hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.3 Test purpose
To verify for VAMOS I/II/III, under static channel conditions, that the BEP is measured and mapped to the MEAN_BEP values defined in subclause 8.2.5 of 3GPP TS 45.008 by the MS in a manner that can be related to an equivalent average BEP before channel decoding. The probability that the correct MEAN_BEP value is report...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.4 Method of test
The SS compares the long term BER average calculated by counting bit errors determined in loop-back type C mode over a SACCH multi frame period to a set of related MEAN_BEP values. The MEAN_BEP values correspond to the same MS received bits that are looped-back for calculation of the long-term BER average (one-phase ap...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.4.1 Initial conditions
The SS transmits a Standard Test Signal C1 (AQPSK) (wanted signal) on the active VAMOS subchannel (subchannel 2) using trainings sequence 5 from TSC set 2 on the TCH channel using the VAMOS TCH/AFS 12.2 at the nominal frequency of the receiver and with a level of –82 dBm and the other VAMOS subchannel (subchannel 1) us...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.4.2 Procedure
a) The unwanted signal is switched off and the SS commands the MS to create traffic channel loop back signalling Type C: ON The SS sends 6000 speech frames to the MS. During this period for 250 times, the MS will report MEAN BEP in Enhanced Measurement Report for every SACCH multi-frame period. For each reported Mean_B...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.5 Test requirements
Testing of the conformance requirement can be done either with fixed minimum number of samples or based on the statistical test method that could lead to an early pass/fail decision with test time significantly reduced for a MS not on the limit.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.5.1 Fixed limit test with minimum number of samples
The fixed testing of the conformance requirement is done using the minimum number of samples and the limit error rate given in table 21.13.5-1. The number of error events determined in steps b), e) and h) stored in error counters N_high, N_mid_high, N_mid_low and N_low shall not exceed the error event limit as defined ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
21.13.5.2 Statistical test with early pass / fail decision
Specific details on statistical testing of performance are defined in Annex 7. The calculation of the error rate for this test shall be done according to the values specified in table 21.13.5-2. Table 21.13.5-2: Statistical error limits for MEAN_BEP_AQPSK Range Block per s Org. error rate requirement Derived test limit...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22 Transmit power control timing and confirmation
Unless otherwise specified all tests in clauses 22.1 to 22.10 are applicable for all MSs supporting the bands referred to in clause 1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1 Transmit power control timing and confirmation, single slot
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.1 Definition
The RF power level to be employed by the MS is indicated by means of the 5 bit TXPWR field sent in the layer 1 header of each downlink SACCH message block and may be sent in a dedicated signalling block. When a power change is signalled the MS must change its power control level to the new level at a certain rate of ch...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.2 Conformance requirement
1. The RF power control level to be employed by the MS is indicated by means of the power control information sent in the layer 1 header of each downlink SACCH message block and may be sent in a dedicated signalling block; 3GPP TS 05.08, subclause 4.2. 2. The MS shall confirm the power level that it is currently employ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.3 Test purpose
1. To verify that the MS will set its transmitter output power in accordance with conformance requirement 1. 2. To verify that the MS will confirm the power level it is currently employing according to conformance requirement 2. 3. To verify that the MS, upon receipt of a command from the SACCH to change its RF power l...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.4 Method of test
NOTE: The method of measuring the MS transmitter output power is given in subclause 13.3.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.4.1 Initial conditions
A call is set up by the SS according to the generic call set up procedure on a channel with ARFCN in the Mid ARFCN range (see table 3.3), power control level set to maximum power.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.4.2 Procedure
a) The SS signals minimum power control level to the MS in the SACCH. b) The SS measures the MS transmitter output power on TDMA frames 6, 19, 32 and every subsequent 13th TDMA frame to TDMA frame 214. The SS also monitors the MS_TXPWR_CONF field in the uplink SACCH L1 header for the four SACCH multiframes after the SS...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.1.5 Test requirements
NOTE: Refer to tables 13-2, 13-3 and 13-4 for relationship between the power class, power control level, transmitter output power and the relevant tolerances. a) In steps b) and d), the transmitter output power shall change by one power step towards the new level signalled for each measured burst until the MS is operat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.2 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3 GPRS Uplink Power Control - Use of  and CH parameters
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.1 Definition
Power control is important for spectrum efficiency as well as for power consumption in a cellular system. Power control for a packet oriented connection is more complicated than for a circuit switched connection, since there is no continuous two-way connection. The RF output power, PCH , to be employed by the MS on ea...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.2 Conformance requirement
The MS shall use the same output power on all four bursts within one radio block. 3GPP TS 05.08, subclause 10.2.1. If a calculated output power is not supported by the MS, the MS shall use the supported output power which is closest to the calculated output power. 3GPP TS 05.08, subclause 10.2.1. When the MS receives n...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.3 Test purpose
To verify the MS uses that the same output power on all four bursts of a radio block under normal conditions. To verify that the highest power supported by the MS is used if the calculated power is greater. To verify that the MS applies new CH or  values 2 radio blocks after the end of the frame containing the last t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.4 Method of test
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.4.1 Initial conditions
The SS establishes a BCCH, and optionally a PBCCH on the same carrier, in the mid ARFCN range. GPRS_MS_TXPWR_MAX_CCH is set to the maximum level (39 dBm for GSM and 36 dBm for DCS and PCS). The CH value is set such that (0 - CH) equals the maximum power control level supported by the Power Class of the MS under tes...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.4.2 Procedure
a) The SS shall trigger a transmitter output power measurement on each of the four bursts of any radio block. The method of power measurement is described in subclause 13.16. b) The SS shall modify the CH value such that (0 - CH) equals the minimum power control level supported by the MS under test (0dBm for DCS 1 8...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.3.5 Test requirements
1. The power of all four bursts within the radio block measured in step a) and c) shall be within the accuracies specified for the power class of the mobile under test, as indicated in the following table. Power class Bands other than DCS 1 800 and PCS 1 900 Nominal Maximum output power DCS 1 800 Nominal Maximum output...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4 GPRS Uplink Power Control - Independence of TS Power Control
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.1 Definition
-
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.2 Conformance requirement
For a GPRS multislot MS supporting 2 or more uplink PDCHs, power control shall be employed by the MS on each individual uplink PDCH. 3GPP TS 05.08, subclause 10.2.1. On a multislot uplink configuration the MS may restrict the interslot output power control range to a 10 dB window, on a TDMA frame basis. On those timesl...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.3 Test purpose
To verify that for a GPRS multislot MS supporting 2 or more uplink PDCHs, power control shall be employed by the MS on each individual uplink PDCH.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.4 Method of test
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.4.1 Initial conditions
The MS shall transmit on the uplink with the maximum number of TS for the multislot class of the MS.. This is achieved using the GPRS test mode by first establishing a downlink TBF and transmitting a GPRS_TEST_MODE_CMD (see 3GPP TS 04.14, subclause 5.4). Each TS is transmitting on its maximum power. The ‑value is set ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.4.2 Procedure
a) The SS shall modify the CH value of one TS such that (0 - CH) equals the minimum power control level supported by the MS under test (0dBm for DCS 1 800 and PCS 1 900 and 5dBm for all other bands). b) The SS shall trigger a transmitter output power measurement on each of the four bursts of any radio block of the T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.4.5 Test requirements
1. The power of all four bursts within the radio block measured in step b) shall be 0dBm for DCS 1 800 and PCS 1 900 and 5dBm for all other bands with an accuracy of 5 dB in both cases. For an MS using reduced interslot dynamic range, the power measured in step b) shall be within 10dB ± 3dB of the average power of the...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.5 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6 Normal transmit power control timing and confirmation in ECSD
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.1 Definition
The RF power level to be employed by the MS is indicated by means of the 5 bit TXPWR field sent in the layer 1 header of each downlink SACCH message block and may be sent in a dedicated signalling block. When a power change is signalled the MS must change its power control level to the new level at a certain rate of ch...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.2 Test conformance
1. The RF power control level to be employed by the MS is indicated by means of the power control information sent in the layer 1 header of each downlink SACCH message block and may be sent in a dedicated signalling block; 3GPP TS 05.08, subclause 4.2. 2. The MS shall confirm the power level that it is currently employ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.3 Test purpose
1. To verify that the MS will set its transmitter output power in accordance with conformance requirement 1. 2. To verify that the MS will confirm the power level it is currently employing according to conformance requirement 2. 3. To verify that the MS, upon receipt of a command from the SACCH to change its RF power l...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.4 Test method
NOTE: The method of measuring the MS transmitter output power is given in subclause 13.3. For 8PSK modulation, a measurement method for estimating the long term average power from a single burst shall be employed. See subclause 13.17.3.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.4.1 Initial conditions
A call is set up by the SS according to the generic call set up procedure for multislot configuration on a channel with ARFCN in the Mid ARFCN range (see table 3.3), power control level set to maximum power. The SS commands the MS to operate in multislot configuration where it has highest possible number of Tx slots.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.4.2 Procedure
If the MS supports both GMSK and 8PSK modulation on the uplink, the test is repeated with each modulation format. a) The SS signals minimum power control level to the MS in the SACCH for one of the subchannels. b) The SS measures the MS transmitter output power on TDMA frames 6, 19, 32 and every subsequent 13th TDMA fr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.6.5 Test requirement
NOTE: Refer to tables 13.17.3-1, 13.17.3-2, 13.17.3-3 and 13.17.3-4 for relationship between the power class, power control level, transmitter output power and the relevant tolerances. a) In steps b) and d), the transmitter output power shall change by one power step towards the new level signalled for each measured bu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7 ECSD Fast Power Control (FPC) timing and interworking with normal power control
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.1 Definition
Using the SACCH L1 header, normal uplink power control modifies the MS transmit power at a maximum rate of one power control level change per SACCH period (480ms). Under Fast Power Control the output power of an MS, in E‑TCH mode, is updated each fast power reporting period. There are 24 fast power reporting periods i...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.2 Test conformance
1. In the E-TCH mode, the MS shall, if so indicated by the BSS in the SACCH L1 header or Assignment command, use FPC (fast power control); 3GPP TS 05.08, subclause 4.2 2. Switching between the normal power control mechanism and FPC shall be done if FPC is enabled or disabled via signalling in the SACCH L1 header. The r...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.3 Test purpose
1. To verify that the MS switches between normal power control and fast power control mechanisms in accordance with conformance requirements 1 and 2. 2. To verify that the initial power control level used by the MS after switching between normal and fast power control mechanisms is in accordance with conformance requir...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.4 Test method
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.4.1 Initial conditions
A call is set up by the SS according to the generic call set up procedure for multislot configuration on a channel with ARFCN in the Mid ARFCN range (see table 3.3). The SS commands the MS to operate in multislot configuration where it has the highest possible number of bi‑directional E-TCHs. Using normal power control...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.4.2 Procedure
For the purpose of this test the SS shall randomly select one bi-directional E-TCH to exercise. All other E-TCHs shall maintain the state defined under the initial conditions. In this procedure these other E-TCHs are referred to as the active but unselected channels. a) Using the normal power control mechanism, the SS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.7.5 Test requirement
a) The powers measured for the unselected timeslots in steps a), c) and d) shall conform with the Pmax specification for the MS power class given in the following table. Power class Bands other than DCS 1 800 and PCS 1 900 Nominal Maximum output power (MS TX Level) Bands other than DCS 1 800 and PCS 1 900 Tolerance (dB...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8 EGPRS Uplink Power Control - Use of  and CH parameters
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.1 Definition
Power control is important for spectrum efficiency as well as for power consumption in a cellular system. Power control for a packet oriented connection is more complicated than for a circuit switched connection, since there is no continuous two-way connection. The RF output power, PCH , to be employed by the MS on eac...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.2 Conformance requirement
1. The MS shall use the same output power on all four bursts within one radio block. 3GPP TS 3GPP TS 05.08, subclause 10.2.1. 2. If a calculated output power is not supported by the MS, the MS shall use the supported output power which is closest to the calculated output power. 3GPP TS 05.08, subclause 10.2.1. 3. When ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.3 Test purpose
1. To verify the MS uses that the same output power on all four bursts of a radio block under normal conditions. 2. To verify that the highest power supported by the MS is used if the calculated power is greater. 3. To verify that the MS applies new CH or  values 2 radio blocks after the end of the frame containing t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.4 Test method
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.4.1 Initial conditions
The SS establishes a BCCH and optionally a PBCCH on the same carrier in the mid ARFCN range. GPRS_MS_TXPWR_MAX_CCH is set to the maximum level (36dBm for DCS 1 800 and PCS 1 900 and 39dBm for all other bands). The CH value is set such that (0 - CH) equals the maximum power control level supported by the Power Class...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.4.2 Procedure
If the MS supports both GMSK and 8PSK modulation on the uplink, the test is repeated with each modulation format. a) The SS shall trigger a transmitter output power measurement on each of the four bursts of any radio block. b) The method of power measurement is described in subclause 13.17.3. NOTE 1: For 8PSK modulatio...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.8.5 Test requirement
1. The power of all four bursts within the radio block measured in step a) and c) shall be within the accuracies specified for the power class of the mobile under test, as indicated in the following table. Power class Bands except DCS 1 800 and PCS 1 900 Nominal Maximum output power Bands except DCS 1 800 and PCS 1 900...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9 EGPRS Uplink Power Control - Independence of TS Power Control
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.1 Definition
-
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.2 Test conformance
For an EGPRS multislot MS supporting 2 or more uplink PDCHs, power control shall be employed by the MS on each individual uplink PDCH. 3GPP TS 05.08, subclause 10.2.1. On a multislot uplink configuration the MS may restrict the interslot output power control range to a 10 dB window, on a TDMA frame basis. On those time...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.3 Test purpose
To verify that EGPRS power control is applied to each PDCH in a multislot configuration independently.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.4 Test method
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.4.1 Initial conditions
The SS establishes a downlink TBF. The SS orders the MS to transmit on the maximum number of timeslots for the multislot class of the MS on the uplink. This is achieved using the GPRS test mode by transmitting a GPRS_TEST_MODE_CMD (see 3GPP TS 04.14, subclause 5.4). Each timeslot is transmitting on its maximum power. T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.4.2 Procedure
If the MS supports both GMSK and 8PSK modulation on the uplink, the test is repeated with each modulation format. a) The SS shall modify the CH value of one timeslot such that (0 - CH) equals the minimum power control level supported by the MS under test (0dBm for DCS 1 800 and PCS 1 900 and 5dBm for all other bands...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.9.5 Test requirement
1. The power of all four bursts within the radio block measured in step b) shall be 0dBm for a DCS 1 800 or PCS 1 900 MS and 5dBm for all other MS with an accuracy of 5 dB in all cases. For an MS using reduced interslot dynamic range, the power measured in step b) shall be within 10dB ± 3dB of the average power of the...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.10 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.11 Power control in exclusive allocation mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.11.1 Conformance requirements
Sub-clauses 10.2.1 and 10.2.2 do not apply for the PDCH/H in Exclusive MAC mode while in DTM. In this case: - The MS shall apply the output power ordered by the network on the SACCH to all channels (both for the TCH/H and the PDCH/H). - The network shall use the same output power on the dedicated connection and on all ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.11.2 Test purpose
To verify that MS applies the output power ordered by the network on the SACCH to all channels.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.11.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated. Test Procedure The MS is triggered to initiate packet uplink transfer data and sends a DTM REQUEST message to the SS. On...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.12 Downlink power control, PR mode A, GPRS TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.12.1 Conformance requirements
The MS is required to meet the 05.05 specification when the downlink power control is used in PR mode A. References 3GPP TS 05.08/45.008, sub-clause 10.2.2
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.12.2 Test purpose
To verify that MS still correctly decodes RLC data blocks while the BSS applies power control mode A and PR mode A and makes downlink power variations on an EGPRS TBF which shares the same PDCH.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.12.3 Method of test
Initial Conditions System Simulator: 1 cell, GPRS and EGPRS supported. The test is performed in TU50 radio environment, at the reference point of c/i = 16dB. Mobile Station: The MS is in GPRS idle mode with a P-TMSI allocated and the PDP context 2 activated; it is allocated a GPRS TBF. Test Procedure The GPRS MS is all...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.1 Definition
The EPC is Rel-5 feature which is part of GERAN Feature Package 2, see 3GPP TS 24.008. The EPC signalling is mapped onto every SACCH burst, allowing a control interval of 120 ms. It can be used with any speech traffic channel (both GMSK and 8PSK modulated) and does not impact the speech channel coding. The EPC is based...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.2 Test conformance
1. The MS shall employ the most recently commanded EPC power control level, as indicated by the EPC Uplink Power Control Command sent on the corresponding EPCCH in the downlink. The EPC Uplink Power Control Command is sent once every EPC reporting period, see 3GPP TS 45.008 subclause 8.4.1b. The MS shall ignore the Ord...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.3 Test purpose
1. To verify that power level changes using EPC are implemented by the MS in accordance with conformance requirements 1, 5 and 7. 2. To verify that power control commands requesting levels not supported by the MS are treated in accordance with conformance requirement 4. 3. To verify that the RF power control level conf...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.4 Test method
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.4.1 Initial conditions
A call is set up by the SS according to the generic call set up procedure for single slot configuration on a channel with ARFCN in the Mid ARFCN range (see table 3.3). The power control level is set to maximum power using normal power control. Specific PICS statements: - PIXIT statements: -
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.4.2 Procedure
If the MS supports both GMSK and 8PSK modulation on the uplink, the test is repeated with each modulation format. a) Using the normal power control mechanism, the SS shall command the MS to transmit at power level 8 (14dBm) in the case of DCS 1 800 and PCS 1 900 or power level 15 (13 dBm) in the case of all other bands...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.13.5 Test requirement
a) The power measured in steps a) and b) shall be 14dBm in the case of DCS 1 800 and PCS 1 900 and 13dBm in the case of all other bands. In all cases the tolerance shall be ±3 dB. b) The powers measured in step c) shall conform with the power specifications in the following table 22.13-2. Table 22.13-2: EPC Power Measu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.1 Definition
The EPC is Rel-5 feature which is part of GERAN Feature Package 2, see 3GPP TS 24.008. The EPC is based on differential control to adjust the employed RF power level, see 3GPP TS 45.008. High Speed Circuit Switched Data (HSCSD) is one possibility for EPC operation in multislot configuration, see 3GPP TS 45.002, clause ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.2 Test conformance
8. The MS shall employ the most recently commanded EPC power control level, as indicated by the EPC Uplink Power Control Command sent on the corresponding EPCCH in the downlink. The EPC Uplink Power Control Command is sent once every EPC reporting period, see 3GPP TS 45.008 subclause 8.4.1b. The MS shall ignore the Ord...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.3 Test purpose
1. To verify that power level changes using EPC are implemented by the MS in accordance with conformance requirements 1, 6 and 8. 2. To verify that power control commands requesting levels not supported by the MS are treated in accordance with conformance requirement 5. 3. To verify that the RF power control level conf...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.4 Test method
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.4.1 Initial conditions
A call is set up by the SS according to the generic call set up procedure for multislot configuration on a channel with ARFCN in the Mid ARFCN range (see table 3.3). The SS commands the MS to operate in multislot configuration where it has the highest possible number of bi‑directional TCHs or O-TCHs. Using normal power...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.4.2 Procedure
If the MS supports both GMSK and 8PSK modulation on the uplink, the test is repeated with each modulation format. For the purpose of this test the SS shall randomly select one bi-directional TCH (in case of GMSK modulation) or O-TCH (in case of 8PSK) to exercise. All other channels shall maintain the state defined unde...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
22.14.5 Test requirement
a) The powers measured for the active but unselected timeslots in steps i), ii) shall conform with the Pmax specification for the MS power class given in the table 22.14-2 (see 3GPP TS 45.005, clause 4.1.1). Table 22.14-2: The MS maximum output power for GMSK and 8PSK modulation Power class Bands except DCS 1 800 and P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
23 Single frequency reference
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
23.1 Definition
The MS is required to use one single frequency reference for both RF generation/reception and baseband signals. A test method to verify this is not available.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
23.2 Conformance requirement
The MS shall use the same frequency source for both RF frequency generation and clocking the time base; 3GPP TS 05.10, subclause 6.1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
23.3 Test purpose
There is no test specified.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
24 Tests of the layer 1 signalling functions
Testing of Layer 1 signalling functions is included in the tests in clauses 15, 16, 17, 18, 19, 20, 21, 22, 23. Other Layer 1 functions are tested in clauses 12, 13 and 14. Some testing of Layer 1 functions is integrated with Layer 3 signalling testing (26).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
25 Tests of the layer 2 signalling functions
References: 1 3GPP TS 04.06 and 3GPP TS 04.08/ 3GPP TS 24.008 / 3GPP TS 44.018, 3GPP TS 04.05. 2 ITU-T Recommendation X.290: OSI Conformance Testing Methodology and Framework for CCITT applications, Part 2: Abstract Test Suite Specification.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
25.1 Introduction, objective and scope
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
25.1.1 General
The objective of clause 25 is to provide detail of how Layer 2 of the MS is tested to verify conformance to the testable parameters given in 3GPP TS 04.06. The tests cover SAPI = 0, and they will be carried out on SDCCH and FACCH/F and on FACCH/H if the MS supports half-rate. Testing of unnumbered information transfer ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
25.1.2 Test configurations
The Layer 2 test configuration defines the Layer 2 functional blocks of a MS being tested and the access arrangement between MS and tester. NOTE: These functional blocks provide the Layer 2 basic capabilities which have to be implemented in accordance with the specification given in 3GPP TS 04.06. However, the definiti...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
25.1.3 Pre-conditions
Before carrying out any Layer 2 tests the tests specified in clauses 12, 13, 14 and 15 to 23 (Layer 1 tests) shall be performed. Apart from powering up the MS to be tested and being able to establish a call the only access to the MS needed and used for Layer 2 testing is the radio interface. It therefore is necessary t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
25.1.4 Layer 2 test frames
The Layer 2 conformance test is accomplished by sequences of those frames which are contained in 3GPP TS 04.06 (Layer 2 frame repertoire etc.). These frame sequences are under control of the System Simulator and are related to the state that the System Simulator perceives the MS to be in as a result of frames transferr...