hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.1.1.10.1 Conformance requirements
In 44.060 it is stated: “If dynamic or extended dynamic allocation is used, a mobile station in GPRS TBF mode shall be able to detect the USF that assigns the uplink to that mobile station. The network shall use GMSK modulation, i.e. either CS-1 to CS-4 or MCS-1 to MCS-4, in those blocks.” In 45.003 it is stated: “For...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.1.1.10.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting,. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to initiate a packet uplink data transfer in RLC acknowledged mode on one P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.1.2 Dynamic Allocation / Uplink Transfer / Abnormal
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.1.2.1 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.1.2.2 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.1.2.3 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment (concurrent)
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.1 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Successful
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.1.1 Conformance requirements
During uplink transfer, the network may initiate a downlink TBF by sending a PACKET DOWNLINK ASSIGNMENT message, or a PACKET TIMESLOT RECONFIGURE, to the mobile station on the PACCH. If a PACKET TIMESLOT RECONFIGURE message is sent, then the message shall contain the DOWNLINK_TFI_ASSIGNMENT field. On receipt of an assi...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.1.2 Test purposes
To verify that during uplink transfer: 1. The MS switches to the assigned PDCHs when the network initiates a downlink TBF by sending PACKET DOWNLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE to the MS on PACCH. 2. When the MS receives PACKET TIMESLOT RECONFIGURE without DOWNLINK_TFI_ASSIGNMENT in the case of uplink and...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting,. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure An uplink TBF is established and in progress. After the MS sends an uplink data block the SS as...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Multislot capabilities
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.2.1 Conformance requirements
1. Mobile station belonging to multislot class 2, 3, 4, 5, 6, 8, 9, 10, 19 and 24 shall support as many uplink and downlink timeslots as indicated in 3GPP TS 05.02 clause B.1. 2. If transmission of the PACKET CONTROL ACKNOWLEDGEMENT would result in more than the maximum Tx timeslots per TDMA frame allowed by the multis...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.2.2 Test purposes
To verify that the GPRS multislot MS supports as many uplink and downlink TBFs per TDMA frame as indicated. Especially, it is verified that the Type 1 MS in a GPRS multislot class declared has the capability of supporting: 1. Ttb, the minimum number of slots allowed between the end of the previous transmit or receive T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.1.2.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - TSPC_Type_GPRS_Multislot_ClassX (where X = 1..45) PIXIT Statements - Test Procedure The following GPRS multislot configurations ar...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Abnormal
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.1 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Abnormal / with random access
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.1.1 Conformance requirements
1. If a failure occurs on the mobile station side before the new TBF has been successfully established, the newly reserved resources are released. 2. If the information in the PACKET TIMESLOT RECONFIGURE does not properly specify an uplink and downlink PDCH or violates the mobile station's multislot capabilities, the m...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.1.2 Test purposes
To verify that the MS, in downlink TBF establishment during uplink transfer, performs an abnormal release with random access, when the information in the PACKET TIMESLOT RECONFIGURE: 1. does not properly specify an uplink and downlink PDCH; 2. violates the mobile station's GPRS multislot capabilities; 3. does not inclu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - TSPC_Type_GPRS_Multislot_ClassX (where X = 1..45) PIXIT Statements - Test Procedure An uplink TBF is established and in progress. ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Abnormal / Continuation of normal operation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.2.1 Conformance requirements
1. If a failure occurs on the mobile station side before the new TBF has been successfully established, the newly reserved resources are released. 2. If a failure in the PACKET DOWNLINK ASSIGNMENT is due to any reason, the mobile station shall abort the procedure and continue the normal operation of the uplink TBF. Ref...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.2.2 Test purposes
To verify that the MS aborts the downlink TBF establishment and continues the normal operation of the uplink TBF when the PACKET DOWNLINK ASSIGNMENT fails due to any reason in downlink TBF establishment during uplink transfer.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.2.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure An uplink TBF is established and in progress. The SS sends PACKET DOWNLINK ASSIGNMENT assigning ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3 Dynamic Allocation / Resource reallocation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1 Dynamic Allocation / Resource reallocation / Successful
During an uplink packet transfer, upper layer may request to transfer another LLC PDU with a different Radio Priority, a different peak throughput class or a different RLC mode than the current one, the MS may require the allocation of new uplink resources.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.1 Dynamic Allocation / Resource reallocation / Successful / Higher throughput class or higher radio priority
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.1.1 Conformance requirements
1. During an uplink packet transfer, upper layer may request to transfer another LLC PDU. If the mobile station has not started the countdown procedure and the new LLC PDU has the same RLC mode as the current uplink TBF and either a higher radio priority or the same radio priority but a higher peak throughput class, th...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.1.2 Test purposes
It is verified that: 1. Having an uplink TBF in progress without starting the countdown procedure, the MS will immediately send PACKET RESOURCE REQUEST if upper layer requests to transfer another LLC PDU which has the same RLC mode as the current uplink TBF and either a higher radio priority or the same radio priority ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting, T3168 timeout value=7 (4s), BS_CV_MAX = 1, N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated: - Test PDP context3 and context6 activated; Specific PICS Statements - PIXIT Statements - Test...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.2 Dynamic Allocation / Resource reallocation / Successful / Lower throughput class
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.2.1 Conformance requirements
1. During an uplink packet transfer, upper layer may request to transfer another LLC PDU. If the new LLC PDU has the same RLC mode as the current uplink TBF and either a lower Radio Priority or the same radio priority but a lower peak throughput class, the mobile station shall first complete the sending of the LLC PDU ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.2.2 Test purposes
To verify that during an uplink packet transfer, upper layer requests to transfer another LLC PDU and the new LLC PDU has the same RLC mode as the current uplink TBF and either a lower Radio Priority or the same radio priority but a lower peak throughput class. 1. The MS first complete the sending of the LLC PDU in tra...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.2.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting, T3168 timeout value=7 (4s), BS_CV_MAX = 1, N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated: - Test PDP context2 and context4 activated; Specific PICS Statements - PIXIT Statements - Tes...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.3 Dynamic Allocation / Resource reallocation / Successful / Different RLC mode and higher radio priority
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.3.1 Conformance requirements
During an uplink packet transfer, upper layer may request to transfer another LLC PDU. If the new LLC PDU does not have the same RLC mode as the current uplink TBF but has a higher radio priority, the mobile station shall complete the transmission of the current LLC PDU using the countdown procedure including acknowled...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.3.2 Test purposes
To verify that during an uplink packet transfer, upper layer requests to transfer another LLC PDU and the new LLC PDU has a different RLC mode from the current uplink TBF but has a higher radio priority. 1. The mobile station completes the transmission of the current LLC PDU using the countdown procedure including ackn...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.1.3.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting, T3168 timeout value=7 (4s), N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated: - Test PDP context1 and context2 activated; Specific PICS Statements - PIXIT Statements - Test Procedure An u...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2 Dynamic Allocation / Resource reallocation / Abnormal
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.1 Dynamic Allocation / Resource reallocation / Abnormal / T3168 expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.1.1 Conformance requirements
On expiry of timer T3168 the mobile station shall retransmit the PACKET RESOURCE REQUEST message unless the PACKET RESOURCE REQUEST has already been transmitted four times in which case the mobile station shall return to packet idle mode and indicate a packet access failure to upper layer. References 3GPP TS 04.60, sub...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.1.2 Test purposes
To verify that during uplink resource reallocation on expiry of timer T3168: 1. The MS retransmits the PACKET RESOURCE REQUEST message unless the PACKET RESOURCE REQUEST has already been transmitted four times; 2. The MS returns to idle mode after PACKET RESOURCE REQUEST has been transmitted four times.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting, CONTROL_ACK_TYPE = 0, T3168 timeout value=0 (0.5s), BS_CV_MAX = 1, N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7, Max Retrans = 11 (Max 7 retransmissions). Mobile Station: The MS is GPRS attached with a P-TMSI allocated: - Test PDP context2 and cont...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.2 Dynamic Allocation / Resource reallocation / Abnormal / Invalid assignment
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.2.1 Conformance requirements
1. If the mobile station receives a PACKET UPLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE message and detects an invalid Frequency Parameters information element in the message, the mobile station shall perform an abnormal release with system information (see sub-clause 8.7.3), performing a partial acquisition of sy...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.2.2 Test purposes
To verify that during uplink resource reallocation: 1. The MS performs an abnormal release with random access if it receives a PACKET UPLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE message specifying frequencies that are not all in one frequency band. 2. The MS performs an abnormal release with random access if it re...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting,, BS_CV_MAX = 1, N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated: - Test PDP context2 and context5 activated; Specific PICS Statements - Support of Standard GSM Band (P-GSM) (TSPC_Type_GS...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.3 Dynamic Allocation / Resource reallocation / Reject
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.3.1 Conformance requirements
1. On receipt of a PACKET ACCESS REJECT message, the mobile station shall stop timer T3168 if running and indicate a packet access failure to upper layers. If no downlink TBF exists, the mobile station shall return to packet idle mode. 2. If the PACKET ACCESS REJECT message contains a WAIT_INDICATION field in a Reject ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.3.2 Test purposes
To verify that during the uplink resource reallocation: 1. The MS returns to packet idle mode when it receives PACKET ACCESS REJECT without WAIT_INDICATION. 2. On receipt of a PACKET ACCESS REJECT with a WAIT_INDICATION the MS waits until T3172 expires. The MS, if having another RLC data blocks to transmit, initiates a...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.3.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting, BS_CV_MAX = 1, N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated: - Test PDP context2 and context5 activated; Specific PICS Statements - PIXIT Statements - Test Procedure An uplink TBF is ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.4 Dynamic Allocation / Resource reallocation / Successful / Lower Coding Scheme Command
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.4.1 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.4.2 Conformance requirements
1. 1. On receipt of a PACKET UPLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE message the mobile station shall stop timer T3168 and switch to the assigned PDCHs (3GPP TS 04.60 sub-clause 8.1.1.1). 2. The transmitter shall transmit the oldest RLC data block whose corresponding element in V(B) indexed relative to V(A) ha...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.4.3 Test purposes
Verify that an MS switches to the newly assigned PDCH, retransmits unacknowledged RLC data blocks with the previous CS, transmits no more than one RLC data block with the previous CS and then applies the new CS command only to the new RLC data blocks.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.3.4.4 Method of test
Initial Conditions System Simulator: 1 cell, GPRS supported. Mobile Station: The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, has a PDP context 2 activated. One LLC frame of 225 octets (which fits in 3 CS-4 blocks and 3 CS-1 blocks, or 2 CS-4 blocks and 6 CS-1 blocks) are to be sent by the MS. Spe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.3.4 Default message contents
Default message contents and macros as defined in the GPRS defaults section 40 are used for subclause 42.3.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4 Measurement reports and Cell change order procedures
This subclause presents tests for "Measurement Reports and Cell Change Order Procedures" which are specified in 3GPP TS 04.60/3GPP TS 44.060 subclauses 5.6 and 8.4. In the testcases which have uplink data transfer while in NC2, the USF needs to be assigned very frequently so that the measurement reports will be receive...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1 Measurement reports
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.1 Network Control measurement reporting / Uplink / Normal case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.1.1 Conformance requirement
The behaviour of the mobile station is controlled by the NETWORK_CONTROL_ORDER parameter in a PACKET MEASUREMENT ORDER message. The reporting periods are indicated in the NC_REPORTING_PERIOD_T field of the PACKET MEASUREMENT ORDER message. The mobile station shall apply to the timer T3158 the NC_REPORTING_PERIOD_T when...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.1.2 Test Purpose
To verify that the MS sends the measurement report of the NC measurements according to the indicated reporting periods, when the T3158 expires. To verify that the MS restarts the timer T3158 when it expires. Reference 3GPP TS 04.60, subclauses 5.6.1 and 8.3.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.1.3 Method of test
Initial conditions System Simulator: 1 cell, GPRS supported. Mobile Station: MS is in Packet Idle mode and GPRS attached. PDP context 2 established. Specific PICS Statements - PIXIT Statements - Foreseen final state of the MS - MS is in transfer mode. Test procedure MS is brought into uplink packet transfer mode. SS se...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.2 Network Control measurement reporting / Idle mode / New cell reselection
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.2.1 Conformance requirement
The procedure for measurement report sending shall be initiated by the mobile station at expiry of the NC measurement report interval timer T3158. At expiry of the timer T3158 the mobile station shall restart the expired timer T3158, perform the measurements and initiate the packet access. The procedure for measurement...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.2.2 Test Purpose
To verify that if the MS reselects a new cell while timer T3158 is active, and the time to expiry of timer T3158 is greater than the indicated reporting period for the new cell, the MS shall immediately restart timer T3158 with the indicated reporting period for the new cell. To verify that if the MS reselects a new ce...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.2.3 Method of test
Initial conditions System Simulator: 3 cells (cell A, cell B, cell C), activated at power-on, GPRS supported. READY Timer is Set to 4 minutes. Mobile Station: MS is in Packet Idle mode and GPRS attached. the Ready Timer is running. Specific PICS Statements - PIXIT Statements - Foreseen final state of the MS - MS is in...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.3 Network Control measurement reporting / Downlink transfer / Normal case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.3.1 Conformance requirement
The procedure for NC measurement report sending shall be initiated by the mobile station at the expiry of the NC measurement report interval timer T3158. At expiry of the timer T3158 the mobile station shall restart the timer T3158, perform the measurements and send the PACKET MEASUREMENT REPORT message containing the ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.3.2 Test Purpose
To verify that the MS sends the measurement report of the NC measurements according to the indicated reporting periods, when the T3158 expires. To verify that the MS restarts the timer T3158 when it expires. To verify that the MS sends at least two PACKET DOWNLINK ACK/NACK messages before transmitting a PACKET MEASUREM...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.3.3 Method of test
Initial conditions System Simulator: 1 cell, GPRS supported. Mobile Station: MS is in Packet Idle mode and GPRS attached. PDP context 2 established. Specific PICS Statements - PIXIT Statements - Foreseen final state of the MS - MS is in transfer mode. Test procedure MS is brought into downlink packet transfer mode. SS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.4.1 Conformance requirement
The procedure for NC measurement report sending shall be initiated by the mobile station at the expiry of the NC measurement report interval timer T3158. At expiry of the timer T3158 the mobile station shall restart the timer T3158, perform the measurements and send the PACKET MEASUREMENT REPORT message containing the ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.4.2 Test Purpose
To verify that if the NC parameters are changed while in packet transfer mode, the MS continues to use the changed parameters after returning to packet idle mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.4.3 Method of test
Initial conditions System Simulator: 1 cell, GPRS supported. Mobile Station: MS is GPRS attached with a P-TMSI allocated. PDP context 2 established. Specific PICS Statements - MS GPRS Release (TSPC_MS_GPRS_RELEASE) PIXIT Statements - Test procedure MS is brought into uplink packet transfer mode. SS commands MS to NC2 w...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.5.1 Conformance requirement
The procedure for NC measurement report sending shall be initiated by the mobile station at the expiry of the NC measurement report interval timer T3158. At expiry of the timer T3158 the mobile station shall restart the timer T3158, perform the measurements and send the PACKET MEASUREMENT REPORT message containing the ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.5.2 Test Purpose
To verify that while in NC2, MS performs autonomous cell reselection when the reselection is triggered by the downlink signalling failure.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.1.5.3 Method of test
Initial conditions System Simulator: 2 cell, GPRS supported. Parameter Carrier1 Carrier2 RF Signal Level (dBm) -60 -70 NETWORK_CONTRO L_ORDER NC2 NC2 NC_REPORTING_PERIOD_I 110 (30.72 sec) 110 (30.72 sec) Mobile Station: MS is GPRS attached on cell A (Carrier 1) with a P-TMSI allocated. Ready timer is set to 2 min. Spec...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2 Cell change order procedures
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1 Cell change order procedure / Uplink transfer
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.1 Cell change order procedure / Uplink transfer / Normal case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.1.1 Conformance requirement
The cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message to the mobile station on the PCCCH or PACCH. Upon receipt of the PACKET CELL CHANGE ORDER message the mobile station shall start timer T3174. When a cell reselection is made controlled by the network, the mobile station shall act u...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.1.2 Test Purpose
To verify the when NC2 is commanded, the MS sends PACKET MEASUREMENT REPORT messages, in which both the serving and non-serving cells are reported. To verify that when the cell change order procedure is started by sending a PACKET CELL CHANGE ORDER message with the IMMEDIATE_REL value set to 1, the MS shall abort any T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.1.3 Method of test
Initial conditions System Simulator: 2 cells (cell A and cell B), activated at power-on, GPRS supported. Mobile Station: MS is in Packet Idle mode and GPRS attached. PDP context 2 established. Specific PICS Statements - PIXIT Statements - Foreseen final state of the MS - MS is in transfer mode. Test procedure MS is bro...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.2 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.3 Cell change order procedure / Uplink transfer / Failure cases / REJECT from the new cell
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.3.1 Conformance requirement
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.3.1.1 Conformance requirement for Rel-5 and earlier
If a PACKET ACCESS REJECT message is received from the new cell, the mobile station shall start timer T3176, return to the old cell and send a PACKET CELL CHANGE FAILURE message to the network. If the mobile station was in uplink packet transfer before the cell change, the mobile station shall establish a new uplink TB...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.3.1.2 Conformance requirement for Rel-6 and later
In the following cases, the mobile station shall determine that the network controlled cell reselection procedure has failed: • Access is denied in the new cell (i.e., the mobile station receives an IMMEDIATE ASSIGNMENT REJECT, a PACKET ASSIGNMENT REJECT or, in a UTRAN cell, an RRC CONNECTION REJECT message). Cause: “I...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.3.2 Test Purpose
To verify that the mobile station sends a PACKET CELL CHANGE FAILURE message to the network from the old cell, if a PACKET ACCESS REJECT message is received from the new cell.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.3.3 Method of test
Initial conditions System Simulator: 2 cells (cell A, cell B), activated at power-on, GPRS supported. Mobile Station: MS is in Packet Idle mode and GPRS attached. PDP context 2 established. Specific PICS Statements - PIXIT Statements - Foreseen final state of the MS - MS is in Transfer mode. Test procedure MS is brough...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.4 Cell change order procedure / Uplink transfer / Failure cases / Contention resolution failure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.4.1 Conformance requirement
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.4.1.1 Conformance requirement for Rel-5 and earlier
If the contention resolution procedure fails on the new cell, then the mobile station shall start timer T3176 and return to the old cell. The mobile station shall send a PACKET CELL CHANGE FAILURE message to the network. If the mobile station was in uplink packet transfer before the cell change, the mobile station shal...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.4.1.2 Conformance requirement for Rel-6 and later
The mobile station shall regard the network controlled cell reselection procedure as successfully completed when it has performed access and successfully completed contention resolution in the new cell. In the following cases, the mobile station shall determine that the network controlled cell reselection procedure has...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.4.2 Test Purpose
To verify that the mobile station initiates a random access to the old cell, if the contention resolution procedure fails on the new cell.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.4.3 Method of test
Initial conditions System Simulator: 2 cells (cell A, cell B), activated at power-on , GPRS supported. Mobile Station: MS is in Packet Idle mode and GPRS attached. Ready timer is set to 44 seconds PDP context established. Specific PICS Statements - PIXIT Statements - Foreseen final state of the MS - MS is in Transfer m...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.5 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.6 Cell change order procedure / Uplink transfer / Failure cases / Frequency not implemented
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
42.4.2.1.6.1 Conformance requirement
If the network message instructs the mobile station to use a frequency that it is not capable of using, the mobile station shall send a PACKET CELL CHANGE FAILURE message with cause "frequency not implemented" and remain on the current PDCH(s).