id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
209ce41c-c21e-4303-970b-7948d58f6fed
transition crossing [ 2,3]. The longitudinal beam stability during theSPS energyrampis maintained bydeployinga double-harmonic RF system operating at 200 MHz and 800 MHz. As soon as the synchronisation process is completed at a momentum of 400GeV/c [4], a two-step bunch com- pression scheme is applied (Fig. 1): (i) the...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
0
b9176e96-cccd-401e-9246-5b8122fe574d
arrivesin thesynchronisationmodule. Since the 800 MHz cavitycontrollerdoesnotdirectlycommunicatewiththeBC module,the800MHzRFvoltagestayconstantduringthe ∗ivan.karpov@cern.ch 0.000.250.500.751.001.25 800 MHz voltage, V800(MV) 5200 5300 5400 5500 5600 Cycle time (ms)0.02.55.07.510.012.5200 MHz voltage, V200(MV)Figure 1: ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
0
cdb0a655-b4bd-4302-addb-6cfd99de1e2d
advancements to meet the target parameters and prepare for the next data-taking period in 2029. DOUBLE BUNCH ROTATION IN SPS The compression factor after a non-adiabatic RF voltage jumpdependsonthefinal, 𝑉𝑓,andinitial, 𝑉𝑖,RFvoltages. In linear approximation, it is equal to √𝑉𝑓/𝑉𝑖. The RF volt- age,𝑉𝑖,islimite...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
0
f317e672-c8c2-4e95-8708-363550d7a7fb
thebeamwasextractedat differentstagesof theinstability (Fig.2). Toavoidthisinstability,analternativeapproachwasim- plemented. The first stage of adiabatic voltage reduction wasreplacedbyanadiabaticvoltageincreasetoguarantee beam stability. Then, the RF voltage is non-adiabatically reducedtoasmallvalue,leadingtoafastbun...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
0
385dad1a-c5f4-4dc5-af7a-dda35f171ebe
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4010 MC4.A04: Hadron accelerators: Circular Accelerators 3345THP: Poster session THP4010 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
0
69cd2dcd-4b8d-4aa4-8212-1008c53d7c98
−400−200 0 200 400 Time (ps)0.000.250.500.751.00SC bunch profile (arb. units)2023-10-21 17:37:00 (UTC) textr= 5500 ms textr= 5550 ms textr= 5590 msFigure 2: Bunch profile measurements with a streak camera (SC)inAWAKEforstandardbunchrotationsettings(Fig. 1). 0123 Bunch length (ns)90% cut 50% cut 10% cut G. fit,σ 0 20 40 6...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
1
f6b04f52-54f4-48cd-8306-8f5ae19cdae2
the800MHzRFvoltagemustbeswitchedoffsynchronously with the firstRF voltagedrop. It wasimplemented in 2024, afterinitialtestsattheendof2023withasynchronousbunch rotationwiththedouble-voltagejump. Suppressionofthe uncontrolledlongitudinalemittanceblow-upat 400GeV/c (see Fig.4) opened the possibility of further decreasing ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
1
8544ddc0-87e6-43ab-9d71-fa6e05d601ba
ageprogrammesofthemainharmonic( ℎ = 1)togetherwith −400−200 0 200 400 Time (ps)0.000.250.500.751.00SC bunch profile (arb. units)2024-04-20 08:40:40 (UTC) textr= 5505 ms textr= 5555 ms textr= 5595 msFigure4: BunchprofilemeasurementswithSCfordouble voltage jump bunch rotation settings similar to those shown in Fig.3. 0246...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
1
372fe9b0-00bd-43ac-901b-a326826a951c
andincreasedlongitudinalshavingresultedinalongitudinal distribution with a denser core, less tails, and smaller lon- gitudinalemittanceincomparisontothestandardscheme. In addition, the working point, (𝑄𝑥,𝑄𝑦), at injection was changedfrom(4.17,4.23)to(4.23,4.33)toavoidtransverse emittance blow-up in both planes. Mod...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
1
8f5f30f3-8173-47bb-a89e-a247d3fb02c4
to the finite bandwidth of the SPS wall current monitor [ 14] and the signal transmission chain, the measured bunch pro- files are systematically longer compared to those measured withthestreakcamera(SC)inAWAKE.Itturnedoutthat,17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
1
d7a1bb8f-1a3e-4342-98b6-65b8599af167
−1 0 1 2 Time (ns)0.00.20.4Bunch profile (V)Extraction turn 5 turns later 0.000.250.500.751.00 SC bunch profile (arb. units)SC data Gauss. fit 84 psFigure6: Comparison of the bunchprofile measured in the SPSpriortoextractionusingtheMDacquisitionsystemand the AWAKE streak camera. The orange trace represents the bunchprofil...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
2
0dcaf973-26a6-4813-87b8-f9fd7d760be2
Updated Scheme in PSB To avoid significant losses (see Fig. 5) and improve re- producibility,thePSBproductionschemewasmodifiedin 2026. Applyinga similarstrategyof injectingmanyshort pulses,thebeamwascapturedandacceleratedmainlyatthe second harmonic ( ℎ = 2). A small RF voltage at the main harmonic ( ℎ = 1)had to be app...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
2
9e63e7fe-9a7b-4e34-80a4-31166a2d04e9
17:10 17:20 17:30 17:40 17:50 18:00 Time0.20.40.60.81.01.2Bunch length (ns) 90% cut 50% cut10% cut 2.62.83.0 Number of particles×1011 Figure 8: Cycle-to-cycle variation of beam parameters at 400GeV/c ,witherrorbarsshowingthreetimesthestandard deviation over 1300 turns. Data was taken on the 30th of March2026. Bunchprof...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
2
42220ea6-98bc-42aa-8c64-b387e7c5a640
rameters before the double-bunch rotation (Fig. 8). Further bunch length reduction can be exploredafter LS3 by further increasingthe200MHzRFvoltageuptoitstheoreticallimit of 13.5MV. CONCLUSION Shorter, high-intensity proton bunches are required for the next phase of the AWAKE experiment. A new bunch production scheme i...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
2
65d56fe3-d7e2-45c2-b6f5-f61b84fbb31c
resulted in improved beam reproducibility and stability at flat-top energy. The measured cycle-to-cycle variations con- firmreliableoperationwithreducedemittanceandconsistent bunchparameters. Althoughlimitationsinthebunch-profile observationsystemcurrentlyrestrictprecisebunchlength measurements, the results indicate th...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
2
c0da3423-e951-4733-9f6e-174b9ea72d99
streakcamera. WealsoacknowledgethesupportofPSB,PS, andSPScrewmembersduringbeamtests. Specialthanks toMiltiadisBozatzisforhisbeamoptimisationduringthe PS transition crossing. REFERENCES [1]A. Caldwell et al., “Path to awake: evolution of the concept”, Nucl. Instrum. Methods Phys. Res. A , vol. 829, pp. 3–16, 2016. doi:1...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
3
43b2b4d9-15d6-470b-bd68-7381e90efa91
paper WEP5111, this conference. [4]H. Damerau et al., “RF Synchronization and Distribution for AWAKE at CERN”, in Proc. IPAC’16 , Busan, Korea, pp. 3743–3746, Jun. 2016. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt416-THPMY/zero.alt439 [5]A.Spierer etal.,“TheCERNSPSLowLevelRF:TheBeam- Control”,in Proc.IPAC’22 ,Bangkok,Th...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
3
10e5c577-bd0d-4e1e-85e0-8ce11977cc9b
//indico.cern.ch/event/1593/zero.alt474/contributions/ 6737492 / attachments / 3155481 / 56/zero.alt448/zero.alt4/zero.alt4 / Farmer . pdf [9]J. Farmer et al., “Nonlinear transverse beam dynamics in AWAKE Run 2c”, presented at IPAC’26, Deauville, France, May 2026, paper WEP6078, this conference. [10]A. S. Lasheen, “Bea...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
3
5ef63848-e683-4abe-bf87-f25518c08a90
Rev. Accel. Beams , vol. 26, no. 1, p. 014401, Jan. 2023. doi:1/zero.alt4.11/zero.alt43/PhysRevAccelBeams.26./zero.alt4144/zero.alt41 [13]H. Damerau, S. Hancock, T. Kroyer, E. Mahner, and M. Schokker,“ElectronCloudMitigationbyFastBunchCom- pressionintheCERNPS”,in Proc.EPAC’08 ,Genoa,Italy, pp. 1658–1660, Jul. 2008. htt...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4010.pdf
3
2802c127-253b-4776-a956-5b5a5f84ddb6
ABSOLUTE ENERGY AND MACHINE LENGTH CALIBRATION IN THE SPS R. De Maria∗, H. Bartosik, S. Cettour Cave, G. Iadarola, F. Murgia, P. Zisopoulos European Organization for Nuclear Research (CERN), Geneva, Switzerland Abstract This contribution presents the results of an absolute- energy and machine-length calibration of the ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
a5701228-2993-4d01-b592-5cbbb246685c
usingthemagneticcentreofthesextupolesasareference, andcomplementsitwithbeampositionmonitor(BPM)cen- tres. Acomparisonbetweennewandoldmeasurementsand models is presented. SPS RING GEOMETRY REVIEW The SPS optics model was updated to better match the as-builtmachine. Themachinesurveywascomparedagainst theGEODEsurveydataba...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
a4609061-4ad3-4424-a91b-5b94d7d80f51
taining only the bending dipole magnets, revealed a discrep- ancy between the optics model and the as-built machine referencegeometrystoredintheGEODEsurveydatabase. Specifically, the machine diameter in GEODE is larger than expectedfromtheSPSasdesignedby 4mm,corresponding toabout14mmincircumferencewithrespecttothenomin...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
35d1b801-8ffb-4ead-856a-3d04d997a523
DCUM) [ 2,3]. This fundamental difference in reference length leads to a measurable discrepancy in the bending magnetlength. Themagneticlengthofthebendingdipole ∗riccardo.de.maria@cern.chis defined as the face-to-face distance, i.e., the chord length, whereastheopticscalculationsoftwaredefinesthemagnetic length of a be...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
e31adedb-07e0-4b6f-a040-3eb4f71adb68
asrecordedinthesurveyreferencegeometry,todeviatefrom thenominaldesignvalue,resultinginanon-conformingma- chine geometry. A further significant correction, which reduced the residual discrepancy, involved adjusting the position and orientation of the starting point of the SPS optics model. The applied orientation correc...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
6ea24365-83a4-403b-ae46-7c33f93969fd
tweenthenewmodelandtheoldreferencewasreducedto below10µm. This allowed the new model to serve as a sin- gle source of truth for both alignment and beam operations. Sextupole Inconsistencies To make the model better match the as-built machine, all beamline components were analysed. Quadrupoles (QD, QF) and octupoles (LO...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
75c3d0f9-8d09-4092-928e-4ab1b04e9367
unchanged from those of the original sextupoles. To ensure consistencywiththelatestavailabledata[ 5],themagnetic lengths wereupdated from 0.423m to 0.435m forthe LSF, and from 0.420m to 0.426m forthe LSD.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN:...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
0
eeb6b74a-0d6d-4a90-b2e9-e31341fdb224
Minor Adjustments Acomprehensivelengthconsistencycheckwasconducted across all beamline elements. This process identified mi- nor discrepancies in element lengths, largely attributable to rounding approximations. While not critical, these approxi- mationsrequiredempiricalcorrectionsintheopticsmodel to maintain accuracy....
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
750550a4-0732-4037-ba7b-4d163653eaf1
magnetic-cycle settings. The measurement repeats a similar calibrationperformed in 2003, in whichproton andPb53+ beams were used for an absolute energy and circumference calibrationoftheSPSatamomentumof 450GeV/c [6]. That campaign observed a circumference larger than expected. In the 2025 campaign, the same calibration...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
d8776850-2f15-4bed-870b-12648536f604
ensuringthatbothparticlestravelledonthesamenominal orbitunder identical magnetic rigidity conditions. The use oftwoparticlespecieswithdifferentcharge-to-massratios resultsindifferentrelativisticspeedsand,therefore,differ- ent revolution frequencies 𝑓rev. This difference allows the machinecircumferencetobedeterminedthr...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
3f17e322-f02e-405a-9b66-643e910575e4
Equation ( 5) can be approximated by 𝑃 ≃ 𝑚𝑝𝑐√𝑓𝑝 rev 2Δ𝑓(𝜇2−1), (7) whereΔ𝑓 = 𝑓𝑝 rev−𝑓𝑖revis the revolution frequency difference betweenthetwoparticlebeams. Δ𝑓shouldbemaximized toachievethebestpossiblemomentumaccuracyforagiven frequencyresolution. Oncemomentumand 𝑓revareknown, thebeampathlengthfollowsfrom...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
553e6c9e-7ba4-48cc-8578-c5e0aed332db
26GeV/c (proton equivalent) and accelerated to 100GeV/c . BothcycleswereoperatedwiththeSPSQ26opticsconfig- uration,withnominaltransversetunesof 𝑄𝐻= 26.13and 𝑄𝑉= 26.18. Thesettingsofallmagnetswerekeptidentical fortheprotonandioncycles,exceptforthechromaticitycor- rectionsettings,whichwerechangedduringthesextupole cr...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
d828d1d7-991d-4248-badd-e0a49bd63d06
plateau in the momentum ramp ( 100GeV/c ,3501ms). At 𝑡 = 1051msand26GeV/c,thehorizontalRMSclosed-orbit valueshadconvergedto 1.80mmand1.77mmforprotons and ions, respectively, indicating that the two beams were circulatingonthesameorbit. TheverticalRMSclosed-orbit values were similarly consistent at this time and moment...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
924a5783-fd9f-4153-9452-b94523d94680
Thebeamremainedstablethroughoutthefull 𝛿𝑝/𝑝sweep onlyfor𝜉𝐻= +0.5and𝜉𝐻= −0.5. Thesetting 𝜉𝐻= −1.517th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4011 3350 MC4.A04: Hadron accelerators: Circular Acceler...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
1
c216ab4c-a2b0-45a2-aa5f-0a52974bc54e
Table 1: CircumferenceResultsfrom the RevolutionFrequencyMethod at TwoProton-EquivalentMomentum Points 𝑓𝑝 rev 𝑓Pbrev 𝑃 𝛿𝑝/𝑝 𝐶 Δ𝐶 as-built [Hz] [Hz] [GeV/c] [m] [m] 43347.256 42967.967 25.987 −5.2×10−46911.56176 0.04357 43373.600 43347.704 100.158 1.6×10−36911.56150 0.04331 providedmarginalstabilityandwasretain...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
2
7627d1a0-3ac0-4d29-9e7d-70e915e1e458
H=2.5 H=2.0 H=3.0 H=1.5 Baseline Figure 1: Evolution of the horizontal tune 𝑄𝐻along the cycle during the 𝛿𝑝/𝑝ramp for six chromaticity settings. wasanalysedforthethreechromaticitysettings( 𝜉𝐻= +0.5, −0.5,and−1.5). Thecrossingpointofthethreelines(shown in Fig.2and expected to be at the centre of the sweep) cor- r...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
2
a117c978-3596-46b3-a79b-32405a820519
exceeds the nominal design value ( 𝐶nom= 1100 × 2𝜋 = 6911.504 m)byapproximately 58mmandtheas-builtmodel value (𝐶as-built= 6911.518 m) by approximately 43mm. Thus,approximately15mmofthe originaldiscrepancybe- tween the nominal and modelled circumference has been resolved through the improved geometrical description o...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
2
2645c0f2-f82b-4dc1-b177-3f14777298fa
H=0.5 H=0.5 H=1.5 Baseline p/p*=1.35×104 1.6 1.4 1.2 1.0 0.131500.131750.132000.132250.13250Figure2: Top: horizontaltune 𝑄𝐻asafunctionof 𝛿𝑝/𝑝for the three chromaticitysettings with stablebeam conditions (𝜉𝐻= −0.5,+0.5, and−1.5); the baseline fractional tune 𝑄𝐻= 0.13158 isshownasareddashedline. Bottom: linea...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
2
2162019a-f92b-4e44-a3ac-2fe7e440d256
determination in future measurements. REFERENCES [1]“GEODE: a new database interface with APEX”. https : //indico.cern.ch/event/489498/contributions/ 221751/zero.alt4/attachments/135/zero.alt4935/2/zero.alt439494/IWAA2/zero.alt416_ DB_GEODE_A_NEW_DATABASE_INTERFACE_WITH_APEX. pdf [2]F. Murgia and R. De Maria, “Update o...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
2
067c38d3-7de0-4740-8e33-d57fab72c71c
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4011 MC4.A04: Hadron accelerators: Circular Accelerators 3351THP: Poster session THP4011 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
2
06788330-9a62-4498-899d-e869e8193039
[4]R.Lauckner,“ThechromaticitysextupolesfortheSPSmain magnet system”, CERN, Geneva, Switzerland, Rep. CM- P00065140, 1975. [5]M. Giesch, “The new sextupoles and octupoles for the SPS: parameters and magnetic measurements”, CERN, Geneva, Switzerland, Rep. CM-P00061356, 1980.[6]G.Arduini,T.Bohl,J.Wenninger,C.Arimatea,K.C...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4011.pdf
3
36a34f6f-88fa-49b7-bfbb-c9b7e79dad0e
BEAM PERFORMANCE REACH AT THE CERN PSB FOR THE ISOLDE FACILITY F. Asvesta∗, S. Albright, C. Bracco, G. P. Di Giovanni, A. Findlay, I. Frank, M.A. Fraser, G. Gnemmi, L. Le, M. Marchi, E. Piselli, T. Prebibaj, A. Rodriguez Rodriguez, S. Rothe, M. Schenk, P. Skowronski, S. Stegemann CERN, Geneva, Switzerland Abstract The ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
e826feb6-da85-47d3-b00f-e0fe70b1b84c
focus on maximizing the achievable intensity in the PSB and assessing the impact on the isotope production at the facility. INTRODUCTION TheIsotopeSeparatorOnLineDetector(ISOLDE)isara- dioactiveionbeamfacilityatCERN,exploiting GeVenergy protons toaccess thefull range ofproduction mechanisms, spallation, fission, and fr...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
098ba1a0-35b8-4538-9f17-e44d49b7efa9
at1.4GeVand providing intensities of 3.2×1013protons perpulse(ppp),i.e. 0.8×1013protonsperring(ppr)ineach of the four rings of the PSB. The average beam current deliveredtoISOLDE,andconsequentlytheprotonsontarget (PoT), depends on the intensity per pulse and the number ofpulsesthatPSBcanallocatetoISOLDE,whileserving th...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
0eed65b3-f943-45b6-9cfc-fc3ae2663dec
introductionofthenewBeamDumpFacilitydedicatedtothe Search for Hidden Particles (BDF/SHiP) experimentat the ∗foteini.asvesta@cern.chSuperProtonSynchrotron(SPS)[?]. Inparticular,dedicated beam sharing studies conducted in recent years have shown that accommodating SHiP in the supercycle substantially increases SPS demand...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
7cdc52c2-8a21-47ee-a009-b83cb7ee8f33
pulse to ISOLDE, partially compensating for the reduced slot occupancy. In parallel, the ISOLDE improvement programme is preparingasetofinfrastructureupgradesduringtheLong Shutdown3(LS3),from2026to2028forISOLDE,toex- tendthefacility’scapabilities[1]. Theseincludeanupgrade ofthePSBtoISOLDEtransferlinetotransportprotonsa...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
a4fca53a-dd46-4fdc-8409-f3e9ed9eb3e6
studies of the achievable PSB intensity for ISOLDE are coordinated,servingbothasamitigationstrategyforreduced slot availability during BDF/SHiP operation and as input tolong-termdesignchoicesfortheISOLDEinfrastructure. Thepresentcontributionreportsontheperformancereach of the PSB for ISOLDE beam delivery and the implic...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
df27fa03-66bf-4750-b056-573c48c3f4a3
up to1.7×1013pprat1.4GeVwere achieved in 2024 [7]. Finally,thehighestintensitieswerereachedin2025,exceed- ing1.8×1013pprand1.45×1013pprat1.4GeVand2GeV respectively,asshowninFig.1. Notethatthereducedinten-17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN:...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
0
145cdd0c-5917-48df-948f-9f90d6f4c14d
sitiesachievedat 2GeVbeamenergyiscausedbythehigher DC current demand on the FineMet RF cavity amplifiers. Figure1: PSBdemonstratedintensitiesinasingleringfor 2GeV (solid lines) and 1.4GeV (dashed lines) for different settings of the interlock thresholds on the maximum current provided by the amplifiers of the FineMet R...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
1
3ab559e0-3d31-4658-84cd-6ed1642a234a
the transfer line due to the larger beam size, and instabili- ties [8]. However the main constraint is the aforementioned high DC current demand on the RF system. The interlock thresholds on the maximum current that can be provided by the amplifiers of the FineMet RF cavities required adjust- ment to sustain high inten...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
1
9ba32c3f-1aea-47d1-a93d-23e8738c2b3d
respectively. Efforts are ongoing tobetter understand these limitations and fully characterise the RF operational con- ditions for higher intensities. Measurements have shown that a faster acceleration ramp can reduce the DC current requirement on the FineMet amplifiers, thereby providing additional margin within the e...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
1
e6bde6a6-0028-4715-a0b8-308ce5af3cb2
shown in Fig. 2. In the nominal configuration, the increased intensity results in larger emittances due to space charge effects, while a variant with constant emittances was pre- pared using the H−injection system to blow up the beam at low intensities. The constant emittance configuration was usedtostudythetargetyield...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
1
2598b4e0-c8c9-4ab1-b6b9-e1f0ef2925a1
facility was able to conduct threehigher current runs at the end of 2025 with intensities up to 4×1013ppp [11]. PSB TO ISOLDE TRANSFER To support the operational delivery of maximum target yield,anonlineoptimiserhasbeendevelopedforthePSB- to-ISOLDEtransferline. TheoptimiserisbuiltwithinGe- off[12], a Python framework f...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
1
3b06491b-6ded-4b15-b52b-24ba8b4a13bb
astheminimisationofthenegativetape-stationcount,using the BOBYQA (Bound Optimization BY Quadratic Approxi- mation) derivative-free algorithm [13 –15]. The observables include the tape-station count, beam sizes from upstream profilemonitors, andthebeamcurrenttransformerreadings. Theinitialbeamtestsoftheoptimisationtoolw...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
1
b8f1b138-3408-41e5-8b40-276940a83032
themachineryfunctionscorrectlyandiscapableofrecov- ering optimal beam delivery conditions from sub-optimal starting points in a small number of iterations. Further- more, they allowed identifying missing features that will beincludedinfuturedevelopments,suchasincorporating beam-sizeconstraintstoallowsafeoperationatfull...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
2
614099b1-fcc1-4a0a-8eb5-ea95fe321520
efficiency, and 𝐼𝑝the average proton current. The yield dependsonthespatialdistributionoftheprotonbeamonthe targetmaterial,whichisinturnafunctionofthebeamoptics in the transfer line. Hence, maximising production requires optimising both the delivered intensity and the proton beam positionandsizeonthetarget,whilerespe...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
2
0eca3bca-efc0-45e7-ab66-ef88c26b166f
Figure 3:26Na release curve used to measure the isotope yields. Early measurements in 2022 showed a declining relative yield with increasing intensity, suggesting that the proton beam size at the target was exceeding the physical con- tainer aperture. The recommended beam size constraint of𝜎𝑥,𝑦≤3.5mmatthetargetwasid...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
2
78a16255-68a6-464d-8404-0fe07d2f0a15
previous hypothesis of the proton beam exceeding the target containeraperture. Animprovementwasobservedwhenop- erating at constant emittance, highlighting the need to fully controlthebeamsizeonthetarget. Inthatrespect,studies will continue in Run 4, including intensity measurements as part of commissioning and a system...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
2
cc42b889-b084-472f-a4c8-50470e257278
MD beams reaching intensities of 1.8×1013pprat1.4GeV and1.4×1013pprat2GeV. The operational intensity is currently kept at lower values due to the FineMet cavity am- plifierconstraints,aswellasthecurrent facilitylimitations toaccepthigherintensities. Onthetargetside,high-intensity studies on the relative isotope target ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
2
c3da4832-936c-4964-84e3-7ef35d21caff
get response characterisation, and online optimisation tools into a coherent strategy for high-intensity operation. ACKNOWLEDGEMENTS TheauthorswouldliketothankthePSBandISOLDEOp- erations groups for their support during the measurements.17th International Particle Accelerator Conference, Deauville, France JACoW Publishi...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
2
71f3bfc1-77af-40a8-a028-de21e30147cb
REFERENCES [1]S. Freeman, “ISOLDE Consolidation and Improvements”, CERN, Geneva, Switzerland, Rep. CERN-INTC-2023- 028, INTC-I-252, 2023. https://cds.cern.ch/record/ 2846021 [2]M.Fraseretal.,UpgradeofthePSBooster-to-ISOLDEbeam transfer line to facilitate an increase in proton driver energy, inProc.IPAC’24,Nashville, TN...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
3
a4a33555-7f47-4721-b8f5-1c0fb2718b86
pp. 1–8.doi:10.18429/JACoW-HB2023-MOA1I1 [6]T.Prebibajetal.,IntensityreachintheCERNPSBwiththe high-current LINAC4 source, inProc. IPAC’24, Nashville, TN, USA, May 2024, pp. 1706–1709. doi:10.18429/JACoW-IPAC2024-TUPS31 [7]M.Marchietal., “CERNProton SynchrotronBooster high- intensity operation”, inProc. HB’25, Huizhou, ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
3
cb03533e-4ed8-4813-951b-2a23409089aa
Brightness Hadron Beams (HB’23), Geneva, Switzerland, Oct. 2023, pp. 458–461. doi:10.18429/JACoW-HB2023-THBP09 [10]F.Asvestaetal.,“Resonancecompensationforhighintensity and high brightness beams in the CERN PSB”, inProc. 64th Adv.BeamDyn.WorkshopHigh-IntensityHigh-Brightness HadronBeams(HB’21),Batavia,IL,USA,Oct.2021,p...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
3
c8f94feb-0a4e-4239-ae85-aeb6ee275f75
Cambridge, UK, Rep. DAMTP 2009/NA05, 2009, https://www.damtp.cam.ac.uk/user/na/NA_ papers/NA2009_06.pdf [14]C.Cartis,J.Fiala,B.Marteau,andL.Roberts,“Improving the flexibility and robustness of model-based derivative-free optimizationsolvers”,ACMTrans.Math.Software,vol.45, no. 3, art. no. 32 (41 pages), 2019. doi:10.114...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
3
8b820907-d69e-4bad-a7a3-caef5b837f17
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4012 3356 MC4.A04: Hadron accelerators: Circular AcceleratorsTHP4012 THP: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4012.pdf
3
1f3a6733-c5ea-4428-9150-ac53906be113
PHASE SPACE MEASUREMENTS ON THE ISIS SYNCHROTRON S. Karbassi∗, H. Cavanagh, B. Kyle, R. Williamson ISIS Neutron and Muon Source, RAL, United Kingdom Abstract The ISIS Neutron and Muon source produces pulsed neu- trons and muons for multi-disciplinary scattering and spec- trometry experiments. Up to 3×1013protons per pu...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
bd605471-0f5a-427b-98be-f9f5963c8ef1
synchrotron lattice parameters. As part of ongoing improve- ments to measurement, modelling and control of ISIS beam dynamics, a new tool has been developed to routinely use these BPM signals to generate phase-space ellipses. Prelim- inary results from commissioning of this tool are presented, showinggoodagreementwitht...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
9866dc50-3caa-4ffb-a4df-1531beb1bb04
plane, the energy mismatch between the fixed linac beam energy and the falling magnetic field of the synchrotron results in a moving dispersive closed orbit. In the vertical plane,aprogrammabledipoleintheinjectionlineisusedto varytheinjectionpointverticallythroughouttheinjection period. Thebetatrontunesareprogrammablet...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
8a08d47d-198c-4cdc-ade1-7ccdfe75178b
the linac and the synchrotron. Timingcontrol allowsselec- tionthroughoutthe 200µsinjectedpulse,enablingthestudy ∗sara.karbassi@stfc.ac.ukoftime-dependentbeamproperties. Suchbeamsfacilitate detailed measurements of transverse beam dynamics, as the injected beam fills only a limited portion of the machine acceptance. The...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
75be3780-5d84-480d-a8a7-6e079bf0d09b
𝑄0∶initial betatron tune , 𝑅0∶initial closed-orbit offset , 𝛿𝑄 ∶tune spread , 𝜙 ∶initial betatron phase divided by π, Δ𝑄 ∶change in tune per turn , Δ𝑅 ∶change in closed orbit per turn . Aleast-squaresfitcanbeappliedtothemeasuredbeam positions,allowingtheextractionofthelatticeparameters aswellasthereconstructiono...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
01fc8128-baa9-42cd-a256-757b53acb5ad
excluded from the fit, simplifying Eq. ( 1) to: 𝑦𝑛= 𝐴cos(2𝜋𝑛𝑄0+2𝜋𝜙). (2) BeampositionmeasurementsfromtwoconsecutiveBPMs canbeobtainedonaturn-by-turnbasis. Givenaknownmon- itorseparationandphaseadvancebetweenthesemonitors, the measurements can be combined geometrically to ob- tain phase-space coordinates and rec...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
f48548eb-90ed-4220-a0a4-02d737baa75a
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4013 MC4.A04: Hadron accelerators: Circular Accelerators 3357THP: Poster session THP4013 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s),...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
0
fa21f7ef-4c08-4aa3-ba3a-a68f64109abe
BPMs separated by a drift space. A pair of BPMs separated by a drift (R3VM1 & R3VM2) were selected to validate the tool. MEASUREMENTS Comparison to MAD-X Model To validate the phase-space reconstruction tool against alatticemodel,measurementswerefirstperformedwitha ‘bare’ machine configuration with a chopped pulse leng...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
1
5fc178b8-a67f-413f-a852-16ff57fb8207
R3VM1 −1.36 −1.1 ± 0.2 7.75 7.7± 0.3 R3VM2 −1.90 −1.6 ± 0.1 12.6 11.7± 0.8 GoodagreementisobservedbetweenthemeasuredTwiss parameters in the vertical plane and those expected from theMAD-XmodeloftheISISsynchrotron. Thisprovides initial validation of the reconstruction method. ErrorcalculationsontheTwissparametersarenon-...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
1
29249baa-861f-4a7c-86ba-7c4d912a6102
commonly referred to as the vertical sweeper. The relation- ship betweenthe sweeperstrength, at flat top of the sweeper field, and the resulting vertical emittance, 𝜀𝑦, was demon- stratedusingthephase-spacereconstructiontool. Figure 1 showsrepresentativereconstructedverticalphase-spaceel- lipseswithincreasingsweeperc...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
1
07f9cfee-0c37-47e3-87c1-81373b7406b4
gradient𝑑𝜀𝑦/𝑑𝐼 =(4.33±0.55) πmmmradA−1This is consistent with the expected vertical amplitude range of 90 – 180πmmmrad for a typical operating current range of 30 – 40A [ 4]. Figure 1: Representative reconstructed vertical phase-space ellipses for BPMs R3VM1 (left) and R3VM2 (right), for vertical sweeper currents ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
1
861388d9-5316-442a-b8a2-03fed94e284d
Vertical Tune Dependence The effectiveness of the tool when varying the pro- grammableverticaltunehasalsobeendemonstrated. The vertical tune was varied between 3.550 and 3.825, while the horizontal tune was set at a constant value of 4.300. The vertical sweeper current was set at 36Afor all measure- ments. Outside this...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
2
defb512c-d4d2-4db2-836c-324d61ab832c
linearregression fitto the measureddata. Individual mea- surements exhibit scatter about the expected linear trend from MAD-X. Figure3: VerticalTwissparameter 𝛽asafunctionofvertical tune at BPMs R3VM1 (top) and R3VM2 (bottom). Figure4shows the corresponding relationship between the Twiss parameter 𝛼and the vertical t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
2
821858d5-19c8-4b63-b56a-1766badc9a65
demonstrated. These results demonstrate a practical tool Figure4: VerticalTwissparameter 𝛼asafunctionofvertical tune at BPMs R3VM1 (top) and R3VM2 (bottom). for beam-based optics validation and machine optimisation, enablingenhancedcapabilityfordetailedinjectionstudies and emittance measurements. Preliminary studies o...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
2
33d51b53-41fd-4e0d-8770-3ed8bbba0c0b
as those introduced by tune harmonic adjustments or the recently available sextupoles and octopole. These will be validated on both the bare machine and the operating lattice. At the BPM locations studied here, the expected relative change in 𝛽is of order 1%for the maximum change across all programmable harmonics. Thi...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
2
d0e38a36-842b-4bee-9227-1b54cd271aa2
M. Wright, “Experimental Measurements of Resonances near to the ISIS Working Point”, in Proc. IPAC’18 , Vancouver, Canada, Apr.–May2018, pp. 1132–1135. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt418-TUPAL/zero.alt45417th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
2
27ef9b32-8571-42a3-9e78-326754f6a07a
[2]C.M. Warsop, “Low Intensity and Injection Studies on the ISIS Synchrotron”, in Proc. EPAC’94 , London, UK, Jun.–Jul. 1994, pp. 1722–1725. [3]C.M. Warsop, “Low Intensity and Injection Studies on the ISISSynchrotron”,in Proc.ICANSXII ,Abingdon,UK,May1993, RAL Report RAL-94-25. [4]B.Jones,D.J.Adams,andC.M.Warsop,“Injec...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4013.pdf
3
5ff727d7-e1c9-4a9a-b802-4213a46171e5
IMPLEMENTATION UPDATE OF MYRRHA PHASE 1 (MINERVA) U. Dorda†, A. Fabich, Belgian Nuclear Research Centre, Mol, Belgium Abstract This contribution provides an update on the development of the 4 mA, 100 MeV continuous -wave (CW) supercon- ducting proton linac - the first stage of MYRRHA’s accel- erator -driven sy...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
0
bf015481-08ef-4660-bcf1-69ba7ff0dd33
MYRRHA [1] is to design, construct and operate an ADS as a technology demonstrator for the transmutation of nu- clear waste but also e.g. for the production of medical ra- dio-isotopes material studies. For this purpose SCK CEN, the Belgian nuclear research center SCK CEN , is currently constr ucting a 100 MeV sup...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
0
90ca973d-6ae8-4181-a4dc-b2626a1e2100
Beam operation Pulsed to CW Cycle length 4 ms # Pulses per cycle max 2 The 100 MeV accelerator which is implemented in the current first implementation stage consists of a 1. normal conducting section to 17 MeV [2] 2. injector switching section 3. superconducting RF section up to 100 MeV 4. HEBT to ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
0
f1aa74db-b6f4-493a-b65d-97fbf6cb57d1
reliability and simplify operation: one injector is now aligned in a straight line with the superconducting linac (SC-linac), while the other is offset to the sid e. Two switch- ing solutions are currently under evaluation: • A switching dipole configuration with a 1s ramp rate • A kicker -septum system ( Fig. 1...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
0
61441ce4-c4e8-4bbb-be62-cfcdc53b874d
The total number of cryo- modules, 30 for the MYRRHA phase 1 SC -linac, is determined by the following rules for high intensity linacs and specific requirements for the MYRRHA phase 1 SC -linac: a) the longitudinal phase ad- vance remains <90 degrees in 1 latti ce period, b) the field in each cavity remains < 7.0 MV...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
0
6e1bfaee-1a80-4b89-8208-cd411169e96a
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4014 MC4.A08: Hadron accelerators: Linear Accelerators 3361THP: Poster session THP4014 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
0
b8c865bf-6335-40cd-b1e1-80cc02a73824
Figure 2: The layout of the MYRRHA accelerator. The first 160 m are the scope of the current implementation stage. Figure 3: The grey area represents the acceptance of the SC-linac. The superimposed colour coded intensity distri- bution is the matched beam at the entrance of the SC -linac. The top figure (A) is...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
1
060fb1ab-398a-4d57-85af-723698b63ea5
into manufacturing drawings by SCK CEN and RI. The first cavity in the series has now been fabricated and cop- per-plated. SC-RF C avities Given the continuous -wave (CW) operation of the linac, the cavities must achieve a loaded quality factor Q 0 exceed- ing 5.2×109 once installed in the cryomodules. The base- l...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
1
8794e402-ea41-4c3a-992c-5e59be1a5723
spoke 352.2 MHz cavities, 32 of which have undergone 2 K testing at the FREIA laboratory (Uppsala University) . Cryogenic System The MINERV A Cryogenic System (QSYS) [ 5] provides the helium refrigeration, distribution, and supporting infra-structure for the superconducting linac. It is physically de- composed in...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
1
7aecd1bc-d3bd-4fab-9ca6-de308c6334f5
Cryogenic Line, which runs from the cryoplant into the linac tunnel and terminates in an End Box for unused ma ss- flow management and header pressure control. Each QCELL comprises three main cooling circuits: a 2 K circuit for isothermal cooling of the SRF cavities in saturated superfluid helium, a thermal -sh...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
1
74b18c40-c40c-4c04-b743-d0125e59b57e
in a saturated superfluid helium bath at 2 K, while also cooling the thermal shield and RF coupler circuits. A spe-cific design feature is the use of warm motors for the cavity tuning system. From the cryogenic point of view, the main operational challenge is linked to the continuous -wave RF operation, which drives...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
1
1773725f-d266-490f-a396-08e62fd92f73
Figure 4: Cryosection of the cryomodule. The cryomodules are produced from separately procured and qualified subcomponents supplied by RI, Meca Mag- netic S.A. (France) , and AMOS S.A. (Belgium) , followed by contracted industrial assembly at RI and subsequent cryogenic testing at FREIA. The design is curren...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
a895897c-5b6b-4a34-b626-a71e9a5a8042
MTCA.4 -based architecture with RFSoC direct -sampling hardware is adopted, providing reduced analog complexity, modularity, and tight integration of real- time cores with programmable logic. The RF control strategy combines feedback and adaptive feedf orward beam loading compen- sation. To minimize power consumpti...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
15ccb036-dd4e-4b73-bda8-8f3e9c51dcd5
There are 11 different types covering from 6 kW to 154 kW. Cryoelectra is responsible for the design and de- livery of the SSAs, with the first unit expected by the end of 2026. While the design of the kicker and septum for the HEBT was done by CERN, the design of the other m agnet s is per- formed by ACT . With...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
665a2975-2e36-41b8-a500-ab746613bff7
addition, some special power supplies are designed for the purpose of powering the kicker and raster magnets. While the collimators are currently being manufactured by Proactive, t he design of the beam dumps has already been completed by ESS Bilbao and the production is now starting. The procurement of t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
b8c76156-1072-42f9-9bf7-04d5715ee84e
of the cryomodule support near conclusion. The routing of the transmission lines is optimized and the rack layout nearing completion. The control system is going to be EPICS based using WhiteRabbit as the timing system. Its implementation is currently ongoing together with FREI Evo Pro. BUILDING AND INFRASTRU...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
8c02686c-a23f-4984-bda0-55c093ea6627
celerator Utilities Building and the Cryogenic Compres- sors Building, have been constructed, providing the basis for future system installation. Preparation and launch of major procurement packages for the delivery of conventional systems, building comple- tion works, and infrastructure for both the accelerator an...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
64d01329-d7bd-4920-abc0-c66ef49a29f3
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4014 MC4.A08: Hadron accelerators: Linear Accelerators 3363THP: Poster session THP4014 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
2
4cd1aa4d-c130-4560-a7e4-80fe64fd4724
REFERENCES [1] http://myrrha.be/ [2] L. De Keukeleere, U. Dorda, J. Hustings, E. Tanke, and J. Van De Walle, “The Low Energy Beam Transfer (LEBT) line and RFQ for the MYRRHA Phase 1 facility”, presented at the IPAC'26, Deauville, France, May 2026, paper THP4057, this conference. [3] J. Van De Walle, L. De Keuk...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4014.pdf
3