id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
f4a8ce54-1799-4c80-b8d5-7a1a0cff54c9
sity is shown on a logarithmic color scale. Particle Energy [MeV]1 1.5 2 2.5CountsNormalized 00.20.40.60.811 kW5 kW10 kW15 kW 20 kW25 kWFigure 5: Simulated energy distribution of proton beams at the detector position calculated from TraceWin simulations for the different power levels. For improved visibility, the spect...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
1
628d819e-4f99-438d-b10b-4d8b6912f41f
width of 0.8keV. Total count rate was around 40,000 for all measurements except at 25kW, where a total of 100,000 counts was measured. At a final power of 25kW, a beam energyof 2.212MeV wasmeasured,whichcorrespondsto an energy gain of 817keV, which is 35keVhigher than pre- dicted by beam dynamics. Acomparisonofallmeasu...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
1
905dd669-d7a8-4f9e-8adc-a073ca644c8f
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4023 3384 MC4.A08: Hadron accelerators: Linear AcceleratorsTHP4023 THP: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
1
456a7259-9e96-4508-a02b-26c0bb549374
Particle Energy [MeV]1 1.5 2 2.5CountsNormalized 00.20.40.60.811 kW5 kW10 kW15 kW 20 kW25 kWFigure 6: Measured energy distribution of proton beams measured by the Si-PIN detector after acceleration in the cavity for the different forward power levels. shunt impedance of the cavity𝑍 effby 𝑍eff,LLRF=𝑄0,meas 𝑄0,sim·𝑍...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
2
3248deb1-a5ca-49b2-8c90-fd76f64104fd
effective inner cavity length, the measured effective shunt impedance is 𝑍eff,beam=(Δ𝑊 acc 𝑒)2 𝑃𝑐·𝐿.(2) We can now calculate both for the AM-IH-DTL cavity using data from the beam test. From low-level RF measure- ments VNA, the measured unloaded quality factor of the Forward Power [kW]051015202530EnergyGain[keV] ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
2
d9fa78f6-cfa0-4cae-86c2-d439ba2438bb
𝑍eff,beam=182.7(44)MΩm−1.(4) Within the confidence of the calculation, both 𝑍effvalues agreewell. Theshuntimpedancedemonstratedhereison thehighendforIH-typestructures. Itis 79.4%ofthesim- ulatedeffectiveshuntimpedance. SimilartootherIH-type structures the AM-IH-DTL is constructed from a middle frame and lids as well ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
2
5d1cd097-a563-4f31-b90e-c4b5c32efd3f
CONCLUSION Inthisexperimentweaccelerateda 1.4MeVprotonbeam to2.2MeVwith an additively manufactured pure copper drift-tube structure, demonstrating the feasibility of AM for normal conducting linac cavities. Moreover, it is to our knowledge the highest frequency IH-DTL, which was re- alized and applied for ion beam acce...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
2
572e3141-23e4-4c31-ad07-a13c56891cfa
a realization of considerably smaller structure components, leading to higher RF frequencies. ACKNOWLEDGMENTS The authors would especially like to thank M. Schöf- fler,M.DworakandP.ZielfromIKFatGoetheUniversity Frankfurt for their active support during the beam exper- iments at the IKF Van de Graaff accelerator. We wou...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
2
53602915-1447-4d2c-b4e0-fe0e284734b1
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4023 MC4.A08: Hadron accelerators: Linear Accelerators 3385THP: Poster session THP4023 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
2
00c4c9bf-c421-4868-a8b0-2ab0fda9da77
REFERENCES [1]T. Torimset al., “First Proof-of-Concept Prototype of an Additive Manufactured Radio Frequency Quadrupole”,In- struments, vol. 5, no. 4, p. 35, 2021. doi:10.3390/instruments5040035 [2]T. Romanoet al., “Metal additive manufacturing for particle acceleratorapplications”,Phys.Rev.Accel.Beams,vol.27, no. 5, p...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
3
45c21b8f-5cf0-4e21-b616-de58ff910dcb
[5]M.Mayerhoferetal.,“Laserpowderbedfusionforx-band RF cavities: A preliminary study”, inProc. IPAC’25, Taipei,Taiwan, pp. 2616–2619, Nov. 2025. doi:10.18429/JACoW-IPAC2025-THPB052 [6]H.HähnelandU.Ratzinger,“First3DPrintedIH-TypeLinac Structure—Proof-of-Concept for Additive Manufacturing of Linac RF Cavities”,Instrumen...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
3
3b102002-0147-4748-a661-82baf5f10f05
[9]H.Hähnel,A.Ates,B.Dedic,C.Wagner,J.Kaiser,andU. Ratzinger,“RFconditioningofanIH-DTLcavitymadeusing additivemanufacturing”,inProc.IPAC’24,pp.3501–3504, 2024.doi:10.18429/JACOW-IPAC2024-THPR10 [10]H. Hähnelet al., “Further high power tests of the additive manufacturing IH-type cavity”, inProc. IPAC’25, pp. 1666– 1669,...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf
3
10c6c213-6988-497c-b2a2-c08f6a4a1940
UPDATE ON ESS MEDIUM BETA CAVITIES AT INFN LASA D. Sertore∗, M. Bertucci, A. Bosotti, E. Del Core, F. Fiorina, L. Monaco, R. Paparella, P. Spruzzola, B. Vitali1, C. Pagani1,2 1INFN Milano - LASA, Segrate, Italy 2University of Milan, Segrate, Italy Abstract INFNLASAisinvolvedinthedeliveryoffourMedium Beta cavities to ES...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
0
4b91c4a8-ef18-470f-9e99-2f7929a5629f
employs superconducting radio-frequency (SRF) cavities to accelerate the proton beam to its final energy of 2 GeV, corresponding to world record power of 5 MW beam on target [1]. The Medium Beta ( 𝛽 = 0.67) section is based on six- cellellipticalcavitiesoperatingat704.42MHzandprovides accelerationbetween 256MeV and571...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
0
dab87657-965f-4627-8ff8-bb43129df293
to the “Operation Phase” of the ESS accelerator. Beyond addressing this operational requirement, the activity was also intended to confirm the maturity and robustness of the productionandsurfacetreatmentworkflowdevelopedduring series production. Thispaperpresentsthestatusandtheresultsofthefirst verticalRFtestsofthesefo...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
0
6b76927f-c83a-416f-bff3-6f2b0420dce0
Parameter Value Frequency 704.42MHz Geometry beta 0.67 Number of cells 6 Operating temperature 2K Active length 0.855m Optimum 𝛽,𝛽𝑜𝑝𝑡 0.705 Max R/Q at 𝛽𝑜𝑝𝑡 374Ω Eaccat𝛽𝑜𝑝𝑡 16.7MV/m 𝑄0at nominal gradient ≥5×109 PRODUCTION AND SURFACE PREPARATION Niobium Material and Quality Control High-purity niobium shee...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
0
951b002d-affd-46ff-8847-4b00f12e9f36
Cavity Fabrication Cavityfabricationwascarriedout atZanon Researchand Innovation S.r.l (ZRI) following the ESS-qualified manufac- turing workflow [ 4,5]. The process started with the deep drawing of the half-cells. The measurements done after this stage indicated a problem with the drawing process whichresulted in out ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
0
35fc80aa-3513-4615-831d-9651e5e50e77
errors. Endgroups,includingthefundamentalpowercou- pler and pickup antenna ports, were subsequently welded. Based on dimensional and RF measurements, we com- bined the different subcomponents to form the final four17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-2...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
0
f6fd9b18-0c29-483d-a56b-c88502afc3c2
cavitiesandproceedwiththeElectronBeamwelding. The newweldedcavitieswerethensubjectedtoRFanddimen- sional measurements. Unexpectedly,allfourcavitiesexhibitedashorterlength than expected. Further investigations revealed that the root causeofthisissuewasachangeintheweldingparameters that was not communicated before the tr...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
1
47434c7f-379d-43f4-9c5c-f25beb5283e5
of the series production [ 3], based on the experience of the PIP-II prototypes [ 6]. Before integration into the helium tank, they were subjected to a first vertical RF test in the barecavityconfiguration. Basedontheexperiencegained duringseriesproduction,electropolishing(EP)wasadopted as the baseline bulk surface tre...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
1
b43d75ed-d6c6-4e5a-a723-64287eae9aba
than at the equator. The full processing sequence consisted of: •Bulk EP with 120µm–140µm material removal •Heat treatment at 600°Cfor10hfor hydrogen de- gassing. The temperature is limited by the Titanium connection ring to the helium tank that is already welded to the cavity. •RFfrequencytuningandfieldflatnesscorrect...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
1
79430888-e83d-4725-a468-d78fb0d16adf
as done in the past for the series cavities.The cavities were tested in pairs in a vertical cryostat at2K. The ESS qualification requires achievement of at least16.7MV/m acceleratinggradient, compliancewith 𝑄0 specifications, and absenceof fieldemission upto thetarget field. Radiation monitors above and below the cavi...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
1
bbb40789-76fd-467d-a308-1332d15ff476
narrow spread in both maximum gradient and 𝑄0values, as showninFig. 1. Maximumacceleratinggradientsrangedbe- tween25.0and26.5MV/m with𝑄0intheinterval 7.0×109 to 9.3×109. Measured 𝑄0values at the nominal gradient of 16.7MV/m fellin the range1.58×1010to 1.88×1010. Thelimitingmechanismatthehighestfieldwasidentified as ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
1
8c32c033-6901-4049-8f7c-8c6c148c0659
burstsatlowgradientinthefirstpowerrise,fieldemission wasabsentforall thecavitiesup to themaximum achieved gradient. This is a clear indication of the smoothness of the inner cavity walls and of the effectiveness of the final cavity preparation steps (cleanroom assembly and HPRs) performed by the cavity vendor. The cons...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
1
f40c2b19-b18d-490c-a996-6001ee0200f7
LESSONS LEARNED AND PROCESS MATURITY The production of the four additional cavities up to the barecavitytestbenefitedfromtheexperienceaccumulated duringseriesfabrication. Afterarelativelylonginterruption followingtheseriesproduction,thepreparationofthesub- components initially suffered from shape deviations beyond tole...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
d3d884be-a90d-4f3a-8042-3631d1c0c2eb
The surface and heat treatment sequence was executed suc- cessfully, with good reproducibility and no need for cor- rectivereprocessing, asidefrom carefulcontrolof material removaltopreservecavitylengthandfrequencywithinspec- ifications. Overall, these results confirm that the fabrication and preparation workflow is st...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
32c1f540-ee35-4b60-9e79-492b54e80cc2
heat treatment, was executed without any issue and resulted inexcellentRFperformanceduringthefirstverticaltest,with allcavitiesexceedingESSspecifications. Despitethelesson learn during the production process, the narrow spread in maximum gradient and 𝑄0confirms a high degree of repro- ducibility and indicates that the...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
8cca2292-0410-4a81-911f-b26fcd49828b
is necessary because a change in field flatness and cavitylengthwasobservedbetweenthelastmeasurementbefore preparation for VT test and the incoming inspection after test. Theheliumvesselintegrationofthefourcavitiesisnow progressing atZanon, wherethe bellowshavebeen already welded. Afterward,thecavitiesandHetankswillbel...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
c21acb9e-cb64-4833-b2d0-6f7f301d962a
CONCLUSION FournewMediumBetacavitieshavebeensuccessfully fabricated and tested bare as elements for a spare module for the ESS superconducting linac. All four bare cavities exceeded ESS qualification requirements during the first vertical test, exhibiting excellent RF performance and repro- ducibility. Besidessomeissue...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
61aab0a7-c670-4d69-8125-0214947f2ab0
[3]D. Sertore et al., “Update on INFN LASA in-kind contribu- tion to ESS ERIC superconducting linac”, in Proc. SRF2025 , Tokyo,Japan, Sep. 2025, pp. 173–177. doi:1/zero.alt4.18429/JACoW-SRF2/zero.alt425-MOP49 [4]D. Sertore et al., “ESS medium beta cavities status at INFN LASA”, in Proc. IPAC’21 , Campinas, Brazil, May ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
3a3f2ec1-3d34-4119-8683-9258a08a4878
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt422-TUPOTK/zero.alt422 [7]A. Bosotti et al., “Vertical test of ESS medium beta cavities”, inProc. IPAC’19 , Melbourne, Australia, May 2019, pp. 2852– 2855. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt419-WEPRB/zero.alt42317th International Particle Accelerator Conference, Deauvil...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf
2
4e964a87-c633-487c-ba01-edda9f213ed8
INFN LASA ACTIVITIES TOWARD PIP -II R. Paparella†, M. Bertucci, A. Bosotti, E. Del Core, F. Fiorina, L. Monaco, C. Pagani1, D. Sertore, P. Spruzzola, B. Vitali, Istituto Nazionale di Fisica Nucleare, Laboratori Acceleratori e Superconduttività Applicata, Segrate, Italy 1 University of Milan, Segrate , Italy ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
9e9f7215-7361-4b0b-a002-bd833c2dde23
cal production of the series cavities progressing while the two pre -series ones are being used to validate the complete industrial workflow, including surface processing an d final preparation, that is mostly entrusted to industrial partners. To ensure compliance with the stringent performance re- quirements of PIP...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
3906f11b-f4a3-4726-9a5d-cf9d79196954
INTRODUCTION The Fermilab Proton Improvement Plan II (PIP -II) Linac is designed to deliver a 1.2 MW H⁻ beam, with future scalability to multi -megawatt operation, in support of the Long- Baseline Neutrino Facility (LBNF) and Deep Under- ground Neutrino Experiment (DUNE) programs [1]. Once it reached 800 MeV , t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
fd5b6242-0589-4fa0-b6ed-29b8b5ad085a
The operational target for the LB650 cavities is a quality factor of 2.4 × 10¹⁰ at an accelerating gradient of 16.9 MV/m under cryomodule conditions [2], with even higher performance required during vertical cold tests. THE LB650 CA VITY DESIGN All 38 superconducting cavities, including 36 series and 2 pre -ser...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
fdc82831-1c39-42b9-b97f-b0eee7d6b4d5
THE LB650 CA VITY SURFACE TREAT- MENT RECIPE The cavity surface preparation sequence begins with bulk electro -polishing (EP), providing a total material re- moval of 140 μm, including a final 20 μm “cold” EP step. Current -voltage measurements are performed during each treatment to ensure process reproducibility...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
488e9dcd-ee85-4d10-a640-e742dc2935c4
The final surface preparation includes an additional 40 μm electro -polishing, again with the last 20 μm per- formed in cold conditions, followed by more than 48 hours of exposure to ISO4 clean air to promote complete re -oxi- dation of the inner surface. Subsequently, a mid -temperature bake at 350 °C for 3 hours...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
1f1c13c3-114a-4db9-a3f3-f3dfa6d5eef9
Finally, to preserve the optimized inner surface, cavity tuning and helium -vessel integration are performed in a particle -free argon atmosphere. During the complete inte- gration process, a dedicated flanging and monitoring sys- tem derived from the Eu -XFEL Frequency Monitoring System (FMS) [5] is used to continu...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
0
a5358267-6d0c-462b-9965-97449abcbf7c
CURRENT STATUS LB650 pre -series cavities Two pre -series cavities , B61M- ZRI-401 and #402, were foreseen in the contract with the awarded manufacturer , Zanon Research and Innovation (Italy) (ZRI) , to anticipate and qualify the cavity forming, welding and treatment steps and timely release the qualified sta...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
1
5459c570-30c5-401e-baa3-0d7060cf23aa
pits or bumps. Although their minor entity, it has been opted for a mechanical removal by grinding the areas around the defects. The cavity was therefore diverted from its baseline cycle and received , after grinding, an EP -reset of 60 µm removal (40 warm plus 20 cold) before restarting the nominal process with ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
1
4e81137b-99ee-472b-98cb-a836f1c3a5c2
• ISO4 clean -room entry, dismounting of flanging hard- ware, single -pass HPR, 48+ hours drying. • Clean, double bagging for the transport to vacuum fur- nace. • Installation of Niobium foil caps in a soft wall ISO7 clean -room area at the furnace entry (Fig. 2). • 350 °C 3h vacuum baking following a burn- out ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
1
c4d672f0-33fd-478a-97f1-641e3e257d8e
to the alarm and cooling began. The cavity was visually inspected, and no abnormal signs were seen on either the external or internal surface. After this incident, further furnace runs and RGA spectrum analyses ruled out air leak as a cause of the pressure in- crease. Before a second, successful process, the cavit...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
1
1b324228-10da-46c4-b7c8-e7b3cda2c6c1
cavity #401 and its box (Fig. 3 ) through the air transport to Fermilab confirmed that s teel wires suspensions system in- stalled in the crate delivers the expected dampening and accelerations experienced by the cavity are comparable to those usually recorded in dedicated road transport s. Figure 3: Log of C avi...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
1
c2e24e89-9ea1-49a8-86f3-ced26e435b7f
LB650 series manufacturing status Forming and coining of half -cells for the pre -series re- quired extra effort to address residual errors in the RF pro- file leading to excessive frequency errors and internal equators diameters that were consistently larger than re- quired [3]. As a consequence, the stamping di...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
1d76f20a-5145-4ed8-9ad0-840273f4cea5
ing of sub -components is already authorized for the whole series. Successful results from the qualification vertical test of the naked pre -series cavities will timely release the surface treatment of the first cavity batch and of all available cavi- ties afterward. All ancillary sub -components for the naked c...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
4f0ba413-68b3-4a9d-a11e-69b4be71e784
Following the successful experience gained with the QA/QC protocol for the ESS in -kind contribution [ 6], a dedicated document management platform based on INFN Alfresco [ 7] was implemented. It is organized into a struc- tured folder hierarchy , reflecting the production workflow agreed upon with the industrial p...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
805a11ac-12d9-4ff5-ae04-0b3dfa36d118
uments is stored in a database. The database is built by merging information extracted from Alfresco with Lab-VIEW output files generated during VT testing at DESY . This tool enables efficient traceability of all cavity compo-nents, making it easier to identify correlations with suc-cessful or unsuccessful cavity p...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
89d4f9d5-7c43-4df4-93c5-ce59427932aa
The q ualification of the LB650 series will take place at the AMTF facility at DESY , an infrastructure that grants both the required test performance and accuracy as well as the high testing rate needed by the project’s schedule. The first of the two vertical inserts dedicated to LB650 cavity series, capable of ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
bd003187-fa6a-4344-974a-0b75ca9e63a5
high-Q cavity qualification in terms of cryogenics, mag- netic hygiene, and diagnostics. In parallel, a second insert, previously dedicated to 3.9 GHz cavities, has been upgraded to also support larger multicell resonators such as those for ESS and PIP -II, ena- bling to proceed with two cavities being simultaneous...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
070dcbed-3bcf-43cf-a302-8649efaff80d
for the series started : subcomponents manufacturing is un- derway and all collaborations with partner companies and labs are running. REFERENCES [1] D. Passarelli, “The future of the Fermilab Accelerator Com- plex with the new PIP -II linac”, presented at the LINAC'24, 17th International Particle Accelerator Co...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
2
3a57e91b-1359-4714-9ba9-e2599c6b6120
Chicago, IL, USA, Aug. 2024, paper MOXA002, un- published. [2] M. Martinello et al., “Toward Qualifications of HB and LB 650 MHz Cavities for the Prototype Cryomodules for the PIP-II Project”, in Proc. SRF'21 , East Lansing, MI, USA, Jun.-Jul. 2021, pp. 448-451. doi:10.18429/JACoW- SRF2021- TUPCAV005 [3] R. Pa...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
3
ba151237-6869-4220-8e43-68155948cf11
Application of the FMS”, in Proc. SRF'09 , Berlin, Ger- many, Sep. 2009, paper THPPO040, pp. 665-668. [6] D. Sertore et al. , “Update on ESS Medium Beta Cavities at INFN LASA”, presented at the IPAC'26, Deauville, France, May 2026, paper THP4026, this conference. [7] Alfresco . https://docs.alfresco.com/content- ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf
3
6a8fd8a6-bdb2-4c09-b86b-d3bb6c0bca04
ARGITU RFQ BEAD-PULL TUNING AND RF TESTS AT ESS-BILBAO J. L. Muñoz∗, I. Bustinduy, D. Fernández-Cañoto , N. Garmendia, P. González, G. Harper, J. Martín ESS-Bilbao, Zamudio, Spain Abstract In this paper we describe the static tuning procedure of theARGITU/HiCANS-platformRFQatESS-Bilbao. The machiningandassemblyoftheRFQ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
0
a35c7b7b-e6fe-4c78-bb2c-0d96038e5290
and a genetic algorithm, the latter required by the limited tuner range available near the operational frequency. The wholeprocedure and the results are described in this paper. INTRODUCTION TheARGITURFQisthefirstacceleratingcavityofthe ESS-BilbaoprotonlinacfortheHiCANSplatformproject ofa compact accelerator-drivenneut...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
0
96112079-4db7-49a1-b825-86f37c82407f
RFQ length will be flat, as well as symmetric in the four lobes. Thedeviationsfromthisidealbehaviorarecausedby themodulationitselfaswellasbyperturbationscausedby the assembly and mechanical deformations of the structure. As a result, the measured field in the four lobes is not flat alongthe longitudinalcoordinate and i...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
0
f8dba4e2-5e5b-4a7f-b759-66e113216b03
wasplacedinalaboratoryroomwithcontrolledtemperature, with the bead-pull apparatus attached. Figure 1shows the RFQ installed in the bead-pull bench. ∗jlmunoz@essbilbao.org Figure 1: ESS-Bilbao RFQ installed in the bead-pull bench. Thetuneractuators,pickuploopsandbead-pullapparatus are visible. BEAD-PULL MEASUREMENTS The...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
0
4f93d27c-ecd2-4a1f-83a7-1d1dc93c4d88
theperturbationcausedbythefirstoftheplungertunersin themeasuredtrace. Traceswerethenshiftedtomatchthis position. Finally, thebase-line magnitude of the traces, in positionsoutsideoftheRFQ(whichshouldbeofzeroampli- tude) were used for height and drift compensation. The four longitudinaltraces, 𝑞1(𝑧)to𝑞4(𝑧),wereassig...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
0
5ec918ab-414b-45e8-872d-0566cef04050
zationhadalltunersinsertedtothesamepenetration. The measuredprofiles,showninFig. 2,presentedastronglongi- tudinalslope in 𝑄andlargedipolarcomponents. Nineteen longitudinal positions were selected from the traces to form the profile vector used by the tuning algorithms. The se- lected positions avoidedregions where the...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
0
2c43b5c0-12e7-4a41-a72b-3cb9c8a7ffdc
Figure2: Initialbead-pullprofilesforuniformtunerpenetra- tion. The quadrupolar component has a strong longitudinal slope and the dipolar components are large. RESPONSE-MATRIX AND SVD TUNING A response matrix of the tuners action on the field pro- files was first constructed experimentally. Starting from a reference tun...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
1
6a218cc8-55b5-42a4-ba67-fd8f46a214a0
Figure3: Acolormaprepresentationoftheresponsematrix 𝑀oftheRFQ,relatingthechangesintunerpenetrationto changes in the profile of 𝑄,𝐷𝑠and𝐷𝑡profiles. TheconventionalSVDapproach [ 8–11]togettheoptimal set of tuner penetration changes that would produce the rightchangeinthefieldprofilestoobtainthedesiredones, involves ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
1
51631624-2c9c-47a2-8a62-61bf32db08da
was successful for the first steps of the tuning procedure. After three iterations, a field profile as the one shown in Fig.4was achieved. Field flatness as well as symmetry among the vanes was well achieved. This is shown in the uniformityofthe 𝑄profilesandintheverysmallmagnitude of the𝐷𝑠and𝐷𝑡profiles. Figure4: F...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
1
3e8252da-bad2-4cad-bf1c-49ffd159728e
penetrationinaverage,theapplicationoftheSVDalgorithm wasnotpossibleinourcasetocontinuethetuningprocedure: the proposed tuner configurations involved tuner changes thatwerenotphysicallypossibleduetotheactuatorsmoving range. Furthermore, increased tuner penetrations resulted instrongerperturbationsof the measuredprofiles...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
1
d646a803-3602-47e2-a6a3-68b1fcf2a7ba
penalties were applied when any tuner exceeded its mechan- ical limits, while softer penalties discouragedsolutions too close to the boundaries. The important practical advantage is that the optimizer solves the reachable problem rather than the unconstrained17th International Particle Accelerator Conference, Deauville...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
1
63df0a09-21a3-4a78-a884-9dfec671f18a
inverse problem. As a result of the constraints in the available tuner ranges, a configuration that can actually be implemented on the RFQ is found. After each genetic- optimizationstep,theselectedtunerconfigurationwasset on the cavity, a new bead-pull measurement was performed, andthemeasuredresultbecamethenextstartin...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
2
338e4673-853f-48e1-9bce-636d41199a77
shown until final configuration is obtained. Figure5: Fieldprofilesafterseveraliterationsofthegenetic algorithm. The field profiles are quite flat and with the asymmetries well compensated. Cavity frequency in this configuration was 352.100MHz , the target frequency of the tuning procedure. Figure 6: Evolution of the R...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
2
692cae1d-5a6e-4279-8f05-3e6085461c15
infrastructure fostering r&d ecosystem in euskadi”, Neutron News, vol. 31, no. 2-4, pp. 19–25, 2020. doi:1/zero.alt4.1/zero.alt48/zero.alt4/1/zero.alt4448632.2/zero.alt42/zero.alt4.181914/zero.alt4 [2]J. Baggemann et al., “High power target for the high bril- liance neutron source”, Nucl. Instrum. Methods Phys. Res. A ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
2
9bfa5ff6-1a48-4cf4-a89e-c6a131428c91
[5]J. L. Muñoz, I. Bustinduy, R. Igor, and D. de Cos, “Devel- opment of the radio frequency quadrupole proton linac for ess-bilbao”, EPJWebConf. ,vol.231,no.02001,pp.173–196, 2020. doi:1/zero.alt4.1/zero.alt451/epjconf/2/zero.alt42/zero.alt4231/zero.alt42/zero.alt4/zero.alt41 [6]N. Garmendia et al., “Status and RF Devo...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
2
fb87e8a0-b142-45e0-a2fe-ae1efdceff7d
[9]B. Koubek, A. Grudiev, and M. Timmins, “Rf measurements andtuningofthe750mhzradiofrequencyquadrupole”, Phys. Rev. Accel. Beams , vol. 20, no. 8, p. 080102, 2017. doi:1/zero.alt4.11/zero.alt43/PhysRevAccelBeams.2/zero.alt4./zero.alt48/zero.alt41/zero.alt42 [10]H. W. Pommerenke, U. van Rienen, and A. Grudiev, “Rf meas...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
2
bb782a85-3ba6-46cb-9051-3dc9af991808
[12]J. L. Muñoz et al., “ESS-Bilbao RFQ Static Tuning Algo- rithmandSimulation”,in Proc.HB’23 ,Geneva,Switzerland, pp. 440–442, Mar. 2024. doi:1/zero.alt4.18429/JACoW-HB2/zero.alt423-THBP/zero.alt43 [13]JL. Muñoz and I. Bustinduy, “Frequency and field-profile tuningof the ess-bilbaorfq usinga geneticoptimization ap- pr...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf
2
7dbc2b2b-2f01-42cb-b104-56fa6d7ab509
COOLING SKID, THERMAL CHARACTERIZATION AND SIMULATIONS FOR THE ARGITU RFQ AT ESS-BILBAO J. L. Muñoz∗, I. Bustinduy, D. Fernandez-Cañoto, N. Garmendia, P. González, R. González, G. Harper, S. Masa, ESS-Bilbao, Zamudio, Spain Abstract TheARGITURFQatESS-Bilbaoisa 352.2MHz ,4-vane RFQ that will accelerate protons from 45ke...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
0
7ab5091e-e4bf-4814-9713-1966e14e44df
runsinseriesfromsegmenttosegmentallowingasimpler design. A dedicated chiller that provides great stability and controlhasbeenintegratedinthesystem,aswellaswater flowandtemperaturevalvesandsensorsmonitoredusingIO linktechnology. Thecoolingwaterskid,thetestsperformed with the RFQ and their correlation with FEM simulation...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
0
314553c4-d9f4-43f5-b131-dede7b80881e
3.0MeVatafrequencyof 352.2MHz [4,5]. TheRFQhas beenfabricated,assembledandtestedatlowRFpower. The tuning,includingcoolingwaterintheprocess,hasalsobeen finished[ 6]. Thenextcommissioningstagesrequirecondi- tioningwithRFpowerandbeam. Theinitialconfiguration forHiCANSplatformprojectfirststageswillbelimitedto low duty cycl...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
0
fb40f904-d66e-43e1-8825-1b37334b1231
usedtocompensatefrequencydrift. Forthisreason,cooling specifications define not only water flow and temperature magnitudes, but also stability requirements. The present ∗jlmunoz@essbilbao.org Figure 1: ESS-Bilbao RFQ connected to the cooling skid duringthefirstwater-coolingandfrequencycharacterization campaign. workfoc...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
0
3376aab9-4119-4cd3-9d2d-956d1c9fe8f5
ing specification gives nominal flow rates of 3.3l/min per type 1 channel and 6l/minfor type 2 and type 3 channels, with a total RFQ-body flow,excludingtuners, couplers and pickups,ofabout 437l/min [4,5]. InthesetupforHiCANS- platform, the cooling skid is simplified with a single chiller anda commoninlet watertemperatu...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
0
c99ee61a-7f70-4457-ade6-37a2e308523b
validation campaign showed temperature stability below approximately ±0.1°Cat fixed set points and good flow stability for the sensors. The flow and temperature-meter sensors are connected to the control system directly via IO- link technology, without needing a PLC.17th International Particle Accelerator Conference, D...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
0
219c52c7-05c6-46ab-bf39-17d91ae12045
Figure 2: Simplified RFQ model showing the cooling chan- nels distribution and the water flows requirements. STABILITY MEASUREMENTS The cooling skid system was connected to the RFQ as de- scribedinFigs. 1and3. ASMCchillerhasbeenused,along withIFMandSMCsensors (modelsPF3W704,PF3W720, andPF3W740)tomonitorpressure,tempera...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
1
d4616ca2-1b61-43c4-853b-e47c9f9360e3
ables. Thechillersetpointwasvariedfrom 20°Cto30°C in steps of 1°C; each step was held long enough for the sys- Figure 3: P&ID diagram of the HiCANS-platform RFQ cooling system, including chiller, flow-temperature sensors and channel distribution. Figure 4: Statistics of the temperature and flow measure- ments for diffe...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
1
31e103f2-0e04-4346-a527-1d1bb93bffb7
connected layout, the measured slope is about −4kHz/°C . This value is much smaller than the sensitivity expected when the vane-tip channel temperature is changed indepen- dently while the other channels remain fixed. In the present configurationallchannelfamiliessharethesameinletwater, withthesametemperature,sopartoft...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
1
14ecb24e-f6f4-4127-9b45-a82f82297c3d
system. Transient response has also been investigated, as it is the basisfordynamiccontrol. AnexampleisshowninFig. 7. For a positive temperature step of 3°C, the chiller outlet Figure 6: Steady-state frequency shift as a function of water temperature. The measured RFQ slope is about −4kHz/°C , whileasimplifiedFEMmodelo...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
1
d8ca0adf-58c0-49ec-9baf-ef7986a38453
temperature increases gradually and the RFQ frequency has aninitialovershootof 40kHz,untilasteadystateconsistent withthemeasuredsteady-stateslopeisachieved. Cooling transientsafterareductionofsetpointarefasterintheab- senceofRFpower,becausethechillerremovesheatmore rapidly than it can heat the full water volume and RFQ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
2
cdcc13d5-5783-48f5-82b9-056bb3419272
condition, computes the copper temperature distribution, deforms the RFQ mesh, and finally evaluates the change of eigenfrequency. Figure 8showsthesimplifiedgeometryand the RF mesh used in the calculation. Although not all RFQ geometry details are included (inter-segmentdeviations, in- trinsic deformations, different w...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
2
12721d1f-ee18-47b0-a502-31ecce210f63
ever, the same compensation that improves passive stability also limits active tuning authority. During operation with higher RF power, thermal detuning and detuning-dependent powerdepositionwillneedtobeevaluatedwiththeRFfield present. The present measurements provide the zero-power baseline for that next step, where i...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
2
2145adf2-1250-499d-ae13-c931d5bcb6c1
model. CONCLUSIONS The cooling skid has been installed and tested with the complete RFQ body. Temperature and flow sensors have been integrated into the EPICS monitoring system, and the first zero-power frequency characterization has been per- formed. The agreement between measurements and sim- ulations provides a vali...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
2
1d7d50c9-b106-437b-afa9-f714c99fb2b0
[2]Paulin,MarianoAndrés etal.,“TheHERMESreflectometer at the JULIC neutron platform”, EPJ Web Conf. , vol. 286, p. 03003, 2023. doi:1/zero.alt4.1/zero.alt451/epjconf/2/zero.alt423286/zero.alt43/zero.alt4/zero.alt43 [3]J. Baggemann et al., “High power target for the high bril- lianceneutronsource”, Nucl.Instrum.MethodsP...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
2
824efb52-9859-4bec-af4d-bfe2f2ad0cf3
[6]J. L. Muñoz, I. Bustinduy, D. Fernandez-Cañoto, and e. a. Garmendia,“ARGITURFQbead-pulltuningandRFtestsat ESS-Bilbao”,presentedatIPAC’26,Deauville,France,May 2026, paper THP4030, this conference. [7]J.L.Muñoz etal.,“Powercouplersconditioningandmultipact- ingsimulationsfortheESS-BilbaoARGITURFQ”,presented at IPAC’26,...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf
2
78647abb-27a3-40f6-a3f3-f09fbe53b368
OUTCOMES OF THE DONES CONSOLIDATION PROJECT ACTIVITIES* I. Podadera†, J. Aguilar, S. Becerril -Jarque, A. Ibarra, R. Lorenzo, J. Maestre, A. Moreno Cortes, C. Torregrosa -Martín, M. Weber, IFMIF -DONES España , Granada, Spain M. Kubkowska, IPPLM , Warsaw, Poland M. Hoic, D. Miler, University of Zagreb, Zagr...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
3fda558b-35b1-4266-8b4c-55ff4f21df44
Abstract IFMIF -DONES is an ESFRI facility based on a 40 MeV , 5 MW beam power deuteron accelerator and a liquid lith- ium target currently under construction in Granada (Spain) as part of the European roadmap to fusion electricity. Its main goal is to characterize and qualify materials under a neutron field with ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
6a5796bf-ba3e-42f0-a5b5-9d61740fb699
tions from the parties. In this contribution, the main out- comes of the project, such as the first proposal of the DONES Experimental Programme, consolidation of the DONES users community, users and machine interfaces, the evolution of the i deas for the complementary experi- ments, organization and project documen...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
fb9e3351-3e6a-470b-8c56-7069abe14dbd
eas, associated to widen the DONES Users community , 2) Completing the framework of the in -kind and partner- ship procurements by assessing the strategy of the in - Kind Contributions (IKC’s) and 3) U pdating key docu- mentation for policy -makers about financial, legal and or- ganisational project organisation rel...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
17862e6a-7b8e-47ad-9adc-b55a1e4e67b0
order to create the materials properties database under fusion prototypic irradiations , prioritiz ed by parameters and conditions originating from EU DEMO requirements . A major methodological advance wa s the proposal of “flip - and-average” approach for High Flux Test Module (HFTM ) specimen boxes (Fig. 1) , ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
1daf4f38-52b3-42d2-84fe-80671329e094
tional materials, and specifies the testing methods to be im-plemented after exposure—such as tensile, fracture, fa- tigue, creep, and microstructural analyses using small - specimen techniques. It provides a mapping between irr a- diation modules and their associated Post Irradiation Ex- periments (PIE) workflows, de...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
cf69838f-94f9-4c5a-bc80-a8022a2d1653
— DONES -ConP1, and partly co -financed by the Polish Ministry of Sci- ence and Higher Education within the programme called 'PMW' for 2023 - 2025 . Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Uni on or the European Commission. Neither the ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
0
818f5ac8-ee73-4b95-bc51-f8393b0e402a
developments was included, linking DONES experimental programme with the broader fusion materials qualification roadmap. Finally, the structure and schedule of the PIE pro- gramme was proposed ensuring alignment between facility design, experiment planning, and post -irradiation capabil- ities, targeting first co...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
41c74db2-9dc1-4275-a72c-6d555bdf8ea3
Non- Fusion Programme The non- fusion experimental capabilities at IFMIF - DONES were identified during the project, with particular emphasis on nuclear physics, nuclear medicine, and indus- trial applications. O ver 50 proposals across different scien- tific domains were selected . Special attention was given t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
9e979fdd-0bcc-4745-a825-303828dbaa1b
periments that enable high -statistics data collection crucial for detailed nuclear structure studies. Technical require- ments have been defined, including the need for approxi- mately 2 ns deuteron beam micro -bunches and the poten- tial integration of state -of-the-art gas -filled magnet spec- trometers brought by...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
9a1e8595-e40a-47c9-9a95-5cb88ab2c4ce
produce, measure and study radioactive isotopes was pro- posed. The production rates and the background have been estimated to evaluate the feasibility of such experiments. For the deuteron pulsed beam area, two experimental areas have been proposed: 1) using the extracted pulsed deuteron beam, and b) Time of Flig...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
7ad7498c-cd57-46c4-bee6-43b6f68104fe
the meander line kicker stands out as the most technically demanding equipment for the deuteron beam extrac- tion [3]. Although this type of device is already in use in other laboratories, the required operating conditions in terms of field strength and beam energy are significantly more stringent. Regarding the ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
2703e88d-38ad-40a4-b997-1d46dcad050c
management at IFMIF -DONES, including data source identification, curation and storage processes, user acces- sibility provisions, and associated data privacy policies. It covers multiple scenarios, such as experiments conducted within the Test Cell, future irradiation modules, comple- mentary experiments, and rem...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
351aab54-a82e-4696-bc14-a1f5864ee1c6
tron time -of-flight experiments, Industrial and cultural her- itage application of neutrons and Life science application of neutrons. The DONES Users webpage [4] was estab- lished . containing basic information about the community. The Third DONES Users Workshop was organized in Oc- tober 2024 in Zagreb, Croatia ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
1
d8fd4983-352e-4c7b-96b8-520f93916bea
IKC STRATEGY A Multilaterial International DONES Agreement (MIDA) was signed in November 2025 among esDONES, F4E, INF N, QST and RBI. Other institutes such as ENEA (Italy) and KIT (Germany) have shown interest to join in short term , which secures the full budget for the construc- tion phase. A list of work packag...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf
2