id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
4d5c6de9-1b4c-488c-83f4-3e6c6b29e176 | oftheOptrismanual[9]. However,thespectralemissivity
ratio of tantalum varies with temperature, introducing a sys-
tematic bias in the reported temperatures. A thermocouple-
based calibration is planned to determine the appropriate
correction.
BEAM PROFILE CHARACTERIZATION
Static Beam
Beam profiles were measured by scan... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 1 |
ad8fd813-cf8e-43cd-b855-b504f1546c81 | accurately, but the Gaussian fit provides a sufficiently good
description of the core beam and is adopted for the FEM
simulations.
Figure 1: Measured and Gaussian fitted beam profiles for
𝐼focus= 805mA and𝐼 beamvalues of 2.5, 10, 15 and 20mA.
Figure 2 shows the fitted Gaussian beam size 𝜎as a func-
tion of𝐼beamand�... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 1 |
4cbe5251-f9e2-4238-a4d5-7e2ad8877556 | presented here.
Figure2: Gaussianbeamsize 𝜎asafunctionofbeamcur-
rent𝐼beamand the color-coded focusing coil current𝐼 focus.
Rotating Beam
Whenthebeamisrotatingatradius 𝑟0withafrequency
muchhigher thanthethermalresponse timeofthefoil, the
time-averaged intensity distribution becomes axisymmetric
and is given by [10]... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 1 |
c23496c9-2697-430c-aa21-35202e2626be | thick,35mmdiameter tantalum foil heated by a rotating
beamwitharotationradiusof 𝑟0=10mm. Forthesetpoints
of 600 mA focusing coil current and 17 mA beam intensity,
the corresponding beam size is𝜎= 3mm.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 1 |
e44088b7-4183-4f5a-8a31-3b795aaae0db | Figure 4 shows the temperature time series for rotation
frequenciesof1,2,10and 100Hz. At1Hz,thetemperature
reachesamaximumof 1929°Cwithanamplitudeof 301°C.
Astherotationfrequencyincreases, thethermalinertiaof
the foil smoothens out the oscillations: the amplitude de-
creases to 6.5°Cat100Hzfor an average temperature of... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 2 |
91b3d423-9edf-4a4a-8c81-cea794caa244 | need to mechanically constrain the foil during the measure-
ment. Post-experiment inspection confirmed that the foil
had deformed permanently.
PRELIMINARY FEM COMPARISON
FEM simulations were performed using Ansys®Mechan-
ical 2024R2. A transient thermal model of the 250µm
thick,35mmdiametertantalumfoilwasbuilt. Tempera... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 2 |
66a4d031-2ce4-4904-8c22-829e18b2eaff | 2𝜋·𝜎2·𝐿foil,(2)
where𝜂BSEisthebackscatteringcoefficient, 𝐼beamand𝐸beam
arethebeamcurrentandenergy, 𝜎istheGaussianbeamsize
and𝐿foilis the foil thickness. The power density is assumed
homogeneous through the foil thickness given the thermally
thin regime. The beam center rotates as:
𝑥𝑐=𝑟0·cos(𝜔𝑡), 𝑦 𝑐=𝑟0·... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 2 |
90ea55f1-14b1-4f79-8de2-4ac49b6d9ed1 | measurementsbyafactorofapproximately1.8,despiteaver-
agingtheFEMresultsoverthepyrometerspotarea. Without
spatial averaging, the FEM predicts peak temperatures of
1661°C at 4mA and 2285°C at 10mA.
Figure 5: Measured and simulated mean temperature and
amplitudeasafunctionofbeamcurrentat 1Hzrotationand
𝜎= 3 mm.
Itshouldb... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 2 |
cb384f1b-7908-4983-bfbc-6d6a8e288e99 | scanner, demonstrating Gaussian beam parameters across
a widerange ofoperating conditions. Pyrometric measure-
mentsunderrotatingbeamconditionsshowedthattemper-
ature oscillations become negligible above 100Hzat the
averagetemperature 1715°C. ThepreliminaryFEMsimula-
tionsareingoodagreementwiththemeanexperimentaldata.
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 2 |
c894dca8-9eff-441c-a8ad-b7ccdeabcc0b | the electron beam welding machine and construction of the
wire scanner.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7141
876 MC7.T20: Technology: Targetry and DumpsMOP7141 Monday: Poster session
Content fro... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 2 |
8e20539b-5214-4f52-8e0f-ee81a9266bde | REFERENCES
[1]R.Eichleretal.,“IMPACTconceptualdesignreport”,Paul
Scherrer Institut, Rep. PSI Bericht 22-01, 2022.
[2]M.Huyse,“ISOLtechniques,presentstatusandnewdevel-
opments”,Nucl. Phys. A, vol. 701, no. 1, pp. 265–271, 2002.
doi:10.1016/S0375-9474(01)01595-0
[3]M.Hartmann,D.Reggiani,J.Snuverink,H.Zhang,andM.
Seidel,“... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 3 |
488712bb-5958-4629-96c2-840b2377d5d0 | Phys. Res. B, vol. 204, pp. 319–324, 2003.
doi:10.1016/S0168-583X(03)00504-4
[6]S. Jolletet al., “Development of the TATTOOS target”, in
Proc. IPAC’23, Venice, Italy, May 2023, pp. 2526–2529.
doi:10.18429/JACoW-IPAC2023-TUPM127[7]M. J. Berger, J. S. Coursey, M. A. Zucker, and J. Chang,
“ESTAR,PSTAR,andASTAR:computerpro... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 3 |
7e89343b-4dce-4847-808c-140e4e0092c4 | [10]T. Reiss, D. Reggiani, M. Seidel, V. Talanov, and M.
Wohlmuther,“Simulationofabeamrotationsystemforaspal-
lationsource”,Phys.Rev.Spec.Top.Accel.Beams,vol.18,
no. 4, p. 044701, 2015.
doi:10.1103/PhysRevSTAB.18.044701
[11]N. D. Milošević, G. Vuković, D. Pavičić, and K. Maglić,
“Thermalpropertiesoftantalumbetween300an... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7141.pdf | 3 |
88b9f3b0-95c2-400b-9405-c61c8b381b8c | THE CYREN PROJECT : REFURBISHMENT OF THE GANIL
CYCLOTRONS FACILITY
P. Anger †, F. De Oliv eira Santos
Grand Accélérateur National d’Ions Lourds, CEA -DRF/CNRS -IN2P3, Caen, France
Abstract
For over 40 years, the GANIL facility has been supply-
ing stable beams (carbon to uranium, 60 keV/A to
95 MeV/A) and low... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 0 |
8a32d7e9-6e13-4fc7-a208-6e345ee956bc | gram presented by the users of the facility is requesting
GANIL to guarantee its operation over the next 20 years or
more. Therefore an ambitious renovation program, the
CYREN (CY clotrons R ENovation) project, was launched
in 2024.
This article cover s the progress of the project. It detail s
the challenges ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 0 |
a9e412a7-0ca7-4e3d-be51-73b5af1fca11 | separator and the ISOL (Isotope Separation On -Line) tech-
nique through the SPIRAL1 facility. Radioactive beams
from SPIRAL1 can be used directly or re -accelerated while
preserving high optical quality. The GANIL cyclotron fa-
cility, without SPIRAL2, is a multi- beam facility, capable
of operating up to 4 simult... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 0 |
699de57a-e621-455f-aee2-1b29bcfbd967 | significantly reduced due to the redeployment of human
and financial resources towards the construction of the
SPIRAL2 facility and the implementation of the action
plan resulting from the first safety review [3].
This minimal renovation and the aging of the facility ,
GANIL is now facing difficulties. It incl... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 0 |
a8424800-e608-4e76-b352-81434d4fb7ef | ____________________________________________
† pascal.anger @ganil.fr 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7142
878 MC7.T21: InfrastructuresMOP7142 Monday: Poster session
Content from this work ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 0 |
7269f6d0-9962-4fa3-9a59-6975d58fbf7a | Working groups have been established to analyse the
situation and to identify the scientific prospects of the
facility. The scientific communities have confirmed their
need for cyclotron beams for a broad research programme.
A white paper has been published outlining the wealth of
planned research studies , i... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 1 |
3468e2b3-27c9-40f1-9418-29707ac16ddc | erators ).
In light of these very promising researche prospects, the
CEA and the CNRS, after pr eliminary studies in 2022
launched the CYREN project in 2024, with the aim of
ensuring, for at least 20 years , the long- term viability of the
beam production capacity of the GANIL facility (from the cyclotrons to th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 1 |
0c05390b-a9d0-4434-bd08-6301fc2ee501 | Water leaks, quickly became apparent as a frequent, sig-
nificant beam downtime problem that was rapidly increas-
ing in frequency (Fig. 3).
Figure 2: Evolution of cyclotron breakdown over time for
the 5 main sources .
Since the 80s, and at a significantly increased rate since
the 2000s, the accelerator HF ca... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 1 |
759448ab-50b9-4142-8fa7-4ffd5dfcffd5 | The feasibility of such an operation has been studied. The creation of new cavities and the construction of the as-
sociate test bench were examined and evaluated. The work-
load and costs were very high in relation to a failure rate inside CSS that did not increas e since 2000 (Fig. 4).
Figure 4: Statistics of wa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 1 |
99d813e9-945d-4296-be47-f52acaa2389a | planned installation of a outgassing system to remove ox-
ygen and carbon dioxide, the main agents causing water
corrosion in copper [5].
In addition to the degassing systems installed on the
most critical cooling circuits, the monitoring of the demin-
eralised water treatment to a pH above 7 will be monitored.
B... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 1 |
53c1208f-6806-4db2-b90c-bdf2504408a9 | major components of the cyclotrons GANIL facility:
• Infrastructure and associated facilities: buildings,
electrical distribution and harmonic filters, refrigera-
tion and IT infrastructure.
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 1 |
0eac4139-a3c5-4c87-9074-fb6faf9f6257 | • Accelerator processes: vacuum systems, beam instru-
mentation and diagnostics, magnetic field coils,
cooled equipment, HF systems, power converters and NMR systems, automation, control systems and the
Injector 2 ion source.
• Nuclear safety systems: human access management
(UGA), beacon management (UGB) and the ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
2ca82976-8e84-4b08-88b2-e93eca3f6849 | A call for tender for a contractor for the cooling system
renovation ( air cooling tower, primary and secondary cir-
cuits, heat exchangers, pumps, instrumentation, O₂ and
CO₂ outgassing system, etc.) is undertaken.
Roll out of the complementary and new network infra-
structure are underway.
Plans are being con... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
f3fd75b4-0862-4a11-8ace-80b17643c576 | tem, is necessary due to the obsolescence of VME cards
and since the s upport for the MOTIF/XRT graphics tech-
nology has been discontinued. A four -year renovation [6]
of 32 I/O controllers and 51 human- machine interfaces is
currently being prepared.
The high- voltage platf orm of the C02 injector needs to
b... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
dadb9495-e438-4d62-96d9-417e2fdb5e64 | being finalized. Cybersecurity risks associated with the up-
grading of increasingly interconnected network infrastruc-tures are being addressed with the utmost care.
Following a temporary insulation fault in a main mag-
netic field coil of a CSS cyclotron, a preliminary study for
a replacement scenario has been lau... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
ffd5d17f-877f-4387-83bf-f63e9af3a610 | of fruitful years of beam production, scientific experiments
and industrial applications in response to this challenge .
Funding for this project is secured, and it was launched
in 2024. The laboratory’s internal human resources com-
mitment is around 150 Full Time Equivalents ( FTEs ).
Studies and renovation wor... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
fd97209c-75b8-44df-84a1-3fd1d10df03b | package leaders: S. Montaigne, E. Perrelle, G. Lebertre, M. Jean, C . Barthe Dejean, A. Outreman, P. Sénécal,
C. Haquin, S . Leloir, B. Osmond, R. Levallois, R. Ferdi-
nand, M . Dupuis, C. Berthe, A. Trudel, Q. Tura , P. E. Ber-
naudin, C. Meurie, G. Delavallée and all CYREN staff .
REFERENCES
[1] GANIL, https://ww... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
9e67d798-8196-4779-a5d3-4d5466b6b881 | [5] R. Kan et al., “Degassing of distilled water -cooling circuits
and affected copper -walled structures presented at the
IPAC'26, Deauville, France, May 2026, paper MOP7148,
this conference.
[6] C. Haquin et al ., "Refurbishment strategy of the GANIL cy-
clotrons control system ", in Proc. ICALEPCS'25 , Chicag... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7142.pdf | 2 |
835a09f7-4379-4de1-8be3-d303062860cd | UPDATES ON THE SUSTAINABILITY IMPROVEMENTS OF THE
KARLSRUHE RESEARCH ACCELERATOR
J. Gethmann∗, E. Bruendermann, W. Mexner, T. Mexner, A.-S. Mueller, R. Ruprecht, B. Shen,
Karlsruhe Institute of Technology, Karlsruhe, Germany
Abstract
Thethermalwellsystemsupportingthecoolingplantof
theKarlsruheResearchAccelerator(KARA)a... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
edea9563-ff73-4a03-876f-cf44003bf6b6 | ment and extension of KARA efforts towards sustainable
operation are presented.
INTRODUCTION
The Karlsruhe Research Accelerator (KARA) is operated
by the Institute for Beam Physics and Technology (IBPT)
attheKarlsruheInstituteofTechnology(KIT).KARAisa
2.5GeVelectron synchrotronoperatedas a light source for
up to100days... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
5d855ba0-c26b-4d08-85de-4166ee5e672c | monitoring functionalities are integrated into a dedicated
monitoringsystem. Thisallowscoolingdomainexpertsto
documentdisturbancesdirectlywithinthemonitorinterface,
whileautomaticallygeneratedreportsprovidecomprehen-
sivedocumentation of thethermal wellsystem’soperation.
On the other hand, the raw data is also interest... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
7d4ef33c-0aaf-4d7c-9902-e0e15d741b0d | systems as possible and make use of existing infrastructure.
After going into details of the data flow and archiving
workflow,wepresentsomeresultsofthethermalwellsystem
∗julian.gethmann@kit.eduwith respect to our sustainability approaches and mention
our ideas for future improvements therein.
EXISTING INFRASTRUCTURE AT... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
10a9c0d2-498d-4d05-9b16-a67f94f519ee | Existing Infrastructure at IBPT
Ouraccelerator control systemsare based on EPICS[ 3].
Data of selected process variables are saved in a Cassandra
databaseviaadedicatedinputoutputcontroller(IOC)asde-
scribedin[ 4]. Thesecontrolsarerunninginourmachinein-
ternal networks and are only directly accessible from within
the sa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
517d60ee-d2ef-4025-8735-3956462fd2a3 | KIT green represents services that were operated before
thecommissioningofthethermalwells,lightbluearethe
servicesdevelopedforthethermalwells,andlightgreenthat
weredevelopedforthereportingtasks. Theboxesmatchthe
different network locations quite well, except for the service
node which is also running in the EPICS netwo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
645547b9-be7d-411e-aa53-c64250460fe3 | the file server/data store is done to provide the data in the
already aggregated way — minutely data as requested by
regulations and in a simple CSV format following the KISS
principle of software development.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 0 |
f6fac5e3-13e5-4c1b-8978-d16401585db7 | Internet
Data store IOT EPICS
ArchiverService node Institute network VM
KIT archive
New for archiving
New for wells
Existing Infrastructure
Figure 1: Data flow from the thermal wells’ PLC and external wells through our existing data acquisition to the newly
created aggregating and curating stages. Eachboxis one service... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 1 |
e0f536d0-78ed-4fac-9b4c-c940f276ed42 | isunavailable,becauseofmaintenanceor unexpectedinci-
dents), it is also possible to manually fetch the data required
by the authorities from the PLC for up to five days and in-
sert them into the data aggregator. Lastly, the aggregator
downloadstemperatureandgroundwaterlevelmonitoring
wells operated by campus groundwat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 1 |
08a85afc-4748-42c9-be19-1d227756f249 | Trends also have to be commented on.
Figure2shows you one view of the GUI, which displays
relevant parameters, including the temperature of the ex-
tractionwells,theabsorbingwells,andthecorresponding
temperature differences. One can mark areas of interest and
highlight them for comments or correct obviously incorrect
d... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 1 |
00c164b5-eac0-4d1d-93c1-9699ad4a07fe | affected by issues, e.g. failure of one sensor, and some-
timesthewholesystem,e.g. theaforementionednetwork
interrupts, or EPICS maintenance. The GUI was developed
taking into account feedback from end users and will be
optimizedforsimplicityof usein theupcoming evaluation
phase. The end user does not have to be an exp... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 1 |
932c165d-f556-4b00-b5f1-a26627a227c2 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7143
882 MC7.T21: InfrastructuresMOP7143 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 1 |
1865f864-9622-472c-a700-2eed767c7182 | Figure 3: Kernel density estimation (KDE) of the quarter
hourly power of the cooling plant with the thermal wells
operating and not cooling.
OPERATIONAL EXPERIENCE AND DATA
ANALYSIS
We operate the thermal well system for several months
stable with only one of the three cooling machines as the
maincooling systemforourac... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 2 |
661f3974-c681-4360-8f4b-c92fc4b39f59 | The case “cooling” is here defined as water flowing into the
dissipating wells, regardless of the amount nor how much it
was heated up in the three heat exchangers. Also only the
case of light source operation as typical for a so-called user
operation is taken into consideration by filtering for beam
energiesofmorethan... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 2 |
d0730234-03c7-45d4-9f6e-3f7c194e5ee9 | amount of energy required to operate the air conditioning
in the cleanrooms. Another possibility is to incorporate
the thermal well system into our main building’s existing
cooling network.
Besides the thermal wells, we are installing two 932kWh
batteriesinouracceleratorcomplextobufferthe 540kWp
powerof our solarpowerp... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 2 |
1aa0ab66-ea49-4564-b16e-6a83bbedcfd6 | wellsystemthatcollectsdatafromdifferentdatasourcesina
securemannerandenablestheoperationsmanagertocurate
the collected data and create monthly and yearly reports.
The first year of commissioning already showed savings. A
reductionofpowerconsumptionby 180kWarerealistic. We
plantomakeuseofourwasteheatandgetmoreindependen... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 2 |
f6450b9b-0c36-4744-8792-13580f122e05 | https://epics-controls.org/ , visited May 2026
[4]S. Marsching, “Scalable Archiving with the Cassandra
Archiver for CSS”, in Proc. ICALEPCS’13 , San Francisco,
CA,USA,Oct. 2013, paper TUPPC004, pp. 554–557.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISS... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7143.pdf | 2 |
4fe80153-454e-484d-8c3a-b2c5efd77b23 | ELETTRA 2.0 – STATUS OF THE REMOVAL & INSTALLATION
ACTIVITIES
R. Visintini†, F. Barbo, A. Buonanno, B. Mazzucco, A. Savron, G. Simonetti
Elettra -Sincrotrone Trieste S.C.p.A., Trieste, Italy
Abstract
On July 2, 2025, at Elettra, we began the “Dark Period”
(DP): the definitive shutdown of Elettra's Storage R... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 0 |
957d08da-d930-4978-8648-55f27d59da89 | photon beam lines are being reconfigured, upgraded, or in-stalled, which involves several changes to the configura-tion of the SR tunnel's outer shielding wall. The paper de-
scribes the status of DP activ ities, the difficulties encoun-
tered, and the mitigation strategies adopted. Logistics plays an important role in... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 0 |
61ebb774-79b4-46a2-bc7c-8b3b6d95fe6b | booster -based full energy injector in 2008 and the subse-
quent start of Top- up operations in 2010 [1].
Elettra 2.0 is the upgrade project of the existing Elettra
synchrotron light source (see, e. g. [2]) with the complete
replacement of the Storage Ring (SR) with a new low -emit-
tance ring and the enhancement ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 0 |
90436b73-2065-46e3-8f95-906887b6ce2b | soon as the construction company has completed the first two sections and handed them over to Elettra’s teams (as of end of May 2026 at the time of writing).
The activities on the beamlines in the Experimental Hall
(EH) of Elettra comprise the removal of some obsolete
beamlines, including their shielding hutches, ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 0 |
e4ec8cb5-dace-4064-b4f2-4ffced0326c1 | “Main Building” houses the SA, the SR, and the EH, and
is also undergoing significant plant engineering work.
STORAGE RING AND SERVICE AREA
Following the LOTO of the plants and systems and the
radioprotection initial checks, we started to remove the ~ 400, 5 -ton each, concrete slabs covering the SR tunnel
(Fig... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 0 |
6204c8e7-b2d4-4313-8a7f-45cbeacf3094 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7144
884 MC7.T21: InfrastructuresMOP7144 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 0 |
94e574ce-d04d-4f37-b5a3-6204eecd6a40 | cabinets, switchboards, and cables. By mid -September
2025 the SA was emptied and handed over to the construc-
tion company for the civil and plants works. The last mag-
net from the SR, a dipole, was extracted on November 11, 2025 (Fig. 3) , granting the construction company full ac-
cess to the SR.
Figure 3: Re... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 1 |
f614ff65-1ce5-44c3-9d79-5c0d0fb6d0d6 | of the full area – are going to be handed over to Elettra for
starting the installation of the 19” racks hosting the magnet
power supplies and other equipment for the SR.
EXPERIMENTAL HALL
With the beginning of the “Dark Period” (DP) the former
beamlines of Elettra have started their upgrade or complete remov... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 1 |
16a13dc0-8eb8-43fe-925c-bb4bfe2df008 | LOGISTICS
Building a new Light Source (or any other type of accel-
erator) from “green field” requires a well -in-advance plan-
ning of the logistics aspects – scheduling of arrival and
temporary storage of new parts, handling and transporta-
tion of components to install, definition of internal path-
ways for lar... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 1 |
4cc56bd8-af8d-4a39-bc36-d885dfe166ae | and commissioning of the FEL -based FERMI light source
(see, e. g. [8, 9]). FERMI, in particular, introduced changes
to the internal pathways , making the passage of large trucks
more difficult (Fig. 5).
Figure 5: 16-meter -long truck accessing the Main Building
for unloading instrumentation racks .
Storage ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 1 |
62769429-95ec-4876-9de6-f84a407c3cb4 | have built a 700- square -meter building equipped with
heavy duty shelves for storing the palletized magnets and
industrial boxes containing the cut cables, pipes, and other
materials . Figure 6 is a partial view of this building; the
wooden boxes contain part of the new multipole magnets
for Elettra 2.0 waiting ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 1 |
158537d0-5439-41ee-8170-a37d3f82fead | assembly laboratories, along with heavy duty shelving for
storing components to be assembled.
Figure 6: Old SR magnets temporary storage building .
Figure 7: Multipole magnets assembled on the granite gird-
ers, ready for installation in SR .
ADDITIONAL CHALLENGE S
There are currently three construction sites... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 2 |
f8c3ed50-62db-45f7-9ca4-192c625fde1a | Main Building for the energy efficiency improvement
works (the grey one is a permanent installation for Elettra.
Figure 8: Cranes around the Main Building of Elettra .
From the logistics point of view, an anticipated delivery,
is sometimes more critical than a late one. Handling and storing many boxes and pallet... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 2 |
788daaa5-918a-4462-ac44-d17c7927ca88 | well as to the construction of the machine and its beam-
lines. Logistics – including both the storage and manage-
ment of materials to be kept for varying lengths of time, as
well as the transport and handling of parts removed from
the machine and those that need to be assembled and in-
stalled – plays a very impo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 2 |
13d92610-ee26-4a42-ac4c-9a1e6fbd0ce4 | G. Simonetti, “Elettra 2.0: Activities in the experimental
Hall”, in Proc. IP AC'23 , Venice, Italy, May 2023, pp. 434-
436.
doi:10.18429/JACoW- IPAC2023- MOPA162
[4] R. Visintini, F. Barbo, A. Buonanno, B. Mazzucco,
M. Milani, and G. Simonetti, “Towards Elettra 2.0 - R&I
preparation activities”, in Proc. ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 2 |
31225884-fd71-4c19-a08e-8774abce567f | ternational Workshop on Radiation Safety at Synchrotron Ra-diation Sources , Grenoble, France, May 2023 ,
https://www.esrf.fr/files/live/sites/www/file
s/events/conferences/2023/RadSynch23/Presen-tations/Tromba.pdf
[7] L. Gregoratti, S. Lizzit, E. Karantzoulis, and A. Franciosi,
“The Elettra 2.0 Beamlines”, Synchr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 2 |
8979ba40-be97-4518-b260-a1ba6c8769f7 | 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7144
886 MC7.T21: InfrastructuresMOP7144 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distrib... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7144.pdf | 2 |
6671e65e-b6d3-4140-8a84-3bde171a2a67 | EURO-LABS: INTEGRATING EUROPEAN RESEARCH
INFRASTRUCTURES FOR PHYSICAL SCIENCES∗
I. Efthymiopoulos†, CERN, Geneva, Switzerland; M. Colonna, P. Giacomelli, INFN, Italy;
M.J. Garcia Borje, CIEMAT, Spain; A. Maj, IFJ-PAN, Poland;
M. Mikuz, JSI, Slovenia; A. Navin, GANIL, France
Abstract
The European Laboratories for Accele... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 0 |
74494d1b-3d49-4749-bc38-b7b56887b9e1 | enablesresearchatthetechnologicalfrontiersofaccelera-
tor and detector development, supporting the exploration
ofnewphysicsconceptsandopeningnewavenuesinboth
fundamental and applied research — from optimizing reac-
toroperationtomimickingstellarreactions. EURO-LABS
actively promotes diversity and inclusion, offering br... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 0 |
805d5279-10cf-4d5d-ba55-1b57c79902eb | High-Energy Physics (HEP) communities. The project was
establishedinresponsetoachallengeoftheHorizonEurope
Programme [2], to bring together communities in the Physi-
cal Sciences domain, with the objective of providing wider,
simplified, andmore efficientaccess toleading researchin-
frastructuresacrossEurope. Byofferin... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 0 |
6ccfd192-5574-40d0-a37a-f4e4fb390fbf | efficient use of resources through the exploitation of com-
plementarities and synergies. Additional objectives include
fostering cross-disciplinary collaborations, enhancing the
∗EU Grant Agreement No 101057511
†Ilias.Efthymiopoulos@cern.chexchangeofknowledgeandtechnologies,andtraininganew
generation of researchers to... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 0 |
81d7eecd-bb81-488b-b5ca-163e829ac405 | ✪Accelerator R&D
✪HEP Detector R&D
Figure 1: Map of EURO-LABS partner institutions and par-
ticipatingRIsacrossEurope. Associated-partnerfacilities
in the US and Japan, are not shown here.
Nuclear Physics RIs
The Nuclear Physics RIs within EURO-LABS provide
EuropeanandinternationaluserswithTNAaccesstoworld-
leading fa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 0 |
43a97718-88c1-4ba6-a2e5-88ec2cd58a1c | ISOL (Isotope Separation On-Line) methods offered for
TNA access, as well as to neutron-beam facilities.
Forthefirsttime,EURO-LABSalsointroducedaVirtual
Access (VA)schemeofferingaccesstotheEuropeanCentre17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 0 |
c8cb3bae-eda7-415c-8843-346fc3591506 | forTheoreticalStudiesinNuclearPhysicsandRelatedAreas,
and to theoretical support for experiments. Table 1 summa-
rizes the participating TNA and VA facilities. The scientific
Table1: ParticipatingFacilitiesinNuclearPhysics. ESFRI
roadmap RIs are shown in bold
Type Country Host Lab Infrastructure
S,R,N Italy INFN LNL-NS... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 1 |
3143af98-e01e-497f-a121-d725804eb217 | S = Stable ion beams, R = Radioactive ion beams, N = Neutron beams.
goal of the NP Transnational Access is to provide enhanced
opportunitiesfor exploring nucleiunder extremeconditions:
at high temperature ( 𝑇), high angular momentum ( 𝐿), large
isospin (𝑁/𝑍), and extreme masses ( 𝐴), including nuclei
close to the ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 1 |
3f17639e-80fd-474f-834c-7604968ac708 | opment and validation of concepts for future accelerator in-
frastructures, including studies relevant for next-generation
colliders such as the CERN Future Circular Collider (FCC)
andtheMuonCollider. Theparticipatingfacilitiesenable
experimental investigations of advanced accelerator tech-
nologies,includingsupercondu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 1 |
878d825f-a7ef-4c52-befb-3a46dd8d1b5e | roadmap RIs are shown in bold
Type Country Host Lab Infrastructure
MT Switzerland CERN HiRadMat
TI Sweden Univ. Uppsala FREIA
TI Italy INFN-MI LASA
TI Italy INFN-Univ. Sal THOR
TI France CNRS-JCLab SUPRATECH
TI France CEA Irfu-Syn-
ergiumMACHAFILM;
CRYOMECH
TI Switzerland CERN XBOX
EP Germany KIT-ALFA KARA; FLUTE
EP UK... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 1 |
21cdd2f6-a4d5-4fae-92b5-a94d7dd6a82f | future detector technologies.
Table 3: Participating Facilities in HEP Detector
R&D.ESFRI roadmap RIs are shown in bold
Type Country Host Lab Infrastructure
TB Switzerland CERNPS&SPS
TB Germany DESY DESY-II
DC Croatia RBI RBI-AF
DC Spain ITAINNOVA EMCLab
DC Switzerland CERN IRRAD; GIF++
DC Slovenia JSI TRIGA Reactor
DC... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 1 |
c4dc6a30-46ca-43ab-a6c2-837279678509 | approachesbasedonmachine-learning (ML)techniquesto
improve beam quality, transport efficiency, and operational
reproducibility [3].
In Nuclear Physics, significant effort was additionally
devotedtointegratingcommunitydataandserviceswithin
theEuropeanOpenScienceCloud(EOSC)framework,with
the objectiveof strengtheningthe ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 1 |
c1826c45-129b-4dd4-8060-5c0a8a66f728 | RESULTS
EURO-LABShasbeenrunningsuccessfullysinceitsstart
onSeptember1st,2022. Informationonthefacilitiesandap-
plication templates were provided at the project website [1].
Applications included a scientific proposal describing the
scope of the project, with particular emphasis on excellence
and novelty, together with ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
6ef18f4a-6384-4ea9-805a-becf22218982 | sentations at conferences, scientific meetings, and outreach
activitieswithintherelatedresearchcommunities. ByDe-
cember2025,atotalof490TNAprojectshadbeenapproved,
supporting 3557 users across all participating facilities. Par-
15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65-69 70-74 75-79 80-84
Age grou... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
d053c21d-05f7-4106-aea1-9a666719895a | Total EU: 1877EU
0 30 60 90 120 150 180 210 240
CountGeorgiaIcelandIndiaTunisiaArmeniaMexicoSerbiaSouth AfricaNorwayBrazilCanadaSwitzerlandJapanCzechiaIEROTürkiyeSouth KoreaChinaUnited StatesUnited Kingdom
Total non-EU: 868Non-EU (top 20)Home Institute Country
Figure3: HomeInstituteoriginfortheEURO-LABSsup-
ported user... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
6c430e78-d688-469a-bf0f-6b11ae8d1384 | Total EU: 1789EU
0 20 40 60 80 100 120 140 160 180
CountIranAustraliaColombiaTunisiaSwitzerlandCanadaNorwaySouth AfricaMexicoSerbiaRussiaCzechiaBrazilJapanSouth KoreaTürkiyeUnited StatesIndiaChinaUnited Kingdom
Total non-EU: 956Non-EU (top 20)Researcher nationalityFigure 4: Researcher Nationality for the EURO-LABS sup-... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
684c39c4-2086-4a1b-a559-b46e64878b0d | an important pillar of the project. This objective was suc-
cessfully pursued through the organisation of nine train-
ingschoolsacrossEurope,coveringbothintroductoryand
advanced-leveltopics. Aparticularhighlightarethethree
AdvancedHands-OnTrainingSchools onOperationofAc-
celerators (ATSOA) held at CERN in 2024-2026, wh... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
3247d490-b2b3-41cb-95b3-cd507e8802a6 | facilities across Europe and supported a broad range of sci-
entificactivitiesthroughitsTNAprogramme. EURO-LABS
providedscientists,inparticularresearchersatearlystages
of their careers, with the opportunity to realise high-quality
projects fostering novel research and technological develop-
ments. In addition to its sc... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
22ccfad0-a063-4e3b-bca4-891af94cb9b0 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7145
MC7.T21: Infrastructures 889Monday: Poster session MOP7145
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 2 |
97572875-5ccb-4c9d-8ba2-f1dc286b2b04 | ERROR: type should be string, got "https://research-and-innovation.ec.\neuropa.eu/funding/funding-opportunities/\nfunding-programmes-and-open-calls/\nhorizon-europe_en\n[3]P. Madysa, S. Appel, V. Kain, and M. Schenk, \"Geoff: The\ngeneric optimization framework & frontend for particle ac-\nceleratorcontrols\",SoftwareX,vol. 32,p. 102335, Dec.2025.\ndoi:10.1016/j.softx.2025.102335\n[4]EURO-LABS newsletter, https://web.infn.it/\nEURO-LABS/category/media/newsletter/[5]A. Matta, A. Lemasson, and M. J. G. Borge, \"D5.3 Release\nof the first functional version of the openNP catalog\", EURO-\nLABS-EUROpeanLaboratoriesforAcceleratorBasedSci-\nence, Rep. EURO-LABS-Del-5-3, 2026.\ndoi:10.5281/zenodo.17020290\n[6]F. Asvestaet al., \"ATSOA at CERN: A Hands On Acceler-\nator Course in the EURO-LABS Framework\", presented at\nIPAC’26, Deauville, France, May 2026, paper TUP8014, this\nconference.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing\nISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7145" | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 3 |
53d8745b-6e8e-400d-b990-be09a9e23fad | conference.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7145
890 MC7.T21: InfrastructuresMOP7145 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7145.pdf | 3 |
e4da462b-4d73-46d6-b46a-1d2621e74a70 | UNIFYING EFFORTS IN ELECTRICAL SAFETY
FOR AN ACCELERATOR COMPLEX
C. M. Schmitt†, A-L. Perrot , D. Ribiollet, G. Podoleanu, K. Zielinski, K. Papastergiou
CERN, Geneva, Switzerland
Abstract
Large research facilities with continuously evolving
electrical installations and many stakeholders often face
unique chall... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
bfe75dba-0113-408b-acd4-b3e526606b8a | ment from the source to the load. The paper will report on the progress made by the Electrical Safety Project in these
fields and on the proposed methodol ogy towards their
long-term implementation.
INTRODUCTION
Effective electrical risk management relies on technical
measures and on clearly defined organization... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
fa5bac4d-5b9a-4919-8923-9d73e44fe1f4 | were recorded: two were caused by unauthorized interven-
tions (dismantling equipment belonging to another unit , in-
tervening in electrical racks without authorization), and
one resulted from incorrect equipment identification (dis-
connection of cables in the wrong rack). Implementing mit-
igation actions at CERN ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
8769139c-68bd-4715-a251-1239ae268f2e | cantly, and inherent information decay leads to gaps espe-
cially on older installations . CERN operates in a context of
strong coactivity between different internal organisational
units and external stakeholders – organisational complex-
ity being a known risk factor for accidents [1]. The Electri-
cal Distributio... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
1e9d1585-2b3d-460d-84b1-f16e2a513c03 | tation for these goals .
METHODOLOGY
Context within CERN
The scope covers equipment of the Accelerator Technol-
ogy Sector (ATS) with potential electrical risk to people,
excluding the power distribution grid . Extra low voltage
(<50 V RMS AC or 120 V DC) connections are thus only
considered when additional ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
d4cbc12a-a815-4748-9fd9-ce3be6a971bd | tions are shown in the Fig. 1 below .
Figure 1: Context within the CERN .
Terminology
Two key roles were identified as critical for the clear
identification of responsibility along the powering chain.
The Equipment Owner (EOw) is defined as the organi-
sational unit responsible for the overall safety o... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
44d3cec1-c35e-4469-99a1-89cc84eefe23 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7146
MC7.T21: Infrastructures 891Monday: Poster session MOP7146
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 0 |
b0df0116-d5c3-4a61-a548-e95ceeb17536 | equipment documentation in the designated asset manage-
ment and documentation databases . They are supported by
a Deputy Equipment Operator (DEOp).
In addition to this, delegation and electrical dependen-
cies of equipment contain critical information about risks
and responsibilities along the powering chain .
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
3c109aac-7273-449d-b067-e3a22e67bfbe | ing data and tools, and a n improved onsite identification .
Deliverable 1: Responsibilities along the
Electrical D istribution N etwork
To document the ownership and delegated activities ,
eight Operation and Maintenance Agreement Document s
are drafted per equipment type: m agnets, beam transfer in-
stallat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
b5ef29ea-bd04-4c1d-a0d6-8312d6f05916 | sponsibilities .
For each of these eight documents , typical powering
chain scenarios were identified. Then, for each powering
chain the following were created: a description of the cir-
cuit, a schematic overview showing the equipment and its relations, and a list of Equipment Owners . For each equip-
ment , ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
9c67bb35-9c44-4571-83bd-e73dcc82d473 | An agreement has been reached where ownership depends
on installation environment and cable type. For this, the
electrical engineering group takes ownership of off-the-
shelf cables in shared environments (like cable trays or underground cabling between buildings), while the user groups take ownership of cables ei... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
ac0fe2c6-9383-48cc-8c3c-1bfb891825b5 | to the applicable Operation and Maintenance Agreement
document . For one -off cases where no general agreement
exists , this acts as a primary source of information. The
data is maintained by the Equipment Operator of the equip-ment .
This information can be uploaded through a dedicated
upload utility tool and ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
7ac03c14-0f55-40fe-a9e3-599158bc190d | Portal
Deliverable 3: Labelling in the F ield
To allow easy on-site identification and provide easy ac-
cess to the relevant safety information , an equipment label
was developed , as shown in Fig. 4 . The labels aim to unify
labelling standards across CERN accelerator complex and
to provide key electrical safet... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
d359503e-1aaa-44e0-baef-9e9933edc292 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7146
892 MC7.T21: InfrastructuresMOP7146 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 1 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.