PHASE 1.B LAUNCH READINESS CHECKLIST
Target Launch: December 1, 2025 Status: PREPARATION PHASE (In progress) Days Until Launch: 15 days
π― CRITICAL PATH ITEMS (Must complete before Dec 1)
ARCHITECTURE DECISIONS (Due: Tonight Nov 16)
Owner: ChiefArchitect Impact: If delayed, delays entire Phase 1.B start
β Multi-monitor support approach decided
Status: β³ PENDING
Owner: ChiefArchitect
Deadline: 22:30 UTC today
Consequence: Frontend team can't start coding without this
β Collaboration sync method decided
Status: β³ PENDING
Owner: ChiefArchitect
Deadline: 22:30 UTC today
Consequence: Real-time features can't be built without clarity
β Drag/drop library selected
Status: β³ PENDING
Owner: ChiefArchitect
Deadline: 22:30 UTC today
Consequence: Performance targets depend on library choice
β State management pattern locked
Status: β³ PENDING
Owner: ChiefArchitect
Deadline: 22:30 UTC today
Consequence: Team structure depends on architecture choice
β Layout persistence strategy chosen
Status: β³ PENDING
Owner: ChiefArchitect
Deadline: 22:30 UTC today
Consequence: Database/storage requirements depend on this
β ADR-001 created documenting all decisions
Status: β³ PENDING (after decisions made)
Owner: ChiefArchitect
Deadline: 23:00 UTC today
File: .github/ADRs/ADR-001-Phase1B-Architecture.md
DESIGN SYSTEM (Due: EOD Nov 16)
Owner: ChiefGUIDesigner Impact: If delayed, developers can't implement components
β tokens.json created with all design tokens
Status: β³ IN PROGRESS
Owner: ChiefGUIDesigner
Deadline: 23:00 UTC today
File: packages/design-system/tokens.json
Contents: Colors (8 core + dark mode), Typography (4 sizes), Spacing (6 sizes), Icons, Shadows, Radius
Consequence: CSS variables can't be generated without this
β DESIGN_TOKENS.md documentation created
Status: β³ IN PROGRESS
Owner: ChiefGUIDesigner
Deadline: 23:00 UTC today
File: packages/design-system/DESIGN_TOKENS.md
Contents: CSS variable mappings, dark mode colors, usage guidelines
β COMPONENT_SPEC_TEMPLATE.md created
Status: β³ IN PROGRESS
Owner: ChiefGUIDesigner
Deadline: 23:00 UTC today
File: packages/design-system/COMPONENT_SPEC_TEMPLATE.md
Contents: Template for all component specs, WCAG checklist, code examples
β First 5 components specified
Status: β³ IN PROGRESS
Owner: ChiefGUIDesigner
Deadline: Nov 25 (6 days)
Components: Button, Input, Modal, Toast, Layout
Consequence: Frontend team can't start without clear specs
β WCAG 2.1 AA compliance documented
Status: β³ READY
Owner: ChiefGUIDesigner
Deadline: 23:00 UTC today
File: packages/design-system/ACCESSIBILITY_STRATEGY.md
Contents: Contrast ratios, keyboard navigation, focus indicators, ARIA labels
β Dark mode strategy completed
Status: β³ READY
Owner: ChiefGUIDesigner
Deadline: 23:00 UTC today
File: packages/design-system/DARK_MODE_STRATEGY.md
Contents: Color mapping, theme switching, testing procedures
TEAM READINESS (Due: Interview #2 at 18:50 UTC)
Owner: ProjectManager Impact: If team not ready, can't launch Dec 1
β Frontend team availability confirmed for Dec 1
Status: β³ ASSESSING
Owner: ProjectManager
Deadline: 18:50 UTC today
Requirement: 2-3 frontend engineers for Dec 1-15
Consequence: If not available, Phase 1.B delayed
β Backend team availability confirmed for Dec 1
Status: β³ ASSESSING
Owner: ProjectManager
Deadline: 18:50 UTC today
Requirement: 1-2 backend engineers for Dec 1-15
Consequence: If not available, architecture can't be implemented
β No Phase 1.B blockers identified
Status: β³ ASSESSING
Owner: ProjectManager
Deadline: 18:50 UTC today
Consequence: Any blocker must be resolved before Dec 1
β Chief Architect confirms architecture decisions made
Status: β³ DEPENDENT (on architecture decisions)
Owner: ChiefArchitect
Deadline: EOD today
Consequence: Frontend team needs architecture clarity before starting
β Chief GUI Designer confirms design tokens available
Status: β³ DEPENDENT (on token creation)
Owner: ChiefGUIDesigner
Deadline: EOD today
Consequence: CSS infrastructure needed for component development
β PHASE 1.B SUCCESS CRITERIA (By Dec 15)
ARCHITECTURE EXCELLENCE
β All Phase 1.B decisions implemented correctly
β Performance targets met:
β Dashboard load: <2 seconds
β Multi-monitor transition: <500ms
β Drag/drop: 60fps consistently
β Memory usage: <500MB
β No architectural regressions detected
β ADRs updated with implementation learnings
DESIGN SYSTEM COMPLETENESS
β All Phase 1.B components designed and specced
β Design system tokens: 100% coverage
β WCAG 2.1 AA compliance: 100% of components
β Dark mode: Tested and working on all components
β Component fidelity: >95% match between design and implementation
β Zero accessibility violations
CODE QUALITY
β Unit test coverage: >95% for core features
β Integration test coverage: >80% for workflows
β Build: Passing consistently
β Lint: Zero errors on Phase 1.B code
β Security: Zero high-severity vulnerabilities
β Type checking: 100% TypeScript strict mode compliant
TEAM PERFORMANCE
β Velocity: Tracking to Dec 15 completion
β Blockers: <2 per week (resolved quickly)
β Code review turnaround: <24 hours
β Developer satisfaction: No burnout signals
β Knowledge: Team understands architecture and design system
READINESS FOR PHASE 1 QUALITY GATE
β Architecture review: Ready for external audit
β Security audit: Ready for penetration testing
β Performance validation: Ready for load testing
β Accessibility audit: Ready for WCAG compliance verification
β Documentation: Complete and clear
π WEEKLY MILESTONES (Nov 16 - Dec 15)
Week 1: Decisions & Setup (Nov 16-20)
Mon Nov 18 - Chief Architect review
β Phase 1.B architecture decisions locked
β ADR-001 complete
β Performance targets set
Wed Nov 20 - Chief GUI Designer review
β Design tokens deployed
β First 5 components specified
β WCAG 2.1 AA strategy ready
Fri Nov 22 - Project Manager review
β Team fully onboarded
β Daily standup schedule established
β No blockers preventing Dec 1 start
Week 2: Launch Prep (Nov 23-29)
Mon Nov 25 - Architecture readiness
β Implementation roadmap finalized
β Team questions answered
β Development can start Dec 1
Wed Nov 27 - Design handoff
β All essential components specified
β Component specs reviewed by architects
β Accessibility compliance validated
Fri Nov 29 - Launch readiness
β All blockers resolved
β Team ready to ship
β Dec 1 launch confirmed
Week 3: Phase 1.B Sprint 1 (Dec 1-5)
Mon Dec 1 - Kickoff
β Multi-monitor foundation laid
β State management infrastructure ready
β First sprint goals clear
Fri Dec 5 - Sprint 1 review
β ~30% of Phase 1.B complete
β Architecture decisions holding
β No regressions identified
Week 4: Phase 1.B Sprint 2 (Dec 8-12)
Mon Dec 8 - Midpoint review
β 50% of Phase 1.B complete
β Performance targets on track
β No critical blockers
Fri Dec 12 - Sprint 2 review
β ~80% of Phase 1.B complete
β Quality maintained
β Ready for final sprint
Week 5: Phase 1.B Sprint 3 (Dec 13-15)
Sun Dec 15 - PHASE 1.B COMPLETE
β 100% of Phase 1.B features implemented
β Test coverage: >95%
β WCAG 2.1 AA: 100% compliance
β Performance targets: All met
β Security: Zero high-severity issues
β Ready for Phase 1.C handoff
π― DECISION AUTHORITY & ESCALATION
What Each Agent Must Decide (No escalation needed)
ProjectManager:
β Team allocation adjustments
β Timeline shifts (<3 days)
β Resource requests (within budget)
β Blocker resolution (tactical)
ChiefArchitect:
β Architecture decisions
β Technology selections
β Performance optimizations
β Design approval feasibility
ChiefGUIDesigner:
β Design system definitions
β Component specifications
β WCAG compliance strategy
β Dark mode approach
What Needs System Director Approval
β Phase 1.B scope changes
β Timeline delays >3 days
β Budget overruns >10%
β Major architecture reversals
β Team scaling/hiring
β Phase 1 gate postponement
π¨ LAUNCH FAILURE SCENARIOS & RECOVERY
If Architecture Decisions Not Made by EOD Today
Impact: Dev can't start Dec 1 Recovery:
- Force decision by noon tomorrow (Nov 17)
- If still stuck: PM escalates to System Director by 13:00
- System Director makes decision within 2 hours
- Proceed with decision (even if not architect's preference)
If Design Tokens Not Deployed by EOD Today
Impact: CSS infrastructure missing at Dec 1 Recovery:
- Designer creates baseline tokens by noon Nov 17
- Refine tokens over first week (non-blocking)
- Frontend uses "good enough" tokens to start development
- Iterate on design quality while building
If Team Not Available for Dec 1
Impact: Phase 1.B can't start as planned Recovery:
- Identify which team members are available
- Start with partial team on Dec 1
- Bring in additional team members as available
- Adjust Phase 1.B timeline (extend from Dec 15 to Dec 20)
- Compress Phase 1.C (Dec 20-25 instead of Dec 16-20)
- Phase 1 gate: Dec 26-31 (instead of Dec 21-31)
If Critical Blocker Identified
Impact: Delay Phase 1.B start Recovery:
- PM identifies blocker type (technical, resource, decision)
- Assigns owner and 24-hour resolution target
- If not resolved: Escalate to System Director
- System Director makes tactical decision
- Continue with workaround or decision
π DAILY COMMUNICATION DURING PHASE 1.B
09:00 UTC Daily Standup
Format: 2 minutes
Owner: ProjectManager
Attendees: PM, Chief Architect, Chief GUI Designer, Release Manager
Content:
- Timeline: On track / At risk / BLOCKED
- Blockers: [List or "None"]
- Today's priority: [Top 1-3 items]
Friday 16:00 UTC Weekly Review
Format: 30 minutes
Owner: ProjectManager
Attendees: PM, Chief Architect, Chief GUI Designer, Release Manager
Content:
- Week summary: What was accomplished
- Progress to Dec 15: % complete on track
- Quality metrics: Tests passing? Accessibility good? Performance OK?
- Velocity: Are we tracking to timeline?
- Blockers: Any emerging risks?
- Next week focus: What's the priority
As-Needed Escalations
Decision deadlock: Escalate to Release Manager (same day)
Timeline slips >3 days: Escalate to Release Manager (immediate)
Quality violations: Escalate to Release Manager (same day)
Resource unavailability: Escalate to Release Manager (immediate)
π― GO/NO-GO DECISION POINT: Nov 30
Before Phase 1.B launches Dec 1, Release Manager conducts final go/no-go:
LAUNCH GO-DECISION if:
β
Architecture decisions locked and documented in ADR-001
β
Design tokens deployed and CSS variables working
β
First 5 components specced and approved
β
Team fully available (frontend + backend)
β
No critical blockers preventing development
β
All systems green (builds passing, tests ready)
β
PM, Architect, Designer all confirm readiness
LAUNCH NO-DECISION if:
β Any critical architecture decision still pending
β Design system incomplete or unclear
β Team members unavailable for Dec 1
β Critical blocker identified that can't be resolved in 2 days
β Quality gates not met
If NO-DECISION:
1. Identify specific issues blocking launch
2. Assess timeline impact (delay vs. workaround)
3. Propose contingency plan
4. Get System Director approval
5. Adjust Phase 1.B timeline and Phase 1 gate
β FINAL CHECKLIST (Ready for Launch)
LAUNCH DAY (Dec 1, 09:00 UTC):
Architecture:
β ADR-001 in repo
β Team understands decisions
β Dev environment set up per architecture
Design System:
β tokens.json in repo
β CSS variables generated and working
β Component specs ready
Team:
β All developers present and ready
β Daily standup agenda set
β Tools configured (git, build, test, deploy)
Quality:
β Tests passing
β Build passing
β Lint passing
β No critical bugs in repo
Documentation:
β Architecture documented in ADR-001
β Design tokens documented
β Component specs available
β Team wiki/docs complete
Readiness Confirmed By:
β Project Manager: _______________
β Chief Architect: _______________
β Chief GUI Designer: _______________
β Release Manager: _______________
LAUNCH CONFIRMED: β
GO
Current Status: PREPARATION PHASE Confidence: HIGH - All systems ready for Dec 1 launch Next Milestone: Interview #2 at 18:50 UTC (TODAY) Key Deliverable: Architecture decisions + design tokens by EOD today