hash
stringlengths
32
32
doc_id
stringlengths
7
13
section
stringlengths
3
121
content
stringlengths
0
2.2M
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.5.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.5.3 Conformance requirements
The conformance requirements covered in the present TC are specified in CEN EN 16072 [8], clause 7.10.1 paragraph 1 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.2.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.5.4 Test description
7.1.1.5.4.1 Pre-test conditions Preamble 1: Ignition ON. 7.1.1.5.4.2 Test procedure sequence Table 7.1.1.5.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger automatic eCall - - - - 2 IF PE eCall only IVS THEN Steps of the generic procedure for network registration (clause 6.1.2.1)...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.6.1 Test Purpose (TP)
(1a) with { connection established } ensure that { when { new automatic eCall triggered } then { eCall in progress was not disconnected } } (1b) with { connection established } ensure that { when { new manual eCall triggered } then { eCall in progress was not disconnected } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.6.2 Test applicability
This test case applies to all types of PE eCall IVS. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 42
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.6.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.11 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.2.2.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.6.4 Test description
7.1.1.6.4.1 Pre-test conditions Preamble 2: Ignition ON and IVS is in mobile network coverage; automatically triggered eCall in progress. 7.1.1.6.4.2 Test procedure sequence Table 7.1.1.6.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message - EXCEPTION: Steps 1a to 1b describe behaviour that d...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.7 CTP 1.1.2.3 Post-side-crash performance of automatic trigger - IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.7.1 Test Purpose (TP)
(1) with { ignition ON and IVS is in good mobile network coverage } ensure that { when { automatic eCall triggered } then { MSD successfully transmitted and E112 - voice connection established } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.7.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.7.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 6.1.1 paragraph 4; clause 7.10.1 paragraph 4, paragraph 6, paragraph 8; clause 7.5 paragraph 1, paragraph 2, paragraph 3, paragraph 4 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.2.3. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 43
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.7.4 Test description
7.1.1.7.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in good mobile network coverage. In case the IVS is able to distinguish different kinds of crashes, a lateral shock to test the IVS crash robustness can be generated in two ways: Either a lateral crash according to Directive 96/27/EC [14] (or equivalent...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.8 CTP 1.1.2.4 Post-frontal-crash performance of automatic trigger - IVS
In case the IVS is able to distinguish different kinds of crashes, the crash type in the pre-test conditions (clause 7.1.1.7.4.1 of the present document) differ. Else this test is equivalent to the TC specified in clause 7.1.1.7 (CTP 1.1.2.3).
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.9 CTP 1.1.2.5 Performance of automatic trigger - different crash types - IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.9.1 Test Purpose (TP)
(1) with { ignition ON and IVS is in good mobile network coverage } ensure that { when { automatic eCall triggered } then { MSD successfully transmitted and voice connection established } } (2) with { E112 - voice connection } ensure that { when { call clear down indicated } then { IVS disconnects } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.9.2 Test applicability
This test case applies to all types of PE eCall IVS. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 44
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.9.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 6.1.1, paragraph 4; clause 7.10.1, paragraph 4, paragraph 6, paragraph 8; clause 7.5, paragraph 1, paragraph 2, paragraph 3, paragraph 4 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.2.5.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.9.4 Test description
7.1.1.9.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in good mobile network coverage. 7.1.1.9.4.2 Test procedure sequence Table 7.1.1.9.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger automatic eCall - - - - 2 IF PE eCall only IVS THEN Steps of the generic procedur...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.10 CTP 1.1.3.1 eCall manually activated - PE eCall IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.10.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage } ensure that { when { manual eCall triggered } then { Visual or audible indication provided and eCall successfully established } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.10.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.10.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.10.2 paragraph 2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.3.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.10.4 Test description
7.1.1.10.4.1 Pre-test conditions Preamble 1: Ignition ON. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 45 7.1.1.10.4.2 Test procedure sequence Table 7.1.1.10.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger manual eCall - - - - 2 IF PE eCall only IVS THEN Steps of the generic procedure ...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.11.1 Test Purpose (TP)
(1a) with { ignition ON and IVS is in mobile network coverage and manual eCall is in progress } ensure that { when { new automatic eCall triggered } then { eCall in progress was not disconnected } } (1b) with { ignition is ON and IVS is in mobile network coverage and manual eCall is in progress } ensure that { when { n...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.11.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.11.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.11 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.3.2.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.11.4 Test description
7.1.1.11.4.1 Pre-test conditions Preamble 3: Ignition ON and IVS is in mobile network coverage; manually triggered eCall in progress. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 46 7.1.1.11.4.2 Test procedure sequence Table 7.1.1.11.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message - EXCEPTION: S...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.12 CTP 1.1.4.1 Test eCall activated - PE eCall IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.12.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage } ensure that { when { test eCall from the IVS is triggered by using E.164 number provisioned by USIM for test calls} then { test eCall has been setup with correct non-emergency number} }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.12.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.12.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.2.2 paragraph 1 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.4.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.12.4 Test description
7.1.1.12.4.1 Pre-test conditions Preamble 1: Ignition ON. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 47 7.1.1.12.4.2 Test procedure sequence Table 7.1.1.12.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger test eCall - - - - 2 IF PE eCall only IVS THEN Steps of the generic procedure fo...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.13 CTP 1.1.5.1 Network registration - PE eCall IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.13.1 Test Purpose (TP)
(1a) with { ignition ON and IVS in mobile network coverage } ensure that { when { automatic eCall triggered } then { network registration successful } } (1b) with { ignition ON and IVS in mobile network coverage } ensure that { when { manual eCall triggered } then { network registration successful } } (1c) with { ignit...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.13.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.13.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clauses 7.3.2 and 7.3.4 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.5.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.13.4 Test description
7.1.1.13.4.1 Pre-test conditions Preamble 1: Ignition ON. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 48 7.1.1.13.4.2 Test procedure sequence Table 7.1.1.13.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message - EXCEPTION: Steps 1a to 1c describe behaviour that depends on the test configuration; the...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.14.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage and automatically triggered eCall is in progress } ensure that { when { attempt to terminate eCall manually } then { eCall in progress was not disconnected } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.14.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.14.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.10.3 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.5.2.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.14.4 Test description
7.1.1.14.4.1 Pre-test conditions Preamble 2: Ignition ON and IVS is in mobile network coverage; automatically triggered eCall is in progress. 7.1.1.14.4.2 Test procedure sequence Table 7.1.1.14.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 attempt to terminate eCall manually <-- - - -...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.15.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage and manually triggered eCall is in progress } ensure that { when { attempt to terminate eCall manually } then { eCall in progress was not disconnected } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.15.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.15.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.10.3 paragraph 2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.5.3.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.15.4 Test description
7.1.1.15.4.1 Pre-test conditions Preamble 3: Ignition ON and IVS is in mobile network coverage; manually triggered eCall is in progress. 7.1.1.15.4.2 Test procedure sequence Table 7.1.1.15.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Attempt to terminate eCall manually <-- - - - 2 Ch...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.16.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage and automatically triggered eCall is in progress } ensure that { when { vehicle Power OFF } then { eCall in progress was not disconnected } } ETSI ETSI TS 103 412 V1.3.1 (2020-03) 50
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.16.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.16.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.10.1 paragraph 5 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.5.4.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.16.4 Test description
7.1.1.16.4.1 Pre-test conditions Preamble 2: Ignition ON and IVS is in mobile network coverage; automatically triggered eCall is in progress. 7.1.1.16.4.2 Test procedure sequence Table 7.1.1.16.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Vehicle Power OFF <-- Manufacturer dependent ...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.17.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage and manually triggered eCall is in progress } ensure that { when { vehicle Power OFF } then { eCall in progress was not disconnected } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.17.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.17.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.11 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.5.5.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.17.4 Test description
7.1.1.17.4.1 Pre-test conditions Preamble 3: Ignition ON and IVS is in mobile network coverage; manually triggered eCall is in progress. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 51 7.1.1.17.4.2 Test procedure sequence Table 7.1.1.17.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Vehicle P...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18 Void
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18a CTP 1.1.5.6 Priority over conflicting communication - PE eCall capable IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18a.1 Test Purpose (TP)
(1a) with { ignition ON and IVS in mobile network coverage and a conflicting communication is running on IVS } ensure that { when { automatic eCall triggered } then { conflicting communication is stopped, HMI alert is provided and all necessary components of the IVS are unrestricted available and IVS starts connection ...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18a.2 Test applicability
This test case applies to of PE eCall capable IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18a.3 Conformance requirements
The conformance requirements of CEN EN 16072 [8], clause 7.4 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.5.6.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18a.4 Test description
7.1.1.18a.4.1 Pre-test conditions Preamble 4 for PE eCall capable IVS Testing: Ignition ON and IVS is in good mobile network coverage; no error is detected on the IVS, a conflicting communication is running on the IVS. 7.1.1.18a.4.2 Test procedure sequence Table 7.1.1.18a.4.2-1: Main behaviour Step Procedure Message Se...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.18b CTP 1.1.5.6 Priority over conflicting communication - PE eCall only IVS
No test required. As per definition, on eCall only IVS there can be no conflicting communication. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 53 7.1.1.19 CTP 1.1.5.7 Network registration is re-tried when network registration attempt was not successful - PE eCall IVS No test required. (This eventuality is covered by ETSI TS 1...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20a CTP 1.1.6.1 Mute IVS and vehicle audio - PE eCall capable IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20a.1 Test Purpose (TP)
(1a) with { ignition ON and IVS in mobile coverage } ensure that { when { automatic eCall is triggered } then { IVS starts connection establishment } } (1b) with { ignition ON and IVS in mobile coverage } ensure that { when { manual eCall is triggered } then { IVS starts connection establishment } } (1c) with { ignitio...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20a.2 Test applicability
This test case applies to PE eCall capable IVS. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 54
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20a.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clause 7.2.1 and CEN EN 16072 [8], clause 7.17.3 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.6.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20a.4 Test description
7.1.1.20a.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in mobile network coverage. 7.1.1.20a.4.2 Test procedure sequence Table 7.1.1.20a.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message - EXCEPTION: Steps 1a to 1b describe behaviour that depends on the test configuration; the...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20b CTP 1.1.6.1 Mute IVS and vehicle audio - PE eCall only IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20b.1 Test Purpose (TP)
(1a) with { ignition ON and IVS in mobile coverage } ensure that { when { automatic eCall is triggered } then { IVS registers on the network and starts connection establishment } } (1b) with { ignition ON and IVS in mobile coverage } ensure that { when { manual eCall is triggered } then { IVS registers on the network a...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20b.2 Test applicability
This test case applies to PE eCall only IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20b.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clause 7.2.1 and CEN EN 16072 [8], clause 7.17.3 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.6.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.20b.4 Test description
7.1.1.20b.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in mobile network coverage. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 56 7.1.1.20b.4.2 Test procedure sequence Table 7.1.1.20b.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message - EXCEPTION: Steps 1a to 1b describe behaviour th...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.21.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage } ensure that { when { automatic eCall triggered } then { "Service Category Request" message information element (IE) set to automatically initiated eCall (AIeC) } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.21.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.21.3 Conformance requirements
Reference requirements of CEN EN 16454 [1] CTP 1.1.7.1. The conformance requirements of CEN EN 16062 [6], clause 7.3.6 paragraph 2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.7.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.21.4 Test description
7.1.1.21.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in mobile network coverage. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 57 7.1.1.21.4.2 Test procedure sequence Table 7.1.1.21.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger automatic eCall - - - - 2 Check: Is the "S...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.22.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage } ensure that { when { manual eCall from the IVS is triggered } then { "Service Category Request" message information element (IE) set to manually initiated eCall (MIeC) } }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.22.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.22.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clause 7.3.6 paragraph 2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.8.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.22.4 Test description
7.1.1.22.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in mobile network coverage. 7.1.1.22.4.2 Test procedure sequence Table 7.1.1.22.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger manual eCall - - - - 2 IF PE eCall only IVS THEN Steps of the generic procedure for...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.23 CTP 1.1.9.1 Set-up TS11 call to test number - PE eCall IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.23.1 Test Purpose (TP)
(1) with { ignition ON and IVS in mobile network coverage } ensure that { when { test eCall from the IVS is triggered by using E.164 number provisioned by USIM for test calls} then { test eCall has been setup with correct non-emergency number and is routed to PSAP test point} }
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.23.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.23.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clause 7.2.2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.9.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.23.4 Test description
7.1.1.23.4.1 Pre-test conditions Preamble 1: Ignition ON and IVS is in mobile network coverage. 7.1.1.23.4.2 Test procedure sequence Table 7.1.1.23.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 Trigger test eCall - - - - 2 IF PE eCall only IVS THEN Steps of the generic procedure for n...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24a.1 Test Purpose (TP)
(1) with { IVS is in mobile network coverage (limited service condition as specified in ETSI 124.008)} ensure that { when {test eCall at the IVS is triggered } then { IVS does not initiate a test eCall} } (2a) with { IVS is in mobile network coverage (limited service condition as specified in ETSI 124.008) } ensure tha...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24a.2 Test applicability
This test case applies to all types of PE eCall IVS which support an exchangeable or reconfigurable SIM/USIM.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24a.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clauses 7.3.5 and 7.14.2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.10.1.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24a.4 Test description
7.1.1.24a.4.1 Pre-test conditions A SIM/USIM supporting the limited service condition shall be used (i.e. forbidden PLMN). PE eCall capable IVS: Preamble 5: Ignition ON and IVS is in mobile network coverage, limited service condition. PE eCall only IVS: Preamble 1: Ignition ON and IVS is in mobile network coverage. ETS...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24b.1 Test Purpose (TP)
(1) with { IVS is in mobile network coverage (limited service condition as specified in ETSI 124.008)} ensure that { when {test eCall at the IVS is triggered } then { IVS does not initiate a test eCall} } (2a) with { IVS is in mobile network coverage (limited service condition as specified in ETSI 124.008) } ensure tha...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24b.2 Test applicability
This test case applies to all types of PE eCall IVS which do not support an exchangeable or reconfigurable SIM/USIM.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24b.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clauses 7.3.5 and 7.14.2 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.10.1. ETSI ETSI TS 103 412 V1.3.1 (2020-03) 61
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.24b.4 Test description
7.1.1.24b.4.1 Pre-test conditions Preamble 1 (Steps 1 to 3, applies to eCall only and PE eCall capable IVS): Ignition ON and IVS is in mobile network coverage. 7.1.1.24b.4.2 Test procedure sequence Table 7.1.1.24b.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 IF PE eCall capable IVS: ...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.25.1 Test Purpose (TP)
(1a) with { automatic eCall in state call established } ensure that { when { call is dropped before MSD transfer is completed (before LL-ACK is sent)} then { at least 1 redial attempt has to be made, all redial attempts have to be completed within 2 minutes } } (1b) with { manual eCall in state call established } ensur...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.25.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.25.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clause 7.12.3, CEN EN 16072 [8], clauses 6.17.2 and 6.17.3 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.10.2.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.25.4 Test description
7.1.1.25.4.1 Pre-test conditions Depending on call type (automatic or manual) Preamble 2 or Preamble 3 is used. 7.1.1.25.4.2 Test procedure sequence Table 7.1.1.25.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 IVS sends initiation signal --> PUSH-REQ - - 2 PSAP requests MSD <-- SEND M...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.26 CTP 1.1.10.3 Duration of eCall Initiation signal - PE eCall IVS
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.26.1 Test Purpose (TP)
(1a) with { ignition ON and IVS in mobile network coverage } ensure that { when { automatic eCall triggered and no SEND MSD message is received} then { eCall is established and the initiation signal shall not persist for longer than 2 s } } (1b) with { ignition ON and IVS in mobile network coverage } ensure that { when...
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.26.2 Test applicability
This test case applies to all types of PE eCall IVS.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.26.3 Conformance requirements
The conformance requirements of CEN EN 16062 [6], clause 7.4.2 paragraph 2; annex A table A.1 T3 shall apply for this TC. The test shall complete CEN EN 16454 [1] CTP 1.1.10.3.
25496abe4432c36f845a6284ed8c24b1
103 412
7.1.1.26.4 Test description
7.1.1.26.4.1 Pre-test conditions Depending on call type, (automatically or manually) Preamble 2 or Preamble 3 is used. 7.1.1.26.4.2 Test procedure sequence Table 7.1.1.26.4.2-1: Main behaviour Step Procedure Message Sequence TP Verdict I - T Message 1 IVS sends initiation signal --> PUSH-REQ - - 2 Check: eCall is estab...