id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
d691ca36-f6ad-47e0-844b-69b1dadd1fbe | Figure 4: Example of an equipment label .
Illustration on a Real Use- Case
The powering chain of normal conducting magnets is
shown in Fig. 5. The concepts explained in the previous
sections will be shown on this example .
Figure 5: Example of a typical powering chain, extracted
from the normal conducting ma... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
e3eef00c-177b-43e0-b326-d3753baaf4c4 | tem B is the electrical engineering group, as it is a standard
off-the-shelf cable in the shared environment of under-
ground cable trays. The Equipment O perator varies based
on location but is a member of the respective groups who is trained on the operation and documentation of these
equipment elements. Both th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
55399981-9535-4a6d-b9c7-70c00610e76a | potential challenges . Three uses cases on real scenarios
were selected – one experimental area (East Area), one sur-
face building installation (S H18) and one accelerator ring
segment (antimatter decelerator).
Data quality and up -to-date documentation were found
to be the key challenges . Common issues includ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
ddcd4f5e-bb72-4542-90d0-9ed1ea075226 | historical inconsistencies continue to influence the current state of need for clearer, harmonized procedures for creat-
ing, updating, and maintaining records across groups. The Electrical Safety Project seeks to address this by providing
structured and practical guidelines, while encouraging
each group to designat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
5aead1b4-c9e1-4a6f-af37-fb45e13cfd56 | quality.
At the time of writing, eight operation and maintenance
agreement documents have been drafted (split based on the
groups involved) , covering a total of twenty -two powering
scenarios .
Strategy to Full Implementation
A series of communication days are being organized, to
explain the terminology ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
827c5349-7cd1-4853-9f07-3aef55c229c9 | works are being performed on them.
CONCLUSION
Clear identification of equipment and well -defined re-
sponsibilities are essential for electrical safety in complex
installations such as CERN. The pilot implementation
highlighted significant gaps in data quality, while confirm-
ing the proposed methodology as a pra... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
aad29094-7e71-4731-8c39-7ac3adfa8edf | accessibility of critical information.
REFERENCES
[1] K. L. Vibke Milch, “Interorganizational complexity and
organizational accident risk: A literature review, ” Saf. Sci.,
vol. 82, pp. 9-17, Feb. 2016.
doi:10.1016/j.ssci.2015.08.010
17th International Particle Accelerator Conference, Deauville, France J... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7146.pdf | 2 |
552a620a-6920-4eac-b0d3-e73dd873d43d | INFRASTRUCTURE WORKSITE COORDINATION
LESSONS LEARNED FROM THE HL-LHC CASE STUDY
T. Bauler, M. Bonnet, H. de Maynard
CERN, Geneva, Switzerland
Abstract
The High-Luminosity LargeHadron Collider (HL-LHC)
projectatCERNisamajorupgradeLHC’stodayinstanta-
neousluminositybyafactoroffiveandtodaytotalintegrated
luminositybyten. ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
ee87b8fa-0eb9-4efc-a379-c056e6d44125 | lenges. Dedicatedplanningtoolssupportmilestonetracking,
resource management, and coordination of activities. Oper-
ationalefficiencyreliesonsafety,scheduleadherence,and
rapid response to technical issues. This paper highlights the
importance of flexible on-site coordination, integrated plan-
ning,andadvancedmonitoringt... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
777b2811-14a5-407d-a8d8-448028bf0e66 | complexity, the upgrade demands meticulous planning and
spansoveradecade. TheHigh-LuminosityLHC(HL-LHC)
represents a significant advancement in accelerator technol-
ogy. Itstechnicalinfrastructureincludescivilengineering,
electrical distribution, cooling and ventilation, access and
alarm systems, technicalmonitoring, t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
d7e82314-27c3-4da1-b4ab-569c65486ec1 | verter gallery, service galleries, safety galleries, and vertical
cores connecting the new infrastructure to the existing LHC
(see Fig. 1) [1].
At CERN, accelerator coordination is managed by the
Accelerator Coordination and Engineering group. For the
casestudiespresentedhere,coordinationinvolvedtwoFa-
Figure 1: Overvi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
9f791068-b553-4bf9-9658-8e02c7ab4f20 | activities. The CSPS ensures compliance with safety best
practices,reportsonnewactivities,andprovidesexpertguid-
ance. All activities require approval from both coordinators
before initiation.
COORDINATION CHALLENGES OF THE
VERTICAL SHAFTS
Two case studies illustrate the coordination challenges
encountered during the H... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
d2e88e86-ea96-431f-bed9-4ec1abccead5 | commissioning of the shaft at Point 1. After completing the
civil engineering work, the lift installation began. However,
concrete debris falling during commissioning disrupted the
process, threatening to delay infrastructure installation in
thegalleries. Giventheshaft’scriticalrole,bothasaworker
access point and a mat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
25ede20b-f353-4447-a6d3-eb0db2dd6775 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7147
894 MC7.T21: InfrastructuresMOP7147 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 0 |
1e1b50c4-0959-46f4-ab85-adc515c9c655 | bridgethegapbetweentheworksiteandmanagement(see
Fig.2).
Figure2: Thecoordinationisafocalpointwithstakeholders.
Infrastructure Installation Within the Shafts
Thesecondcasestudyaddressesinfrastructureinstallation
challengeswithintheshafts. Beyondservingasadelivery
route, the shaft must accommodate infrastructure such as
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 1 |
ac79c18c-dba1-4929-bde0-2d2325efdf9e | point 5 started to be delayed compared to the baseline. This
forced the coordination to initiate worksite meetings that fa-
cilitate the communication and the reactivity to issues. The
facilitycoordinator,overseeingall installationphases from
conception to commissioning, acted as a conductor, linking
the two sites and ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 1 |
7c824490-83ef-448a-8187-b1862784a51b | completed on the other site.
COORDINATION METHODOLOGY
The methodology begins with the consolidation of inputs
from the 3D Integration Service providing the 3D drawings
andverifyingtheinterfacesbetweenequipmentsandfrom
theProject Engineerresponsible ofthe physicalworkand
the contractors. This integration enables the wor... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 1 |
a0b216a3-f36e-4e12-965d-b073dfb37747 | ingthis,apreparatoryvisitisorganizedtoclarifyspecific
needs, such as delivery logistics, storage requirements, and
workshoparrangements. AJointSafetyVisit(VIC)issubse-
quentlyconductedtoensurethesafetyofallstakeholdersand
to guarantee compliance with safety regulations. Regular
worksite meetings are held with Work and ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 1 |
8ef6cb92-2e61-4cfe-ae2f-342d67357801 | tailoredtoaspecificpurposeandaudience. Theseschedules
arerankedinorderofimportancefromLevel1toLevel4,
with Level 5 introduced temporarily to manage particularly
complex activities.
•Level 1 consists of the CERN accelerators schedule,
primarily used for general CERN communication with
a horizon of decades.
•Level 2 is t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 1 |
f4f62f61-1c7c-4343-82fd-abb708b437b3 | providingashort-termview,typicallycoveringafive
weekshorizon. Updatedweeklyandpublishedinthe
weekly report, it is primarilyaimed at techniciansand
on-site WSS. This schedule distils information from
higher-level schedules to ensure daily coordination on-
siteandincorporatesconstraintsfromLevels2and3.17th International ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 1 |
ed81d26f-f429-4c47-b7e6-0076a6004b20 | Italso feedsbackfield information tothe higher-level
schedules.
•Level 5 is used temporarily and exclusively in cases of
forcemajeure,whereprecisedailyplanningisrequired
for complex activities.
Figure 4: From Worksite schedule to CERN management
schedule. Differentschedulesofferdifferentviewsandgran-
ularity, targeted ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
2aba427d-45d5-427b-8631-2c2abde9ed11 | the installation phase. This coordination acts as a bridge
between all stakeholders, enabling rapid information
sharing and prompt issue resolution. By facilitating
seamless communication among groups, it ensures efficient
information flow and timely responses to challenges.
Thesecondlessonhighlightsthecontinuousimprov... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
a7aa397e-e73a-414b-b738-185dcf3685b8 | technicalandsafetyvisitsatthestartofeachactivityaddress
emerging needs such as compensatory safety measures,
handling procedures, scaffolding, or lockouts. Follow-up
meetings throughout the activity allow for reactive so-
lutions,reassessmentofco-activities,andadaptiveplanning.
The third lesson underscores the necessit... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
45f1e749-269a-4262-953b-69bb02e20788 | to commissioning, providing scheduling and organiza-
tional support. By centralizing worksite knowledge, the
coordination team delivers efficient, personalized support
to stakeholders, empowering the Facility Coordinator to
schedule, guide, and manage the worksite effectively.
Finally, a fourth lesson underscores the i... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
73c49524-64ba-406c-931e-9bb8436c84a3 | activity starts and measures are shared with all stakeholders.
CONCLUSION & FUTURE WORKS
Coordinating the installation of such a complex project
requires flexible planning strategies, tailored to the stake-
holdersinvolved. Adualtop-downandbottom-upapproach,
combined with real-time monitoring of day-to-day worksite
iss... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
45e9adf9-74f5-4fb6-9a04-e8ea0697d5a5 | Thefacilitycoordinationteamexperiencefoundthatin-
creasingits ownautonomywouldgreatlyhelp the efficiency
ofworkingon-site,particularlyinareaswheredifferentre-
sponsibilitiesareinterfacingtoeachother. Assigningamod-
estbudgettothecoordinationteam,estimatedas0.8%ofthe
activityvalueanddesignatedexclusivelytofundinterface
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
797d9bcf-1004-4a42-8f9b-ba7b7e4ad7a9 | management to propose claims based on delays observed.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7147
896 MC7.T21: InfrastructuresMOP7147 Monday: Poster session
Content from this work may be used under th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 2 |
dfd5a575-a4c0-4233-867e-15aff47d6728 | ACKNOWLEDGEMENTS
Theauthorsgratefullyacknowledgethetechnicians,de-
signers,andengineersfortheirvaluablecontributionsand
effective collaboration in the planning and execution of this
project. Thisworkreflectsthreeyearsofdevelopment,dis-
cussions,andcontinuousimprovementsacrossbothwork-
sites and offices. Each project ph... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 3 |
886494f0-10e8-4760-b05c-c2667b7ee778 | acceleratorcomplex”,in Proc.IPAC’25 ,Taipei,Taiwan,Jun.
2025, pp. 891–894.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt425-TUBN1
[3]E. Vergara Fernandez et al., “Processes and Tools to Man-
age CERN Programmed Stops Applied to the Second Long
Shutdown of the Accelerator Complex”, in Proc. IPAC’22 ,
Bangkok,Thailand, Jun.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 3 |
34e05c23-acc0-40be-9bb6-1655708c6ee3 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7147
MC7.T21: Infrastructures 897Monday: Poster session MOP7147
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7147.pdf | 3 |
ff5623ed-5b99-42fc-b502-4578cf91bd17 | DEGASSING OF DISTILLED WATER -COOLING CIRCUITS AND
AFFECTED COPPER -WALLED STRUCTURES
R.P. Kan*1, R. Eichler1,2 and A. Weber1
1 PSI Center for Accelerator Science and Engineering, Villigen, Switzerland
2University of Bern, Bern, Switzerland
Abstract
Cooling circuits running with distilled water to cool cop-
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 0 |
d3338637-5532-4637-beb4-008dad354289 | water leakage. Regular unclogging causes the circuit to be opened more often and therefor e accelerating the destruc-
tive process. A good solution to this problem comes with a
steep price: Degassing by reverse osmosis in every copper
cooling circuit.
PURE WATER TURNING ACIDIC
A Troublesome Copper Cooling Circu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 0 |
ddc2fd35-de03-401f-ab75-547e3d7c60ef | tions (regime 5 of Fig . 6 due to CO 2) and the steady abla-
tion of the interior of copper coils / tubes (due to O 2).
Ongoing Chemistry at the Surface
The corrosion mechanism is illustrated in Figure 4. Ox-
ygen (O 2) and carbon dioxide (CO 2) are always present in
water due to interaction with the atmosphere.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 0 |
6b4d70ae-4ddd-4ac6-8279-fd703bb90001 | formed at the surface. Upon further oxidation by dissolved
oxygen CuO (blackish in colour as in Fig. 3) forms. In the
absence of other influences this stable surface, non -soluble
in water at these pH -levels, would render this surface stable
to further corrosion. However, the mechanical stress from
*Richard.K... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 0 |
8b0e1805-bca7-4a8d-956e-9ccc154483ce | Figure 2: Accumulations of corrosion sludge (ø6 mm), con-
sisting of CuO and/or Cu
2O, from behind a flow restrictor. A
Swiss 50 centime coin is shown in the background [1].
Figure 3: Filtrated deposits of various copper ox ides. The
pore size of the filter is 12 µm. The dry weight of the resi-
due is 0.72 g [... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 0 |
6f863da7-e0f9-4dcb-8a4c-6b3d700ee2e3 | Figure 5: A quadrupole magnet with copper coil made of
small diameter tubes with narrow elbows, filled with dis-
tilled water at a low flow rate (to counteract erosion).
Equation 1: Rate of corrosion R [µm/y], see Table 2 for
contributing factors
𝑅𝑅⬚= 1.4 × 109×𝑐𝑐(𝑂𝑂2)×𝑐𝑐(𝐻𝐻+)×𝑓𝑓(𝑇𝑇)×𝑓𝑓(𝑉𝑉) ×𝑓... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 1 |
600a002d-c769-4584-9030-0e0ab995fe74 | 𝑓𝑓 (v) [m/s] 20.3 0.5 m/s< v < 4 m/s (v1/2 )
𝑓𝑓 (T) [0C] 3 20°C< T < 50 °C
𝑓𝑓(γ): dD/dt
[Gy/h] 1.6 1 Gy/h < Dγ < 900 Gy/h
The rate of corrosion shown in Equation 1 depends
strongly on the concentration O2 and CO 2, and the flow
rate, but much less on temperature and dose rate [4] . The
resulting c... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 1 |
cda188a5-c8e1-4c1a-8281-b4c638befaee | the residue. However, every time the water circuit had to be opened, (a lot of) oxygen and carbon dioxide were able to enter , also the pH level 5.6-6.65 was measured
[1], which
puts the system into the orange band where Cu reacts with
O2 into Cu 2O (see Fig. 7). Weekly flushing was necessary
until this cooling was... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 1 |
60751c2f-4657-4390-bb22-5ff9d6934b13 | verse osmosis. It is connected in series with ion exchange filters on a bypass of the water circuit (Fig. 9).
Figure 8: The degassing system
With roughly €200k plus yearly maintenance of about
€15k, it is costly, and it needs to be installed in many dif-ferent water -cooled circuits, depending on the possible ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 1 |
28b5b506-447c-4512-aa95-5b5e4e651062 | Regime 4
Regime 5
Regime 4
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7148
MC7.T21: Infrastructures 899Monday: Poster session MOP7148
Content from this work may be used under the terms of the CC BY 4.0 li... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 1 |
4c08cee9-661d-4b9b-8692-8de9030a43a5 | one-week failure of the degassing system in cooling circuit
nr.9 in 2021 abruptly caused a cooling- water blocking of
the deflection magnet AWD. One of the last cooling cir-
cuits (PROSCAN P5 for inactive power supplies (pH6.9) ),
is still without a degassing system, and recently heat ex-
changers in power supplies... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
9372f290-aca2-425c-8e1d-7a4ae9c2bbb0 | PSI has chosen a system that reduces the oxygen content
from <50 ppm to <5 ppb and carbon dioxide to <3%, while
the water resistivity is reduced from 1 µS/cm to 0.1 µS/cm
-0.2 µS/cm. The exchange of the resin of the deionization
is done every two years about. The pH level is kept this
way between pH 6.8 and pH... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
eee359db-657b-4951-9157-01d5dd9f40aa | cuits for water that ca n become radioactive have a separate
degassing system than cooling circuits where the water is
not exposed to radiation (in case of power supplies cooling
circuits). Also, cooling circuits for aluminium structures
should never be mixed with copper cooling circuits due to
galvanic corrosion ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
9ed6536d-5c16-4449-bb0f-6cd9cd4791bb | uminium oxide/hydroxide deposits) at intermediate pH
levels, which can clog tubes and reduce thermal perfor-
mance. Otherwise, the amphoteric aluminium is very sen-
sitive to pH levels; its protective oxide layer is only stable between pH 4.0 and pH 8.5. If the pH drops below this
range due to CO₂ content in the w... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
021cdec6-5bfe-4811-a867-0f7fbe8cca9e | Figure 11: The Pourbaix- diagram of Al in an aqueous en-
vironment at 298 K, 1 bar and a[Al]=10- 8 m [6]
CONCLUSION
Air leakage into a cooling circuit cannot be prohibited
and all copper cooling circuits corrode (even OFE copper)
and should therefore have a degassing system to prevent
water leakages and clogging ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
53221b41-2e2d-4d76-8e96-fcb8a518b445 | [4] R.Dortwegt, E.V .Maughan, “ The chemistry of Copper in w a-
ter…”, in Proc. PAC-01, Chicago, II, USA, Ed, in PAC01 -01,
vol.2, IEEE, pp.1456 -1458 .
doi:10.1109/pac.2001.986712
[5] B.Beverskog, I.Puigdomenech , “Revised Pourbaix diagrams
for copper at 25 to 300°C”, J. Electrochem . Soc., vol. 144,
no. 10, ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
e05300a1-565d-4f41-9989-482a6b74d88f | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7148
900 MC7.T21: InfrastructuresMOP7148 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7148.pdf | 2 |
51e3951f-203c-45eb-8d3c-54f39b54fb1a | MODELLING AND EXPERIMENTAL STUDIES OF A X-BAND WINDOW
FOR MOBILE LINACS∗
Y. Rozier†, Epsyl, Pertuis, France
M. Boucard, AVELION, Peynier, France
Abstract
Radio-frequency (RF) windows are sensitive components
thatensurebothRFpowertransmissionandvacuumintegrity
in linear accelerators (LINACs). In the X-band frequency,
im... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 0 |
a3e737d7-e85d-4e9f-acf1-9be6543c3860 | exploiting the 𝑇𝐸112mode.
A prototype has been fabricated, and low-power RF mea-
surements have been carried out to validate both the design
andmanufacturingprocess. RF simulationsand low-power
testsshowinsertionlossesbelow 0.1dBandastanding-wave
ratio lower than 1.05 at 9.3GHz. High‑power endurance
tests carried out... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 0 |
790a2118-f9be-4129-89d6-57b5ec1079d3 | solutionsthatgobeyondasimplepill-boxdesign[ 1]forfield
considerations. Integrationofirisinwaveguide[ 2],progres-
sive taper [ 3] or over-sized dimensions [ 4] approaches leads
to dimensional constraints on the final system. Mixed-mode
designs [5,6] have also been reported in the literature.
The RF window presented in t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 0 |
22651985-0c41-4a51-a11e-8346a0837006 | significant design constraints. In particular, the reduction
∗ThisworkwassupportedbyagrantfromtheFrenchPublicInvestment
Bank(Bpifrance) as part of the France 2030 program.
†yrozier@avelion-alcen.comTable 1: RF windowspecification
Item Value Unit
Central frequency 𝑓𝐶9.3 GHz
RF peak power 2.0 MW
RF average power 1.6 kW... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 0 |
a108f794-1e62-4fa4-b91a-827ce5151c2d | DN40CF vacuum flange on the LINAC side and a WR90
squarecoverflangeontheexternalside. Thecomponent is
manufactured using a two-stage brazed approach. A 97.6%
vacuumgradeAl2O3(AL300®,MorganAdvancedCeram-
ics)has beenused forthispurpose. Itsrelativepermittivity
is 9.04 at 8.5GHz, which is consistent with the operating
fr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 0 |
69e078d8-1cae-4236-858c-659a19451f45 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7150
MC7.T31: Subsystems, Technology and Components 901Monday: Poster session MOP7150
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 0 |
79f0c56d-b26b-4ac7-b47d-a2855e27fdd2 | Coupled Modelling
Numerical simulations were performed using Comsol
Multiphysics®, coupling several physics: RF, heat trans-
fer,laminarflowandstructuralmechanics. TheRFdesign
has been performed to ensure the best transmission possible
alongtheentirestructurepath,startingfromthechokeflange
uptothepillboxwindow. However... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 1 |
570f1bf7-23fc-40c0-b68a-e15eb7ac2662 | (6.15A/mm ) at the ceramic window values are obtained.
Thesefieldlevelsprovideincreasedtolerancewithrespect
to potential brazing excess during fabrication. The maxi-
mum electrical field observed ( 6.94kV/mm ) is located at
half the length of the rectangular-circular transition. This
valueis belowthe design limit (< 10... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 1 |
0effd92d-0b38-43d1-b52b-855cad16a675 | der steady state conditions, incorporating thermal analy-
sis, fluid flow, and structural deformation. These simula-
tions have been performed at an average transmitted RF
powerof 1.6kW,whichcorrespondstothemaximumpos-
sibleaveragepowerdeliveredbytheavailablemagnetrons.
The cooling principle is very simple, with water ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 1 |
9e78f386-4ded-4d3b-a959-61b22f984182 | Figure 3: Simulated thermal field (top) and water flow (bot-
tom) maps for an average RF power of 1.6kW.
EXPERIMENTAL VALIDATION
Low-Power Tests
After the brazing sequence, helium leak tightness has
beenmeasuredto 4×10−10mbarL/s,confirmingcompati-
bility with ultra-high vacuum operation. RF transmission
(𝑆12=−0.07dB) ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 1 |
4363756c-8bed-469c-bc3f-a2a4c70414c1 | air partiallyreduces these differences. However, they don’t
fully explain the observed deviations. Further refinement
of the model would require incorporating the actual braz-
ingjoint volumeaswellas the preciseas-built geometrical
dimensions of the component into the simulations.
High-Power RF Tests
The high-power tes... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 1 |
186dc7e0-bf41-4bc5-9815-d1412245ac9c | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7150
902 MC7.T31: Subsystems, Technology and ComponentsMOP7150 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 1 |
39966089-03a4-4376-a6c0-f2b633637174 | Figure4: Simulated andmeasured reflectedRF power 𝑆11.
figure) on the input side and a water load on the output side
(right side of the figure).
To reproduce realistic LINAC operating scenarios, con-
trolled mismatches were intentionally introduced down-
stream of the RF window. This was implemented designing
a symmetr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 2 |
db9bd87b-8f47-48f7-bf80-3f7e9436858b | the whole power ramping sequence, no indication of perfor-
mance degradation has been observed.
At the end of the power ramping sequence, an endurance
test at full peak power and full average power is performed
for each iris conditions, checking the temperature elevation
on the outer surface.
The test duration variates... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 2 |
d84661f8-b3a0-4542-86e4-426a6fe59815 | and reflection characteristics, as well as the preservation of
heliumleaktightness,indicatingappropriatedesignmargins
for the RF window.
CONCLUSION
A prototype RF window for X-band LINAC working at
9.3GHzwas designed, manufactured, and experimentally
validated. The design, based on an extended cylindrical
pillbox geome... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 2 |
ed6cb5be-8ce7-497f-8b72-6955240138ff | dation, or loss of vacuum integrity was observed.
Thesuccessfulcompletionofthemanufacturingandtests
will enable future integration into our X-band products.
ACKNOWLEDGMENTS
The authors thank N. Tannoury and T. Campanella for
technical supervision, V. Parga and R. Convers for CAD
design,J.Sommervogel,J.Marre,andG.Sanzfo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 2 |
88416bfd-aa8e-4b9c-a26f-00c40b9f840c | Design of an S-band Pillbox-Type RF Window”, in Proc.
LINAC’98 , Chicago, U.S.A., Aug. 1998, paper MO4081,
pp. 249–251. https://jacow.org/l98/papers/MO4/zero.alt481.
pdf17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 2 |
f878c74a-52df-40a5-aff9-05d8b0d59934 | [3]Y. Otake, S. Tokumoto, and H. Mizuno, ”Design and High-
PowerTestofaTE11-modeX-bandRFWindowwithTaper
Transitions”, in Proc. PAC’95 , Dallas, U.S.A., May 1995, pa-
per TAQ29, pp. 1590–1592.
doi:1/zero.alt4.11/zero.alt49/PAC.1995.5/zero.alt45296
[4]W. R. Fowkes, R. S. Callin, and E. N. Jongewaard, ”Large di-
ameterred... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 3 |
a7b98fa4-895d-4d50-b298-71c2d39501c7 | UnitedKingdom, April 2017.
doi:1/zero.alt4.11/zero.alt49/ivec.2/zero.alt417.8289511
[7]M. Boucard and Y. Rozier, ”Compact X-Band Linear Acceler-
atorsDesignforOn-SiteIndustrialApplications”,presentedat
IPAC’26, Deauville, France, May 2026, paper TUP8002, this
conference.17th International Particle Accelerator Conferenc... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7150.pdf | 3 |
152d3b6a-be9a-4a73-9df4-5e93d1e9aa81 | CHALLENGES IN THE DEVELOPMENT OF THE SIS100
ELECTROSTATIC EXTRACTION SYSTEM
M. Petryk†, GSI Helmholtz Centre for Heavy Ion Research, Darmstadt, Germany
Abstract
The "Facility for Antiproton and Ion Research" (FAIR)
is a new international accelerator complex, which is cur-
rently built in Darmstadt, Germany. Pa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 0 |
beddab1f-abc8-49ee-943b-44de36ca23d6 | Specifications on rise and fall times for the high voltage implies the need of a bleeder resistor, used for improved
voltage accuracy, too. During this project numerous prob-
lems had to been solved to end up with a stable system. The
results of the tests and lessons learned are presented.
SYSTEM OVERVIEW
The el... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 0 |
ae12ad00-fa41-48aa-92b6-00a01a477c19 | † m.petryk@gsi.de
Figure 2: Deflection of part of the beam.
To achieve the required deflection angle, a high voltage
between -5 kV and - 180 kV is used. Due to the required
length, two electrode systems of 2.5 m length each are used
in this septum. P rotection r esistors (Fig. 3) are used to ab-
sorb the ener... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 0 |
384e1b52-cfe9-43d0-8545-acd876cf84c5 | The intensity of the beam can destroy the anode wires if
the beam parameters are chosen wrong. To reduce the dam-
age, broken wire detection in multiple independent sec-
tions rises an alarm and switch of the accelerator immedi-ately.
NEG- Modules have to build into the chambers to reach
the required vacuum quali... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 0 |
3f077523-6f26-470f-a8db-234dfc81bfbd | MECHANICAL CHALLENGES
Bake out cycles are necessary to reach the necessary vac-
uum quality. The heating process up to 300°C elongates the
chamber more than 2 cm. It has to be ensured, that after
cool down, everything is in the original position again.
Some parts of the system cannot withstand the high tem-
perat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 1 |
1c043a92-06e5-4ec1-96f3-7e5cf31e876f | springs. To reduce the force by using weaker springs would
solve this problem but can’t guarantee sufficient contact of
the electrodes to the HV source at each position in the mov-
ing range .
Figure 5: Simulation results of spring- loaded cathode.
Recalculations of the beam dynamic shows, that the ef-
fect of... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 1 |
4ad27b62-2887-4c5a-8e1d-2a95fe1bcdbf | between straightness and tension limit has to be found.
Low spring forces lead to bending of the wires due to the
force caused by the electric field (Fig. 7, Fig. 8), while
strong forces break the thin wires (0.1mm) , heated up by
the beam.
Figure 7: Influence of the electr ostat ic field to the wire po-
sit... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 1 |
8826d20b-fe3c-48bd-89e4-f095e5ef23e7 | During the bake -out cycles the tension of the spring
forces are reduced (Fig. 9), further complicating the issue.
Figure 9: Measured spring forces over bakeout cycles.
V ACUUM CHALLENGES
The requirements are a pressure below 2*10e -11mBar
despite numerous components featuring large surface ar-
eas. To reac... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 2 |
4f437715-7fea-4ad6-b0ad-511412f8babc | and the septum a bleeder resistor is used. This bleeder (Fig.
10) had to be redesigned due to internal arcs .
The internal voltage measurement of the power supply
is not accurate enough. Therefore, a calibrated voltage di-
vider was implemented into the bleeder oil tank .
Space restrictions forced a development... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 2 |
fa690561-939e-4b0f-b9da-475fad465220 | reduced significant by a controlled voltage ramp -up with
several interpolated setpoints.
Figure 1 1: Overshoot caused by mismatched control loop
to the load in the power supply .
Originally the connection between the HV -parts of the
system (bleeder resistor, T -shaped pre resistor, HV feed-
throughs) was real... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 2 |
1917392f-2db7-45ba-8658-83ab08410e5d | SUMMARY
The project is currently under final acceptance test.
Pushing the limits of field strength, vacuum quality and
available space, the development of the septum system was
combined with many changes and adaptions. But we are looking forward to complete this project within the next
two months.
ACKNOWLEDGEM... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 2 |
c9002f29-5748-41dc-acd8-5d24a8546bae | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7151
MC7.T31: Subsystems, Technology and Components 907Monday: Poster session MOP7151
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7151.pdf | 2 |
0d07ac14-120e-4f57-b593-55245ff5da4d | DEVELOPMENT OF A GUANELLA-TYPE 4:1 IMPEDANCE
TRANSFORMER FOR THE FUTURE
SIS100 BROADBAND CAVITY SYSTEMS
C. J. Wegmann∗,1, H. Klingbeil1,2, R. Balß2, M. Frey2, U. Laier2, S. Orth2
1Technical University Darmstadt, Darmstadt, Germany
2GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany
Abstract
The SIS1... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 0 |
f8e63294-6a96-4189-9fa9-27365a53e842 | attheexpenseofmore driveramplifier power. Inthiscase,
achieving an impedance matching to the driver amplifier ne-
cessitates the inclusion of a transformer generating a broad-
band4:1 impedance transformation overthe entirerelevant
frequencyrange. AGuanella-type4:1ferritetransmission
line transformer meeting these requ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 0 |
6d15b046-e0bf-47f5-a9d6-7072af74f46f | 15MHz need to be induced.
The tetrode’s control grid input, fed by a DC-bias and
anRFdriveramplifier[ 5]connectedviaaLCF12line[ 6]
of about 100mlength, represents a capacitance of about
800pFto1000pFin parallel to the resistive load. While
techniquesdirectlyimprovingthesignalqualityofthegap
voltage are planned – e.g. p... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 0 |
25e43cd9-7857-492b-91b2-abb3561e20d7 | frequency range and power level (2kWto 3kW).
∗julien.wegmann@tu-darmstadt.de
50 Ω
c= 0.87c0
100 m50 Ω15 mH
−+−271 V 800 pF
3.75µF
3.75µF50 Ω
c= 0.87c0
100 m2 : 1
25 Ω
c= 0.67c0
1 m12.5 Ω3.75µF
15 mH
−+−271 V
3.75µF800 pFFigure1: Controlgridcircuitwithout(upperdiagram)and
with 4:1 impedance transformer (lower diagram, v... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 0 |
fcb49de8-28bb-4f44-ac91-a8eb704b34ec | mission line transformer with symmetrical and unsymmetri-
cal current components [ 8,9].
twolinesontheprimarysidewhileon thesecondaryside
the currents carried by the two lines are added. Since all
terminalsareconnectedwitheachotherbyDCshortcircuits,
capacitive DC blocks are included in Fig. 1. Assuming
exactlyequalando... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 0 |
c0f80499-2902-430a-bfe1-6f76acc298c1 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7152
908 MC7.T31: Subsystems, Technology and ComponentsMOP7152 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 0 |
93763490-5adc-405d-b71e-3db049ac05bc | Figure3shows measurement results of our prototype 4:1
Guanella impedance transformer (in blue) for frequencies
from100kHzto20MHz. For all shown measurements, the
reference impedance is 𝑍ref=50Ω. Connections are real-
izedusingprintedcircuitboards,the 25Ωtransmissionlines
byconnectingtwo 50Ωtransmissionlinesinparallel.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 1 |
40233b5d-1e35-49ce-8bb7-2ba807c7151c | balun[8,14],anadditionalbalunisnecessarytomatchthe
balanced transformer output to the unbalanced VNA port.
0 5 10 15 20
Frequency f in MHz40
30
20
10
0Reflection |S11| in dBWithout Choke
With Choke and Housing
0 5 10 15 20
Frequency f in MHz0.00.20.40.50.60.81.0Transmission |S21| (linear scale)
Without Choke
With Choke... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 1 |
b33f4c49-38db-4342-a99f-4c8d333b71ae | canbeplacedinahousing(alsoimportantforEMC)with-
outdiminishingtheperformancenotablybelowthetargetof
|𝑆11| < −20dBi.e. lessthan 1%reflectedpower(seeFig. 3).
The transmission remains almost constant in magnitude and
linearinphasewiththemaindifferencebeingtheadditional
delay introduced by the transmission lines of the ch... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 1 |
bd8ea351-309d-4292-a82e-b4641bcb82f6 | Fig.4. Two current paths corresponding to the symmet-
rical and unsymmetrical current through the transmission
linescanbeidentified[ 8,9,17](seealsoFig. 2). Onlythe
symmetricalcurrenttransmitspowertotheload. Theunsym-
metricalcurrentiscounteractedbythewindingsonthecore
and,thus,vanisheswithincreasingfrequency(seealso[ ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 1 |
246d16e9-30f2-4a52-898c-59f00224f4e6 | impedance transformer [ 8,9].
From the right diagram of Fig. 4with𝑍ref= 4𝑍out, a
relation for the lower operating limit can be obtained as
𝑓−20dB= 𝑓∣|𝑆11|=−20dB=1
2𝜋√99
8𝑍out
𝑀.(3)
For toroidal cores with cross sections that are small com-
paredtothediameter(andgoodfluxguiding)[ 18],𝑀can
be estimated using
𝑀 ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 1 |
1392b2c7-c53e-4023-b41f-180b5b3ad988 | with𝑙 = 3.5maswellasanalyticalpredictionsusingEqs. (3)
and (4).
100101
Number of Windings N102
101
100f20dB in MHz
Measurement Result
Analytical Prediction
Figure 5: Dependence of the lower operating limit on the
number of windings on the magnetic core.17th International Particle Accelerator Conference, Deauville, Fr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 1 |
822e0044-ce15-4f64-bfef-c8128ce39687 | Upper Operating Limit
Considering again the circuit diagram of Fig. 2but intro-
ducing an asymmetry 𝑍L1= 𝑍L,𝑍L2= 𝑍L+Δ𝑍Lleads to
the impedance transformation
𝑍in= 4𝑍out⎡⎢⎢
⎣1+Δ𝑍L
2𝑍out−𝑡2Δ𝑍L
8𝑍out+𝑗𝑡(1+Δ𝑍L
4𝑍out)
(1+Δ𝑍L
2𝑍out)+𝑗𝑡(1+Δ𝑍L
4𝑍out)⎤⎥⎥
⎦.(5)
Evenasmall asymmetry can leadto alargemismatchn... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 2 |
30b38c6c-4acd-46c1-813c-58a03ec8fe4d | sion lines means less windings on the core are possible.
0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0
Frequency f in MHz40
30
20
10
0Reflection |S11| in dB
13.55 MHz 16.89 MHz16.89MHz
13.55MHz1.25=3.5m
2.8m
l=3.5 m
l=2.8 m
Figure 6: Comparison of impedance transformation for
Guanella transformers with lines of different l... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 2 |
5cab4914-b488-433b-932e-b322e619168d | quality decreases for higher frequency.
Figure8showsthefirstseriestransformer. Guanellatrans-
former (left) and choke coil (right) are located in a housing
with integrated air cooling. From long-term high-power
tests,heatingdue totransmissionline losseswasidentified
asalimitingeffect. Ascountermeasures,thelinetypewas
r... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 2 |
c9b89544-1f27-4b76-929f-443d79353057 | Measurement
Sim. without Transformer
Sim. with Transformer
Sim. with Transformer
and 1 m, 25 Line
2
1
0 1 2 3
Time t in µs0.2
0.1
0.00.10.2Driver Input in V
540
470
370
270
170
70
0
Control Grid Voltage in VFigure 7: Measurement setup (upper picture) and results
(lowerdiagrams)ofthetetrodeinputcircuit. Components
fr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 2 |
05242791-16ba-4a25-929d-723212cf34f2 | improvements of the circuit design are in progress. Applica-
tions to other problems are possible.
ACKNOWLEDGEMENTS
TheauthorswishtothankfurthermembersoftheRing
RF department at GSI for their support of this project.
REFERENCES
[1]P.Spiller etal.,“TheFAIRheavyionsynchrotronSIS100”,
J. Instrum. , vol. 15, no. 12, 2020.
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 2 |
746e121f-43ad-4dc4-9671-ebc78ca4d8e7 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7152
910 MC7.T31: Subsystems, Technology and ComponentsMOP7152 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), ti... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 2 |
bcc106ea-6bf3-4211-9ea9-4f6b8c33e933 | [3]U.Laieretal.,“StatusandrecentdevelopmentofFAIRRing
RFsystems”,in Proc.IPAC’21 ,Campinas,Brazil,May2021,
pp. 1073–1040.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt421-MOPAB334
[4]H. Klingbeil, U. Laier, and D. Lens, Theoretical Founda-
tions of Synchrotron and Storage Ring RF Systems . Cham,
Switzerland: Springer, 201... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 3 |
8c54b97d-9962-4a86-8994-60229f7fc61a | [8]G. Guanella, “New method of impedance matching in radio-
frequency circuits”, Brown Boveri Rev. , vol. 31, no. 9,
pp. 327–329, Sep. 1944.
[9]O. Zinke and H. Brunswig, Hochfrequenztechnik 1: Hochfre-
quenzfilter, Leitungen, Antennen , A. Vlcek, H. L. Hartnagel,
and K. Mayer, Eds. Springer Berlin, Heidelberg, 1999.
do... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 3 |
165efb14-15fc-44e1-8646-80205d0c472e | jacket-ENVIROFLEX_316_D ,HUBER+SUHNER,Herisau,
Switzerland, Aug. 2024.
[14]J.Sevick, Understanding,Building,andUsingBalunsandUn-
uns. CQ Communications, Inc., Hichsville,NY, USA,2003.
[15]R. W.Lewallen, “Baluns: what theydo and howtheydo it”,
ARRL Antenna Compend. , vol. 1, pp. 157–164, 1985.
[16]C. J. Wegmann and H. K... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 3 |
d3efc339-c62e-421d-91b8-321e7af8c7f0 | John Wiley & Sons, Inc., 2010.
[19]Soft Ferritesand Accessories:Data Handbook , Ferroxcube,
Sep. 2008.
[20]RG400 LSFH, 50 Ohm, 6 GHz, 105°C, ø5 mm, RADOX®
Jacket-ENVIROFLEX_400 ,HUBER+SUHNER,Herisau,
Switzerland, Apr. 2025.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7152.pdf | 3 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.