2e9eb6e2-ee83-4c16-8003-307cbab65d55 | veloped for 150 volt drain to source voltage (Vds) at UHF
to L band frequencies [3, 4]. Impedance matching from the
drain tab to 50 ohm loads is improved with higher drain
voltage , as determined by this relationship:
Optimal load resistance, R =(Vds−Vsat)2
2∗Pout(1)
where V sat is approximately 10 volts fo... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 1 |
0d6099f4-6a10-42ef-8c9e-194374e0fc4c | combiner to reach 350 kW, ¼ of the total power of the en-
tire SSA.
We have evaluated push- pull 3.6 kW HEMTs from a
transistor fab with HV GaN on SiC optimized for pulsed
RF power. The IGN815 device uses conventional Ag- Sn
die attach in a Gemini package and is designed for 12%
duty factor (Fig. 1) . A... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 1 |
8c47b93b-5a15-4988-9830-14145bbc8369 | gain, efficiency, phase response, all with varying duty factors and temperatures [5]. Table 1 shows measured data
from both types of HEMTs.
Figure 2: 5 kW Pallet using IGN825 HEMTs .
Table 1: Comparison of Two HEMT Pallets
Thermal Considerations
Like the klystrons that it could replace, the SSA will re-
quire... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 1 |
3962de73-cc73-4a3a-b395-7601eec21f2e | 225 ℃ [6 ]. It has been especially important to work with
the HEMT manufacturer using their thermal parameters
measured using advanced techniques [7] . The balance of
circuitry of the overall system should set the limit for SSA
mean time to repair , and this analysis is ongoing.
Outphasing Modulation Method... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 1 |
5c8ad32c-2550-427d-ae34-499bce94587b | sive collector regardless of RF drive, GaN HEMTs must
consider specific situations:
• When conditioning a CCL cavity
• Ramping up power slowly to minimize sparking
• During accelerator beam tuning
• Normal uneven RF power distribution along linac
• Fast power fluctuation for beam loading805 MHz 1mS
PW, 120 pps I... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 1 |
d886aa42-d976-4872-8102-ca999935ab0c | The outphasing modulation techniqu e of Chireix has
been resurrected from historic tube use [ 8, 9]. Fundamen-
tally, i t uses a pair of identical amplifiers operat ing at max-
imum (saturated) efficiency. Linear amplitude modulation
is then obtained using nonlinear amplifiers operating with
varying phase -rel... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
690a9da2-acf6-4da5-b99b-f4d5456aa4c5 | outphasing is restricted by design.
Figure 3: Outphasing Amplifier (adopted from Godoy,
IEEE Trans MTT, Dec. 2009) .
Outphasing modulation for amplitude control is devel-
oped in the digital low level RF controller [10-12]. Phase
modulation for the overall SSA is developed with conven-
tional PI feedback loop... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
88309ad6-71da-40ab-b956-37da796e3fd1 | power reductions that are not handled with outphasing.
Combin ed Pallets
For a SSA with 320 RF pallets, combining networks
must have low loss and the highest number of combined
blades to be most efficient. The limiting power level of a
blade is 10 kW peak and 1.2 kW average, determined by
the coaxial RF co... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
bf491e85-c0b8-45cd-93ac-e223d945b45b | velopment. This ¼ module generates 350 kW peak power
with 40 blades . It is combined with three others using
waveguide magic tees to the final combination for
1.25 MW (Fig. 4). One high power circulator will be between the final magic tee and the CCL , similar to what a
high efficiency klystron requires. Testing... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
2f108014-c2dc-491a-aae4-d86d1e6255d6 | cant flicker on the AC power network. We are studying the
optimal location of this storage, likely to be a combination
of bulk capacitance at the converters as well as distributed
capacitance closer to the pallets. The exiting AC grid sup-
plies 4.16 kV AC to the mains power supply for LANSCE
klystrons. This wo... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
89e94988-d99f-4dfb-a6d9-a3fa52e907d6 | binations to test effectiveness of outphasing modulation.
Leading -edge technologies are being used to overcome
shortcomings that would otherwise make a 1.25 MW
pulsed SSA at 805 MHz very complex, physically large
and inefficient. GaN on SiC devices allow us to design a
more compact SSA that will not becom... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
49ebf3ca-d234-4a6b-9706-b94414290865 | Deauville, France, May 2026 , paper TUP7345, this confer-
ence.
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7347
1592 MC7.T08: RF Power SourcesTUP7347 TUP: Poster session
Content from this work may be u... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 2 |
a06c9e16-9938-403c-9d14-3815ecd6c13f | [3]G. Formicone, “A Highly Manufacturable 75-150 VDC
GaN-S iC RF Technology for Radars and Particle Accelera-
tors”, IEEE Trans. On Semiconductor Manufacturing,
vol. 31, no. 4, pp. 440-446, Nov. 2018.
doi:10.1109/tsm.2018.2866 209
[4]G. Formicone, J. Custer, “An Emerging Solid-S tate UHF
Technology Based on 100 VDC... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 3 |
bf010e08-84dd-4553-8b53-78fadfe28b34 | Power Transistors, App. Note 011, Integra Technologies
Inc.
[7]Thermal Analysis of Integra’s GaN on SiC Transistors, App.
Note 015, Integra Technologies Inc.
[8]H. Chireix, “High Power Outphasing Modulation”, in Proc.
Inst. Radio Eng., vol. 23, no. 11, Nov. 1935, pp. 1370-1392.[9] T. Barton, “Not Just a Phase : Ou... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 3 |
21f1ed2b-6f7b-42d3-89db-160dfdd7c8fa | the LANL Solid -State Power Amplifier ”, presented at the
17th International Particle Accelerator Conf. (IPAC’26),
Deauville, France, May 2026 , paper TUP7342, this confer-
ence.
[12] M. Brown et al., “Design of a Low -Power Proof-of-Concept
Multi-Stage Amplifier Test Stand to Model and ImplementOutphasing Control for ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 3 |
5b5e4dba-f561-4a85-a140-d76610108859 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7347
MC7.T08: RF Power Sources 1593TUP: Poster session TUP7347
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publis... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7347.pdf | 3 |
48e90d10-0724-4030-b235-30e875e29eb5 | ARIEL RADIOACTIVE GAS MANAGEMENT SYSTEM
F. Rahimi, D . Yosifov, N . Mathur
TRIUM F, Vancouver, B C, Canada
Abstract
The Advanced Rare Isotope Laboratory (ARIEL)
facility expands TRIUMF’s isotope production by adding
two new target stations operating in parallel with the
existing infrastructure, enabling high-... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 0 |
1bf8fd6b-eb91-4389-b264-2783563616ff | independent target station operation, prevent
cross- contamination between exhaust streams, enable
future scalability, and provide fault tolerance to ensure
uninterrupted operation in the event of equipment failure.
This system incorporates controlled gas recirculation and
sampling capabilities to ensure the coll... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 0 |
7ea1895f-53de-41ef-a6e0-4882fcb0aca5 | INTRODUCTION
The vacuum system for the ARIEL electron and proton
stations is designed to maintain a high -vacuum
environment while managing radioactive gases released
during operation. These highly radioactive gases are continuously evacuated at a rate that ensures the required
vacuum level during operation and ar... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 0 |
dffa69aa-c6ce-403e-87cc-bffadcee0900 | the vacuum pump manifold, which will then be directed
into pre -evacuated storage tanks.
Once stored, the gases undergo radioactive decay. After
a designated period, a sample is drawn from the decay tanks through the s ampling system for radioactivity
assessment [2]. If the sample meets regulatory safety
require... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 0 |
2afef24b-5a3a-4ed9-b49c-dd9631d32913 | minimize contamination spread, and remain maintainable
in a constrained installation envelo pe. It must also support
operational modes such as tank selection, pre -evacuation,
gas transfer, sampling, tank evacuation, and discharge to
NVS after verification that stored gases meet release
requirements.
Figure 1.... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 0 |
9f950d99-ce64-4c0f-ae0a-837a8d2b8f45 | showing the main equipment layout, process connections,
and control interfaces. The system can be operated
remotely and is connected to multiple decay storage tanks,
which provide dedicated storage volume for radioactive
gas decay.
A key function of the system is the ability to select a
specific decay tank for g... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 0 |
58e3225f-c510-430d-a25a-4cf9bf32ef4f | Figure 2. High -level P&ID of the ARIEL radioactive gas
management system [4].
All major operations, including tank selection, vacuum
system control, and gas sampling, are managed through the
Experimental Physics and Industrial Control System
(EPICS). This centralized control platform supports real -
time monitor... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 1 |
babbca6a-e703-4423-90b3-6634921e3ed1 | components that require annual calibration and inspection
should be installed in a way that can be easily accessed .
Considering the complexity of this system, p riority is given
to metal seals, as practically achievable, to ensure minimal
to zero leakage from the system .
Control System
This system is operable ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 1 |
ff162a7d-4da7-4ef9-8489-b077a8ee8c01 | false floor to optimize the available space, while removable
floor panels provide access for calibration, maintenance,
and component replacement. T he vacuum pump manifold
is mounted on the wall above the backing and roughing
pumps located on the false floor. This arrangement reduces
congestion around the decay ta... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 1 |
c8c7cf90-884f-4f32-a573-d0b2905d4b24 | environment.
Figure 3. 3D model showing the general layout of the
ARIEL radioactive gas management system with the decay tanks .
SYSTEM INSTALLATION
The ARIEL radioactive gas management system
implementation included the installation of the radioactive
gas decay storage tanks, assembly of the radioactive gas ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 1 |
afcdf606-cbb2-4d72-9413-8c6baf872b78 | The installation is an ongoing effort; however, the
following key implementation activities have been
completed thus far:
• The storage tanks have been installed with the
required shielding and piping, as shown in Fig. 4,
• The radioactive gas management manifold was
assembled and bench tested before instal... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 2 |
126a029e-717f-4c12-968f-f9a701c703d5 | CONCLUSION
The ARIEL radioactive gas management system is a key
support system for the safe operation of ARIEL target
stations. It provides a controlled pathway for gases
exhausted from the vacuum system to be stored , sampled,
and discharged through the NVS when acceptable. This
system supports containment, op... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 2 |
fd43716e-f0ff-428d-adf9-687e27380eb2 | REFERENCES
[1] ARIEL Radioactive Gas Management System, TRIUMF
Design Note , 2025.
[2] ARIEL Radioactive Gas Sampling System , TRIUMF Design
Note , 2025.
[3] ARIEL Radioactive Gas Storage System, TRIUMF Requirements Document , 2022.
[4] Vacuum, Radioactive Gas Storage & Auxiliary System
P&ID , TRIUMF Drawi... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7356.pdf | 2 |
fdc9ad4e-b402-4f86-af9a-5f7789630ee6 | RECONFIGURATION OPTIONS FOR REUSING A PERMANENT MAGNET
UNDULATOR AS A LOW-FIELD WIGGLER SOURCE∗
M. J. Sigrist†
Canadian Light Source .Inc, Saskatoon, Canada
Abstract
The Canadian Light Source (CLS) currently operates a
1.9Tsuper conducting wiggler (SCW) that has been in ser-
vice since 2005. As the risk of failure and ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 0 |
f74c5912-bbb7-4c73-bf3d-e0cfffa08e58 | fications include reducing the gap and halving the magnetic
period to achieve the desired field characteristics.
BACKGROUND
The CLS has operated a 1.9TSCW as a photon source
ontheHXMA(HardX-rayMicro-Analysis)beamlinesince
January 2005. Maintenance needs are increasing for this
aging device. High numbers of past quenche... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 0 |
5e5c485e-9d27-4b7c-8c99-19d2599927e0 | beamlineupgradestominimizecostanddesigneffort. U185
has a185mmmagnetic period ( 𝜆), a peak field of 0.72T
and could generate photons as low as 5.5eVwith the first
harmonic on the 2.9GeVstoragering at the CLS.
U185 - Design
The U185 device has an eight block per period design,
see Fig.1a, that offers some additional de... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 0 |
09894ef3-8128-43fe-988d-6f41269bd629 | †michael.sigrist@lightsource.ca
(a) U185
(b) U93A
(c) U93B
Figure 1: Magnet blocksin a single period.
thevacuumchamberhadanouterthicknessof 10mm. De-
creasingthemagneticgapwouldfurtherincreasethepeak
magneticfields and improvetheperformanceof the device
as a wiggler source.
Reconfiguration Approaches
Severalstrategie... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 0 |
c8d2cbbb-f283-4422-a400-d6586c9509dd | trade-offs.
Table1: SummaryofKeyParametersforU185Reconfigu-
ration
Config. Period Gap Poles Length
mm mm # m
SCW 35.3 13.5 61 1.06
U185 (orig) 185 25 17 1.635
U93 A 92.5 11-25 33 1.612
U93 B 92.5 11-25 21 1.057
ThetworeconfigurationsU93AandU93Busefourandsix
blocksperperiodasseeninFig. 1. WhileU93Bgenerates
higher field... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 0 |
4a885a9a-6dfc-4dc9-a8ac-ffba4cb242aa | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7358
MC7.T15: Technology: Undulators and Wigglers 1597TUP: Poster session TUP7358
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 0 |
0bbfc51a-9165-43ea-8d69-e6a5052340be | Magnetic Field Calculations
Keyparameters for the original U185 and proposed con-
figurations are summarized and compared with the current
SCWinTable 1,includingperiod,gap,andlengthofdevice.
Magnetic field calculations for the original and proposed re-
configurations were performed using Radia [ 3] for multiple
gaps ab... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 1 |
5325d116-da31-43fc-a6a1-ede0dd452d1b | report[4]. Ifhighermagneticforcesarepossible,thenthe
alternate designs can achieve even higher peak fields, see
Fig.5. The longer period of the original design has flat top
field with an increasing dip for small gaps, which limits the
peak fields at smaller gaps.
Figure 2: Peak magnetic fields versus gap for three opti... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 1 |
a2945f24-ad4b-4bff-a864-b8f901cf96dd | U93optionswasconsideredwheremagneticforcesequalthe
Figure 4: Magnetic force versus gap for three options.
Shaded box shows operating range below 13.6kNforce and
above the original 25mm minimum gap.
Figure 5: Simulated magnetic fields with peaks of 1.0T,
1.13T,and1.25TforeachofthethreeoptionsU185,U93A,
and U93B at a 11m... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 1 |
a4dc40b7-a360-4a6b-822e-7585eae77f39 | significantlylessflux,perhapslessthan 5%forphotonen-
ergies at 25keV.
Ifthesupportstructurecan’toperatewithhighermagnetic
forcesU93AandU93Boffertwooptionsthatmayrequire
compromisingbetweenhigherfluxattheloworhighenergy
photon ranges. If higher magnetic forces are possible the
U93A configuration may provide the highest ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 1 |
145ec627-8a4b-454f-8c82-7a63745ba2d3 | oscillationscanbeseenintheSCWspectrainFig. 6even
withtheperiodshimming. OnesmallbenefitofalltheU185
options is a larger K value which almost entirely eliminates
thesesmallintensityoscillations. OnlyU93Ashowssome17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 1 |
1626d57f-1bac-42fb-a15e-d1116104820c | Figure 6: Comparing total flux in a 1mm×6mmaperture at the primary slit for the existing SCW and three configurations
of the U185 device.
smalloscillationswithanidealfieldanditisexpectedthat
field errors or a small taper would entirely eliminate this
effect.
Figure 7: Deflection parameter, K, for SCW and three op-
tion... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 2 |
222ceeac-1991-4501-b4ec-14c1e79b03c8 | beamlinecapabilitieswhileawaitingapermanentreplace-
ment. Ideally preliminary work needed to determine themaximumforceswouldbedoneinadvanceofanyneedto
install the ID. This would allow an informed decision to be
madeonwhethertomodifythemagneticlayoutanddeter-
minewhichoptionfromU93AorU93Bwouldofferthebest
overall perfor... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 2 |
f0c94aa8-ee92-47fb-8d49-d8143a3a06c3 | doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt425-WEPB/zero.alt448
[3]P. Elleaume, O. Chubar, and J. Chavanne, “Computing 3D
Magnetic Fields from Insertion Devices”, in Proc. PAC’97 ,
Vancouver, Canada, May 1997, pp. 3509–3511, 1997.
doi:1/zero.alt4.11/zero.alt49/PAC.1997.753258
[4]I. Blomqvist, “Magnetic Design of a 185 m... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 2 |
1071a58f-4aa8-4552-a6b9-b15f33954b7b | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7358
MC7.T15: Technology: Undulators and Wigglers 1599TUP: Poster session TUP7358
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7358.pdf | 2 |
b0251c4b-e0b4-433a-9e6d-4547891dc93d | A NOVEL MAGNETIC MEASUREMENT SYSTEM FOR
CRYOGENIC PERMANENT MAGNET UNDULATOR
Toshiya Tanabe*, Brian Eipper, Marco Musardo, Thomas Brookbank, James Rank,
Dean Hidas, Bryan Holland, Daniel Migliorino
Energy & Photon Science Directorate, National Synchrotron Light Source- II,
Brookhaven National Laboratory, Upto... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 0 |
415c6692-b8f5-4672-9423-2cf7c126ea93 | mounted rectangular window for room -temperature char-
acterization. An in -vacuum magnetic measurement system
(IVMMS) suitable for 1.5 m long CPMUs was developed during the NSLS -II project. A newly developed in- vacuum
Hall probe system, capable of accommodating devices longer than 1.5 m, has been designed to inter... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 0 |
d9677a14-e075-41ec-984c-96e3cb19630d | tegral measurement system, common ly utilizing either a
single -wire configuration or a multi -turn coil. Our group
has previously developed a field integral measurement sys-tem based on an in -vacuum flip coil [1] which is applicable
to CPMUs. During the NSLS -II project, an in -vacuum Hall
mapping system, refer... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 0 |
c470b548-53a8-4d65-b002-1bbe59839e6d | provided in Table 1.
Table 1: HRD -CPMU Parameters
Item Specification
Magnet Core length (including magic
fingers) 3.0 m
Period Length 18.0 mm
Min. Vertical Physical Aperture 4.50 mm
Min. Operational Vertical Physical Aper-ture 5.97 mm
Max. Operational Magnetic Gap 25.0 mm
Min. Fully Open Gap (... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 0 |
4bf60d15-c81b-4bed-a940-d5900c24b0a2 | directions, as well as roll (rotation about the X -axis). A
newly developed system should provide full six- degree- of-
freedom adjustment, encompassing X, Y , Z translations and pitch ( T
x), yaw ( θy), and roll ( θz) rotations. Figure 2
illustrates the definitions of these parameters. The Z -direc-
tion corresponds... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 0 |
b24dc34d-0e6a-4d83-9512-bba3ce11efac | Figure 2: Our coordinate definitions . Z axis is for the long
travel along the device.
The Z -axis motion (aligned with the electron beam di-
rection) is driven by an in -vacuum linear motor (C12- 1
with Delta phase connection by Allied Motion), a configu-
ration analogous to that employed in the IVMMS. The re-
ma... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 1 |
e85768ce-7124-47d1-9914-06dadb7181a7 | challenge associated with in -vacuum motors is thermal
management, as the absence of convective cooling signifi-cantly limits heat dissipation from the coils. Given the sub-
stantially reduced load in the present system relative to the IVMMS, the L MC-C12 model has been selected [3]. The
Hall probe element will be ca... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 1 |
572c3588-1140-4a5d-87eb-12c0a8f5bc83 | tem with a 1 m long configuration; the rails and backplate can be extended or shortened as required. The assumption
for the thermal analysis is shown in Fig. 4. The resulting
temperature distribution across the structure —assuming a
volumetric heat load of 1.38 × 10⁶ W/m³ and a thermal con-
ductance of 100 W/m² /°... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 1 |
95f5be63-2566-4779-8227-c2e2b2a97415 | 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7360
MC7.T15: Technology: Undulators and Wigglers 1601TUP: Poster session TUP7360
Content from this work may be used under the terms of the CC BY 4.0 licence (© ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 1 |
71fde3b9-4166-4b65-83f3-8a822e21cd7c | PROBE POSTION ING
ERROR DETECTION
In contrast to a conventional Hall probe bench, which
ensures the flatness of the granite surface, the present sys-
tem cannot maintain the required straightness of ±5 µ m
without supplementary position monitoring instrumenta-
tion. A triple -beam laser interferometer (SP 5000 TR... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 2 |
e676aecd-3805-4482-9efb-2bec41829f6f | HALL PROBE
The MV2 Hall probe [7] has been selected due to its ca-
pability for digital signal output. Rather than transmitting signals through long analog cables, the probe converts
measurements into digital form, thereby mitigating suscep-
tibility to electrical noise. By incorporating a Bluetooth
transmitter, d... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 2 |
0a422008-80e7-475e-890d-52a5085444de | ibration and analog/digital noise comparison.
CONCLUSION
A preliminary design of the in -vacuum Hall probe meas-
urement bench, designated IVMMS -II, intended for the
characterization of a 3 m long CPMU planned for the
NEXT -III project beamline, High Resolution Powder Dif-
fraction (HRD), is presented. Unlike the... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 2 |
4cbb0c7d-6189-471b-a8ac-e3ca2ff2664f | Position -sensitive detectors, in conjunction with parallel
laser beams, are used to monitor X and Y displacements
and roll. A shorter prototype will be constructed to evaluate
the functionality of the system in the coming months.
Figure 6: Layout of MV2 control hardware for Digital ac-
quisition and transmis... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 2 |
822fd77d-c66d-4b2e-b4a1-b29320c17c6f | contract number DE-SC0012704.
REFERENCES
[1] T. Tanabe et al., “Development of the high energy engineer-
ing X-ray (HEX) superconducting wiggler, magnetic meas-
urement, installation, and commissioning” , Rev. Sci. Instrum.,
vol. 94, no. 6, Jun. 2023. doi:10.1063/5.0146964
[2] National Synchrotron Light Source ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 2 |
45752f45-77fe-404d-911a-60eeddee1447 | IPAC'16 , Busan, Korea, May 2016, pp. 4028 –4030.
doi:10.18429/JACoW- IPAC2016- THPOW038
[6] T. Tanaka, T. Seike, and H. Kitamura, “Measurement of
SPring -8 XFEL undulator prototype with the SAFALI sys-
tem”, in Proc . FEL’08 , Gyeongju, Korea, Aug. 2008, paper
TUPPH053, pp. 371- 373.
[7] Metrolab Technology, M... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7360.pdf | 2 |
9cdae2b2-a20b-4793-b080-383ef8b17aba | PROGRESS FROM TESTING FACILITY FOR HPRF SSA SYSTEM
AT LANSCE CCL *
J. Vega†, J. T. M. Lyles, T. W. Hall, M. S . Barrueta, J. A. Valladares, M. C. Brown, S. J. Russell
Los Alamos National Laboratory, Los Alamos, NM, USA
Abstract
A new high- power RF test facility was developed at the
Los Alamos Neutron Sci... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
421ca006-73a5-4d30-8be3-2776a4f30864 | ensure stable operation under high duty- factor pulsed con-
ditions. Multiple HEMT a mplifier modules will be power
combined to achieve the full 1.25 MW output, with the aim
of enhancing reliability, modularity, and maintainability in
accelerator RF infrastructure. Integrated protection proce-
dures allow for secure... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
71e1d4d6-2aad-4a8a-9322-216a6da3a7a6 | targeting 1.25 MW output for accelerator applications , see
Fig. 1. This effort addresses the growing need for RF
sources that are modular, scalable, and maintainable—crit-
ical for supporting high- duty- factor pulsed operation in
modern accelerator infrastructures. The SSA design em-
ploys Gallium Nitride (GaN) o... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
b92d9353-1029-47f6-bd7e-ef9e5c273552 | tron-based sources, which are increasingly difficult to
main tain and no longer manufactured. By validating the
SSA architecture in a realistic environment, this work sup-
ports the transition to modern, solid- state-based RF solu-
tions that align with current safety, reliability, and opera-
tional standards. This p... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
e830215d-2cb6-4e37-a4a0-94db62e34e88 | 90 kV DC, representing a significant improvement in lab
safety and power handling [1]. Lowering the operating
voltage by nearly three orders of magnitude reduces the
complexity of insulation, arcing risk, and personnel hazard during maintenance or fault scenarios. T he transition to
low-voltage, high -current solid... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
3f97dd67-f7bc-41ce-887a-54eff5813e1f | tures protections for overvoltage. Its compact form facto r
allows it to be integrated directly into the test stand rack alongside RF and control systems.
Each SSA module also includes onboard two 1000 µF
capacitors positioned on the drain side of the GaN device.
These capacitors are critical for managing fast po... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
63fc8688-19f6-49d9-8ed3-beee3a258574 | ________________________________ ____________
* Work was performed under the auspices of the US Department of En-
ergy by Triad National Security, LLC, under contract
89233218CNA000001.
† javierv@lanl.gov 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 0 |
d8b34db5-860e-49df-a4a3-733626508415 | Figure 2: HPRF SSA at Testbench .
THERMAL MANAGEMENT BASED ON
SSA DEVICE PERFORMANCE
With the modules being able to produce 3.6 kW of RF
power at pulse width of 1 ms and repetition rate of 120 Hz
with a d uty Factor of 12% with 43 W of RF drive and a
measured 19.17 dB of gain from the transistor with 71.5% ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 1 |
acfe9c53-e48e-415f-bbc0-9c2e525be2e9 | mance under the given operating conditions. This satura-
tion region corresponds closely with the thermal con-
straints observed during testing, emphasizing the im-
portance of efficient heat removal to maintain stable device
operation at high power levels. In response to these thermal demands, the system incorporate... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 1 |
b433a0fa-b2d1-4255-b8d7-04b3e97fe60e | featuring embedded coolant channels, receiving approxi-
mately 1.0 L/min of coolant flow per module. The inlet
coolant temperature is maintained near 20 °C during typi-
cal operation, ensuring stable thermal conditions across the
array of SSA modules.
The cooling strategy directly addresses the thermal chal-
leng... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 1 |
fef7a1cc-45c0-4386-8f5e-70e6735935d0 | and supports scalable high -power RF output under de-
manding accelerator conditions.
SYSTEM INTEGRATION, MODULARITY,
AND SAFETY FEATURES
The SSA system is built on a highly modular architec-
ture, comprising multiple independent amplifier modules. Each module operates as a self -contained RF source with
its own ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 1 |
4bddec9b-87b1-4dbb-9638-bfda9b55032f | and system levels. Vector network analyzers, power me-
ters, and directional couplers are used to verify gain bal-
ance, return loss, and insertion loss across the combining
network. Phase control is implemented at each module to
ensure proper signal alignment during power combining,
allowing for optimized efficienc... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 1 |
bc8c98d8-9752-4838-aebd-e6f5c4051bda | Looking ahead, active hardware protections are planned
to enhance safety and fault response. While this system re-
mains at this testing stage, integrated interlock logic mon-
itors are critical for the following parameters including
17th International Particle Accelerator Conference, Deauville, France JACoW Publi... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 1 |
812a36da-a2f1-4f4a-9b52-49d2e307b13e | overvoltage, overcurrent, and overtemperature at module
and system levels. These interlocks trigger staged shut-
downs of RF drive and DC input to affected modules, sup-
ported by continuous monitoring of coolant flow, RF re-
flections, and DC bus conditions.
In summary, the SSA’s modular architecture not only fa-
... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 2 |
69e1244a-b9fc-4c12-8ce1-6803f2cebf18 | aging GaN on SiC HEMT technology, the system offers
high gain, efficiency, and thermal stability under high -
duty- factor pulsed operation. Initial results demonstrate
19.17 dB of gain at 805 MHz with 7 1.5% efficiency, vali-
dating the suitability of this platform for accelerator -class
RF applications.
The mod... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 2 |
e197a52a-3098-45f5-909c-adac0bc9b6fe | aging and obsolete legacy equipment, including klystrons
and high -voltage tube -based amplifiers, which are no
longer manufactured or supported. The solid- state ap-
proach not only improves maintainabilit y and operational
safety but also offers a sustainable, modern path forward
for high- power RF infrastructure... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 2 |
2693d522-30ac-4a8c-a714-27ae8d40017d | doi:10.18429/JACoW- NAPAC2025- WEP075
[3] M. Brown et al. , “Design of a low -power proof -of-concept
multi-stage amplifier test stand to model and implement out-
phasing control for the LANSCE 805 MHz solid-state high -
power RF amplifier”, in Proc. NAP AC'25 , Sacramento, Cali-
fornia, USA, Aug. 2025, pp. 725 -72... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7367.pdf | 2 |
ee5ca2e0-5f15-4cf6-8421-502905ce9c62 | ALS -U SR MODULES PRESTAGING PLANNING TOOL AND
METHODOLOGY
J. Shaw, R. Bloemhard, C. Espino Devine, D. Gudkov, M. Holmes, M. F. Khalid, K. Mccombs ,
H. Singhal, A. Talon, Lawrence Berkeley National Laboratory, Berkeley, United States
Abstract
The Advanced Light Source Upgrade (ALS -U) project
faces strict sch... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
aaaf5772-0f1d-41f6-82d0-8f1491219953 | developed a Visual Basic for Application coded planning
tool to automate estimation of SR module assembly dura-
tion and resource needs. The tool methodology is based on
bottom -up task sequencing where individual assembly
tasks are laid out in succession with adjustments made for
resource constraints and equipment... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
4720dc5b-ee6c-41f6-a5fe-2907a0ec850a | ror. With the model, Prestaging can quickly react t o module
component delays ensuring assembly planning is opti-
mized within the constraints of the project. This contribu-
tion describes the model development methodology, func-tional testing results, and ap plications for future use during
the ALS -U module assembl... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
9d2ccb7f-5740-466b-8bb0-c4ccfc91f0c1 | streamline the module assembly procedure, optimize the module assembly space w ithin preexisting facility con-
straints, and perform functional tests on the module prior
to installation.
The Prestaging assembly plan faces various challenges;
• Assembly spaces are limited to the existing LBNL fa-cilities.
• In... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
14422666-a767-4667-a765-715b94c8f965 | sonnel resource groups needed by week. The macro’s out-
puts had to be considered along with a qualitative assess-ment of material storage, logistics, and risks to determine
the most efficient assembly strategy that meets schedule
constraints.
The macro was developed in support of two planning
phases; the firs... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
9a5229b6-df1a-46d0-9efc-b250f1b3fb6e | (Prestaging, subsystem engineers, and technical support
groups including mechanical and electrical tech teams , and
Survey & Alignment) reviewed the module assembly de-
sign documentation and developed a baseline assembly process. The baseline assembly process identified 35 as-
sembly steps, established assembly comp... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
1e6318f7-f6c1-4a1d-8882-875fd3d83586 | into which features had the greatest impact on the produc-
tion schedule.
Case Study 1: Crane Investment Optimization
Figure 1 graphs the overall production duration against
2 variables, the number of cranes and the number of Pre-staging assembly stations . Multiple cranes mean assembly
steps that require a crane... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 0 |
6f1fa597-a04a-444b-bae7-8d914e38a344 | Figure 1: Graph of Prestaging s tations vs Prestaging b uild
duration .
There is a reduction in Prestaging production duration
by increasing the number of assembly stations (number of
modules which can be assembled in parallel). The graph
also provides evidence that there is negligible advantage to using 3 cran... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 1 |
9a0cdf0c-e553-4f31-a712-3f92d75bb105 | in one location ( High Bay 1).
The
Option A timeline (Fig . 2) displays the schedule
where each cell is a day, each row is a module, and the as-
sembly steps are grouped into 3 broad groups (initial assembly in green, alignment in blue, & final assembly in
orange).
The white cells represent module inactivity. ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 1 |
09273baa-4300-491a-8dec-781a51d6965a | tion A production is due to crane overallocation, caused by
the assumption that assembly on all 6 modules begins on the same day. The total assembly duration is 386 working
days (77 weeks) .
Figure 3: Option A personnel resource graph.
The personnel resource graph (Fig. 3) displays the per-
sonnel resources req... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 1 |
9fd93366-a0c7-493b-95a0-c48f6554fbec | Survey & Alignment team (S&A), and Electrical Techni-
cians (EIs).
The production average provides the baseline estimate
for required resources. The average mech tech requirement
for Option A is 7.5 technicians per assembly day. The
macro does not have the ability to level resources but inter-preting the graph c... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
288d9b73-4543-4e4d-a64b-497ea8440b94 | timizing the location of those assembly stations became a
critical consideration for macro analysis.
Option B assumes 8 modules assembled in parallel with
all assembly steps planned in one location ( High Bay 1).
Option B adds two assembly stations in High Bay 1 (com-
pared to Option A) and consequently reduce... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
c8530177-a54f-46e3-b1c4-563114e5043b | tions but splits assembly operations between 2 high bays .
The timeline for this option is shown as Option C in Fig. 2.
Initial assembly & alignment (green & blue) is performed
in High Bay 1, final assembly (orange) is performed in
High Bay 2.
Option C assembly duration is 326 working days (65
weeks). Splittin... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
87ddfd29-5e7e-4e81-8d97-8be6ecab05b9 | nent delays. Spreading the assembly work between high bays also means component storage is available near the
assembly stations , reducing the material planning com-
plexity and i n turn the resources required to transport or
manage component availability in the assembly area .
MACRO DEVELOPMENT PHASE 2 : AS-
SEM... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
ebcde1b8-47c4-42c4-b4dc-867d9da00ef0 | Case Study 4: Assembly Sequence Modification
Impacts
The module component assembly sequence can have a
major impact on the overall production schedule . In Option
C of Fig. 2 the alignment step ( in blue ) depicts the align-
ment of module components and demarcates initial assem-bly in High Bay 1 and final as... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
1c75bc6a-2298-4f01-b2e9-39507fb2e8a2 | tion extends to 373 days (75 weeks).
A meaningful takeaway from Option D is that when the
production duration between the two high bays is unequal,
the high bay with a longer duration is a bottleneck for mod-
ule throughput . The assembly duration should be equal be-
tween the two high bays to optimize throughput... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
2c76ecd8-24f8-434e-89c9-902f14f5a40c | hardware. The macro estimates are regularly revised and
the Prestaging schedule adjusts to account for delayed sub-
system hardware. The tool will remain valuable as it pro-
vides needed flexibility for Prestaging to actively adapt to
evolving project variables to optimize the production schedule for the ALS -U SR i... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
1eee5533-76d2-4826-a297-88e6c4425fba | Ring Modules”, presented at IPAC'26, Deauville, Normandy ,
May 202 6, paper TUP 2343 , this conference 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-TUP7368
1096 MC7.T31: Subsystems, Technology and Components... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7368.pdf | 2 |
3711e25d-27ea-4c8e-8107-cbd72696576a | STATUS UPDATE OF PERMANENT MAGNET RADIATION
RESILIENCY STUDIES AT CEBAF∗
R. M. Bodenstein†, C. Decker, K. E. Deitrick, B. R. Gamage, J. F. Gubeli, D. Hamlette, M. Janak,
K. Jordan, S. Lee, C. Matthews, M. X. Mason, J. Meyers, B. Mosbrucker, I. Neththikumara,
E. Nissen, V. Okey-Ejiowhor, J. Samari, S. Shriner, M. Smith,... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf | 0 |
15fd3947-b59a-4320-a2fd-2304ec4c0b08 | presentanoverviewofJeffersonLab’spermanentmagnet
radiationresiliencyprogram,reviewingthein-situdemag-
netizationmonitoringmethodologyandinitialoperational
results. We also discuss upgrades for the ongoing second
exposurecampaign,whichtargetrefineddosecorrelations
and reduced systematic uncertainties. Finally, we outlin... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf | 0 |
8c32d988-c9fb-4a34-9d2b-2c25636c8d28 | particularlyfor undulator magnets at light sources [ 2]. The
established damage hierarchy ranks protons as most dam-
aging,followedbyneutrons,electrons,andgammas[ 3,4].
However, prior studies typically relied on small sample sets
(𝑁 ≤ 12), doses far exceeding the CEBAF environment,
or single material families. This LD... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf | 0 |
1303651d-60cb-4e4c-b84b-f864ae868530 | liminary results from the first data-taking campaign and
∗AuthoredbyJeffersonScienceAssociates,LLCunderU.S.DOEContract
No. DE-AC05-06OR23177. The research described in this work was
conducted under the Laboratory Directed Research and Development
ProgramatThomasJeffersonNationalAcceleratorFacilityfortheU.S.
Department ... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf | 0 |
d3968a52-837f-4abd-b83f-911c8c63a852 | identicalY-platesremainedinthe laboratoryasunexposed
controls. Therandomizedco-locationofallfourmaterials
on each plate is central to the analysis: the intra-plate differ-
ential between the radiation-sensitive NdFeB and radiation-
hardSmCocancelsthedominantHelmholtzcoilgaindrift
(±0.124% ) by construction, enabling su... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf | 0 |
98908f20-5132-4b88-a112-206c9a8fb0ed | in-situtunnelaccessduringacceleratordowntime[ 12,13].
Each plate is tracked with co-located dosimetry: optically
stimulated luminescence (OSL) area monitors for photon
andneutrondose,andFWT-70optichromicrodsforhigh-
dose gamma fields [ 5]. Gamma doses span five orders of
magnitude, from 0.3 Gy (labyrinths) to 23,000 Gy... | D:\Daily_ihep\Conferences\IPAC2026\TUP\TUP7370.pdf | 0 |