d691ca36-f6ad-47e0-844b-69b1dadd1fbe
Figure 4: Example of an equipment label . Illustration on a Real Use- Case The powering chain of normal conducting magnets is shown in Fig. 5. The concepts explained in the previous sections will be shown on this example . Figure 5: Example of a typical powering chain, extracted from the normal conducting ma...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
e3eef00c-177b-43e0-b326-d3753baaf4c4
tem B is the electrical engineering group, as it is a standard off-the-shelf cable in the shared environment of under- ground cable trays. The Equipment O perator varies based on location but is a member of the respective groups who is trained on the operation and documentation of these equipment elements. Both th...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
55399981-9535-4a6d-b9c7-70c00610e76a
potential challenges . Three uses cases on real scenarios were selected – one experimental area (East Area), one sur- face building installation (S H18) and one accelerator ring segment (antimatter decelerator). Data quality and up -to-date documentation were found to be the key challenges . Common issues includ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
ddcd4f5e-bb72-4542-90d0-9ed1ea075226
historical inconsistencies continue to influence the current state of need for clearer, harmonized procedures for creat- ing, updating, and maintaining records across groups. The Electrical Safety Project seeks to address this by providing structured and practical guidelines, while encouraging each group to designat...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
5aead1b4-c9e1-4a6f-af37-fb45e13cfd56
quality. At the time of writing, eight operation and maintenance agreement documents have been drafted (split based on the groups involved) , covering a total of twenty -two powering scenarios . Strategy to Full Implementation A series of communication days are being organized, to explain the terminology ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
827c5349-7cd1-4853-9f07-3aef55c229c9
works are being performed on them. CONCLUSION Clear identification of equipment and well -defined re- sponsibilities are essential for electrical safety in complex installations such as CERN. The pilot implementation highlighted significant gaps in data quality, while confirm- ing the proposed methodology as a pra...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
aad29094-7e71-4731-8c39-7ac3adfa8edf
accessibility of critical information. REFERENCES [1] K. L. Vibke Milch, “Interorganizational complexity and organizational accident risk: A literature review, ” Saf. Sci., vol. 82, pp. 9-17, Feb. 2016. doi:10.1016/j.ssci.2015.08.010 17th International Particle Accelerator Conference, Deauville, France J...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf
2
552a620a-6920-4eac-b0d3-e73dd873d43d
INFRASTRUCTURE WORKSITE COORDINATION LESSONS LEARNED FROM THE HL-LHC CASE STUDY T. Bauler, M. Bonnet, H. de Maynard CERN, Geneva, Switzerland Abstract The High-Luminosity LargeHadron Collider (HL-LHC) projectatCERNisamajorupgradeLHC’stodayinstanta- neousluminositybyafactoroffiveandtodaytotalintegrated luminositybyten. ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
ee87b8fa-0eb9-4efc-a379-c056e6d44125
lenges. Dedicatedplanningtoolssupportmilestonetracking, resource management, and coordination of activities. Oper- ationalefficiencyreliesonsafety,scheduleadherence,and rapid response to technical issues. This paper highlights the importance of flexible on-site coordination, integrated plan- ning,andadvancedmonitoringt...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
777b2811-14a5-407d-a8d8-448028bf0e66
complexity, the upgrade demands meticulous planning and spansoveradecade. TheHigh-LuminosityLHC(HL-LHC) represents a significant advancement in accelerator technol- ogy. Itstechnicalinfrastructureincludescivilengineering, electrical distribution, cooling and ventilation, access and alarm systems, technicalmonitoring, t...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
d7e82314-27c3-4da1-b4ab-569c65486ec1
verter gallery, service galleries, safety galleries, and vertical cores connecting the new infrastructure to the existing LHC (see Fig. 1) [1]. At CERN, accelerator coordination is managed by the Accelerator Coordination and Engineering group. For the casestudiespresentedhere,coordinationinvolvedtwoFa- Figure 1: Overvi...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
9f791068-b553-4bf9-9658-8e02c7ab4f20
activities. The CSPS ensures compliance with safety best practices,reportsonnewactivities,andprovidesexpertguid- ance. All activities require approval from both coordinators before initiation. COORDINATION CHALLENGES OF THE VERTICAL SHAFTS Two case studies illustrate the coordination challenges encountered during the H...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
d2e88e86-ea96-431f-bed9-4ec1abccead5
commissioning of the shaft at Point 1. After completing the civil engineering work, the lift installation began. However, concrete debris falling during commissioning disrupted the process, threatening to delay infrastructure installation in thegalleries. Giventheshaft’scriticalrole,bothasaworker access point and a mat...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
25ede20b-f353-4447-a6d3-eb0db2dd6775
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7147 894 MC7.T21: InfrastructuresMOP7147 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
0
1e1b50c4-0959-46f4-ab85-adc515c9c655
bridgethegapbetweentheworksiteandmanagement(see Fig.2). Figure2: Thecoordinationisafocalpointwithstakeholders. Infrastructure Installation Within the Shafts Thesecondcasestudyaddressesinfrastructureinstallation challengeswithintheshafts. Beyondservingasadelivery route, the shaft must accommodate infrastructure such as ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
1
ac79c18c-dba1-4929-bde0-2d2325efdf9e
point 5 started to be delayed compared to the baseline. This forced the coordination to initiate worksite meetings that fa- cilitate the communication and the reactivity to issues. The facilitycoordinator,overseeingall installationphases from conception to commissioning, acted as a conductor, linking the two sites and ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
1
7c824490-83ef-448a-8187-b1862784a51b
completed on the other site. COORDINATION METHODOLOGY The methodology begins with the consolidation of inputs from the 3D Integration Service providing the 3D drawings andverifyingtheinterfacesbetweenequipmentsandfrom theProject Engineerresponsible ofthe physicalworkand the contractors. This integration enables the wor...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
1
a0b216a3-f36e-4e12-965d-b073dfb37747
ingthis,apreparatoryvisitisorganizedtoclarifyspecific needs, such as delivery logistics, storage requirements, and workshoparrangements. AJointSafetyVisit(VIC)issubse- quentlyconductedtoensurethesafetyofallstakeholdersand to guarantee compliance with safety regulations. Regular worksite meetings are held with Work and ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
1
8ef6cb92-2e61-4cfe-ae2f-342d67357801
tailoredtoaspecificpurposeandaudience. Theseschedules arerankedinorderofimportancefromLevel1toLevel4, with Level 5 introduced temporarily to manage particularly complex activities. •Level 1 consists of the CERN accelerators schedule, primarily used for general CERN communication with a horizon of decades. •Level 2 is t...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
1
f4f62f61-1c7c-4343-82fd-abb708b437b3
providingashort-termview,typicallycoveringafive weekshorizon. Updatedweeklyandpublishedinthe weekly report, it is primarilyaimed at techniciansand on-site WSS. This schedule distils information from higher-level schedules to ensure daily coordination on- siteandincorporatesconstraintsfromLevels2and3.17th International ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
1
ed81d26f-f429-4c47-b7e6-0076a6004b20
Italso feedsbackfield information tothe higher-level schedules. •Level 5 is used temporarily and exclusively in cases of forcemajeure,whereprecisedailyplanningisrequired for complex activities. Figure 4: From Worksite schedule to CERN management schedule. Differentschedulesofferdifferentviewsandgran- ularity, targeted ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
2aba427d-45d5-427b-8631-2c2abde9ed11
the installation phase. This coordination acts as a bridge between all stakeholders, enabling rapid information sharing and prompt issue resolution. By facilitating seamless communication among groups, it ensures efficient information flow and timely responses to challenges. Thesecondlessonhighlightsthecontinuousimprov...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
a7aa397e-e73a-414b-b738-185dcf3685b8
technicalandsafetyvisitsatthestartofeachactivityaddress emerging needs such as compensatory safety measures, handling procedures, scaffolding, or lockouts. Follow-up meetings throughout the activity allow for reactive so- lutions,reassessmentofco-activities,andadaptiveplanning. The third lesson underscores the necessit...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
45f1e749-269a-4262-953b-69bb02e20788
to commissioning, providing scheduling and organiza- tional support. By centralizing worksite knowledge, the coordination team delivers efficient, personalized support to stakeholders, empowering the Facility Coordinator to schedule, guide, and manage the worksite effectively. Finally, a fourth lesson underscores the i...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
73c49524-64ba-406c-931e-9bb8436c84a3
activity starts and measures are shared with all stakeholders. CONCLUSION & FUTURE WORKS Coordinating the installation of such a complex project requires flexible planning strategies, tailored to the stake- holdersinvolved. Adualtop-downandbottom-upapproach, combined with real-time monitoring of day-to-day worksite iss...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
45e9adf9-74f5-4fb6-9a04-e8ea0697d5a5
Thefacilitycoordinationteamexperiencefoundthatin- creasingits ownautonomywouldgreatlyhelp the efficiency ofworkingon-site,particularlyinareaswheredifferentre- sponsibilitiesareinterfacingtoeachother. Assigningamod- estbudgettothecoordinationteam,estimatedas0.8%ofthe activityvalueanddesignatedexclusivelytofundinterface ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
797d9bcf-1004-4a42-8f9b-ba7b7e4ad7a9
management to propose claims based on delays observed.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7147 896 MC7.T21: InfrastructuresMOP7147 Monday: Poster session Content from this work may be used under th...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
2
dfd5a575-a4c0-4233-867e-15aff47d6728
ACKNOWLEDGEMENTS Theauthorsgratefullyacknowledgethetechnicians,de- signers,andengineersfortheirvaluablecontributionsand effective collaboration in the planning and execution of this project. Thisworkreflectsthreeyearsofdevelopment,dis- cussions,andcontinuousimprovementsacrossbothwork- sites and offices. Each project ph...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
3
886494f0-10e8-4760-b05c-c2667b7ee778
acceleratorcomplex”,in Proc.IPAC’25 ,Taipei,Taiwan,Jun. 2025, pp. 891–894. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt425-TUBN1 [3]E. Vergara Fernandez et al., “Processes and Tools to Man- age CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex”, in Proc. IPAC’22 , Bangkok,Thailand, Jun....
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
3
34e05c23-acc0-40be-9bb6-1655708c6ee3
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7147 MC7.T21: Infrastructures 897Monday: Poster session MOP7147 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf
3
ff5623ed-5b99-42fc-b502-4578cf91bd17
DEGASSING OF DISTILLED WATER -COOLING CIRCUITS AND AFFECTED COPPER -WALLED STRUCTURES R.P. Kan*1, R. Eichler1,2 and A. Weber1 1 PSI Center for Accelerator Science and Engineering, Villigen, Switzerland 2University of Bern, Bern, Switzerland Abstract Cooling circuits running with distilled water to cool cop- ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
0
d3338637-5532-4637-beb4-008dad354289
water leakage. Regular unclogging causes the circuit to be opened more often and therefor e accelerating the destruc- tive process. A good solution to this problem comes with a steep price: Degassing by reverse osmosis in every copper cooling circuit. PURE WATER TURNING ACIDIC A Troublesome Copper Cooling Circu...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
0
ddc2fd35-de03-401f-ab75-547e3d7c60ef
tions (regime 5 of Fig . 6 due to CO 2) and the steady abla- tion of the interior of copper coils / tubes (due to O 2). Ongoing Chemistry at the Surface The corrosion mechanism is illustrated in Figure 4. Ox- ygen (O 2) and carbon dioxide (CO 2) are always present in water due to interaction with the atmosphere....
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
0
6b4d70ae-4ddd-4ac6-8279-fd703bb90001
formed at the surface. Upon further oxidation by dissolved oxygen CuO (blackish in colour as in Fig. 3) forms. In the absence of other influences this stable surface, non -soluble in water at these pH -levels, would render this surface stable to further corrosion. However, the mechanical stress from *Richard.K...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
0
8b0e1805-bca7-4a8d-956e-9ccc154483ce
Figure 2: Accumulations of corrosion sludge (ø6 mm), con- sisting of CuO and/or Cu 2O, from behind a flow restrictor. A Swiss 50 centime coin is shown in the background [1]. Figure 3: Filtrated deposits of various copper ox ides. The pore size of the filter is 12 µm. The dry weight of the resi- due is 0.72 g [...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
0
6f863da7-e0f9-4dcb-8a4c-6b3d700ee2e3
Figure 5: A quadrupole magnet with copper coil made of small diameter tubes with narrow elbows, filled with dis- tilled water at a low flow rate (to counteract erosion). Equation 1: Rate of corrosion R [µm/y], see Table 2 for contributing factors 𝑅𝑅⬚= 1.4 × 109×𝑐𝑐(𝑂𝑂2)×𝑐𝑐(𝐻𝐻+)×𝑓𝑓(𝑇𝑇)×𝑓𝑓(𝑉𝑉) ×𝑓...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
1
600a002d-c769-4584-9030-0e0ab995fe74
𝑓𝑓 (v) [m/s] 20.3 0.5 m/s< v < 4 m/s (v1/2 ) 𝑓𝑓 (T) [0C] 3 20°C< T < 50 °C 𝑓𝑓(γ): dD/dt [Gy/h] 1.6 1 Gy/h < Dγ < 900 Gy/h The rate of corrosion shown in Equation 1 depends strongly on the concentration O2 and CO 2, and the flow rate, but much less on temperature and dose rate [4] . The resulting c...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
1
cda188a5-c8e1-4c1a-8281-b4c638befaee
the residue. However, every time the water circuit had to be opened, (a lot of) oxygen and carbon dioxide were able to enter , also the pH level 5.6-6.65 was measured [1], which puts the system into the orange band where Cu reacts with O2 into Cu 2O (see Fig. 7). Weekly flushing was necessary until this cooling was...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
1
60751c2f-4657-4390-bb22-5ff9d6934b13
verse osmosis. It is connected in series with ion exchange filters on a bypass of the water circuit (Fig. 9). Figure 8: The degassing system With roughly €200k plus yearly maintenance of about €15k, it is costly, and it needs to be installed in many dif-ferent water -cooled circuits, depending on the possible ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
1
28b5b506-447c-4512-aa95-5b5e4e651062
Regime 4 Regime 5 Regime 4 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7148 MC7.T21: Infrastructures 899Monday: Poster session MOP7148 Content from this work may be used under the terms of the CC BY 4.0 li...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
1
4c08cee9-661d-4b9b-8692-8de9030a43a5
one-week failure of the degassing system in cooling circuit nr.9 in 2021 abruptly caused a cooling- water blocking of the deflection magnet AWD. One of the last cooling cir- cuits (PROSCAN P5 for inactive power supplies (pH6.9) ), is still without a degassing system, and recently heat ex- changers in power supplies...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
9372f290-aca2-425c-8e1d-7a4ae9c2bbb0
PSI has chosen a system that reduces the oxygen content from <50 ppm to <5 ppb and carbon dioxide to <3%, while the water resistivity is reduced from 1 µS/cm to 0.1 µS/cm -0.2 µS/cm. The exchange of the resin of the deionization is done every two years about. The pH level is kept this way between pH 6.8 and pH...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
eee359db-657b-4951-9157-01d5dd9f40aa
cuits for water that ca n become radioactive have a separate degassing system than cooling circuits where the water is not exposed to radiation (in case of power supplies cooling circuits). Also, cooling circuits for aluminium structures should never be mixed with copper cooling circuits due to galvanic corrosion ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
9ed6536d-5c16-4449-bb0f-6cd9cd4791bb
uminium oxide/hydroxide deposits) at intermediate pH levels, which can clog tubes and reduce thermal perfor- mance. Otherwise, the amphoteric aluminium is very sen- sitive to pH levels; its protective oxide layer is only stable between pH 4.0 and pH 8.5. If the pH drops below this range due to CO₂ content in the w...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
021cdec6-5bfe-4811-a867-0f7fbe8cca9e
Figure 11: The Pourbaix- diagram of Al in an aqueous en- vironment at 298 K, 1 bar and a[Al]=10- 8 m [6] CONCLUSION Air leakage into a cooling circuit cannot be prohibited and all copper cooling circuits corrode (even OFE copper) and should therefore have a degassing system to prevent water leakages and clogging ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
53221b41-2e2d-4d76-8e96-fcb8a518b445
[4] R.Dortwegt, E.V .Maughan, “ The chemistry of Copper in w a- ter…”, in Proc. PAC-01, Chicago, II, USA, Ed, in PAC01 -01, vol.2, IEEE, pp.1456 -1458 . doi:10.1109/pac.2001.986712 [5] B.Beverskog, I.Puigdomenech , “Revised Pourbaix diagrams for copper at 25 to 300°C”, J. Electrochem . Soc., vol. 144, no. 10, ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
e05300a1-565d-4f41-9989-482a6b74d88f
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7148 900 MC7.T21: InfrastructuresMOP7148 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf
2
51e3951f-203c-45eb-8d3c-54f39b54fb1a
MODELLING AND EXPERIMENTAL STUDIES OF A X-BAND WINDOW FOR MOBILE LINACS∗ Y. Rozier†, Epsyl, Pertuis, France M. Boucard, AVELION, Peynier, France Abstract Radio-frequency (RF) windows are sensitive components thatensurebothRFpowertransmissionandvacuumintegrity in linear accelerators (LINACs). In the X-band frequency, im...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
0
a3e737d7-e85d-4e9f-acf1-9be6543c3860
exploiting the 𝑇𝐸112mode. A prototype has been fabricated, and low-power RF mea- surements have been carried out to validate both the design andmanufacturingprocess. RF simulationsand low-power testsshowinsertionlossesbelow 0.1dBandastanding-wave ratio lower than 1.05 at 9.3GHz. High‑power endurance tests carried out...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
0
790a2118-f9be-4129-89d6-57b5ec1079d3
solutionsthatgobeyondasimplepill-boxdesign[ 1]forfield considerations. Integrationofirisinwaveguide[ 2],progres- sive taper [ 3] or over-sized dimensions [ 4] approaches leads to dimensional constraints on the final system. Mixed-mode designs [5,6] have also been reported in the literature. The RF window presented in t...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
0
22651985-0c41-4a51-a11e-8346a0837006
significant design constraints. In particular, the reduction ∗ThisworkwassupportedbyagrantfromtheFrenchPublicInvestment Bank(Bpifrance) as part of the France 2030 program. †yrozier@avelion-alcen.comTable 1: RF windowspecification Item Value Unit Central frequency 𝑓𝐶9.3 GHz RF peak power 2.0 MW RF average power 1.6 kW...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
0
a108f794-1e62-4fa4-b91a-827ce5151c2d
DN40CF vacuum flange on the LINAC side and a WR90 squarecoverflangeontheexternalside. Thecomponent is manufactured using a two-stage brazed approach. A 97.6% vacuumgradeAl2O3(AL300®,MorganAdvancedCeram- ics)has beenused forthispurpose. Itsrelativepermittivity is 9.04 at 8.5GHz, which is consistent with the operating fr...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
0
69e078d8-1cae-4236-858c-659a19451f45
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7150 MC7.T31: Subsystems, Technology and Components 901Monday: Poster session MOP7150 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
0
79f0c56d-b26b-4ac7-b47d-a2855e27fdd2
Coupled Modelling Numerical simulations were performed using Comsol Multiphysics®, coupling several physics: RF, heat trans- fer,laminarflowandstructuralmechanics. TheRFdesign has been performed to ensure the best transmission possible alongtheentirestructurepath,startingfromthechokeflange uptothepillboxwindow. However...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
1
570f1bf7-23fc-40c0-b68a-e15eb7ac2662
(6.15A/mm ) at the ceramic window values are obtained. Thesefieldlevelsprovideincreasedtolerancewithrespect to potential brazing excess during fabrication. The maxi- mum electrical field observed ( 6.94kV/mm ) is located at half the length of the rectangular-circular transition. This valueis belowthe design limit (< 10...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
1
0effd92d-0b38-43d1-b52b-855cad16a675
der steady state conditions, incorporating thermal analy- sis, fluid flow, and structural deformation. These simula- tions have been performed at an average transmitted RF powerof 1.6kW,whichcorrespondstothemaximumpos- sibleaveragepowerdeliveredbytheavailablemagnetrons. The cooling principle is very simple, with water ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
1
9e78f386-4ded-4d3b-a959-61b22f984182
Figure 3: Simulated thermal field (top) and water flow (bot- tom) maps for an average RF power of 1.6kW. EXPERIMENTAL VALIDATION Low-Power Tests After the brazing sequence, helium leak tightness has beenmeasuredto 4×10−10mbarL/s,confirmingcompati- bility with ultra-high vacuum operation. RF transmission (𝑆12=−0.07dB) ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
1
4363756c-8bed-469c-bc3f-a2a4c70414c1
air partiallyreduces these differences. However, they don’t fully explain the observed deviations. Further refinement of the model would require incorporating the actual braz- ingjoint volumeaswellas the preciseas-built geometrical dimensions of the component into the simulations. High-Power RF Tests The high-power tes...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
1
186dc7e0-bf41-4bc5-9815-d1412245ac9c
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7150 902 MC7.T31: Subsystems, Technology and ComponentsMOP7150 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
1
39966089-03a4-4376-a6c0-f2b633637174
Figure4: Simulated andmeasured reflectedRF power 𝑆11. figure) on the input side and a water load on the output side (right side of the figure). To reproduce realistic LINAC operating scenarios, con- trolled mismatches were intentionally introduced down- stream of the RF window. This was implemented designing a symmetr...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
2
db9bd87b-8f47-48f7-bf80-3f7e9436858b
the whole power ramping sequence, no indication of perfor- mance degradation has been observed. At the end of the power ramping sequence, an endurance test at full peak power and full average power is performed for each iris conditions, checking the temperature elevation on the outer surface. The test duration variates...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
2
d84661f8-b3a0-4542-86e4-426a6fe59815
and reflection characteristics, as well as the preservation of heliumleaktightness,indicatingappropriatedesignmargins for the RF window. CONCLUSION A prototype RF window for X-band LINAC working at 9.3GHzwas designed, manufactured, and experimentally validated. The design, based on an extended cylindrical pillbox geome...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
2
ed6cb5be-8ce7-497f-8b72-6955240138ff
dation, or loss of vacuum integrity was observed. Thesuccessfulcompletionofthemanufacturingandtests will enable future integration into our X-band products. ACKNOWLEDGMENTS The authors thank N. Tannoury and T. Campanella for technical supervision, V. Parga and R. Convers for CAD design,J.Sommervogel,J.Marre,andG.Sanzfo...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
2
88416bfd-aa8e-4b9c-a26f-00c40b9f840c
Design of an S-band Pillbox-Type RF Window”, in Proc. LINAC’98 , Chicago, U.S.A., Aug. 1998, paper MO4081, pp. 249–251. https://jacow.org/l98/papers/MO4/zero.alt481. pdf17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
2
f878c74a-52df-40a5-aff9-05d8b0d59934
[3]Y. Otake, S. Tokumoto, and H. Mizuno, ”Design and High- PowerTestofaTE11-modeX-bandRFWindowwithTaper Transitions”, in Proc. PAC’95 , Dallas, U.S.A., May 1995, pa- per TAQ29, pp. 1590–1592. doi:1/zero.alt4.11/zero.alt49/PAC.1995.5/zero.alt45296 [4]W. R. Fowkes, R. S. Callin, and E. N. Jongewaard, ”Large di- ameterred...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
3
a7b98fa4-895d-4d50-b298-71c2d39501c7
UnitedKingdom, April 2017. doi:1/zero.alt4.11/zero.alt49/ivec.2/zero.alt417.8289511 [7]M. Boucard and Y. Rozier, ”Compact X-Band Linear Acceler- atorsDesignforOn-SiteIndustrialApplications”,presentedat IPAC’26, Deauville, France, May 2026, paper TUP8002, this conference.17th International Particle Accelerator Conferenc...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf
3
152d3b6a-be9a-4a73-9df4-5e93d1e9aa81
CHALLENGES IN THE DEVELOPMENT OF THE SIS100 ELECTROSTATIC EXTRACTION SYSTEM M. Petryk†, GSI Helmholtz Centre for Heavy Ion Research, Darmstadt, Germany Abstract The "Facility for Antiproton and Ion Research" (FAIR) is a new international accelerator complex, which is cur- rently built in Darmstadt, Germany. Pa...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
0
beddab1f-abc8-49ee-943b-44de36ca23d6
Specifications on rise and fall times for the high voltage implies the need of a bleeder resistor, used for improved voltage accuracy, too. During this project numerous prob- lems had to been solved to end up with a stable system. The results of the tests and lessons learned are presented. SYSTEM OVERVIEW The el...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
0
ae12ad00-fa41-48aa-92b6-00a01a477c19
† m.petryk@gsi.de Figure 2: Deflection of part of the beam. To achieve the required deflection angle, a high voltage between -5 kV and - 180 kV is used. Due to the required length, two electrode systems of 2.5 m length each are used in this septum. P rotection r esistors (Fig. 3) are used to ab- sorb the ener...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
0
384e1b52-cfe9-43d0-8545-acd876cf84c5
The intensity of the beam can destroy the anode wires if the beam parameters are chosen wrong. To reduce the dam- age, broken wire detection in multiple independent sec- tions rises an alarm and switch of the accelerator immedi-ately. NEG- Modules have to build into the chambers to reach the required vacuum quali...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
0
3f077523-6f26-470f-a8db-234dfc81bfbd
MECHANICAL CHALLENGES Bake out cycles are necessary to reach the necessary vac- uum quality. The heating process up to 300°C elongates the chamber more than 2 cm. It has to be ensured, that after cool down, everything is in the original position again. Some parts of the system cannot withstand the high tem- perat...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
1
1c043a92-06e5-4ec1-96f3-7e5cf31e876f
springs. To reduce the force by using weaker springs would solve this problem but can’t guarantee sufficient contact of the electrodes to the HV source at each position in the mov- ing range . Figure 5: Simulation results of spring- loaded cathode. Recalculations of the beam dynamic shows, that the ef- fect of...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
1
4ad27b62-2887-4c5a-8e1d-2a95fe1bcdbf
between straightness and tension limit has to be found. Low spring forces lead to bending of the wires due to the force caused by the electric field (Fig. 7, Fig. 8), while strong forces break the thin wires (0.1mm) , heated up by the beam. Figure 7: Influence of the electr ostat ic field to the wire po- sit...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
1
8826d20b-fe3c-48bd-89e4-f095e5ef23e7
During the bake -out cycles the tension of the spring forces are reduced (Fig. 9), further complicating the issue. Figure 9: Measured spring forces over bakeout cycles. V ACUUM CHALLENGES The requirements are a pressure below 2*10e -11mBar despite numerous components featuring large surface ar- eas. To reac...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
2
4f437715-7fea-4ad6-b0ad-511412f8babc
and the septum a bleeder resistor is used. This bleeder (Fig. 10) had to be redesigned due to internal arcs . The internal voltage measurement of the power supply is not accurate enough. Therefore, a calibrated voltage di- vider was implemented into the bleeder oil tank . Space restrictions forced a development...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
2
fa690561-939e-4b0f-b9da-475fad465220
reduced significant by a controlled voltage ramp -up with several interpolated setpoints. Figure 1 1: Overshoot caused by mismatched control loop to the load in the power supply . Originally the connection between the HV -parts of the system (bleeder resistor, T -shaped pre resistor, HV feed- throughs) was real...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
2
1917392f-2db7-45ba-8658-83ab08410e5d
SUMMARY The project is currently under final acceptance test. Pushing the limits of field strength, vacuum quality and available space, the development of the septum system was combined with many changes and adaptions. But we are looking forward to complete this project within the next two months. ACKNOWLEDGEM...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
2
c9002f29-5748-41dc-acd8-5d24a8546bae
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7151 MC7.T31: Subsystems, Technology and Components 907Monday: Poster session MOP7151 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf
2
0d07ac14-120e-4f57-b593-55245ff5da4d
DEVELOPMENT OF A GUANELLA-TYPE 4:1 IMPEDANCE TRANSFORMER FOR THE FUTURE SIS100 BROADBAND CAVITY SYSTEMS C. J. Wegmann∗,1, H. Klingbeil1,2, R. Balß2, M. Frey2, U. Laier2, S. Orth2 1Technical University Darmstadt, Darmstadt, Germany 2GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany Abstract The SIS1...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
0
f8e63294-6a96-4189-9fa9-27365a53e842
attheexpenseofmore driveramplifier power. Inthiscase, achieving an impedance matching to the driver amplifier ne- cessitates the inclusion of a transformer generating a broad- band4:1 impedance transformation overthe entirerelevant frequencyrange. AGuanella-type4:1ferritetransmission line transformer meeting these requ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
0
6d15b046-e0bf-47f5-a9d6-7072af74f46f
15MHz need to be induced. The tetrode’s control grid input, fed by a DC-bias and anRFdriveramplifier[ 5]connectedviaaLCF12line[ 6] of about 100mlength, represents a capacitance of about 800pFto1000pFin parallel to the resistive load. While techniquesdirectlyimprovingthesignalqualityofthegap voltage are planned – e.g. p...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
0
25e43cd9-7857-492b-91b2-abb3561e20d7
frequency range and power level (2kWto 3kW). ∗julien.wegmann@tu-darmstadt.de 50 Ω c= 0.87c0 100 m50 Ω15 mH −+−271 V 800 pF 3.75µF 3.75µF50 Ω c= 0.87c0 100 m2 : 1 25 Ω c= 0.67c0 1 m12.5 Ω3.75µF 15 mH −+−271 V 3.75µF800 pFFigure1: Controlgridcircuitwithout(upperdiagram)and with 4:1 impedance transformer (lower diagram, v...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
0
fcb49de8-28bb-4f44-ac91-a8eb704b34ec
mission line transformer with symmetrical and unsymmetri- cal current components [ 8,9]. twolinesontheprimarysidewhileon thesecondaryside the currents carried by the two lines are added. Since all terminalsareconnectedwitheachotherbyDCshortcircuits, capacitive DC blocks are included in Fig. 1. Assuming exactlyequalando...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
0
c0f80499-2902-430a-bfe1-6f76acc298c1
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7152 908 MC7.T31: Subsystems, Technology and ComponentsMOP7152 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
0
93763490-5adc-405d-b71e-3db049ac05bc
Figure3shows measurement results of our prototype 4:1 Guanella impedance transformer (in blue) for frequencies from100kHzto20MHz. For all shown measurements, the reference impedance is 𝑍ref=50Ω. Connections are real- izedusingprintedcircuitboards,the 25Ωtransmissionlines byconnectingtwo 50Ωtransmissionlinesinparallel....
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
1
40233b5d-1e35-49ce-8bb7-2ba807c7151c
balun[8,14],anadditionalbalunisnecessarytomatchthe balanced transformer output to the unbalanced VNA port. 0 5 10 15 20 Frequency f in MHz40 30 20 10 0Reflection |S11| in dBWithout Choke With Choke and Housing 0 5 10 15 20 Frequency f in MHz0.00.20.40.50.60.81.0Transmission |S21| (linear scale) Without Choke With Choke...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
1
b33f4c49-38db-4342-a99f-4c8d333b71ae
canbeplacedinahousing(alsoimportantforEMC)with- outdiminishingtheperformancenotablybelowthetargetof |𝑆11| < −20dBi.e. lessthan 1%reflectedpower(seeFig. 3). The transmission remains almost constant in magnitude and linearinphasewiththemaindifferencebeingtheadditional delay introduced by the transmission lines of the ch...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
1
bd8ea351-309d-4292-a82e-b4641bcb82f6
Fig.4. Two current paths corresponding to the symmet- rical and unsymmetrical current through the transmission linescanbeidentified[ 8,9,17](seealsoFig. 2). Onlythe symmetricalcurrenttransmitspowertotheload. Theunsym- metricalcurrentiscounteractedbythewindingsonthecore and,thus,vanisheswithincreasingfrequency(seealso[ ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
1
246d16e9-30f2-4a52-898c-59f00224f4e6
impedance transformer [ 8,9]. From the right diagram of Fig. 4with𝑍ref= 4𝑍out, a relation for the lower operating limit can be obtained as 𝑓−20dB= 𝑓∣|𝑆11|=−20dB=1 2𝜋√99 8𝑍out 𝑀.(3) For toroidal cores with cross sections that are small com- paredtothediameter(andgoodfluxguiding)[ 18],𝑀can be estimated using 𝑀 ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
1
1392b2c7-c53e-4023-b41f-180b5b3ad988
with𝑙 = 3.5maswellasanalyticalpredictionsusingEqs. (3) and (4). 100101 Number of Windings N102 101 100f20dB in MHz Measurement Result Analytical Prediction Figure 5: Dependence of the lower operating limit on the number of windings on the magnetic core.17th International Particle Accelerator Conference, Deauville, Fr...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
1
822e0044-ce15-4f64-bfef-c8128ce39687
Upper Operating Limit Considering again the circuit diagram of Fig. 2but intro- ducing an asymmetry 𝑍L1= 𝑍L,𝑍L2= 𝑍L+Δ𝑍Lleads to the impedance transformation 𝑍in= 4𝑍out⎡⎢⎢ ⎣1+Δ𝑍L 2𝑍out−𝑡2Δ𝑍L 8𝑍out+𝑗𝑡(1+Δ𝑍L 4𝑍out) (1+Δ𝑍L 2𝑍out)+𝑗𝑡(1+Δ𝑍L 4𝑍out)⎤⎥⎥ ⎦.(5) Evenasmall asymmetry can leadto alargemismatchn...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
2
30b38c6c-4acd-46c1-813c-58a03ec8fe4d
sion lines means less windings on the core are possible. 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 Frequency f in MHz40 30 20 10 0Reflection |S11| in dB 13.55 MHz 16.89 MHz16.89MHz 13.55MHz1.25=3.5m 2.8m l=3.5 m l=2.8 m Figure 6: Comparison of impedance transformation for Guanella transformers with lines of different l...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
2
5cab4914-b488-433b-932e-b322e619168d
quality decreases for higher frequency. Figure8showsthefirstseriestransformer. Guanellatrans- former (left) and choke coil (right) are located in a housing with integrated air cooling. From long-term high-power tests,heatingdue totransmissionline losseswasidentified asalimitingeffect. Ascountermeasures,thelinetypewas r...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
2
c9b89544-1f27-4b76-929f-443d79353057
Measurement Sim. without Transformer Sim. with Transformer Sim. with Transformer and 1 m, 25 Line 2 1 0 1 2 3 Time t in µs0.2 0.1 0.00.10.2Driver Input in V 540 470 370 270 170 70 0 Control Grid Voltage in VFigure 7: Measurement setup (upper picture) and results (lowerdiagrams)ofthetetrodeinputcircuit. Components fr...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
2
05242791-16ba-4a25-929d-723212cf34f2
improvements of the circuit design are in progress. Applica- tions to other problems are possible. ACKNOWLEDGEMENTS TheauthorswishtothankfurthermembersoftheRing RF department at GSI for their support of this project. REFERENCES [1]P.Spiller etal.,“TheFAIRheavyionsynchrotronSIS100”, J. Instrum. , vol. 15, no. 12, 2020. ...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
2
746e121f-43ad-4dc4-9671-ebc78ca4d8e7
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7152 910 MC7.T31: Subsystems, Technology and ComponentsMOP7152 Monday: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
2
bcc106ea-6bf3-4211-9ea9-4f6b8c33e933
[3]U.Laieretal.,“StatusandrecentdevelopmentofFAIRRing RFsystems”,in Proc.IPAC’21 ,Campinas,Brazil,May2021, pp. 1073–1040. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt421-MOPAB334 [4]H. Klingbeil, U. Laier, and D. Lens, Theoretical Founda- tions of Synchrotron and Storage Ring RF Systems . Cham, Switzerland: Springer, 201...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
3
8c54b97d-9962-4a86-8994-60229f7fc61a
[8]G. Guanella, “New method of impedance matching in radio- frequency circuits”, Brown Boveri Rev. , vol. 31, no. 9, pp. 327–329, Sep. 1944. [9]O. Zinke and H. Brunswig, Hochfrequenztechnik 1: Hochfre- quenzfilter, Leitungen, Antennen , A. Vlcek, H. L. Hartnagel, and K. Mayer, Eds. Springer Berlin, Heidelberg, 1999. do...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
3
165efb14-15fc-44e1-8646-80205d0c472e
jacket-ENVIROFLEX_316_D ,HUBER+SUHNER,Herisau, Switzerland, Aug. 2024. [14]J.Sevick, Understanding,Building,andUsingBalunsandUn- uns. CQ Communications, Inc., Hichsville,NY, USA,2003. [15]R. W.Lewallen, “Baluns: what theydo and howtheydo it”, ARRL Antenna Compend. , vol. 1, pp. 157–164, 1985. [16]C. J. Wegmann and H. K...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
3
d3efc339-c62e-421d-91b8-321e7af8c7f0
John Wiley & Sons, Inc., 2010. [19]Soft Ferritesand Accessories:Data Handbook , Ferroxcube, Sep. 2008. [20]RG400 LSFH, 50 Ohm, 6 GHz, 105°C, ø5 mm, RADOX® Jacket-ENVIROFLEX_400 ,HUBER+SUHNER,Herisau, Switzerland, Apr. 2025.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-...
D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf
3