id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
f4a8ce54-1799-4c80-b8d5-7a1a0cff54c9 | sity is shown on a logarithmic color scale.
Particle Energy [MeV]1 1.5 2 2.5CountsNormalized
00.20.40.60.811 kW5 kW10 kW15 kW
20 kW25 kWFigure 5: Simulated energy distribution of proton beams at
the detector position calculated from TraceWin simulations
for the different power levels. For improved visibility, the
spect... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 1 |
628d819e-4f99-438d-b10b-4d8b6912f41f | width of 0.8keV. Total count rate was around 40,000 for
all measurements except at 25kW, where a total of 100,000
counts was measured. At a final power of 25kW, a beam
energyof 2.212MeV wasmeasured,whichcorrespondsto
an energy gain of 817keV, which is 35keVhigher than pre-
dicted by beam dynamics.
Acomparisonofallmeasu... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 1 |
905dd669-d7a8-4f9e-8adc-a073ca644c8f | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4023
3384 MC4.A08: Hadron accelerators: Linear AcceleratorsTHP4023 THP: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 1 |
456a7259-9e96-4508-a02b-26c0bb549374 | Particle Energy [MeV]1 1.5 2 2.5CountsNormalized
00.20.40.60.811 kW5 kW10 kW15 kW
20 kW25 kWFigure 6: Measured energy distribution of proton beams
measured by the Si-PIN detector after acceleration in the
cavity for the different forward power levels.
shunt impedance of the cavity𝑍 effby
𝑍eff,LLRF=𝑄0,meas
𝑄0,sim·𝑍... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 2 |
3248deb1-a5ca-49b2-8c90-fd76f64104fd | effective inner cavity length, the measured effective shunt
impedance is
𝑍eff,beam=(Δ𝑊 acc
𝑒)2
𝑃𝑐·𝐿.(2)
We can now calculate both for the AM-IH-DTL cavity
using data from the beam test. From low-level RF measure-
ments VNA, the measured unloaded quality factor of the
Forward Power [kW]051015202530EnergyGain[keV]
... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 2 |
d9fa78f6-cfa0-4cae-86c2-d439ba2438bb | 𝑍eff,beam=182.7(44)MΩm−1.(4)
Within the confidence of the calculation, both 𝑍effvalues
agreewell. Theshuntimpedancedemonstratedhereison
thehighendforIH-typestructures. Itis 79.4%ofthesim-
ulatedeffectiveshuntimpedance. SimilartootherIH-type
structures the AM-IH-DTL is constructed from a middle
frame and lids as well ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 2 |
5d1cd097-a563-4f31-b90e-c4b5c32efd3f | CONCLUSION
Inthisexperimentweaccelerateda 1.4MeVprotonbeam
to2.2MeVwith an additively manufactured pure copper
drift-tube structure, demonstrating the feasibility of AM for
normal conducting linac cavities. Moreover, it is to our
knowledge the highest frequency IH-DTL, which was re-
alized and applied for ion beam acce... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 2 |
572e3141-23e4-4c31-ad07-a13c56891cfa | a realization of considerably smaller structure components,
leading to higher RF frequencies.
ACKNOWLEDGMENTS
The authors would especially like to thank M. Schöf-
fler,M.DworakandP.ZielfromIKFatGoetheUniversity
Frankfurt for their active support during the beam exper-
iments at the IKF Van de Graaff accelerator. We wou... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 2 |
53602915-1447-4d2c-b4e0-fe0e284734b1 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4023
MC4.A08: Hadron accelerators: Linear Accelerators 3385THP: Poster session THP4023
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 2 |
00c4c9bf-c421-4868-a8b0-2ab0fda9da77 | REFERENCES
[1]T. Torimset al., “First Proof-of-Concept Prototype of an
Additive Manufactured Radio Frequency Quadrupole”,In-
struments, vol. 5, no. 4, p. 35, 2021.
doi:10.3390/instruments5040035
[2]T. Romanoet al., “Metal additive manufacturing for particle
acceleratorapplications”,Phys.Rev.Accel.Beams,vol.27,
no. 5, p... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 3 |
45c21b8f-5cf0-4e21-b616-de58ff910dcb | [5]M.Mayerhoferetal.,“Laserpowderbedfusionforx-band
RF cavities: A preliminary study”, inProc. IPAC’25, Taipei,Taiwan, pp. 2616–2619, Nov. 2025.
doi:10.18429/JACoW-IPAC2025-THPB052
[6]H.HähnelandU.Ratzinger,“First3DPrintedIH-TypeLinac
Structure—Proof-of-Concept for Additive Manufacturing of
Linac RF Cavities”,Instrumen... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 3 |
3b102002-0147-4748-a661-82baf5f10f05 | [9]H.Hähnel,A.Ates,B.Dedic,C.Wagner,J.Kaiser,andU.
Ratzinger,“RFconditioningofanIH-DTLcavitymadeusing
additivemanufacturing”,inProc.IPAC’24,pp.3501–3504,
2024.doi:10.18429/JACOW-IPAC2024-THPR10
[10]H. Hähnelet al., “Further high power tests of the additive
manufacturing IH-type cavity”, inProc. IPAC’25, pp. 1666–
1669,... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4023.pdf | 3 |
10c6c213-6988-497c-b2a2-c08f6a4a1940 | UPDATE ON ESS MEDIUM BETA CAVITIES AT INFN LASA
D. Sertore∗, M. Bertucci, A. Bosotti, E. Del Core, F. Fiorina, L. Monaco,
R. Paparella, P. Spruzzola, B. Vitali1, C. Pagani1,2
1INFN Milano - LASA, Segrate, Italy
2University of Milan, Segrate, Italy
Abstract
INFNLASAisinvolvedinthedeliveryoffourMedium
Beta cavities to ES... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 0 |
4b91c4a8-ef18-470f-9e99-2f7929a5629f | employs superconducting radio-frequency (SRF) cavities
to accelerate the proton beam to its final energy of 2 GeV,
corresponding to world record power of 5 MW beam on
target [1].
The Medium Beta ( 𝛽 = 0.67) section is based on six-
cellellipticalcavitiesoperatingat704.42MHzandprovides
accelerationbetween 256MeV and571... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 0 |
dab87657-965f-4627-8ff8-bb43129df293 | to the “Operation Phase” of the ESS accelerator. Beyond
addressing this operational requirement, the activity was
also intended to confirm the maturity and robustness of the
productionandsurfacetreatmentworkflowdevelopedduring
series production.
Thispaperpresentsthestatusandtheresultsofthefirst
verticalRFtestsofthesefo... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 0 |
6b76927f-c83a-416f-bff3-6f2b0420dce0 | Parameter Value
Frequency 704.42MHz
Geometry beta 0.67
Number of cells 6
Operating temperature 2K
Active length 0.855m
Optimum 𝛽,𝛽𝑜𝑝𝑡 0.705
Max R/Q at 𝛽𝑜𝑝𝑡 374Ω
Eaccat𝛽𝑜𝑝𝑡 16.7MV/m
𝑄0at nominal gradient ≥5×109
PRODUCTION AND SURFACE
PREPARATION
Niobium Material and Quality Control
High-purity niobium shee... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 0 |
951b002d-affd-46ff-8847-4b00f12e9f36 | Cavity Fabrication
Cavityfabricationwascarriedout atZanon Researchand
Innovation S.r.l (ZRI) following the ESS-qualified manufac-
turing workflow [ 4,5]. The process started with the deep
drawing of the half-cells. The measurements done after
this stage indicated a problem with the drawing process
whichresulted in out ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 0 |
35fc80aa-3513-4615-831d-9651e5e50e77 | errors. Endgroups,includingthefundamentalpowercou-
pler and pickup antenna ports, were subsequently welded.
Based on dimensional and RF measurements, we com-
bined the different subcomponents to form the final four17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-2... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 0 |
f6fd9b18-0c29-483d-a56b-c88502afc3c2 | cavitiesandproceedwiththeElectronBeamwelding. The
newweldedcavitieswerethensubjectedtoRFanddimen-
sional measurements.
Unexpectedly,allfourcavitiesexhibitedashorterlength
than expected. Further investigations revealed that the root
causeofthisissuewasachangeintheweldingparameters
that was not communicated before the tr... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 1 |
47434c7f-379d-43f4-9c5c-f25beb5283e5 | of the series production [ 3], based on the experience of the
PIP-II prototypes [ 6]. Before integration into the helium
tank, they were subjected to a first vertical RF test in the
barecavityconfiguration. Basedontheexperiencegained
duringseriesproduction,electropolishing(EP)wasadopted
as the baseline bulk surface tre... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 1 |
b43d75ed-d6c6-4e5a-a723-64287eae9aba | than at the equator.
The full processing sequence consisted of:
•Bulk EP with 120µm–140µm material removal
•Heat treatment at 600°Cfor10hfor hydrogen de-
gassing. The temperature is limited by the Titanium
connection ring to the helium tank that is already
welded to the cavity.
•RFfrequencytuningandfieldflatnesscorrect... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 1 |
79430888-e83d-4725-a468-d78fb0d16adf | as done in the past for the series cavities.The cavities were tested in pairs in a vertical cryostat
at2K. The ESS qualification requires achievement of at
least16.7MV/m acceleratinggradient, compliancewith 𝑄0
specifications, and absenceof fieldemission upto thetarget
field.
Radiation monitors above and below the cavi... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 1 |
bbb40789-76fd-467d-a308-1332d15ff476 | narrow spread in both maximum gradient and 𝑄0values, as
showninFig. 1. Maximumacceleratinggradientsrangedbe-
tween25.0and26.5MV/m with𝑄0intheinterval 7.0×109
to 9.3×109. Measured 𝑄0values at the nominal gradient
of 16.7MV/m fellin the range1.58×1010to 1.88×1010.
Thelimitingmechanismatthehighestfieldwasidentified
as ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 1 |
8c32c033-6901-4049-8f7c-8c6c148c0659 | burstsatlowgradientinthefirstpowerrise,fieldemission
wasabsentforall thecavitiesup to themaximum achieved
gradient. This is a clear indication of the smoothness of
the inner cavity walls and of the effectiveness of the final
cavity preparation steps (cleanroom assembly and HPRs)
performed by the cavity vendor.
The cons... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 1 |
f40c2b19-b18d-490c-a996-6001ee0200f7 | LESSONS LEARNED AND
PROCESS MATURITY
The production of the four additional cavities up to the
barecavitytestbenefitedfromtheexperienceaccumulated
duringseriesfabrication. Afterarelativelylonginterruption
followingtheseriesproduction,thepreparationofthesub-
components initially suffered from shape deviations beyond
tole... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
d3d884be-a90d-4f3a-8042-3631d1c0c2eb | The surface and heat treatment sequence was executed suc-
cessfully, with good reproducibility and no need for cor-
rectivereprocessing, asidefrom carefulcontrolof material
removaltopreservecavitylengthandfrequencywithinspec-
ifications.
Overall, these results confirm that the fabrication and
preparation workflow is st... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
32c1f540-ee35-4b60-9e79-492b54e80cc2 | heat treatment, was executed without any issue and resulted
inexcellentRFperformanceduringthefirstverticaltest,with
allcavitiesexceedingESSspecifications. Despitethelesson
learn during the production process, the narrow spread in
maximum gradient and 𝑄0confirms a high degree of repro-
ducibility and indicates that the... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
8cca2292-0410-4a81-911f-b26fcd49828b | is necessary because a change in field flatness and cavitylengthwasobservedbetweenthelastmeasurementbefore
preparation for VT test and the incoming inspection after
test.
Theheliumvesselintegrationofthefourcavitiesisnow
progressing atZanon, wherethe bellowshavebeen already
welded.
Afterward,thecavitiesandHetankswillbel... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
c21acb9e-cb64-4833-b2d0-6f7f301d962a | CONCLUSION
FournewMediumBetacavitieshavebeensuccessfully
fabricated and tested bare as elements for a spare module
for the ESS superconducting linac. All four bare cavities
exceeded ESS qualification requirements during the first
vertical test, exhibiting excellent RF performance and repro-
ducibility. Besidessomeissue... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
61aab0a7-c670-4d69-8125-0214947f2ab0 | [3]D. Sertore et al., “Update on INFN LASA in-kind contribu-
tion to ESS ERIC superconducting linac”, in Proc. SRF2025 ,
Tokyo,Japan, Sep. 2025, pp. 173–177.
doi:1/zero.alt4.18429/JACoW-SRF2/zero.alt425-MOP49
[4]D. Sertore et al., “ESS medium beta cavities status at INFN
LASA”, in Proc. IPAC’21 , Campinas, Brazil, May ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
3a3f2ec1-3d34-4119-8683-9258a08a4878 | doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt422-TUPOTK/zero.alt422
[7]A. Bosotti et al., “Vertical test of ESS medium beta cavities”,
inProc. IPAC’19 , Melbourne, Australia, May 2019, pp. 2852–
2855. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt419-WEPRB/zero.alt42317th International Particle Accelerator Conference, Deauvil... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4026.pdf | 2 |
4e964a87-c633-487c-ba01-edda9f213ed8 | INFN LASA ACTIVITIES TOWARD PIP -II
R. Paparella†, M. Bertucci, A. Bosotti, E. Del Core, F. Fiorina, L. Monaco, C. Pagani1, D. Sertore,
P. Spruzzola, B. Vitali, Istituto Nazionale di Fisica Nucleare, Laboratori Acceleratori e
Superconduttività Applicata, Segrate, Italy
1 University of Milan, Segrate , Italy
... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
9e9f7215-7361-4b0b-a002-bd833c2dde23 | cal production of the series cavities progressing while the
two pre -series ones are being used to validate the complete
industrial workflow, including surface processing an d final
preparation, that is mostly entrusted to industrial partners. To ensure compliance with the stringent performance re-
quirements of PIP... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
3906f11b-f4a3-4726-9a5d-cf9d79196954 | INTRODUCTION
The Fermilab Proton Improvement Plan II (PIP -II) Linac
is designed to deliver a 1.2 MW H⁻ beam, with future
scalability to multi -megawatt operation, in support of the
Long- Baseline Neutrino Facility (LBNF) and Deep Under-
ground Neutrino Experiment (DUNE) programs [1].
Once it reached 800 MeV , t... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
fd5b6242-0589-4fa0-b6ed-29b8b5ad085a | The operational target for the LB650 cavities is a quality
factor of 2.4 × 10¹⁰ at an accelerating gradient of
16.9 MV/m under cryomodule conditions [2], with even
higher performance required during vertical cold tests.
THE LB650 CA VITY DESIGN
All 38 superconducting cavities, including 36 series and
2 pre -ser... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
fdc82831-1c39-42b9-b97f-b0eee7d6b4d5 | THE LB650 CA VITY SURFACE TREAT-
MENT RECIPE
The cavity surface preparation sequence begins with
bulk electro -polishing (EP), providing a total material re-
moval of 140 μm, including a final 20 μm “cold” EP step.
Current -voltage measurements are performed during each
treatment to ensure process reproducibility... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
488e9dcd-ee85-4d10-a640-e742dc2935c4 | The final surface preparation includes an additional
40 μm electro -polishing, again with the last 20 μm per-
formed in cold conditions, followed by more than 48 hours
of exposure to ISO4 clean air to promote complete re -oxi-
dation of the inner surface.
Subsequently, a mid -temperature bake at 350 °C for
3 hours... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
1f1c13c3-114a-4db9-a3f3-f3dfa6d5eef9 | Finally, to preserve the optimized inner surface, cavity
tuning and helium -vessel integration are performed in a
particle -free argon atmosphere. During the complete inte-
gration process, a dedicated flanging and monitoring sys-
tem derived from the Eu -XFEL Frequency Monitoring
System (FMS) [5] is used to continu... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 0 |
a5358267-6d0c-462b-9965-97449abcbf7c | CURRENT STATUS
LB650 pre -series cavities
Two pre -series cavities , B61M- ZRI-401 and #402, were
foreseen in the contract with the awarded manufacturer ,
Zanon Research and Innovation (Italy) (ZRI) , to anticipate
and qualify the cavity forming, welding and treatment steps
and timely release the qualified sta... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 1 |
5459c570-30c5-401e-baa3-0d7060cf23aa | pits or bumps. Although their minor entity, it has been
opted for a mechanical removal by grinding the areas around the defects. The cavity was therefore diverted from
its baseline cycle and received , after grinding, an EP -reset
of 60 µm removal (40 warm plus 20 cold) before restarting
the nominal process with ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 1 |
4e81137b-99ee-472b-98cb-a836f1c3a5c2 | • ISO4 clean -room entry, dismounting of flanging hard-
ware, single -pass HPR, 48+ hours drying.
• Clean, double bagging for the transport to vacuum fur-
nace.
• Installation of Niobium foil caps in a soft wall ISO7 clean -room area at the furnace entry (Fig. 2).
• 350 °C 3h vacuum baking following a burn- out ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 1 |
c4d672f0-33fd-478a-97f1-641e3e257d8e | to the alarm and cooling began.
The cavity was visually inspected, and no abnormal
signs were seen on either the external or internal surface.
After this incident, further furnace runs and RGA spectrum analyses ruled out air leak as a cause of the pressure in-
crease. Before a second, successful process, the cavit... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 1 |
1b324228-10da-46c4-b7c8-e7b3cda2c6c1 | cavity #401 and its box (Fig. 3 ) through the air transport to
Fermilab confirmed that s teel wires suspensions system in-
stalled in the crate delivers the expected dampening and
accelerations experienced by the cavity are comparable to
those usually recorded in dedicated road transport s.
Figure 3: Log of C avi... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 1 |
c2e24e89-9ea1-49a8-86f3-ced26e435b7f | LB650 series manufacturing status
Forming and coining of half -cells for the pre -series re-
quired extra effort to address residual errors in the RF pro-
file leading to excessive frequency errors and internal
equators diameters that were consistently larger than re-
quired [3].
As a consequence, the stamping di... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
1d76f20a-5145-4ed8-9ad0-840273f4cea5 | ing of sub -components is already authorized for the whole
series.
Successful results from the qualification vertical test of
the naked pre -series cavities will timely release the surface
treatment of the first cavity batch and of all available cavi-
ties afterward.
All ancillary sub -components for the naked c... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
4f0ba413-68b3-4a9d-a11e-69b4be71e784 | Following the successful experience gained with the
QA/QC protocol for the ESS in -kind contribution [ 6], a
dedicated document management platform based on INFN
Alfresco [ 7] was implemented. It is organized into a struc-
tured folder hierarchy , reflecting the production workflow
agreed upon with the industrial p... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
805a11ac-12d9-4ff5-ae04-0b3dfa36d118 | uments is stored in a database. The database is built by
merging information extracted from Alfresco with Lab-VIEW output files generated during VT testing at DESY .
This tool enables efficient traceability of all cavity compo-nents, making it easier to identify correlations with suc-cessful or unsuccessful cavity p... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
89d4f9d5-7c43-4df4-93c5-ce59427932aa | The q ualification of the LB650 series will take place at
the AMTF facility at DESY , an infrastructure that grants
both the required test performance and accuracy as well as
the high testing rate needed by the project’s schedule.
The first of the two vertical inserts dedicated to LB650
cavity series, capable of ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
bd003187-fa6a-4344-974a-0b75ca9e63a5 | high-Q cavity qualification in terms of cryogenics, mag-
netic hygiene, and diagnostics.
In parallel, a second insert, previously dedicated to
3.9 GHz cavities, has been upgraded to also support larger
multicell resonators such as those for ESS and PIP -II, ena-
bling to proceed with two cavities being simultaneous... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
070dcbed-3bcf-43cf-a302-8649efaff80d | for the series started : subcomponents manufacturing is un-
derway and all collaborations with partner companies and
labs are running.
REFERENCES
[1] D. Passarelli, “The future of the Fermilab Accelerator Com-
plex with the new PIP -II linac”, presented at the LINAC'24,
17th International Particle Accelerator Co... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 2 |
3a57e91b-1359-4714-9ba9-e2599c6b6120 | Chicago, IL, USA, Aug. 2024, paper MOXA002, un-
published.
[2] M. Martinello et al., “Toward Qualifications of HB and LB
650 MHz Cavities for the Prototype Cryomodules for the
PIP-II Project”, in Proc. SRF'21 , East Lansing, MI, USA,
Jun.-Jul. 2021, pp. 448-451.
doi:10.18429/JACoW- SRF2021- TUPCAV005
[3] R. Pa... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 3 |
ba151237-6869-4220-8e43-68155948cf11 | Application of the FMS”, in Proc. SRF'09 , Berlin, Ger-
many, Sep. 2009, paper THPPO040, pp. 665-668.
[6] D. Sertore et al. , “Update on ESS Medium Beta Cavities at
INFN LASA”, presented at the IPAC'26, Deauville, France,
May 2026, paper THP4026, this conference.
[7] Alfresco . https://docs.alfresco.com/content-
... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4027.pdf | 3 |
6a8fd8a6-bdb2-4c09-b86b-d3bb6c0bca04 | ARGITU RFQ BEAD-PULL TUNING AND RF TESTS AT ESS-BILBAO
J. L. Muñoz∗, I. Bustinduy, D. Fernández-Cañoto , N. Garmendia, P. González, G. Harper, J. Martín
ESS-Bilbao, Zamudio, Spain
Abstract
In this paper we describe the static tuning procedure of
theARGITU/HiCANS-platformRFQatESS-Bilbao. The
machiningandassemblyoftheRFQ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 0 |
a35c7b7b-e6fe-4c78-bb2c-0d96038e5290 | and a genetic algorithm, the latter required by the limited
tuner range available near the operational frequency. The
wholeprocedure and the results are described in this paper.
INTRODUCTION
TheARGITURFQisthefirstacceleratingcavityofthe
ESS-BilbaoprotonlinacfortheHiCANSplatformproject
ofa compact accelerator-drivenneut... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 0 |
96112079-4db7-49a1-b825-86f37c82407f | RFQ length will be flat, as well as symmetric in the four
lobes. Thedeviationsfromthisidealbehaviorarecausedby
themodulationitselfaswellasbyperturbationscausedby
the assembly and mechanical deformations of the structure.
As a result, the measured field in the four lobes is not flat
alongthe longitudinalcoordinate and i... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 0 |
f8dba4e2-5e5b-4a7f-b759-66e113216b03 | wasplacedinalaboratoryroomwithcontrolledtemperature,
with the bead-pull apparatus attached. Figure 1shows the
RFQ installed in the bead-pull bench.
∗jlmunoz@essbilbao.org
Figure 1: ESS-Bilbao RFQ installed in the bead-pull bench.
Thetuneractuators,pickuploopsandbead-pullapparatus
are visible.
BEAD-PULL MEASUREMENTS
The... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 0 |
4f93d27c-ecd2-4a1f-83a7-1d1dc93c4d88 | theperturbationcausedbythefirstoftheplungertunersin
themeasuredtrace. Traceswerethenshiftedtomatchthis
position. Finally, thebase-line magnitude of the traces, in
positionsoutsideoftheRFQ(whichshouldbeofzeroampli-
tude) were used for height and drift compensation. The four
longitudinaltraces, 𝑞1(𝑧)to𝑞4(𝑧),wereassig... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 0 |
5ec918ab-414b-45e8-872d-0566cef04050 | zationhadalltunersinsertedtothesamepenetration. The
measuredprofiles,showninFig. 2,presentedastronglongi-
tudinalslope in 𝑄andlargedipolarcomponents. Nineteen
longitudinal positions were selected from the traces to form
the profile vector used by the tuning algorithms. The se-
lected positions avoidedregions where the... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 0 |
2c43b5c0-12e7-4a41-a72b-3cb9c8a7ffdc | Figure2: Initialbead-pullprofilesforuniformtunerpenetra-
tion. The quadrupolar component has a strong longitudinal
slope and the dipolar components are large.
RESPONSE-MATRIX AND SVD TUNING
A response matrix of the tuners action on the field pro-
files was first constructed experimentally. Starting from a
reference tun... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 1 |
6a218cc8-55b5-42a4-ba67-fd8f46a214a0 | Figure3: Acolormaprepresentationoftheresponsematrix
𝑀oftheRFQ,relatingthechangesintunerpenetrationto
changes in the profile of 𝑄,𝐷𝑠and𝐷𝑡profiles.
TheconventionalSVDapproach [ 8–11]togettheoptimal
set of tuner penetration changes that would produce the
rightchangeinthefieldprofilestoobtainthedesiredones,
involves ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 1 |
51631624-2c9c-47a2-8a62-61bf32db08da | was successful for the first steps of the tuning procedure.
After three iterations, a field profile as the one shown in
Fig.4was achieved. Field flatness as well as symmetry
among the vanes was well achieved. This is shown in the
uniformityofthe 𝑄profilesandintheverysmallmagnitude
of the𝐷𝑠and𝐷𝑡profiles.
Figure4: F... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 1 |
3e8252da-bad2-4cad-bf1c-49ffd159728e | penetrationinaverage,theapplicationoftheSVDalgorithm
wasnotpossibleinourcasetocontinuethetuningprocedure:
the proposed tuner configurations involved tuner changes
thatwerenotphysicallypossibleduetotheactuatorsmoving
range. Furthermore, increased tuner penetrations resulted
instrongerperturbationsof the measuredprofiles... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 1 |
d646a803-3602-47e2-a6a3-68b1fcf2a7ba | penalties were applied when any tuner exceeded its mechan-
ical limits, while softer penalties discouragedsolutions too
close to the boundaries.
The important practical advantage is that the optimizer
solves the reachable problem rather than the unconstrained17th International Particle Accelerator Conference, Deauville... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 1 |
63df0a09-21a3-4a78-a884-9dfec671f18a | inverse problem. As a result of the constraints in the
available tuner ranges, a configuration that can actually
be implemented on the RFQ is found. After each genetic-
optimizationstep,theselectedtunerconfigurationwasset
on the cavity, a new bead-pull measurement was performed,
andthemeasuredresultbecamethenextstartin... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 2 |
338e4673-853f-48e1-9bce-636d41199a77 | shown until final configuration is obtained.
Figure5: Fieldprofilesafterseveraliterationsofthegenetic
algorithm. The field profiles are quite flat and with the
asymmetries well compensated. Cavity frequency in this
configuration was 352.100MHz , the target frequency of the
tuning procedure.
Figure 6: Evolution of the R... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 2 |
692cae1d-5a6e-4279-8f05-3e6085461c15 | infrastructure fostering r&d ecosystem in euskadi”, Neutron
News, vol. 31, no. 2-4, pp. 19–25, 2020.
doi:1/zero.alt4.1/zero.alt48/zero.alt4/1/zero.alt4448632.2/zero.alt42/zero.alt4.181914/zero.alt4
[2]J. Baggemann et al., “High power target for the high bril-
liance neutron source”, Nucl. Instrum. Methods Phys. Res. A ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 2 |
9bfa5ff6-1a48-4cf4-a89e-c6a131428c91 | [5]J. L. Muñoz, I. Bustinduy, R. Igor, and D. de Cos, “Devel-
opment of the radio frequency quadrupole proton linac for
ess-bilbao”, EPJWebConf. ,vol.231,no.02001,pp.173–196,
2020. doi:1/zero.alt4.1/zero.alt451/epjconf/2/zero.alt42/zero.alt4231/zero.alt42/zero.alt4/zero.alt41
[6]N. Garmendia et al., “Status and RF Devo... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 2 |
fb87e8a0-b142-45e0-a2fe-ae1efdceff7d | [9]B. Koubek, A. Grudiev, and M. Timmins, “Rf measurements
andtuningofthe750mhzradiofrequencyquadrupole”, Phys.
Rev. Accel. Beams , vol. 20, no. 8, p. 080102, 2017.
doi:1/zero.alt4.11/zero.alt43/PhysRevAccelBeams.2/zero.alt4./zero.alt48/zero.alt41/zero.alt42
[10]H. W. Pommerenke, U. van Rienen, and A. Grudiev, “Rf
meas... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 2 |
bb782a85-3ba6-46cb-9051-3dc9af991808 | [12]J. L. Muñoz et al., “ESS-Bilbao RFQ Static Tuning Algo-
rithmandSimulation”,in Proc.HB’23 ,Geneva,Switzerland,
pp. 440–442, Mar. 2024.
doi:1/zero.alt4.18429/JACoW-HB2/zero.alt423-THBP/zero.alt43
[13]JL. Muñoz and I. Bustinduy, “Frequency and field-profile
tuningof the ess-bilbaorfq usinga geneticoptimization ap-
pr... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4030.pdf | 2 |
7dbc2b2b-2f01-42cb-b104-56fa6d7ab509 | COOLING SKID, THERMAL CHARACTERIZATION AND SIMULATIONS
FOR THE ARGITU RFQ AT ESS-BILBAO
J. L. Muñoz∗, I. Bustinduy, D. Fernandez-Cañoto, N. Garmendia, P. González, R. González,
G. Harper, S. Masa, ESS-Bilbao, Zamudio, Spain
Abstract
TheARGITURFQatESS-Bilbaoisa 352.2MHz ,4-vane
RFQ that will accelerate protons from 45ke... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 0 |
7ab5091e-e4bf-4814-9713-1966e14e44df | runsinseriesfromsegmenttosegmentallowingasimpler
design. A dedicated chiller that provides great stability and
controlhasbeenintegratedinthesystem,aswellaswater
flowandtemperaturevalvesandsensorsmonitoredusingIO
linktechnology. Thecoolingwaterskid,thetestsperformed
with the RFQ and their correlation with FEM simulation... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 0 |
314553c4-d9f4-43f5-b131-dede7b80881e | 3.0MeVatafrequencyof 352.2MHz [4,5]. TheRFQhas
beenfabricated,assembledandtestedatlowRFpower. The
tuning,includingcoolingwaterintheprocess,hasalsobeen
finished[ 6]. Thenextcommissioningstagesrequirecondi-
tioningwithRFpowerandbeam. Theinitialconfiguration
forHiCANSplatformprojectfirststageswillbelimitedto
low duty cycl... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 0 |
fb40f904-d66e-43e1-8825-1b37334b1231 | usedtocompensatefrequencydrift. Forthisreason,cooling
specifications define not only water flow and temperature
magnitudes, but also stability requirements. The present
∗jlmunoz@essbilbao.org
Figure 1: ESS-Bilbao RFQ connected to the cooling skid
duringthefirstwater-coolingandfrequencycharacterization
campaign.
workfoc... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 0 |
3376aab9-4119-4cd3-9d2d-956d1c9fe8f5 | ing specification gives nominal flow rates of 3.3l/min per
type 1 channel and 6l/minfor type 2 and type 3 channels,
with a total RFQ-body flow,excludingtuners, couplers and
pickups,ofabout 437l/min [4,5]. InthesetupforHiCANS-
platform, the cooling skid is simplified with a single chiller
anda commoninlet watertemperatu... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 0 |
c99ee61a-7f70-4457-ade6-37a2e308523b | validation campaign showed temperature stability below
approximately ±0.1°Cat fixed set points and good flow
stability for the sensors. The flow and temperature-meter
sensors are connected to the control system directly via IO-
link technology, without needing a PLC.17th International Particle Accelerator Conference, D... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 0 |
219c52c7-05c6-46ab-bf39-17d91ae12045 | Figure 2: Simplified RFQ model showing the cooling chan-
nels distribution and the water flows requirements.
STABILITY MEASUREMENTS
The cooling skid system was connected to the RFQ as de-
scribedinFigs. 1and3. ASMCchillerhasbeenused,along
withIFMandSMCsensors (modelsPF3W704,PF3W720,
andPF3W740)tomonitorpressure,tempera... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 1 |
d4616ca2-1b61-43c4-853b-e47c9f9360e3 | ables. Thechillersetpointwasvariedfrom 20°Cto30°C
in steps of 1°C; each step was held long enough for the sys-
Figure 3: P&ID diagram of the HiCANS-platform RFQ
cooling system, including chiller, flow-temperature sensors
and channel distribution.
Figure 4: Statistics of the temperature and flow measure-
ments for diffe... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 1 |
31e103f2-0e04-4346-a527-1d1bb93bffb7 | connected layout, the measured slope is about −4kHz/°C .
This value is much smaller than the sensitivity expected
when the vane-tip channel temperature is changed indepen-
dently while the other channels remain fixed. In the present
configurationallchannelfamiliessharethesameinletwater,
withthesametemperature,sopartoft... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 1 |
14ecb24e-f6f4-4127-9b45-a82f82297c3d | system.
Transient response has also been investigated, as it is the
basisfordynamiccontrol. AnexampleisshowninFig. 7.
For a positive temperature step of 3°C, the chiller outlet
Figure 6: Steady-state frequency shift as a function of water
temperature. The measured RFQ slope is about −4kHz/°C ,
whileasimplifiedFEMmodelo... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 1 |
d8ca0adf-58c0-49ec-9baf-ef7986a38453 | temperature increases gradually and the RFQ frequency has
aninitialovershootof 40kHz,untilasteadystateconsistent
withthemeasuredsteady-stateslopeisachieved. Cooling
transientsafterareductionofsetpointarefasterintheab-
senceofRFpower,becausethechillerremovesheatmore
rapidly than it can heat the full water volume and RFQ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 2 |
cdcc13d5-5783-48f5-82b9-056bb3419272 | condition, computes the copper temperature distribution,
deforms the RFQ mesh, and finally evaluates the change of
eigenfrequency. Figure 8showsthesimplifiedgeometryand
the RF mesh used in the calculation. Although not all RFQ
geometry details are included (inter-segmentdeviations, in-
trinsic deformations, different w... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 2 |
12721d1f-ee18-47b0-a502-31ecce210f63 | ever, the same compensation that improves passive stability
also limits active tuning authority. During operation with
higher RF power, thermal detuning and detuning-dependent
powerdepositionwillneedtobeevaluatedwiththeRFfield
present. The present measurements provide the zero-power
baseline for that next step, where i... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 2 |
2145adf2-1250-499d-ae13-c931d5bcb6c1 | model.
CONCLUSIONS
The cooling skid has been installed and tested with the
complete RFQ body. Temperature and flow sensors have
been integrated into the EPICS monitoring system, and the
first zero-power frequency characterization has been per-
formed. The agreement between measurements and sim-
ulations provides a vali... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 2 |
1d7d50c9-b106-437b-afa9-f714c99fb2b0 | [2]Paulin,MarianoAndrés etal.,“TheHERMESreflectometer
at the JULIC neutron platform”, EPJ Web Conf. , vol. 286,
p. 03003, 2023. doi:1/zero.alt4.1/zero.alt451/epjconf/2/zero.alt423286/zero.alt43/zero.alt4/zero.alt43
[3]J. Baggemann et al., “High power target for the high bril-
lianceneutronsource”, Nucl.Instrum.MethodsP... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 2 |
824efb52-9859-4bec-af4d-bfe2f2ad0cf3 | [6]J. L. Muñoz, I. Bustinduy, D. Fernandez-Cañoto, and e. a.
Garmendia,“ARGITURFQbead-pulltuningandRFtestsat
ESS-Bilbao”,presentedatIPAC’26,Deauville,France,May
2026, paper THP4030, this conference.
[7]J.L.Muñoz etal.,“Powercouplersconditioningandmultipact-
ingsimulationsfortheESS-BilbaoARGITURFQ”,presented
at IPAC’26,... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4031.pdf | 2 |
78647abb-27a3-40f6-a3f3-f09fbe53b368 | OUTCOMES OF THE DONES CONSOLIDATION PROJECT ACTIVITIES*
I. Podadera†, J. Aguilar, S. Becerril -Jarque, A. Ibarra, R. Lorenzo, J. Maestre, A. Moreno Cortes,
C. Torregrosa -Martín, M. Weber, IFMIF -DONES España , Granada, Spain
M. Kubkowska, IPPLM , Warsaw, Poland
M. Hoic, D. Miler, University of Zagreb, Zagr... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
3fda558b-35b1-4266-8b4c-55ff4f21df44 | Abstract
IFMIF -DONES is an ESFRI facility based on a 40 MeV ,
5 MW beam power deuteron accelerator and a liquid lith-
ium target currently under construction in Granada (Spain)
as part of the European roadmap to fusion electricity. Its main goal is to characterize and qualify materials under a
neutron field with ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
6a5796bf-ba3e-42f0-a5b5-9d61740fb699 | tions from the parties. In this contribution, the main out-
comes of the project, such as the first proposal of the
DONES Experimental Programme, consolidation of the
DONES users community, users and machine interfaces,
the evolution of the i deas for the complementary experi-
ments, organization and project documen... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
fb9e3351-3e6a-470b-8c56-7069abe14dbd | eas, associated to widen the DONES Users community ,
2) Completing the framework of the in -kind and partner-
ship procurements by assessing the strategy of the in -
Kind Contributions (IKC’s) and 3) U pdating key docu-
mentation for policy -makers about financial, legal and or-
ganisational project organisation rel... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
17862e6a-7b8e-47ad-9adc-b55a1e4e67b0 | order to create the materials properties database under
fusion prototypic irradiations , prioritiz ed by parameters
and conditions originating from EU DEMO requirements .
A major methodological advance wa s the proposal of “flip -
and-average” approach for High Flux Test Module
(HFTM ) specimen boxes (Fig. 1) , ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
1daf4f38-52b3-42d2-84fe-80671329e094 | tional materials, and specifies the testing methods to be im-plemented after exposure—such as tensile, fracture, fa-
tigue, creep, and microstructural analyses using small -
specimen techniques. It provides a mapping between irr a-
diation modules and their associated Post Irradiation Ex-
periments (PIE) workflows, de... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
cf69838f-94f9-4c5a-bc80-a8022a2d1653 | — DONES -ConP1, and partly co -financed by the Polish Ministry of Sci-
ence and Higher Education within the programme called 'PMW' for 2023 -
2025 . Views and opinions expressed are however those of the author(s)
only and do not necessarily reflect those of the European Uni on or the
European Commission. Neither the ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 0 |
818f5ac8-ee73-4b95-bc51-f8393b0e402a | developments was included, linking DONES experimental
programme with the broader fusion materials qualification
roadmap. Finally, the structure and schedule of the PIE pro-
gramme was proposed ensuring alignment between facility
design, experiment planning, and post -irradiation capabil-
ities, targeting first co... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
41c74db2-9dc1-4275-a72c-6d555bdf8ea3 | Non- Fusion Programme
The non- fusion experimental capabilities at IFMIF -
DONES were identified during the project, with particular
emphasis on nuclear physics, nuclear medicine, and indus-
trial applications. O ver 50 proposals across different scien-
tific domains were selected . Special attention was given t... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
9e979fdd-0bcc-4745-a825-303828dbaa1b | periments that enable high -statistics data collection crucial
for detailed nuclear structure studies. Technical require-
ments have been defined, including the need for approxi-
mately 2 ns deuteron beam micro -bunches and the poten-
tial integration of state -of-the-art gas -filled magnet spec-
trometers brought by... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
9a1e8595-e40a-47c9-9a95-5cb88ab2c4ce | produce, measure and study radioactive isotopes was pro-
posed. The production rates and the background have been estimated to evaluate the feasibility of such experiments.
For the deuteron pulsed beam area, two experimental areas
have been proposed: 1) using the extracted pulsed deuteron beam, and b) Time of Flig... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
7ad7498c-cd57-46c4-bee6-43b6f68104fe | the meander line kicker stands out as the most technically
demanding equipment for the deuteron beam extrac-
tion [3]. Although this type of device is already in use in
other laboratories, the required operating conditions in
terms of field strength and beam energy are significantly
more stringent. Regarding the ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
2703e88d-38ad-40a4-b997-1d46dcad050c | management at IFMIF -DONES, including data source
identification, curation and storage processes, user acces-
sibility provisions, and associated data privacy policies. It
covers multiple scenarios, such as experiments conducted
within the Test Cell, future irradiation modules, comple-
mentary experiments, and rem... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
351aab54-a82e-4696-bc14-a1f5864ee1c6 | tron time -of-flight experiments, Industrial and cultural her-
itage application of neutrons and Life science application
of neutrons. The DONES Users webpage [4] was estab-
lished . containing basic information about the community.
The Third DONES Users Workshop was organized in Oc-
tober 2024 in Zagreb, Croatia ... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 1 |
d8fd4983-352e-4c7b-96b8-520f93916bea | IKC STRATEGY
A Multilaterial International DONES Agreement
(MIDA) was signed in November 2025 among esDONES,
F4E, INF N, QST and RBI. Other institutes such as ENEA
(Italy) and KIT (Germany) have shown interest to join in
short term , which secures the full budget for the construc-
tion phase. A list of work packag... | D:\Daily_ihep\Conferences\IPAC2026\THP\THP4033.pdf | 2 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.