Mohammad Wasil
Deploy with fixed LFS tracking for ChromaDB
9a3b3da

SmartCoffee Pro Installition:

  1. Placement: Must be on a flat, stable surface at least 1.2 meters above the ground.
  2. Ventilation: Leave adequate space around the machine for air circulation to prevent overheating.
  3. Power Safety: Never use with an extension cord or external timer.
  4. Initial Setup: Before first use, wash the carafe and brew basket in mild detergent and run one full "water-only" brew cycle.