# Priority 3: "Start Now" Work - Week 1 Kickoff (Nov 18-22)
**Status**: βœ… APPROVED - LAUNCHING TODAY (Nov 18)
**Goal**: Complete 8.5 people-days of prep work in parallel for Phase 1.C fast-track
**Timeline**: Nov 18 (Mon) - Nov 22 (Fri)
**Phase 1.C Launch**: Dec 8, 2025
---
## 🎯 Mission
Prepare for Phase 1.C acceleration (Dec 8-13) by running 4 independent prep teams in parallel. This eliminates bottlenecks and compresses Phase 1.C execution from 5 days β†’ 4.5 effective days.
**Success = Dec 13 Phase 1 completion with all quality gates passed (95%+ coverage, 0 critical vulns)**
---
## πŸ‘₯ Team Assignments & Daily Tasks
### βœ… TEAM 1: Design System Foundation (2 people-days)
**Lead**: Chief GUI Designer
**Support**: Frontend Architect 3
**Deliverable**: Design System Standards Document (100% complete by Fri)
#### Monday Nov 18
- [ ] 09:00 - Kickoff meeting (30 min)
- [ ] 10:00 - Review existing component patterns in codebase
- [ ] 11:00 - Document component hierarchy (20+ components identified)
- [ ] 14:00 - Define naming conventions (consistent across system)
- [ ] 16:00 - Checkpoint: Hierarchy + naming doc ready
#### Tuesday-Wednesday (Nov 19-20)
- [ ] Review color palette usage across codebase
- [ ] Document color system (semantic naming, accessibility standards)
- [ ] Establish typography system (font families, sizes, weights)
- [ ] Define spacing scale (8px base unit system)
- [ ] Document accessibility requirements (WCAG 2.1 AA compliance)
#### Thursday-Friday (Nov 21-22)
- [ ] Create component documentation template
- [ ] Write usage guidelines for 3-4 primary components
- [ ] Finalize and review complete standards document
- [ ] Prepare Storybook integration checklist for Team 2
**Deliverable File**: `design-system/DESIGN_SYSTEM_STANDARDS.md`
**Definition of Done**:
- βœ… Component hierarchy documented (all 20+ components)
- βœ… Naming conventions established and examples given
- βœ… Color system with semantic naming
- βœ… Typography scale documented
- βœ… Spacing system (8px base) defined
- βœ… Accessibility standards clear (WCAG 2.1 AA)
- βœ… Ready for Team 2 Storybook integration
---
### βœ… TEAM 2: Storybook Infrastructure (1.5 people-days)
**Lead**: Frontend Architect 3
**Support**: Technical Writer
**Deliverable**: Storybook environment fully configured and ready for stories
#### Monday Nov 18
- [ ] 09:00 - Kickoff meeting (30 min)
- [ ] 10:00 - Install Storybook 7.x in monorepo
- [ ] 11:00 - Configure Chromatic integration for visual testing
- [ ] 14:00 - Set up build pipeline and CI/CD
- [ ] 16:00 - Checkpoint: Storybook running locally
#### Tuesday-Wednesday (Nov 19-20)
- [ ] Create Storybook templates for common patterns
- [ ] Configure component documentation patterns
- [ ] Set up Storybook addons (accessibility, actions, controls)
- [ ] Create CSF (Component Story Format) templates
- [ ] Document story writing standards
#### Thursday-Friday (Nov 21-22)
- [ ] Test Storybook build and deployment pipeline
- [ ] Create quick-start guide for story authors
- [ ] Verify Chromatic integration working
- [ ] Final testing and documentation
- [ ] Hand off to Phase 1.C teams
**Deliverable File**: `storybook/STORYBOOK_SETUP.md`
**Definition of Done**:
- βœ… Storybook 7.x installed and running
- βœ… Chromatic integration configured
- βœ… CSF templates ready for story writing
- βœ… Accessibility addon enabled
- βœ… CI/CD pipeline working
- βœ… Story templates documented
- βœ… 100+ stories can start writing Dec 8
---
### βœ… TEAM 3: E2E Test Planning (3 people-days)
**Lead**: QA Engineer 1
**Support**: QA Engineer 2
**Deliverable**: 100+ E2E test scenarios designed and ready for execution
#### Monday Nov 18
- [ ] 09:00 - Kickoff meeting (30 min)
- [ ] 10:00 - Review Phase 1.C blocks and requirements
- [ ] 11:00 - Plan E2E test scenarios (user journeys, critical paths)
- [ ] 14:00 - Map test coverage matrix (features Γ— browsers Γ— devices)
- [ ] 16:00 - Checkpoint: Test plan document 50% complete
#### Tuesday-Wednesday (Nov 19-20)
- [ ] Design 100+ test scenarios (detailed steps for each)
- [ ] Create test data generators (user fixtures, mock data)
- [ ] Document cross-browser matrix (Chrome, Firefox, Safari, Edge)
- [ ] Design accessibility testing scenarios (WCAG 2.1)
- [ ] Document performance testing approach
- [ ] Create Playwright test templates
#### Thursday-Friday (Nov 21-22)
- [ ] Review and finalize all test scenarios
- [ ] Create test execution checklist
- [ ] Document expected results for each test
- [ ] Prepare test environment requirements
- [ ] Hand off to QA team for Dec 8-13 execution
**Deliverable File**: `testing/E2E_TEST_PLAN.md`
**Definition of Done**:
- βœ… 100+ test scenarios documented with steps
- βœ… Cross-browser testing matrix defined
- βœ… Test data generators created
- βœ… Accessibility scenarios included
- βœ… Performance testing approach defined
- βœ… Playwright templates ready
- βœ… Test environment requirements clear
- βœ… Execution ready for Phase 1.C
---
### βœ… TEAM 4: Performance Infrastructure (2 people-days)
**Lead**: Frontend Performance Specialist
**Support**: DevOps Engineer 2
**Deliverable**: Performance monitoring infrastructure operational and validated
#### Monday Nov 18
- [ ] 09:00 - Kickoff meeting (30 min)
- [ ] 10:00 - Review current performance baseline
- [ ] 11:00 - Set up Core Web Vitals monitoring (FCP, LCP, CLS, INP)
- [ ] 14:00 - Configure performance profiling tools
- [ ] 16:00 - Checkpoint: Monitoring dashboard online
#### Tuesday-Wednesday (Nov 19-20)
- [ ] Establish performance targets verification
- [ ] Create CI/CD performance gates
- [ ] Set up automated bundle size analysis
- [ ] Configure production monitoring alerts
- [ ] Document performance optimization workflow
- [ ] Create performance testing checklist
#### Thursday-Friday (Nov 21-22)
- [ ] Validate all monitoring and alerting
- [ ] Test performance gates in CI/CD
- [ ] Create performance optimization guide
- [ ] Prepare dashboards for Phase 1.C team
- [ ] Document edge cases and fallbacks
**Deliverable File**: `performance/PERFORMANCE_INFRASTRUCTURE.md`
**Definition of Done**:
- βœ… Core Web Vitals monitoring operational
- βœ… Performance profiling tools configured
- βœ… CI/CD gates set (FCP <1.5s, LCP <2.5s, CLS <0.1)
- βœ… Bundle size tracking enabled
- βœ… Alerting and notifications working
- βœ… Performance dashboards accessible
- βœ… Optimization workflow documented
- βœ… Ready for Phase 1.C performance block
---
## πŸ“… Daily Coordination (All Teams)
### Daily Standup: 09:15 AM (15 minutes)
**Attendees**: All 4 team leads + System Director
**Format**:
- Each team: 2-min status (on track / blockers)
- Blockers: 1-2 min each for resolution
- Alignment on dependencies
**Location**: Zoom or in-person (TBD)
### Daily End-of-Day Check-in: 17:00 (10 minutes)
**Attendees**: All 4 team leads
**Format**:
- Status update
- Anything needed for next day
- Progress toward deliverables
---
## 🎯 Daily Targets
### Monday Nov 18 (Kickoff Day)
- **Team 1**: Component hierarchy documented
- **Team 2**: Storybook installed and running locally
- **Team 3**: Test plan document started (50% complete)
- **Team 4**: Performance monitoring dashboard online
### Tuesday Nov 19
- **Team 1**: Color palette + typography documented
- **Team 2**: CSF templates and documentation complete
- **Team 3**: 100+ test scenarios drafted
- **Team 4**: CI/CD gates configured and testing
### Wednesday Nov 20
- **Team 1**: 90% of standards doc complete
- **Team 2**: Story writing guides ready
- **Team 3**: Test data generators created
- **Team 4**: Production monitoring validated
### Thursday Nov 21
- **Team 1**: Final review and sign-off
- **Team 2**: Storybook fully tested and documented
- **Team 3**: All 100+ scenarios finalized
- **Team 4**: Performance dashboards prepared
### Friday Nov 22 (Checkpoint Day)
- **Team 1**: βœ… Design System Standards document DONE
- **Team 2**: βœ… Storybook infrastructure DONE
- **Team 3**: βœ… E2E test plan with 100+ scenarios DONE
- **Team 4**: βœ… Performance infrastructure DONE
**Friday End-of-Day Celebration**: All 4 deliverables complete, teams ready for Phase 1.C
---
## 🚨 Blocker Resolution
**If a team discovers blockers**:
1. **Immediate Action** (same day):
- Report in daily standup (09:15)
- Identify if blocker blocks other teams
- Propose workaround or solution
2. **Resolution Paths**:
- **Dependency blocker**: Coordinate with other team leads
- **Technical blocker**: Escalate to System Director
- **Resource blocker**: Request additional resources (approved by director)
3. **Example Blocker Scenarios**:
- "Storybook 7.x has breaking change" β†’ Design System team adjusts templates
- "Performance monitoring needs backend API" β†’ DevOps Engineer 2 creates API
- "Test scenario requires feature not yet built" β†’ QA team documents dependency, Phase 1.C team prioritizes
**No blocker will be allowed to derail Nov 22 deliverables without explicit System Director decision.**
---
## πŸ“Š Success Metrics (Friday Nov 22)
### Team 1: Design System
- [ ] βœ… 100% of standards documented
- [ ] βœ… All naming conventions clear with examples
- [ ] βœ… Accessibility requirements (WCAG 2.1 AA) documented
- [ ] [ ] βœ… Ready for Storybook integration
### Team 2: Storybook
- [ ] βœ… Storybook 7.x fully operational
- [ ] βœ… Chromatic integration working
- [ ] βœ… CSF templates ready for 100+ stories
- [ ] βœ… CI/CD pipeline verified
### Team 3: E2E Testing
- [ ] βœ… 100+ test scenarios documented
- [ ] βœ… Test data generators created
- [ ] βœ… Cross-browser matrix defined
- [ ] βœ… Playwright templates ready
### Team 4: Performance
- [ ] βœ… Core Web Vitals monitoring operational
- [ ] βœ… CI/CD performance gates working
- [ ] βœ… Performance dashboards accessible
- [ ] βœ… Optimization workflow documented
---
## πŸŽ‰ Phase 1.C Launch: Dec 8
After this week's prep work completes:
- All infrastructure ready (0 ramp-up time)
- Day 1 (Dec 8): Immediate productivity
- Blocks 1-3 run in parallel
- Dec 13: Phase 1 complete βœ…
---
## πŸ“ž Key Contacts
**System Director**: For approvals and escalations
**Team Leads**: For daily coordination
**Tech Leads**: For technical decisions
---
## πŸš€ LAUNCH STATUS
**βœ… APPROVED - Start Time: NOW (Nov 18, 2025)**
All team leads: Check your email for task assignments.
All team members: Check Slack for team channel invites.
**First Daily Standup**: Nov 18, 09:15 AM
---
**Generated**: Nov 17, 2025
**By**: Claude Code - Priority 3 Fast-Track
**Next Review**: Nov 22 Friday EOD (All deliverables checkpoint)