UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 15 DEFINITIONS 2-1 GENERAL . The definitions contained in this chapter apply to the terms used in this UFC. Where terms are not defined in this chapter or within another chapter , they are defined in the referenced UFC, code or standard applicable to the cont...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
40
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 16 \6\ CFPE /6/ offices are as follows /1/: a. U.S. Army - HQ USACE/CECW -CE. b. U.S. Navy - NAVFACENG SYSCOM HQ , \6\ Chief Fire Protection Engineer /6/ . c. U.S. Marine Corps - HQMC Code LF. d. U.S. Air Force - AFCEC/CO . e. \1\Defense Logistics Agency (...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
41
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 17 containing telecommunication equipment that serves more than one Facility , a portion of an Installation or the entire Installation . This section does not apply to the room in a Facility that contains the incoming telecommunications service fo r that spec...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
42
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 18 Fire Protection Engineer. Designated (or Service) Fire Protection Engineer (DFPE). The DoD fire protection engineer that oversees that Area of Responsibility for that project . This is sometimes referred to as the “cognizant” fire protection engineer. N...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
43
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 19 Major Project. A project that includes any one of the following: a. \5\ Adding /5/ to an existing Facility . b. \5\Work to a facility that co nsists /5/ of 50 percent or more of the total floor area of an existing Facility . c. Design or construction of...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
44
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 20 Noncombustible Materi al. A material that, in the form in which it is used and under the conditions anticipated will not ignite, burn, support combustion, or release flammable vapors, when subjected to fire or heat. Materials that are reported as passing AS...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
45
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 21 A pipe that transports water from the Distribution Main to the Service Lateral . A service main can be connected to a Distribution Main , Service L ateral or another service main. A main with three or more fire hydrants connected to it is a service main. A ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
46
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 22 This Pag e Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
47
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 23 USE AND OCCUPANCY CL ASSIFICATION 3-1 GENERAL This UFC utilizes criteria from both IBC and NFPA 101. Care must be exercised when using this UFC to ensure proper use of IBC and NFPA 101. 3-2 INTERNATIONAL BUILDI NG CODE (IBC). General . The IBC mu...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
48
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 24 “Occupancy Classification and Use” must be used /6/. Where the maximum allowable quantities are exceeded in NFPA 400, the H occupancy classification (H -1, H-2, etc .) must be defined in accordance with IBC for High-Hazard Group H occupancies , except as mod...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
49
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 25 SPECIAL DETAILED REQUIREMENTS BASED ON USE 4-1 GENERAL . This Chapter provides specific criteria for special or unique occupancies and hazards and supersedes IBC Chapter 4 in its entirety. For special or unique occupancies and hazards not addressed in...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
50
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 26 controls in such enclosures are provided with connection to the installation fire alarm communic ation network by the installation. Conform to the requirements listed in the paragraph entitled “Aircraft Facilities” . Provide separate manual controls for act...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
51
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 27 \6\ Weather coverings are structures that control the amount of direct sunlight on aircraft parked on the flight line , see Figure 4- 1 and Figure 4- 2. Weather coverings used for aircraft on the flight line must comply with all of the following: a. Const...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
52
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 28 Figure 4 -2 Example of Weather Covering Facilities Housing Unmanned Aerial Vehicles (UAV) or Remotely Piloted Aircraft (RPA). \2\For this UFC, an Unmanned Aerial Vehicle (UAV) or Remotely Piloted Aircraft (RPA) consists of just the vehicle; and, an U...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
53
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 29 Facilities designed to support \2\UAS, /2/ UAV, or RPA that have both of the following must be \ 2\provided with sprinklers designed/2/ in accordance with NFPA 30, \2\Storage of Liquids in Cont ainers – Storage Occupancies /2/: a. Has a door opening less th...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
54
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 30 UAS housing area by 1- hour fire barrier walls. Floor elevations must be arranged to prevent a spill within the UAV or UAS housing area from flowing into adjacent areas. Adjacent areas are not permitted to have their required egress through the UAV or UAS hou...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
55
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 31 will apply. Where it is not poss ible to meet all criteria, coordinate with the DFPE for guidance. The service explosives safety regulations include: • For Navy projects, NAVSEA OP -5, Volume 1. • For Army projects, AR 385- 10 and DA PAM 385- 64 • For Air ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
56
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 32 occupancies from supporting spaces must not be less than the required separation of H -2 occupancies from other occupancies and must also comply with any fire rated requirements of DESR 6055.09 and service explosive safety regulations . [C] 4 -5.4.3 Sup...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
57
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 33 from one part of the operation to another. A mitigation w ould be 4- hour fire rated concrete blast containment walls . Exterior walls must be rated in accordance with IBC C hapter titled “ Types of Construction”. Fire Suppression Systems . Complete au...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
58
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 34 Water Spray Systems: Water spray systems, including high speed and ultra-high-speed deluge systems must be designed and installed in accordance with NFPA 15 unless otherwise not ed herein or in the applicable DoD or Service explosives safety regulation. H...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
59
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 35 self-contained deluge systems are primarily intended for personnel protection, although they provide limited building/equipment protection. When used, self -contained deluge systems must be connected to the existing water supply . Portable, self -contained ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
60
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 36 Accessory Magazines and Armories . 4-5.7.1.1 Accessory magazines and armories containing limited quantities of ammunition and explosives for reasons of operational necessity at police stations, security facilit ies and similar type facilities are not requ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
61
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 37 accomplished during the design, a preliminary risk assessment must be performe d. The hazard(s) must be accurately defined. A potential fire or thermal hazard with an unacceptable risk requires personnel protection in accordance with explosives safety require...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
62
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 38 Due to combat mission needs it may be necessary to construct combat related Ammunition and Explosives Facilities that do not comply with the detached building requirement of IBC for H -1 and H -2 occupancies. Where an H -1 building area is attached to a liv...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
63
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 39 Separate the room or space containing the anechoic chamber from the remainder of the facility with 2- hour fire rated construction. Provide sprinkler protection inside the anechoic chamber that complies with the following “Sprinkler Protection” paragr aph i...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
64
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 40 This section applies to all DoD facilities housing government -owned or -managed animals. These facilities must comply with NFPA 150 and the requirements of this UFC. This section does not apply to retail kennels, riding stables , private or club stables , or...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
65
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 41 Animal housing or animal research facilities may require smoke control in order to ensure a clean atmosphere in the animal housing or research area is maintained in the event of a fire. If products of combustion enter the animal housing or research area, it co...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
66
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 42 A perimeter fence or wall in accordance with the installation’s facility standards must be provided not less than 100 feet from the structure. An adjacent facility ext erior wall maybe part of the perimeter separation. [C] 4 -8.1.1 For information pertainin...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
67
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 43 The BESS- Li room must be dedicated to DoD owned and operated BESS -Li operation. BESS- Li rooms must not be used for any other purpose other than the lithium batteries and required/approved switching. Third party owned and operated BESS -Li that are supporti...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
68
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 44 The partitions separating the battery cabinets or open battery racks will help limit the spread of a fire from one battery or battery system to another. The partitions need to be floor to ceiling/roof/floor above. Any penetrations need to be firestopped for an...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
69
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 45 Storage in BESS -Li Rooms. Flammable and combustible materials must not be stored in BESS -Li rooms . Use Group. For Building Code and Life Safety code purposes, BESS -Li rooms in occupied structures must be classified as occupancy Use Group H -3. Batter...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
70
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 46 Pulverizing Equipment. Use components designed and constructed in accordance with requirements of NFPA 850. 4-11 COMMISSARIES AND EXC HANGES. Mixed Occupancy. Commissaries and Exchanges that are part of another facility (i.e., mixed occupancy) and the C...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
71
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 47 Provide for constant visual supervision of cell areas. Central supervisory control area must be separated from cell areas by not less than one- hour fir e-rated construction. Fire alarm notification in cell areas must be at a constantly attended location,...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
72
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 48 Telecom munication areas must comply with NFPA 76 , in lieu of NFPA 75 . Buildings housing telecommunication areas must be of noncombustible construction. Co-located Facility . For Facilities that house telecommunication areas that have occupancies and ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
73
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 49 Note: Consult with the DFPE to determine the extent , or boundary, of the Electronic Equipment Area. For areas with finished ceilings, use concealed pendent or concealed sidewall sprinklers. For areas without finished ceilings, use upright sprinklers...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
74
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 50 Electrical equipment must be protected by disconnecting the power upon activation of the fire sprinkler system in the electronic spaces, unless power disconnect is permitted by manual means indicated above. The disconnect must be installed downstream of any...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
75
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 51 Activation of any elevator machine room, hoistway, or lobby smoke detector must activate the Facility fire alarm system and send the affected elevator s to the designated floor. Sprinkler Protection . Where sprinklers are provided in the Facility , provi...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
76
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 52 damage. Discharge to a floor drain may be permitted only if the drain is sized to accommodate full flow (minimum of 40 gpm) . Discharge to service sinks or similar plumbing fixt ures is not permitted. The top of the hoistway and machine room sprinklers m...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
77
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 53 ROOM / AREA PROVIDE SPRINKLER (Not Applicable for Buildings Without Sprinkler Protection) PROVIDE SMOKE DETECTOR to INITIATE ELEVATOR FIREFIGHTERS SERVICE and BUILDING FIRE ALARM SYSTEM MACHINE ROOM YES YES ELEVATOR LOBBIES YES YES PIT AREA YES NO ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
78
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 54 Elevator Cab Counter Weight Machine Room Figure 4-2 Electric Traction Elevator Elevator Lobby Elevator Lobby Elevator Lobby SD SD SD Test SD FS
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
79
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 55 Machine Roo m Elevator Cab Hydraulic Piping Figure 4-3 Direct Plunger Hydraulic Elevator Elevator Lobby Elevator Lobby Elevator Lobby SD SD SD SD Test FS No more than 24 inches above the pit floor
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
80
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 56 4-17 EMERGENCY SERVICES C OMMUNICATIONS CENTERS. Facilities and equipment that are used for the receipt of alarm sig nals and telephone calls for assistance, and dispatching of fire, police, or emergency medical services personnel and equipme...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
81
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 57 Family housing outside the United States and its territories and possessions , constru cted or leased- constructed, must comply with provisions of this section and the H ost Nation fire protection requirements . DoD- Leased Family Housing. DoD personnel oc...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
82
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 58 Residential type range top cooking surfaces must be equipped with a UL 300A listed residential range top extinguishing system or the cooking surface must be equipped with burners and controls that have their temperature limited to a maximum temperature of 6...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
83
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 59 A single building is often used for storage o f both flammable and combustible liquids and hazardous materials. Requirements for the storage of hazardous waste are separate and distinct from the storage of hazardous materials. Comply with the requirements ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
84
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 60 c. Exterior walls must be of noncombustible construction when the Facility is more than 50 f eet (15.3 m) from another building or property line. d. Interior walls/ceilings must be 4- hour fire barriers if the Facility shares at least one wall with a Facil...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
85
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 61 Walls must not obstruct more than two sides of the structure, or, walls may obstruct portions of multiple sides of the structure, provided that the sum of the walls does not exceed 50 percent of the structure’s perimeter. /2/ The outdoor storage area must ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
86
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 62 Mechanical penthouses and mechanical stories are not considered occupied floor levels. Buildings Greater than 420 f eet (128 m) . The provisions of this UFC are not intended to appl y to buildings greater than 420 f eet (128 m) in height. For buildings exc...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
87
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 63 Use of threaded pipe must be avoided. Where threaded connections are used, requirements of ANSI B1.20.1 must be met. A safety factor of eight over normal pressure must be used. Tubing runs must have as few bends as possible, but must have at least one be...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
88
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 64 Automatic fire suppression systems must be provided for all other indoor transformers rated 35 kV or greater and all must be enclosed by 1 -hour fire -rated barriers. Fire suppression system type must be one of the following. a. Water mist system with o...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
89
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 65 b. Clean Agent in accordance with NFPA 2001. Oil Storage and Oil Purification Rooms . Oil storage and oil purification rooms must be protected by one of the following automatic fire suppression systems . a. Water mist system with operating pressure greater t...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
90
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 66 Hypobaric chambers must comply with NFPA 99B. 4-27 LABORATORIES . General . Laboratories using chemicals must comply with NFPA 45. [C] 4 -27.1 The occupancy specific maximum allowable q uantities in NFPA 45 take precedence over the general maximum all...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
91
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 67 A manually activated smoke exhaust system must be provided for structures three stories or more in height. The smoke exhaust system must be designed for a minimum of six air changes/hour throughout the entire building. Provide complete automatic spri nk...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
92
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 68 4-33 MORALE WELFARE AND R ECREATION FACILITIES (MWR). Clubs, bowling centers, craft shops (including hobby shops, woodworking, auto centers) , and similar recreational facilities with an occupant load of 50 or more must be protected with automatic sprinkler ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
93
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 69 Hose Station Requirements . Hose stations in accordance with NFPA 14 must be located 25 feet upstream and downstream of each gate. These hose stations must be equally spaced at no more than 300 feet intervals along the walls on both sides of the lock chamber....
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
94
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 70 4-36 OXYGEN . General . Comply with NFPA 55 and NFPA 400, except as modified by this UFC. Gaseous oxygen ( GOX ). Bulk GOX Systems. Comply with provisions of NFPA 55 for the installation and location of bulk GOX. Bulk GOX must be located either abo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
95
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 71 Fixed tanks having combined capacity of 100 gal (380 L) or less or portable tanks , \2\/2/must comply with applicable provisions NFPA 51 and NFPA 99, regardless of occupancy. Where tanks have a single or combined capacity of more than 100 gal (380 L), tank...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
96
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 72 1) 1) Noncombustible construction having blank walls 10 ft (3 m) above and 10 ft (3 m) on each side of the equipment . Regulators and other control equipment are permitted to be located indoors in a noncombustible building detached or cut off from main buildi ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
97
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 73 Automatic Sprinkler Protection. Complete automatic sprinkler protection must be provided , regardless of floor area or construction type. Smoke Detection . Provide smoke detectors in accordance with NFPA 101 . A smoke detector must be provided for e...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
98
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 74 Locate facilities or operations involving the storage, mixing, or handling of non-flammable pesticides a minimum of 100 f eet (30.5 m) from the nearest Facility or occupied structure. Facilities of Type I construction as defined by t he IBC, may be located...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
99
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 75 b. UFC 4 -150-02. c. NFPA 30 . d. NFPA 30A. e. NFPA 307 (if liquids are handled in bulk quantities across general purpose piers and wharves). f. "Guide on Mar ine Terminal Fire Protection and Emergency Evacuation", Oil Companies International Marine Forum ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
100
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 76 The separation distance between other equipment (including adjacent transformers) must be as indicated in Table 4-5. When fire barriers are utilized, comply with the following: a. Barriers must be of concrete block or reinforced concrete construction adeq...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
101
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 77 a. There must be no window openings in first -story walls within a horizontal distance of 10 f eet (3 m) from the transformers. Existing window openings must be closed using brick or concrete block. b. Overhanging eaves, where they exist, must be noncombustib...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
102
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 78 Table 4-5 Separation Distance Between Outdoor Fluid Insulated Transformers and Equipment ( Including Other Transformers) Liquid Fluid Volume gal (m³) Distance ft. (m) Less Flammable <10,000 (3 7.9) 5 (1.5) >10,000 (3 7.9) 25 (7.6) Mineral Oil <500 ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
103
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 79 Grouping: Pods separated by less than 4 feet (1.2 m) are considered a group. The size of the group will be determined by the area of the pods, plus the area between the pods. A group of pods having a total area less than 75 ft2 (7.0 m2) will follow the req...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
104
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 80 Relocatable facilities must have the same fire protection \2\and/2/ construction \2\/2/requirements as non- relocatable facilities. Provide a minimum separation of 50 f eet (15.3 m) between groups of high hazard occupanc ies, as d efined by NFPA 101 and 15...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
105
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 81 (i.e. electric d oor strikes, magnetic locks, etc.) that would restrict single- motion door operation. Fire Alarm and Mass Notification System (MNS). See UFC 4 -010-05 for requirements pertaining to the installation of fire alarm and MNS devices within a S...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
106
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 82 The separation area must be a clear zone adjacent to the tension fabric structure. The clear zone cannot be used for storage and must be clear of vegetation (maintained lawn is permitted). The clear zone may be used as a street or driveway, but not fo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
107
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 83 Provide automatic sprinklers in all trash /recycling chutes installed within a Facilit y 4-47 VEHICLE PARKING, STO RAGE, MAINTENANCE, A ND REPAIR FACILITIES . General. Facilities used for parking or storage of motor vehicles must comply with NFPA 88A. ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
108
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 84 Complete automatic sprinkler protection must be provided for warehouses and storage Facilities , rega rdless of floor area or construction type. Automatic sprinkler systems may be omitted for Facilities with an area less than 5,000 ft2 (465 m2) with app...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
109
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 85 Requirements. Protect in accordance with NFPA 13, except as noted below. The ceiling density must be increased by 10 percent or one additional level of in-rack sprinklers where c ombustible bins are stored in racks. Mini-storage and retrieval systems...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
110
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 86 4-49 WATERFRONT FACILITIE S. Waterfront and harbor facilities must comply with all of the following, as applicable: a. NFPA 303 . b. NFPA 307 . c. NFPA 312 . d. UFC 4 -152-01. e. UFC 4 -150-02. f. UFC 4 -151-10. g. UFC 4 -213-10. h. UFC 4 -213-12 i. ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
111
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 87 GENERAL BUILDING HEIG HTS AND AREAS 5-1 GENERAL . Allowances or exceptions that require the Facility to be protected throughout by an approved automatic sprinkler system may only be applied where the system is an approved, electrically supervised automati...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
112
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 88 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
113
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 89 TYPES OF CONSTRUCTIO N 6-1 GENERAL . Conform to the requir ements of IBC Chapter 6, except as modified by this UFC. 6-2 SEPARATION BETWEEN BUILDINGS. Conform to the requirements of the IBC, except as modified by this UFC.
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
114
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 90 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
115
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 91 FIRE AND SMOKE PROTE CTION FEATURES 7-1 GENERAL . Confo rm to the requirements of NFPA 101 except as noted below. Where IBC Chapter 5 or 6 specifically references IBC Chapter 7, utilize the specific IBC Chapter 7 reference. Note: For example, IBC Secti...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
116
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 92 Ceilings . Listed floor/ceiling or roof/ceiling assemblies that utilize suspended gypsum wallboard or acoustical tile ceilings must not be used to achieve required fire resistance rating of building structural elements. 7-5 SMOKE AND HEAT VENTS . General ....
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
117
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 93 INTERIOR FINISH ES 8-1 GENERAL . Conform to the requirements of NFPA 101 . 8-2 DROP -OUT PANELS . Drop -out panels , as defined in NFPA 13, must not be used. 8-3 INSULATION. Requirements. Use thermal and acoustical insulation with a flame spread (FS...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
118
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 94 Recognized Testing Laboratory (NRTL ), as noncombustible roof deck construction. b. Insulation installed above roof decks where the entire roof construction assembly, including the insulation, is UL- listed as Fire Classified, or FM - approved for Class I roo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
119
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 95 FIRE PROTECTION SYSTEMS 9-1 FIRE DEPARTMENT (EME RGENCY) VEHICLE ACCE SS. All-Weather Ground Access . All Facilities greater than 5,000 ft2 (465 m2), or more than two stories in height , must have at least one means of all -weather ground access to allo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
120
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 96 Fire Department Connection. Facilities with fire department connections for fire suppression systems must be provided with suitable all -weather ground access surface for any apparatus within 150 feet (45 m) of such fire d epartment connections. 9-2 FIRE F...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
121
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 97 c. Three -story and above - 1,000 gpm (3,785 L/min) for 90 minutes. /3/ 9-3 SERVICE MAINS AND LATERALS . General . Service Mains and Service Laterals must comply with AWWA M31, NFPA 24 and UFC 3 -230-01, except wher e specifically modified by this UFC. ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
122
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 98 For NFPA 13D systems, the minimum Service Lateral size must be based on hydraulic calculations. The minimum residual pressure in a Service Lateral must not be less than 20 psi at the greater of Fire Flow or Fire Water Demand. This residual pressure mus...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
123
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 99 Wet barrel or California- type hydrants are preferable in areas where there is no danger of freezing. Dry barrel or traffic -type hydrants must be used in areas where there is a danger of freezing. Hydrants must be aboveground type and match the type used o...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
124
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 100 airfield obstruction authority may approve individual hydrants up to 30 inches (760 mm) above the adjacent airfield pavement . /6/ [C] 9 -3.5.7.h For additional information see the Service specific airfield clearance criteria. The measurement i s taken from...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
125
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 101 f. \2\ Fire hydrants protecting aircraft parking and servicing aprons must be spaced at 300 feet (91 m) maximum intervals along one side ./2/ Protection. Hydrants located adjacent to parking areas , vehicle traffic areas or other areas subject to mechanica...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
126
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 102 In calculating the fire protection water storage requirement, a reduction in storage capacity is acceptable if an adequate replenishment source is available. Factors that m ust be evaluated include the reliability of the makeup supply , its sustained flow c...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
127
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 103 Provide white painted stenciled letters and arrows, a minimum of 2- in. (50 mm) in height and visible from at least three sides when v iewed from the floor. The maximum \2\fire suppression system demand must /2/ not exceed 140 percent of rated pump capacity....
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
128
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 104 Note: The lowest available static pressure should be utilized in determining churn pressure so that the stop pressure can be achieved with low pressure. The 5 psi differential is used to allow for gauge error. \2\ /2/Fire pump activation (run) must transm...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
129
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 105 Electric Circuits for Diesel Engine Driven Pumps. Provide separate hard- wired electric circuit s for the pump controller , engine starting system battery charger and hard- wired electric circuit for the engine block h eater. Test Connections . Provide...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
130
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 106 All working (shop) drawings, regardless of the type of fire suppression system, must meet the drawing requirements in NFPA 13 for Working Drawings, unless the system specific standard has requirements for wor king drawings. For new or modified systems, wor...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
131
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 107 Conduct waterflow tests, in accordance with the procedures contained in NFPA 291 to determine available water supply for the water -based fire extinguishing systems. The flow test must be performed under the direction of the QFPE . Note: Hydraulic calculat...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
132
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 108 When installed as part of a fire pump system, piping and fitt ings suitable for potable water must be used upstream of the backflow preventer in accordance with local environmental requirements. The backflow preventer must be located where required by NFP...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
133
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 109 Complete automatic sprinkler protec tion must be provided \5\ where required by other codes or standards and for the following /5/: Single -story, Type I or II construction Facilities greater than 15,000 ft2 (1,394 m2) gross floor area Multi -story ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
134
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 110 /2/Storage occupancies , in mixed use Facilities , must follow the misce llaneous storage and storage provisions of NFPA 13. Wet pipe , single -interlock preaction, and non-interlock preaction sprinkler systems must use the requirements for “wet” listed ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
135
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 111 Hose stream requirements must be in accordance with Table 9- 4 unless otherwise modified by this UFC . Table 9 -4 Hose Stream Demand and Duration Hazard Category Hose Demand, gpm (lpm) Duration, min Ceilings 60 ft (18.3 m) or less Ceilings greater tha...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
136
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 112 Sprinkler systems permitted by this UFC to be supplied from the domestic plumbing may be designed using the pipe schedule method in NFPA 13. The addition of no more than 20 sprinklers to an existing system is permitted to be designed using the pipe schedul...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
137
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 113 Nitrogen Generation Systems . Design the nitrogen generation system so all equipment is installed within the confines of the riser room with the exception of a connection for a manual gas analyzer . Provide a nitrogen generation system that is capable of...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
138
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 114 The QFPE must coordinate with the Structural Engineer to determine the proper seismic design category for the project, in accordance with the IBC or ASCE guidelines. Seismic restraint is not required for Seismic design category A or B , except as otherwi...