id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
57fc4ebf-0152-4730-817d-9212b8129448
Beam Screen Alumina Chamber BusbarFerrite GFRFigure 3: Quarter-Symmetric 2D ‘quasi-parallel’ kicker model. 02Y [mm]Time: 2us Time: 50us 0 10 20 30 X [mm]02Y [mm]Time: 100us 0 10 20 30 X [mm]Time: 300us -0.49 -0.27 -0.06 0.16 Deviation of By [%]Magnetic Field Distribution on Chamber Figure 4: Field homogeneity with the ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
2
f0dcc932-9322-45af-b4a0-afde5a962048
the flattop and improves as the pulse progresses. Aconductivebeamchambercoatingisforeseentomin- imisebeamcouplingimpedanceandreducebeam-induced heating. However, eddy currents induced in this coating willpartiallyshieldthefast-risingmagneticfield,negatively impacting both the field rise time and homogeneity. Con- seque...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
2
388e890c-ae7e-44de-aada-f38333078c4f
quirements,asalongermodulepossessesalargerinductance. Therefore,achainofmultipleidenticalmagnetmodulesisforeseen for each system. These fundamental dependencies are described by Eqs. ( 2)–(5). 𝐵𝜌 ≈ 3.3356⋅𝐸( GeV)(2)𝜃def=∫𝐵𝑑𝑙 𝐵𝜌(3) 𝐿kicker≈ 𝜇0⋅𝐻ap 𝑉ap⋅𝑙(4)𝑡rise≈ 5⋅𝐿kicker 𝑍system(5) Equations (2)and(3)d...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
2
4386b1fc-4ef2-46e2-8991-7d82089349d1
the necessary magnet current. Assuminganinitialbaselinesystemimpedanceof 10Ω, Table2summarisestheexpectedminimalnumberofmag- netsforeachFCC-eekickersystem. Tofacilitateastraightfor- ward pulse generator design and reliable magnet insulation forout-of-vacuumoperation,thedrivingvoltageandnom- inal current were limited to...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
2
32327ee7-a990-4a72-89d7-a679b2092e7f
Table 2: Summary of SystemParameters System Expected Field[mT]Max. Magnet Length[m]Min. No. of Magnets Booster Extraction 41.89 0.347 9 Collider Injection 41.89 0.347 4 Collider Dump 41.89 0.347 17 Booster Dump 41.89 0.347 17 CONCLUSION A common lumped-inductance kicker magnet module design has been proposed to serve m...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
2
791468c5-67a6-429b-adbe-52b3f8a68eb7
so far, future work will focus on 3D electromagnetic model- ling, beam coupling impedance studies, including the beam chambercoating,pulsegeneratordesign,andfinalsystem impedance optimisation.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 d...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
2
65f01506-ff45-4539-81e7-eb5bb86087d7
REFERENCES [1]P. Janot and C. Grojean, ‘FCC: the physics case’, CERN Courier, vol. 64, no. 2, pp. 21–24, Mar. 2024. https : / / cerncourier.com/a/fcc-the-physics-case/ [2]M. Barnes, ‘Kicker systems’, CERN Yellow Rep. School Proc. , vol. 5, p. 229, 2018. doi:1/zero.alt4.2373/zero.alt4/CYRSP-2/zero.alt418-/zero.alt4/zero...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
3
51dcc720-cdf6-449e-87c6-628e33aff85d
338. doi:1/zero.alt4.1/zero.alt4/zero.alt42/9783527839599.ch817th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7129 MC7.T16: Pulsed Technology (magnet and power supplies) 837Monday: Poster session MOP7129 Conten...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7129.pdf
3
88258465-7f8b-4bf1-94a2-9ff205ec9a50
HIGH- VOLTAGE COILS OPTIMIZATION FOR THE LHC BEAM DUMP DILUTOR KICKER MAGNETS V. Namora†, Ch. Bracco, L. Ducimetière, G. Favia, S. Huon, V . Senaj European Organization for Nuclear Research (CERN ), Geneva, Switzerland Abstract Two sets of 6 fast -pulsed vertical and two sets of 4 fast - pulsed horizontal ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
0
f0625c6e-a006-4f44-a428-13b110212c03
citation coils, which are immersed in the accelerator vac- uum. As part of a consolidation program, high- voltage in- sulated coil spares will be manufactured. The coils are composed of conductor bars of quasi -rectang ular cross - section, junction pieces, and conductor contact pieces. The coils are completely insul...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
0
e28fa6c4-fb5b-49aa-bee5-5e39bd7204b1
perform a safe beam dump the dilution kicker magnets sweep the beam , in a spiral pattern (see Fig. 1), reduc ing the peak energy density and avoiding damag e to the dump block [1]. Figure 1: Diluted beam sweep on the dump block. Blue: nominal particles, red: particles in filled abort gap . To perf...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
0
25beee4f-dd1c-4bcc-bbda-a903252bfcb1
circulating beam line and installed in vacuum tanks , typically at a pressure of ~10-8 mbar. Dilution kicker magnets parameters are show in Table 1. Table 1: Dilution Kicker Magnets Parameters MKBV MKBH Number of magnets per system 6 4 Number of magnets per tank 2 2 Maximum Deflection angle per system...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
0
77678d99-9af3-409c-b388-9ce57cf92f5b
steel yoke with a two -turn excitation winding. The yoke is composed of tape -wound cores made from 50 µm thick Si - steel, into which a gap is cut, as shown in Fig . 2. Figure 2: Cross- section of the MKBV magnet. Three cores are moulded using a charged epoxy into a unit which form a triple pack. During the ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
0
ddff408d-8481-4d48-b732-029aa6dfc0cc
The two -turn coil comprises four copper bars of quasi - rectangular cross section, three junction pieces and two conductor contact pieces , as show in Fig . 3. The coil is completely insulated with a minimum insulation thickness of 1.5 mm. On the straight section of the coil , each pair of conductors have a fur...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
1
dab400e3-c457-45b2-ae76-32220e3cd767
are individually brazed. The coil insulation system is threefold. First, each indi- vidual straight conductor is insulated using pre -impreg- nated tape and hot pressed to calibrated dimensions. Two such conductors are then assembled and further over -insu- lated with pre -impregnated mica tape, using the hot -pre...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
1
3265c4ec-8b93-4460-a311-cb7697126bee
half. Test voltages of the coil before the moulding of the contact pieces are 13 kV rms between the inter -turn and 26 kV rms for the assembled coil to ground (graphite coat- ing), 50 Hz for 5 minute s, 1.5 times the design voltage and 2.7 times the operational voltage . The completed coil is then subjected to ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
1
5c0bbfd8-11b8-462e-a974-b5b0b5b9b617
mirror current, leading to a doubling of the effective driv- ing current . This pattern is fully anti- symmetric between the upper and lower conductor groups, consistent with the opposing current directions required to generate the m ag- netic deflecting field in the MKBV magnet. Simulation re- sults of this effec...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
1
18b10373-5b75-418b-8dd8-615f4b36595a
MKBH KICKER MAGNET COIL The MKB H is a window -frame magnet that consist of a steel yoke with a one -turn excitation winding. The yoke is composed of tape -wound cores of 50 µm thick Si- steel, into which a gap is cut. T wo cores are moulded using a charged epoxy into a unit which form a twin pack (Fig. 6) . D...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
2
c3ace506-08d2-467e-bd75-e7ea033f7d4f
layer. Figure 7: MKBH High- V oltage coil schematic. MKBH COIL FABRICATION PROCESS The conductors of the high- voltage coils are manufac- tured from highly conductive electrolytic copper (OFE), cold-rolled to a half -hard condition, with a chemical composition of Cu ≥ 99.99 % and O₂ ≤ 5 ppm. The j unction pi...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
2
c81448e2-329c-4905-ae08-ae29632103f1
The completed coil is then subjected to a high- voltage test, between the conductor and the semi -conductive coat- ing, at 22 kV rms, 50 Hz for 5 minutes. PERFORMANCE OUTCOMES Since its installation in 2008 , five flashovers were iden- tified in the dilution kickers with the most significant one, on July 14, 2...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
2
3db889dd-cb09-42cb-a90d-4c51e48374e1
voltage test ratio of the coils is below the EN50209 recom- mendation, years of operation of the MKBH demonstrates their robustness. Nevertheless, these coils are very critical components and, in case of an electrical breakdown in solid insulation , they must be replaced, leading to a long repair duration. During ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
2
9fca8476-275b-48c5-a7eb-44b022131364
along with inter -turn tests at 13 kV rms, confirm sufficient insulation margins. Regarding insulation, both techniques yield excellent re- sults. The selection of which will be applied for the fabri- cation of the new coils will ultimately be industry -driven, with dimensional compatibility as the only constraint....
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
2
2bcecc23-0be4-46ff-8eac-3bee65df3d24
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7130 840 MC7.T16: Pulsed Technology (magnet and power supplies)MOP7130 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the autho...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
2
a048f483-418d-47d8-9a3f-0244455f426d
[2] E. B. V ossenberg et al, "A high current sinusoidal pulse gen- erator for the diluter magnets of the LHC beam dump sys- tem", in Conference Record of the 2000 Twenty -fourth Inter- national Power Modulator Symposium , Norfolk, V A, USA, 2000, pp. 175 -178, doi: 10.1109/MODSYM.2000.896193 [3] A. M. Loebner et al....
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7130.pdf
3
5180af00-cd8e-42d3-b876-bc8adbc3b16b
DESIGN AND OPERATION OF SLS2 THIN SEPTUM S. Dordevic†, M. Paraliev , M. Aiba PSI Center for Accelerator Science and Enginee ring, Villigen , Switzerland Abstract In the SLS2.0 upgrade project at the Paul Scherrer Insti- tute (PSI) the injector complex remained mostly un- changed, but we had to design three new s...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
0
6718b70f-1bd6-438a-a036-3a18f0ccb60e
the main field. To power the thin septum, we designed a pulse generator based on a two-stage fast thyristors switch and a matrix ca- pacitor. The latter was built using multiple commercially available ceramic SMD capacitors to avoid the risk of cat- astrophic failure of the oil filled foil capacitors. We suc- ce...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
0
5a818a51-43d5-4d55-8155-bc0e98a0187f
serting the injected beam very close (~3 mm) to the stored beam. Powder cores are chosen for the magnetic circuit to cover the frequency and the fie ld strength requirements. Septum should provide the required field and at the same time extremely low leakage field to limit stored beam dis- turbance . 3D electro...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
0
b4ec092b-f391-40ba-bd46-5902b11b4bb9
used, fine meshing was necessary to provide reliable re- sults. Local meshing gives the m inimal number of mesh cells for geometry with thin layers . Tetrahedral mesh for the septum model is based on usage of different local mesh- ing (Fig. 2, top right ). Figure 2: 3D CST® model and cross -section of a “sa...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
0
32206786-b78e-402d-8271-42eb0da83eeb
the result, but further increase (using smaller mesh size) has negligible influence . For practical excitation pulse (sin wave with T=12. 5 μs) one mm of co pper does not provide the required screening (Fig. 3, top plot) . No other engineering material (at room temperature) could provide significantly larger ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
0
86eab9cd-2147-40d3-8550-7c1efd562914
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7131 842 MC7.T16: Pulsed Technology (magnet and power supplies)MOP7131 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the autho...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
0
ec6d16d1-ef49-468d-bdb0-efa20d6fc6ea
depends on material conductivity (σ) and permeability (μ). Using high- µ soft magnetic material [4] we can provide better screening than copper in the frequency range where it has significantly large relative permeability , despite of its lower conductivity. That was the reason to investigate us- ing a “sandwich...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
1
5da675db-fd37-4e3d-b3c5-60baf33529f9
credibility of the simulation results depends a lot on the correct material model. Choosing the proper model param- eters for high -μ soft magnetic materials proved to be diffi- cult since this information is usually not readily available. Figure 3: Excitation , main field and l eakage field for dif- ferent “sand...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
1
37ae2add-fd9b-491c-9028-89b1f40d0ed8
erational , optical trigger link driver decodes the local trig - ger pulse and the remote one , which return ed from the op- tical receiver . Figure 4: Thin septum pulser . Figure 5: Optical trigger link driver , optical trigger splitter and solid state switch prototype . Figure 6: Oil impregnated f oil ca...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
1
c29795a8-5041-4770-9afa-e3cfe98b0951
was built, based on multiple commercially available ce- ramic SMD capacitors (Fig. 6). LEAKAGE FIELD MEASUREMENT Measurement of l eakage field in range of unity μ T is very difficult . To gain confidence in the results, t wo meas- urement methods were used (Fig. 7): • Induction coi l • Large bandwidth magneto...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
1
82582867-cfe7-483e-970f-625d27030789
Figure 8: Simulation and measurement results for two “sandwich” configurations (1 mm copper, and copper + soft magnetic material): e xcitation pulse and main field (top plot s) and leakage field (bottom plots) . In Fig. 8 top plot shows thin septum excitation pulse of 3 kA amplitude , that is required to gener...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
2
68d0d054-e75b-4ab2-b81d-6d50b26f89ab
ence the main field. We con firmed that such configuration (copper + μ -metal) can provide better screening perfor- mance compared to a copper septum with the same thick- ness, and two layers configuration (0.6 mm thick copper and 0.35 mm thick μ -metal layers [8]) was adopted. OPERATION Figure 9 shows thin sep...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
2
c2f36d95-9ada-4b19-9eb6-4d8bfa528783
Figure 11: Normalized thin septum disturbance (beam sigma) , orange – on the bump ed orbit (bump kicker contri- bution subtracted) and blue - on axis ( bump kicker off). by turn (Fig. 11). Equivalent field disturbance is evaluated as the magnetic field integral to cause the residual beam disturbance in one tu...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
2
b695b286-2933-43af-8656-e13cc3fbbfcb
lows us to surpass performance of traditional copper septa . In this way we achieved very good screening of the main field and managed to limit stored beam disturbance . De- spite the measured equivalent disturbance slightly exceeds the set target (10% vs. 15% of the beam sigma ), the thin septum performs fully s...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
2
8d7dbec0-dcfd-4fab-a742-1bf1da00464d
REFERENCES [1] H.-H. Braun et al ., “SLS 2.0 Storage Ring Technical Design Report”, P aul Scherrer Institut, Villigen, Switzerland, Rep. 21-02, Nov. 2021 . [2] R. Ganter et al., "SLS 2.0 storage ring upgrade overview ", in Proc. IP AC'23 , Venice, Italy, May 2023, pp. 1019- 1022. doi:10.18429/JACoW- IPAC202...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
3
d924b4e4-4392-436a-9cd8-27f3bd352a6b
p. 164904 , 2021 . doi:10.1016/j.nima.2020.164904 [8] https://www.detakta.de17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7131 MC7.T16: Pulsed Technology (magnet and power supplies) 845Monday: Poster session...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7131.pdf
3
45792d6c-d1c1-43bc-93db-c16bdc37f502
EVALUATION OF ERROR PROPAGATION IN THE FIRST-ORDER GEODETIC NETWORK OF THE FCC TUNNEL USING TOPOGRAPHICAL TECHNIQUES V. Gerligand1, D. Mergelkuhl, L. Watrelot, CERN, Geneva, Switzerland S. Durand, Laboratoire Géomatique et Foncier, Cnam, Le Mans, France 1also at Laboratoire Géomatique et Foncier, Cnam, Le Mans, France ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
271474c1-02ff-435b-801f-0c622d5430d3
networktransferredfrom surfacereferencesmustbeestab- lished along the entire tunnel. This network should provide thebasisfortracing,installationandabsolutealignmentof components prior to the relative alignment phase. A dedicated simulation tool has been developed to model the FCC-ee tunnel, including shafts and bypasse...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
5f81a6c5-3804-419e-a890-c8066b18b4b8
around150μmforcertain components to be aligned in arc sections [ 1]. To achieve these requirements, a First-Order Geodetic Network must be installed and measured along the entire tunnel to provide the reference forinstallationand absolutealignmentofcomponents,priortotherelativealign- mentphase. BasedonLHCabsolutealignm...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
f1e83fdd-b5b5-4dcb-8d41-6401d1392978
propagation along the tunnel a critical issue that needs to be studied. Thispaperpresentsapreanalysis-basedapproach toevaluateerrorpropagationandassesswhetherthealign- ment tolerances can be achieved using polar, gyroscopic, and leveling measurements.REALISTIC FCC GEOMETRY MODEL Beforesimulationscanbeperformed,acomplet...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
bc1f518f-5f5a-4bba-a2fb-40c137cb13ab
software tool has been developed, to create a geometry as realisticaspossiblewithrespecttotheexpectedfinaldesign of the machine infrastructure. It uses two different inputs: the integration design derived from CAD models and the optics design obtained from MAD-X files. From the inte- grationdata,two-dimensionalcrosssec...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
063afef2-9174-45ea-8002-de6ba4c64c5a
cross sections, with the two dimensions describing a top view rather than a transverse profile. These elements can then be inserted and positioned at their nominal locations by the software user. Figure 1: Generated FCC infrastructure. Whiledevelopedandemployedtomodelafinelydetailed FCC geometry with the most up-to-dat...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
a59a882b-e68b-403f-ad54-7bf9ec050132
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publisher, and DOI. This is a preprint - the final version is published with IOP
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
0
9bf21b23-b6f8-4fd5-8e2b-c149ee232514
FIRST-ORDER GEODETIC NETWORK OncetheFCCgeometryisdefined,thenextstepisthees- tablishmentoftheFirst-OrderGeodeticNetworkthroughout thetunnel,correspondingtothedefinitionofnetworkpoints and observations. In practice, the network originates at the surface, based on the Primary Surface Geodetic Network andthegeoiddetermina...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
9d359a2b-66e1-467b-acf5-61e42a594610
to link specific areas, suchas shafts, to the main tunnel net- work. Pointsin the main tunnel networkare then generated byplacingthemonatunnelcrossprofiletypeandreplicating thislayoutalongthetunnelaxisatuser-specifiedintervals of x meters. Finally, the user can automatically define polar, leveling, and gyroscopic obser...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
d498c271-b2bb-40aa-b00a-f8a20e554949
Allpointsandobservationscanbeextractedfromthesoft- ware as input for the Logiciel Général de Compensation (LGC),aCERNin-houseopen-sourcecompensationsoft- ware able to run least-squares-based simulations [ 7]. These preanalyses yield 3D covariance matrices of the network points, from which point uncertainties can be ext...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
76fd511e-df4b-49b0-bd0b-8bf3f620bf3d
ties,aswellasthoseforlevelling,arederivedfromempirical studiesconductedatCERN[ 8]andCERNalignmentteam experience. Gyroscopic uncertainties are taken from [ 9], while those for the laser tracker inclinometer used for in- strument verticalization come from [ 10]. Furthermore, it is importanttonotethat,whiletherelativegeo...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
1d44c93f-a0fa-4216-8cca-8582a876b2df
as atmospheric refraction. The primary focus is to under- stand the propagation of random errors within such network geometries. SIMULATIONS AND RESULTS Since the simulation frame is purely theoretical, the co- variance matrix provided by LGC has been transformed, using the 2-dimensional rotation matrix, to get longitu...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
72f1484c-5669-4e74-ae11-4f70f0bb9f05
resulting network point uncertainties are shown in Fig. 2as a functionof the cumulativedistance. This baseline simu- lation shows a similar error behavior along the FCC arcs. However, a pronounced error increase is observed around point F due to the 800mlong transfer between the access shaftandtheFCCtunnel. Anotherincr...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
a0210b64-bb3f-4940-a8a1-eb22b32002fd
function of the tunnel longitudinal dimension, along the radial (red) and longitudinal (blue) axis. curvature. Theuncertaintyalongtheverticalaxis,notshown here for scaling reasons, is addressed later in the paper. Toassesspotentialimprovementsofthenetwork,thebase- line simulation was repeated with modified parameters t...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
1
7b13202b-52ed-4c55-803d-04815ba79c9c
evaluatetheir impact on the overallerror propagation. The sameconfigurationwasthussimulatedwithpointprofiles and stations spaced every 10m(case a), 8-point profiles (case b), and an increased measurement range of 90m, cor- responding to observations of five profiles per side (case c). The results shown in Table 2indica...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
38ed2082-4577-427e-b11d-d347b2912cdb
thepolarinstrument. However,empiricalstudiesreported in[8]showthat,forlasertrackerlinesofsightlongerthan 55m, the impact of systematic errors arising from atmo- spheric refraction on vertical angle measurements should be considered. Further investigations are therefore required to assess the impact of this effect and t...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
8ab334d8-51a4-40f5-89b9-de8a6c17b64e
so far been deliberately omitted: gyroscopic observations. Theircontributionisthereforeinvestigatedbyre-runningthe baselinesimulationwiththeadditionofgyroscopemeasure- ments. For simulation purposes, gyroscope observations were assigned to existing polar station points. In practice, gyroscopes are mounted on theodolite...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
c2980d9c-8eae-42d4-aed8-2c29ecd65c53
nario. Considering that a single azimuth observation re- quires approximately 8 to 10 minutes and must be repeated 2 to 3 times for control, this would correspond to more than 360 hours of pure measurement time. In addition, gyro- scopesarefragileinstrumentandneedtobeoftencalibrated andcontrolled. This represents asubs...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
c8eac7eb-94b3-4853-bff1-5b1f6cff5335
instruments. Forthesamereasons,closed-looplevelingsim- ulations show similar uncertainties, also remaining below 0.8mm. To evaluate the impact of realistic verticalization imperfections,additionalsimulationsincludinginclinometer measurements of instruments roll and pitch were performed. Thesesimulations,whichincludeave...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
19044fa1-6501-4655-b5ef-72187cae9988
arisingfromverticaldeflectionandgeoidmodelimperfec- tions cannot be neglected and still need to be assessed. CONCLUSION Asoftwaretoolhasbeendevelopedtogenerateandtunere- alisticFCCnetworksimulations. Thesimulationstudyhigh- lights the key parameters affecting the first-order FCC-ee tunnelnetwork. Whilethemaximumuncerta...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
4b6a6fd6-b3f8-4421-af98-59441d01415f
suggestthatcombininggyroscope observationswithan in- creasedlasertrackerrangeandhighernetworkdensitycould reducetheradialerrorbelowthe 5mmtolerancestargeted here. Future work will focus on estimating dominant system- atic effects, including geoid model imperfections and atmo- sphericrefraction,toprovideamorerealisticer...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
dd6e6294-ce04-4a6e-b944-19067d2f5059
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7132 848 MC7.T17: Technology: Alignment and SurveyMOP7132 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title o...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
2
4bbd6bc6-dfa0-4b56-b54d-ec55b86b4ac8
vol. 19, no. 02, T02006, 2024. doi:1/zero.alt4.1/zero.alt488/1748-/zero.alt4221/19//zero.alt42/T/zero.alt42/zero.alt4/zero.alt46 [2]D.Martin,“Reviewofacceleratoralignment”,in Proceedings of the FIG Congress , Sydney, Australia, Apr. 2010. [3]B. Weyer and H. S. Konan, “Towards centimetric geoid over the FCC area: applic...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
3
41ddb8bc-6ff2-4c42-b019-b06cbe803ae0
tunnel”, Institute of Geodesy and Photogrammetry, ETH Zurich,Zurich,Switzerland,Rep.FCC-GeodesyIGP-AA-2.3, 2025.[6]J.-F. Fuchs, J. -F. Segers, and C. Vendeuvre, “Development of a new levelling process integrated into a 3D global calcu- lation”, in Proc. IWAA’24 , Menlo Park, CA, USA, Oct. 2024. https://cds.cern.ch/reco...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
3
b485e6e4-46b2-4bce-9c75-def565f94946
Essen, Germany, 2024. [10]NIVEL230forAbsoluteTrackerUser ,LeicaGeosystemsAG, Heerbrugg, Switzerland, 2008.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7132 MC7.T17: Technology: Alignment and Survey 849Monda...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7132.pdf
3
a807c59a-23ed-454e-b75c-2227f7f94d5b
DESIGNANDDEVELOPMENTOFTHENEWISOLDEBEAMDUMPSAT CERN I. Z. Johansen∗, E. Grenier-Boley†, A. P. Bernardes‡, I. R. Boff, T. F. Calvet, C. Cipriani, T. Coiffet, L. S. Esposito, M. A. Fraser, P.R. Menachilis, J.D.J. Pegg, A. Perillo Marcone, F. Pozzi, S. Sgobba, M. Simoes, M. Timmins, A.N. Osthus, M. Calviani, CERN, Geneva, ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
0
bfb64ce1-a217-470e-b441-d5d092853b04
thecuprouscorebymeansofHotIsostaticPressing(HIP). Thecladdedblocksareenclosedwithina316LNstainless steel vessel, which allows the use of pressurised water to cool the dump. Extensive Monte Carlo and thermomechanical studies wereconducted to evaluatetemperature and stressdistribu- tionsundernominalandaccidentalbeamcondi...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
0
842fd80e-f238-490c-97a9-a78725e1a654
Sustainability(IBDRS)projectaimstofacilitatetheincrease of beam power ( 2.8kWto13kW) at ISOLDE whilst mit- igating existing concerns for radiation protection, with an improved life-cycle management [ 2,3]. This is done by replacing the current beam dumps and increasing the sur- rounding shielding during CERN’s Long Shu...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
0
cc496e8b-a7eb-402e-b475-b304f7eddc2a
†edouard.grenier-boley@cern.ch ‡ana-paula.bernardes@cern.chFacility Figure1depicts the overview of the two beam dumps for the General Purpose Separator (GPS), and the High Resolu- tion Separator (HRS), in the post-LS3 configuration. The beamissuppliedbytheProtonSynchrotronBooster(PSB) throughthePSB-to-ISOLDE(BTY)transf...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
0
cd84b433-faf1-4eb8-9960-fb8e0859b5f5
of variables thicknesses, where the deposited energy den- sityishighest,followedbyapurecopperblock. Thecross section of the blocks is 420 ×420 mm2to sufficiently absorb the beam within its ”stay-clear” region (+/- 135mm), with margin for initial alignment in the difficult to access area and no realignment until the end...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
0
fd45ceef-3e92-41a3-a1ea-d53a7df58ad0
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7135 850 MC7.T20: Technology: Targetry and DumpsMOP7135 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
0
2568fd75-38c7-4798-8b5d-0459751282e7
ductility. The thickness is chosen to satisfy structural re- quirements [ 7] while limiting beam energy deposition. Demineralised water is delivered to the dump at 5barg, a safe operating pressure for the vessel that accounts for the pressure drops in the cooling circuit and increases the boilingpointofthewater. Thebea...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
1
66fe1495-c369-4642-a9e5-fa0c7df600e5
bond dissimilar metals together by means of inter-diffusion [8,9]. In this application, the CuCr1Zr plates and the Cu block are encapsulated by 1mmthick 316LN. This material wasselectedasitisahigh-strength,corrosionanderosion resistantmaterial,withsimilarCoefficientofThermalEx- pansion (CTE) to Cu, to avoid high residu...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
1
f81018e0-d906-46a2-9035-180d50b28176
ISOLDEconsumesmorethanhalfofallprotonsproduced at CERN [ 10]. Due to the nature of the facility, a variety of operational scenarios are possible. Two scenarios are chosenasrepresentativestodesignanddimensionthedump: nominal, and accidental; both reflect the maximum opera- tionatISOLDE,withbeamparametersasshowninTable 1...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
1
60b20882-c6a9-425e-b763-898c6bfdee01
Table1: Beamparametersfornominalandaccidentalsce- narios [12] Parameter Nominal Accidental Beam momentum 2GeV/ 𝑐 Beam intensity 1×1014protons per pulse Average beam intensity 6µA Beam sigma 32.7 mm 6.2mm Beam pulse length 1906ns Max. consecutivepulses 8 Min. pulse-to-pulse period 1.2s Min. period inc. 8 consecutivepul...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
1
4e5e850f-5e32-4411-b53f-22bb9cd2ff97
tensilestressesareobservedintheouteredgesandcladding. Despite higher energy deposition in the absorbers, the highest temperature (120∘C) and von-Mises stresses (190MPa) is expected at the front endcap of the tank, as seen in Fig. 4. This is due to the fact that only one side is cooled and subjected to internal pressure...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
1
f8521731-afae-4cd5-a1e1-4a76c4df36ae
Withabeampulselengthofjustunder 2µs,dynamiceffects areexpected. AsseeninFig. 5,thevon-Misesstressesare close to an order of magnitude higher in accidental scenario than those in the nominal operation. The dynamic response17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
1
f7f6b64b-6ba9-4fbf-9993-bd30bf0c9803
Figure4: Maximumtransientbeam-inducedtemperatures and von-Mises stresses of the beam dump during failure scenario. showsbriefstressoscillations,butthemaximumstressre- mains below the initial peak, and well below the material yieldatelevatedtemperatures[ 15–17]. Betweenthebeam cycles,theplatesreturntotheirsteady-statebe...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
2
c1aab052-b40a-4d06-ac07-a2a75edb3179
claddingwasrequired,but 0.5mm316LNsheetswerenot readily available. Accordingly, one prototype was tested by machining 1mmplatesdownto 0.5mmbeforeHIP,while theotherexploredmachiningthecladdingafterHIP.Further analysisallowedtoconclude thatthe claddingthicknessof 1mm will be used forthe production of the beam dumps.To re...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
2
d10f1c11-be96-47fa-bb36-264d40475b9e
5 Slow cooling in air Cooling to room temperature Notconstrained Ultrasonictestingbyimmersionshowednobondingde- fectsinanyofthethreeprototypes[ 19]. Measuringofresid- ual stresses shows equibiaxial compressive residual stresses in the cladding [ 20]. The 316LN prototypes show signifi- cantlylessresidualstress( 200MPa)c...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
2
038b379f-2211-4680-8fc2-dac4d9eb4994
efficientheatextraction,enhancingthermalperformanceand long-term operability. Cladding with 316LN addresses ero- sionandcorrosionconcerns,improvinglong-termstructural integrity. Thermomechanicalanalysesindicatereliableoper- ationwithintheexpectedoperationalscenarios. Prototyping activitieshavedemonstratedthefeasibility...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
2
baae4ada-339c-46d4-8ef9-83a801c7a326
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7135 852 MC7.T20: Technology: Targetry and DumpsMOP7135 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
2
689f0286-a5d5-40d3-aa5e-c498b605ef02
energy”, in Proc.IPAC’24 , Nashville, TN,USA,May2024, pp. 3552-3555. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-THPR28 [3]A-P. Bernardes et al., ”IBDRS Summary Report”, CERN, Geneva, Switzerland, Rep. EDMS#2875087, Apr. 2023. [4]R. Catherall, ”Isolde and n_TOF consolidation”, in Proc. Chamonix2014: LHCPerformanceWor...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
3
8d40795e-c3ef-4b9e-806a-c96e69460a28
doi:1/zero.alt4.517/zero.alt4/CERN-1968-/zero.alt4/zero.alt42 [7]Unfired pressure vessels , EN 13445, 2021. [8]S. Pianese et al., ”Hot isostatic pressing assisted diffusion bondingforapplicationto theSuper ProtonSynchrotronin- ternalbeamdumpatCERN”, Phys.Rev.Accel.Beams ,vol 24, p. 043001, Apr. 2021. doi:1/zero.alt4.11...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
3
9f28d1f6-ca9f-44d1-bc24-7e4806a4e348
PerformanceWorkshop,CERN,Geneva,Switzerland,Dec. 2022.[11]A. Gottberg, ”Target materials for exotic ISOL beams”, Nucl. Instrum. Methods Phys. Res. B , vol. 376, pp. 8-15, Jun. 2016. doi:1/zero.alt4.1/zero.alt416/j.nimb.2/zero.alt416./zero.alt41./zero.alt42/zero.alt4 [12]M. Fraser et al., ”ISOLDE beam dump upgrade”, CER...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
3
fc955892-7095-4a11-802a-0d146123add2
Switzerland, Rep. EDMS#1771731, Mar. 2017. [16]K.Zhang etal.,”Developmentofthematerialpropertyhand- book and database of CuCrZr”, Fusion Eng. Des. , vol 144, pp.148-153, Jul. 2019. doi:1/zero.alt4.1/zero.alt416/j.fusengdes.2/zero.alt419./zero.alt44./zero.alt494 [17]Y. Xiong et al., ”Tensile Deformation Temperature Impa...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
3
456a57a0-0e28-4bc7-904b-28a176cf9785
on Orbital Welds”, CERN, Geneva, Switzerland, Rep. EDMS#3353256.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7135 MC7.T20: Technology: Targetry and Dumps 853Monday: Poster session MOP7135 Content from this ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7135.pdf
3
90bb65fe-fe1b-4673-835b-e82c62e2cf88
UPGRADE OF THE SPS TARGET EXTERNAL DUMP FOR HIGH INTENSITY OPERATION IN CERN’S NORTH AREA P. R. Menachilis †, N. Solieri, A. L. Lund, D. Grenier, M . Calviani, T. Coiffet, L.S. Esposito, M. A. Fraser, G. Garlaschelli, J -L. Grenard, A. P. Marcone, G. Mazzola, T. Parmentier, B. Pittet, F. Sanda, C. Sharp, M. Timm...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
45eeba11-677f-4fbb-afa5-bce4774f05e3
steady -state power generated by the slow extraction of 400 GeV/c protons from the SPS under various operational sce- narios. In addition, it sh all also be able to withstand short, high-intensity pulses during machine development phases. Building upon proven design concepts implemented in the previous generati...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
ad74c6a9-d345-4e12-8c56-6203c75c4aea
contribution presents the main stages of this upgrade, from definition of updated beam parameters to conceptual de- sign and validation . INTRODUCTION The Target External Dump (TED) is a movable dump/beam stopper located in the TT20 transfer line con- necting the Super Proton Synchrotron (SPS) to the experi-menta...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
6ebee75b-c443-4b4a-bc3a-5e22d519d8e8
Search for Hidden Particles (SHiP) experiment after Long Shutdown 3 (LS3), the existing TED approaches its thermo -mechanical limits [3]. While the commissioning scenarios are within the current TED’s capabilities, the MD cases significantly exceed the allowed pulsed intensity . In addition to these thermomechan...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
256f3ec3-67d0-406c-b1f2-8aaf7811cab9
dedicated thermal contact conductance measurements . BEAM PARAMETERS The beam parameters of the design -driving scenarios during post-LS3 operation are summarized in Table 1. Up to 45 kW of average power will be deposited on the TED during commissioning and MD phases. Higher intensity pulses are foreseen duri...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
1d9a3905-b32e-491b-93d5-56bbe93e642b
Spill length [s] 1.0 1.0 – 9.6 Cycle length [s] 7.2 7.2 Repetition period [s] 7.2 ~ 120 Average power [kW] 44 ~ 40 UPGRADED TED The new TED consists of a core assembly which is made of graphite and CuCr1Zr , encapsulated by two layers of ra- diation shielding , made of steel and marble respectively (F...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
f70535fc-37fb-4148-9e42-e81e583ef0d8
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7136 854 MC7.T20: Technology: Targetry and DumpsMOP7136 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
0
8c8059ad-508c-4567-af40-12e4e67d680d
Figure 1: Isometric view of the new TT20 TED assembly (top) and transverse cross section depicting dump layout (bottom). The core assembly of the TED (Fig. 2) includes 5 iso- static graphite blocks with a total length of 3.5 m, followed by 0.5 m of high -density CuCr1Zr blocks (UNS C18150) . The low de...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
1
45cdd665-642b-4420-8e61-a8d8e4c551a0
plete the core assembly, 4 CuCr1Zr side plates fully encap- sulate the core blocks and are bolted to the top and bottom cooling plates . These are not actively cooled, and they do not extract heat from the core blocks. Their main function is to intercept secondary particles and dissipate the pro- duced heat towa...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
1
cda73edb-b7d8-497c-9f4c-ca466e2c0630
which form the first layer of radiation shielding (Fig. 3) . Since around 19.5 kW of power is deposited into the steel shielding, 4 of the plates are actively cooled by clamping stainless -steel tubes between them [1]. The remaining side plates are cooled through contact with the actively cooled plates. A chro...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
1
9dc18b09-2b7b-4bc4-b4ae-377a7d6fc041
The FLUKA code [6,7] was used to model beam -matter interaction and obtain energy deposition maps in the TED assembly . Fig ure 4 depicts the peak energy density profile deposited in the graphite blocks during the Ultimate M D scenario. Figure 4: Peak energy density deposited along graphite blocks axis, Ul...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
1
bc1d13a7-a09e-4fa4-971d-ff22374ba9ba
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7136 MC7.T20: Technology: Targetry and Dumps 855Monday: Poster session MOP7136 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
1
33c8b0e4-50a0-4b23-8b5c-12eeccab2d0c
that stress remains within the material limits. The Ultimate MD scenario with an intensity of 7×1013 protons per pulse was used as the design driver. To incorporate a safety mar- gin and allow for future operational flexibility , the assess- ment was performed assuming 90 kW of average power deposited in the dump, t...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7136.pdf
2