paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
2,573,135,239 | 2013-01-01 | null | [
1512342490
] | [
2160763688,
2001598892,
2130796978,
1512342490,
2151675709
] | This study describes international coal transportation from a coal mining site in the South Gobi, Mongolia to Japan, which is located approximately 8,000 km to the west. The logistics of transportation from the origin to the final destination comprises of four stages: transportation by truck, Mongolian railway, Russian... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | SIMULATION ANALYSIS OF INTERNATIONAL COAL TRANSPORTATION MIWA, K.; TAN, Y.; CHINBAT, U.; BATDELGER, N. & TAKAKUWA, S. |
2,789,409,847 | 2018-02-06 | 48,643,595 | [
1985080107,
1969483356,
2046010791,
1918344999,
1534941005,
2094566145,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
2060929952,
1972121892,
2099741732,
2068546981,
1918344999,
2046010791,
2160763688,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
2020999234,
1534941005,
1496852045,
1995565517,
19694833... | Mass mining methods provide alternatives in developing deeper and lower-grade mineral deposits. Consequently, block cave mining has been increasingly popular mass mining method, especially for large copper deposits currently being mined by open pit methods. This study adopts similar concepts as in stochastic open pit p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic optimisation of long-term block cave scheduling with hang-up and grade uncertainty |
2,991,163,372 | 2019-11-30 | 4,210,224,691 | [] | [
2094566145,
2000715618,
1972121892,
2122244604,
2160763688,
1534941005,
2043345585,
1979015826,
2130796978,
2185734033,
1551276924,
2151675709
] | In stratified deposits such as coal, lignite, and phosphate, the ratio of waste to ore is often very high and one of the major concerns relates to waste placement to in-pit or external dumps. Unless it is known which waste dump will be used for the extracted material, depending on the availability of the waste dumps (i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimised Pit Scheduling Including In-Pit Dumps for Stratified Deposit |
2,031,025,678 | 2013-12-01 | 72,171,858 | [] | [] | As open cut mines become progressively deeper, mining operations face increased operating costs and technical challenges. In-Pit Crusher Conveyor (IPCC) systems offer advantages in the form of continuous operation, reduced labour requirements and decreased energy consumption resulting in lower cost per bank cubic metre... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling of In-Pit Crusher Conveyor alternatives |
2,068,546,981 | 2010-09-01 | 173,256,270 | [
1534941005
] | [
3217061993,
1534941005,
1488422606
] | We present an integer programming formulation for the open pit mine production scheduling problem. We strengthen this formulation by adding inequalities derived by combining the precedence and production constraints. The addition of these inequalities decreases the computational requirements to obtain the optimal integ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A strengthened formulation and cutting planes for the open pit mine production scheduling problem |
2,889,992,269 | 2018-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new open-pit mine planning optimization method using block aggregation and integer programming |
2,994,601,031 | 2001-10-01 | 17,930,613 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production-rate selection for steeply dipping tabular deposits |
2,046,422,784 | 2014-12-01 | 58,516,903 | [
1969397762,
2091248362,
2119356110
] | [
1969397762,
1989853704,
2140956556,
2090972948,
3124536214,
2105827100,
3123142049,
2123709218,
2067516463,
2017190577,
1535912252,
2114803781,
2274815048,
2120546504,
2035564877,
2119356110,
2065198673,
1964946787,
2159784807,
2091248362
] | Energy consumption rises as mines extract ore from deeper levels. Rising energy costs, increased public scrutiny and enhanced awareness of carbon emissions are factors which can influence mining companies to examine and reduce their energy use. A comparison of best practice energy management initiatives of the 1970's w... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Energy and mining – the home truths |
2,140,636,924 | 2013-03-01 | 61,699,894 | [] | [
2060929952,
2045523936,
1972121892,
1534941005,
2043345585,
1639032689,
2130796978,
2118578357,
2171646358
] | Grade and tonnage are the most important technical uncertainties in mining ventures because of the use of estimations/simulations, which are mostly generated from drill data. Open pit mines are planned and designed on the basis of the blocks representing the entire orebody. Each block has different estimation/simulatio... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Planning additional drilling campaign using two-space genetic algorithm: A game theoretical approach |
1,935,019,292 | 2003-12-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ground Vibration from Blasting vis-a-vis Prediction and control Measures |
3,113,285,581 | 2023-07-26 | 1,026,706,133 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimizing mining production plan as a trade-off between resources utilization and economic targets in underground coal mines |
4,366,770,786 | 2023-04-20 | 4,210,229,995 | [] | [
2754029504,
2160763688,
2051607409,
1966814098,
2140170679,
2016210396,
2754252319
] | A significant portion of mineral deposits developed by open-pit mining is opened to the full depth by road transport ramps without the use of combined transport. In most cases, this is dictated by the high rate of a pit deepening and multi-stage development. In this study, the energy intensity of rock mass (RoM) haulag... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Behaviour pattern of rock mass haulage energy intensity in deep pits |
3,199,573,866 | 2021-09-05 | 4,306,498,857 | [] | [
2041108033,
2162882947,
1555319078,
2147889003,
2020003150,
2169438702,
2177679859,
2168234067,
2123974549,
2141919702,
2122273272,
2111502521,
1979527452
] | This article considers the developed software for modeling the main algorithms of the control system of the electromechanical transmission of a quarry dump truck. The description of the main functionality of the developed software product is given. The application architecture and the main mechanism of its operation ar... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Software Development for Dump Truck EMT Control System Simulation |
4,285,160,262 | 2022-01-01 | 2,764,743,394 | [] | [
2169528473,
2151675709
] | In the current phase of open-pit mining, the role of process road transport is of particular importance. It has a number of undoubted advantages, but is very costly. In the structure of the prime cost of mining operations for an ore quarry, the share of costs for ore transportation and overburden reaches up to 50 - 80 ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamic of performance of open-pit dump trucks in ore mining in severe climatic environment |
2,002,289,226 | 2005-09-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Critical Survey of the Existing Stope Layout Optimization Techniques |
3,094,270,112 | 2020-10-23 | 4,210,195,883 | [] | [] | This paper gives a brief introduction of coal transportation layout in China, and analyzes Haoji Railway using SWOT analysis method, establishes a model to calculate the comprehensive transportation cost of coal by Haoji Railway, Sea-river Combination and highway transport respectively, and the model takes time value a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on Competitiveness of Haoji Railway Compared to Traditional Multimodal Transportation Organization |
1,998,311,509 | 2011-11-01 | 100,482,762 | [
2016211524,
4293775970
] | [
4293775970,
2016211524,
1988249327,
2007975985,
1994698775,
4256185527
] | Coal production, processing, and blending are partly addressed by existing models for operations planning of mining enterprises. To this end, this article proposes a (mixed-integer) linear programming formulation for integrated planning of mining operations over time and with stochastic parameters. The model is applied... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrated Coal-Mining Operations Planning: Modeling and Case Study |
4,220,832,862 | 2022-06-01 | 2,764,572,437 | [
2140170679
] | [
1497256448,
2053920929,
1988744163,
2126105956,
2116661285,
1525513734,
2145479420,
2096285034,
2090607438,
163792080,
2007535697,
2130796978,
2024060531,
2140170679,
2010334716,
2151675709,
2098907614
] | Production scheduling is one of the most substantial indicators in achieving short-term, medium-term, and long-term production planning goals. Satisfying this indicator can remarkably reduce total costs and enhance profitability. The haulage system significantly affects the mine production scheduling. Indeed, the uncer... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production Capacity Insurance Considering Reliability, Availability, and Maintainability Analysis |
895,852,828 | 2011-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Economic Evaluation and Sensitivity-Risk Analysis of Zarshuran Gold Mine Project |
2,203,492,501 | 2016-03-01 | 103,321,696 | [
2100769519,
2160763688,
2046010791,
1979015826,
2130796978,
1534941005,
2065332058,
2068546981,
2128208761,
2126895748
] | [
2126895748,
1979015826,
2169528473,
2010334716,
2149230623,
2053920929,
1972121892,
2068546981,
2148673189,
2046010791,
2160763688,
1984953641,
2163428398,
2126258480,
2043345585,
2130796978,
2151675709,
2090359754,
1534941005,
1496852045,
2042986967,
2065332058,
20016199... | In order to establish a production plan, an open-pit mine is partitioned into a three-dimensional array of blocks. The order in which blocks are extracted and processed has a dramatic impact on the economic value of the exploitation. Since realistic models have millions of blocks and constraints, the combinatorial opti... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Aggregation heuristic for the open-pit block scheduling problem |
2,885,771,399 | 2014-04-16 | 4,210,181,965 | [] | [] | For the first time a series of digital structural-lithological maps based on the method of the digital structural and lithologic modelling adapted for placers of heavy minerals for the perspective Motrona- Annyvske placer deposit (north-eastern slope of the Ukrainian Shield) were constructed. A series of derivatives (v... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | STRUCTURAL AND LYTHOLOGICAL MODEL OF MOTRONA-ANNYVSKE TITANIUM-ZIRCONIUM DEPOSIT |
2,064,922,126 | 2009-09-01 | 206,834,481 | [] | [] | There are many deposits that have the potential to be mined by a combined method of open-pit and underground. In this manner, the most sensitive problem is the determination of the optimal transition depth from open-pit to underground or vice versa. To calculate this depth, a model based on block economic values of ope... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Transition from open-pit to underground as a new optimization challenge in mining engineering |
3,125,454,720 | 2020-03-20 | 4,210,228,333 | [] | [
2104050785,
2019291268,
2069467462,
1647779468,
2049606892,
2008982893,
2130796978,
2027016436,
2746485780,
1991538680,
2125617946,
2012127071
] | Based on an analysis of the design principles and practice of underground mining of ore deposits, the most significant features, trends to develop and directions to enhance of underground geotechnology in the field of opening and preparation, mining systems, filling works and ore preparation have been established. The ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Experience in the development of innovative underground geotechnologies for mining of ore deposits |
72,807,773 | 2013-08-11 | 4,306,499,196 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Remote and Semi-Automated Operation of an Electric Cable Shovel |
2,063,881,861 | 2014-03-01 | 2,764,755,457 | [] | [
2585206336,
2246023205,
2145520874,
2024509488,
2159071801
] | Rope shovels are used to dig and load materials in surface mines. One of the main factors that influence the production rate and energy consumption of rope shovels is the performance of the operator. This paper presents a method for evaluating rope shovel operators using the Multi-Attribute Decision-Making (MADM) model... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evaluation of rope shovel operators in surface coal mining using a Multi-Attribute Decision-Making model |
1,993,509,103 | 2007-09-01 | 72,171,858 | [
2024060531,
2020999234
] | [
2126895748,
2020999234,
2024060531,
1551276924
] | Life of mine (LOM) production scheduling is a critically important part of open pit mining ventures and deals with the efficient management of cash flows in the order of hundreds of millions of dollars. A LOM production schedule determines the quantity and quality of ore and waste materials to be mined over time, so as... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit |
2,052,939,735 | 2007-01-01 | 103,321,696 | [
2103002522
] | [
2042238593,
2104050785,
3022050627,
4252999557,
2070558838,
2103002522,
1988328380
] | Motivated by an underground mining operation at Kiruna, Sweden, we formulate a mixed integer program to schedule iron ore production over multiple time periods. Our optimization model determines an operationally feasible ore extraction sequence that minimizes deviations from planned production quantities. The number of... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using aggregation to optimize long-term production planning at an underground mine |
4,289,131,825 | 2022-07-31 | 152,111,507 | [] | [
2045308943,
2094470803,
2155788949,
2332036250,
2060283935,
1971723555,
2174069807,
1972731318,
2550093246,
2170254912,
2015512134,
2060711624,
2023248330,
2032152396,
1988642637,
1976098013,
2132484323,
2054723044,
2008068453,
2063824742,
2161064703
] | Aiming at the complex situation of mine underground engineering, this paper is chaos optimization to design 3D visualization simulation system of mine underground engineering, especially to satisfy the basic functions of 3D dynamic system and chaos optimization algorithm. A symmetric manifold algorithm is adopted. Expl... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Three-Dimensional Dynamic Visualization Simulation of Underground Mining Engineering considering Chaos Optimization of Symmetric Varieties |
2,972,902,102 | 2019-09-09 | 130,567,056 | [] | [] | Yi, Y., 2019. Effect evaluation and optimization model of logistics supply chain in coastal ports. In: Gong, D.; Zhu, H., and Liu, R. (eds.), Selected Topics in Coastal Research: Engineering, Industry, Economy, and Sustainable Development. Journal of Coastal Research, Special Issue No. 94, pp. 763–767. Coconut Creek (F... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Effect Evaluation and Optimization Model of Logistics Supply Chain in Coastal Ports |
4,313,408,625 | 2022-12-16 | 4,210,192,031 | [
1969483356,
1551276924,
2100769519,
2046010791,
1972121892,
1534941005,
2068546981,
2094566145
] | [
2094566145,
2126895748,
2000425991,
4236127247,
2543580944,
2185734033,
1979015826,
2060929952,
1972121892,
2068546981,
2122244604,
2046010791,
1918344999,
2160763688,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
2151675709,
2020999234,
20903597... | The standard optimization of open-pit mine design and production scheduling, which is impacted by a variety of factors, is an essential part of mining activities. The metal uncertainty, which is connected to supply uncertainty, is a crucial component in optimization. To address uncertainties regarding the economic valu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Novel Approach to Integrating Uncertainty into a Push Re-Label Network Flow Algorithm for Pit Optimization |
1,982,396,353 | 2002-01-01 | 4,306,522,903 | [] | [] | Two methods are compared for the performance calculations of a dual construction induction motor intended for use in a hybrid electric vehicle. First a conventional circuit analysis is used after calculation of the machine parameters; secondly a 2D finite element method is used to investigate the flux levels in the mac... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | 170 kW induction motor for an electric truck and bus drive |
1,974,710,011 | 2013-11-01 | 181,849,944 | [
2022318022
] | [
2060929952,
1972121892,
2126895748,
2022318022,
2160763688,
1968056105,
1968496011,
1990543244,
1534941005,
2073775990,
2128208761,
2103002522
] | A single process plant throughput rate to achieve a certain recovery at a certain cost is often assumed over the life of a resource project for strategic planning purposes. The process plant throughput–recovery relationship that exists for each ore type can and should be exploited for the purpose of creating additional... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Exploiting the metallurgical throughput–recovery relationship to optimise resource value as part of the production scheduling process |
2,068,905,781 | 2010-09-01 | 4,306,419,613 | [] | [
2098613108
] | This paper proposes a new algorithm to make real time dispatching decisions in open-pit mines based on discrete position information. New methods are presented to estimate the probability density function for the position of each vehicle across the mine. New heuristic rules are then presented that use current local dat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Heuristic rule for truck dispatching in open-pit mines with local information-based decisions |
2,033,972,853 | 2014-12-31 | 4,210,186,421 | [
2151675709
] | [
2164768649,
2072834565,
2151675709
] | 본 연구에서는 지하광산의 트럭-로더 운반시스템의 시뮬레이션을 수행할 수 있는 프로그램을 개발하였다. 국내 석회석 지하광산 현장을 연구지역으로 설정하여 생산현장의 트럭-로더 운반 시스템에 대해 조사하고, 이를 바탕으로 시뮬레이션 알고리즘을 설계하였다. 트럭-로더 운반 시스템의 시뮬레이션 프로그램은 GPSS/H 시뮬레이션 언어를 이용하여 개발하였다. 개발된 프로그램에 현장조사를 통해 측정한 시뮬레이션 인자 값들을 입력하여 시뮬레이션을 수행한 결과 연구지역의 540 ML(540갱) 적재지점에는 8대의 트럭을 투입하는 것이 하루 생산량을 2,076 ton으로 최대화할 수 있... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation of Truck-Loader Haulage Systems in an Underground Mine using GPSS/H |
2,010,690,400 | 2014-01-01 | 33,782,831 | [
2169245194,
1972121892,
1534941005
] | [
1972121892,
2126895748,
3217061993,
2169245194,
1534941005,
2152195021,
2043345585,
1979015826,
2024060531,
1551276924
] | Determining an optimum long term production schedule is an important part of the planning process of any open pit mine; however, the associated optimization problem is demanding and hard to deal with, as it involves large datasets and multiple hard and soft constraints which makes it a large combinatorial optimization ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production Scheduling of Open Pit Mines Using Particle Swarm Optimization Algorithm |
56,590,618 | 2006-01-01 | 4,210,168,282 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Metallic Raw Materials — Constituents of Our Economy |
3,025,316,519 | 2020-01-01 | 4,306,530,206 | [] | [] | The Serra Sul Iron Ore Project, located in state of Para, northern Brazil, is one of the largest mining complexes in Vale S.A.’s, history with state-of-the-art mining technology. Operations began in 2017, which saw the application of conveyor systems as the replacement for traditional haul trucks for open pit mining. O... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An overview of the slope monitoring program at the Serra Sul Iron Ore Project, S11D, northern Brazil |
2,079,105,981 | 2001-07-01 | 4,210,223,158 | [] | [] | O trabalho apresenta modelos matemáticos para resolução de problemas operacionais relacionados com o planejamento de lavra de minas a céu aberto. Os modelos se prestam à determinação do ritmo de lavra a ser implementado em cada frente de lavra, levando-se em consideração a qualidade do minério em cada frente, a relação... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Planejamento operacional da lavra de mina usando modelos matemáticos |
1,562,029,177 | 2004-01-01 | null | [] | [
3145128584,
1988520084,
2752885492,
1995565517
] | Stochastic simulation is a recognised tool for quantifying the spatial distribution of geological uncertainty and risk in earth science and engineering. Metals mining is an area where simulation technologies are extensively used; however, applications in the coal mining industry have been limited. This is particularly ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Quantification of geological uncertainty and risk using stochastic simulation and applications in the coal mining industry |
2,605,078,397 | 2017-08-01 | 2,764,661,512 | [] | [
2076396544,
2014034914,
2105175235,
2122645796,
2053482949,
2051566572,
2067728749,
1998510734,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | SIMULATION–OPTIMIZATION TRUCK DISPATCH PROBLEM USING LOOK – AHEAD ALGORITHM IN OPEN PIT MINES |
2,149,691,851 | 2010-12-20 | null | [] | [
1512342490,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | ANALYSIS OF A MINE-MILL PRODUCTION SYSTEM USING SIMULATION AND INTEGER PROGRAMMING |
3,023,297,583 | 2020-04-21 | 4,210,196,779 | [] | [] | Актуальность исследования. Функционирование горнодобывающих предприятий в современных условиях характеризуется активным воздействием факторов внешней и внутренней среды. В условиях нестабильной внешней среды, при переходе от одного этапа разработки к другому, подсистемы горнодобывающих предприятий должны подчиняться це... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | |
2,475,781,528 | 2005-08-18 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Transportation – haulage and hoisting |
2,892,160,685 | 2018-10-24 | 121,608,518 | [
2049606892,
4247165901,
2798344481
] | [
2094566145,
2126895748,
1647779468,
1986745486,
4300580367,
2106424475,
2089105401,
2136558239,
2798344481,
4251616545,
2068546981,
2083259944,
3124407081,
1981743146,
2043345585,
2130796978,
1593505867,
4247165901,
1496852045,
1534941005,
2099867994,
2065332058,
19789568... | Abstract The advantages of organic‐chemical fertilizers have been recognised by farmers, and accordingly, the demand for them has increased. An organic‐chemical fertilizer, with an amount of nutrients less than that registered or as specified on the label, is considered a fake or a nonconforming fertilizer. It has been... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of the optimal blending problem of organic-chemical fertilizer under uncertainty |
1,949,528,514 | 2011-11-01 | 135,704,260 | [] | [] | Identifying, quantifying, and minimizing technical risks associated with investment decisions is a key challenge for mineral industry decision makers and investors. However, risk analysis in most bankable mine feasibility studies are based on the stochastic modelling of project Net Present Value (NPV)which, in most cas... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A METHODOLOGICAL MODEL TO ASSIST IN THE OPTIMIZATION AND RISK MANAGEMENT OF MINING INVESTMENT DECISIONS |
4,379,880,667 | 2023-06-08 | 4,210,217,500 | [
2123958887,
2023071828
] | [
2094566145,
2105151233,
2126895748,
2146879621,
1492655370,
2068645132,
2140742285,
2185734033,
1979015826,
2068303762,
2096305430,
2038345112,
2140481308,
2093563804,
1988622494,
1536615069,
2053920929,
2031236641,
1972121892,
2480680997,
2068546981,
1918344999,
21115631... | In-Pit Crushing and Conveying (IPCC) has gained momentum in recent years to replace trucks partially or fully in large open pit mines because of the shovel-truck system's increasing fuel and labour costs and conveyor systems' low operating costs and less greenhouse gas emissions. This article reviews the most recent li... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Review of recent developments in short-term mine planning and IPCC with a research agenda |
2,989,952,069 | 2019-11-30 | 4,210,224,691 | [] | [
2059757952,
3123821384,
2126311658,
2146612430,
2126258480
] | The conventional transportation system of mining projects is one of the significant parts of mining designs, which is considered as the most costly part of the mining operation with approximately 30%–50% of the total operating costs. Accordingly, it is worth to rethink about other transportation system alternatives tha... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of Transition Time from Truck-Shovel to an IPCC System Considering Economic Viewpoint by System Dynamics Modelling |
4,311,376,893 | 2022-12-14 | 139,857,051 | [
2151675709,
2169528473
] | [
2094566145,
2126895748,
2185734033,
1979015826,
2169528473,
1988622494,
2053920929,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
2152358062,
2130796978,
2140170679,
2151675709,
2056956492,
1496852045,
2065332058,
1969483356,
3217061993,
2100769519,
15512769... | The fleet management system (FMS) plays a vital role in truck and shovel open-pit mining operations. The list of expectations from the FMS ranges from data recording to making operational decisions. This article proposes a nested fleet management system (N-FMS) for open-pit mining operations. The primary contribution o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A nested multiple-objective optimization algorithm for managing production fleets in surface mines |
2,904,023,402 | 2019-03-01 | 194,185,345 | [
1969483356,
1918344999,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2060929952,
1972121892,
2099741732,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
2126258480,
2043345585,
1569990960,
2130796978,
2140170679,
4365787967,
2020999234,
14968520... | Mining complexes are comprised of multiple mines and mineral processing streams, each governed by internal (mineral deposit, operation) and external (commodity prices) uncertainties, and must be optimized jointly to manage technical risk and maximize economic value. This study presents a method that optimizes annual pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamically optimizing the strategic plan of mining complexes under supply uncertainty |
2,887,672,116 | 2018-10-01 | 184,816,971 | [
2140170679,
2160763688,
2053920929,
2151675709
] | [
2094566145,
2025878787,
2126895748,
2166186246,
2107974152,
2056246536,
2068645132,
2118465040,
1981557392,
1979015826,
2096305430,
2169528473,
2116859162,
2019207321,
2154929945,
1988622494,
2053920929,
2798344481,
1972121892,
1978558628,
2068546981,
2145493798,
21607636... | Abstract In the current copper mining scenario, where prices are decreasing and pits are larger, there is a pressing need for increasing operational productivity. This is particularly important for mining contractors, who are constantly facing the additional pressure of obsolescence if they are not able to provide cost... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Decision support for fleet allocation and contract renegotiation in contracted open-pit mine blasting operations |
2,557,527,252 | 2014-01-01 | 4,210,219,192 | [] | [] | When deposit is composed of few ore bodies it is necessary to interconnect them into one integrated system. Suppose the deposit characteristics indicate that decline development system is preferred one. In such environment we treat development of an underground mine as access infrastructure composed of different declin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimisation of underground mine decline development system using genetic algorithm |
2,323,209,935 | 2008-01-01 | null | [
2010334716
] | [
2161455936,
2090069860,
2024060531,
2042986967,
2010334716
] | This work deals with the Operational Mining Planning in open pit mines with equipment dynamic allocation. This problem consists in determining the number of trips that each truck would do in each mining site as well as deciding in which mining site to allocate the loaders machines, in order to attend the production and... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | PLANEJAMENTO OPERACIONAL DE LAVRA COM ALOCAÇÃO DINÂMICA DE CAMINHÕES: ABORDAGENS EXATA E HEURÍSTICA |
2,066,302,951 | 2003-09-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits |
2,184,013,555 | 2001-01-01 | null | [] | [] | We describe the development and implementation of a management informing system (MIS) to aid the mining, transporting, stockpiling and shipping of iron ore. Ore is railed from mines to a port, where it is blended on stockpiles and recovered to ships. The project commence d as a Decision Support System to aid quality co... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | I Ir ro on n Or re e Min ni in ng g O Op pe er rat ti io on ns s |
2,963,259,922 | 2019-05-22 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Incorporating grade uncertainty into sublevel stope sequencing |
2,283,699,095 | 2016-02-24 | 2,737,336,974 | [
2140170679,
2100769519,
2046010791,
1972121892,
2130796978,
1534941005,
2094566145,
2068546981,
2128208761,
2126895748
] | [
2059757952,
2094566145,
2126895748,
2019291268,
1647779468,
1979015826,
2010334716,
1972121892,
2068546981,
2046010791,
2160763688,
1985080107,
2126258480,
2043345585,
2130796978,
2140170679,
3123821384,
2090359754,
1534941005,
1496852045,
2146612430,
2077791698,
20653320... | This study proposes a new method to quantitatively represent the uncertainty existing in open pit optimization results due to variations in mineral prices. After generating multiple mineral prices using Monte Carlo simulation with data on past mineral prices, a probability model that represents the uncertainty was deve... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Uncertainty Representation Method for Open Pit Optimization Results Due to Variation in Mineral Prices |
3,124,971,792 | 2021-01-21 | 10,134,376 | [
2059536960
] | [
2041454720,
2034960640,
1969397762,
2138054535,
1963879048,
2074483086,
2291288208,
1979015826,
2090972948,
4239510810,
3123261979,
2004698524,
2092553756,
2069069851,
2033834012,
2060929952,
2043219105,
2007367842,
2147324701,
1484474409,
194786220,
2157579184,
250676882... | Sustainability of the open pit mining and technical system (MTS) is one of its key goals in the changing conditions of the external and internal environment. All MTS’s subsystems must function in concert to achieve this goal. The structure of the MTS is formed by many subsystems and elements, which are evaluated by a s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sustainable Open Pit Mining and Technical Systems: Concept, Principles, and Indicators |
2,774,672,307 | 2013-06-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Oil sands mine planning and waste management using goal programming |
2,889,721,727 | 2018-11-01 | 184,816,971 | [] | [
2102365077,
1988429718,
2111398557,
1988622494,
2116661285,
4245176872,
1990298160,
4230588984,
2001141328,
2143185749,
2001368153,
2020407132,
2098907614,
2018821216,
2074450400,
2126105956,
2024008934,
2049606892,
2024060531,
2070558838,
2010334716
] | The blending problem is one of the oldest and well-known optimization problems. It is generally formulated as a linear program and has been applied in many industries. However, the blending problem encountered in the tea industry requires a lot more than a straight forward linear programming formulation. Indeed, the cl... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A multi-objective optimization approach for the blending problem in the tea industry |
2,002,910,047 | 2010-01-01 | 107,246,200 | [
1551276924,
3217061993,
2130796978,
1534941005
] | [
1972121892,
2126895748,
3217061993,
1534941005,
2043345585,
2130796978,
1551276924
] | One of the main obstacles in using Mixed Integer Linear Programming (MILP) formulations for open pit production scheduling is the size of the problem. The main objective of this paper is to present and implement a practical MILP formulation for open pit production scheduling problem. To reduce the number of binary inte... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Large-scale open pit production scheduling using Mixed Integer Linear Programming |
2,130,796,978 | 2009-04-01 | 173,256,270 | [
1972121892,
1534941005
] | [
1972121892,
2126895748,
3217061993,
1534941005,
2043345585,
1551276924
] | Given a discretisation of an orebody as a block model, the open pit mining production scheduling problem (OPMPSP) consists of finding the sequence in which the blocks should be removed from the pit, over the lifetime of the mine, such that the net present value (NPV) of the operation is maximised. In practice, due to t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity |
2,769,929,912 | 2017-05-01 | 4,306,498,210 | [] | [
2060929952,
2094566145,
1972121892,
2046010791,
2160763688,
1534941005,
2130796978
] | The open-pit mine vehicle scheduling problems are discussed to assign the mine resource reasonably, adjusting the balance of supply and demand effectively and improving the transportation efficiently, and provide necessary technical support for complete open-pit operational scheduling measures. Meanwhile, we design nat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | GA-based Resource Transportation Scheduling Optimization of Open-Pit Mine |
2,387,166,691 | 2001-01-01 | 142,630,227 | [] | [] | The authors advance the technical route for the evaluation of traps and introduce the functions of the software of Trap Evaluation System (TrapDEM2.0), taking the evaluation of eight traps in Erlian basin as application examples.The software package of Trap Evaluation System (TrapDEM2.0) consists of three models: trap ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The software package of trap evaluation system. |
171,099,224 | 2001-01-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | |
2,105,112,061 | 2003-01-20 | 4,306,418,636 | [] | [] | Existing DC diesel-electric drive systems for off highway haul trucks are at the limits of economical feasibility due to high maintenance costs and power, speed and space constraints of their DC traction motors. Large-scale introduction of AC drives in the rail transportation sector has made compact, powerful, and rugg... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A GTO powered AC drive system increases the performance of off-highway haul trucks |
2,183,631,024 | 2012-01-01 | null | [
1551276924,
1496852045,
2160763688,
3217061993,
1972121892,
2130796978,
1534941005,
2068546981,
2128208761
] | [
2053920929,
2169528473,
1972121892,
2068546981,
2126895748,
2160763688,
3217061993,
2090359754,
1496852045,
1534941005,
2126258480,
2043345585,
2130796978,
1979015826,
2128208761,
1551276924,
2151675709,
2036112575
] | The open-pit mine production scheduling problem has received a great deal of attention in recent years, both in the academic literature, and in the mining industry. Optimization approaches to strategic planning for mine exploitation have become the industry standard, as the recent review of Newman et al. (19) highlight... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Solving mixed integer nonlinear programming problems for mine production planning with stockpiling |
2,564,057,986 | 2014-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on Vehicle Dispatching Problem in Open-Pit Coal Mine |
2,887,326,110 | 2018-01-01 | 4,210,228,333 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Validation of open pit stage design in the transition periods of mining at steeply dipping mineral deposits |
3,169,018,749 | 2006-06-01 | 4,306,401,840 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sayısal Harita Üretiminde Proje Planlaması ve Yönetimi |
2,833,334,139 | 2002-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic optimization of western Canadian coal production |
2,797,293,457 | 2018-04-01 | 4,210,178,226 | [
2100769519
] | [
2126895748,
2068546981,
1972121892,
2046010791,
2160763688,
1496852045,
1534941005,
2100769519,
2043345585,
2130796978,
1979015826,
2128208761,
2065332058,
1551276924
] | Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine Project |
2,350,467,482 | 2008-01-01 | 2,764,395,679 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Finite element analysis of upper frame of hydraulic excavator |
4,289,767,450 | 2022-07-31 | 4,210,175,326 | [] | [
3103145119,
2055873761,
2053920929,
2040381573,
1918344999,
1998000455,
2091966857,
2151675709,
2088886701,
2773549135,
1563088657,
2024666582,
2044049559,
2122646361,
2013117405,
2017136542,
1975687263
] | The timely maintenance of haulage machines is important to prevent machine breakdown and reduce productivity down time. An unintended breakdown or machine stop due to inadequate maintenance causes huge financial loss to the company due to delivery delays. Excessive maintenance also increases production cost due to down... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Automatic Maintenance Alert System for Heavy Duty Haulage Machines |
3,116,117,141 | 2016-05-31 | 4,210,201,586 | [] | [] | The successful operation of the mineral sector in modern business conditions, labeled by transition crossing to a market mineral economy and establishing market conditions for the production and trade of mineral raw materials, requires the development of expert economic evaluations of mineral reserves and resources. Th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | EXPERT ECONOMIC EVALUATION OF MINERAL RESOURCES IN THE FUNCTION OF ENVIRONMENTAL PROTECTION |
2,102,509,281 | 2006-06-01 | 173,256,270 | [
2151675709
] | [
2167580124,
2151675709
] | This paper presents an enumeration algorithm based on dynamic programming for optimally solving the fleet management problem in underground mines. This problem consists of routing and scheduling bidirectional vehicles on a haulage network composed of one-lane bidirectional road segments. The method takes into account t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An enumeration algorithm for solving the fleet management problem in underground mines |
3,108,580,496 | 2020-09-16 | 4,210,197,456 | [
1985080107,
2099867994
] | [
2059757952,
2094566145,
3125246470,
2168175751,
2064978316,
2502254989,
1647779468,
2116347131,
2141209339,
2185734033,
3021444882,
1979015826,
2090972948,
1980620433,
2060929952,
2101547937,
2798344481,
3123142049,
1972121892,
1918344999,
2160763688,
3124407081,
31230685... | Risk is a significant phenomenon in mineral industries due to several associated social, environmental, technical, and financial uncertainties. Risk assessment is a standard procedure that evaluates the effects of uncertainties on a mining project. To deal with technical and financial uncertainties, the most well-known... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Enhancing mine risk assessment through more accurate reproduction of correlations and interactions between uncertain variables |
3,190,209,717 | 2021-07-31 | 11,934,891 | [] | [
2006502673,
1979015826,
2153504150,
1972121892,
2068546981,
1918344999,
2046010791,
2130796978,
4205649593,
2019400639,
2093625674,
1534941005,
2065332058,
1969483356,
2100816864,
2000715618,
2109606373,
2100769519,
2113634802
] | Purpose In the mining industry, a run-of-mine (ROM) stockpile is a temporary storage unit, but it is also widely accepted as an effective method to reduce the short-term variations of ore grade. However, tracing ore grade at ROM stockpiles accurately using most current fleet management systems is challenging, due to in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A framework for near real-time ROM stockpile modelling to improve blending efficiency |
3,151,859,318 | 2007-09-01 | 4,210,210,408 | [
2080179645
] | [
2080179645
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A High Performance Drive For the Rotary Coal Breaker Application |
3,094,224,881 | 2020-09-01 | 2,505,686,813 | [
2000715618,
2043345585,
2130796978,
2094566145,
2185734033,
2068546981
] | [
2094566145,
2126895748,
1976744965,
2169245194,
1993885071,
2543580944,
2185734033,
4236127247,
1979015826,
2154929945,
2165299997,
2060929952,
1820051232,
1972121892,
2068546981,
2072955302,
1918344999,
2160763688,
2162145193,
2046010791,
1985080107,
1970101292,
21505937... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms |
4,308,726,269 | 2022-09-22 | 194,672,249 | [
2065332058,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2163428398,
2150593711,
1569990960,
2043345585,
2130796978,
2020999234,
1496852045,
1534941005,
2065332058,
1969483356,
20007156... | Con el presente artículo se busca representar el paso a paso para la obtención de la valoración económica y el agendamiento de un proyecto minero, basado en un yacimiento polimetálico hipotético de Cu y Au, mediante la aplicación de los conceptos de ley equivalente para expresar la presencia de los diferentes metales e... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Uso del software DESWIK® en un deposito polimetalico de Cu y Au |
129,918,228 | 2007-01-01 | 2,737,454,842 | [] | [] | Bauxite is mined and transported by conveyor to a processing plant, screened and washed, then placed into blended stockpiles to feed the alumina refinery. While being stacked to the stockpile, the ore is sampled. Completed stockpiles must be acceptably close to target grade (composition), not only in alumina, but also ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Information System for a Bauxite Mine |
3,131,087,989 | 2021-02-07 | 4,306,517,159 | [] | [] | During this time the performance appraisal of PT. Injep Inti Cemerlang has not been implemented optimally, especially in employee performance appraisal. Performance appraisal so far is only determined from the results, there are no clear appraisal criteria. Based on this reason, a decision support system is needed to h... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Employee Performance Apparaisal Using Decision Support System by AHP and TOPSIS Methods |
2,900,967,138 | 2018-01-01 | null | [] | [] | The process of benchmarking is commonly used when developing mining projects. As new projects come under scrutiny during the evaluation process, the key drivers, such as development advance rate, drawpoint construction and rate of caving or production ramp-up are, or should be, critically examined.
However, with a lim... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Benchmarking and its application for caving projects |
2,426,856,311 | 2016-01-31 | 4,210,223,002 | [] | [] | PT. XYZ adalah perusahaan yang bergerak di bidang manufaktur perakitan sepeda motor, visinya menjadi perusahaan yang leading di bidang tersebut. Berdasarkan hasil wawancara dan pengamatan langsung di perusahaan, untuk perawatan mesin Gas Engine perusahaan telah menerapkan kegiatan maintenance dengan konsep Planned Main... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | USULAN WAKTU PENGGANTIAN OPTIMUM KOMPONEN MESIN GAS ENGINE (PRECHAMBER GAS VALVE) DENGAN MODEL AGE-BASED REPLACEMENT DI PT. XYZ |
918,174,150 | 2007-01-01 | 4,306,511,618 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technologia likwidacji zwałowiska tymczasowego na przedpolu frontu eksploatacyjnego w odkrywce "Drzewce" w KWB "Konin" S.A. |
2,465,299,687 | 2016-06-20 | 72,171,858 | [] | [
2025878787,
3217061993,
1534941005,
2048769967,
2130796978,
2057300506,
2018957623,
1512342490,
2140481308,
2121863487
] | A key design aspect of room-and-pillar coal mines is the panel width (or number of entries in a panel), which affects unit mining costs and productivity. Traditional mine design approaches do not facilitate optimisation of unit mining costs and productivity as a function of the panel width. Discrete event simulation ca... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of discrete event simulation in optimising coal mine room-and-pillar panel width: a case study |
2,950,057,207 | 2019-01-01 | 4,210,186,093 | [
2053920929,
2151675709
] | [
2053920929,
2151675709,
2096305430,
2798344481
] | Reducing costs in the extraction and transportation of solid minerals is an urgent task. To solve it, the article proposes the use of a systematic approach to consider the features of planning the operation of motor vehicles in conditions of coal mine functioning uncertainty. The account of the uneven operation of mini... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving the Mining Enterprise Productivity Based on Probabilistic Nature of the Solid Minerals Extraction and Transportation |
2,586,462,593 | 2010-09-01 | 4,306,419,639 | [] | [] | A disconnector for an overvoltage protector is equipment that disconnects a circuit when the overvoltage protector may fail in a short circuit mode. The disconnector and the overvoltage protector are connected in series. A fuse or a circuit breaker is normally used as a disconnector. However there are problems with bot... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Circuit breaker type disconnector for overvoltage protector |
2,783,658,388 | 2018-01-01 | null | [
3217061993,
2341171179
] | [
3217061993,
2341171179
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal Mining Principles |
2,134,726,534 | 2010-10-01 | 4,306,419,609 | [
3023540311
] | [
2052325226,
1534941005,
2072595219,
3023540311,
2128208761,
2103002522
] | The problems concerning multi-mineral source, multi-ore-dressing plant, multi-mineral of complex mining and ore-dressing systems in regional mine emerge gradually, with resources changes in new areas, such as an unreasonable overall layout of production, overlap and duplicated construction. From the perspective of comp... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization Model of Complex Mining and Ore-Dressing Systems in Regional Mine and Its Application Based on Genetic Algorithm |
2,995,999,596 | 2020-04-01 | 58,516,903 | [] | [
2151675709
] | The effectiveness of mining equipment is a huge challenge in mining which affects mining companies’ competitive advantage in the global mining sector. It is therefore, very important for the mining industry to utilize its intensive equipment with proper measurements. In this paper an algorithm has been developed using ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evaluating and optimizing the effectiveness of mining equipment; the case of Chibuluma South underground mine |
4,379,470,615 | 2023-06-05 | 4,210,217,500 | [] | [
2079747200,
2124853884,
1969397762,
2096873487,
1586930966,
2156267802,
2162661914,
2051709477,
2072910891,
2090132397,
2012645943,
2123179704,
2128070591,
2026689473,
1995790159,
2140730837,
2012016729,
2089635163,
1971931485,
2063052894,
2100922849,
2115277030,
21203807... | Mining is a high-risk industry, so efficiency and safety are key priorities. Technological advancements, such as digitisation, digitalisation, and automation have made mines safer. These developments have also highlighted the need for operators with updated skills and improved education programs. This study analysed th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Training of load haul dump (LHD) machine operators: a case study at LKAB’s Kiirunavaara mine |
8,211,305 | 2007-09-15 | 2,764,992,145 | [] | [] | During Haulage and Loading 2007, the Engineering and Mining Journal organized an OEM round table discussion with the theme 'Reducing cycle times'. Seven panelists identified areas where they could improve cycle times for open-pit mining. Although the discussions focused mainly on haud trucks, two panelists discussed sh... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Productivity considerations for shovels and excavators |
178,353,944 | 2007-01-01 | null | [] | [] | There are presently no suitable underground mine production scheduling optimisation models available for application to sublevel stope mining. Scheduling underground production for maximum return is therefore still a manual process. which generally involves scheduling production from the next available highest cash flo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production schedule optimisation in underground hard rock mining using mixed integer programming |
2,578,174,675 | 2005-04-01 | 4,210,169,854 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Entwicklungen im untertägigen Bergbau |
2,599,462,167 | 2016-01-01 | null | [
1972121892,
3138949179,
1534941005,
2068546981
] | [
1972121892,
2068546981,
2126895748,
2160763688,
3217061993,
1534941005,
2043345585,
1979015826,
2024060531,
2130796978,
2128208761,
3138949179,
1551276924,
2149230623
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of new metaheuristic tools for long term production scheduling of open pit mines |
3,181,386,490 | 2021-07-06 | 2,764,543,046 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Backfill of a Mined-Out Gold Ore Deposit with the Cemented Rubber-Cord and Waste Rock Paste: Environmental Changes in Aqueous Media |
1,969,159,691 | 2013-04-01 | 128,754,310 | [
1972121892
] | [
1551276924,
2043345585,
1972121892,
2126895748
] | Three important aspects of phase-mining must be optimized: the number of phases, the geometry and position of each phase-pit (including the ultimate pit), and the ore and waste quantities to be mined in each phase. A model is presented in this paper in which, a sequence of geologically optimum pits are first generated ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Dynamic-Programming Based Model for Phase-Mining Optimization in Open-Pit Metal Mines |
2,995,281,834 | 2020-03-01 | 4,210,178,226 | [
1972121892
] | [
2060929952,
2088025057,
2000715618,
2094566145,
2001902436,
1972121892,
2126895748,
1918344999,
2024697317,
2341283081,
1985080107,
1981106795,
2100769519,
1506265168,
2043345585,
1979015826,
2128208761,
1551276924
] | The traditionally and widely used Lerchs-Grossmann algorithm presents well-known limitations that newer propositions attempt to overcome. The direct block schedule (DBS) methodology, which has gained relevance with computational advances, obtains the final pit as a natural result of production sequencing, different fro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of the impacts of slope angle variation on slope stability and NPV via two different final pit definition techniques |
3,044,265,069 | 2020-08-13 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Surface mining of Polish lignite deposits with complex geological structure |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.