id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
2e9eb6e2-ee83-4c16-8003-307cbab65d55
veloped for 150 volt drain to source voltage (Vds) at UHF to L band frequencies [3, 4]. Impedance matching from the drain tab to 50 ohm loads is improved with higher drain voltage , as determined by this relationship: Optimal load resistance, R =(Vds−Vsat)2 2∗Pout(1) where V sat is approximately 10 volts fo...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
1
0d6099f4-6a10-42ef-8c9e-194374e0fc4c
combiner to reach 350 kW, ¼ of the total power of the en- tire SSA. We have evaluated push- pull 3.6 kW HEMTs from a transistor fab with HV GaN on SiC optimized for pulsed RF power. The IGN815 device uses conventional Ag- Sn die attach in a Gemini package and is designed for 12% duty factor (Fig. 1) . A...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
1
8c47b93b-5a15-4988-9830-14145bbc8369
gain, efficiency, phase response, all with varying duty factors and temperatures [5]. Table 1 shows measured data from both types of HEMTs. Figure 2: 5 kW Pallet using IGN825 HEMTs . Table 1: Comparison of Two HEMT Pallets Thermal Considerations Like the klystrons that it could replace, the SSA will re- quire...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
1
3962de73-cc73-4a3a-b395-7601eec21f2e
225 ℃ [6 ]. It has been especially important to work with the HEMT manufacturer using their thermal parameters measured using advanced techniques [7] . The balance of circuitry of the overall system should set the limit for SSA mean time to repair , and this analysis is ongoing. Outphasing Modulation Method...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
1
5c8ad32c-2550-427d-ae34-499bce94587b
sive collector regardless of RF drive, GaN HEMTs must consider specific situations: • When conditioning a CCL cavity • Ramping up power slowly to minimize sparking • During accelerator beam tuning • Normal uneven RF power distribution along linac • Fast power fluctuation for beam loading805 MHz 1mS PW, 120 pps I...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
1
d886aa42-d976-4872-8102-ca999935ab0c
The outphasing modulation techniqu e of Chireix has been resurrected from historic tube use [ 8, 9]. Fundamen- tally, i t uses a pair of identical amplifiers operat ing at max- imum (saturated) efficiency. Linear amplitude modulation is then obtained using nonlinear amplifiers operating with varying phase -rel...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
690a9da2-acf6-4da5-b99b-f4d5456aa4c5
outphasing is restricted by design. Figure 3: Outphasing Amplifier (adopted from Godoy, IEEE Trans MTT, Dec. 2009) . Outphasing modulation for amplitude control is devel- oped in the digital low level RF controller [10-12]. Phase modulation for the overall SSA is developed with conven- tional PI feedback loop...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
88309ad6-71da-40ab-b956-37da796e3fd1
power reductions that are not handled with outphasing. Combin ed Pallets For a SSA with 320 RF pallets, combining networks must have low loss and the highest number of combined blades to be most efficient. The limiting power level of a blade is 10 kW peak and 1.2 kW average, determined by the coaxial RF co...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
bf491e85-c0b8-45cd-93ac-e223d945b45b
velopment. This ¼ module generates 350 kW peak power with 40 blades . It is combined with three others using waveguide magic tees to the final combination for 1.25 MW (Fig. 4). One high power circulator will be between the final magic tee and the CCL , similar to what a high efficiency klystron requires. Testing...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
2f108014-c2dc-491a-aae4-d86d1e6255d6
cant flicker on the AC power network. We are studying the optimal location of this storage, likely to be a combination of bulk capacitance at the converters as well as distributed capacitance closer to the pallets. The exiting AC grid sup- plies 4.16 kV AC to the mains power supply for LANSCE klystrons. This wo...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
89e94988-d99f-4dfb-a6d9-a3fa52e907d6
binations to test effectiveness of outphasing modulation. Leading -edge technologies are being used to overcome shortcomings that would otherwise make a 1.25 MW pulsed SSA at 805 MHz very complex, physically large and inefficient. GaN on SiC devices allow us to design a more compact SSA that will not becom...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
49ebf3ca-d234-4a6b-9706-b94414290865
Deauville, France, May 2026 , paper TUP7345, this confer- ence. 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7347 1592 MC7.T08: RF Power SourcesTUP7347 TUP: Poster session Content from this work may be u...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
2
a06c9e16-9938-403c-9d14-3815ecd6c13f
[3]G. Formicone, “A Highly Manufacturable 75-150 VDC GaN-S iC RF Technology for Radars and Particle Accelera- tors”, IEEE Trans. On Semiconductor Manufacturing, vol. 31, no. 4, pp. 440-446, Nov. 2018. doi:10.1109/tsm.2018.2866 209 [4]G. Formicone, J. Custer, “An Emerging Solid-S tate UHF Technology Based on 100 VDC...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
3
bf010e08-84dd-4553-8b53-78fadfe28b34
Power Transistors, App. Note 011, Integra Technologies Inc. [7]Thermal Analysis of Integra’s GaN on SiC Transistors, App. Note 015, Integra Technologies Inc. [8]H. Chireix, “High Power Outphasing Modulation”, in Proc. Inst. Radio Eng., vol. 23, no. 11, Nov. 1935, pp. 1370-1392.[9] T. Barton, “Not Just a Phase : Ou...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
3
21f1ed2b-6f7b-42d3-89db-160dfdd7c8fa
the LANL Solid -State Power Amplifier ”, presented at the 17th International Particle Accelerator Conf. (IPAC’26), Deauville, France, May 2026 , paper TUP7342, this confer- ence. [12] M. Brown et al., “Design of a Low -Power Proof-of-Concept Multi-Stage Amplifier Test Stand to Model and ImplementOutphasing Control for ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
3
5b5e4dba-f561-4a85-a140-d76610108859
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7347 MC7.T08: RF Power Sources 1593TUP: Poster session TUP7347 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publis...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf
3
48e90d10-0724-4030-b235-30e875e29eb5
ARIEL RADIOACTIVE GAS MANAGEMENT SYSTEM F. Rahimi, D . Yosifov, N . Mathur TRIUM F, Vancouver, B C, Canada Abstract The Advanced Rare Isotope Laboratory (ARIEL) facility expands TRIUMF’s isotope production by adding two new target stations operating in parallel with the existing infrastructure, enabling high-...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
0
1bf8fd6b-eb91-4389-b264-2783563616ff
independent target station operation, prevent cross- contamination between exhaust streams, enable future scalability, and provide fault tolerance to ensure uninterrupted operation in the event of equipment failure. This system incorporates controlled gas recirculation and sampling capabilities to ensure the coll...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
0
7ea1895f-53de-41ef-a6e0-4882fcb0aca5
INTRODUCTION The vacuum system for the ARIEL electron and proton stations is designed to maintain a high -vacuum environment while managing radioactive gases released during operation. These highly radioactive gases are continuously evacuated at a rate that ensures the required vacuum level during operation and ar...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
0
dffa69aa-c6ce-403e-87cc-bffadcee0900
the vacuum pump manifold, which will then be directed into pre -evacuated storage tanks. Once stored, the gases undergo radioactive decay. After a designated period, a sample is drawn from the decay tanks through the s ampling system for radioactivity assessment [2]. If the sample meets regulatory safety require...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
0
2afef24b-5a3a-4ed9-b49c-dd9631d32913
minimize contamination spread, and remain maintainable in a constrained installation envelo pe. It must also support operational modes such as tank selection, pre -evacuation, gas transfer, sampling, tank evacuation, and discharge to NVS after verification that stored gases meet release requirements. Figure 1....
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
0
9f950d99-ce64-4c0f-ae0a-837a8d2b8f45
showing the main equipment layout, process connections, and control interfaces. The system can be operated remotely and is connected to multiple decay storage tanks, which provide dedicated storage volume for radioactive gas decay. A key function of the system is the ability to select a specific decay tank for g...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
0
58e3225f-c510-430d-a25a-4cf9bf32ef4f
Figure 2. High -level P&ID of the ARIEL radioactive gas management system [4]. All major operations, including tank selection, vacuum system control, and gas sampling, are managed through the Experimental Physics and Industrial Control System (EPICS). This centralized control platform supports real - time monitor...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
1
babbca6a-e703-4423-90b3-6634921e3ed1
components that require annual calibration and inspection should be installed in a way that can be easily accessed . Considering the complexity of this system, p riority is given to metal seals, as practically achievable, to ensure minimal to zero leakage from the system . Control System This system is operable ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
1
ff162a7d-4da7-4ef9-8489-b077a8ee8c01
false floor to optimize the available space, while removable floor panels provide access for calibration, maintenance, and component replacement. T he vacuum pump manifold is mounted on the wall above the backing and roughing pumps located on the false floor. This arrangement reduces congestion around the decay ta...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
1
c8c7cf90-884f-4f32-a573-d0b2905d4b24
environment. Figure 3. 3D model showing the general layout of the ARIEL radioactive gas management system with the decay tanks . SYSTEM INSTALLATION The ARIEL radioactive gas management system implementation included the installation of the radioactive gas decay storage tanks, assembly of the radioactive gas ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
1
afcdf606-cbb2-4d72-9413-8c6baf872b78
The installation is an ongoing effort; however, the following key implementation activities have been completed thus far: • The storage tanks have been installed with the required shielding and piping, as shown in Fig. 4, • The radioactive gas management manifold was assembled and bench tested before instal...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
2
126a029e-717f-4c12-968f-f9a701c703d5
CONCLUSION The ARIEL radioactive gas management system is a key support system for the safe operation of ARIEL target stations. It provides a controlled pathway for gases exhausted from the vacuum system to be stored , sampled, and discharged through the NVS when acceptable. This system supports containment, op...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
2
fd43716e-f0ff-428d-adf9-687e27380eb2
REFERENCES [1] ARIEL Radioactive Gas Management System, TRIUMF Design Note , 2025. [2] ARIEL Radioactive Gas Sampling System , TRIUMF Design Note , 2025. [3] ARIEL Radioactive Gas Storage System, TRIUMF Requirements Document , 2022. [4] Vacuum, Radioactive Gas Storage & Auxiliary System P&ID , TRIUMF Drawi...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf
2
fdc9ad4e-b402-4f86-af9a-5f7789630ee6
RECONFIGURATION OPTIONS FOR REUSING A PERMANENT MAGNET UNDULATOR AS A LOW-FIELD WIGGLER SOURCE∗ M. J. Sigrist† Canadian Light Source .Inc, Saskatoon, Canada Abstract The Canadian Light Source (CLS) currently operates a 1.9Tsuper conducting wiggler (SCW) that has been in ser- vice since 2005. As the risk of failure and ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
0
f74c5912-bbb7-4c73-bf3d-e0cfffa08e58
fications include reducing the gap and halving the magnetic period to achieve the desired field characteristics. BACKGROUND The CLS has operated a 1.9TSCW as a photon source ontheHXMA(HardX-rayMicro-Analysis)beamlinesince January 2005. Maintenance needs are increasing for this aging device. High numbers of past quenche...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
0
5e5c485e-9d27-4b7c-8c99-19d2599927e0
beamlineupgradestominimizecostanddesigneffort. U185 has a185mmmagnetic period ( 𝜆), a peak field of 0.72T and could generate photons as low as 5.5eVwith the first harmonic on the 2.9GeVstoragering at the CLS. U185 - Design The U185 device has an eight block per period design, see Fig.1a, that offers some additional de...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
0
09894ef3-8128-43fe-988d-6f41269bd629
†michael.sigrist@lightsource.ca (a) U185 (b) U93A (c) U93B Figure 1: Magnet blocksin a single period. thevacuumchamberhadanouterthicknessof 10mm. De- creasingthemagneticgapwouldfurtherincreasethepeak magneticfields and improvetheperformanceof the device as a wiggler source. Reconfiguration Approaches Severalstrategie...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
0
c8d2cbbb-f283-4422-a400-d6586c9509dd
trade-offs. Table1: SummaryofKeyParametersforU185Reconfigu- ration Config. Period Gap Poles Length mm mm # m SCW 35.3 13.5 61 1.06 U185 (orig) 185 25 17 1.635 U93 A 92.5 11-25 33 1.612 U93 B 92.5 11-25 21 1.057 ThetworeconfigurationsU93AandU93Busefourandsix blocksperperiodasseeninFig. 1. WhileU93Bgenerates higher field...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
0
4a885a9a-6dfc-4dc9-a8ac-ffba4cb242aa
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7358 MC7.T15: Technology: Undulators and Wigglers 1597TUP: Poster session TUP7358 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
0
0bbfc51a-9165-43ea-8d69-e6a5052340be
Magnetic Field Calculations Keyparameters for the original U185 and proposed con- figurations are summarized and compared with the current SCWinTable 1,includingperiod,gap,andlengthofdevice. Magnetic field calculations for the original and proposed re- configurations were performed using Radia [ 3] for multiple gaps ab...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
1
5325d116-da31-43fc-a6a1-ede0dd452d1b
report[4]. Ifhighermagneticforcesarepossible,thenthe alternate designs can achieve even higher peak fields, see Fig.5. The longer period of the original design has flat top field with an increasing dip for small gaps, which limits the peak fields at smaller gaps. Figure 2: Peak magnetic fields versus gap for three opti...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
1
a2945f24-ad4b-4bff-a864-b8f901cf96dd
U93optionswasconsideredwheremagneticforcesequalthe Figure 4: Magnetic force versus gap for three options. Shaded box shows operating range below 13.6kNforce and above the original 25mm minimum gap. Figure 5: Simulated magnetic fields with peaks of 1.0T, 1.13T,and1.25TforeachofthethreeoptionsU185,U93A, and U93B at a 11m...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
1
a4dc40b7-a360-4a6b-822e-7585eae77f39
significantlylessflux,perhapslessthan 5%forphotonen- ergies at 25keV. Ifthesupportstructurecan’toperatewithhighermagnetic forcesU93AandU93Boffertwooptionsthatmayrequire compromisingbetweenhigherfluxattheloworhighenergy photon ranges. If higher magnetic forces are possible the U93A configuration may provide the highest ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
1
145ec627-8a4b-454f-8c82-7a63745ba2d3
oscillationscanbeseenintheSCWspectrainFig. 6even withtheperiodshimming. OnesmallbenefitofalltheU185 options is a larger K value which almost entirely eliminates thesesmallintensityoscillations. OnlyU93Ashowssome17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
1
1626d57f-1bac-42fb-a15e-d1116104820c
Figure 6: Comparing total flux in a 1mm×6mmaperture at the primary slit for the existing SCW and three configurations of the U185 device. smalloscillationswithanidealfieldanditisexpectedthat field errors or a small taper would entirely eliminate this effect. Figure 7: Deflection parameter, K, for SCW and three op- tion...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
2
222ceeac-1991-4501-b4ec-14c1e79b03c8
beamlinecapabilitieswhileawaitingapermanentreplace- ment. Ideally preliminary work needed to determine themaximumforceswouldbedoneinadvanceofanyneedto install the ID. This would allow an informed decision to be madeonwhethertomodifythemagneticlayoutanddeter- minewhichoptionfromU93AorU93Bwouldofferthebest overall perfor...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
2
f0c94aa8-ee92-47fb-8d49-d8143a3a06c3
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt425-WEPB/zero.alt448 [3]P. Elleaume, O. Chubar, and J. Chavanne, “Computing 3D Magnetic Fields from Insertion Devices”, in Proc. PAC’97 , Vancouver, Canada, May 1997, pp. 3509–3511, 1997. doi:1/zero.alt4.11/zero.alt49/PAC.1997.753258 [4]I. Blomqvist, “Magnetic Design of a 185 m...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
2
1071a58f-4aa8-4552-a6b9-b15f33954b7b
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7358 MC7.T15: Technology: Undulators and Wigglers 1599TUP: Poster session TUP7358 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf
2
b0251c4b-e0b4-433a-9e6d-4547891dc93d
A NOVEL MAGNETIC MEASUREMENT SYSTEM FOR CRYOGENIC PERMANENT MAGNET UNDULATOR Toshiya Tanabe*, Brian Eipper, Marco Musardo, Thomas Brookbank, James Rank, Dean Hidas, Bryan Holland, Daniel Migliorino Energy & Photon Science Directorate, National Synchrotron Light Source- II, Brookhaven National Laboratory, Upto...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
0
415c6692-b8f5-4672-9423-2cf7c126ea93
mounted rectangular window for room -temperature char- acterization. An in -vacuum magnetic measurement system (IVMMS) suitable for 1.5 m long CPMUs was developed during the NSLS -II project. A newly developed in- vacuum Hall probe system, capable of accommodating devices longer than 1.5 m, has been designed to inter...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
0
d9677a14-e075-41ec-984c-96e3cb19630d
tegral measurement system, common ly utilizing either a single -wire configuration or a multi -turn coil. Our group has previously developed a field integral measurement sys-tem based on an in -vacuum flip coil [1] which is applicable to CPMUs. During the NSLS -II project, an in -vacuum Hall mapping system, refer...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
0
c470b548-53a8-4d65-b002-1bbe59839e6d
provided in Table 1. Table 1: HRD -CPMU Parameters Item Specification Magnet Core length (including magic fingers) 3.0 m Period Length 18.0 mm Min. Vertical Physical Aperture 4.50 mm Min. Operational Vertical Physical Aper-ture 5.97 mm Max. Operational Magnetic Gap 25.0 mm Min. Fully Open Gap (...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
0
4bf60d15-c81b-4bed-a940-d5900c24b0a2
directions, as well as roll (rotation about the X -axis). A newly developed system should provide full six- degree- of- freedom adjustment, encompassing X, Y , Z translations and pitch ( T x), yaw ( θy), and roll ( θz) rotations. Figure 2 illustrates the definitions of these parameters. The Z -direc- tion corresponds...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
0
b24dc34d-0e6a-4d83-9512-bba3ce11efac
Figure 2: Our coordinate definitions . Z axis is for the long travel along the device. The Z -axis motion (aligned with the electron beam di- rection) is driven by an in -vacuum linear motor (C12- 1 with Delta phase connection by Allied Motion), a configu- ration analogous to that employed in the IVMMS. The re- ma...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
1
e85768ce-7124-47d1-9914-06dadb7181a7
challenge associated with in -vacuum motors is thermal management, as the absence of convective cooling signifi-cantly limits heat dissipation from the coils. Given the sub- stantially reduced load in the present system relative to the IVMMS, the L MC-C12 model has been selected [3]. The Hall probe element will be ca...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
1
572c3588-1140-4a5d-87eb-12c0a8f5bc83
tem with a 1 m long configuration; the rails and backplate can be extended or shortened as required. The assumption for the thermal analysis is shown in Fig. 4. The resulting temperature distribution across the structure —assuming a volumetric heat load of 1.38 × 10⁶ W/m³ and a thermal con- ductance of 100 W/m² /°...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
1
95f5be63-2566-4779-8227-c2e2b2a97415
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7360 MC7.T15: Technology: Undulators and Wigglers 1601TUP: Poster session TUP7360 Content from this work may be used under the terms of the CC BY 4.0 licence (© ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
1
71fde3b9-4166-4b65-83f3-8a822e21cd7c
PROBE POSTION ING ERROR DETECTION In contrast to a conventional Hall probe bench, which ensures the flatness of the granite surface, the present sys- tem cannot maintain the required straightness of ±5 µ m without supplementary position monitoring instrumenta- tion. A triple -beam laser interferometer (SP 5000 TR...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
2
e676aecd-3805-4482-9efb-2bec41829f6f
HALL PROBE The MV2 Hall probe [7] has been selected due to its ca- pability for digital signal output. Rather than transmitting signals through long analog cables, the probe converts measurements into digital form, thereby mitigating suscep- tibility to electrical noise. By incorporating a Bluetooth transmitter, d...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
2
0a422008-80e7-475e-890d-52a5085444de
ibration and analog/digital noise comparison. CONCLUSION A preliminary design of the in -vacuum Hall probe meas- urement bench, designated IVMMS -II, intended for the characterization of a 3 m long CPMU planned for the NEXT -III project beamline, High Resolution Powder Dif- fraction (HRD), is presented. Unlike the...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
2
4cbb0c7d-6189-471b-a8ac-e3ca2ff2664f
Position -sensitive detectors, in conjunction with parallel laser beams, are used to monitor X and Y displacements and roll. A shorter prototype will be constructed to evaluate the functionality of the system in the coming months. Figure 6: Layout of MV2 control hardware for Digital ac- quisition and transmis...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
2
822fd77d-c66d-4b2e-b4a1-b29320c17c6f
contract number DE-SC0012704. REFERENCES [1] T. Tanabe et al., “Development of the high energy engineer- ing X-ray (HEX) superconducting wiggler, magnetic meas- urement, installation, and commissioning” , Rev. Sci. Instrum., vol. 94, no. 6, Jun. 2023. doi:10.1063/5.0146964 [2] National Synchrotron Light Source ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
2
45752f45-77fe-404d-911a-60eeddee1447
IPAC'16 , Busan, Korea, May 2016, pp. 4028 –4030. doi:10.18429/JACoW- IPAC2016- THPOW038 [6] T. Tanaka, T. Seike, and H. Kitamura, “Measurement of SPring -8 XFEL undulator prototype with the SAFALI sys- tem”, in Proc . FEL’08 , Gyeongju, Korea, Aug. 2008, paper TUPPH053, pp. 371- 373. [7] Metrolab Technology, M...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf
2
9cdae2b2-a20b-4793-b080-383ef8b17aba
PROGRESS FROM TESTING FACILITY FOR HPRF SSA SYSTEM AT LANSCE CCL * J. Vega†, J. T. M. Lyles, T. W. Hall, M. S . Barrueta, J. A. Valladares, M. C. Brown, S. J. Russell Los Alamos National Laboratory, Los Alamos, NM, USA Abstract A new high- power RF test facility was developed at the Los Alamos Neutron Sci...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
421ca006-73a5-4d30-8be3-2776a4f30864
ensure stable operation under high duty- factor pulsed con- ditions. Multiple HEMT a mplifier modules will be power combined to achieve the full 1.25 MW output, with the aim of enhancing reliability, modularity, and maintainability in accelerator RF infrastructure. Integrated protection proce- dures allow for secure...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
71e1d4d6-2aad-4a8a-9322-216a6da3a7a6
targeting 1.25 MW output for accelerator applications , see Fig. 1. This effort addresses the growing need for RF sources that are modular, scalable, and maintainable—crit- ical for supporting high- duty- factor pulsed operation in modern accelerator infrastructures. The SSA design em- ploys Gallium Nitride (GaN) o...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
b92d9353-1029-47f6-bd7e-ef9e5c273552
tron-based sources, which are increasingly difficult to main tain and no longer manufactured. By validating the SSA architecture in a realistic environment, this work sup- ports the transition to modern, solid- state-based RF solu- tions that align with current safety, reliability, and opera- tional standards. This p...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
e830215d-2cb6-4e37-a4a0-94db62e34e88
90 kV DC, representing a significant improvement in lab safety and power handling [1]. Lowering the operating voltage by nearly three orders of magnitude reduces the complexity of insulation, arcing risk, and personnel hazard during maintenance or fault scenarios. T he transition to low-voltage, high -current solid...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
3f97dd67-f7bc-41ce-887a-54eff5813e1f
tures protections for overvoltage. Its compact form facto r allows it to be integrated directly into the test stand rack alongside RF and control systems. Each SSA module also includes onboard two 1000 µF capacitors positioned on the drain side of the GaN device. These capacitors are critical for managing fast po...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
63fc8688-19f6-49d9-8ed3-beee3a258574
________________________________ ____________ * Work was performed under the auspices of the US Department of En- ergy by Triad National Security, LLC, under contract 89233218CNA000001. † javierv@lanl.gov 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
0
d8b34db5-860e-49df-a4a3-733626508415
Figure 2: HPRF SSA at Testbench . THERMAL MANAGEMENT BASED ON SSA DEVICE PERFORMANCE With the modules being able to produce 3.6 kW of RF power at pulse width of 1 ms and repetition rate of 120 Hz with a d uty Factor of 12% with 43 W of RF drive and a measured 19.17 dB of gain from the transistor with 71.5% ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
1
acfe9c53-e48e-415f-bbc0-9c2e525be2e9
mance under the given operating conditions. This satura- tion region corresponds closely with the thermal con- straints observed during testing, emphasizing the im- portance of efficient heat removal to maintain stable device operation at high power levels. In response to these thermal demands, the system incorporate...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
1
b433a0fa-b2d1-4255-b8d7-04b3e97fe60e
featuring embedded coolant channels, receiving approxi- mately 1.0 L/min of coolant flow per module. The inlet coolant temperature is maintained near 20 °C during typi- cal operation, ensuring stable thermal conditions across the array of SSA modules. The cooling strategy directly addresses the thermal chal- leng...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
1
fef7a1cc-45c0-4386-8f5e-70e6735935d0
and supports scalable high -power RF output under de- manding accelerator conditions. SYSTEM INTEGRATION, MODULARITY, AND SAFETY FEATURES The SSA system is built on a highly modular architec- ture, comprising multiple independent amplifier modules. Each module operates as a self -contained RF source with its own ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
1
4bddec9b-87b1-4dbb-9638-bfda9b55032f
and system levels. Vector network analyzers, power me- ters, and directional couplers are used to verify gain bal- ance, return loss, and insertion loss across the combining network. Phase control is implemented at each module to ensure proper signal alignment during power combining, allowing for optimized efficienc...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
1
bc8c98d8-9752-4838-aebd-e6f5c4051bda
Looking ahead, active hardware protections are planned to enhance safety and fault response. While this system re- mains at this testing stage, integrated interlock logic mon- itors are critical for the following parameters including 17th International Particle Accelerator Conference, Deauville, France JACoW Publi...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
1
812a36da-a2f1-4f4a-9b52-49d2e307b13e
overvoltage, overcurrent, and overtemperature at module and system levels. These interlocks trigger staged shut- downs of RF drive and DC input to affected modules, sup- ported by continuous monitoring of coolant flow, RF re- flections, and DC bus conditions. In summary, the SSA’s modular architecture not only fa- ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
2
69e1244a-b9fc-4c12-8ce1-6803f2cebf18
aging GaN on SiC HEMT technology, the system offers high gain, efficiency, and thermal stability under high - duty- factor pulsed operation. Initial results demonstrate 19.17 dB of gain at 805 MHz with 7 1.5% efficiency, vali- dating the suitability of this platform for accelerator -class RF applications. The mod...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
2
e197a52a-3098-45f5-909c-adac0bc9b6fe
aging and obsolete legacy equipment, including klystrons and high -voltage tube -based amplifiers, which are no longer manufactured or supported. The solid- state ap- proach not only improves maintainabilit y and operational safety but also offers a sustainable, modern path forward for high- power RF infrastructure...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
2
2693d522-30ac-4a8c-a714-27ae8d40017d
doi:10.18429/JACoW- NAPAC2025- WEP075 [3] M. Brown et al. , “Design of a low -power proof -of-concept multi-stage amplifier test stand to model and implement out- phasing control for the LANSCE 805 MHz solid-state high - power RF amplifier”, in Proc. NAP AC'25 , Sacramento, Cali- fornia, USA, Aug. 2025, pp. 725 -72...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf
2
ee5ca2e0-5f15-4cf6-8421-502905ce9c62
ALS -U SR MODULES PRESTAGING PLANNING TOOL AND METHODOLOGY J. Shaw, R. Bloemhard, C. Espino Devine, D. Gudkov, M. Holmes, M. F. Khalid, K. Mccombs , H. Singhal, A. Talon, Lawrence Berkeley National Laboratory, Berkeley, United States Abstract The Advanced Light Source Upgrade (ALS -U) project faces strict sch...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
aaaf5772-0f1d-41f6-82d0-8f1491219953
developed a Visual Basic for Application coded planning tool to automate estimation of SR module assembly dura- tion and resource needs. The tool methodology is based on bottom -up task sequencing where individual assembly tasks are laid out in succession with adjustments made for resource constraints and equipment...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
4720dc5b-ee6c-41f6-a5fe-2907a0ec850a
ror. With the model, Prestaging can quickly react t o module component delays ensuring assembly planning is opti- mized within the constraints of the project. This contribu- tion describes the model development methodology, func-tional testing results, and ap plications for future use during the ALS -U module assembl...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
9d2ccb7f-5740-466b-8bb0-c4ccfc91f0c1
streamline the module assembly procedure, optimize the module assembly space w ithin preexisting facility con- straints, and perform functional tests on the module prior to installation. The Prestaging assembly plan faces various challenges; • Assembly spaces are limited to the existing LBNL fa-cilities. • In...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
14422666-a767-4667-a765-715b94c8f965
sonnel resource groups needed by week. The macro’s out- puts had to be considered along with a qualitative assess-ment of material storage, logistics, and risks to determine the most efficient assembly strategy that meets schedule constraints. The macro was developed in support of two planning phases; the firs...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
9a5229b6-df1a-46d0-9efc-b250f1b3fb6e
(Prestaging, subsystem engineers, and technical support groups including mechanical and electrical tech teams , and Survey & Alignment) reviewed the module assembly de- sign documentation and developed a baseline assembly process. The baseline assembly process identified 35 as- sembly steps, established assembly comp...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
1e6318f7-f6c1-4a1d-8882-875fd3d83586
into which features had the greatest impact on the produc- tion schedule. Case Study 1: Crane Investment Optimization Figure 1 graphs the overall production duration against 2 variables, the number of cranes and the number of Pre-staging assembly stations . Multiple cranes mean assembly steps that require a crane...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
0
6f1fa597-a04a-444b-bae7-8d914e38a344
Figure 1: Graph of Prestaging s tations vs Prestaging b uild duration . There is a reduction in Prestaging production duration by increasing the number of assembly stations (number of modules which can be assembled in parallel). The graph also provides evidence that there is negligible advantage to using 3 cran...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
1
9a0cdf0c-e553-4f31-a712-3f92d75bb105
in one location ( High Bay 1). The Option A timeline (Fig . 2) displays the schedule where each cell is a day, each row is a module, and the as- sembly steps are grouped into 3 broad groups (initial assembly in green, alignment in blue, & final assembly in orange). The white cells represent module inactivity. ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
1
09273baa-4300-491a-8dec-781a51d6965a
tion A production is due to crane overallocation, caused by the assumption that assembly on all 6 modules begins on the same day. The total assembly duration is 386 working days (77 weeks) . Figure 3: Option A personnel resource graph. The personnel resource graph (Fig. 3) displays the per- sonnel resources req...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
1
9fd93366-a0c7-493b-95a0-c48f6554fbec
Survey & Alignment team (S&A), and Electrical Techni- cians (EIs). The production average provides the baseline estimate for required resources. The average mech tech requirement for Option A is 7.5 technicians per assembly day. The macro does not have the ability to level resources but inter-preting the graph c...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
288d9b73-4543-4e4d-a64b-497ea8440b94
timizing the location of those assembly stations became a critical consideration for macro analysis. Option B assumes 8 modules assembled in parallel with all assembly steps planned in one location ( High Bay 1). Option B adds two assembly stations in High Bay 1 (com- pared to Option A) and consequently reduce...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
c8530177-a54f-46e3-b1c4-563114e5043b
tions but splits assembly operations between 2 high bays . The timeline for this option is shown as Option C in Fig. 2. Initial assembly & alignment (green & blue) is performed in High Bay 1, final assembly (orange) is performed in High Bay 2. Option C assembly duration is 326 working days (65 weeks). Splittin...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
87ddfd29-5e7e-4e81-8d97-8be6ecab05b9
nent delays. Spreading the assembly work between high bays also means component storage is available near the assembly stations , reducing the material planning com- plexity and i n turn the resources required to transport or manage component availability in the assembly area . MACRO DEVELOPMENT PHASE 2 : AS- SEM...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
ebcde1b8-47c4-42c4-b4dc-867d9da00ef0
Case Study 4: Assembly Sequence Modification Impacts The module component assembly sequence can have a major impact on the overall production schedule . In Option C of Fig. 2 the alignment step ( in blue ) depicts the align- ment of module components and demarcates initial assem-bly in High Bay 1 and final as...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
1c75bc6a-2298-4f01-b2e9-39507fb2e8a2
tion extends to 373 days (75 weeks). A meaningful takeaway from Option D is that when the production duration between the two high bays is unequal, the high bay with a longer duration is a bottleneck for mod- ule throughput . The assembly duration should be equal be- tween the two high bays to optimize throughput...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
2c76ecd8-24f8-434e-89c9-902f14f5a40c
hardware. The macro estimates are regularly revised and the Prestaging schedule adjusts to account for delayed sub- system hardware. The tool will remain valuable as it pro- vides needed flexibility for Prestaging to actively adapt to evolving project variables to optimize the production schedule for the ALS -U SR i...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
1eee5533-76d2-4826-a297-88e6c4425fba
Ring Modules”, presented at IPAC'26, Deauville, Normandy , May 202 6, paper TUP 2343 , this conference 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7368 1096 MC7.T31: Subsystems, Technology and Components...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf
2
3711e25d-27ea-4c8e-8107-cbd72696576a
STATUS UPDATE OF PERMANENT MAGNET RADIATION RESILIENCY STUDIES AT CEBAF∗ R. M. Bodenstein†, C. Decker, K. E. Deitrick, B. R. Gamage, J. F. Gubeli, D. Hamlette, M. Janak, K. Jordan, S. Lee, C. Matthews, M. X. Mason, J. Meyers, B. Mosbrucker, I. Neththikumara, E. Nissen, V. Okey-Ejiowhor, J. Samari, S. Shriner, M. Smith,...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf
0
15fd3947-b59a-4320-a2fd-2304ec4c0b08
presentanoverviewofJeffersonLab’spermanentmagnet radiationresiliencyprogram,reviewingthein-situdemag- netizationmonitoringmethodologyandinitialoperational results. We also discuss upgrades for the ongoing second exposurecampaign,whichtargetrefineddosecorrelations and reduced systematic uncertainties. Finally, we outlin...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf
0
8c32d988-c9fb-4a34-9d2b-2c25636c8d28
particularlyfor undulator magnets at light sources [ 2]. The established damage hierarchy ranks protons as most dam- aging,followedbyneutrons,electrons,andgammas[ 3,4]. However, prior studies typically relied on small sample sets (𝑁 ≤ 12), doses far exceeding the CEBAF environment, or single material families. This LD...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf
0
1303651d-60cb-4e4c-b84b-f864ae868530
liminary results from the first data-taking campaign and ∗AuthoredbyJeffersonScienceAssociates,LLCunderU.S.DOEContract No. DE-AC05-06OR23177. The research described in this work was conducted under the Laboratory Directed Research and Development ProgramatThomasJeffersonNationalAcceleratorFacilityfortheU.S. Department ...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf
0
d3968a52-837f-4abd-b83f-911c8c63a852
identicalY-platesremainedinthe laboratoryasunexposed controls. Therandomizedco-locationofallfourmaterials on each plate is central to the analysis: the intra-plate differ- ential between the radiation-sensitive NdFeB and radiation- hardSmCocancelsthedominantHelmholtzcoilgaindrift (±0.124% ) by construction, enabling su...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf
0
98908f20-5132-4b88-a112-206c9a8fb0ed
in-situtunnelaccessduringacceleratordowntime[ 12,13]. Each plate is tracked with co-located dosimetry: optically stimulated luminescence (OSL) area monitors for photon andneutrondose,andFWT-70optichromicrodsforhigh- dose gamma fields [ 5]. Gamma doses span five orders of magnitude, from 0.3 Gy (labyrinths) to 23,000 Gy...
D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf
0