src
stringlengths
51
3.39k
tgt
stringlengths
51
3.39k
bleu
float64
0
1
tgt_index
listlengths
1
495
original_filename
stringlengths
7
201
filename
stringlengths
8
13
page_idx
int64
0
1.6k
src_layout
listlengths
1
495
tgt_layout
listlengths
1
495
endangered / rare flora is impacted by such disposal. First stage The Supervising Engineer and the Contractor will Pre-Construction 5 Social and Environmental Monitoring carry out joint monitoring of the EMP. The suitability Consultants of needed at this the mitigation measures suggested in the EMP will be stage checke...
endangered / rare flora is impacted by such disposal. 5 First stage Monitoring The Supervising Engineer and the Contractor will carry out joint monitoring of the EMP. The suitability of the mitigation measures suggested in the EMP will be checked. Contractor/ PIU, Pre-Construction Social and Environmental Consultants n...
0.693663
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 19, 9, 10, 23, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 28, 29, 30, 31, 32, 34, 38, 39, 40, 41, 42, 43, 44, 45, 46, 48, 49, 50, 18, 20, 21, 22, 33, 35, 36, 37, 47, 53, 51, 66, 67...
E29860v50EA0P100Box369263B00053101.docx
task-959-282
104
[ [ 215, 282, 295, 309 ], [ 299, 282, 308, 309 ], [ 312, 282, 339, 309 ], [ 343, 282, 374, 309 ], [ 378, 282, 388, 309 ], [ 392, 282, 455, 309 ], [ 459, 282, 475, 309 ], [ 47...
[ [ 215, 282, 295, 309 ], [ 299, 282, 308, 309 ], [ 312, 282, 339, 309 ], [ 343, 282, 374, 309 ], [ 378, 282, 388, 309 ], [ 392, 282, 455, 309 ], [ 459, 282, 475, 309 ], [ 47...
PRESCHOOL # STUDENTS GRADES 6-8 # STUDENTS Gilchrist, Ayana 27 Apura, Webster KINDERGARTEN # STUDENTS Capersino, Dominick Mosher, Caitlin 23 Hanson, Rhonda 285 Serkowski, Liz 23 Honea, Cindy Jimenez, Beverly Stenson, Leah 22 Manalo, Malia Reynolds, Greg GRADE 1 # STUDENTS Singer, Jeff Courtright, Lydia 24 Smith, Rusty ...
PRESCHOOL # STUDENTS Gilchrist, Ayana 27 KINDERGARTEN # STUDENTS Mosher, Caitlin 23 Serkowski, Liz 23 Stenson, Leah 22 GRADE 1 # STUDENTS Courtright, Lydia 24 Millan, Alexandria 23 Paulson, Markitta 23 GRADE 2 # STUDENTS Candelaria, Pat 30 Graham, Ana 30 Griffen, Wendy 30 OPEN GRADE 3 # STUDENTS Darrow, Aimee 26 Gust, ...
0.546242
[ 0, 1, 2, 7, 8, 9, 12, 13, 14, 17, 18, 19, 23, 24, 25, 30, 31, 32, 37, 38, 39, 40, 43, 44, 45, 48, 49, 50, 51, 52, 53, 57, 58, 59, 60, 64, 65, 66, 73, 74, 75, 79, 80, 81, 85, 89, 90, 91, 92, 95, 96, 97, 98, 99, ...
e2f80e4e-9741-4e71-a74f-3434477c467f.docx
task-959-357
1
[ [ 117, 94, 211, 111 ], [ 338, 94, 348, 111 ], [ 352, 94, 426, 111 ], [ 500, 109, 563, 127 ], [ 568, 109, 593, 127 ], [ 765, 109, 774, 127 ], [ 779, 109, 852, 127 ], [ 117, ...
[ [ 117, 94, 211, 111 ], [ 338, 94, 348, 111 ], [ 352, 94, 426, 111 ], [ 117, 110, 183, 127 ], [ 187, 110, 241, 127 ], [ 373, 110, 391, 127 ], [ 117, 142, 236, 160 ], [ 340, ...
Table 1: Environmental Screening Checklist (Contd.) Environmental impacts Status Mitigation Measures (if the status is Notes Is the site to be restored to The site to be completely restored to original or better Yes original or better condition condition. No ditches or surplus soil will be left behind. after the works ...
Table 1: Environmental Screening Checklist (Contd.) Environmental impacts Status Mitigation Measures (if the status is Notes Is the site to be restored to original or better condition after the works completion? Yes No The site to be completely restored to original or better condition. No ditches or surplus soil will b...
0.889301
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 34, 35, 36, 37, 48, 49, 50, 51, 33, 52, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 53, 54...
E30480EA0P1312078B0SAR0EMP0P131266.docx
task-959-454
19
[ [ 325, 115, 362, 142 ], [ 366, 115, 379, 142 ], [ 386, 115, 484, 142 ], [ 488, 115, 551, 142 ], [ 555, 115, 616, 142 ], [ 620, 115, 674, 142 ], [ 117, 157, 207, 182 ], [ 21...
[ [ 325, 115, 362, 142 ], [ 366, 115, 379, 142 ], [ 386, 115, 484, 142 ], [ 488, 115, 551, 142 ], [ 555, 115, 616, 142 ], [ 620, 115, 674, 142 ], [ 117, 157, 207, 182 ], [ 21...
Wastewater profiles Wastewaters toward the centralized CETP of Nhon Trach 3 IP is industrial and domestic wastewater, which being generated by the operating facilities and workers onsite Influent profiles The highly polluted parameters of the influents depend on the wastewater profiles of the industries within the IP. ...
Wastewater profiles Wastewaters toward the centralized CETP of Nhon Trach 3 IP is industrial and domestic wastewater, which being generated by the operating facilities and workers onsite Influent profiles The highly polluted parameters of the influents depend on the wastewater profiles of the industries within the IP. ...
0.575752
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E30500v20EA0P1030Module02020120604.docx
task-959-456
24
[ [ 179, 67, 282, 85 ], [ 287, 67, 354, 85 ], [ 142, 101, 254, 121 ], [ 265, 101, 326, 121 ], [ 337, 101, 364, 121 ], [ 375, 101, 471, 121 ], [ 483, 101, 536, 121 ], [ 547, ...
[ [ 179, 67, 282, 85 ], [ 287, 67, 354, 85 ], [ 142, 101, 254, 121 ], [ 265, 101, 326, 121 ], [ 337, 101, 364, 121 ], [ 375, 101, 471, 121 ], [ 483, 101, 536, 121 ], [ 547, ...
DISCHARGE POINT LOCATION Wastewater from Nhon Trach 3 IP Module 2 will use the existing (Module 1) – discharge network. Therefore the location of Module 2 discharge 2 will be unchanged WASTEWATER TREATMENT TECHNOLOGY Treatment efficiency of the treatment plant (Module 1) is very effective. The results from eelier treat...
DISCHARGE POINT LOCATION Wastewater from Nhon Trach 3 IP – Module 2 will use the existing (Module 1) discharge network. Therefore the location of Module 2 discharge 2 will be unchanged WASTEWATER TREATMENT TECHNOLOGY Treatment efficiency of the treatment plant (Module 1) is very effective. The results from eelier treat...
0.664166
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 17, 9, 10, 11, 12, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E30500v20EA0P1030Module02020120604.docx
task-959-456
58
[ [ 159, 105, 291, 127 ], [ 296, 105, 365, 127 ], [ 371, 105, 490, 127 ], [ 120, 141, 223, 161 ], [ 233, 141, 276, 161 ], [ 286, 141, 334, 161 ], [ 345, 141, 395, 161 ], [ 40...
[ [ 159, 105, 291, 127 ], [ 296, 105, 365, 127 ], [ 371, 105, 490, 127 ], [ 120, 141, 223, 161 ], [ 233, 141, 276, 161 ], [ 286, 141, 334, 161 ], [ 345, 141, 395, 161 ], [ 40...
Table 41: Public consultations Is affected by the project on the Air No Name Address Job opinions sources project Health Income Others year The project owner should ensure treated Hamlet 2, Long wastewater meet Nguyen Tho Commune, national 1 Van Male 1969 Fishman Well No No No No Agree Nhon regulation Bang District, Tr...
Table 41: Public consultations No Name year Address Job sources Is affected by the project on the project opinions Air Health Income Others 1 Nguyen Van Bang Male 1969 Hamlet 2, Long Tho Commune, Nhon District, Fishman Well No No No No Agree The project owner should ensure treated wastewater meet national regulation 2 ...
0.389001
[ 0, 1, 2, 3, 12, 13, 22, 14, 15, 17, 4, 5, 6, 7, 8, 9, 10, 18, 16, 11, 19, 20, 21, 38, 34, 39, 51, 40, 41, 29, 30, 31, 35, 36, 49, 52, 42, 43, 44, 45, 46, 47, 48, 23, 24, 25, 26, 27, 28, 32, 33, 37, 50, 65, 58...
E30500v20EA0P1030Module02020120604.docx
task-959-456
92
[ [ 67, 140, 102, 169 ], [ 106, 140, 126, 169 ], [ 129, 140, 169, 169 ], [ 173, 140, 254, 169 ], [ 545, 193, 555, 219 ], [ 558, 193, 602, 219 ], [ 606, 193, 619, 219 ], [ 623...
[ [ 67, 140, 102, 169 ], [ 106, 140, 126, 169 ], [ 129, 140, 169, 169 ], [ 173, 140, 254, 169 ], [ 68, 225, 84, 251 ], [ 105, 225, 138, 251 ], [ 202, 246, 227, 272 ], [ 267, ...
development works not the cross sectoral complying the pollution stakeholders for standards and environmental amendments in approval conditions. the EPR provisions for approval from the Cabinet of Ministers. Ministry of Administration Planning, Monitoring and The Planning, Directly responsible. As Co-ordination Divisio...
development works not complying the pollution standards and environmental approval conditions. the cross sectoral stakeholders for amendments in the EPR provisions for approval from the Cabinet of Ministers. Ministry of Physical Planning and Works (MoPPW) Administration Division Foreign Aid and Quality Standard Divisio...
0.471776
[ 0, 1, 2, 6, 7, 8, 11, 12, 13, 16, 17, 3, 4, 5, 9, 10, 14, 15, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 55, 71, 72, 97, 98, 30, 40, 56, 57, 58, 73, 74, 91, 110, 111, 124, 134, 135, 143, 153, 163, 164, 172, ...
E30540EA0P12540A005JUNE201200Final.docx
task-959-459
66
[ [ 678, 165, 736, 184 ], [ 739, 165, 767, 184 ], [ 770, 165, 784, 184 ], [ 828, 165, 842, 184 ], [ 845, 165, 868, 184 ], [ 871, 165, 906, 184 ], [ 678, 184, 726, 204 ], [ 72...
[ [ 678, 165, 736, 184 ], [ 739, 165, 767, 184 ], [ 770, 165, 784, 184 ], [ 678, 184, 726, 204 ], [ 729, 184, 743, 204 ], [ 746, 184, 787, 204 ], [ 678, 203, 721, 223 ], [ 72...
Peer reviewers, DPs, May 30 July ESSA disclosed online, sent in hard copy to MDAs, emailed to – Disclosure and comment period MDAs, LGAs, CSOs, 6 key stakeholders. Comments accepted via post and email. public PMO-RALG, MLHHSD, Technical consultation with targeted MDAs May 31 Inputs on ESSM and agreement on delegation i...
Disclosure and comment period Peer reviewers, DPs, MDAs, LGAs, CSOs, public May 30 – July 6 ESSA disclosed online, sent in hard copy to MDAs, emailed to key stakeholders. Comments accepted via post and email. Technical consultation with targeted MDAs PMO-RALG, MLHHSD, COWI, WB, MoW, May 31 Inputs on ESSM and agreement ...
0.690236
[ 18, 19, 20, 21, 0, 1, 2, 22, 23, 24, 34, 3, 4, 17, 5, 25, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 26, 27, 28, 29, 30, 31, 32, 33, 37, 38, 39, 40, 41, 35, 36, 52, 53, 54, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51...
E30690REVISED000112B0AFR0ESSA0Vol2.docx
task-959-465
61
[ [ 336, 116, 361, 140 ], [ 364, 116, 421, 140 ], [ 425, 116, 451, 140 ], [ 501, 126, 526, 150 ], [ 530, 126, 543, 150 ], [ 557, 126, 580, 150 ], [ 597, 126, 631, 150 ], [ 63...
[ [ 52, 136, 111, 160 ], [ 115, 136, 135, 160 ], [ 138, 136, 190, 160 ], [ 193, 136, 229, 160 ], [ 336, 116, 361, 140 ], [ 364, 116, 421, 140 ], [ 425, 116, 451, 140 ], [ 336...
20. Did you/she* EVER have a positive or reactive test for: 20a. the HIV/AIDS virus? No Yes 20a(i). Explain: No 20b. hepatitis? Yes 20b(i). Explain: No 20c. HTLV-I or HTLV-II? Yes 20c(i). Explain: 20d. T. cruzi or told you have (she* has) No Chagas’ disease? Yes 20d(i). Explain: 21. Did you/she* EVER have liver disease...
20. Did you/she* EVER have a positive or reactive test for: 20a. the HIV/AIDS virus? 20b. hepatitis? 20c. HTLV-I or HTLV-II? 20d. T. cruzi or told you have (she* has) Chagas’ disease? No Yes No Yes No Yes No Yes 20a(i). Explain: 20b(i). Explain: 20c(i). Explain: 20d(i). Explain: 21. Did you/she* EVER have liver disease...
0.751148
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 21, 26, 27, 28, 29, 33, 34, 35, 36, 37, 38, 39, 40, 41, 43, 44, 15, 16, 19, 22, 25, 30, 42, 45, 17, 18, 23, 24, 31, 32, 46, 47, 48, 49, 50, 51, 52, 53, 54...
e387ee52-6777-435c-baeb-025155cf4f8e.docx
task-959-598
9
[ [ 61, 115, 87, 132 ], [ 92, 115, 116, 132 ], [ 121, 115, 187, 132 ], [ 192, 115, 235, 132 ], [ 240, 115, 275, 132 ], [ 280, 115, 288, 132 ], [ 293, 115, 348, 132 ], [ 353, ...
[ [ 61, 115, 87, 132 ], [ 92, 115, 116, 132 ], [ 121, 115, 187, 132 ], [ 192, 115, 235, 132 ], [ 240, 115, 275, 132 ], [ 280, 115, 288, 132 ], [ 293, 115, 348, 132 ], [ 353, ...
not technically Environment Law development within these areas, report. Loss of land area to be linked to feasible, includes prohibit development in as provided an ESIA is DLIs. measures to mitigate or protected wetlands and approved, permission is offset impacts or restrict development normally always granted. program...
not technically feasible, includes measures to mitigate or offset impacts or program activities. Environment Law prohibit development in protected wetlands and restrict development activities in buffer zones around lakes and along rivers. The Forestry and Tree Planting Act and the Uganda Wildlife Act prohibit developme...
0.562348
[ 0, 1, 17, 18, 28, 29, 30, 31, 38, 39, 40, 46, 47, 2, 3, 19, 20, 21, 32, 33, 34, 41, 42, 48, 49, 50, 51, 56, 57, 58, 59, 64, 65, 66, 67, 71, 72, 73, 74, 75, 82, 83, 84, 87, 88, 89, 95, 96, 97, 102, 103, 104, 109, ...
E40520EA0P11170disclosed0100220120.docx
task-959-720
78
[ [ 44, 78, 62, 102 ], [ 66, 78, 127, 102 ], [ 183, 78, 255, 102 ], [ 259, 78, 283, 102 ], [ 335, 78, 406, 102 ], [ 410, 78, 445, 102 ], [ 449, 78, 477, 102 ], [ 481, 78,...
[ [ 44, 78, 62, 102 ], [ 66, 78, 127, 102 ], [ 44, 98, 91, 122 ], [ 95, 98, 141, 122 ], [ 44, 119, 96, 143 ], [ 100, 119, 110, 143 ], [ 114, 119, 159, 143 ], [ 163, 119, ...
Schedule Day 3 08:30-09:00 Review of Day 2 09:00-09:45 General Chemical Management 09:45-10:30 Working Safety- Prevention of Occupational Injuries 10:30-11:00 Break 11:00-11:45 Management of Photochemical 11:45-12:30 Workshop chemicals – 12:30-13:30 Lunch 13:30-14:15 Onsite Visit to a hospital 14:15-15:00 15:00-15:15 1...
Schedule Day 3 08:30-09:00 Review of Day 2 09:00-09:45 General Chemical Management 09:45-10:30 Working Safety- Prevention of Occupational Injuries 10:30-11:00 Break 11:00-11:45 Management of Photochemical Workshop – chemicals 11:45-12:30 12:30-13:30 Lunch 13:30-14:15 Onsite Visit to a hospital 14:15-15:00 15:00-15:15 1...
0.885474
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 26, 28, 27, 25, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E41280EA0P132101300SS0MW0Final0Rep.docx
task-959-741
112
[ [ 237, 118, 312, 134 ], [ 392, 118, 422, 134 ], [ 427, 118, 436, 134 ], [ 237, 132, 327, 148 ], [ 392, 132, 447, 148 ], [ 451, 132, 465, 148 ], [ 470, 132, 500, 148 ], [ 50...
[ [ 237, 118, 312, 134 ], [ 392, 118, 422, 134 ], [ 427, 118, 436, 134 ], [ 237, 132, 327, 148 ], [ 392, 132, 447, 148 ], [ 451, 132, 465, 148 ], [ 470, 132, 500, 148 ], [ 50...
1 Minutes of Public Consultations Name / Position Question / Comment Answer The number of the proposed equipment Yusupbaev Will the 230 cotton picking machines be has been calculated for three project Mahsud (LABAIS used only in the Project area or whole districts and they will be used only in the First deputy) Karakal...
1 Minutes of Public Consultations Name / Position Question / Comment Answer Yusupbaev Mahsud (LABAIS First deputy) Will the 230 cotton picking machines be used only in the Project area or whole Karakalpakstan? The number of the proposed equipment has been calculated for three project districts and they will be used onl...
0.727983
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 18, 32, 33, 51, 52, 19, 20, 21, 22, 23, 24, 25, 34, 35, 36, 37, 38, 39, 40, 41, 53, 12, 13, 14, 15, 16, 17, 26, 27, 28, 29, 30, 31, 42, 43, 44, 45, 46, 47, 48, 49, 50, 54...
E41550V30ECA0E0Box382170B00PUBLIC0.docx
task-959-749
6
[ [ 873, 89, 882, 108 ], [ 376, 120, 439, 139 ], [ 444, 120, 459, 139 ], [ 463, 120, 512, 139 ], [ 517, 120, 623, 139 ], [ 117, 182, 160, 201 ], [ 165, 182, 170, 201 ], [ 174...
[ [ 873, 89, 882, 108 ], [ 376, 120, 439, 139 ], [ 444, 120, 459, 139 ], [ 463, 120, 512, 139 ], [ 517, 120, 623, 139 ], [ 117, 182, 160, 201 ], [ 165, 182, 170, 201 ], [ 174...
The main objective of the project is to provide a cost effective measure to strengthen the existing transmission network in Lusaka in order to improve the quality and reliability of supply within the power transmission network. Therefore, the Lusaka 132kV Transmission Ring Reinforcement project is aimed at: Increasing ...
The main objective of the project is to provide a cost effective measure to strengthen the existing transmission network in Lusaka in order to improve the quality and reliability of supply within the power transmission network. Therefore, the Lusaka 132kV Transmission Ring Reinforcement project is aimed at: Increasing ...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E41650Lusaka0P0180201300Box374368B.docx
task-959-750
19
[ [ 117, 106, 151, 127 ], [ 156, 106, 199, 127 ], [ 204, 106, 282, 127 ], [ 287, 106, 303, 127 ], [ 309, 106, 336, 127 ], [ 342, 106, 400, 127 ], [ 406, 106, 420, 127 ], [ 42...
[ [ 117, 106, 151, 127 ], [ 156, 106, 199, 127 ], [ 204, 106, 282, 127 ], [ 287, 106, 303, 127 ], [ 309, 106, 336, 127 ], [ 342, 106, 400, 127 ], [ 406, 106, 420, 127 ], [ 42...
ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR THE TRANSMISSION UPGRADE Table 10: Environmental and Social Management Plan for the Transmission Upgrade Aspect Impact Mitigation Frequency of Time Frame Performance Responsible Cost Measure Monitoring Indicator Person (US$) PHYSICAL ENVIRONMENT Excavation, Vibrations leadin...
ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN FOR THE TRANSMISSION UPGRADE Table 10: Environmental and Social Management Plan for the Transmission Upgrade Aspect Impact Mitigation Measure Frequency of Monitoring Time Frame Performance Indicator Responsible Person Cost (US$) PHYSICAL ENVIRONMENT Excavation, burrowing and bla...
0.496217
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 30, 23, 24, 31, 25, 26, 27, 32, 28, 33, 29, 34, 35, 36, 37, 49, 50, 63, 74, 85, 86, 91, 96, 101, 102, 38, 39, 51, 52, 53, 64, ...
E41650Lusaka0P0180201300Box374368B.docx
task-959-750
68
[ [ 136, 154, 268, 181 ], [ 272, 154, 305, 181 ], [ 309, 154, 366, 181 ], [ 371, 154, 481, 181 ], [ 485, 154, 526, 181 ], [ 530, 154, 562, 181 ], [ 566, 154, 597, 181 ], [ 60...
[ [ 136, 154, 268, 181 ], [ 272, 154, 305, 181 ], [ 309, 154, 366, 181 ], [ 371, 154, 481, 181 ], [ 485, 154, 526, 181 ], [ 530, 154, 562, 181 ], [ 566, 154, 597, 181 ], [ 60...
opted wherever possible; Wayleave clearance be restricted to the 50m swath; Use of fires shall be monitored and restricted to residential camps SOCIO-ECONOMIC ENVIRONMENT Increase in Stress on social Employment Weekly during Pre-site people Project Embedded population in amenities during site the project preparation em...
opted wherever possible; Wayleave clearance be restricted to the 50m swath; Use of fires shall be monitored and restricted to residential camps SOCIO-ECONOMIC ENVIRONMENT Increase in population in search of employment Stress on social amenities Employment during site preparation and construction stages shall be done fr...
0.452425
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 36, 37, 48, 49, 59, 26, 27, 28, 38, 29, 39, 40, 50, 51, 60, 63, 64, 65, 68, 69, 70, 71, 72, 73, 74, 75, 30, 31, 41...
E41650Lusaka0P0180201300Box374368B.docx
task-959-750
71
[ [ 308, 164, 346, 191 ], [ 350, 164, 412, 191 ], [ 308, 187, 368, 214 ], [ 308, 232, 374, 259 ], [ 308, 255, 374, 282 ], [ 308, 277, 325, 304 ], [ 329, 277, 391, 304 ], [ 39...
[ [ 308, 164, 346, 191 ], [ 350, 164, 412, 191 ], [ 308, 187, 368, 214 ], [ 308, 232, 374, 259 ], [ 308, 255, 374, 282 ], [ 308, 277, 325, 304 ], [ 329, 277, 391, 304 ], [ 39...
99 STANLEY KACHIBE S. K 0978278324 PROFESSIONAL RENTALS 100 SAMUEL PHIRI MPULUNGU 0977195631 WARD D. C 23 101 SIMUZHIMBA, MP L.C.C 0973198411 102 RICHARD AIRTEL 0978980640 MANIMAINI 103 NOEL NDHLOVU ZAM 0977860557 104 RIEBECK MATAMBO KALINGALINGA 0977435652 W.D.C 105 CHIPOYA HENRY YAPOCHI 0977830828 ENT.LTD 0967830825 ...
99 STANLEY KACHIBE S. K PROFESSIONAL RENTALS 0978278324 100 SAMUEL PHIRI MPULUNGU WARD D. C 23 0977195631 101 SIMUZHIMBA, MP L.C.C 0973198411 102 RICHARD MANIMAINI AIRTEL 0978980640 103 NOEL NDHLOVU ZAM 0977860557 104 RIEBECK MATAMBO KALINGALINGA W.D.C 0977435652 105 CHIPOYA HENRY YAPOCHI ENT.LTD 0977830828 0967830825 ...
0.546006
[ 0, 1, 2, 3, 4, 6, 7, 5, 8, 9, 10, 11, 13, 14, 15, 16, 12, 17, 18, 19, 20, 21, 22, 23, 26, 24, 25, 27, 28, 29, 30, 31, 32, 33, 34, 35, 37, 36, 38, 39, 40, 41, 43, 42, 44, 45, 46, 49, 47, 48, 50, 51, 52, 53, 54...
E41650Lusaka0P0180201300Box374368B.docx
task-959-750
116
[ [ 76, 62, 98, 83 ], [ 151, 62, 240, 83 ], [ 245, 62, 331, 83 ], [ 364, 62, 382, 83 ], [ 388, 62, 401, 83 ], [ 536, 62, 645, 83 ], [ 364, 80, 516, 100 ], [ 364, 97, ...
[ [ 76, 62, 98, 83 ], [ 151, 62, 240, 83 ], [ 245, 62, 331, 83 ], [ 364, 62, 382, 83 ], [ 388, 62, 401, 83 ], [ 364, 80, 516, 100 ], [ 364, 97, 454, 118 ], [ 536, 62, ...
Public Consultation Findings in Lot - 2 Family Location (Rd Name, Serial No Name Nature of Impact Mitigation Suggestions Section Rd No) Income/Afs 1 Khawja Agha A Macrorayan IV, Our income will decrease Needs to work first in one side and Banayee-Airport after that in another side Road Fruit Seller 2 Esmatullah Fruit A...
Public Consultation Findings in Lot - 2 Serial No Name Section Location (Rd Name, Rd No) Family Income/Afs Nature of Impact Mitigation Suggestions 1 Khawja Agha Fruit Seller A Macrorayan IV, Banayee-Airport Road Our income will decrease Needs to work first in one side and after that in another side 2 Esmatullah Fruit S...
0.69132
[ 0, 1, 2, 3, 4, 5, 6, 11, 12, 13, 19, 8, 9, 10, 20, 21, 7, 22, 14, 15, 16, 17, 18, 23, 24, 25, 48, 49, 26, 27, 28, 41, 47, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 42, 43, 44, 45, 46, 50, 51, 52, 69, 53...
E42310Afghanis0050201300Box377327B.docx
task-959-769
37
[ [ 90, 115, 131, 142 ], [ 134, 115, 216, 142 ], [ 220, 115, 275, 142 ], [ 279, 115, 291, 142 ], [ 295, 115, 316, 142 ], [ 319, 115, 324, 142 ], [ 328, 115, 336, 142 ], [ 455...
[ [ 90, 115, 131, 142 ], [ 134, 115, 216, 142 ], [ 220, 115, 275, 142 ], [ 279, 115, 291, 142 ], [ 295, 115, 316, 142 ], [ 319, 115, 324, 142 ], [ 328, 115, 336, 142 ], [ 96,...
PUBLIC CONSULTATION FINDINGS in Lot -3 Family Location (Rd Serial Name Nature Mitigation Section Income/Afs Name, No of Suggestions Rd No) Impact 1 Abdul Manaf Fuel C Meena Dust, and Work should be Seller bother selling started in one side and it should have good quality 2 Ahmad Seer Book C Jamal Meena Dust The impleme...
PUBLIC CONSULTATION FINDINGS in Lot -3 Serial No Name Section Location (Rd Name, Rd No) Family Income/Afs Nature of Impact Mitigation Suggestions 1 Abdul Manaf Fuel Seller C Meena Dust, and bother selling Work should be started in one side and it should have good quality 2 Ahmad Seer Book Seller C Jamal Meena Dust The ...
0.540822
[ 0, 1, 2, 3, 4, 5, 9, 16, 10, 13, 7, 8, 15, 19, 20, 6, 14, 11, 17, 21, 12, 18, 22, 23, 24, 25, 33, 26, 27, 28, 29, 34, 35, 30, 31, 32, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 56, 50, 51, 52, 53...
E42310Afghanis0050201300Box377327B.docx
task-959-769
38
[ [ 88, 91, 151, 112 ], [ 156, 91, 294, 112 ], [ 298, 91, 383, 112 ], [ 387, 91, 403, 112 ], [ 408, 91, 435, 112 ], [ 439, 91, 457, 112 ], [ 539, 120, 585, 135 ], [ 390, ...
[ [ 88, 91, 151, 112 ], [ 156, 91, 294, 112 ], [ 298, 91, 383, 112 ], [ 387, 91, 403, 112 ], [ 408, 91, 435, 112 ], [ 439, 91, 457, 112 ], [ 95, 126, 133, 141 ], [ 95, 15...
Kabul Municipality Continue with process Be ongoing To ensure no delay No comment needed. of locating and in beginning Self-evident action. PIU preparing technical plans implementation of KUTEI etc. for sub- projects under the IRDP Municipality likely resettlement This action should begin To ensure no delay Processes f...
Kabul Municipality Continue with process of locating and preparing technical plans etc. for sub- projects under the IRDP Be ongoing To ensure no delay in beginning implementation of KUTEI No comment needed. Self-evident action. PIU Municipality likely resettlement will be involved in a site located for action under KUT...
0.50472
[ 0, 1, 2, 3, 4, 14, 15, 16, 22, 23, 24, 28, 29, 30, 31, 32, 33, 34, 5, 6, 7, 8, 9, 10, 17, 18, 25, 26, 27, 11, 12, 13, 19, 20, 21, 35, 36, 37, 49, 50, 51, 52, 53, 54, 69, 70, 71, 72, 81, 82, 83, 88, 89, 90, 91...
E42310V30P13180Box379885B00PUBLIC0.docx
task-959-770
106
[ [ 90, 141, 127, 167 ], [ 131, 141, 209, 167 ], [ 262, 141, 317, 167 ], [ 334, 141, 361, 167 ], [ 378, 141, 423, 167 ], [ 435, 141, 452, 167 ], [ 455, 141, 505, 167 ], [ 606...
[ [ 90, 141, 127, 167 ], [ 131, 141, 209, 167 ], [ 262, 141, 317, 167 ], [ 334, 141, 361, 167 ], [ 378, 141, 423, 167 ], [ 262, 159, 274, 185 ], [ 292, 159, 341, 185 ], [ 401...
Meet regularly and guarantee to APs that The GRC see themselves settle disputes within 10 the process is both as independent and days. substantively (a second operate accordingly. They and independent opinion are not there save ‗to on compensation) and government money. procedurally ( an AP can have a hearing and put h...
Meet regularly and settle disputes within 10 days. guarantee to APs that the process is both substantively (a second and independent opinion on compensation) and procedurally ( an AP can have a hearing and put his/her case) fair The GRC see themselves as independent and operate accordingly. They are not there ‗to save ...
0.582994
[ 0, 1, 2, 11, 12, 13, 14, 22, 3, 4, 5, 6, 15, 16, 17, 18, 23, 24, 25, 29, 30, 31, 37, 38, 39, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 7, 8, 9, 10, 19, 20, 21, 26, 27, 28, 32, 33, 34, 36, 35, 40, 41...
E42310V30P13180Box379885B00PUBLIC0.docx
task-959-770
108
[ [ 435, 141, 466, 167 ], [ 494, 141, 549, 167 ], [ 577, 141, 599, 167 ], [ 606, 141, 665, 167 ], [ 679, 141, 691, 167 ], [ 704, 141, 730, 167 ], [ 743, 141, 766, 167 ], [ 77...
[ [ 435, 141, 466, 167 ], [ 494, 141, 549, 167 ], [ 577, 141, 599, 167 ], [ 435, 159, 467, 185 ], [ 476, 159, 526, 185 ], [ 536, 159, 574, 185 ], [ 584, 159, 599, 185 ], [ 43...
Annex 4 Template for Environmental and Social Management Plan (ESMP) – Naghlu project Concerns/Issues Potential Proposed Institutional Cost Comments Environmental and Mitigation Responsibilities Estimates (e.g. secondary components Social Measure(s) impacts) Impacts Component 1 Design Phase Component 2 Design Phase Com...
Annex 4 – Template for Environmental and Social Management Plan (ESMP) Naghlu project components Concerns/Issues Potential Environmental and Social Impacts Proposed Mitigation Measure(s) Institutional Responsibilities Cost Estimates Comments (e.g. secondary impacts) Component 1 Design Phase Component 2 Design Phase Com...
0.776712
[ 0, 1, 10, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 26, 13, 14, 19, 20, 27, 30, 15, 21, 28, 16, 22, 17, 23, 18, 24, 25, 29, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E42430REVISED00Box382170B00PUBLIC0.docx
task-959-774
69
[ [ 117, 104, 181, 128 ], [ 186, 104, 198, 128 ], [ 220, 104, 311, 128 ], [ 317, 104, 346, 128 ], [ 351, 104, 498, 128 ], [ 504, 104, 541, 128 ], [ 546, 104, 605, 128 ], [ 61...
[ [ 117, 104, 181, 128 ], [ 186, 104, 198, 128 ], [ 204, 106, 215, 126 ], [ 220, 104, 311, 128 ], [ 317, 104, 346, 128 ], [ 351, 104, 498, 128 ], [ 504, 104, 541, 128 ], [ 54...
monitoring done by PWA) Monitoring of public Presented below at separate subsection 8,000 MoH in cooperation health due to The cost is related with MoA recovered to the recording effluent reuse from different hospitals and agricultural centers and random survey for public health conditions on the area of reuse Monitori...
monitoring done by PWA) Monitoring of public health due to recovered effluent reuse Presented below at separate subsection 8,000 The cost is related to the recording from different hospitals and agricultural centers and random survey for public health conditions on the area of reuse MoH in cooperation with MoA Monitori...
0.684112
[ 0, 1, 2, 3, 4, 5, 6, 16, 17, 18, 25, 29, 30, 7, 8, 9, 10, 11, 12, 19, 20, 21, 22, 26, 27, 28, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 13, 14, 15, 23, 24, 49, 50, 61, 62, 63, 69...
E42670v20NGEST0PUBLIC00Box3798908B.docx
task-959-782
33
[ [ 713, 187, 765, 210 ], [ 779, 187, 802, 210 ], [ 713, 205, 724, 229 ], [ 727, 205, 756, 229 ], [ 85, 225, 137, 248 ], [ 143, 225, 153, 248 ], [ 158, 225, 187, 248 ], [ 199...
[ [ 713, 187, 765, 210 ], [ 779, 187, 802, 210 ], [ 713, 205, 724, 229 ], [ 727, 205, 756, 229 ], [ 85, 225, 137, 248 ], [ 143, 225, 153, 248 ], [ 158, 225, 187, 248 ], [ 85,...
Backfilling of banks behind Use of improper fill material Backfill materials should be selected after proper analyses of and sub-standard compacting the gabions, turfing and soil characteristics and with approval from Project behind gabion walls may lead reinstatement of the Manager/Engineer. Adequate compaction should...
Backfilling of banks behind the gabions, turfing and reinstatement of the maintenance road Use of improper fill material and sub-standard compacting behind gabion walls may lead to differential settlement causing gabion walls misalign and fail. Backfill materials should be selected after proper analyses of soil charact...
0.749508
[ 0, 1, 2, 3, 21, 22, 23, 24, 37, 38, 39, 49, 50, 4, 5, 6, 7, 8, 18, 19, 20, 32, 33, 34, 35, 36, 46, 47, 48, 60, 61, 62, 63, 71, 72, 9, 10, 11, 12, 13, 14, 15, 16, 17, 25, 26, 27, 28, 29, 30, 31, 40, 41, 42, 43...
E43530V50Morag0Box382148B00PUBLIC0.docx
task-959-798
35
[ [ 90, 204, 158, 230 ], [ 168, 204, 180, 230 ], [ 189, 204, 225, 230 ], [ 234, 204, 275, 230 ], [ 301, 204, 325, 230 ], [ 333, 204, 346, 230 ], [ 354, 204, 409, 230 ], [ 418...
[ [ 90, 204, 158, 230 ], [ 168, 204, 180, 230 ], [ 189, 204, 225, 230 ], [ 234, 204, 275, 230 ], [ 90, 230, 109, 256 ], [ 126, 230, 177, 256 ], [ 194, 230, 236, 256 ], [ 253,...
Increase in Ecosystems, Improved ecosystems as Contact with organic Educate farmers on the need conservation farming soils, soil organic content is matter could increase to protect themselves from practices and use of enhanced chances of contamination direct contact with animal organic manure flora, Improved soils due ...
Increase in conservation farming practices and use of organic manure Ecosystems, soils, flora, rural livelihoods, economy, HIV and AIDS and Gender Improved ecosystems as soil organic content is enhanced Improved soils due to high humus content in the soil Protected surface and groundwater resources as vegetative cover ...
0.634212
[ 0, 1, 14, 15, 28, 29, 30, 31, 40, 41, 2, 16, 42, 55, 56, 67, 76, 77, 78, 79, 88, 3, 4, 5, 17, 18, 19, 20, 32, 43, 44, 45, 46, 47, 57, 58, 59, 60, 61, 68, 69, 70, 80, 81, 82, 89, 90, 91, 98, 100, 101, 102, 106, ...
E43620v10EA0P1489640Box379878B00PUBLIC0.docx
task-959-802
77
[ [ 85, 210, 132, 237 ], [ 136, 210, 147, 237 ], [ 248, 210, 318, 237 ], [ 399, 210, 455, 237 ], [ 458, 210, 523, 237 ], [ 527, 210, 538, 237 ], [ 593, 210, 637, 237 ], [ 641...
[ [ 85, 210, 132, 237 ], [ 136, 210, 147, 237 ], [ 85, 234, 158, 261 ], [ 161, 234, 206, 261 ], [ 85, 257, 136, 284 ], [ 139, 257, 160, 284 ], [ 163, 257, 182, 284 ], [ 186, ...
Improved socioeconomic Increased road traffic Minimize stripping of relationships accidents vegetation so that surface Generation solid and soil is less susceptible to liquid waste erosion Compulsory land Conduct road safety acquisition awareness campaign An influx of migrant meetings with workers during communities re...
Improved socioeconomic relationships Increased road traffic accidents Generation solid and liquid waste Compulsory land acquisition An influx of migrant workers during rehabilitation of roads can be a socially disruptive force (spread HIV/AIDS) Construction camps can lead to increased incidence of sexually transmitted ...
0.412342
[ 0, 1, 8, 2, 3, 4, 9, 14, 15, 16, 22, 23, 25, 26, 30, 33, 34, 35, 36, 39, 40, 42, 43, 44, 45, 49, 50, 51, 52, 56, 57, 58, 61, 62, 63, 67, 68, 69, 74, 75, 76, 82, 83, 88, 89, 93, 94, 95, 97, 98, 99, 100, 101, 106...
E43620v10EA0P1489640Box379878B00PUBLIC0.docx
task-959-802
85
[ [ 399, 210, 455, 237 ], [ 458, 210, 544, 237 ], [ 593, 210, 647, 237 ], [ 666, 210, 691, 237 ], [ 709, 210, 744, 237 ], [ 778, 210, 834, 237 ], [ 856, 210, 907, 237 ], [ 93...
[ [ 399, 210, 455, 237 ], [ 458, 210, 544, 237 ], [ 399, 234, 472, 261 ], [ 593, 210, 647, 237 ], [ 666, 210, 691, 237 ], [ 709, 210, 744, 237 ], [ 593, 234, 646, 261 ], [ 59...
Significance Impacts are low. A Impacts are Impact is high. Impact is very high. Impact is unknown. - 2 small change that is moderate. An impact Many organisms lost A process or area is Insufficient hardly detectable. that is measurable, or affected. Major completely disrupted information is but does not alter disrupti...
Significance Impacts are low. A small change that is hardly detectable. Impacts are moderate. An impact that is measurable, but does not alter ecosystems. Impact is high. Many organisms lost or affected. Major disruption of ecosystem processes. Impact is very high. A process or area is completely disrupted or destroyed...
0.588445
[ 0, 1, 2, 3, 4, 19, 20, 21, 22, 35, 36, 5, 6, 23, 24, 25, 37, 38, 39, 47, 48, 49, 50, 59, 7, 8, 9, 26, 27, 28, 40, 41, 42, 51, 52, 60, 66, 10, 11, 12, 13, 29, 30, 31, 32, 33, 43, 44, 53, 54, 55, 56, 61, 62, 67...
E43620v10EA0P1489640Box379878B00PUBLIC0.docx
task-959-802
90
[ [ 85, 119, 159, 147 ], [ 191, 119, 236, 146 ], [ 240, 119, 257, 146 ], [ 261, 119, 286, 146 ], [ 289, 119, 299, 146 ], [ 341, 119, 386, 146 ], [ 390, 119, 407, 146 ], [ 475...
[ [ 85, 119, 159, 147 ], [ 191, 119, 236, 146 ], [ 240, 119, 257, 146 ], [ 261, 119, 286, 146 ], [ 289, 119, 299, 146 ], [ 191, 142, 222, 169 ], [ 225, 142, 266, 169 ], [ 269...
Table 6.1: Sample Environmental and Social Management Plan (ESMP) No. Environmental/ Proposed Responsible Estimated Cost (MK) and Proposed Frequency/Time Social Impacts Mitigation/Enhancement Institution Source of Funding Frame Measures Component 1: IMPACTS FROM FUNCTIONAL REVIEW AND TRANSFORMATION FOR SWAp 1 Fear of L...
Table 6.1: Sample Environmental and Social Management Plan (ESMP) No. Environmental/ Social Impacts Proposed Mitigation/Enhancement Measures Responsible Institution Estimated Cost (MK) and Proposed Source of Funding Frequency/Time Frame Component 1: IMPACTS FROM FUNCTIONAL REVIEW AND TRANSFORMATION FOR SWAp 1 Fear of L...
0.636409
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 19, 20, 11, 21, 27, 12, 22, 13, 14, 15, 16, 17, 23, 24, 25, 18, 26, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 54, 66, 67, 68, 69, 77, 81, 82, 87, 91, 43, 44...
E43620v10EA0P1489640Box379878B00PUBLIC0.docx
task-959-802
116
[ [ 85, 129, 114, 152 ], [ 117, 129, 136, 152 ], [ 139, 129, 176, 152 ], [ 179, 129, 256, 152 ], [ 259, 129, 278, 152 ], [ 281, 129, 311, 152 ], [ 314, 129, 381, 152 ], [ 384...
[ [ 85, 129, 114, 152 ], [ 117, 129, 136, 152 ], [ 139, 129, 176, 152 ], [ 179, 129, 256, 152 ], [ 259, 129, 278, 152 ], [ 281, 129, 311, 152 ], [ 314, 129, 381, 152 ], [ 384...
BIOLOGICAL RESOURCES Flora (include threatened/endangered/endemic species) (include threatened/endangered/endemic species) Sensitive habitats including protected areas e.g. national parks and forest reserves CLIMATE Temperature Rainfall PART D: SCREENING CRITERIA FOR IMPACTS DURING PROJECT PLANNING AND DESIGN AREAS OF ...
BIOLOGICAL RESOURCES Flora (include threatened/endangered/endemic species) (include threatened/endangered/endemic species) Sensitive habitats including protected areas e.g. national parks and forest reserves CLIMATE Temperature Rainfall PART D: SCREENING CRITERIA FOR IMPACTS DURING PROJECT PLANNING AND DESIGN AREAS OF ...
0.896217
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 49, 50, 51, 52, 53, 54, 63, 64, 45, 46...
E43620v10EA0P1489640Box379878B00PUBLIC0.docx
task-959-802
179
[ [ 125, 112, 235, 129 ], [ 239, 112, 341, 129 ], [ 151, 126, 186, 142 ], [ 190, 126, 245, 142 ], [ 249, 126, 463, 142 ], [ 467, 126, 521, 142 ], [ 187, 139, 242, 155 ], [ 24...
[ [ 125, 112, 235, 129 ], [ 239, 112, 341, 129 ], [ 151, 126, 186, 142 ], [ 190, 126, 245, 142 ], [ 249, 126, 463, 142 ], [ 467, 126, 521, 142 ], [ 187, 139, 242, 155 ], [ 24...
application of chemical pesticides POSITIVE IMPACTS OF MECHANICAL METHODS Very fast Not method applicable to ASWAp -SP NEGATIVE IMPACTS OF BIOLOGICAL CONTROLS Limited Wrong Biological controls Farmers IPMMP ASWAp-SP Annually knowledge of application of must be applied consequences method by carefully with the full of i...
application of chemical pesticides POSITIVE IMPACTS OF MECHANICAL METHODS Very fast method Not applicable to ASWAp -SP NEGATIVE IMPACTS OF BIOLOGICAL CONTROLS Limited knowledge of consequences of impacts Wrong application of method by farmers Biological controls must be applied carefully with the full knowledge of the ...
0.653739
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 11, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 30, 31, 37, 44, 45, 23, 32, 33, 38, 39, 46, 24, 25, 34, 35, 36, 40, 41, 42, 43, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58...
E43620v20EA0P1489640Box379878B00PUBLIC0.docx
task-959-803
43
[ [ 324, 189, 387, 216 ], [ 390, 189, 402, 216 ], [ 406, 189, 457, 216 ], [ 324, 212, 380, 239 ], [ 127, 294, 195, 322 ], [ 198, 294, 264, 322 ], [ 268, 294, 287, 322 ], [ 29...
[ [ 324, 189, 387, 216 ], [ 390, 189, 402, 216 ], [ 406, 189, 457, 216 ], [ 324, 212, 380, 239 ], [ 127, 294, 195, 322 ], [ 198, 294, 264, 322 ], [ 268, 294, 287, 322 ], [ 29...
practices to reduce application of chemical pesticides; and Enforce regulation prohibiting importation of banned chemical pesticides Contribution to Banned Enforce regulation Farmers Pesticides Act PCB Quarterly offsetting rural/ chemicals prohibiting urban importation of migration banned chemical pesticides Educate fa...
practices to reduce application of chemical pesticides; and Enforce regulation prohibiting importation of banned chemical pesticides Contribution to offsetting rural/ urban migration Banned chemicals Enforce regulation prohibiting importation of banned chemical pesticides Educate farmers on harmful consequences of bann...
0.746151
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 26, 27, 30, 33, 18, 28, 19, 20, 29, 31, 32, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 21, 22, 23, 24, 25 ]
E43620v20EA0P1489640Box379878B00PUBLIC0.docx
task-959-803
47
[ [ 344, 189, 394, 216 ], [ 398, 189, 409, 216 ], [ 413, 189, 451, 216 ], [ 344, 212, 407, 239 ], [ 411, 212, 423, 239 ], [ 344, 236, 395, 262 ], [ 399, 236, 459, 262 ], [ 34...
[ [ 344, 189, 394, 216 ], [ 398, 189, 409, 216 ], [ 413, 189, 451, 216 ], [ 344, 212, 407, 239 ], [ 411, 212, 423, 239 ], [ 344, 236, 395, 262 ], [ 399, 236, 459, 262 ], [ 34...
Land acquisition Low population Medium population High population density; tenure rights density; mixed land density; major well-defined; no ownership and tenure human illegal or mixed land rights; limited cases of settlements; use or ownership; no land disputes; no illegal occupation cases of land disputes; complex, m...
Land acquisition Low population density; tenure rights well-defined; no illegal or mixed land use or ownership; no cases of land disputes; no impact on third party due to leasing of land; no communal properties; and/ or no need to extend existing core network Medium population density; mixed land ownership and tenure r...
0.758677
[ 0, 1, 2, 3, 8, 9, 10, 16, 17, 22, 23, 24, 25, 31, 32, 33, 34, 40, 41, 42, 43, 50, 51, 52, 53, 59, 60, 61, 62, 63, 69, 70, 71, 78, 79, 80, 81, 88, 89, 90, 100, 101, 102, 4, 5, 11, 12, 13, 18, 19, 20, 26, 27, 28,...
E43670EA0P145500disclosed012040130.docx
task-959-804
31
[ [ 238, 94, 272, 110 ], [ 276, 94, 350, 110 ], [ 370, 94, 400, 110 ], [ 405, 94, 476, 110 ], [ 541, 94, 598, 110 ], [ 602, 94, 674, 110 ], [ 714, 94, 748, 110 ], [ 752, ...
[ [ 238, 94, 272, 110 ], [ 276, 94, 350, 110 ], [ 370, 94, 400, 110 ], [ 405, 94, 476, 110 ], [ 370, 109, 423, 125 ], [ 427, 109, 469, 125 ], [ 473, 109, 511, 125 ], [ 370, ...
MONITORING PLAN Phase What Where How When Why Cost (Is the parameter (Is the parameter (Is the parameter (Define the (Is the parameter being (if not to be to be to be frequency / or monitored?) monitored?) monitored?) monitored?) continuous?) During activity preparation During activity During activity supervision PART ...
PART 3: PLAN MONITORING PLAN Phase What (Is the parameter to be monitored?) Where (Is the parameter to be monitored?) How (Is the parameter to be monitored?) When (Define the frequency / or continuous?) Why (Is the parameter being monitored?) Cost (if not During activity preparation During activity During activity supe...
0.397635
[ 48, 49, 50, 0, 1, 2, 3, 9, 10, 11, 26, 27, 36, 4, 12, 13, 14, 28, 29, 37, 5, 15, 16, 17, 30, 31, 38, 6, 18, 19, 32, 33, 34, 39, 7, 20, 21, 22, 23, 35, 8, 24, 25, 40, 41, 42, 43, 44, 45, 46, 47 ]
E43670EA0P145500disclosed012040130.docx
task-959-804
58
[ [ 125, 261, 248, 280 ], [ 253, 261, 302, 280 ], [ 149, 284, 194, 304 ], [ 285, 284, 328, 304 ], [ 424, 284, 476, 304 ], [ 576, 284, 611, 304 ], [ 722, 284, 768, 304 ], [ 85...
[ [ 66, 544, 115, 563 ], [ 119, 544, 134, 563 ], [ 267, 544, 316, 563 ], [ 125, 261, 248, 280 ], [ 253, 261, 302, 280 ], [ 149, 284, 194, 304 ], [ 285, 284, 328, 304 ], [ 246...
Schools and other noise sensitive areas shall be notified at Around the least 5 days before construction is due to commence. project area Construction Stage Vegetation monitoring will be taken seriously, mainly Drilling Site Before clearing of Engineer EEPCo Impacts on near the drilling wells and along the steam pipes ...
Schools and other noise sensitive areas shall be notified at least 5 days before construction is due to commence. Around the project area Construction Stage Impacts on Flora Vegetation clearance Vegetation monitoring will be taken seriously, mainly near the drilling wells and along the steam pipes and monitoring of pot...
0.698403
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 12, 13, 14, 15, 16, 17, 18, 19, 20, 10, 11, 21, 22, 23, 24, 39, 40, 56, 138, 151, 25, 26, 27, 28, 29, 30, 31, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 57, 58, 59, 60, 61, 62, 63, ...
E43920V10P13360Box382090B00PUBLIC0.docx
task-959-808
91
[ [ 202, 143, 242, 167 ], [ 245, 143, 263, 167 ], [ 266, 143, 291, 167 ], [ 294, 143, 321, 167 ], [ 324, 143, 368, 167 ], [ 371, 143, 396, 167 ], [ 399, 143, 423, 167 ], [ 42...
[ [ 202, 143, 242, 167 ], [ 245, 143, 263, 167 ], [ 266, 143, 291, 167 ], [ 294, 143, 321, 167 ], [ 324, 143, 368, 167 ], [ 371, 143, 396, 167 ], [ 399, 143, 423, 167 ], [ 42...
3.2 Screening and Categorization of Sub-Project activities This is an impact centered SESA focusing on potential environment and social impacts and suggesting mitigation measures. For proper implementation of the ESMF it is essential to screen all sub-project activities and then apply the ESMF provisions in the project...
3.2 Screening and Categorization of Sub-Project activities This is an impact centered SESA focusing on potential environment and social impacts and suggesting mitigation measures. For proper implementation of the ESMF it is essential to screen all sub-project activities and then apply the ESMF provisions in the project...
0.771939
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E43970EA0P13270disclosed0120270130.docx
task-959-809
53
[ [ 120, 95, 145, 113 ], [ 149, 95, 227, 113 ], [ 231, 95, 260, 113 ], [ 264, 95, 379, 113 ], [ 383, 95, 399, 113 ], [ 403, 95, 495, 113 ], [ 499, 95, 570, 113 ], [ 120, ...
[ [ 120, 95, 145, 113 ], [ 149, 95, 227, 113 ], [ 231, 95, 260, 113 ], [ 264, 95, 379, 113 ], [ 383, 95, 399, 113 ], [ 403, 95, 495, 113 ], [ 499, 95, 570, 113 ], [ 120, ...
that there There exists a gap for the need of Promote perishable produce where wil be warehousing facilities for the storage of warehousing and storage facilities are perishable and non perishable goods from available. increase in production farms. Explore convergence with Central/State schemes that promote local level...
that there wil be increase in production There exists a gap for the need of warehousing facilities for the storage of perishable and non perishable goods from farms. Promote perishable produce where warehousing and storage facilities are available. Explore convergence with Central/State schemes that promote local level...
0.733154
[ 0, 1, 14, 15, 34, 35, 36, 2, 3, 4, 5, 6, 7, 8, 9, 16, 17, 18, 19, 20, 21, 27, 28, 29, 30, 31, 32, 37, 10, 11, 12, 13, 22, 23, 24, 25, 26, 33, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 61, 70, 85, 86...
E43970EA0P13270disclosed0120270130.docx
task-959-809
64
[ [ 106, 230, 133, 255 ], [ 137, 230, 172, 255 ], [ 229, 230, 263, 255 ], [ 277, 230, 310, 255 ], [ 324, 230, 331, 255 ], [ 346, 230, 367, 255 ], [ 382, 230, 398, 255 ], [ 41...
[ [ 106, 230, 133, 255 ], [ 137, 230, 172, 255 ], [ 106, 252, 126, 278 ], [ 130, 252, 146, 278 ], [ 106, 275, 161, 300 ], [ 165, 275, 177, 300 ], [ 106, 297, 178, 322 ], [ 22...
Taking up livelihood /micro credit Same as mitigation Same as mitigation activities measure measure Participating in monitoring Same as mitigation Same as mitigation processes such as social audits measure measure and use of score cards etc. Contributing to the Operation and Same as mitigation Same as mitigation Same a...
Taking up livelihood /micro credit activities Same as mitigation measure Same as mitigation measure Participating in monitoring processes such as social audits and use of score cards etc. Same as mitigation measure Same as mitigation measure Contributing to the Operation and Maintenance Fund Same as mitigation measure ...
0.562968
[ 0, 1, 2, 3, 4, 11, 5, 6, 7, 12, 8, 9, 10, 13, 14, 15, 16, 23, 24, 25, 26, 27, 30, 31, 32, 33, 34, 35, 17, 18, 19, 28, 20, 21, 22, 29, 36, 37, 38, 39, 40, 50, 51, 41, 42, 43, 52, 44, 45, 46, 53, 47, 48, 49, 54...
E43970EA0P13270disclosed0120270130.docx
task-959-809
78
[ [ 336, 119, 370, 142 ], [ 376, 119, 389, 142 ], [ 394, 119, 443, 142 ], [ 449, 119, 482, 142 ], [ 487, 119, 516, 142 ], [ 651, 119, 677, 142 ], [ 694, 119, 704, 142 ], [ 72...
[ [ 336, 119, 370, 142 ], [ 376, 119, 389, 142 ], [ 394, 119, 443, 142 ], [ 449, 119, 482, 142 ], [ 487, 119, 516, 142 ], [ 336, 139, 381, 163 ], [ 651, 119, 677, 142 ], [ 69...
WCDC (Watershed IWMP; Data Corporate PIAs Project Officer, Agriculture IWMP; Data Plan, monitor, Cell Cum Data compilation, (Direct implementation and Department compilation, supervise, Beneficiary) Center) management, provide backstop to and APDs management, implement IWMP; analysis, the project. analysis, Data compil...
WCDC (Watershed Cell Cum Data Center) (Direct Beneficiary) Line Departments (Indirect Beneficiary) IWMP; Data compilation, management, analysis, reporting; MIS Technical Support; Convergence; Training and Capacity Building Corporate PIAs (Direct Beneficiary) Empanelled Resource organizations Other NGOs working in the p...
0.158169
[ 0, 1, 13, 14, 15, 24, 40, 41, 60, 61, 67, 79, 2, 3, 16, 25, 34, 42, 43, 54, 63, 72, 87, 88, 97, 98, 4, 5, 17, 23, 51, 52, 62, 68, 69, 70, 80, 81, 82, 83, 94, 100, 6, 18, 19, 26, 27, 28, 35, 36, 49, 50, 55, 56, ...
E43970EA0P13270disclosed0120270130.docx
task-959-809
96
[ [ 127, 208, 161, 228 ], [ 173, 208, 225, 228 ], [ 239, 208, 273, 228 ], [ 302, 208, 324, 228 ], [ 337, 208, 383, 228 ], [ 386, 208, 408, 228 ], [ 454, 208, 486, 228 ], [ 56...
[ [ 127, 208, 161, 228 ], [ 173, 208, 225, 228 ], [ 127, 225, 146, 245 ], [ 164, 225, 186, 245 ], [ 204, 225, 225, 245 ], [ 127, 242, 161, 262 ], [ 127, 261, 160, 279 ], [ 16...
Importation Leakage/spillage during shipment People exposed to risk, Old stock; causing damage to the including wildlife & aquatic pesticide environment species quality Leakages and spillage fire; Spills Operator hazard during Lack of or cleaned; Decanted or spillage and decontamination protective repacking and absorbe...
Importation Leakage/spillage during shipment causing damage to the environment People exposed to risk, including wildlife & aquatic species Old stock; pesticide quality Leakages and spillage fire; Spills or cleaned; Decanted or repacking Operator hazard during spillage and decontamination Lack of protective and absorbe...
0.676468
[ 0, 1, 2, 3, 10, 11, 12, 13, 19, 4, 5, 6, 7, 14, 15, 16, 17, 20, 8, 9, 18, 21, 22, 23, 24, 25, 26, 32, 33, 34, 35, 40, 27, 28, 29, 36, 37, 38, 30, 31, 39, 41, 42, 43, 44, 45, 46, 47, 51, 52, 53, 54, 61, 62, 63...
E44260V20AFR0P0Box382135B00PUBLIC0.docx
task-959-817
20
[ [ 117, 89, 213, 110 ], [ 253, 89, 385, 110 ], [ 392, 89, 444, 110 ], [ 450, 89, 525, 110 ], [ 543, 89, 598, 110 ], [ 602, 89, 669, 110 ], [ 673, 89, 690, 110 ], [ 694, ...
[ [ 117, 89, 213, 110 ], [ 253, 89, 385, 110 ], [ 392, 89, 444, 110 ], [ 450, 89, 525, 110 ], [ 253, 108, 313, 129 ], [ 348, 108, 412, 129 ], [ 447, 108, 464, 129 ], [ 499, ...
Table 8 Monitoring Plan Responsibility Cost What parameter is to Where is the parameter How is the parameter to When is the parameter to Install Operate Install Operate be monitored? to be monitored? be monitored? be monitored? Frequency Construction phase Traffic safety Existence of traffic At and near job site on Ins...
Table 8 Monitoring Plan What parameter is to be monitored? Where is the parameter to be monitored? How is the parameter to be monitored? When is the parameter to be monitored? Frequency Cost Responsibility Install Operate Install Operate Construction phase Traffic safety Safety during construction Existence of traffic ...
0.460451
[ 0, 1, 2, 3, 6, 7, 8, 9, 28, 29, 10, 11, 12, 13, 30, 31, 32, 14, 15, 16, 17, 18, 33, 34, 19, 20, 21, 22, 23, 35, 36, 37, 5, 4, 24, 25, 26, 27, 38, 39, 40, 41, 76, 77, 81, 42, 43, 44, 58, 59, 69, 70, 45, 46, 47...
E44820V20ECA0E0Box385162B00PUBLIC0.docx
task-959-830
34
[ [ 412, 114, 453, 149 ], [ 458, 114, 467, 149 ], [ 472, 114, 549, 149 ], [ 554, 114, 587, 149 ], [ 802, 187, 866, 209 ], [ 705, 206, 727, 228 ], [ 179, 224, 203, 247 ], [ 20...
[ [ 412, 114, 453, 149 ], [ 458, 114, 467, 149 ], [ 472, 114, 549, 149 ], [ 554, 114, 587, 149 ], [ 179, 224, 203, 247 ], [ 206, 224, 253, 247 ], [ 256, 224, 263, 247 ], [ 26...
Mitigation measures in the ESMP hinge on prior information /notices to and consent by other operators and users of affected infrastructure. Arusha City Council establish: procedure for early notification and coordination among relevant utility and infrastructure authorities responsible for e.g. water supply, electricit...
Mitigation measures in the ESMP hinge on prior information /notices to and consent by other operators and users of affected infrastructure. Arusha City Council establish: procedure for early notification and coordination among relevant utility and infrastructure authorities responsible for e.g. water supply, electricit...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E45160V30AFR0E0Box385175B00PUBLIC0.docx
task-959-844
56
[ [ 95, 99, 180, 118 ], [ 189, 99, 264, 118 ], [ 273, 99, 288, 118 ], [ 298, 99, 322, 118 ], [ 331, 99, 384, 118 ], [ 393, 99, 438, 118 ], [ 447, 99, 467, 118 ], [ 476, 9...
[ [ 95, 99, 180, 118 ], [ 189, 99, 264, 118 ], [ 273, 99, 288, 118 ], [ 298, 99, 322, 118 ], [ 331, 99, 384, 118 ], [ 393, 99, 438, 118 ], [ 447, 99, 467, 118 ], [ 476, 9...
Unplanned Check condition of land LGA Works Ongoing $ 100 a year illegal See measures sections 1& 2 uses at project site Engineer developments above. LGA EMO, the road LGA CDO 9.2 New / Improve trade Enhancement measures: LGA Operation $ 100 a year rehabilitated rural and supply of Engineer, Period roads commodities to...
Unplanned illegal developments the road See measures sections 1& 2 above. Check condition of land uses at project site LGA Works Engineer LGA EMO, LGA CDO Ongoing $ 100 a year 9.2 New / rehabilitated rural roads Improve trade and supply of commodities to neighbouring communities Enhancement measures: Regular Preventive...
0.449015
[ 0, 12, 23, 27, 28, 13, 14, 15, 16, 17, 24, 1, 2, 3, 4, 18, 19, 20, 21, 5, 6, 22, 25, 26, 29, 30, 7, 8, 9, 10, 11, 31, 32, 33, 44, 45, 51, 34, 35, 46, 47, 48, 52, 53, 57, 61, 36, 37, 54, 55, 58, 59, 38, 49, 56...
E45160V30AFR0E0Box385175B00PUBLIC0.docx
task-959-844
70
[ [ 208, 165, 265, 189 ], [ 478, 165, 511, 189 ], [ 514, 165, 564, 189 ], [ 567, 165, 578, 189 ], [ 581, 165, 603, 189 ], [ 629, 165, 656, 189 ], [ 659, 165, 694, 189 ], [ 72...
[ [ 208, 165, 265, 189 ], [ 208, 186, 240, 211 ], [ 208, 207, 280, 232 ], [ 232, 229, 248, 253 ], [ 251, 229, 275, 253 ], [ 302, 186, 321, 211 ], [ 324, 186, 372, 211 ], [ 37...
Has the receiving environment for any wastes been identified and described? Relevant? Judgement Comments Yes/No (C/A/I) 4 ALTERNATIVES Were strategic alternatives to the project considered in the EA? Does the EIA assess various “within-project” alternatives (e.g. design, location) Are the reasons for selecting the prop...
Has the receiving environment for any wastes been identified and described? Relevant? Yes/No Judgement (C/A/I) Comments 4 ALTERNATIVES Were strategic alternatives to the project considered in the EA? Does the EIA assess various “within-project” alternatives (e.g. design, location) Are the reasons for selecting the prop...
0.896756
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 14, 12, 15, 13, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E45220REVISED00Box385215B00PUBLIC0.docx
task-959-847
63
[ [ 181, 84, 211, 103 ], [ 216, 84, 239, 103 ], [ 244, 84, 315, 103 ], [ 181, 100, 279, 119 ], [ 283, 100, 305, 119 ], [ 310, 100, 338, 119 ], [ 181, 117, 233, 136 ], [ 237, ...
[ [ 181, 84, 211, 103 ], [ 216, 84, 239, 103 ], [ 244, 84, 315, 103 ], [ 181, 100, 279, 119 ], [ 283, 100, 305, 119 ], [ 310, 100, 338, 119 ], [ 181, 117, 233, 136 ], [ 237, ...
along the proposed Bukoba / Bukoba Task team members for Discussed fieldwork recommendations on Rural District the project irrigation selected Ngono valley irrigation Beneficiaries and village Met beneficiaries and village council reps and watershed project. council representatives Assessment of irrigation areas and re...
along the proposed Ngono valley irrigation and watershed project. Bukoba / Bukoba Rural District Task team members for the project Beneficiaries and village council representatives Discussed fieldwork recommendations on irrigation selected Met beneficiaries and village council reps Assessment of irrigation areas and re...
0.796719
[ 0, 1, 2, 20, 21, 22, 32, 33, 34, 3, 4, 5, 14, 15, 6, 7, 8, 9, 16, 17, 23, 24, 25, 35, 36, 10, 11, 12, 13, 18, 19, 26, 27, 28, 29, 30, 31, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E45530P14721800Box385203B00PUBLIC0.docx
task-959-852
73
[ [ 106, 164, 139, 180 ], [ 142, 164, 162, 180 ], [ 165, 164, 222, 180 ], [ 264, 164, 309, 180 ], [ 312, 164, 318, 180 ], [ 321, 164, 366, 180 ], [ 418, 164, 444, 180 ], [ 44...
[ [ 106, 164, 139, 180 ], [ 142, 164, 162, 180 ], [ 165, 164, 222, 180 ], [ 106, 180, 145, 196 ], [ 149, 180, 183, 196 ], [ 186, 180, 241, 196 ], [ 106, 196, 128, 212 ], [ 13...
from Hekwe/Magatini, Wegero, Buswahili, Busawe and Kisaka villages (villages under proposed Mara valley irrigation project). Village general assemblies were also conducted in respective villages; Divisional Secretary, Ward and Village Executive Officers. SIO-SANGO (KENYA) AND NYABANJA (UGANDA) IRRIGATION PROJECTS CONSU...
from Hekwe/Magatini, Wegero, Buswahili, Busawe and Kisaka villages (villages under proposed Mara valley irrigation project). Village general assemblies were also conducted in respective villages; Divisional Secretary, Ward and Village Executive Officers. SIO-SANGO (KENYA) AND NYABANJA (UGANDA) IRRIGATION PROJECTS CONSU...
0.623603
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 43, 44, 39, 40, 41, 42, 45, 46, 47, 60, 61, 71, 72, 79, 80, 81...
E45530P14721800Box385203B00PUBLIC0.docx
task-959-852
76
[ [ 415, 164, 444, 180 ], [ 477, 164, 580, 180 ], [ 415, 178, 466, 194 ], [ 470, 178, 530, 194 ], [ 534, 178, 580, 194 ], [ 415, 192, 437, 208 ], [ 442, 192, 479, 208 ], [ 48...
[ [ 415, 164, 444, 180 ], [ 477, 164, 580, 180 ], [ 415, 178, 466, 194 ], [ 470, 178, 530, 194 ], [ 534, 178, 580, 194 ], [ 415, 192, 437, 208 ], [ 442, 192, 479, 208 ], [ 48...
2.6 Relationship of the Policy/Plan/Program to Other Policies, Plans and Program 3 SESA Approach 3.1 Scoping 3.2 SESA Objectives and Indicators 3.3 SESA Scope 3.4 Assessment Methodology 3.5 Consultation 4 Environmental Information 4.1 Introduction 4.2 Baseline 4.3 Relevant Existing Problems 4.4 Likely Evolution of the ...
2.6 Relationship of the Policy/Plan/Program to Other Policies, Plans and Program 3 SESA Approach 3.1 Scoping 3.2 SESA Objectives and Indicators 3.3 SESA Scope 3.4 Assessment Methodology 3.5 Consultation 4 Environmental Information 4.1 Introduction 4.2 Baseline 4.3 Relevant Existing Problems 4.4 Likely Evolution of the ...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E45600REVISED00Box385296B00PUBLIC0.docx
task-959-853
26
[ [ 109, 95, 134, 115 ], [ 138, 95, 237, 115 ], [ 241, 95, 258, 115 ], [ 262, 95, 289, 115 ], [ 332, 95, 497, 115 ], [ 501, 95, 518, 115 ], [ 522, 95, 569, 115 ], [ 573, ...
[ [ 109, 95, 134, 115 ], [ 138, 95, 237, 115 ], [ 241, 95, 258, 115 ], [ 262, 95, 289, 115 ], [ 332, 95, 497, 115 ], [ 501, 95, 518, 115 ], [ 522, 95, 569, 115 ], [ 573, ...
Soil, surface water, air Cover the trucks transporting the fine materials Not C, D pollution with transported N/A N/A Contractor or waste applicable materials Separation of topsoil and subsoil during Contractor, Construction Not excavation works, with careful replacement of Bill of Q N/A supervision applicable topsoil ...
C, D Soil, surface water, air pollution with transported materials Cover the trucks transporting the fine materials or waste N/A N/A Contractor Not applicable C Loss of topsoil leading to increased soil erosion Separation of topsoil and subsoil during excavation works, with careful replacement of topsoil after pipe is ...
0.551932
[ 12, 13, 0, 1, 2, 3, 14, 15, 16, 23, 4, 5, 6, 7, 8, 9, 10, 20, 21, 17, 18, 19, 11, 22, 58, 50, 51, 52, 53, 54, 70, 71, 72, 24, 25, 26, 27, 28, 29, 33, 34, 35, 36, 37, 38, 45, 46, 47, 48, 49, 39, 40, 41, 42, 30...
E46010EA0EMP0M0Box385269B00PUBLIC0.docx
task-959-862
24
[ [ 160, 232, 179, 251 ], [ 190, 232, 221, 251 ], [ 233, 232, 259, 251 ], [ 270, 232, 281, 251 ], [ 294, 240, 319, 259 ], [ 322, 240, 335, 259 ], [ 339, 240, 364, 259 ], [ 36...
[ [ 71, 248, 81, 266 ], [ 83, 248, 90, 266 ], [ 160, 232, 179, 251 ], [ 190, 232, 221, 251 ], [ 233, 232, 259, 251 ], [ 270, 232, 281, 251 ], [ 160, 248, 196, 266 ], [ 206, ...
Table 1: Some important seed borne organisms of relevance to Zambia Crop Organism Disease maize Cob rot Fusarium spp Cob rot Diplodia spp Bacterial leaf blight Erwinia stewartii Downy mildew Scleropthora microspora sorghum Smut Spacelotheca spp Claviceps microcephala Ergot Claviceps purpureum Seed rot Fusarium monilifo...
Table 1: Some important seed borne organisms of relevance to Zambia Crop Organism Disease maize Fusarium spp Diplodia spp Erwinia stewartii Scleropthora microspora Cob rot Cob rot Bacterial leaf blight Downy mildew sorghum Spacelotheca spp Claviceps microcephala Claviceps purpureum Fusarium moniliform Smut Ergot Seed r...
0.845197
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 17, 18, 21, 22, 26, 27, 30, 31, 15, 16, 19, 20, 23, 24, 25, 28, 29, 32, 34, 35, 36, 37, 39, 40, 43, 44, 33, 38, 41, 42, 45, 48, 49, 52, 53, 46, 47, 50, 51, 54...
E46830V20P14420Box385383B00PUBLIC0.docx
task-959-881
11
[ [ 117, 105, 161, 124 ], [ 166, 105, 180, 124 ], [ 189, 105, 231, 124 ], [ 236, 105, 314, 124 ], [ 318, 105, 351, 124 ], [ 356, 105, 400, 124 ], [ 405, 105, 484, 124 ], [ 48...
[ [ 117, 105, 161, 124 ], [ 166, 105, 180, 124 ], [ 189, 105, 231, 124 ], [ 236, 105, 314, 124 ], [ 318, 105, 351, 124 ], [ 356, 105, 400, 124 ], [ 405, 105, 484, 124 ], [ 48...
hazard in normal use 16 Triazole 18 Triadimenol Baytan III Coffee Coffee Leaf Rust 17 Triphyenyltin 19 Triphenyltin Acetate Brestan, II Soybeans Red leaf blotch Source: ADSP Pest Management Plan Table 5:Insecticides phased out, banned, or restricted Banned, restricted or no longer in use pesticides that are still recom...
hazard in normal use 16 Triazole 18 Triadimenol Baytan III Coffee Coffee Leaf Rust 17 Triphyenyltin 19 Triphenyltin Acetate Brestan, II Soybeans Red leaf blotch Source: ADSP Pest Management Plan Table 5:Insecticides phased out, banned, or restricted Banned, restricted or no longer in use pesticides that are still recom...
0.586286
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 65...
E46830V20P14420Box385383B00PUBLIC0.docx
task-959-881
23
[ [ 506, 152, 540, 173 ], [ 543, 152, 553, 173 ], [ 506, 170, 542, 192 ], [ 545, 170, 562, 192 ], [ 63, 198, 76, 220 ], [ 114, 198, 156, 220 ], [ 235, 198, 247, 220 ], [ 285,...
[ [ 506, 152, 540, 173 ], [ 543, 152, 553, 173 ], [ 506, 170, 542, 192 ], [ 545, 170, 562, 192 ], [ 63, 198, 76, 220 ], [ 114, 198, 156, 220 ], [ 235, 198, 247, 220 ], [ 285,...
rich in bio-diversity with for ESIA, and the ESIA will provide inputs to the dense vegetation. Access engineering design of the project to ensure that the road will be disruptive to impacts on the national Park is avoided/mitigated to the conservation area, acceptable level. especially with the tunnel and large amount ...
rich in bio-diversity with dense vegetation. Access road will be disruptive to the conservation area, especially with the tunnel and large amount of spoils disposal. Can the entire road be constructed above the surface, possibly along the riverbank or make use of planned Koshi Highway on the other side of the Arun Rive...
0.775369
[ 0, 1, 2, 3, 14, 15, 16, 26, 27, 28, 29, 30, 39, 40, 41, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82...
E47270REVISED00LIC00SAR0EA0P150066.docx
task-959-894
28
[ [ 108, 89, 136, 108 ], [ 141, 89, 155, 108 ], [ 159, 89, 251, 108 ], [ 255, 89, 287, 108 ], [ 310, 89, 331, 108 ], [ 335, 89, 380, 108 ], [ 384, 89, 410, 108 ], [ 415, ...
[ [ 108, 89, 136, 108 ], [ 141, 89, 155, 108 ], [ 159, 89, 251, 108 ], [ 255, 89, 287, 108 ], [ 108, 105, 149, 124 ], [ 154, 105, 233, 124 ], [ 237, 105, 288, 124 ], [ 108, ...
management practices Water use during Confined to water Minimal as other project Yes due to Neighbouring Yes. May be (to plan t construction source area and activities are likely to be development Particularly in enhancement can be replenished less as water intensive activities and the industrial measures under develop...
management practices Water use during construction Confined to water source area and can be replenished Minimal as other project activities are likely to be less as water intensive development activities are likely to be located away from EDFC impact zone Yes due to development activities and increased demand from Indu...
0.408189
[ 0, 1, 2, 3, 4, 22, 5, 6, 7, 23, 24, 25, 35, 36, 37, 8, 9, 10, 11, 26, 27, 28, 29, 30, 38, 39, 40, 41, 48, 49, 50, 57, 58, 59, 60, 61, 68, 69, 70, 71, 12, 13, 14, 31, 42, 43, 51, 62, 63, 72, 15, 16, 32, 33, 44...
E47320v40EA0390vised0Draft0P150158.docx
task-959-895
29
[ [ 818, 356, 884, 378 ], [ 818, 379, 862, 401 ], [ 91, 423, 121, 445 ], [ 197, 423, 214, 445 ], [ 217, 423, 249, 445 ], [ 279, 423, 323, 445 ], [ 326, 423, 336, 445 ], [ 340...
[ [ 818, 356, 884, 378 ], [ 818, 379, 862, 401 ], [ 91, 423, 121, 445 ], [ 197, 423, 214, 445 ], [ 217, 423, 249, 445 ], [ 171, 447, 232, 468 ], [ 279, 423, 323, 445 ], [ 326...
materials Littering of Instructions to contractor to Construction Contractor Supervision of State Depts. construction site which local utility observance of with removed pipe landfill the waste has to be services measures portions and delivered. discarded If insulation contains asbestos, insulation material workers mus...
materials Littering of construction site with removed pipe portions and discarded insulation material Noise pollution in towns Reduced amenity values of the area Archeological” chance find” Instructions to contractor to which landfill the waste has to be delivered. If insulation contains asbestos, workers must wear pro...
0.31242
[ 0, 1, 2, 13, 14, 20, 21, 22, 31, 32, 34, 39, 40, 49, 50, 62, 63, 73, 84, 85, 91, 92, 93, 104, 118, 119, 3, 4, 5, 6, 15, 23, 24, 25, 26, 27, 28, 33, 35, 36, 37, 38, 41, 42, 43, 44, 45, 48, 46, 47, 51, 52, 53, 54...
E47390ECA0EMF00Box385429B00PUBLIC0.docx
task-959-897
75
[ [ 174, 193, 222, 217 ], [ 174, 235, 220, 260 ], [ 223, 235, 234, 260 ], [ 293, 235, 354, 260 ], [ 357, 235, 368, 260 ], [ 371, 235, 424, 260 ], [ 427, 235, 437, 260 ], [ 47...
[ [ 174, 193, 222, 217 ], [ 174, 235, 220, 260 ], [ 223, 235, 234, 260 ], [ 174, 257, 238, 281 ], [ 242, 257, 260, 281 ], [ 174, 278, 197, 302 ], [ 200, 278, 246, 302 ], [ 24...
construction. Asbestos hazardous materials may be present in old management plan buildings. (HMMP) Construct additional storey Refurbishing existing There are no negative NA EMP will provide for Completion audit by for tsunami warning centre building may result in impacts expected with guidance on mitigation building i...
construction. Asbestos may be present in old buildings. hazardous materials management plan (HMMP) Construct additional storey for tsunami warning centre in Samoa Refurbishing existing building may result in minor adverse impacts including noise, dust and generation of solid waste materials from construction There are ...
0.497713
[ 0, 1, 4, 5, 6, 7, 8, 11, 2, 3, 9, 10, 12, 13, 14, 15, 30, 31, 32, 33, 47, 48, 16, 17, 34, 35, 36, 37, 49, 50, 51, 58, 59, 60, 61, 63, 64, 65, 66, 67, 68, 69, 18, 19, 20, 21, 38, 39, 40, 52, 53, 22, 23, 24, 25...
E47620EAP0ESMF0Box385451B00PUBLIC0.docx
task-959-902
49
[ [ 253, 162, 321, 185 ], [ 324, 162, 373, 185 ], [ 670, 162, 726, 185 ], [ 729, 162, 777, 185 ], [ 253, 181, 276, 204 ], [ 279, 181, 292, 204 ], [ 296, 181, 335, 204 ], [ 33...
[ [ 253, 162, 321, 185 ], [ 324, 162, 373, 185 ], [ 253, 181, 276, 204 ], [ 279, 181, 292, 204 ], [ 296, 181, 335, 204 ], [ 338, 181, 348, 204 ], [ 351, 181, 367, 204 ], [ 25...
9.1.2 Capacity Building Plan to commencement of implementation, the PREP will provide funds for social and environmental safeguards support and oversight as needed, including funds for a suitable qualified individual who will support the PMU for each participating country. Training on safeguards should include familiar...
9.1.2 Capacity Building Plan to commencement of implementation, the PREP will provide funds for social and environmental safeguards support and oversight as needed, including funds for a suitable qualified individual who will support the PMU for each participating country. Training on safeguards should include familiar...
0.892517
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E47620EAP0ESMF0Box385451B00PUBLIC0.docx
task-959-902
68
[ [ 120, 83, 162, 101 ], [ 181, 83, 258, 101 ], [ 263, 83, 337, 101 ], [ 342, 83, 381, 101 ], [ 167, 105, 182, 123 ], [ 192, 105, 324, 123 ], [ 334, 105, 349, 123 ], [ 359, ...
[ [ 120, 83, 162, 101 ], [ 181, 83, 258, 101 ], [ 263, 83, 337, 101 ], [ 342, 83, 381, 101 ], [ 167, 105, 182, 123 ], [ 192, 105, 324, 123 ], [ 334, 105, 349, 123 ], [ 359, ...
G Guidance on Action Plan of Activities for CERC I. Guidance on developing a CERC Action Plan of Activities Framework A Action Plan of Activities Framework (APAF) be developed and submitted to the World Bank prior to the occurrence of an eligible event. While the Action Plan of Activities Framework will not contain the...
G Guidance on Action Plan of Activities for CERC I. Guidance on developing a CERC Action Plan of Activities Framework A Action Plan of Activities Framework (APAF) be developed and submitted to the World Bank prior to the occurrence of an eligible event. While the Action Plan of Activities Framework will not contain the...
0.981153
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E47620EAP0ESMF0Box385451B00PUBLIC0.docx
task-959-902
124
[ [ 164, 88, 179, 109 ], [ 191, 88, 280, 109 ], [ 285, 88, 309, 109 ], [ 315, 88, 376, 109 ], [ 381, 88, 422, 109 ], [ 428, 88, 446, 109 ], [ 452, 88, 539, 109 ], [ 544, ...
[ [ 164, 88, 179, 109 ], [ 191, 88, 280, 109 ], [ 285, 88, 309, 109 ], [ 315, 88, 376, 109 ], [ 381, 88, 422, 109 ], [ 428, 88, 446, 109 ], [ 452, 88, 539, 109 ], [ 544, ...
Retrofitting public buildings Refurbishing existing Exclusion of vulnerable NA Site assessment Completion audit by for resilience based on building may result in groups - potential for including hazard building inspector or feasibility studies, e.g. adverse impacts including physically disable vulnerability, flood and ...
Retrofitting public buildings for resilience based on feasibility studies, e.g. Evacuation Centres, schools that act as emergency shelters Refurbishing existing building may result in adverse impacts including noise, dust and generation of solid waste materials from construction Exclusion of vulnerable groups - potenti...
0.53501
[ 0, 1, 2, 14, 15, 16, 17, 31, 32, 33, 44, 45, 54, 55, 56, 57, 70, 71, 3, 4, 18, 19, 20, 21, 34, 35, 36, 46, 47, 48, 58, 59, 60, 61, 72, 73, 77, 5, 6, 7, 22, 23, 24, 25, 37, 38, 49, 50, 51, 62, 63, 64, 65, 74, ...
E47980EAP0ESMF0Box391418B00PUBLIC0.docx
task-959-915
52
[ [ 91, 162, 149, 185 ], [ 152, 162, 183, 185 ], [ 186, 162, 233, 185 ], [ 253, 162, 320, 185 ], [ 323, 162, 364, 185 ], [ 403, 162, 454, 185 ], [ 457, 162, 467, 185 ], [ 470...
[ [ 91, 162, 149, 185 ], [ 152, 162, 183, 185 ], [ 186, 162, 233, 185 ], [ 91, 181, 105, 204 ], [ 109, 181, 159, 204 ], [ 162, 181, 194, 204 ], [ 198, 181, 211, 204 ], [ 91, ...
Compliance with these conventions is required to retain GSP+ status. Complementarity between GSP+ and the recommendations of the ESSA was emphasized. Ensuring compliance with conventions can be used as an incentive to increase exports. Participants stated that it is the constitutional right of every child in Pakistan t...
Compliance with these conventions is required to retain GSP+ status. Complementarity between GSP+ and the recommendations of the ESSA was emphasized. Ensuring compliance with conventions can be used as an incentive to increase exports. Participants stated that it is the constitutional right of every child in Pakistan t...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
E4845-REVISED-EA-P155963-ESSA-PUBLIC-Disclosed-2-24-2016.docx
task-959-925
82
[ [ 215, 89, 309, 109 ], [ 328, 89, 363, 109 ], [ 382, 89, 422, 109 ], [ 440, 89, 535, 109 ], [ 554, 89, 567, 109 ], [ 586, 89, 651, 109 ], [ 670, 89, 685, 109 ], [ 703, ...
[ [ 215, 89, 309, 109 ], [ 328, 89, 363, 109 ], [ 382, 89, 422, 109 ], [ 440, 89, 535, 109 ], [ 554, 89, 567, 109 ], [ 586, 89, 651, 109 ], [ 670, 89, 685, 109 ], [ 703, ...
Practice Exam Matching Questions Match the following terms with their definitions: (2) A. Drawer 1. Someone who issues a promissory note (3) B. Drawee 2. The person who issues a draft (5) C. Issuer 3. The person who pays a draft (1) D. .Maker 4. Anyone in possession of an instrument if it is indorsed to her (4) E. Hold...
Practice Exam Matching Questions Match the following terms with their definitions: (2) A. Drawer (3) B. Drawee (5) C. Issuer (1) D. .Maker (4) E. Holder 1. Someone who issues a promissory note 2. The person who issues a draft 3. The person who pays a draft 4. Anyone in possession of an instrument if it is indorsed to h...
0.888121
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 21, 22, 23, 31, 32, 33, 41, 42, 43, 57, 58, 59, 14, 15, 16, 17, 18, 19, 20, 24, 25, 26, 27, 28, 29, 30, 34, 35, 36, 37, 38, 39, 40, 44, 45, 46, 47, 48, 49, 50, 51...
113318815X_320686.docx
task-96-248
0
[ [ 117, 88, 212, 115 ], [ 219, 88, 286, 115 ], [ 117, 119, 203, 140 ], [ 209, 119, 304, 140 ], [ 117, 145, 163, 163 ], [ 168, 145, 189, 163 ], [ 194, 145, 264, 163 ], [ 268,...
[ [ 117, 88, 212, 115 ], [ 219, 88, 286, 115 ], [ 117, 119, 203, 140 ], [ 209, 119, 304, 140 ], [ 117, 145, 163, 163 ], [ 168, 145, 189, 163 ], [ 194, 145, 264, 163 ], [ 268,...
Practice Exam Matching Questions Match the following terms with their definitions: (1) A. ECPA 1. Regulates e-mail. (4) B. Fourth Amendment to the Constitution 2. Regulates Internet service providers. (5) C. CFAA 3. Regulates collection of information from children. (3) D. COPPA 4. Regulate Internet advertising. (2) E....
Practice Exam Matching Questions Match the following terms with their definitions: (1) A. ECPA (4) B. Fourth Amendment to the Constitution (5) C. CFAA (3) D. COPPA (2) E. CDA 1. Regulates e-mail. 2. Regulates Internet service providers. 3. Regulates collection of information from children. 4. Regulate Internet advertis...
0.885885
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 17, 18, 19, 20, 21, 22, 23, 29, 30, 31, 39, 40, 41, 46, 47, 48, 14, 15, 16, 24, 25, 26, 27, 28, 32, 33, 34, 35, 36, 37, 38, 42, 43, 44, 45, 49, 50, 51, 52, 53, 54...
113318815X_320699.docx
task-96-259
0
[ [ 117, 88, 212, 115 ], [ 219, 88, 286, 115 ], [ 117, 119, 203, 140 ], [ 209, 119, 304, 140 ], [ 117, 145, 163, 163 ], [ 168, 145, 189, 163 ], [ 194, 145, 264, 163 ], [ 268,...
[ [ 117, 88, 212, 115 ], [ 219, 88, 286, 115 ], [ 117, 119, 203, 140 ], [ 209, 119, 304, 140 ], [ 117, 145, 163, 163 ], [ 168, 145, 189, 163 ], [ 194, 145, 264, 163 ], [ 268,...
CASE 3-11 Joint Commission Hospital Quality Check The Joint Commission: CASE 3-12 Nursing Home Comparative Data Access the Medicare Nursing Home Compare website to search nursing homes: (Accessed by author on April 14, 2012) CASE 3-13 Residential Care Facilities in Long-Term Care (LTC) Access the 2010 Survey of Residen...
CASE 3-11 Joint Commission Hospital Quality Check The Joint Commission: CASE 3-12 Nursing Home Comparative Data Access the Medicare Nursing Home Compare website to search nursing homes: (Accessed by author on April 14, 2012) CASE 3-13 Residential Care Facilities in Long-Term Care (LTC) Access the 2010 Survey of Residen...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
1133602681_390030.docx
task-96-289
0
[ [ 117, 89, 155, 108 ], [ 159, 89, 192, 108 ], [ 117, 108, 153, 128 ], [ 157, 108, 246, 128 ], [ 250, 108, 312, 128 ], [ 316, 108, 371, 128 ], [ 375, 108, 419, 128 ], [ 117,...
[ [ 117, 89, 155, 108 ], [ 159, 89, 192, 108 ], [ 117, 108, 153, 128 ], [ 157, 108, 246, 128 ], [ 250, 108, 312, 128 ], [ 316, 108, 371, 128 ], [ 375, 108, 419, 128 ], [ 117,...
This step was further extended to determine template accommodation potential of the functional monomer using confirmation optimization the most stable template–monomer complexes based on interaction energy scores. For preparation of the imprinted polymer an appropriate functional monomer is very importance to have high...
This step was further extended to determine template accommodation potential of the functional monomer using confirmation optimization the most stable template–monomer complexes based on interaction energy scores. For preparation of the imprinted polymer an appropriate functional monomer is very importance to have high...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
11356_2014_2566_MOESM1_ESM.docx
task-96-363
2
[ [ 211, 100, 247, 119 ], [ 252, 100, 284, 119 ], [ 290, 100, 321, 119 ], [ 326, 100, 381, 119 ], [ 386, 100, 458, 119 ], [ 464, 100, 479, 119 ], [ 484, 100, 565, 119 ], [ 57...
[ [ 211, 100, 247, 119 ], [ 252, 100, 284, 119 ], [ 290, 100, 321, 119 ], [ 326, 100, 381, 119 ], [ 386, 100, 458, 119 ], [ 464, 100, 479, 119 ], [ 484, 100, 565, 119 ], [ 57...
GEOMETRIC >1000 MEAN@ Diatom Algal Same EC50 (Cell 20 24 – Bacillariophyceae (Phaeodactylum - 10 d Chronic nutrient 30 ± 5 as 100 U.S. EPA (2015) density) ± 2 medium media tricornutum) GEOMETRIC 100 MEAN@ Diatom Exponential IC10 Filtered 8.2 ± Osborn and Hook Bacillariophyceae (Phaeodactylum growth 3 d Chronic (Growth ...
>1000 GEOMETRIC MEAN@ Bacillariophyceae Diatom (Phaeodactylum tricornutum) - 10 d Chronic EC50 (Cell density) Algal nutrient medium 30 ± 5 20 – 24 ± 2 Same as media 100 U.S. EPA (2015) 100 GEOMETRIC MEAN@ Bacillariophyceae Diatom (Phaeodactylum tricornutum) Exponential growth phase 3 d Chronic IC10 (Growth rate) Filter...
0.308996
[ 1, 0, 2, 11, 3, 12, 31, 13, 14, 15, 16, 6, 7, 26, 4, 17, 29, 18, 19, 20, 8, 10, 9, 27, 28, 5, 21, 30, 22, 23, 24, 25, 33, 32, 34, 44, 35, 45, 65, 36, 46, 62, 47, 48, 49, 37, 50, 63, 38, 51, 59, 64, 52, 53, 54...
11356_2017_1097_MOESM9_ESM.docx
task-96-368
1
[ [ 804, 95, 858, 112 ], [ 736, 103, 761, 121 ], [ 814, 113, 848, 130 ], [ 248, 130, 276, 148 ], [ 540, 130, 561, 148 ], [ 683, 130, 704, 148 ], [ 470, 139, 492, 157 ], [ 494...
[ [ 736, 103, 761, 121 ], [ 804, 95, 858, 112 ], [ 814, 113, 848, 130 ], [ 135, 148, 204, 166 ], [ 248, 130, 276, 148 ], [ 231, 148, 293, 166 ], [ 238, 167, 286, 184 ], [ 339...
5. Lawrence Downing Lawrence Downing testified as a township commissioner in Manheim Township. He requested consideration of a phase-in based upon the magnitude of the requested increase. 6. Herbert B. Watson, Sr. Herbert B. Watson, Sr., a senior citizen, testified on behalf of himself and seniors with regard to the ec...
5. Lawrence Downing Lawrence Downing testified as a township commissioner in Manheim Township. He requested consideration of a phase-in based upon the magnitude of the requested increase. 6. Herbert B. Watson, Sr. Herbert B. Watson, Sr., a senior citizen, testified on behalf of himself and seniors with regard to the ec...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
1138838.docx
task-96-495
122
[ [ 176, 89, 192, 111 ], [ 235, 89, 324, 111 ], [ 330, 89, 411, 111 ], [ 235, 145, 318, 167 ], [ 324, 145, 403, 167 ], [ 408, 145, 476, 167 ], [ 482, 145, 499, 167 ], [ 505, ...
[ [ 176, 89, 192, 111 ], [ 235, 89, 324, 111 ], [ 330, 89, 411, 111 ], [ 235, 145, 318, 167 ], [ 324, 145, 403, 167 ], [ 408, 145, 476, 167 ], [ 482, 145, 499, 167 ], [ 505, ...
The Unit of Study or Annotated Bibliography assignment requires students to develop and carry out research projects, and to locate, evaluate, organize, and incorporate information effectively (CLO 4). Required Texts/Readings Textbook by Mary Adolescents in the Search for Meaning: Tapping the Powerful Resource of Story ...
The Unit of Study or Annotated Bibliography assignment requires students to develop and carry out research projects, and to locate, evaluate, organize, and incorporate information effectively (CLO 4). Required Texts/Readings Textbook Adolescents in the Search for Meaning: Tapping the Powerful Resource of Story by Mary ...
0.881754
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 31, 32, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
112B%20access%20syll%20Fa%2016.docx
task-96-52
2
[ [ 223, 106, 254, 126 ], [ 258, 106, 293, 126 ], [ 298, 106, 314, 126 ], [ 319, 106, 365, 126 ], [ 370, 106, 386, 126 ], [ 391, 106, 473, 126 ], [ 478, 106, 581, 126 ], [ 58...
[ [ 223, 106, 254, 126 ], [ 258, 106, 293, 126 ], [ 298, 106, 314, 126 ], [ 319, 106, 365, 126 ], [ 370, 106, 386, 126 ], [ 391, 106, 473, 126 ], [ 478, 106, 581, 126 ], [ 58...
signal. In fact, it is impossible to remove just the noise without attenuating the signal if the frequencies overlap or if there are common frequencies. For this reason, the Signal to Noise Ratio (SNR), the power ratio between the signal and noise, has more value in noise reducing processes and is more frequently used ...
signal. In fact, it is impossible to remove just the noise without attenuating the signal if the frequencies overlap or if there are common frequencies. For this reason, the Signal to Noise Ratio (SNR), the power ratio between the signal and noise, has more value in noise reducing processes and is more frequently used ...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
114050994-39369044-Internet-Mobile-Robot-the-Quad-Copter.docx
task-96-615
38
[ [ 176, 129, 226, 150 ], [ 237, 129, 252, 150 ], [ 257, 129, 292, 150 ], [ 297, 129, 308, 150 ], [ 314, 129, 326, 150 ], [ 331, 129, 416, 150 ], [ 421, 129, 438, 150 ], [ 44...
[ [ 176, 129, 226, 150 ], [ 237, 129, 252, 150 ], [ 257, 129, 292, 150 ], [ 297, 129, 308, 150 ], [ 314, 129, 326, 150 ], [ 331, 129, 416, 150 ], [ 421, 129, 438, 150 ], [ 44...
Please find the revenue budget heads that need external funding support in the table below. S.No Description of for which support is being sought y-o-y Amounts in Funding position basis INR April 2012 for academic year 2012-2013 1 Notebooks and stationery materials - for all students 2,00,000 I Request to Asha St. Loui...
Please find the revenue budget heads that need external funding support in the table below. S.No Description of for which support is being sought y-o-y basis Amounts in INR Funding position April 2012 for academic year 2012-2013 1 Notebooks and stationery materials - for all students 2,00,000 I Request to Asha St. Loui...
0.804467
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 29, 25, 26, 30, 27, 28, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
1142_Project_proposal.docx
task-96-696
4
[ [ 117, 89, 164, 108 ], [ 168, 89, 197, 108 ], [ 201, 89, 225, 108 ], [ 229, 89, 289, 108 ], [ 293, 89, 345, 108 ], [ 349, 89, 392, 108 ], [ 396, 89, 426, 108 ], [ 431, ...
[ [ 117, 89, 164, 108 ], [ 168, 89, 197, 108 ], [ 201, 89, 225, 108 ], [ 229, 89, 289, 108 ], [ 293, 89, 345, 108 ], [ 349, 89, 392, 108 ], [ 396, 89, 426, 108 ], [ 431, ...
(1)(2) Birth center or birthing center’ means a ‘Birthing facility or other place where human births are planned to occur. This but does not include the usual residence of the mother or any a facility which is licensed as a hospital. (2)(3) means the South Carolina Board of Health and Environmental Control. (3)(4) Nurs...
(1)(2) ‘Birthing Birth center or birthing center’ means a facility or other place where human births are planned to occur. This but does not include the usual residence of the mother or any a facility which is licensed as a hospital. (2)(3) means the South Carolina Board of Health and Environmental Control. (3)(4) ‘Cer...
0.90251
[ 0, 8, 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 57, 53...
1143.docx
task-96-699
2
[ [ 168, 61, 210, 80 ], [ 297, 61, 334, 80 ], [ 345, 61, 388, 80 ], [ 399, 61, 414, 80 ], [ 425, 61, 482, 80 ], [ 492, 61, 542, 79 ], [ 553, 61, 599, 80 ], [ 609, 61, ...
[ [ 168, 61, 210, 80 ], [ 221, 64, 286, 80 ], [ 297, 61, 334, 80 ], [ 345, 61, 388, 80 ], [ 399, 61, 414, 80 ], [ 425, 61, 482, 80 ], [ 492, 61, 542, 79 ], [ 553, 61, ...
availability and accessibility of professional and technical workforces required to build community capacity and wellbeing. However, these are outcomes reliant on the completion of quality education courses and clear employment pathways. Current Aboriginal and Torres Strait Islander participation in the higher educatio...
availability and accessibility of professional and technical workforces required to build community capacity and wellbeing. However, these are outcomes reliant on the completion of quality education courses and clear employment pathways. Current Aboriginal and Torres Strait Islander participation in the higher educatio...
0.93366
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
1144.%20Congress%20of%20ATSI%20Nurses%20and%20Midwives.docx
task-96-730
1
[ [ 142, 143, 230, 162 ], [ 236, 143, 267, 162 ], [ 273, 143, 371, 162 ], [ 377, 143, 394, 162 ], [ 400, 143, 500, 162 ], [ 506, 143, 537, 162 ], [ 543, 143, 617, 162 ], [ 62...
[ [ 142, 143, 230, 162 ], [ 236, 143, 267, 162 ], [ 273, 143, 371, 162 ], [ 377, 143, 394, 162 ], [ 400, 143, 500, 162 ], [ 506, 143, 537, 162 ], [ 543, 143, 617, 162 ], [ 62...
Options: Enabled or Disabled Receive Updates via Determine if you are planning to receive My MOS Oracle Support updates automatically for SuperCluster. Options: Enabled or Disabled MOS Email Address The My Oracle Support address to receive My Oracle Support updates. Access Oracle Determine if you are planning to access...
Options: Enabled or Disabled Receive Updates via MOS Determine if you are planning to receive My Oracle Support updates automatically for SuperCluster. Options: Enabled or Disabled MOS Email Address The My Oracle Support address to receive My Oracle Support updates. Access Oracle Configuration Manager via Support Hub D...
0.860468
[ 0, 1, 2, 3, 4, 5, 6, 15, 7, 8, 9, 10, 11, 12, 13, 14, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 50, 56, 57, 58, 64, 42, 43, 44, 45, 46, 47, 48, 49...
E58632.docx
task-960-157
168
[ [ 610, 130, 669, 146 ], [ 673, 130, 729, 146 ], [ 733, 130, 748, 146 ], [ 752, 130, 813, 146 ], [ 242, 181, 295, 198 ], [ 299, 181, 357, 198 ], [ 361, 181, 382, 198 ], [ 61...
[ [ 610, 130, 669, 146 ], [ 673, 130, 729, 146 ], [ 733, 130, 748, 146 ], [ 752, 130, 813, 146 ], [ 242, 181, 295, 198 ], [ 299, 181, 357, 198 ], [ 361, 181, 382, 198 ], [ 24...
2018/2019 HOMEWORK TIMETABLE YEAR 11 WEEK 1 WEEK 2 COHORT 1 COHORT 2 COHORT 1 COHORT 2 DAY Saints Catherine, Clare, Saints Martin, Stephen, Saints Catherine, Saints Martin, Stephen, Dominic, Margaret Teresa, Vincent Dominic, Margaret Teresa, Vincent Option Y (P2) Option Y (P2) Option X(P3) Option X(P3) All subjects All...
2018/2019 HOMEWORK TIMETABLE YEAR 11 DAY WEEK 1 WEEK 2 COHORT 1 Saints Catherine, Clare, Dominic, Margaret COHORT 2 Saints Martin, Stephen, Teresa, Vincent COHORT 1 Saints Catherine, Dominic, Margaret COHORT 2 Saints Martin, Stephen, Teresa, Vincent MONDAY Option Y (P2) RE Option Y (P2) Option X(P3) All subjects Scienc...
0.628365
[ 0, 1, 2, 3, 4, 17, 5, 6, 7, 8, 9, 10, 18, 19, 20, 29, 30, 11, 12, 21, 22, 23, 31, 32, 13, 14, 24, 25, 33, 34, 15, 16, 26, 27, 28, 35, 36, 53, 37, 38, 39, 51, 40, 41, 42, 43, 44, 47, 48, 52, 45, 46, 49, 50, 67...
E642C40E03A8995283EEC0D444A96877.docx
task-960-316
0
[ [ 466, 68, 533, 96 ], [ 391, 120, 471, 146 ], [ 475, 120, 550, 146 ], [ 553, 120, 589, 146 ], [ 593, 120, 608, 146 ], [ 392, 143, 431, 168 ], [ 435, 143, 442, 168 ], [ 723,...
[ [ 466, 68, 533, 96 ], [ 391, 120, 471, 146 ], [ 475, 120, 550, 146 ], [ 553, 120, 589, 146 ], [ 593, 120, 608, 146 ], [ 154, 174, 182, 200 ], [ 392, 143, 431, 168 ], [ 435,...
What are the ethical challenges we face Using digital media created by another when using digital media? is legally protected and should be used How do framing and lighting impact shot accordingly. composition? There are many sources available to create and edit digital media. Unit Objectives Unit Objectives Students w...
What are the ethical challenges we face when using digital media? How do framing and lighting impact shot composition? Using digital media created by another is legally protected and should be used accordingly. There are many sources available to create and edit digital media. Unit Objectives Students will know… The im...
0.887894
[ 0, 1, 2, 3, 4, 5, 6, 13, 14, 15, 16, 24, 25, 26, 27, 28, 29, 30, 32, 7, 8, 9, 10, 11, 12, 17, 18, 19, 20, 21, 22, 23, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 48, 49, 50, 62, 63, 64, 65, 66, 67...
e7462e30-de8e-416c-bf67-3e8ede5ff81c.docx
task-960-501
13
[ [ 138, 89, 180, 109 ], [ 185, 89, 209, 109 ], [ 214, 89, 238, 109 ], [ 243, 89, 295, 109 ], [ 300, 89, 382, 109 ], [ 387, 89, 410, 109 ], [ 415, 89, 448, 109 ], [ 558, ...
[ [ 138, 89, 180, 109 ], [ 185, 89, 209, 109 ], [ 214, 89, 238, 109 ], [ 243, 89, 295, 109 ], [ 300, 89, 382, 109 ], [ 387, 89, 410, 109 ], [ 415, 89, 448, 109 ], [ 138, ...
Stepaside U13,U14,U17b St Laurence’s College PARKVALE FC Adam Berber 086 2414463 Rockbrook Pk Private Blue Blue 13 Ballyroan Road Templeogue Dublin 14 parkvalefc@gmail.com R RAILWAY UNION FC Mark Staunton 05 8342481 Park Ave Private Yellow & White 33 Farney Park Green Sandymount Dublin 4 markstaunton@eircom.net RATHCOO...
Stepaside U13,U14,U17b St Laurence’s College PARKVALE FC Adam Berber 13 Ballyroan Road Templeogue Dublin 14 parkvalefc@gmail.com 086 2414463 Rockbrook Pk Private Blue Blue R RAILWAY UNION FC Mark Staunton 33 Farney Park Sandymount Dublin 4 markstaunton@eircom.net 05 8342481 Park Ave Private Yellow & Green White RATHCOO...
0.577065
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 16, 17, 18, 19, 20, 21, 22, 9, 10, 11, 12, 13, 14, 15, 23, 24, 25, 26, 27, 28, 37, 38, 39, 41, 42, 43, 44, 29, 30, 31, 32, 33, 34, 35, 40, 36, 45, 46, 47, 48, 49, 59, 60, 61, 65, 66...
e7bcca4527b18a0c1d71accace1f51ae51070c6b.docx
task-960-592
6
[ [ 579, 42, 644, 59 ], [ 579, 57, 677, 75 ], [ 579, 73, 592, 90 ], [ 596, 73, 667, 90 ], [ 579, 88, 628, 105 ], [ 63, 104, 127, 120 ], [ 130, 104, 145, 120 ], [ 226, 104...
[ [ 579, 42, 644, 59 ], [ 579, 57, 677, 75 ], [ 579, 73, 592, 90 ], [ 596, 73, 667, 90 ], [ 579, 88, 628, 105 ], [ 63, 104, 127, 120 ], [ 130, 104, 145, 120 ], [ 226, 104...
Detail the ethnic background of your practice population and PRG: The PRG representatives from the Surgery are: Senior Salaried Doctor Dr Ahmed Wasim – Practice Manager Tudose – Practice Nurse Mihaela Vaduva – Receptionist- Savita Hirani Practice Opening Times The Practice opening hours are as follows: Monday 08.00 18....
Detail the ethnic background of your practice population and PRG: The PRG representatives from the Surgery are: Senior Salaried Doctor – Dr Ahmed Wasim Practice Manager – Tudose Practice Nurse – Mihaela Vaduva Receptionist- Savita Hirani Practice Opening Times The Practice opening hours are as follows: Monday 08.00 – 1...
0.620999
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 23, 20, 21, 22, 24, 25, 27, 26, 28, 29, 32, 30, 31, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 49, 48, 50, 51, 53, 52, 54...
E84029%20-%20Harness%20Harlesden%20Practice%20-%20Patient%20Participation%20Enhanced%20Service%202014%202015%20Annex%20D.docx
task-960-685
1
[ [ 83, 255, 113, 278 ], [ 117, 255, 133, 278 ], [ 136, 255, 168, 278 ], [ 171, 255, 233, 278 ], [ 237, 255, 247, 278 ], [ 250, 255, 273, 278 ], [ 276, 255, 318, 278 ], [ 321...
[ [ 83, 255, 113, 278 ], [ 117, 255, 133, 278 ], [ 136, 255, 168, 278 ], [ 171, 255, 233, 278 ], [ 237, 255, 247, 278 ], [ 250, 255, 273, 278 ], [ 276, 255, 318, 278 ], [ 321...
Craigavon Senior Ngaire Trade A male pupil with The result of the Ballot commenced on 1 June 2017. High School McCann dispute over a history of ballot in which (County Armagh) refusal to disruptive and 36 ballot papers Ballot closed on 12 June 2017. teach a threatening were issued, certain pupil. behaviour and was: The...
Craigavon Senior High School (County Armagh) Ngaire McCann Trade dispute over refusal to teach a certain pupil. A male pupil with a history of disruptive and threatening behaviour and verbally abusing teaching staff. The result of the ballot in which 36 ballot papers were issued, was: Question 1 YES 35 NO 0 Threshold N...
0.656176
[ 0, 1, 18, 19, 29, 30, 2, 20, 3, 21, 22, 31, 32, 44, 45, 49, 50, 4, 5, 6, 7, 23, 24, 25, 33, 34, 46, 51, 52, 60, 61, 66, 67, 8, 9, 10, 11, 26, 27, 28, 35, 36, 37, 47, 48, 53, 68, 69, 70, 71, 72, 73, 86, 87, 95...
e8ba2bf3-deb5-49f2-9f763999847ed58c.docx
task-960-790
29
[ [ 59, 149, 117, 172 ], [ 121, 149, 158, 172 ], [ 177, 149, 214, 172 ], [ 268, 149, 301, 172 ], [ 359, 149, 367, 172 ], [ 371, 149, 398, 172 ], [ 401, 149, 429, 172 ], [ 433...
[ [ 59, 149, 117, 172 ], [ 121, 149, 158, 172 ], [ 59, 169, 86, 192 ], [ 89, 169, 129, 192 ], [ 59, 188, 104, 211 ], [ 107, 188, 156, 211 ], [ 177, 149, 214, 172 ], [ 177, ...
Overall September, 17 October, 21 November and threshold met on 12 December 2017 16 January 2018. both questions Holy Cross Ngaire Trade A male (Year 10) The result of the Ballot commenced on 5 June 2017. College McCann dispute over pupil with ballot in which (County Tyrone) a refusal to aggressive and 69 ballot papers...
Overall threshold met on both questions September, 17 October, 21 November and 12 December 2017 16 January 2018. Holy Cross College (County Tyrone) Ngaire McCann Trade dispute over a refusal to teach a certain pupil A male (Year 10) pupil with aggressive and threatening behaviour towards a teacher. The result of the ba...
0.589358
[ 0, 7, 8, 9, 16, 17, 1, 2, 3, 4, 5, 6, 10, 11, 12, 13, 14, 15, 18, 19, 36, 45, 46, 20, 37, 21, 38, 39, 47, 48, 49, 61, 62, 67, 68, 22, 23, 24, 25, 40, 41, 50, 51, 63, 69, 70, 79, 80, 26, 27, 28, 29, 42, 43, 44...
e8ba2bf3-deb5-49f2-9f763999847ed58c.docx
task-960-790
30
[ [ 479, 127, 519, 150 ], [ 588, 127, 653, 150 ], [ 656, 127, 669, 150 ], [ 673, 127, 721, 150 ], [ 725, 127, 738, 150 ], [ 741, 127, 799, 150 ], [ 803, 127, 824, 150 ], [ 47...
[ [ 479, 127, 519, 150 ], [ 479, 147, 533, 170 ], [ 536, 147, 557, 170 ], [ 560, 147, 575, 170 ], [ 479, 166, 504, 189 ], [ 508, 166, 564, 189 ], [ 588, 127, 653, 150 ], [ 65...
with potential ballot papers The National Officers approved the ballot on 17 October 2017. dismissal of were issued, staff and job 13 returned The National Officers approved the ballot on 21 November loss. was: 2017. Question 1 The National Officers reviewed the progress of the dispute on YES 13 NO 0 12 December 2017 a...
with potential dismissal of staff and job loss. ballot papers were issued, 13 returned was: Question 1 YES 13 NO 0 Threshold 54.17% Question 2 YES 13 NO 0 Threshold 54.17% Overall threshold met on both questions The National Officers approved the ballot on 17 October 2017. The National Officers approved the ballot on 2...
0.579872
[ 0, 1, 14, 15, 18, 19, 20, 32, 2, 3, 16, 17, 21, 22, 33, 35, 36, 47, 48, 49, 50, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 23, 24, 25, 26, 27, 28, 29, 30...
e8ba2bf3-deb5-49f2-9f763999847ed58c.docx
task-960-790
47
[ [ 268, 127, 292, 150 ], [ 295, 127, 345, 150 ], [ 369, 127, 401, 150 ], [ 404, 127, 443, 150 ], [ 466, 127, 487, 150 ], [ 490, 127, 537, 150 ], [ 540, 127, 585, 150 ], [ 58...
[ [ 268, 127, 292, 150 ], [ 295, 127, 345, 150 ], [ 268, 147, 322, 170 ], [ 326, 147, 337, 170 ], [ 268, 166, 293, 189 ], [ 297, 166, 318, 189 ], [ 321, 166, 339, 189 ], [ 26...
Assistant Professor of English, California U Dominguez Hills, Carson CA, Aug. 2003 - July 2007 Instructor of English, Wittenberg U, Springfield OH, Jan. 2003 - May 2003 Graduate Teaching Assistant in English, Ohio State U, Columbus OH, Sept. 1998 Dec. 2002 – Instructor of Art, Urbana U, Urbana OH, June Dec. 1994 – Publ...
Assistant Professor of English, California U Dominguez Hills, Carson CA, Aug. 2003 - July 2007 Instructor of English, Wittenberg U, Springfield OH, Jan. 2003 - May 2003 Graduate Teaching Assistant in English, Ohio State U, Columbus OH, Sept. 1998 – Dec. 2002 Instructor of Art, Urbana U, Urbana OH, June – Dec. 1994 Publ...
0.765315
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 41, 39, 40, 42, 43, 44, 45, 46, 47, 48, 49, 52, 50, 51, 53, 54...
e90a2d8836c91296ad801fd5ed535fc81529095324.docx
task-960-851
1
[ [ 82, 115, 154, 136 ], [ 159, 115, 233, 136 ], [ 238, 115, 254, 136 ], [ 259, 115, 324, 136 ], [ 328, 115, 408, 136 ], [ 456, 115, 470, 136 ], [ 475, 115, 566, 136 ], [ 571...
[ [ 82, 115, 154, 136 ], [ 159, 115, 233, 136 ], [ 238, 115, 254, 136 ], [ 259, 115, 324, 136 ], [ 328, 115, 408, 136 ], [ 456, 115, 470, 136 ], [ 475, 115, 566, 136 ], [ 571...
Margaret (Peggy) Cooke 77 Bellwoods Ave. Apt. 1 Toronto, ON. M6J 3N4 Telephone: (416) 709-1457 Email: pedgehog@gmail.com EDUCATION: VOLUNTEER EXPERIENCE: Bachelor of Philosophy University of New Brunswick (2007) Abortion Rights Coalition of Canada (Jan. 2008 present) Media Spokesperson Major in Interdisciplinary Leader...
Margaret (Peggy) Cooke 77 Bellwoods Ave. Apt. 1 Toronto, ON. M6J 3N4 Telephone: (416) 709-1457 Email: pedgehog@gmail.com EDUCATION: Bachelor of Philosophy University of New Brunswick (2007) Major in Interdisciplinary Leadership Minor in Political Science WORK EXPERIENCE: ACORN Canada National Administrator (Aug. 2010 –...
0.570018
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 20, 21, 22, 23, 24, 25, 26, 27, 38, 39, 40, 41, 43, 44, 45, 46, 49, 50, 59, 60, 66, 67, 68, 69, 76, 70, 81, 82, 83, 84, 85, 86, 87, 88, 97, 89, 90...
e9adac95d048e14aac6d116b54b13c861486171405.docx
task-960-973
0
[ [ 405, 89, 479, 108 ], [ 483, 89, 541, 108 ], [ 545, 89, 594, 108 ], [ 404, 105, 422, 124 ], [ 427, 105, 504, 124 ], [ 509, 105, 543, 124 ], [ 548, 105, 581, 124 ], [ 586, ...
[ [ 405, 89, 479, 108 ], [ 483, 89, 541, 108 ], [ 545, 89, 594, 108 ], [ 404, 105, 422, 124 ], [ 427, 105, 504, 124 ], [ 509, 105, 543, 124 ], [ 548, 105, 581, 124 ], [ 586, ...
possibility to synchronize text and audio content, text-to-speech technology, allowing alternative renditions of the content and its interoperability with a variety of assistive technologies in such a way that can be perceivable, understandable, operable and maximizes compatibility with user agents. I Section VIII Part...
possibility to synchronize text and audio content, text-to-speech technology, allowing alternative renditions of the content and its interoperability with a variety of assistive technologies in such a way that can be perceivable, understandable, operable and maximizes compatibility with user agents. I – Section VIII – ...
0.768454
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 48, 41, 42, 49, 43, 44, 50, 45, 46, 47, 51, 52, 53, 54...
EAA-EBU-proposal-for-amendments-during-plenary-session_2107.docx
task-961-239
44
[ [ 508, 159, 608, 178 ], [ 613, 159, 632, 178 ], [ 638, 159, 755, 178 ], [ 761, 159, 797, 178 ], [ 802, 159, 838, 178 ], [ 508, 177, 562, 197 ], [ 567, 177, 646, 197 ], [ 65...
[ [ 508, 159, 608, 178 ], [ 613, 159, 632, 178 ], [ 638, 159, 755, 178 ], [ 761, 159, 797, 178 ], [ 802, 159, 838, 178 ], [ 508, 177, 562, 197 ], [ 567, 177, 646, 197 ], [ 65...
MAJOR EQUIVALENCE WORKSHEET MATHEMATICS – Applicants who do not have a major in the subject area of the license they are seeking must demonstrate the equivalent of a major through any combination of courses, training, teaching experience, or other professional experience. For each item listed in the chart below, indica...
MAJOR EQUIVALENCE WORKSHEET – MATHEMATICS Applicants who do not have a major in the subject area of the license they are seeking must demonstrate the equivalent of a major through any combination of courses, training, teaching experience, or other professional experience. For each item listed in the chart below, indica...
0.967935
[ 0, 1, 2, 4, 3, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
EAAMathMajor.docx
task-961-258
0
[ [ 147, 139, 243, 167 ], [ 249, 139, 444, 167 ], [ 450, 139, 623, 167 ], [ 649, 139, 852, 167 ], [ 629, 142, 642, 165 ], [ 117, 298, 202, 319 ], [ 207, 298, 241, 319 ], [ 24...
[ [ 147, 139, 243, 167 ], [ 249, 139, 444, 167 ], [ 450, 139, 623, 167 ], [ 629, 142, 642, 165 ], [ 649, 139, 852, 167 ], [ 117, 298, 202, 319 ], [ 207, 298, 241, 319 ], [ 24...
COMMUNICATION DETAILS E-mail address: Telephone number: (Country code/number) Mobile number: (Country code/number) PERMANENT ADDRESS Street: City: Postal Code: Country: INSTITUTION Institution to which you belong: Street: City: Postal Code: Country: Type of organisation: Your institution is What is the main field of ac...
COMMUNICATION DETAILS E-mail address: Telephone number: (Country code/number) Mobile number: (Country code/number) PERMANENT ADDRESS Street: City: Postal Code: Country: INSTITUTION Institution to which you belong: Street: City: Postal Code: Country: Type of organisation: Your institution is What is the main field of ac...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
eacs_clinical_management_of_hiv_online_course_application_form_160523.docx
task-961-546
1
[ [ 151, 124, 303, 145 ], [ 308, 124, 374, 145 ], [ 210, 142, 259, 163 ], [ 264, 142, 331, 163 ], [ 210, 164, 294, 184 ], [ 299, 164, 367, 184 ], [ 376, 164, 445, 184 ], [ 45...
[ [ 151, 124, 303, 145 ], [ 308, 124, 374, 145 ], [ 210, 142, 259, 163 ], [ 264, 142, 331, 163 ], [ 210, 164, 294, 184 ], [ 299, 164, 367, 184 ], [ 376, 164, 445, 184 ], [ 45...
6: Online Marking (Potential Candidates) Qualification Pilot/ Type Operational N Minimum Maximum Mean Functional Pilot 2 36 55 45.50 Skills Operational 4 36 12500 3972.75 GCSE Pilot 3 10850 14150 12374.67 Operational 82 0 639578 40021.16 GCE Operational 54 29 200996 25820.20 The number of candidates per qualification i...
6: Online Marking (Potential Candidates) Qualification Type Pilot/ Operational N Minimum Maximum Mean Functional Skills Pilot 2 36 55 45.50 Operational 4 36 12500 3972.75 GCSE Pilot 3 10850 14150 12374.67 Operational 82 0 639578 40021.16 GCE Operational 54 29 200996 25820.20 The number of candidates per qualification i...
0.875765
[ 0, 1, 2, 3, 4, 5, 7, 6, 8, 9, 10, 11, 12, 13, 19, 14, 15, 16, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
eA%20in%20CA%20report%20-%20Final%20for%20circulation.docx
task-961-57
20
[ [ 195, 98, 211, 116 ], [ 216, 98, 273, 116 ], [ 279, 98, 349, 116 ], [ 354, 98, 439, 116 ], [ 444, 98, 549, 116 ], [ 150, 129, 262, 147 ], [ 299, 129, 345, 147 ], [ 150, ...
[ [ 195, 98, 211, 116 ], [ 216, 98, 273, 116 ], [ 279, 98, 349, 116 ], [ 354, 98, 439, 116 ], [ 444, 98, 549, 116 ], [ 150, 129, 262, 147 ], [ 150, 144, 194, 162 ], [ 299, ...
A: Item 2015-16 2016-17 2017-18 1 Manage contracts with providers of In partnership with PHA online learning management platform external training module (Tocal) 2 Manage contracts with provider of training resources Incident Details to be Details to be outsourced for development Management decided by decided by Team/I...
A: Item 2015-16 2016-17 2017-18 1 Manage contracts with providers of online learning management platform external training module (Tocal) In partnership with PHA 2 Manage contracts with provider of training resources outsourced for development Incident Management Team/Industry response functions – training resources De...
0.751744
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 15, 16, 17, 18, 19, 20, 21, 22, 11, 12, 13, 14, 23, 24, 25, 26, 27, 28, 29, 30, 38, 39, 40, 31, 41, 46, 49, 50, 51, 52, 53, 32, 33, 34, 42, 43, 47, 35, 36, 37, 44, 45, 48, 54...
EAD_Training_business_plan_2015-16-to-2017-18_-v2_170615.docx
task-961-583
23
[ [ 155, 158, 169, 184 ], [ 166, 213, 192, 238 ], [ 534, 213, 578, 238 ], [ 636, 213, 680, 238 ], [ 738, 213, 782, 238 ], [ 109, 275, 116, 300 ], [ 166, 275, 208, 300 ], [ 21...
[ [ 155, 158, 169, 184 ], [ 166, 213, 192, 238 ], [ 534, 213, 578, 238 ], [ 636, 213, 680, 238 ], [ 738, 213, 782, 238 ], [ 109, 275, 116, 300 ], [ 166, 275, 208, 300 ], [ 21...
Time Monday Tuesday Wednesday Thursday Friday Saturday KICKBOXING CYCLE & GUTS 5:00AM Debbie Adrian Debbie CORE & CORE & MORE MORE Elma ZUMBA 8:00AM Elma CYCLE Gabriel CYCLE Rita Rita Yoga BUTTS & GUTS CYCLE Stella CYCLE Debbie 9:15AM YOGA PILATES Amber Starting Amber CYCLE Elma Elma 6/20/18 Amber ZUMBA PILATES ZUMBA Y...
Time Monday Tuesday Wednesday Thursday Friday Saturday 5:00AM KICKBOXING Debbie CYCLE Adrian & GUTS Debbie 8:00AM CORE & MORE Elma CYCLE Rita CORE & MORE Elma CYCLE Rita ZUMBA Gabriel 9:15AM CYCLE Amber YOGA Elma Yoga Stella Starting 6/20/18 PILATES Elma CYCLE Amber BUTTS & GUTS Debbie CYCLE Amber 10:30AM ZUMBA Gabriel...
0.193019
[ 0, 1, 2, 3, 4, 5, 6, 11, 7, 12, 8, 13, 9, 10, 14, 23, 15, 16, 20, 24, 27, 29, 17, 18, 19, 21, 25, 28, 22, 26, 38, 34, 41, 39, 45, 30, 35, 42, 47, 40, 46, 36, 43, 31, 32, 33, 37, 44, 48, 53, 49, 54, 50, 55, 51...
Eagle-Rock-Class-New-4.docx
task-961-682
0
[ [ 57, 288, 94, 307 ], [ 148, 288, 209, 307 ], [ 267, 288, 328, 307 ], [ 380, 288, 465, 307 ], [ 526, 288, 593, 307 ], [ 670, 288, 714, 307 ], [ 794, 288, 859, 307 ], [ 131,...
[ [ 57, 288, 94, 307 ], [ 148, 288, 209, 307 ], [ 267, 288, 328, 307 ], [ 380, 288, 465, 307 ], [ 526, 288, 593, 307 ], [ 670, 288, 714, 307 ], [ 794, 288, 859, 307 ], [ 47, ...
Time Monday Tuesday Wednesday Thursday Friday Saturday KICKBOXING CYCLE BUTTS & GUTS 5:00AM Debbie Adrian Debbie CORE & CORE & MORE MORE Elma Yoga ZUMBA 8:00AM Coming Soon! Elma CYCLE Mallory Gabriel CYCLE Rita Rita BUTTS & GUTS CYCLE Yoga CYCLE Debbie 9:15AM YOGA PILATES Amber Stella CYCLE Elma Elma Amber PILATES Zumb...
Time Monday Tuesday Wednesday Thursday Friday Saturday 5:00AM KICKBOXING Debbie CYCLE Adrian BUTTS & GUTS Debbie 8:00AM Coming Soon! CORE & MORE Elma CYCLE Rita CORE & MORE Elma CYCLE Rita Yoga Mallory ZUMBA Gabriel 9:15AM CYCLE Amber YOGA Elma Yoga Stella PILATES Elma CYCLE BUTTS & GUTS Debbie CYCLE Amber 10:30AM PILA...
0.239987
[ 0, 1, 2, 3, 4, 5, 6, 12, 7, 13, 8, 14, 9, 10, 11, 15, 25, 26, 27, 16, 17, 21, 28, 32, 34, 18, 19, 20, 22, 29, 33, 23, 30, 24, 31, 42, 38, 45, 43, 48, 39, 46, 44, 49, 40, 35, 36, 37, 41, 47, 50, 55, 51, 56, 52...
Eagle-Rock-Class-Schedue-12_15.docx
task-961-683
0
[ [ 57, 271, 94, 290 ], [ 148, 271, 209, 290 ], [ 267, 271, 328, 290 ], [ 380, 271, 465, 290 ], [ 526, 271, 593, 290 ], [ 670, 271, 714, 290 ], [ 794, 271, 859, 290 ], [ 131,...
[ [ 57, 271, 94, 290 ], [ 148, 271, 209, 290 ], [ 267, 271, 328, 290 ], [ 380, 271, 465, 290 ], [ 526, 271, 593, 290 ], [ 670, 271, 714, 290 ], [ 794, 271, 859, 290 ], [ 47, ...
Seoul 100-786, Republic of Korea Telephone: +82-2-2277-1683 (ext. 112) Application Forms Fax: +82-2-2277-1684 E-mail: fellowships@eai.or.kr Website: www.eai.or.kr Please type or print neatly in English: Name: (Last Name) (First) (Middle) Citizenship(s): Date of Birth (mm/dd/yyyy): Proposed Title of Fellowship Project: ...
Seoul 100-786, Republic of Korea Telephone: +82-2-2277-1683 (ext. 112) Fax: +82-2-2277-1684 E-mail: fellowships@eai.or.kr Website: www.eai.or.kr Application Forms Please type or print neatly in English: Name: (Last Name) (First) (Middle) Citizenship(s): Date of Birth (mm/dd/yyyy): Proposed Title of Fellowship Project: ...
0.74903
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 11, 12, 13, 14, 15, 16, 9, 10, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 46, 43, 47, 44, 45, 48, 49, 50, 51, 52, 53, 54...
EAIFellowsProgram2014-2015_ApplicationBooklet.docx
task-961-743
7
[ [ 120, 104, 166, 123 ], [ 171, 104, 244, 123 ], [ 249, 104, 321, 123 ], [ 326, 104, 343, 123 ], [ 348, 104, 397, 123 ], [ 120, 126, 211, 145 ], [ 216, 126, 358, 145 ], [ 36...
[ [ 120, 104, 166, 123 ], [ 171, 104, 244, 123 ], [ 249, 104, 321, 123 ], [ 326, 104, 343, 123 ], [ 348, 104, 397, 123 ], [ 120, 126, 211, 145 ], [ 216, 126, 358, 145 ], [ 36...
EAL12-3 selects and uses language forms, Reflection activity features and structures of texts appropriate to a Students view the Ted-Ed video miscommunication happens (and how to ‘How range of purposes, audiences and contexts, and avoid it)’. In small groups, they consider how the issues and information about analyses ...
EAL12-3 selects and uses language forms, features and structures of texts appropriate to a range of purposes, audiences and contexts, and analyses and evaluates their effects on meaning Students: recognise and explain the influence of context on the selection of language and form to communicate meaning EAL12-4 applies ...
0.81687
[ 0, 1, 2, 3, 4, 5, 8, 9, 10, 11, 12, 13, 14, 15, 27, 28, 29, 30, 31, 32, 33, 47, 48, 49, 50, 51, 52, 53, 64, 80, 81, 82, 83, 84, 85, 99, 100, 101, 102, 103, 104, 105, 109, 110, 111, 112, 117, 118, 119, 120, 121, 122...
eal-d_focus-on-writing-sample-unit.docx
task-961-772
2
[ [ 29, 116, 81, 142 ], [ 85, 116, 125, 141 ], [ 129, 116, 151, 141 ], [ 154, 116, 182, 141 ], [ 186, 116, 239, 141 ], [ 243, 116, 279, 141 ], [ 323, 116, 387, 142 ], [ 390, ...
[ [ 29, 116, 81, 142 ], [ 85, 116, 125, 141 ], [ 129, 116, 151, 141 ], [ 154, 116, 182, 141 ], [ 186, 116, 239, 141 ], [ 243, 116, 279, 141 ], [ 29, 137, 76, 163 ], [ 80, ...
Expressing and developing ideas Visuals themselves are not culturally Develop and extend vocabulary neutral, and sometimes require as (multiple meanings) and link to Explore the different contribution of much explanation as words. images descriptive vocabulary to words and images to text meaning in – enhance meaning. s...
Expressing and developing ideas Explore the different contribution of words and images to text meaning in stories and informative texts (ACELA1786) Visuals themselves are not culturally neutral, and sometimes require as much explanation as words. Develop and extend vocabulary (multiple meanings) and link to images – de...
0.743627
[ 0, 1, 2, 3, 23, 24, 25, 26, 27, 36, 37, 38, 39, 40, 41, 42, 46, 47, 48, 49, 50, 4, 5, 6, 7, 8, 13, 14, 15, 16, 17, 28, 29, 30, 31, 9, 10, 11, 12, 18, 19, 20, 21, 22, 32, 43, 33, 34, 35, 44, 45, 51, 52, 53, 54...
EALD-English-Pre-primary-to-Year-10.DOCX
task-961-796
8
[ [ 90, 130, 164, 146 ], [ 168, 130, 194, 146 ], [ 198, 130, 275, 146 ], [ 278, 130, 315, 146 ], [ 372, 130, 420, 146 ], [ 423, 130, 501, 146 ], [ 505, 130, 527, 146 ], [ 531...
[ [ 90, 130, 164, 146 ], [ 168, 130, 194, 146 ], [ 198, 130, 275, 146 ], [ 278, 130, 315, 146 ], [ 90, 149, 141, 166 ], [ 145, 149, 168, 166 ], [ 172, 149, 231, 166 ], [ 235,...
EAL/D Network Meeting Place Macquarie Park Operational Directorate Course Code: NR18205 English as an Additional Language/Dialect (EAL/D) Network Meeting provides opportunities for all EAL/D teachers to engage in ongoing professional learning and collegial discussions in order to reflect on and improve their specialist...
EAL/D Network Meeting Place Macquarie Park Operational Directorate Course Code: NR18205 English as an Additional Language/Dialect (EAL/D) Network Meeting provides opportunities for all EAL/D teachers to engage in ongoing professional learning and collegial discussions in order to reflect on and improve their specialist...
0.979819
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
EALD-Network-Meeting-Place-Session-Details-T1-2018.docx
task-961-800
0
[ [ 84, 78, 161, 105 ], [ 169, 78, 267, 105 ], [ 275, 78, 370, 105 ], [ 378, 78, 445, 105 ], [ 84, 112, 209, 138 ], [ 217, 112, 272, 138 ], [ 279, 112, 418, 138 ], [ 426, ...
[ [ 84, 78, 161, 105 ], [ 169, 78, 267, 105 ], [ 275, 78, 370, 105 ], [ 378, 78, 445, 105 ], [ 84, 112, 209, 138 ], [ 217, 112, 272, 138 ], [ 279, 112, 418, 138 ], [ 426, ...
EAN Scientific Panels/Task forces Business meetings 3rd EAN Congress in Amsterdam SCIENTIFIC PANEL/TASK FORCE DAY, TIME ROOM# Saturday, 24 June Scientific Panel Epilepsy Room D301 15.00 16.00 – Saturday, 24 June Scientific Panel Neuro-oncology Room D302 15.00 16.30 – Scientific Panel Sleep-wake disorders - Saturday, 24...
EAN Scientific Panels/Task forces Business meetings 3rd EAN Congress in Amsterdam SCIENTIFIC PANEL/TASK FORCE DAY, TIME ROOM# Scientific Panel Epilepsy Saturday, 24 June 15.00 – 16.00 Room D301 Scientific Panel Neuro-oncology Saturday, 24 June 15.00 – 16.30 Room D302 Scientific Panel Sleep-wake disorders - YESNA Saturd...
0.376725
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 20, 21, 22, 17, 18, 19, 25, 27, 26, 23, 24, 31, 32, 33, 28, 29, 30, 36, 38, 37, 34, 35, 39, 40, 41, 42, 43, 49, 44, 45, 46, 50, 52, 51, 47, 48, 53, 54...
EAN%20Scientific%20Panels_meeting%20overview_Amsterdam.docx
task-961-846
0
[ [ 119, 82, 166, 108 ], [ 172, 82, 272, 108 ], [ 278, 82, 413, 108 ], [ 419, 82, 487, 108 ], [ 493, 82, 589, 108 ], [ 595, 82, 698, 108 ], [ 119, 107, 156, 133 ], [ 162, ...
[ [ 119, 82, 166, 108 ], [ 172, 82, 272, 108 ], [ 278, 82, 413, 108 ], [ 419, 82, 487, 108 ], [ 493, 82, 589, 108 ], [ 595, 82, 698, 108 ], [ 119, 107, 156, 133 ], [ 162, ...
Emergency phones Please familiarize yourself with the locations of these items for your building so that you will be more prepared in the event of an evacuation or other emergency. Evacuation & Safety Equipment- 1st Floor Engineering Bldg, Evacuation & Safety Equipment Map- Engineering Bldg, 2nd Floor Evacuation & Safe...
Emergency phones Please familiarize yourself with the locations of these items for your building so that you will be more prepared in the event of an evacuation or other emergency. Evacuation & Safety Equipment- Engineering Bldg, 1st Floor Evacuation & Safety Equipment Map- Engineering Bldg, 2nd Floor Evacuation & Safe...
0.896666
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 36, 37, 34, 35, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
EAP-COEN-10-5-2015.docx
task-961-915
21
[ [ 176, 82, 275, 103 ], [ 281, 82, 345, 103 ], [ 117, 108, 177, 129 ], [ 183, 108, 271, 129 ], [ 276, 108, 345, 129 ], [ 350, 108, 385, 129 ], [ 390, 108, 418, 129 ], [ 423,...
[ [ 176, 82, 275, 103 ], [ 281, 82, 345, 103 ], [ 117, 108, 177, 129 ], [ 183, 108, 271, 129 ], [ 276, 108, 345, 129 ], [ 350, 108, 385, 129 ], [ 390, 108, 418, 129 ], [ 423,...
Appendix D: Part 2 Emergency Evacuation Planning Checklist – (Confidential Will Not Be Posted) – OCCUPANT NOTIFICATION Type of Are there emergency Are there emergency Are persons needing Emergency notification systems notification systems for assistance during an available for these these hazards that are emergency awa...
Appendix D: Part 2 – Emergency Evacuation Planning Checklist (Confidential – Will Not Be Posted) OCCUPANT NOTIFICATION Type of Emergency Are there emergency notification systems available for these hazards? Are there emergency notification systems for these hazards that are appropriate for persons needing assistance du...
0.451362
[ 0, 1, 2, 3, 8, 4, 5, 6, 7, 9, 14, 10, 11, 12, 13, 15, 16, 17, 18, 28, 19, 20, 21, 29, 30, 37, 38, 39, 48, 22, 23, 24, 31, 32, 33, 40, 41, 42, 43, 49, 50, 53, 54, 58, 59, 60, 64, 25, 26, 27, 34, 35, 36, 44, 45...
eap-template.docx
task-961-932
14
[ [ 451, 120, 526, 137 ], [ 530, 120, 548, 137 ], [ 312, 137, 343, 153 ], [ 347, 137, 356, 153 ], [ 373, 137, 456, 153 ], [ 461, 137, 544, 153 ], [ 548, 137, 613, 153 ], [ 61...
[ [ 451, 120, 526, 137 ], [ 530, 120, 548, 137 ], [ 312, 137, 343, 153 ], [ 347, 137, 356, 153 ], [ 360, 139, 369, 152 ], [ 373, 137, 456, 153 ], [ 461, 137, 544, 153 ], [ 54...
CAMPUS EMERGENCY CONTACT NUMBERS DIAL 9-1-1 FROM ANY PHONE MEDICAL EMERGENCIES FIRE/SMOKE Identify yourself, your location, the HAZARDOUS MATERIAL SPILLS location and type of incident, and if an evacuation is underway. Answer any VIOLENCE & THREATS questions and do not hang up the phone WHEN IN DOUBT… until the operato...
CAMPUS EMERGENCY CONTACT NUMBERS MEDICAL EMERGENCIES FIRE/SMOKE HAZARDOUS MATERIAL SPILLS VIOLENCE & THREATS WHEN IN DOUBT… DIAL 9-1-1 FROM ANY PHONE Identify yourself, your location, the location and type of incident, and if an evacuation is underway. Answer any questions and do not hang up the phone until the operato...
0.854521
[ 0, 1, 2, 3, 9, 10, 11, 17, 18, 19, 33, 34, 35, 44, 45, 46, 4, 5, 6, 7, 8, 12, 13, 14, 15, 16, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 36, 37, 38, 39, 40, 41, 42, 43, 47, 48, 49, 50, 51, 53, 54, 52...
EAP-template2018.docx
task-961-933
4
[ [ 117, 107, 230, 134 ], [ 238, 107, 406, 134 ], [ 413, 107, 541, 134 ], [ 548, 107, 680, 134 ], [ 560, 149, 613, 174 ], [ 619, 149, 673, 174 ], [ 679, 149, 746, 174 ], [ 75...
[ [ 117, 107, 230, 134 ], [ 238, 107, 406, 134 ], [ 413, 107, 541, 134 ], [ 548, 107, 680, 134 ], [ 133, 150, 223, 171 ], [ 228, 150, 373, 171 ], [ 133, 176, 255, 197 ], [ 13...
District and Municipal Judges’ Association Education assistance Program POLICY The District and Municipal Judges’ Association provides funding support for district and municipal court judges, magistrates, and commissioners. Funds are available to full- and part-time district and municipal court judges, magistrates, and...
District and Municipal Judges’ Association Education assistance Program The District and Municipal Judges’ Association provides funding support for district and municipal court judges, magistrates, and commissioners. Funds are available to full- and part-time district and municipal court judges, magistrates, and commis...
0.9895
[ 0, 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 5...
EAP_Application.docx
task-961-988
0
[ [ 202, 105, 292, 133 ], [ 299, 105, 346, 133 ], [ 353, 105, 473, 133 ], [ 543, 105, 642, 131 ], [ 649, 105, 797, 133 ], [ 309, 128, 435, 156 ], [ 442, 128, 576, 156 ], [ 58...
[ [ 202, 105, 292, 133 ], [ 299, 105, 346, 133 ], [ 353, 105, 473, 133 ], [ 543, 105, 642, 131 ], [ 649, 105, 797, 133 ], [ 309, 128, 435, 156 ], [ 442, 128, 576, 156 ], [ 58...
Independence Payment (PIP), Carers Allowance, Working Tax Credit, Child Benefit, Housing Benefit, Council Tax Benefit, No access to Public Funds, Other. Is debt a factor? Discuss utilise and other outgoings - has spending been prioritised? Is spending prioritised? Employment Who is working the household, their pattern ...
Independence Payment (PIP), Carers Allowance, Working Tax Credit, Child Benefit, Housing Benefit, Council Tax Benefit, No access to Public Funds, Other. Is debt a factor? Discuss utilise and other outgoings - has spending been prioritised? Is spending prioritised? Employment Who is working the household, their pattern ...
0.977773
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
Early%20Help%20Assessment%20-%20v3%20-%20Word.docx
task-962-171
5
[ [ 30, 48, 77, 64 ], [ 79, 48, 109, 64 ], [ 111, 48, 129, 64 ], [ 130, 48, 152, 64 ], [ 154, 48, 191, 64 ], [ 193, 48, 221, 64 ], [ 223, 48, 235, 64 ], [ 237, 48, 25...
[ [ 30, 48, 77, 64 ], [ 79, 48, 109, 64 ], [ 111, 48, 129, 64 ], [ 130, 48, 152, 64 ], [ 154, 48, 191, 64 ], [ 193, 48, 221, 64 ], [ 223, 48, 235, 64 ], [ 237, 48, 25...
SUPPORTING CHILDREN & YOUNG PEOPLE TO ACHIEVE Walsall Young Carers Project A Young Carer is someone under 18 who helps look after Referrals can be made by : My Place somebody who cannot manage otherwise because of age, illness 60 Walstead Road West or disability. This may mean doing the housework, shopping or Children'...
SUPPORTING CHILDREN & YOUNG PEOPLE TO ACHIEVE Walsall Young Carers Project My Place 60 Walstead Road West Walsall WS5 4PE Tel: 655419 Email : A Young Carer is someone under 18 who helps look after somebody who cannot manage otherwise because of age, illness or disability. This may mean doing the housework, shopping or ...
0.779917
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 28, 29, 39, 40, 41, 42, 55, 73, 74, 91, 92, 119, 120, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 30, 31, 32, 33, 34, 35, 36, 37, 38, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, ...
Early%20Help%20Guide%20For%20Professionals%20Updated%20August%2016%20v5.docx
task-962-179
15
[ [ 85, 119, 163, 147 ], [ 166, 119, 226, 147 ], [ 229, 119, 239, 147 ], [ 242, 119, 287, 147 ], [ 290, 119, 335, 147 ], [ 338, 119, 355, 147 ], [ 358, 119, 410, 147 ], [ 85,...
[ [ 85, 119, 163, 147 ], [ 166, 119, 226, 147 ], [ 229, 119, 239, 147 ], [ 242, 119, 287, 147 ], [ 290, 119, 335, 147 ], [ 338, 119, 355, 147 ], [ 358, 119, 410, 147 ], [ 85,...
WPH Counselling & Education Service WPH is a charitable organisation. They a specialist For more information contact: The service relative to pregnancy (WPH Upper Forster Street, Pregnancy help) and a general counselling service and Website: Walsall, WS4 2AB education service (WPH Counselling & Education Service). Emai...
WPH Counselling & Education Service The Upper Forster Street, Walsall, WS4 2AB Tel : 649000 Fax : 01922 649 322 WPH is a charitable organisation. They a specialist service relative to pregnancy (WPH Pregnancy help) and a general counselling service and education service (WPH Counselling & Education Service). For more i...
0.808652
[ 0, 1, 2, 3, 4, 17, 23, 24, 25, 35, 36, 37, 46, 47, 48, 52, 53, 54, 55, 56, 5, 6, 7, 8, 9, 10, 11, 12, 18, 19, 20, 21, 22, 26, 27, 28, 29, 30, 31, 32, 33, 38, 39, 40, 41, 42, 43, 44, 13, 14, 15, 16, 34, 45, 49...
Early%20Help%20Guide%20For%20Professionals%20Updated%20August%2016%20v5.docx
task-962-179
28
[ [ 85, 120, 108, 142 ], [ 111, 120, 165, 142 ], [ 167, 120, 175, 142 ], [ 178, 120, 225, 142 ], [ 227, 120, 261, 142 ], [ 366, 120, 388, 142 ], [ 391, 120, 398, 142 ], [ 401...
[ [ 85, 120, 108, 142 ], [ 111, 120, 165, 142 ], [ 167, 120, 175, 142 ], [ 178, 120, 225, 142 ], [ 227, 120, 261, 142 ], [ 85, 139, 102, 161 ], [ 85, 159, 114, 181 ], [ 116, ...
Thornbury EarlyON Child and Family Centre September 2018 Phone Number: Email: oeyc@bvo.ca Website: Sat Mon Tue Wed Thu Fri New Location!! Beaver Valley Community Centre Thornbury 3 4 5 8 7 6 Thornbury Fall Early Learning CLOSED Baby Group Playgroup Fair 9:30-11:30 9:30-11:30 10-1 p.m. BVCC 11 12 10 14 15 13 Tammy C. Le...
Thornbury EarlyON Child and Family Centre September 2018 Phone Number: Email: oeyc@bvo.ca Website: Mon Tue Wed Thu Fri Sat New Location!! Beaver Valley Community Centre Thornbury 3 CLOSED 4 Baby Group 9:30-11:30 5 Early Learning Playgroup 9:30-11:30 6 7 8 Thornbury Fall Fair 10-1 p.m. BVCC 10 Early Learning Playgroup 9...
0.356839
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 18, 13, 19, 20, 21, 22, 23, 24, 25, 26, 36, 27, 37, 38, 41, 28, 34, 35, 39, 42, 31, 30, 29, 32, 33, 40, 43, 44, 45, 48, 55, 56, 60, 63, 46, 52, 53, 57...
Early%20ON%20September%202018%20Calendar.docx
task-962-237
0
[ [ 117, 103, 245, 135 ], [ 252, 103, 352, 135 ], [ 117, 131, 179, 162 ], [ 185, 131, 231, 162 ], [ 238, 131, 318, 162 ], [ 325, 131, 406, 162 ], [ 117, 174, 237, 202 ], [ 24...
[ [ 117, 103, 245, 135 ], [ 252, 103, 352, 135 ], [ 117, 131, 179, 162 ], [ 185, 131, 231, 162 ], [ 238, 131, 318, 162 ], [ 325, 131, 406, 162 ], [ 117, 174, 237, 202 ], [ 24...
5.6. Involving families and communities in young children’s development PTC: 3B, 4D and learning by communicating academic and behavioral performance NAEYC PDK: 2.4; 2c expectations and assessment results with students, their families, and other PRF: 6.1 educators. 5.8. Understanding and practicing responsible assessme...
NAEYC 2c PTC: 3B, 4D PDK: 2.4; PRF: 6.1 5.6. Involving families and communities in young children’s development and learning by communicating academic and behavioral performance expectations and assessment results with students, their families, and other educators. 3c PTC: 4C PDK: 2.4; DIV: 5.1 5.8. Understanding and p...
0.715648
[ 20, 23, 9, 10, 11, 21, 22, 34, 35, 0, 1, 2, 3, 4, 5, 6, 7, 8, 12, 13, 14, 15, 16, 17, 18, 19, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 36, 71, 56, 57, 72, 73, 83, 84, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47...
Early-Childhood-Education-Student-Teaching-Evaluation-Grid1.docx
task-962-346
3
[ [ 246, 654, 268, 669 ], [ 276, 654, 335, 670 ], [ 339, 654, 388, 670 ], [ 392, 654, 415, 670 ], [ 419, 654, 499, 670 ], [ 503, 654, 515, 670 ], [ 518, 654, 557, 670 ], [ 56...
[ [ 37, 669, 82, 682 ], [ 53, 680, 65, 694 ], [ 119, 664, 147, 676 ], [ 150, 664, 168, 676 ], [ 171, 664, 187, 676 ], [ 126, 676, 156, 688 ], [ 159, 676, 180, 688 ], [ 129, ...
whether to convene an earlier TAF review meeting or escalate to a the Multi-Agency Safeguarding Hub as a safeguarding/child protection concern. A diagram explaining the Stage Two pathway. For more help on how to assess need, complete the Help Assessment and organise and deliver a Team Around the Family contact our Earl...
whether to convene an earlier TAF review meeting or escalate to a the Multi-Agency Safeguarding Hub as a safeguarding/child protection concern. A diagram explaining the Stage Two pathway. For more help on how to assess need, complete the Help Assessment and organise and deliver a Team Around the Family contact our Earl...
1
[ 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54...
early-help-and-child-protection-policy-2018.docx
task-962-390
17
[ [ 60, 41, 120, 57 ], [ 124, 41, 138, 57 ], [ 143, 41, 207, 57 ], [ 211, 41, 230, 57 ], [ 235, 41, 281, 57 ], [ 286, 41, 318, 57 ], [ 322, 41, 371, 57 ], [ 376, 41, ...
[ [ 60, 41, 120, 57 ], [ 124, 41, 138, 57 ], [ 143, 41, 207, 57 ], [ 211, 41, 230, 57 ], [ 235, 41, 281, 57 ], [ 286, 41, 318, 57 ], [ 322, 41, 371, 57 ], [ 376, 41, ...
l. Does the child/young person Yes Yes Yes Yes Yes No No No No No have a disability or an Don’t Know Don’t Know Don’t know Don’t Know Don’t know additional need? Briefly explain the impact on the child/young person of having a disability or additional need: m. Does the child/young SEN support SEN support SEN support SE...
l. Does the child/young person have a disability or an additional need? Yes Yes Yes Yes Yes No No No No No Don’t Know Don’t Know Don’t know Don’t Know Don’t know Briefly explain the impact on the child/young person of having a disability or additional need: m. Does the child/young person have a Special Educational Need...
0.750356
[ 0, 1, 2, 3, 4, 15, 16, 17, 18, 19, 30, 31, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 61, 62, 63, 64...
Early-Help-Assessment-V7.0-docx.docx
task-962-401
3
[ [ 67, 69, 75, 97 ], [ 79, 69, 114, 97 ], [ 117, 69, 139, 97 ], [ 143, 69, 223, 97 ], [ 227, 69, 274, 97 ], [ 292, 69, 317, 97 ], [ 426, 69, 451, 97 ], [ 562, 69, 58...
[ [ 67, 69, 75, 97 ], [ 79, 69, 114, 97 ], [ 117, 69, 139, 97 ], [ 143, 69, 223, 97 ], [ 227, 69, 274, 97 ], [ 67, 97, 99, 124 ], [ 103, 97, 111, 124 ], [ 115, 97, 17...