url
stringclasses
1 value
pdf_file
stringclasses
976 values
page_number
int64
0
1.08k
text
stringlengths
0
24.6k
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
139
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 115 Normally closed valves required by NFPA 13, NFPA 13R or NFPA 13D to be supervised must be locked or sealed, unless otherwise required by this UFC . Provide listed or approved sprinkler guards for sprinklers that are less than 7 feet (2.1 m) above finished f...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
140
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 116 Foam concentrate piping must be stainless steel pipe with roll grooved fittings, welded joints and fittings, or flanged joints and fittings. If using welded joints and fittings, consideration must be given to the maintenance of the system and provide flange...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
141
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 117 All foam system valves affecting foam delivery must be electrically supervised for correct position. Foam Concentrate Spill Control. Spill control must be provided around foam storage tank(s) to help prevent spilled/leaked foam concentrate from reachin...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
142
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 118 Standpipes and hose valves must not encroach into the means of egress especially on stair landings . Class II and III Standpipes . Class II and III standpipes , as defined in NFPA 14 are not permitted. 9-11 DRY CHEMICAL EXTI NGUISHING SYSTEMS. Note: F...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
143
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 119 Clean agent fire extinguishing systems must comply with NFPA 2001 and the "Fire Suppression System s" requirements of this UFC, except as modified below. Clean agent fire extingui shing systems are not permitted to s ubstitute for required automatic sprin...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
144
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 120 9-15 CARBON DIOXIDE SYS TEMS. Note: Carbon dioxide (CO 2) systems are normally effective against flammable liquid (Class B) and energized electrical (Class C) fires. General. Carbon dioxide system must comply with NFPA 1 2 and the "Fire Suppression S...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
145
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 121 If provided in Electronic Equipment Areas , clean agent type portable fire extinguishers must be used. Portable fire extinguishers utilizing c arbon dioxide (CO 2) are only permitted to be used in enclosed rooms if they exceed 1,000 ft2 (92.9 m2).\2\ 9-18...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
146
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 122 For Army, construction (shop) drawings and calculations must be prepared by, or prepared under the immediate supervision of , the QFPE . The QFPE must affix their professional engineering stamp with signature to the shop drawings , calculations and material ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
147
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 123 a. The ability to store at least 400 events in the history log. These events must be stored in a non- volatile memory and remain in the memory until the memory is downloaded or cleared manually. b. Resetting of the control panel must not clear the memory f...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
148
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 124 The area of protection for smoke detection devices permitted by NFPA 72 must be reduced by 50 percent where destratification (ceiling) fans are used (e. g., this may require additional smoke detectors for that area being protected). The above reduction is ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
149
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 125 h. Visible notification is required in any normall y unoccupied area where the ambient noise is loud enough to require hearing protection ( e.g., compressor room). i. Visible notification must be provided in all offices that are designed for, or may contai...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
150
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 126 \2\Note 2: See “Appendix E” for guidance on other messages. /2/ Initiating Devices. Sprinkler Waterflow . Provide a separate address for each sprinkler water flow switch. Sprinkler System Supervisory Air or Gas . Monitor high and low air or gas pres...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
151
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 127 Under -floor Smoke Detector Identification . When under -floor smoke detectors are provided, provide a framed CAD drawn floor plan showing the location of the devices in the room and their corresponding address . Locate a single framed drawing of the loca...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
152
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 128 Conductor Terminations. All terminations must be at a terminal strip or the device screw terminals. Terminal strips are only permitted where direct connection to a device is not possible. ( e.g., pigtails off a rate-compensating heat detector). Identi...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
153
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 129 Releasing Control Panels. In addition to the requirements specified above for fire alarm control panels , panels used for control or release of fire suppression systems must be listed by a NRTL for releasing service. Provide a separate releasing pane...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
154
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 130 Detectors must be located in each room/space where the fuel burning appliances(s) are located. \2\Where HVAC equipment utilizes fuel burning equipment, one detector must be located downstream of the fuel burning equipment ./2/ \3\For large open spaces wi...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
155
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 131 Fire alarm control unit must be ANSI/UL 864, category UUKL listed. HVAC controls must be ANSI/UL 864, category UUKL listed where required by NFPA 92. Fire alarm system sequence of operations matrix must include all automatic and firefighter's smoke c on...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
156
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 132 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
157
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 133 MEANS OF EGRESS 10-1 GENERAL . Requirements. Comply with NFPA 101 for all components and features related to means of egress. IBC must not be used for any means of egress features, except as specifically noted below. Accessible Means of Egress. Co...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
158
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 134 10-3 OCCUPANT LOAD. Occupant load factors. Occupant load must be calculated in accordance with NFPA 101, except as noted in Table 10 -1 below: Table 10 -1 Supplemental Occupant Load Factors Use Occupant Load Factor (sf/person) Waiting spaces other th...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
159
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 135 Maximum occupant load. The maximum occupant load for any space or Facility must not exceed one person per 7 ft2 (0.65 m²) of net floor space or the maximum capacity of the required egress components , whichever is les s. 10-4 STAIR TO ROOF ACCESS . Sta...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
160
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 136 • The clear width between an aisle stair handrail and seating where an aisle does not serve more than five rows on one side is at least 23 inches. Continuity and Components . Accessible means of egress are required to be continuous to a public way or area...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
161
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 137 An accessible route to a performing area and speakers’ platforms in assembly occupancies . An accessible route to spaces that are not open to the general public with an occupant load of five or less . An accessible route within a dwelling or sleeping unit...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
162
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 138 b. Persons able to use the exit stairway do so as soon as possible unless assisting others. c. Information on planned availability of assistance in the use of stairs or supervised operation of elevators and how to summon such assistance. d. Directions for u...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
163
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 139 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
164
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 140 ACCESSIBILITY 11-1 GENERAL . For fire protection requirements, n o changes to the IBC Chapter 11 provisions . INTERIOR ENVIRONMENT 12-1 GENERAL . For fire protection requirements, n o changes to the IBC Chapter 12 provisions . ENERGY EFFICIENCY ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
165
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 141 Where a non -combustible roof is installed over an existing combustible roof, the existing combustible roof materials must be removed or the space between the existing and new roof must be protected as a combustible concealed space per NF PA 13. Note: FM C...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
166
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 142 CONCRETE 19-1 GENERAL . For fire protection requirements, no changes to the IBC Chapter 19 provisions . ALUMINUM 20-1 GENERAL . For fire protection requirements, no changes to the IBC Chapter 20 provisions . MASONRY 21-1 GENERAL . For fire p...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
167
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 143 GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER 25-1 GENERAL . For fire protection requirements, no changes to the IBC Chapter 25 provisions . PLASTIC 26-1 GENERAL. For fire protection requirements, no changes to the IBC Chapter 26 provisions. ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
168
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 144 Rooms or areas that form a plenum space or that are used as a plenum must not be occupied for any purpose except during repairs or maintenance operations to the air handling equipment. Computer Room Air Conditioning (CRAC) . CRAC units must not automatical...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
169
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 145 EXISTING FACILITIES 34-1 GENERAL . Minimum Requirements. Facilities , as they exist, must meet the requirements of NFPA 101, for existing occupancies. Facilities that do not meet the requirements of NFPA 101 for existing occupancies must conform to o...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
170
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 146 If exits are obstructed during construction, provide alternate means of egress and exit routes during each phase of construction and identify the alternate routes on the construction drawings as part of the phasing plan(s) . Minimize, to the extent possible...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
171
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 147 If the project cost exceeds 50 percent of the building replacement value, then the entire building must be brought up to the requirements for new construction. Project costs to bring the building more into compliance with NFPA 101 must not count towards th...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
172
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 148 When any building , or portion thereof , is \5\changed /5/ from i ts current use to support a mission that will exist for one year or more, the building must meet the requirements for new construction. [C] 34- 1.3.1.2 An example would include a F ac...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
173
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 149 that exceeds 50 percent of the area , or project cost exceeds 50 percent of the building replacement value,/5/ is greater than five years. 34-3 COOKING AREAS. Cooking equipment in common areas in existing, non-sprinklered Facilities that are provided wi...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
174
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 150 Sprinkler protection must be considered for installation in the Facility . 34-7 FIRE PROTECTION SYST EMS. General . See the paragraphs entitled "Fire Suppression Systems " \2\and “Automatic Sprinkler Systems” /2/ in the " Fire Protection Systems " Chapter...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
175
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 151 Air Force . Existing Air Force non- sprinklered Facilities with the following features are considered acceptable until protection is compliant with the "Personnel Housing and Similar Lodging Facilities " section of this UFC is provided: Heat and smoke dete...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
176
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 152 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
177
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 153 APPENDIX A REFERENCES AMERICAN CORRECTIONA L ASSOCIATION (ACA) http://www.aca.org/ Planning and Design Guide for Secure Adult and Juvenile Facilities AMERICAN NATIONAL ST ANDARDS INSTITUTE (ANSI) http://www.ansi.org ANSI B1.20.1, Pipe Thread ANS...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
178
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 154 AMERICAN SOCIETY FOR TESTING AND MATERIA LS (ASTM) http://www.astm.org ASTM A351, Standard Specificati on for Casting, Austenitic for Pressure- Containing Parts ASTM E84, Standard Method of Test of Surface Burning Characteristics of Building Materials ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
179
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 155 EM-385-1-1, Safety and Health Requirements Manual U.S. Army National Guard NGR 385- 64, U.S. Army Ammunition and Explosives Safety Standards DEPARTMENT OF DEFENS E MIL-STD-101, Standard Practice, Color Code for Pipelines and for Compressed Gas Cylinders ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
180
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 156 Executive Order 13728, Wildland -Urban Interface Federal Risk Mitigation of 18 May 2016/3/ FACTORY MUTUAL GLOBA L (FM) http://www.fmglobal.com/ FM Global Data Sheet 1- 20, Protection Against Exterior Fire Exposure FM Global Data Sheet 1- 53, Anechoic C...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
181
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 157 NFPA 13, Standard for the Installation of Sprinkler Systems NFPA 13R , Standard for the Installation of Sprinkler Systems in Low -Rise Residential Occupancies NFPA 13D, Standard for the Installation of Sprinkler Systems in One - and Two- Family Dwellings an...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
182
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 158 ANSI/NFPA 75, Standard for the Fire Protection of Information Technology Equipment NFPA 76, Standard for the Fire Protection of Telecommunications Facilities NFPA 80A, Recommended Practice for Protection of Buildings From Exterior Fire Exposures NFPA 88A, ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
183
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 159 NFPA 312, Standard for Fire Protection of Vessels During Construction, Conversion, Repair, and Lay -Up NFPA 400, Hazardous Materials Code NFPA 409, Standard on Aircraft Hangars NFPA 704, Standard System for t he Identification of the Hazards of Materials fo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
184
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 160 SFPE Engineering Guide to Performance- Based Fire Protection Analysis and Design of Buildings UNDERWRITERS LABORAT ORY (UL) http://www.ul.com/ UL 864, Standard for Control Units and Accessories for Fire Alarm Systems UL 1283, Electromagnetic Interfere...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
185
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 161 UFC 4 -021-01, Design and O&M: Mass Notification Systems UFC 4 -150-02, Dockside Utilities for Ship Service UFC 4 -151-10, General Criteria for Waterfront Construction UFC 4 -152-01, Design: Piers and Wharves UFC 4 -159-01N, Design: Hyperbaric Facilities ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
186
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 162 UNITED STATES HOUSE OF REPRES ENTATIVES, OFFICE OF THE LAW REVISION COUNSEL http://uscode.house.gov/ USC Title 10, Chapter 8, Subchapter II, Military Child Care USC Title 15, Section 272, Utilization of Consensus Technical Standards by Federal Agencies...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
187
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 163 APPENDIX B OCCUPANCY HAZARD CLA SSIFICATION FOR DETE RMINING AUTOMATIC SPRINKLER DENSITIES AND HOSE STREAM DEMANDS B-1 CLASSIFICATION OF OC CUPANCIES. The principal occupancy classifications are light hazard, ordinary hazard, and extra hazard. Listed bel...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
188
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 164 n. Fitness Centers o. Gymnasiums p. Theaters and auditoriums q. Welding shops r. Forge shops s. Laundries t. Mechanical rooms, with or with out boilers or fuel -fired equipment u. Electrical rooms, other than transformer vaults v. Small storage ro...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
189
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 165 B-1.4 Special Occupancies . Special occupancies are Facilities or areas that DoD does not assigned a specific occupancy hazar d classification because of special protection requirements. Refer to Chapter 4 for fire protection requirements for the followi...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
190
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 166 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
191
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 167 APPENDIX C PROCEDURE FOR PERFORMANCE -BASED FIRE SAFETY DE SIGN C-1 EQUIVALENT LEVEL OF SAFETY AND PROTECTIO N. Any proposed performance- based fire safety design must demonstrate, to the satisfaction of the \ 6\ CFPE /6/, a level of safety equivalent ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
192
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 168 Detai l and document the goals of life safety, property protection, continuity of operations, and the limitation of the environmental impact of the fire, as defined by NFPA 101, and as additionally defined by the Stakeholders . Adequately address the allied f...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
193
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 169 severity, and smoke generation. Indicate in the description of t he fire scenarios all applicable data, characteristics and assumptions, which must remain consistent between all fire scenarios. Ensure the omission of certain details will not reduce the reali...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
194
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 170 Provide the qualifications and contact information for the entire design team, including the QFPE as part of the required documentation. A performance- based, fire safety design must be prepared by a QFPE with experience in performance -based fire safety d...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
195
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 171 Provide every performance- based fire safety design with a technical review, and develop a Review Brief. Analyze each trial design to determine the compliance with the required performance criteria. The reviewer must be an indiv idual capable of providing a ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
196
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 172 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
197
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 173 APPENDIX D INTERNATIONAL BUILDI NG CODE AND NFPA 220 EQUIVALENTS This table provides the corresponding types of construction from the various codes. This table is for information only. IBC NFPA 220 Type I (442) Type I -A Type I (332) Type I -B Type...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
198
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 174 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
199
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 175 APPENDIX E RECOMMENDED FIRE ALA RM AND EMERGENCY NOT IFICATION MESSAGES GENERAL ANNOUNCEMENTS AND PAGING AUDIBLE in the following sequence: Pre-announcement Sound – Ding-Dong – Percussive pairs of 700 and 570 Hz tones each d amped to zero (one cycle) ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
200
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 176 Textual message signs (if provided). CARBON MONOXIDE DETECTION {GENERIC} MESSAGES: AUDIBLE [Audible must sound for not less than 180 seconds (NFPA 72)] in the following sequence: Alert Sound – Temporal 4 (T -4) pattern tone - 520Hz over 850 m s for fo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
201
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 177 Option 1: A [force protection emergency] [ ] HAS BEEN DECLARED; PLEASE TAKE SHELTER IN A DESIGNATED SAFE AREA IMMEDIATELY. Option 2: A [force protection emergency] [ ] HAS BEEN DECLARED; PLEASE SEEK A DESIGNATED SAFE LOCATION IMMEDIATELY. Op...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
202
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 178 \5\Clear /5/ Strobe or other listed \ 5\clear /5/ appliance. Textual message signs (if provided). Note: The Weather / Natural Disaster Warnings ( Tornado, Tsunami, Hurricane, Earthquake, Volcano, Etc. ) messages are only shown as examples if prerecor...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
203
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 179 Option 1: A [earthquake] [ ] EMERGENCY HAS OCCURRED; PLEASE LEAVE THE BUILDING BY THE NEAREST EXIT. Option 2: A [earthquake] [ ] EMERGENCY HAS OCCURRED; PLEASE LEAVE THE BUILDING BY THE NEAREST EXIT AND REPORT TO YOUR ASSEMBLY LOCATION. Op...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
204
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 180 Announcement: Voice – Tom – TEST, TEST, TEST, THIS IS AN EMERGENCY NOTIFICATION AUDIO SYSTEM TEST; YOU MAY CONTINUE NORMAL OPERATIONS, TEST, TEST, TEST. VISIBLE [Visible must flash/operate during the pre- test sound and the announcement and then stop]...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
205
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 181 Alert Sound – Four Pulse Chime - 575Hz, four -0.5 second pulses separated by 0.5 seconds followed by a 1.5 second delay (repeat cycles) Announcement: Voice – Donna (repeat 2 cycles): For outside assembly : CARBON MONOXIDE HAS BEEN DETECTED IN THE BU...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
206
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 182 \5\Clear /5/ Strobe or other listed \ 5\clear /5/ appliance. Textual message signs (if provided). EVACUATE: AUDIBLE [Audible m ust sound for not less than 180 seconds] in the following sequence: Alert Sound – Chime – Percussive 700 Hz chime tone ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
207
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 183 Alert Sound – NFPA Temporal Whoop - 422-775Hz upward sweep over 850 ms for three -pulses separated by 1 second followed by a 1.5 second delay (repeat 2 cycles) Announcement: Voi ce – Tom (repeat 2 cycles): ACTIVATION FROM SUPPRESSION SYSTEM, MANUAL FIRE...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
208
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 184 Option 1E: A FIRE EMERGENCY HAS OCCURRED; PLEASE LEAVE THE BUILDING BY THE NEAREST EXIT DO NOT USE THE ELEVATORS. Option 2E: A FIRE EMERGENCY HAS OCCURRED; PLEASE LEAVE THE BUILDING BY THE NEAREST EXIT; DO NOT USE THE ELEVATORS AND REPORT TO YO UR ASSEMBLY ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
209
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 185 APPENDIX F ABBREVIATIONS AND ACRONYMS °F degrees Fahrenheit °C degrees Celsius A&E Archi tectural and Engineering Services ABA Architectural Barriers Act ABAAG Architectural Barriers Act Accessibility Guidelines ACA American Correctional Ass...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
210
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 186 \6\ CFPE Component Fire Protection Engi neer /6/ cm2 square centimeter(s) CO Carbon Monoxide CO 2 Carbon Dioxide CRAC Computer Room Air Conditioning CSS Central Security Service \6\ DA Department of the Army DESR Defense Explosives Safety Reg...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
211
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 187 ft feet; foot ft2 square feet; square foot gal gallon(s) GH 2 Gaseous hydrogen GOX Gaseous Oxygen gpm gallons per minute HQUSACE Headquarters, U.S. Army Corps of Engineers HNFA Host Nation Funded Construction Agreements HP Horsepower HV...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
212
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 188 LOX Liquid Oxygen m meter(s) m2 square meter(s) MAF Missile Alert Facilities MIL-HDBK Military Handbook min minute mm millimeter(s) ms milliseconds NARA National Archives and Records Administration NATOPS Naval Air Training & Operating Pr...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
213
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 189 PIV Post Indicator Valve POL Petroleum Oil Lubricant PRVs Pressure -Regulating Valves psi pounds per square inch PV Photovoltaic QFPE Qualified Fire Protection Engineer RPA Remotely Piloted Aircraft s second(s) SAE Society of Automotive E...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
214
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 190 This Page Intentionally Left Blank
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
215
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 191 APPENDIX G \3\ CRITERIA FOR PROJECT S IN JAPAN Purpose: The intent of this Appendix is to provide clarification on the use of Japanese products and standards. Japanese products and standards should be used to the maximum extent possible providing it does...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
216
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 192 G-1.3 Criteria Evaluations. G-1.3.1 DFPE will coordinate with the Host Nation to evaluate and determine acceptable fire protection engineering policy, criteria, codes, manufactured equipment and materials to meet the intent o f this UFC. If the DFPE is unab...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
217
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 193 G-1.6.3 The code compliance certification is not required to address compliance with host -Nation Codes and standards. The QFPE will review the criteria and concept package drawings and document in writing that the package is in compliance with the this UFC ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
218
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 194 G-2.3 Floor Grate Nozzles and Flow Control Valves. Comply with paragraph “ \6\ /6/ Trench Nozzle System” in Chapter “General Hangar Requirements” in UFC 4- 211- 01. G-2.4 Other Components. Japanese materials and installation practices are acceptable. G-3 ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
219
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 195 G-4.3.2 All available Japanese optional features for supervision of speakers and circuits are required when used on DoD installation in Japan. G-4.3.3 Provide audible notification devices in all areas and rooms when the audible requirements of NFPA 72 cann...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
220
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 196 G-6 FIRE PUMPS. G-6.1 Vertical Lift Fire Pumps. Fire pumps for vertical lift such as taking suction from a cistern as is fo und in many Japanese sprinkler and other fire protection systems will be Japanese vertical turbine type. G-6.2 Supervision of Power ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000719.pdf
221
UFC 3 -600-01 8 August 2016 Change 6, 6 May 2021 197 G-10 REFERENCES G-10.1 Japanese Laws and Related Government Standards. The following Japanese documents are available in English translations: G-10.1.1 The Building Standard Law of Japan, The Building Center of Japan, http://www.bcj.or.jp/en/ G-10.1.2 ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000803.pdf
0
Active Directory Integrating Repertoire Server with Active Directory The Active Directory_Secondary_Authentication.pdf highlights how the Repertoire Server is integrated with Active Directory using sAMAccountName as the log in attribute. In addition, for environments where the Repertoire Server and Active Directo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000804.pdf
0
Electrical test of an active detection loop Page 1 of 2 Date: 26 -5-2010 Version: 1 www.mylaps.com Electrical test of an active detection loop Procedure to check an active detection loop and the coax connection. Required measure instrument: multi meter 1. Power adapter measure: Befo...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000804.pdf
1
Electrical test of an active detection loop Page 2 of 2 Date: 26 -5-2010 Version: 1 www.mylaps.com 2. Coax cable Before measuring:  Disconnect the coax cable from the decoder  Set the multi meter to measure Ω (Ohm) If another value is measured, the connection box with activator is faulty. Repla...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000796.pdf
0
WiFIsViz: Effective Visualization of Frequent Itemsets Carson Kai-Sang Leung∗Pourang P. Irani Christopher L. Carmichael The University of Manitoba, Winnipeg, MB, Canada {kleung, irani, umcarmi1 }@cs.umanitoba.ca Abstract Frequent itemset mining plays an essential role in the mining of many different patterns. Most exis...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000796.pdf
1
2. Our proposed frequent itemset visualizer In this section, we show how wi ring-type diagrams (or orthogonal graphs) are used to represent frequent itemsets in our proposed f requent i tems etvi sualiz er called WiFIsViz . By using wiring-type diagrams, WiFIsViz minimizes bends and avoids the crossings of the polyline...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000796.pdf
2
- 6 abcd20%e u u u40%e u60%e e 80% 100% - ?abcd u u u u u u u u u (a) Overview (b) Detailed view Figure 2. The two views in WiFIsViz. squares) for item bin Figure 2(a), we know that any itemsets containing bhave one of the three frequen- cies: 80%, 40% or 20%. P2. For user convenience (e.g., ease of item recognition)...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000796.pdf
3
P12. By counting the number of nodes on the horizontal line (from the leftmost node to a filled node) in the detailed view, we can obtain the cardinality kof the k-itemset represented by that line (e.g., cardinality of {a,b,c}is 3 because there are 3 nodes from the left- most square to the second filled circle). While us...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000796.pdf
4
Figure 3. A snapshot of our proposed WiFIsViz. if there does not exist any proper superset of Xthat have the same frequency as X. By using this option (clicking the “Closed Itemsets” button), WiFIsViz reduces the number of displayed itemsets without losing any information. Similarly, an itemset Yismaximal if there does...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000796.pdf
5
To test the expressivity of our visualization, we for- mulated two sets of questions. The first set of questions was aimed at assessing whether participants could simply pick out useful information from viewing the data. This would inform us whether the itemsets were easily visible, whether the frequencies of items were...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
0
UNFCU FOUNDATION INC. Financial Statements December 31, 2020 (With Comparative totals for 2019 )
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
1
UNFCU Foundation Inc. Table of Contents December 31, 2020 and 2019 Independent Auditors' Report 1 Statement of Financial Position 3 Statement of Activities 4 Statements of Functional Expenses 5 Statement of Cash Flows 6 Notes to Financial Statements 7
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
2
1 Independent Auditors' Report To the Board of Directors UNFCU Foundation Inc. Long Island City, NY Report on the Financial Statements We have audited the a ccompanying financial statements of UNFCU Foundation Inc. (a nonprofit organization) (“UNFCU Foundation ”), which comprise the...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
3
To the Board of Directors UNFCU Foundation Inc. 2 Accordingly, we express no such op inion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
4
UNFCU Foundation Inc. Statement of Financial Position December 31, 2020 and 2019 See Notes to Financial Statements 3 2020 2019 Assets Current Assets Cash and cash equivalents 516,868 $ 278,442 $ Pledges receivable 10,000 4,000 Prepaid expenses 7,152 1,152 Total Current Assets 53...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
5
UNFCU Foundation Inc. Statement of Activities For the Years Ended December 31, 2020 and 2019 See Notes to Financial Statements 4 2020 2019 Revenue and other support: Contributions 649,275 $ 713,387 $ Fundraising and special events 42,006 159,343 In-kind revenue 138,151 90,423 Othe...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
6
UNFCU Foundation Inc. Statement of Functional Expenses Year Ended December 31, 2020 (With Summarized Comparative Totals for the Year Ended December 31, 2019) See Notes to Financial Statements 5 2020 2019 General and administrative Fundraising Total Total Grants and assistance to other organizations 336,785 ...
s3://digitalcorpora/corpora/files/CC-MAIN-2021-31-PDF-UNTRUNCATED/zipfiles/0000-0999/0000.zip
0000800.pdf
7
UNFCU Foundation Inc. Statement of Cash Flows December 31, 2020 and 2019 See Notes to Financial Statements 6 2020 2019 Cash flows from operating activities: Change in net assets 190,911 $ 103,764 $ Adjustments to reconcile change in net assets to net cash provided by operating activities:...