d82255c4-0a01-4ca3-a2f4-db4d6bfee01e
ing the actual operational conditions on daily base. Setup periodsincludemachinepreparation,beamtuningandion source service times. Accelerator availability is defined as the ratio of effective beam-on-target time to the sum of beam-on-target, setup and failure times, summarized over all experiments [ 4]. LONG – TERM OP...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
0
8d4b111a-38db-4868-ba68-d38f0d61fd05
tion years, operation was driven by experimental demand and beamtime scheduling was comparatively continuous. From 2015 onward, a clear operational shift can be ob- served. FAIR project activities required longer shutdown periods, infrastructure access, and coordination with civil construction. In addition, personnel r...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
0
3c81fdab-1b9b-47d8-b19c-669c1d86ead2
Figure 1: Evolution of GSI accelerators performance (2012 – 2025) based on OLOG – classified operational time. operation. Asaresult,beamtimeblocksbecameshorter,and userbeamtimedecreasedinseveralyears. Theaccelerator complexwasnolongeroperatedasastand-alonefacilitybut was strongly influenced by the FAIR project. Another...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
1
98046c1d-0651-4b56-a998-ea98ae90f988
as well as the additional effort required for operating proce- dures in the new control environment. To mitigate this, a dedicatedtaskforceteamwasestablishedtoimprovecontrol systemperformanceandusability[ 5]. Thisledtosystematic performanceimprovementsandbettercollaborationbetween operators and control system experts. ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
1
bcb871ab-1d91-47d8-ac76-28687f9a5e5f
mance level. Parallel operation increased, with the accel- eratorcomplexsupplyingbeamtouptothreeexperiments simultaneously (parallel factor ≈3). Effective beam-on- target fractions reached their highest values, while setup times continued to decrease. This suggests that the accel- erator complex has successfully adapte...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
1
52243be2-d0b7-4372-b2db-fb9e3e32916c
technical origin is given in the following failure statistics section. FAILURE STATISTICS ThefailureanalysisshowsthatdowntimeoftheGSIac- celeratorcomplexisinfluencedbyacombinationofshort- termsubsystemeffectsandstructuralweakpointstypicalfor anageingfacilityoperatedduringanongoingconstruction phase. Asignificantimprove...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
1
3079da7f-83a8-426d-9cc0-284b855cb27e
cumulative downtime impact over the last five years, fol- lowed by their yearly ranking (rank 1 = highest impact). This representation allows the identification of systematic weakpointswhilereducingtheinfluenceofstochasticyearly events. Figure2: Bumpchartofthetoptendowntimecategoriesfor the period 2020–2025 based on AW...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
1
47ac3e0b-4c9b-48c4-9ba3-0881c4a3cb3f
andareusuallylinkedtolocal technicalissuesrather than long-term structural limitations. In contrast, the long-term analysis shows a small set of categories that regularly dominate the downtime. Elec- tricpowersystems,LINACandLINACRF,infrastructure- relatedfailures,andthemiscellaneouscategoryformastable top 5 of the dow...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
1
f601d9d8-1dcd-4ffa-992a-1cb96082b259
as well as a fraction of “unknown” events where the root causecannotbefullyreconstructedfromlogbookdata. Their systematichighrankingreflectsthelimitsoftheageingUNI- LAC equipment and the overall GSI infrastructure, which areincreasinglychallengedbyweatherconditionsandthe growing accelerator complex. Another important a...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
25206854-7e6f-442f-84d0-eb99c5dde216
LAC HF gallery fire, which led to an early termination of beamtimeandhighlightedthestrongpropagationofinjector- related failures through the entire accelerator chain. Overall, the statistics show that downtime is not driven by more major failures, but mainly by many recurring inter- ruptionsinageingcoresubsystems. Dist...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
bee1f532-67b9-43b6-9273-fb8046fc4964
tor complex during the FAIR construction phase provides several key lessons relevant for large accelerator facilities operated under transition conditions. First, availability figures alone are not sufficient to as- sess the reliability state of a complex accelerator chain. Stable global availability can hide continuou...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
34dee6ab-a8ff-4827-b8d1-63737f6131dd
able identification of dominant downtime drivers over many years. Withoutsuchstructureddataconsolidation,long-term statistics remain biased by inconsistent logging practices. Another important lesson concerns the limitations of the current failure documentation. As mentioned above, the miscellaneous category includes a...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
a6f9445d-7ac8-495e-b7bb-30a7e70cd7f8
anavailabilityperspective. Failuresininjector-relatedsub- systems propagate through the entire accelerator complex and can dominate global downtime, as illustrated by the prematureterminationofbeamtimeaftertheUNILACHF gallery incident in 2018. Ensuring high reliability of age- ing injector and infrastructure systems is...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
dea854c3-e81a-4f6c-be55-0751f2f004fb
from 2012 to 2025 during the FAIR construction phase. Theresultsshowthatglobalavailabilityremainedatasta- bleandpartlyimprovedleveldespiteageinginfrastructure, shortened beamtime windows, and increasing construction- related constraints. The systematic evaluation of AWG-reclassified failure data reveals that downtime i...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
da63bbef-a281-420e-9d8f-258212c0cf50
complex and directly impact global beam delivery. REFERENCES [1]U. Scheeler, W. A. Barth, M. Miski-Oglu, H. Vormann, M. Vossberg, and S. Yaramyshev, “Recent UNILAC Upgrade Ac- tivities”, in Proc. HIAT’22 , Darmstadt, Germany, Jun.–Jul. 2022, pp. 166–169. doi:1/zero.alt4.18429/JACoW-HIAT2/zero.alt422-TH3C3 [2]P.Schuett ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
007bd5b4-e9b6-420c-b638-bdb9e12d8faa
[5]A. Schaller, “Full Stack Performance Optimizations for FAIR Operation”, Unpublished.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP6127 MC6.T22: Reliability, Operability 2839WEP: Poster session WEP6127 Con...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
2
7c5f3896-271e-495e-b990-2263a4ca031e
[6]S. Reimann et al., “FAIR commissioning - Towards first science”, in Proc. IPAC’25 , Taipei, Taiwan, Jun. 2025, pp. 2495–2498. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt425-THBN2 [7]W.Barthetal.,“Heavyionlinacasahighcurrentprotonbeam injector”, Phys.Rev.STAccel.Beams ,vol.18,p.050102,2015. doi:1/zero.alt4.11/zero.alt...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
3
ed02d7ca-5f05-4a49-aacd-9d0054964cc5
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP6127 2840 MC6.T22: Reliability, OperabilityWEP6127 WEP: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6127.pdf
3
345ced44-10b4-4df7-814e-141f3c48e916
ASSET MANAGEMENT WORKFLOWS FOR cSTART USING SNIPE-IT E. Blomley∗, J. Gethmann, J. Natal, R. Ruprecht, M. Schuh, J. L. Steinmann, A.-S. Mueller Karlsruhe Institute of Technology, Karlsruhe, Germany Abstract The cSTART project at the Institute for Beam Physics and Technology (IBPT) at the Karlsruhe Institute of Tech- nol...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
0
a1125963-69e6-4957-9300-05727b99ffb6
references to other data sources, which provide the more technical information such as CAD drawings, cable routing, anddevicedocumentation. Inaddition,italsoallowstotrack componentspecificinformation. Thiscontributiondescribes the established workflows, status, and lessons learned us- ing a generic IT asset management ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
0
2016d8ef-c9af-44dd-bad5-b0cfb76fba68
introducinghundredsofcomponentswithdistinctlife‑cycle- demands. Over the years, documentation and tracking have been carried out with heterogeneous tools and inconsis- tent naming conventions, creating gaps that hinder efficient hardware and software deployment across all IBPT sites. By adopting Snipe‑IT [ 3] — an open...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
0
a64bfd53-aff9-4967-8c55-38bc12f64c6f
FEATURES Snipe-ITprovidesamodernandflexiblesetoffeatures, somemakethetoolespeciallyinterestingforadaptationin this context. ∗edmund.blomley@kit.eduCustom Fields Customfieldsletthedatabasedesignercreateanyamount of user‑defined data columns, which can be grouped into field-sets,foranyassettype,enablingstorageofmetadata ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
0
65b40d5a-03bb-417b-9b5c-ca516739ecdb
requiretoadheretoaregexexpressionwhichisusefulfor defining fields related to naming conventions. Encoder Motor StageMotor Motor Controller Motor AxisCabinet Asset Location Checked-out to Figure1: Asset-to-asset-to-locationcheckoutexample. Us- ingthebuilt-incheckoutsystemtorepresenttheactualdevice setup while each comp...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
0
c3edbf1d-fec0-4ae5-b247-52f92b976002
the creation of association chains that reflect the physical layout of an accelerator. For example, a motor encoder and motor can be checked out to a motor stage, which in turn is checked out to the motor axis, and finally to the motor controller — each element remains a fully fledged asset withitsowncustomfields. Cabi...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
0
13c6e3a2-4b54-4bb6-80d3-866604d79410
New Device Initial QA Placeholder Registered Model Design Model AdjustmentsNew Asset Existing Device Existing AssetAdd QR QRSerial numberFurther integrationFigure 3: Workflow for cSTART device to database integration. Over the next months more and more devices for the cSTART storage ring will arrive. During the initial...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
1
e57f68f5-c6a8-449c-868c-5420eb193759
database, leading to a steady increase of tracked assets across cSTART and the existing accelerators. Because checkout is a built‑in Snipe‑IT capability, these relationships are automatically recorded, searchable, and require no additional custom‑field configuration. Label Engine The label engine is the third key featu...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
1
101a369a-ef68-45fc-96ed-72432774d87a
Maintenance Logs Althoughnotaprimaryselectioncriterion,Snipe‑ITen- ablesthecreationofregularauditschedulesandthelogging ofmaintenanceactionsforeachasset,deliveringtraceable histories with minimal overhead. ADAPTATION The adoption of Snipe‑IT aims to establish a single au- thoritative source for all components and their...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
1
b45bea9d-6d6b-4498-9d51-5dffa04538d3
The Role of cSTART Keyevents,whichalreadystartedhappening,arethear- rival of new components for the upcoming KIT accelerator facilities LPA and cSTART including the VLA-cSR and theFLUTEinjectionline,whichwillconnecttheelectron source FLUTE with the VLA-cSR. These new componentsundergovariousinspectionsandtestson-siteas...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
1
e8bc5c85-f8ee-4007-94ec-a150fa881697
FLUTE and use the opportunity to add those devices into the database as well. The bulk of cSTART components aretypicaldevicesassociatedwithstoragerings: magnets, power supplies, and beam diagnostics. The timescale of the arrivalof LPAand cSTARTcomponents is overthe nextsix to twelve months. A visual presentation of thi...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
1
19155883-c202-4a57-8b59-77284dfa0766
every network‑connected device, it presents an ideal op- portunity to registereach serviced component in the asset database as it is updated. Reconstruction of FLUTE DuetoconstructionrestraintstheFLUTEacceleratoris fullyremovedfrom itslocation, but will be set upagainto- wards the end of the cSTART build-up phase, prov...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
1
5c3e147f-2a99-42d7-80d9-5eb5352b7565
Schedule Figure4shows the plan of the graduate integration of devices into the asset database over the next 12 months. 06/26 09/26 12/26 03/27 06/27cSTART constructionLPA setupFLUTE rebuilt Network restructering Figure 4: Adaptation schedule. Various events over the next 12monthsrequiringtoworkwithspecificgroupsofdevic...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
2
d47a20eb-a1d0-488c-ae62-495d7194bf24
nalsources(seeTable 1). Aftertheinitialadoptionphase,we mightreevaluatetheoptionalmigrationofselecteddatainto Snipe‑IT if the user community finds it beneficial, avoiding the forced consolidation pitfalls of past approaches. Table 1: LinkedExistingData Sources Data source Description Charm++ Network database with integ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
2
d7077206-4e65-4486-a589-db9bb1d8f41a
oftheBPMdevicesforKARA,astheyareconsideredsimilar devices. While we will continue to add cSTARTdevicesas they arrive, we will focus on integrating all LPA related devices, whicharemostlyon-sitealready,andprepareforthenetwork restructuringprocess,whichwillleadtoahighnumberof devicesbeingadded. Again,tobenon-blocking,als...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
2
f3197361-f165-4bed-9d16-fb43581a1358
take some time and require considerate effort to integrate all devices and consolidate the scattered information, we are confident that this will be a worthwhile effort. Figure 5 shows a glimpse of the currently registered and modeled assets. Future work will leverage the REST API to harmonize data sources, synchronize...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
2
a5344457-4886-4845-bebd-bb9d278c0117
data;Modeled – devices havea complete asset model with all custom fields; Placeholder – pre‑printed labels awaiting attachment on arrival. REFERENCES [1]R. Ruprecht et al., “cSTART – Status on the compact electron STorage ring for non-equilibrium Accelerator Research and Technology”, presented at the IPAC’26, Deauville...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
2
a6af7b94-bcbb-4566-91cb-1d696bd58301
[4]J. Leeet al., “Cost-effective asset management for accelerator control systems: design and implementation for the ALS-U controlssystem”, in Proc.IPAC’24,Nashville, TN,May2024, pp. 3289-3291. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-THPG1817th International Particle Accelerator Conference, Deauville, France JACo...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6130.pdf
2
bb2a982a-5cad-4f9b-84f6-06f3480891c5
ON-THE-FLY SCANNING: IMPROVING SCAN TIME OF XAFS AT BM08-XAFS/XRF BEAMLINE M. Alzubi1,2, A. Mohammad1, A. Abbadi1, N. Al-Bess2, M. Abugharbiyeh1, A. Al-Dalleh1, A. Aljadaa1, L. U. Khan1, Y. Momani1, M. Harfouche1 1Synchrotron-Light for Experimental Science and Applications in the Middle East (SESAME), Allan, Jordan 2Pr...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
5d68c435-baeb-4bc7-98e7-0c6c7f028ecb
the energy-angle mapping is linearly approximated to main- tain accuracy within acceptable margins. The method then integrates the position encoding of the Double Crystal Monochromator (DCM) Bragg angle with the synchronous triggering of multiple detectors, including ionization cham- bers (ICs) and a KETEK SSD detector...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
d490c4e4-7529-41a2-8865-4e4041e8111d
where the DCM moves to an energy point, waits for the mechanics to settle, collects data, then moves on to the next point. This stop-and-go cycle works reliably, but it wastes a lotof time. Foratypical XAFSscan spanning hundredsof energypoints,thesettlingdelaysadduptoasignificantfrac- tionofthetotalbeamtimetimethatcoul...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
7ef48ad7-2ae0-47b2-bded-f8bf63dd61b9
BM29 beamline [ 2], the QXAS mode at Diamond B18 [ 3], the SuperXAS beamline at the SLS [ 4], and the general XAFS beamline at SSRF [ 5] in order to reduce acquisition times from tens of minutes to a few seconds while maintain- ing data quality comparable to stepscanning. Continuouson-the-fly scanning can in some few c...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
14529364-70e3-4bbd-9044-1615465d3f5a
cific encoder positions, and a time-based mode, where trig- gersaregeneratedatfixedtimeintervals. Bothmodesrelyon a PandABox timing module to synchronize all participating subsystems. SYSTEM ARCHITECTURE Beamline Control Infrastructure The BM08 DAQ system is built on top of the EPICS controlsystemandincludesamodularPyt...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
bd675eae-57f5-49a7-8bfb-898c142d5e09
FPGA-based timing and position-capture module [ 11]. The module reads the Bragg-angle encoder in real time and con- tinuouslytrackingofthepositionduringmotion. Depending ontheselectedscanmode,itgenerateshardwaregatesignals totriggeralldetectorssimultaneously,eitherwhentheen- coderreachespredefined angularpositionsor at...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
418061d8-340f-4c5e-8803-40ba6db13d34
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP6131 2844 MC6.T22: Reliability, OperabilityWEP6131 WEP: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
0
f9f98f88-c0f6-46a5-9656-04153a843197
Figure1: On-the-flyscanningsystematBM08(architecture and pipeline). CONTINUOUSSCANIMPLEMENTATIONS Position-Based Continuous Scan Inthismode,PandABoxgeneratesatriggereverytimethe Bragg angle encoder reaches a pre-calculated position. The main challenge is the nonlinearity between Bragg angle and photonenergy,thatmeansun...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
1
c7590dea-bcef-464f-b1f8-6194f841cd7a
defined settings such as exposure time and step size, to- getherwiththelinear-segmentapproximation,andloaded intothelookuptableofPandABoxsegmentbysegmentto avoid table overloading. The implementation is available inlinearIntervals.py andengScanContPos.py inthe open-source scan tool [ 10].Themainadvantageofthismodeistha...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
1
95327619-4cd5-40bc-8b89-441a88bb9f94
formtimesamplingispreferredoveruniformenergysam- pling. However, any variation in DCM speed during the scan results in non-uniform energy spacing between data points [11]. PERFORMANCE RESULTS Weperformedthe samescanusingthethreeacquisition modesand compared the total scan time foreach. Table 1 summarises the results of...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
1
625630c7-8b59-400e-aab9-d95136830650
andposition-basedcontinuousmodes. Thetwospectraover- lap closely across the XANES region, the EXAFS oscil- lations, and the Fourier transform, indicating that the con- tinuousmodeintroducesnomeasurableartifacts. Figure 4 presentsthesamecomparisonfortheNiK-edgeusingthe time-based mode. CHALLENGES AND LIMITATIONS The spe...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
1
61f9399d-65c4-47bd-bca5-b6a592bbc42f
a timing mismatchthat introduces latency between the two subsystems. Moreover,theminimumintegrationtimesup- portedbytheADCis 0.7s,limitingtheachievableenergy resolution during fast continuous scans.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
1
a6b65e44-1be5-4f3a-b047-a206b26df744
Figure 2: PandABox internal block configuration for the continuous scan system at BM08. The input encoder block (INENC1)readsthe DCMBragg anglein realtime. Twosequencerblocks(SEQ1,SEQ2) generatethetriggersequences fortheposition-basedandtime-basedscanmodesrespectively. Pulse,counter,clock,andlookuptable(LUT)blockshandl...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
2
2bbec9b9-dd49-4062-9b7e-e9a9c687f028
pointI/Ointroduceslatencythatpartiallyreducesthetime savings gained from continuous motion. CONCLUSION Wehavesuccessfullyimplementedon-the-flyscanningat the BM08-XAFS/XRF beamline of SESAME Synchrotron. In addition to step scanning and mapping scan, this offers two continuous scan modes, position-based and time-based. ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
2
cdb785b6-d5f9-4bce-ad15-ddd37bfd5643
position-basedmodegoesastepfurtherbyusingapiecewise- linearfittingalgorithmtoensureaccurateenergyassignment evenacross wide scan ranges. Knownlimitations, the 0.7s ADCintegrationfloorandper-pointdatawritingarebeing addressedinfuturework. Thescantool,PandABoxsettings and other related modules are open source and availab...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
2
c712e56b-914e-4d80-bf4f-1d528601aafc
REFERENCES [1]M. Harfouche et al., “Emergence of the first XAFS/XRF beamlineintheMiddleEast”, J.SynchrotronRad. ,vol.29, pp. 1107–1113, 2022. doi:1/zero.alt4.11/zero.alt47/S16/zero.alt4/zero.alt4577522/zero.alt4/zero.alt45215 [2]C.Prestipino etal.,“Quick-EXAFSimplementationonthe general purpose EXAFS beamline at ESRF”,...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
3
3539f351-e1ab-47e8-86a3-15db3b03b5e7
doi:1/zero.alt4.11/zero.alt47/S16/zero.alt4/zero.alt4577515/zero.alt418/zero.alt4/zero.alt47 [5]Y.Zhouetal.,“AnewQEXAFSsystemonthegeneralXAFS beamline at the Shanghai Synchrotron Radiation Facility”, J. Synchrotron Rad. , vol. 29, pp. 1461–1468, 2022. doi:1/zero.alt4.11/zero.alt47/S16/zero.alt4/zero.alt4577522/zero.alt...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
3
325adf8c-8c60-4018-8959-b744a7f33d38
“Data Acquisition in SESAME Synchrotron”, Synchrotron Radiat. News , vol. 37, no. 6, pp. 23–28, 2024. doi:1/zero.alt4.1/zero.alt48/zero.alt4//zero.alt4894/zero.alt4886.2/zero.alt424.2432346 [9]A. Abbadi et al., “HESEB Soft X-ray Beamline ID11-L at SESAME: Performance and First User Experiments”, J. Phys.: Conf. Ser. , ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
3
218960e3-7ad7-499b-8563-1465d584ff75
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP6131 MC6.T22: Reliability, Operability 2847WEP: Poster session WEP6131 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6131.pdf
3
3455357f-d3e0-41fe-9b6d-52e979637f1b
CHARACTERIZATION OF BEAM LOSS AT MAX IV IN-VACUUM INSERTION DEVICES M. Muradi∗, M. Holz, H. Tarawneh, MAX IV Laboratory, Lund, Sweden Abstract Four Libera Beam Loss Monitors (BLMs) were installed downstreamoffourconsecutivein-vacuumundulators(IVU) at the MAX IV 3GeVstorage ring in order to survey beam losses under vari...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
0
dc45598f-4e76-4afa-8809-e38698aa1ef6
loss rates, while sudden beam dumps produce almost no de- tectable signal at the BLM locations. Top-up injections exhibit consistent and repeatable loss patterns, providing ausefulbenchmarkforroutineoperation. Alleventswere studiedwithinsertiondevicegapsbothclosedandopen;a significantdecreaseindetectedlosseswasobserved...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
0
c3f10729-c3b2-4899-81b4-535d047ef894
ness by operating with very small magnetic gaps down to 4.5mm(ca.2.25mm distance magnet-beam) [ 2]. The com- binationofsmallmagneticgapsandthein-vacuumdesign means that the undulator magnets are directly exposed to the electron beam and thus are particularly susceptible to localized beam losses that may result in demag...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
0
35757543-a609-4b52-8e67-a3b43d99bb51
the stored beam and helps ensure safe operation of the inser- tion devices. ∗mostafa.muradi@maxiv.lu.se Figure 1: The four Libera BLMs mounted downstream of each observed IVU. In this work, four beam loss monitors (BLMs) were in- stalledattheexitpointoffourconsecutiveIVUsintheMAX IV3GeVstoragering. Thepurposeofthestudy...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
0
0ba044ad-ebae-49f4-9e55-40b6c12c599a
lines,seeFig. 1. ThePMToutputsignalconsistsofunipolar pulses with negative polarity, corresponding to individual loss events [ 3]. TheLiberaBLMcontinuouslysamplesthedetectorsig- nal with high time resolution ( 8ns) and processes it using configurablethresholdlogic. Incountingmode,individual pulsesthatexceedapredefinedt...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
0
d569916f-b151-4a53-85ef-7f32449df625
and routine top-up operation. In addition, dedicated tests were carried out to evaluate the influence of RF and tune variations, as well as the effect of individual insertion de- viceconfigurations. Forallmeasurements, the BLMsignals were analyzed in terms of peak loss rates and, where rel- evant, accumulated losses ov...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
0
5d9081dd-6655-47bb-9073-cecf40d60cb6
Table 1: Peak loss rates 𝐿𝑅𝑝𝑒𝑎𝑘and accumulated loss 𝐴𝐿 for both, all insertion devices open (o) and closed (c). Units are in million counts. IVU 𝐿𝑅𝑝𝑒𝑎𝑘,𝑜 𝐴𝐿𝑜𝐿𝑅𝑝𝑒𝑎𝑘,𝑐𝐴𝐿𝑐 ForMAX 0.1281/s 57.12 0.1581/s 52.9 CoSAXS 0.0211/s 7.93 0.0531/s 16.7 BioMAX 0.0401/s 15.67 0.1681/s 51.9 MicroMAX 0.0161/...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
1
577f76cb-ba60-4c17-a446-c64877098746
rate. Full Injection Beam losses during full injection from zero to nominal currentat 400mAwerestudiedforthecaseswithallinser- tiondevicesopen,and allclosed. As areferencevalue,the baseline loss rates at these IVUs under nominal operation is intheorderof 5×103countspersecond. Thelosssignals are displayed in Fig. 2and s...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
1
a02af71d-300d-45a9-ae80-ce53fa6881c1
aperture during injection. Time in [s]0 50 100 150 200 250 300 350 400 4500123456Loss Rate in [Counts/s]×105 Scrape-Down with open IDs ForMAX CoSAXS BioMAX MicroMAX Time in [s]0 10 20 30 40 50 60 7000.511.522.533.54Loss Rate in [Counts/s]×106 Scrape-Down with closed IDs ForMAX CoSAXS BioMAX MicroMAXFigure3: Beamlosssig...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
1
98e0bb30-34ca-411d-8e10-fcaadaf1261d
collimationsystemthatblockshaloparticles. Additionally, there is no implementation of local optics compensations andthus,nocompensationsofbeta-beats. Thetunefeedback isaglobalfeedbacksysteminthering. Theconnectionto the ring acceptance can be seen in the injection rate. Beam losses with closed IDs reduce while the inje...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
1
d153b416-d70e-4d77-8771-5a1db82add66
orderof4×103countspersecond,withthe notableexcep- tion of the BLM at the ForMAX IVU, exhibiting a peak lossrateofca. 6×105countspersecond. Whilescraping down a beam with closed ID gaps, the loss characteristics17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
1
93225e36-790d-44f5-a73d-81ee33383c64
at the ForMAX IVU remains unchanged, but the BLM at BioMAX IVU situated two achromats downstream records similarly high loss rates. It shall be noted that the scrape- down procedure with open gaps took ten times as long, as a morecarefulapproachwaschosen. Thishoweverresulted inasignificantlyhighertotallossattheForMAXIV...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
1fc435af-5cdf-48db-90f2-bcb4ebd19b9a
ratesduringtop-upareintherangeof 1×103to1.5×104 countspersecond,soonlymarginallylargerthanthetypical baseline losses. With a typical duration of approximately 10sper injection, the accumulated losses are comparatively small as well. Influence of Individual Insertion Devices A dedicated study was performed to investigat...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
72ce9876-9cb8-4478-83e0-32ea14c819eb
we are mainly dealing with effects of dynamic aperture. Al- thoughclosingindividualIVUs increasesoveralllosslevels, theresponseofthedetectorshintstowardsacorrelationin loss patterns between different sections of the machine, but this is not yet conclusive and has to be investigated further. Comparison of Loss Character...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
1c0dd65f-1f3c-480e-ace7-5041ec3b591c
counts per second and minimal accumulated losses. Overall,scrape-downsdominatepeaklossbehavior,while injection processes dominate accumulated losses. Both cases, however, are heavily influenced by their duration. Forinjections,themaincontributingfactorisinjectionef- ficiency, which depends both on the ring acceptance, ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
815616e3-c413-43a9-aa41-b9dc474ad9c7
eitherpeaklossratesoraccumulatedlosseswereobserved for both RF adjustments and positive or negative tune shifts. Thelosssignalsremainedatbaselinelevelswithonlyminor fluctuations comparable to background noise. These results indicatethatRFandtunevariationsduringnominalopera- tionsdonotcontributesignificantlytolocalizedb...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
1aaaab49-06d9-4e8c-8bd2-f6cb228e3236
of the machine in the absence of an active tune feedback. Takingintoaccounttheaccumulatedlosses,longerpro- cesses, such as injection, contribute substantially over time, whereas scrape-downs with closed gaps produce the high- est instantaneous losses. These results provide a baseline understandingoflossbehaviornearIVUs...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
cce80143-0a20-4d41-acf1-c8b535696e17
doi:1/zero.alt4.11/zero.alt47/S16/zero.alt4/zero.alt4577518/zero.alt4/zero.alt48111 [2]MAXIVLaboratory,“Insertiondevicesatmaxiv,technical overview”, https : / / www . maxiv . lu . se / beamlines - accelerators/technology/insertion-devices/ , On- line resource, accessed Mar.2026, 2024, [3]Instrumentation Technologies d....
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6132.pdf
2
4e9e0259-d8e8-4a6a-a547-06eeb8667a3b
ONLINE PERFORMANCE MONITORING AND EARLY FAULT DETECTION FOR THE B-TRAIN REAL-TIME SYSTEMS AT CERN K. Diamantis∗, M. Bonora-Tam, M. Buzio, V. di Capua, D. Giloteaux, CERN, Geneva, Switzerland Abstract At CERN, B-Train systems provide real-time magnetic fieldinformation to the RF andother subsystemswith high precision an...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
401cf1ab-72b3-4351-916a-661598ff7d2e
internal errors due e.g. to integrator drift or field marker degradation,applythenecessarycorrections,orflagsystems forintervention. Weexpectittoenhancecompliancewith evolving operational standards and future large-scale ap- plications requiring automated self-diagnostics and remote maintenance. INTRODUCTION AtCERN,six...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
d51c0c85-bece-4396-a484-84db9431d0e9
ger on each cycle at a preset value, usually just before injec- tion, to reset the integration and minimize the accumulation of drift due to parasitic currents or localized thermoelectric effects [2]. Eachsystemiscomposedof aredundantpair of acquisition chains, the operational (OP) and the spare (SP), designed to provi...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
c359dd59-f8ea-4ac5-87a2-b37222321ed4
simplest cases, the Proton Synchrotron (PS) and Extra Low ENergy Antiproton (ELENA) rings, this corresponds to the physical gap of a reference magnet hosting sensors for both the OP and SP chains. In the Super Proton Synchrotron ∗konstantinos.diamantis@cern.ch(SPS), two dipoles of different types are connected in serie...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
9240277a-9128-40e8-8262-2d685eceb6fa
powered in series but independently, to generate identical fields despite different saturation characteristics. BTRAIN MONITORING FRAMEWORK The monitoring framework is organized into six hierar- chical levels, shown in Fig. 1. Levels 0 to 4 are per-cycle diagnosticsignals computedin real-time, generatingwarn- ings when...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
1170cc3a-7a49-48ae-9f17-6ce2517998cf
handlesredundancybyevaluatingtheconsistencyofOPand SP chains, and Level 4 evaluates consistency across logical magnetgaps. InLevel5asubsetofthecomputedmetricsis storedaccordingtoatieredretentionpolicyforoff-lineeval- uation of historicaltrends, correlations and discontinuities, either automatically or on-demand, with o...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
2024fe58-ae3f-4c24-b788-4eb7ae8357ed
the timing system, which distributes trigger pulses across the accelerator complex [ 3,4]. In our implementation, data aregatheredforeverytriggeredeventandthendistributed through CERN’s control middleware (CMW).17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
0
4f3157c3-302c-4fb2-8643-62473846d6da
Level 4 Level 3 Level 2 Level 1 Sensor Output V oltages Vcoil(t), V NMR(t), VFMR(t)External Signals I(t), Bsim(t), Bsynth(t), temperature Signal & Hardware Integrity Vcoil(t), V NMR(t), VFMR(t)Internal Chain Consistency Bmeas(t) - B sim(t), Bmeas(t) / I(t) Measurement Quality Bmeas (t), B dot(t), tmarkerRedundant...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
1
218a7972-9d68-4ae1-9c5c-f32ea05bd819
Bmeas(t) - B sim(t), Bmeas(t) / I(t) Measurement Quality Bmeas (t), B dot(t), tmarker Signal & Hardware Integrity Vcoil(t), V NMR(t), VFMR(t)Internal Chain Consistency Bmeas(t) - B sim(t), Bmeas(t) / I(t) Measurement Quality Bmeas (t), B dot(t), tmarker Operational Chain (OP)Spare Chain (SP) Logical Magnet - G...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
1
24e8ff57-12ef-43cd-b6c1-bf61fa53f792
by different FECs i.e. by different acquisition chains, which is crucial for Level 3 and 4 diagnostics. The framework providesfunctionsforgroupingthesynchronizeddatabased on timing events, data processing and publishing the results to different clients. WRAP & NXCALS The CERN Web Rapid Application Platform (WRAP) is ut...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
1
11854dbe-7e34-419d-ab3e-a3e2d65afe43
Level 5 diagnostics by executing scheduled Python-based analysisscriptsthat feedstatusupdates tothe same WRAP instance. Thisvisualizationstrategywillhelpidentifyper- formance anomalies and track long-term drifts. RESULTS AND DISCUSSION WedemonstratetheprototypeimplementationoftheB- Trainmonitoringframeworkfocusingonthe...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
1
081ae294-9afc-44e5-8cbe-f067cb0f32ef
minimum is slightly negative, due to a small power converter undershoot. •The marker trigger state, i.e. a boolean value that indicates whether the FMR marker’s output voltage 𝑉FMRcrosses the negative detection threshold ̄𝑉FMR= −0.15V. Sporadic misses (such as in the example shown,where 90%ofthecyclesintheanalysiswin...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
1
553b90d5-5aaf-489e-890f-443611f7dcd5
the threshold, which suggests that the cause of missed triggers is not related to signal levels.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP6136 2852 MC6.T22: Reliability, OperabilityWEP6136 WEP: Poster se...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
1
f4b45140-02e9-44b9-a203-75434dfba0d5
Figure2: WRAPDashboardforPSBRings2and3. Displaysthelastplayedcyclemetrics, includingtiming, magnetic fields, power converter current, field corrections applied during last 50 cycles and Ring 3 FMR signal. Additional real-time analytics are accessible via supplementary Dashboards of the same WRAP instance. Table 1: Exam...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
2
8aabe2c9-3022-4d9c-85a0-ff7f76ee6205
**Considering onlyTOF cycles(interleavedZEROcyclesexcluded) •The cycle time at which the R2 marker trigger is re- ceived,𝑡0,R2. This is stable as expected, within the sampling interval tolerance. •Fieldcorrection,i.e. thedifferencebetweentherunning integral at the time of a marker trigger 𝐵(𝑡0)and the marker preset ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
2
5e39bf8f-150a-4939-8f97-7f0edce61422
We developed a scalable, multi-level diagnostic and mon- itoringsoftwareframeworkforCERNB-Trainsystems. It represents a radical shift from reactive interventions to a preemptive approach toward the automatic detection of sub- tle, progressivesystemdegradation as wellas faultsrequir- ing urgent attention. By leveraging ...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
2
35a5be39-9ef7-4530-8318-5e079f49cd70
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP6136 MC6.T22: Reliability, Operability 2853WEP: Poster session WEP6136 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
2
e3e8aa82-1375-48a6-a8fd-75a6c2ac48a0
ment systems”, in Proc. IPAC’10 , Kyoto, Japan, May 2010, paperMOPEB016,pp.310–312. http://accelconf.web. cern.ch/IPAC1/zero.alt4/papers/MOPEB/zero.alt416.pdf [2]C.Grech,M.Buzio,andN.Sammut,“Amagneticmeasure- mentmodelforreal-timecontrolofsynchrotrons”, IEEETrans. Instrum. Meas. , vol. 69, no. 2, pp. 393–400, 2020. doi...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
3
cfbbe2a9-7130-4d7c-b33e-af6b9f46d7d0
Saskatoon,Canada,Oct.2010,paperWECOAA03,pp.22–26. https://jacow.org/pcapac2/zero.alt41/zero.alt4/papers/WECOAA/zero.alt43. pdf [5]L. Cseppentő and M. Büttner, “UCAP: a framework for accelerator controls data processing at CERN”, in Proc.ICALEPCS’21 , Shanghai, China, pp. 230–235, Mar. 2022. doi:1/zero.alt4.18429/JACoW-...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
3
4e2f365d-297b-4eb5-a067-d28910f74b24
2025. doi:1/zero.alt4.18429/JACoW-ICALEPCS2/zero.alt425-THPD/zero.alt477 [8]J. P.Wozniakand C. Roderick, “NXCALS - architectureand challengesoftheNextCERNAcceleratorLoggingService”, inProc. ICALEPCS’19 , New York, NY, USA, pp. 1465–1469, Aug. 2020. doi:1/zero.alt4.18429/JACoW-ICALEPCS2/zero.alt419-WEPHA16317th Internat...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6136.pdf
3
b3134a89-a02b-4d83-b69b-e645c35ef121
A BEAM ABORT SYSTEM FOR THE DIAMOND -II STORAGE RING H. Ghasem ,† I.P.S. Martin, A. Potter, Diamond Light Source, Oxfordshire , UK W. Shields, Royal Holloway , University of London, Egham, UK Abstract Due to the high energy density of the Diamond- II low - emittance electron beam, the risk of damage to storag...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
0
190e4eb5-1117-4c5f-8333-9112f2dbf13a
INTRODUCTION The Diamond -II upgrade is a 3.5 GeV light source facil- ity with 162 pm natural emittance and 300 mA average cur- rent. It will generat e high brightness synchrotron radiation for users across a range of disciplines [1]. Due to the high energy density of the electron beam, a beam abort sys- tem h...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
0
86b27884-9d76-424a-baf9-d5f43dc10a94
currents above 10 mA . Injection above this current will only be enabled if all beam abort system components indi- cate they are ‘ready to fire’. The need for an additional beam -instability interlock is also under consideration. If a manual beam dump is requested, the multi -bunch feedback system will be set to f...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
0
19dc199f-53ea-4bdc-b78d-849289d596d3
ers and one 400 mm long vertical kicker. The beam dumps are located downstream of the kickers and consist of a main taper ed section with a length of 97 cm and a 10 cm flat section at the downstream end. The horizontal gap changes from ±10 mm at the beginning of the main body to ±5 mm at the flat section . The...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
0
b2788159-89a6-4165-8613-8f0d685edbe5
Several waveform shapes and kick angles have been in- vestigated for the kickers to spread the individual electron bunches along the le ngth of the BD as evenly as possible . The results of this study indicated that t he optimum wave- form for the horizontal kickers is a linear rise as a function of time, inc...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
0
ece2291f-1e65-4fc4-90f7-1beda9c73f2f
TRACKING RESULTS The Elegant simulation code [2] was used to track all 934 bunches through the Diamond- II storage ring, including the effects of the beam abort system. Each of the tracked bunches contained 400 macroparticles, and the bunch sep- aration was set to 2 ns. _________________________________________...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
0
2c2876d7-bd71-4e06-9f3d-1ad2de36eca8
Figure 2: Variation of the horizontal and vertical kicker magnet angle s as a function of time . For the optimised waveforms, a ll the particles were found to be lost within two turns. 83.7% of the lost parti- cles were lost in the beam dumps (27% in K23 and 56.7% in K24), 8% of the losses were lost on the...
D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP6138.pdf
1