| # INTERVIEW #2: AGENT SCALING ASSESSMENT | |
| **Time**: 18:50 UTC (TODAY) | |
| **With**: System Director (Claus) | |
| **By**: Project Manager | |
| **Purpose**: Assess team scaling needs for Phase 2 (3 parallel tracks) | |
| --- | |
| ## π PRE-INTERVIEW CHECKLIST (PM - Before 18:50 UTC) | |
| ### Phase 1.B Readiness Status (PM to confirm) | |
| ``` | |
| β Frontend team availability for Dec 1: [YES/NO + constraints] | |
| β Backend team availability for Dec 1: [YES/NO + constraints] | |
| β Chief Architect ready to lock decisions: [YES/NO] | |
| β Chief GUI Designer ready with design tokens: [YES/NO] | |
| β Dashboard Shell architecture clarity: [HIGH/MEDIUM/LOW] | |
| β Any Phase 1.B blockers identified: [LIST or "None"] | |
| β Timeline confidence for Dec 15 completion: [1-10 scale] | |
| ``` | |
| ### Agent Performance Status (PM to report) | |
| ``` | |
| PROJECTMANAGER Operations: | |
| β Daily standup template established: [YES/NO] | |
| β Escalation protocol tested: [YES/NO] | |
| β Authority boundaries understood by team: [YES/NO] | |
| β First week (Dec 1-5) priorities clear: [YES/NO] | |
| CHIEFARCHITECT Operations: | |
| β Phase 1.B decisions: [How many decided?] / 5 | |
| β ADR-001 created: [YES/NO] | |
| β Architecture communication plan: [YES/NO] | |
| β Performance targets set: [YES/NO] | |
| CHIEFGUIDESIGNER Operations: | |
| β Design tokens deployed: [YES/NO] | |
| β Component specs created: [Number] / 5+ | |
| β WCAG 2.1 AA strategy documented: [YES/NO] | |
| β Dark mode strategy ready: [YES/NO] | |
| ``` | |
| --- | |
| ## π― INTERVIEW #2 AGENDA (30 minutes) | |
| ### SECTION A: Phase 1.B READINESS (8 minutes) | |
| **Topic**: Can we launch Phase 1.B on Dec 1? | |
| ``` | |
| PM presents: | |
| β‘ Current team status (frontend/backend availability) | |
| β‘ Architecture readiness (decisions locked in?) | |
| β‘ Design system readiness (tokens ready?) | |
| β‘ Any blockers preventing Dec 1 launch | |
| System Director responds: | |
| β‘ YES, proceed with current team | |
| β‘ NO, need [specific resources/decisions] | |
| β‘ CONDITIONAL, if we [specific actions] by [date] | |
| Decision: PROCEED / HOLD / CONDITIONAL | |
| ``` | |
| ### SECTION B: PHASE 2 TEAM SCALING (15 minutes) | |
| **Topic**: What team do we need for Phase 2.A/B/C? | |
| ``` | |
| PHASE 2 STRUCTURE: | |
| - Track 2.A: Core Widgets (Calendar, Notes, Status, Procurement, Security) | |
| Effort: 32-44 days | Team: 2-3 Frontend engineers | |
| - Track 2.B: Security Intelligence (Feed, Search, Activity Stream) | |
| Effort: 23-29 days | Team: 1-2 Frontend + 1 Backend | |
| - Track 2.C: Backend Platform (Services, logging, types) | |
| Effort: 18-24 days | Team: 1-2 Backend engineers (NEW ROLE NEEDED) | |
| TOTAL PARALLEL: 3 tracks = 4-6 engineers needed (currently: 1 PM + 1 Arch + 1 Designer) | |
| Questions for System Director: | |
| 1. "Do we hire Backend Architect NOW or in December?" | |
| 2. "How many Frontend specialists needed (estimate 2-3)?" | |
| 3. "Should we onboard team in December before Phase 2 kickoff?" | |
| 4. "Budget impact for Phase 2 team expansion - acceptable?" | |
| 5. "Timeline confidence with team of [X] people?" | |
| PM Recommendation Framework: | |
| IF Phase 1.B complete by Dec 15 + team ready: | |
| β HIRE: 2-3 specialists in December (Backend Architect, Frontend specialists) | |
| β START: Phase 2 onboarding Dec 16-31 | |
| β LAUNCH: Phase 2 at full speed Jan 1 | |
| IF Phase 1.B slips past Dec 15: | |
| β DELAY: Phase 2 start to Feb 1 | |
| β ADJUST: Phase 2 timeline or scope | |
| β ESCALATE: Budget/timeline impact to System Director | |
| ``` | |
| ### SECTION C: AGENT PERFORMANCE (5 minutes) | |
| **Topic**: Are agents working at full speed? | |
| ``` | |
| PM Assessment: | |
| β‘ Decision turnaround time: [days/hours] (target: same-day max) | |
| β‘ Authority clarity: Clear / Somewhat clear / Unclear | |
| β‘ Escalation triggers: Working as designed? YES/NO | |
| β‘ Team confidence: High / Medium / Low | |
| System Director Feedback: | |
| β‘ Agent instructions sufficient? YES/NO | |
| β‘ Additional authority needed? [AREAS] | |
| β‘ Timeline pressure sustainable? YES/NO | |
| β‘ Burnout risk? [Level: None/Low/Medium/High] | |
| ``` | |
| ### SECTION D: NEXT STEPS (2 minutes) | |
| **Topic**: Confirm execution plan | |
| ``` | |
| Decisions to Make: | |
| 1. Phase 1.B launch: Dec 1 CONFIRMED or adjusted? | |
| 2. Phase 2 team size: [Number] engineers to hire? | |
| 3. Hiring timeline: NOW or December? | |
| 4. Interview #3 schedule: [Date/Time] for progress check | |
| Output: Clear next steps with dates and decision authority | |
| ``` | |
| --- | |
| ## π CURRENT METRICS TO REPORT | |
| ### Phase 1.B Progress | |
| ``` | |
| Architecture Decisions: 0/5 complete (decide by EOD today) | |
| Design System: 0% deployed (deploy by EOD today) | |
| Component Specs: 0/5 created (create by EOD today) | |
| Team Readiness: TBD (assess in interview) | |
| Timeline: ON TRACK for Dec 1 (if decisions made today) | |
| ``` | |
| ### Agent Performance Baseline | |
| ``` | |
| ProjectManager: | |
| - Daily standups: Not yet started (begin Dec 1) | |
| - Decision authority: Clear and tested | |
| - Blocker identification: Framework ready | |
| ChiefArchitect: | |
| - Architecture decisions: 0/5 (decide TODAY) | |
| - ADR creation: Ready to execute | |
| - Performance targets: Defined | |
| ChiefGUIDesigner: | |
| - Design tokens: Ready to commit TODAY | |
| - Component specs: 0/5 (create TODAY) | |
| - Accessibility compliance: WCAG 2.1 AA ready | |
| ``` | |
| ### Team Status | |
| ``` | |
| Current Team: | |
| - Project Manager: 1 (newly onboarded) | |
| - Chief Architect: 1 (newly onboarded) | |
| - Chief GUI Designer: 1 (newly onboarded) | |
| - Frontend engineers: ? (TBD) | |
| - Backend engineers: ? (TBD) | |
| - Security specialist: ? (TBD) | |
| Phase 1.B Needs: Confirm in interview | |
| Phase 2 Needs: CRITICAL - assess in this interview | |
| Hiring Timeline: DECISION POINT | |
| ``` | |
| --- | |
| ## π¨ ESCALATION SCENARIOS | |
| ### If Phase 1.B is NOT ready for Dec 1: | |
| ``` | |
| Trigger: Team not available OR architecture not decided OR design not ready | |
| PM Response: | |
| 1. Identify specific blocker | |
| 2. Assess timeline impact (days slipped) | |
| 3. Recommend mitigation (resources, decisions, priority changes) | |
| 4. Escalate to System Director for decision | |
| System Director Options: | |
| - Add resources to fix blocker | |
| - Adjust Phase 1.B scope | |
| - Delay start date | |
| - Parallel track approach | |
| ``` | |
| ### If team scaling is NOT approved for Phase 2: | |
| ``` | |
| Trigger: Budget constraints OR timeline assumptions change | |
| PM Response: | |
| 1. Assess Phase 2 timeline impact (team size vs. 8-week target) | |
| 2. Recommend scope adjustments (which tracks to prioritize) | |
| 3. Propose phased hiring (hire later for later tracks) | |
| System Director Options: | |
| - Approve scaled budget for Phase 2 | |
| - Adjust Phase 2 timeline (10-12 weeks instead of 8) | |
| - Prioritize one track, defer others | |
| - Hire contractors for specific tracks | |
| ``` | |
| --- | |
| ## β SUCCESS CRITERIA FOR INTERVIEW #2 | |
| Interview is SUCCESSFUL if: | |
| ``` | |
| β Phase 1.B launch date confirmed (Dec 1 or adjusted) | |
| β Phase 2 team size decided (X engineers to hire) | |
| β Hiring timeline established (now vs. December) | |
| β Budget impact for Phase 2 approved (or escalated) | |
| β Next interview scheduled (for progress tracking) | |
| β Clear action items for next week | |
| Interview FAILS if: | |
| β No decision made on team scaling | |
| β Phase 1.B launch left ambiguous | |
| β Timeline remains uncertain | |
| β Authority boundaries still unclear | |
| ``` | |
| --- | |
| ## π INTERVIEW OUTCOMES TO COMMUNICATE | |
| **After Interview #2**, PM communicates outcomes to: | |
| 1. **Chief Architect** | |
| - "Phase 1.B launches Dec 1 - confirmed" | |
| - "You have X Frontend engineers starting Dec 1" | |
| - "You have X Backend engineers starting Dec 1" | |
| 2. **Chief GUI Designer** | |
| - "Dashboard Shell design specifications confirmed for Phase 1.B" | |
| - "Component library scope: [estimate] components by Dec 15" | |
| - "Design system will support [estimate] widgets by Phase 2" | |
| 3. **Team** | |
| - "Phase 1.B confirmed Dec 1-15" | |
| - "Phase 2 team being hired - [details]" | |
| - "Next milestones: Phase 1.B complete Dec 15, Phase 1 gate Dec 21-31" | |
| --- | |
| ## π¬ READY FOR EXECUTION | |
| Interview #2 ready at **18:50 UTC** with: | |
| β Phase 1.B readiness assessment | |
| β Phase 2 team scaling framework | |
| β Agent performance evaluation | |
| β Clear decision scenarios | |
| β Escalation protocols if needed | |
| **Expected Outcome**: Clear Phase 2 team composition + Phase 1.B launch confirmation | |