2 |
4bbd6bc6-dfa0-4b56-b54d-ec55b86b4ac8 | vol. 19, no. 02, T02006, 2024.
doi:1/zero.alt4.1/zero.alt488/1748-/zero.alt4221/19//zero.alt42/T/zero.alt42/zero.alt4/zero.alt46
[2]D.Martin,“Reviewofacceleratoralignment”,in Proceedings
of the FIG Congress , Sydney, Australia, Apr. 2010.
[3]B. Weyer and H. S. Konan, “Towards centimetric geoid over
the FCC area: applic... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 3 |
41ddb8bc-6ff2-4c42-b019-b06cbe803ae0 | tunnel”, Institute of Geodesy and Photogrammetry, ETH
Zurich,Zurich,Switzerland,Rep.FCC-GeodesyIGP-AA-2.3,
2025.[6]J.-F. Fuchs, J. -F. Segers, and C. Vendeuvre, “Development
of a new levelling process integrated into a 3D global calcu-
lation”, in Proc. IWAA’24 , Menlo Park, CA, USA, Oct. 2024.
https://cds.cern.ch/reco... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 3 |
b485e6e4-46b2-4bce-9c75-def565f94946 | Essen, Germany, 2024.
[10]NIVEL230forAbsoluteTrackerUser ,LeicaGeosystemsAG,
Heerbrugg, Switzerland, 2008.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7132
MC7.T17: Technology: Alignment and Survey 849Monda... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf | 3 |
a807c59a-23ed-454e-b75c-2227f7f94d5b | DESIGNANDDEVELOPMENTOFTHENEWISOLDEBEAMDUMPSAT
CERN
I. Z. Johansen∗, E. Grenier-Boley†, A. P. Bernardes‡, I. R. Boff, T. F. Calvet, C. Cipriani,
T. Coiffet, L. S. Esposito, M. A. Fraser, P.R. Menachilis, J.D.J. Pegg, A. Perillo Marcone, F. Pozzi,
S. Sgobba, M. Simoes, M. Timmins, A.N. Osthus, M. Calviani, CERN, Geneva, ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 0 |
bfb64ce1-a217-470e-b441-d5d092853b04 | thecuprouscorebymeansofHotIsostaticPressing(HIP).
Thecladdedblocksareenclosedwithina316LNstainless
steel vessel, which allows the use of pressurised water to
cool the dump.
Extensive Monte Carlo and thermomechanical studies
wereconducted to evaluatetemperature and stressdistribu-
tionsundernominalandaccidentalbeamcondi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 0 |
842fd80e-f238-490c-97a9-a78725e1a654 | Sustainability(IBDRS)projectaimstofacilitatetheincrease
of beam power ( 2.8kWto13kW) at ISOLDE whilst mit-
igating existing concerns for radiation protection, with an
improved life-cycle management [ 2,3]. This is done by
replacing the current beam dumps and increasing the sur-
rounding shielding during CERN’s Long Shu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 0 |
cc496e8b-a7eb-402e-b475-b304f7eddc2a | †edouard.grenier-boley@cern.ch
‡ana-paula.bernardes@cern.chFacility
Figure1depicts the overview of the two beam dumps for
the General Purpose Separator (GPS), and the High Resolu-
tion Separator (HRS), in the post-LS3 configuration. The
beamissuppliedbytheProtonSynchrotronBooster(PSB)
throughthePSB-to-ISOLDE(BTY)transf... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 0 |
cd84b433-faf1-4eb8-9960-fb8e0859b5f5 | of variables thicknesses, where the deposited energy den-
sityishighest,followedbyapurecopperblock. Thecross
section of the blocks is 420 ×420 mm2to sufficiently absorb
the beam within its ”stay-clear” region (+/- 135mm), with
margin for initial alignment in the difficult to access area
and no realignment until the end... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 0 |
fd45ceef-3e92-41a3-a1ea-d53a7df58ad0 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7135
850 MC7.T20: Technology: Targetry and DumpsMOP7135 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 0 |
2568fd75-38c7-4798-8b5d-0459751282e7 | ductility. The thickness is chosen to satisfy structural re-
quirements [ 7] while limiting beam energy deposition.
Demineralised water is delivered to the dump at 5barg,
a safe operating pressure for the vessel that accounts for
the pressure drops in the cooling circuit and increases the
boilingpointofthewater. Thebea... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 1 |
66fe1495-c369-4642-a9e5-fa0c7df600e5 | bond dissimilar metals together by means of inter-diffusion
[8,9]. In this application, the CuCr1Zr plates and the Cu
block are encapsulated by 1mmthick 316LN. This material
wasselectedasitisahigh-strength,corrosionanderosion
resistantmaterial,withsimilarCoefficientofThermalEx-
pansion (CTE) to Cu, to avoid high residu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 1 |
f81018e0-d906-46a2-9035-180d50b28176 | ISOLDEconsumesmorethanhalfofallprotonsproduced
at CERN [ 10]. Due to the nature of the facility, a variety
of operational scenarios are possible. Two scenarios are
chosenasrepresentativestodesignanddimensionthedump:
nominal, and accidental; both reflect the maximum opera-
tionatISOLDE,withbeamparametersasshowninTable
1... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 1 |
60b20882-c6a9-425e-b763-898c6bfdee01 | Table1: Beamparametersfornominalandaccidentalsce-
narios [12]
Parameter Nominal Accidental
Beam momentum 2GeV/ 𝑐
Beam intensity 1×1014protons per pulse
Average beam intensity 6µA
Beam sigma 32.7 mm 6.2mm
Beam pulse length 1906ns
Max. consecutivepulses 8
Min. pulse-to-pulse period 1.2s
Min. period inc. 8 consecutivepul... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 1 |
4e5e850f-5e32-4411-b53f-22bb9cd2ff97 | tensilestressesareobservedintheouteredgesandcladding.
Despite higher energy deposition in the absorbers,
the highest temperature (120∘C) and von-Mises stresses
(190MPa) is expected at the front endcap of the tank, as
seen in Fig. 4. This is due to the fact that only one side is
cooled and subjected to internal pressure... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 1 |
f8521731-afae-4cd5-a1e1-4a76c4df36ae | Withabeampulselengthofjustunder 2µs,dynamiceffects
areexpected. AsseeninFig. 5,thevon-Misesstressesare
close to an order of magnitude higher in accidental scenario
than those in the nominal operation. The dynamic response17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 1 |
f7f6b64b-6ba9-4fbf-9993-bd30bf0c9803 | Figure4: Maximumtransientbeam-inducedtemperatures
and von-Mises stresses of the beam dump during failure
scenario.
showsbriefstressoscillations,butthemaximumstressre-
mains below the initial peak, and well below the material
yieldatelevatedtemperatures[ 15–17]. Betweenthebeam
cycles,theplatesreturntotheirsteady-statebe... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 2 |
c1aab052-b40a-4d06-ac07-a2a75edb3179 | claddingwasrequired,but 0.5mm316LNsheetswerenot
readily available. Accordingly, one prototype was tested by
machining 1mmplatesdownto 0.5mmbeforeHIP,while
theotherexploredmachiningthecladdingafterHIP.Further
analysisallowedtoconclude thatthe claddingthicknessof
1mm will be used forthe production of the beam dumps.To re... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 2 |
d10f1c11-be96-47fa-bb36-264d40475b9e | 5 Slow cooling in air Cooling to room temperature Notconstrained
Ultrasonictestingbyimmersionshowednobondingde-
fectsinanyofthethreeprototypes[ 19]. Measuringofresid-
ual stresses shows equibiaxial compressive residual stresses
in the cladding [ 20]. The 316LN prototypes show signifi-
cantlylessresidualstress( 200MPa)c... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 2 |
038b379f-2211-4680-8fc2-dac4d9eb4994 | efficientheatextraction,enhancingthermalperformanceand
long-term operability. Cladding with 316LN addresses ero-
sionandcorrosionconcerns,improvinglong-termstructural
integrity. Thermomechanicalanalysesindicatereliableoper-
ationwithintheexpectedoperationalscenarios. Prototyping
activitieshavedemonstratedthefeasibility... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 2 |
baae4ada-339c-46d4-8ef9-83a801c7a326 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7135
852 MC7.T20: Technology: Targetry and DumpsMOP7135 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 2 |
689f0286-a5d5-40d3-aa5e-c498b605ef02 | energy”, in Proc.IPAC’24 , Nashville, TN,USA,May2024,
pp. 3552-3555.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-THPR28
[3]A-P. Bernardes et al., ”IBDRS Summary Report”, CERN,
Geneva, Switzerland, Rep. EDMS#2875087, Apr. 2023.
[4]R. Catherall, ”Isolde and n_TOF consolidation”, in Proc.
Chamonix2014: LHCPerformanceWor... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 3 |
8d40795e-c3ef-4b9e-806a-c96e69460a28 | doi:1/zero.alt4.517/zero.alt4/CERN-1968-/zero.alt4/zero.alt42
[7]Unfired pressure vessels , EN 13445, 2021.
[8]S. Pianese et al., ”Hot isostatic pressing assisted diffusion
bondingforapplicationto theSuper ProtonSynchrotronin-
ternalbeamdumpatCERN”, Phys.Rev.Accel.Beams ,vol
24, p. 043001, Apr. 2021.
doi:1/zero.alt4.11... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 3 |
9f28d1f6-ca9f-44d1-bc24-7e4806a4e348 | PerformanceWorkshop,CERN,Geneva,Switzerland,Dec.
2022.[11]A. Gottberg, ”Target materials for exotic ISOL beams”, Nucl.
Instrum. Methods Phys. Res. B , vol. 376, pp. 8-15, Jun. 2016.
doi:1/zero.alt4.1/zero.alt416/j.nimb.2/zero.alt416./zero.alt41./zero.alt42/zero.alt4
[12]M. Fraser et al., ”ISOLDE beam dump upgrade”, CER... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 3 |
fc955892-7095-4a11-802a-0d146123add2 | Switzerland, Rep. EDMS#1771731, Mar. 2017.
[16]K.Zhang etal.,”Developmentofthematerialpropertyhand-
book and database of CuCrZr”, Fusion Eng. Des. , vol 144,
pp.148-153, Jul. 2019.
doi:1/zero.alt4.1/zero.alt416/j.fusengdes.2/zero.alt419./zero.alt44./zero.alt494
[17]Y. Xiong et al., ”Tensile Deformation Temperature Impa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 3 |
456a57a0-0e28-4bc7-904b-28a176cf9785 | on Orbital Welds”, CERN, Geneva, Switzerland, Rep.
EDMS#3353256.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7135
MC7.T20: Technology: Targetry and Dumps 853Monday: Poster session MOP7135
Content from this ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf | 3 |
90bb65fe-fe1b-4673-835b-e82c62e2cf88 | UPGRADE OF THE SPS TARGET EXTERNAL DUMP FOR HIGH
INTENSITY OPERATION IN CERN’S NORTH AREA
P. R. Menachilis †, N. Solieri, A. L. Lund, D. Grenier, M . Calviani, T. Coiffet, L.S. Esposito, M.
A. Fraser, G. Garlaschelli, J -L. Grenard, A. P. Marcone, G. Mazzola, T. Parmentier, B. Pittet, F.
Sanda, C. Sharp, M. Timm... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
45eeba11-677f-4fbb-afa5-bce4774f05e3 | steady -state power generated by the slow extraction of 400
GeV/c protons from the SPS under various operational sce-
narios. In addition, it sh all also be able to withstand short,
high-intensity pulses during machine development phases.
Building upon proven design concepts implemented in the
previous generati... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
ad74c6a9-d345-4e12-8c56-6203c75c4aea | contribution presents the main stages of this upgrade, from
definition of updated beam parameters to conceptual de-
sign and validation .
INTRODUCTION
The Target External Dump (TED) is a movable
dump/beam stopper located in the TT20 transfer line con-
necting the Super Proton Synchrotron (SPS) to the experi-menta... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
6ebee75b-c443-4b4a-bc3a-5e22d519d8e8 | Search for Hidden Particles (SHiP) experiment after Long
Shutdown 3 (LS3), the existing TED approaches its
thermo -mechanical limits [3]. While the commissioning
scenarios are within the current TED’s capabilities, the MD cases significantly exceed the allowed pulsed intensity . In
addition to these thermomechan... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
256f3ec3-67d0-406c-b1f2-8aaf7811cab9 | dedicated thermal contact conductance measurements .
BEAM PARAMETERS
The beam parameters of the design -driving scenarios
during post-LS3 operation are summarized in Table 1. Up
to 45 kW of average power will be deposited on the TED
during commissioning and MD phases. Higher intensity pulses are foreseen duri... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
1d9a3905-b32e-491b-93d5-56bbe93e642b | Spill length [s] 1.0 1.0 – 9.6
Cycle length [s] 7.2 7.2
Repetition period [s] 7.2 ~ 120
Average power [kW] 44 ~ 40
UPGRADED TED
The new TED consists of a core assembly which is made
of graphite and CuCr1Zr , encapsulated by two layers of ra-
diation shielding , made of steel and marble respectively
(F... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
f70535fc-37fb-4148-9e42-e81e583ef0d8 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7136
854 MC7.T20: Technology: Targetry and DumpsMOP7136 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 0 |
8c8059ad-508c-4567-af40-12e4e67d680d | Figure 1: Isometric view of the new TT20 TED assembly
(top) and transverse cross section depicting dump layout
(bottom).
The core assembly of the TED (Fig. 2) includes 5 iso-
static graphite blocks with a total length of 3.5 m, followed
by 0.5 m of high -density CuCr1Zr blocks (UNS C18150) .
The low de... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 1 |
45cdd665-642b-4420-8e61-a8d8e4c551a0 | plete the core assembly, 4 CuCr1Zr side plates fully encap-
sulate the core blocks and are bolted to the top and bottom
cooling plates . These are not actively cooled, and they do
not extract heat from the core blocks. Their main function is to intercept secondary particles and dissipate the pro-
duced heat towa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 1 |
cda73edb-b7d8-497c-9f4c-ca466e2c0630 | which form the first layer of radiation shielding (Fig. 3) .
Since around 19.5 kW of power is deposited into the steel
shielding, 4 of the plates are actively cooled by clamping
stainless -steel tubes between them [1]. The remaining side
plates are cooled through contact with the actively cooled
plates. A chro... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 1 |
9dc18b09-2b7b-4bc4-b4ae-377a7d6fc041 | The FLUKA code [6,7] was used to model beam -matter
interaction and obtain energy deposition maps in the TED
assembly . Fig ure 4 depicts the peak energy density profile
deposited in the graphite blocks during the Ultimate M D
scenario.
Figure 4: Peak energy density deposited along graphite
blocks axis, Ul... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 1 |
bc1d13a7-a09e-4fa4-971d-ff22374ba9ba | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7136
MC7.T20: Technology: Targetry and Dumps 855Monday: Poster session MOP7136
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 1 |
33c8b0e4-50a0-4b23-8b5c-12eeccab2d0c | that stress remains within the material limits. The Ultimate
MD scenario with an intensity of 7×1013 protons per pulse
was used as the design driver. To incorporate a safety mar-
gin and allow for future operational flexibility , the assess-
ment was performed assuming 90 kW of average power
deposited in the dump, t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf | 2 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.