doc_id stringlengths 16 27 | page int64 0 3.45k | chunk int64 0 38 | mention_name stringlengths 2 86 | start int64 0 2.75k | end int64 4 2.78k | extractor_specificity stringclasses 3
values | extractor_typology stringclasses 1
value | specificity stringclasses 3
values | typology stringclasses 11
values | usage stringlengths 0 1.45k ⌀ | valid_data_mention bool 2
classes | judge_error stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
fcv_pads_east_asia:000418 | 27 | 0 | accounting records | 1,935 | 1,953 | descriptive | descriptive | administrative | confirm the completeness of the ⟦accounting records⟧[30] maintained for the Project | true | null | |
fcv_pads_east_asia:000419 | 18 | 1 | performance surveys | 1,282 | 1,301 | descriptive | descriptive | survey | Feedback on EEU's procurement performance based on ⟦performance surveys⟧ questionaries is shown in ANNEX 5. | true | null | |
fcv_pads_east_asia:000419 | 26 | 0 | ESH assessment outputs | 499 | 521 | descriptive | descriptive | other | EEP apply government and WB social and environmental standards as per the contract ⟦ESH assessment outputs⟧. | true | null | |
fcv_pads_east_asia:000419 | 35 | 1 | least cost transmission expansion study | 611 | 650 | descriptive | descriptive | other | Investments selected under this component form a part of the ⟦least cost transmission expansion study⟧ conducted by EEP. | false | null | |
fcv_pads_east_asia:000419 | 52 | 0 | contract ESH assessment outputs | 840 | 871 | descriptive | descriptive | other | EEP apply GoE and WB social and environmental standards as per the ⟦contract ESH assessment outputs⟧. | true | null | |
fcv_pads_east_asia:000419 | 65 | 6 | ESIA Study | 815 | 825 | named | named | other | Project E&S Support Consultancy: Consultancy for all exploration sites ⟦ESIA Study⟧ | false | null | |
fcv_pads_east_asia:000422 | 4 | 2 | e National Databases | 315 | 335 | descriptive | descriptive | database | The Supply & Installation of IT Equipment for Integrating th ⟦e National Databases⟧ | true | null | |
fcv_pads_east_asia:000427 | 1 | 0 | Procurement Plan tables | 146 | 169 | descriptive | descriptive | other | Leasing may be used for those contracts identified in the ⟦Procurement Plan tables⟧. | true | null | |
fcv_pads_east_asia:000430 | 1 | 0 | Procurement Plan tables | 232 | 255 | descriptive | descriptive | other | allowed for those contracts identified in the ⟦Procurement Plan tables⟧ | true | null | |
fcv_pads_east_asia:000431 | 30 | 0 | internal air quality monitoring results | 161 | 200 | descriptive | descriptive | other | Sample of ⟦internal air quality monitoring results⟧ are tabulated as follow | true | null | |
fcv_pads_east_asia:000431 | 31 | 0 | Air quality monitoring analysis graphs | 161 | 199 | descriptive | descriptive | other | Figure 1.⟦Air quality monitoring analysis graphs⟧ (the one hundred-sixth time) | true | null | |
fcv_pads_east_asia:000431 | 34 | 0 | PPV Records | 658 | 669 | named | descriptive | other | The following graphs illustrate the results of the monitoring and reporting of the noise vibration within the project area:- ⟦PPV Records⟧ | true | null | |
fcv_pads_east_asia:000431 | 39 | 0 | tax returns | 1,455 | 1,466 | descriptive | descriptive | administrative | This can include the provision of full access to ⟦tax returns⟧, ⟦bank records⟧, and/or other relevant financial and personal data. | true | null | |
fcv_pads_east_asia:000431 | 39 | 0 | bank records | 1,468 | 1,480 | descriptive | descriptive | administrative | This can include the provision of full access to ⟦tax returns⟧, ⟦bank records⟧, and/or other relevant financial and personal data. | true | null | |
fcv_pads_east_asia:000431 | 47 | 0 | adjustment data | 1,250 | 1,265 | vague | vague | other | schedule of ⟦adjustment data⟧ for the expenditure items. | true | null | |
fcv_pads_east_asia:000431 | 53 | 1 | Land acquisition maps | 795 | 816 | descriptive | descriptive | geospatial | ⟦Land acquisition maps⟧ and land parcels lists provided by the project surveyor (Geomatics) indicated that | true | null | |
fcv_pads_east_asia:000432 | 23 | 1 | bank reconciliation statements | 240 | 270 | descriptive | descriptive | administrative | Review of ⟦bank reconciliation statements⟧ revealed that | true | null | |
fcv_pads_east_asia:000433 | 63 | 0 | C.B.K. Ledger Account | 365 | 387 | named | named | administrative | as per ⟦C.B.K. Ledger Account⟧ 0.00 | true | null | |
fcv_pads_east_asia:000433 | 63 | 0 | Central Bank of Kenya Ledger | 996 | 1,024 | named | named | administrative | The ending balance as per ⟦Central Bank of Kenya Ledger⟧ as at 30th June,2026 is attached. | true | null | |
fcv_pads_east_asia:000434 | 129 | 0 | vehicle Log-bodk of OK | 293 | 315 | descriptive | descriptive | administrative | entered in the ⟦vehicle Log-bodk of OK⟧ | true | null | |
fcv_pads_east_asia:000434 | 129 | 1 | Bu)k Petrol Register | 170 | 190 | named | descriptive | administrative | And/ ýn the ⟦Bu)k Petrol Register⟧, Folio No. | true | null | |
fcv_pads_east_asia:000434 | 15 | 0 | data repository | 841 | 856 | descriptive | descriptive | system | The system design will also include development of a ⟦data repository⟧ with forward and backward linkages for MSMEs. | true | null | |
fcv_pads_east_asia:000434 | 32 | 0 | accounting records | 406 | 424 | descriptive | descriptive | administrative | Adequate ⟦accounting records⟧ have been kept by the Project | true | null | |
fcv_pads_east_asia:000434 | 59 | 1 | NetBookValues | 7 | 20 | named | descriptive | other | ⟦NetBookValues⟧ | false | null | |
fcv_pads_east_asia:000434 | 93 | 2 | Bul-Piol Register | 151 | 168 | named | descriptive | administrative | in the ⟦Bul-Piol Register⟧, Folio No | true | null | |
fcv_pads_east_asia:000434 | 99 | 0 | velhile Log-book of 0K | 339 | 361 | descriptive | descriptive | administrative | entered ithe ⟦velhile Log-book of 0K⟧ | true | null | |
fcv_pads_east_asia:000434 | 99 | 2 | ele Log-Book | 222 | 234 | descriptive | descriptive | administrative | enteredinthe **⟦ele Log-Book⟧** ofO | true | null | |
fcv_pads_east_asia:000435 | 2 | 1 | records of the Procurement Process | 1 | 35 | descriptive | descriptive | administrative | ⟦records of the Procurement Process⟧. | true | null | |
fcv_pads_east_asia:000436 | 2 | 1 | records of the Procurement Process | 1 | 35 | descriptive | descriptive | administrative | ⟦records of the Procurement Process⟧. | true | null | |
fcv_pads_east_asia:000437 | 2 | 1 | records of the Procurement Process | 1 | 35 | descriptive | descriptive | administrative | ⟦records of the Procurement Process⟧. | true | null | |
fcv_pads_east_asia:000438 | 14 | 1 | records of the information systems | 434 | 468 | descriptive | descriptive | system | through direct access of the ⟦records of the information systems⟧ used by KPLC. | true | null | |
fcv_pads_east_asia:000438 | 20 | 0 | accounting records | 1,975 | 1,993 | descriptive | descriptive | administrative | completeness of the ⟦accounting records⟧[1] maintained for the Project | true | null | |
fcv_pads_east_asia:000438 | 35 | 0 | fixed asset register | 1,347 | 1,367 | descriptive | descriptive | administrative | A ⟦fixed asset register⟧[2] is maintained by each public entity | true | null | |
fcv_pads_east_asia:000438 | 51 | 0 | Special Deposit Accounts Movement Schedule | 763 | 805 | named | named | other | ### ⟦Special Deposit Accounts Movement Schedule⟧[3] | false | null | |
fcv_pads_east_asia:000439 | 106 | 0 | MASTER INVENTORY REGISTER | 224 | 249 | named | named | administrative | ###### ⟦MASTER INVENTORY REGISTER⟧[4]/ REGISTER OF ASSETS | true | null | |
fcv_pads_east_asia:000439 | 16 | 1 | Informal Sector Skills and Occupations Survey | 304 | 349 | named | named | survey | ###### **a) ⟦Informal Sector Skills and Occupations Survey⟧[5]** | true | null | |
fcv_pads_east_asia:000439 | 18 | 0 | ISOS data | 514 | 523 | named | named | survey | Development of indicators from STEP Survey and ⟦ISOS data⟧[6] | true | null | |
fcv_pads_east_asia:000439 | 22 | 0 | HouseholdSurvey | 656 | 671 | descriptive | named | survey | AnalysisofContinuous ⟦HouseholdSurvey⟧[7] Programme | true | null | |
fcv_pads_east_asia:000439 | 26 | 1 | accounting records | 393 | 411 | descriptive | descriptive | administrative | completeness of the ⟦accounting records⟧[8] maintained for the Project | true | null | |
fcv_pads_east_asia:000439 | 46 | 0 | fixed asset register | 1,648 | 1,668 | descriptive | descriptive | administrative | A ⟦fixed asset register⟧[9] is maintained by each public entity | true | null | |
fcv_pads_east_asia:000439 | 46 | 1 | fixed asset register | 161 | 181 | descriptive | descriptive | administrative | A ⟦fixed asset register⟧[10] is maintained by each public entity | true | null | |
fcv_pads_east_asia:000439 | 62 | 0 | Fixed Assets Register | 299 | 320 | named | descriptive | administrative | Summary of ⟦Fixed Assets Register⟧[11] | true | null | |
fcv_pads_east_asia:000439 | 62 | 0 | Fixed Assets Register | 335 | 356 | named | descriptive | administrative | see attached ⟦Fixed Assets Register⟧[12] | true | null | |
fcv_pads_east_asia:000439 | 86 | 0 | REGISTER OF ASSETS | 279 | 299 | descriptive | descriptive | administrative | ⟦REGISTER OF ASSETS⟧[13] (LAiND / BUlDINmG / VEHICLES & OTHER EQUIPMIENT) | true | null | |
fcv_pads_east_asia:000439 | 94 | 0 | MASTER NVENTORY REGISTER | 209 | 233 | named | named | administrative | ⟦MASTER NVENTORY REGISTER⟧[14] /5/NO. | true | null | |
fcv_pads_east_asia:000440 | 2 | 1 | records of the Procurement Process | 1 | 35 | descriptive | descriptive | administrative | ⟦records of the Procurement Process⟧[15] | true | null | |
fcv_pads_east_asia:000442 | 1 | 1 | household data | 731 | 745 | descriptive | descriptive | microdata | third-party validation of the ⟦household data⟧[16] collected | true | null | |
fcv_pads_east_asia:000442 | 2 | 1 | HSNP MIS | 1,079 | 1,087 | named | named | system | households entered in the ⟦HSNP MIS⟧[17] | true | null | |
fcv_pads_east_asia:000442 | 3 | 0 | ESR data | 997 | 1,005 | named | named | administrative | using the ⟦ESR data⟧[18] for retargeting and or replacement | true | null | |
fcv_pads_east_asia:000442 | 5 | 1 | HSNP MIS | 1,001 | 1,009 | named | named | system | households registered and entered in the ⟦HSNP MIS⟧[19] | true | null | |
fcv_pads_east_asia:000442 | 5 | 2 | dated list of households | 907 | 931 | descriptive | descriptive | administrative | the changes are ⟦dated list of households⟧[20] registered in the existing | true | null | |
fcv_pads_east_asia:000442 | 6 | 0 | IPRS | 546 | 550 | named | named | system | with links to the ⟦IPRS⟧[21] | true | null | |
fcv_pads_east_asia:000442 | 7 | 0 | Data on Financial Performance | 1,032 | 1,061 | descriptive | vague | other | # **⟦Data on Financial Performance⟧[22]** | false | null | |
fcv_pads_east_asia:000442 | 7 | 1 | Data on Financial Performance | 45 | 74 | descriptive | vague | other | # **⟦Data on Financial Performance⟧[23]** | false | null | |
fcv_pads_east_asia:000443 | 1 | 0 | Procurement Plan tables | 146 | 169 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[24] | false | null | |
fcv_pads_east_asia:000444 | 13 | 0 | census | 1,249 | 1,255 | vague | descriptive | census | Unavailable PAPs during the ⟦census⟧[25] | true | null | |
fcv_pads_east_asia:000444 | 15 | 0 | grievance log | 957 | 970 | descriptive | descriptive | administrative | A ⟦grievance log⟧[26] will be established by SCRCC and copies of the records kept | true | null | |
fcv_pads_east_asia:000444 | 20 | 0 | project database | 487 | 503 | descriptive | descriptive | database | the grievance log was uploaded onto the ⟦project database⟧[27] | true | null | |
fcv_pads_east_asia:000444 | 23 | 0 | PAPs register | 146 | 159 | named | descriptive | administrative | all PAPs has been verified and documented in the ⟦PAPs register⟧[28] | true | null | |
fcv_pads_east_asia:000444 | 23 | 0 | PAP Audit list | 997 | 1,011 | named | descriptive | administrative | On completion of the ⟦PAP Audit list⟧[29], recommend payment | true | null | |
fcv_pads_east_asia:000444 | 25 | 0 | Site Confirmation Survey | 706 | 730 | named | named | survey | Monitoring of the resettlement activities ⟦Site Confirmation Survey⟧[30] | true | null | |
fcv_pads_east_asia:000444 | 29 | 0 | Assets Register | 244 | 259 | descriptive | named | administrative | as recorded in the ⟦Assets Register⟧[1] | true | null | |
fcv_pads_east_asia:000444 | 30 | 0 | data for these indicators | 1,692 | 1,717 | vague | vague | other | The ⟦data for these indicators⟧[2] will be collected every six months | true | null | |
fcv_pads_east_asia:000444 | 30 | 1 | monitoring data | 271 | 286 | vague | vague | other | collection of ⟦monitoring data⟧[3] of the RAPs implementation | true | null | |
fcv_pads_east_asia:000444 | 39 | 0 | questionnaire surveys | 1,227 | 1,248 | descriptive | descriptive | survey | following the site visits and ⟦questionnaire surveys⟧[4] | true | null | |
fcv_pads_east_asia:000444 | 42 | 0 | survey to identify the affected persons in the market | 1,425 | 1,478 | descriptive | descriptive | survey | The ⟦survey to identify the affected persons in the market⟧[5] would be performed | true | null | |
fcv_pads_east_asia:000444 | 45 | 0 | Attendance Lists | 92 | 108 | descriptive | descriptive | other | Appendix 4 : ⟦Attendance Lists⟧[6] | true | null | |
fcv_pads_east_asia:000444 | 7 | 0 | site - specific surveys | 969 | 992 | descriptive | descriptive | survey | execution of ⟦site - specific surveys⟧[7] among others | true | null | |
fcv_pads_east_asia:000444 | 8 | 0 | census | 483 | 489 | descriptive | descriptive | census | the date of the commencement of ⟦census⟧[8] or the ⟦socioeconomic survey⟧[9] | true | null | |
fcv_pads_east_asia:000444 | 8 | 0 | socioeconomic survey | 497 | 517 | descriptive | descriptive | survey | the date of the commencement of ⟦census⟧[8] or the ⟦socioeconomic survey⟧[9] | true | null | |
fcv_pads_east_asia:000446 | 2 | 1 | records of the Procurement Process | 1 | 35 | descriptive | descriptive | administrative | ⟦records of the Procurement Process⟧[10] | true | null | |
fcv_pads_east_asia:000447 | 0 | 1 | Procurement Plan tables | 747 | 770 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[11] | false | null | |
fcv_pads_east_asia:000447 | 1 | 0 | Procurement Plan tables | 180 | 203 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[12] | false | null | |
fcv_pads_east_asia:000447 | 1 | 0 | Procurement Plan tables | 266 | 289 | descriptive | descriptive | other | those contracts identified in the ⟦Procurement Plan tables⟧[13] | false | null | |
fcv_pads_east_asia:000449 | 1 | 0 | Procurement Plan tables | 258 | 281 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[14] | false | null | |
fcv_pads_east_asia:000449 | 1 | 0 | Procurement Plan tables | 480 | 503 | descriptive | descriptive | other | those contracts identified in the ⟦Procurement Plan tables⟧[15] | false | null | |
fcv_pads_east_asia:000451 | 7 | 0 | NLIS | 990 | 994 | named | named | system | enhancement and auto|mation of the ⟦NLIS⟧[16] | true | null | |
fcv_pads_east_asia:000451 | 7 | 2 | NLIS | 143 | 147 | named | named | system | are integrated into the ⟦NLIS⟧[17] | true | null | |
fcv_pads_east_asia:000451 | 9 | 0 | Data on Financial Performance | 670 | 699 | named | descriptive | report | # **⟦Data on Financial Performance⟧[18]** | true | null | |
fcv_pads_east_asia:000452 | 5 | 0 | anc syphilis profile | 794 | 814 | descriptive | descriptive | other | procure 600 ⟦anc syphilis profile⟧[19] | false | null | |
fcv_pads_east_asia:000453 | 15 | 0 | Customer Satisfaction Survey | 1,374 | 1,402 | named | named | other | ⟦Customer Satisfaction Survey⟧[20]- The final inception report | false | null | |
fcv_pads_east_asia:000453 | 15 | 1 | Customer Satisfaction Survey | 89 | 117 | named | named | other | **k)** ⟦Customer Satisfaction Survey⟧[21]- The final inception report | false | null | |
fcv_pads_east_asia:000453 | 15 | 1 | data fromKenya Power | 251 | 271 | descriptive | named | administrative | delay in acquisition of ⟦data fromKenya Power⟧[22] | true | null | |
fcv_pads_east_asia:000453 | 16 | 0 | records of the information | 1,958 | 1,984 | descriptive | descriptive | administrative | direct access of the ⟦records of the information⟧[23] | true | null | |
fcv_pads_east_asia:000453 | 16 | 1 | records of the information systems | 239 | 273 | descriptive | descriptive | administrative | direct access of the ⟦records of the information systems⟧[24] used by KPLC | true | null | |
fcv_pads_east_asia:000453 | 23 | 1 | accounting records | 449 | 467 | descriptive | descriptive | administrative | completeness of the ⟦accounting records⟧[25] maintained for the Project | true | null | |
fcv_pads_east_asia:000453 | 38 | 0 | fixed asset register | 1,405 | 1,425 | descriptive | descriptive | administrative | A ⟦fixed asset register⟧[26] is maintained by each public entity | true | null | |
fcv_pads_east_asia:000453 | 38 | 1 | fixed asset register | 53 | 73 | descriptive | descriptive | administrative | A ⟦fixed asset register⟧[27] is maintained by each public entity | true | null | |
fcv_pads_east_asia:000454 | 12 | 1 | accounting records | 809 | 827 | descriptive | descriptive | administrative | completeness of the ⟦accounting records⟧[28] maintained for the Program | true | null | |
fcv_pads_east_asia:000454 | 15 | 1 | statement of receipts and payments | 1,142 | 1,176 | descriptive | descriptive | report | The ⟦statement of receipts and payments⟧[29] for the year ended 30 June, 2021 reflects | true | null | |
fcv_pads_east_asia:000454 | 48 | 0 | C.B K. Ledger Account | 543 | 566 | named | named | administrative | as per ⟦C.B K. Ledger Account⟧[1] | true | null | |
fcv_pads_east_asia:000454 | 48 | 0 | Ceptral Bank of Kenya Ledger | 1,204 | 1,232 | named | named | administrative | ending balance **as** per ⟦Ceptral Bank of Kenya Ledger⟧[2] | true | null | |
fcv_pads_east_asia:000454 | 48 | 1 | Ceptral Bank of Kenya Ledger | 78 | 106 | named | named | administrative | ending balance **as** per ⟦Ceptral Bank of Kenya Ledger⟧[3] | true | null | |
fcv_pads_east_asia:000455 | 2 | 1 | records of the Procurement Process | 1 | 35 | descriptive | descriptive | administrative | ⟦records of the Procurement Process⟧[4] | true | null | |
fcv_pads_east_asia:000456 | 11 | 0 | census | 1,228 | 1,234 | vague | descriptive | census | during the ⟦census⟧[5] | true | null | |
fcv_pads_east_asia:000456 | 13 | 0 | grievance log | 784 | 797 | descriptive | descriptive | other | A ⟦grievance log⟧[6] will be established by SCRCC and copies of the records kept by both LRCC and SCRCC to be used for monitoring of complaints | true | null | |
fcv_pads_east_asia:000456 | 17 | 0 | project database | 475 | 491 | descriptive | descriptive | database | the grievance log was uploaded onto the ⟦project database⟧[7] | true | null | |
fcv_pads_east_asia:000456 | 19 | 1 | PAPs register | 1,186 | 1,199 | named | descriptive | administrative | verified and documented in the ⟦PAPs register⟧[8] | true | null | |
fcv_pads_east_asia:000456 | 20 | 0 | PAP Audit list | 810 | 824 | named | descriptive | administrative | On completion of the ⟦PAP Audit list⟧[9], recommend payment | true | null | |
fcv_pads_east_asia:000456 | 21 | 0 | Confirmation Survey | 698 | 717 | named | descriptive | survey | Site ⟦Confirmation Survey⟧[10] | true | null |
Subsets and Splits
No community queries yet