paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
4,213,008,202 | 2022-02-15 | 48,643,595 | [
1551276924,
1979015826,
1534941005
] | [
2094566145,
2126895748,
2185734033,
1979015826,
2090972948,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
2043345585,
2130796978,
2151675709,
1551276924,
1534941005,
1969483356,
2000715618,
3217061993,
2100769519,
2122244604
] | Reducing the footprint of mining by backfilling and rehabilitating open pit mines progressively reduces the amount of land exposed at any point in time. Optimal dump destination (in-pit or external) depends on their availability, which for in-pit is determined by the mined-out void created and available lag distance be... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improved optimised scheduling in stratified deposits in open pit mines – using in-pit dumping |
3,117,499,911 | 2018-05-08 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Linear programming model applied to scheduling of iron ore production at the Kiruna Mine, Sweden |
2,494,762,270 | 2016-07-20 | 4,306,418,476 | [] | [
1970635216,
1586409345,
2116661285
] | In this paper we present a challenging problem that many decision makers in coal mining industry face. The coal processing and blending problem (CPBP) builds upon the traditional blending problem known in operations research (OR) by including decision variables around coal processing, novel constraints as well as arbit... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Benchmarks for the Coal Processing and Blending Problem |
2,618,624,206 | 2006-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Advances in redox-flow batteries |
142,398,667 | 2011-01-01 | 4,306,463,937 | [] | [
2098395403,
2007221293
] | In order to design the real-time monitor system with good performance, the application of GPRS network on it was studied in depth. Firstly, the importance of designing a real-time monitor system was introduced, and the basic theory of GPRS network was explained; and then the theory principle of real-time monitor system... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Application of the GPRS Network on the Design of Real-Time Monitor System for Water Pollution Resource |
2,999,163,097 | 2020-03-01 | 194,185,345 | [
2046010791
] | [
2060929952,
2094566145,
2126895748,
2068546981,
1972121892,
1918344999,
2160763688,
2046010791,
1551276924,
1985080107,
2113076747,
1496852045,
1534941005,
2100769519,
2185734033,
2130796978,
1969483356
] | The definition of caving economic limits is one of the initial steps in the planning and design of caving projects. This paper proposes a binary optimization framework to integrate the caving envelope and production schedule that maximizes the net present value of the project under technical constraints that model the ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A two-step mathematical programming framework for undercut horizon optimization in block caving mines |
2,518,348,532 | 2003-04-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Just-in-time development model for a sub-level caving underground mine in Zimbabwe. |
3,157,916,430 | 2021-04-26 | 26,994,821 | [
2053920929,
2151675709
] | [
2121766240,
2053920929,
2000715618,
2798344481,
1972121892,
1918344999,
1534941005,
2100769519,
2130796978,
2088304441,
2065332058,
1969483356,
2151675709
] | We propose, implement, and test two approaches for dispatching trucks in an open-pit mining operation. The first approach relies on a nonlinear optimization model that incorporates queueing effects to set target average flow rates between mine locations. The second approach is based on a time-discretized mixed integer ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization-based dispatching policies for open-pit mining |
2,470,772,053 | 2016-06-30 | 48,643,595 | [
1985080107,
1969483356,
2000715618,
2160763688,
2094566145
] | [
2094566145,
2126895748,
1979015826,
2169528473,
2154929945,
2010334716,
2060929952,
2053920929,
1972121892,
2148673189,
2068546981,
2160763688,
1984953641,
1985080107,
2163428398,
2126258480,
2043345585,
2130796978,
2140170679,
2151675709,
2020999234,
2022318022,
14968520... | Stochastic mine planning algorithms have been extended to better represent ore selection decisions. Under geological uncertainty, existing algorithms generate plans that may violate the mineral processing capacity; under such geological scenarios, the excess ore undergoes a recourse action which is not as profitable as... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic strategic planning of open-pit mines with ore selectivity recourse |
2,901,942,412 | 2019-08-01 | 194,185,345 | [] | [
2128208761,
2090359754,
2126895748
] | Abstract Solving the stope boundary optimization problem is the primary step that should be taken after selecting an underground mining method. Obviously, this solution should be optimal because suboptimal boundaries may lead to wasting both mining capital and mineral resources. Four decades have passed since the first... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stope boundary optimization: A mathematical model and efficient heuristics |
2,302,112,271 | 2012-12-01 | 4,306,401,280 | [] | [
2615190415
] | In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importan... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cut-off Grade Optimization for Maximizing the Output Rate |
2,746,657,041 | 2017-08-29 | 2,764,461,748 | [] | [
2108498594,
1977727715,
2246023205,
2030153045,
2073775990,
2062613656,
1488896703
] | The article provides the results of application of artificial neural networks for diagnosis of the condition of electrical mining machinery as well as the description of data collection and processing of intelligent system structure and a condition of components of mechatronic systems analysis algorithms using neural n... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Intelligent Diagnostics of Mechatronic System Components of Career Excavators in Operation |
1,970,592,673 | 2011-01-01 | 107,246,200 | [] | [
1972121892
] | Mixed Integer Programming (MIP) models are recognised as possessing the ability to optimise underground mine planning. However, MIP's use for optimising underground mine planning has often been restricted to problems of certain sizes and/or simplicity. This is because the number of variables and complex constraints in ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming |
3,106,795,685 | 2020-12-17 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design of open-pit phases with consideration of schedule constraints |
2,522,640,896 | 2015-01-01 | 4,306,524,771 | [] | [
2115570304
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelowanie i optymalizacja wydobycia w kopalniach węgla kamiennego z wykorzystaniem struktur gridowych |
4,241,960,123 | 2019-01-01 | 4,210,178,414 | [] | [] | Job scheduling has always been a challenging task for production managers. It is of special importance if it involves multi-objectives and parallel machines. In this research, our direction is largely motivated by the uncertainty emerged in production systems, where processing times of jobs and setup times of machines ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Green fuzzy parallel machine scheduling with sequence-dependent setup in the plastic moulding industry |
2,158,508,387 | 2005-01-01 | 33,447,932 | [] | [] | The required water supply of a pump could be provided by means of different combinations
of pressure piping and pumping units at different operational costs. The basic indices describing the
operational modes for the individual and group pumping units, including the values of the efficiency,
are computed. The adequa... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Operational Features of Pumping Stations Equiped with Parallel-Connected Centrifugal Pumps for Land-Reclamation |
4,365,144,285 | 2023-04-12 | 48,643,595 | [
2053920929,
2151675709
] | [
2053920929,
2798344481,
2150046657,
2766447205,
1918344999,
2160763688,
2152358062,
2185734033,
1979015826,
2096305430,
2140170679,
2044049559,
2169528473,
1662894842,
2151675709,
2098907614
] | Real-time truck dispatching is an important function of the open-pit mine transportation system. However, most of the existing methods are not comprehensive enough to consider the optimisation of both full truck hauling and empty truck travelling stages. Further, most of the real-time dispatching criteria are fixed, wh... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Real-time truck dispatching in open-pit mines |
2,171,772,945 | 2013-01-01 | 2,898,246,533 | [
2096305430,
2151675709
] | [
2151675709,
2096305430
] | Material transportation is one of the most important aspects of open-pit mine operations. The problem usually involves a truck dispatching system in which decisions on truck assignments and destinations are taken in real-time. The dispatch is usually done in a mine with many trucks working together to achieve a common ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Decision Making applied to Shift Change in Stochastic Open-pit Mining Truck Dispatching |
4,210,435,562 | 2022-01-25 | 48,643,595 | [
1979015826
] | [
2094566145,
2185734033,
1979015826,
2090972948,
2053920929,
1972121892,
2122244604,
1918344999,
2160763688,
1985080107,
2152358062,
2031003438,
2043345585,
1970804916,
2506768821,
2124629174,
2140170679,
2151675709,
2020999234,
2274815048,
1534941005,
2000715618,
20240605... | Mining waste management is progressively gathering attention as current waste disposal practices may cause substantial environmental impact. This study aims to evaluate a waste sequencing method, called Multi Stage Dumping Sequencing (MSDS), using a commercial sequencing software in a hypothetical copper deposit. This ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sequencing the waste: when rehandling can be a feasible option to open pit mines |
4,245,269,935 | 2005-08-25 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of Dispatching Criteria for Open-Pit Truck Haulage System Design Using Multiple Comparisons with the Best and Common Random Numbers |
4,363,610,256 | 2023-01-01 | 4,210,216,571 | [] | [
1550258693,
1980862600,
2194187530,
1969879564,
2163107094,
2154929945,
2002055708,
2167557160,
2118020653,
2098162425,
2161554615,
2162800060,
2154053567,
1832693441,
2158698691,
2155482699,
2141847884,
1985454926,
2083062358,
2142997978,
2159583324,
2064675550,
21715453... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ant Colony Algorithm-Based Feature Extraction Model for English Corpus Word Segmentation |
2,573,194,682 | 2016-01-01 | 110,258,470 | [] | [] | This study forms part of an MSc research project undertaken at the University of the Witwatersrand. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A survey of applications of multi-criteria decision analysis methods in mine planning and related case studies |
336,688,262 | 2009-11-01 | 61,699,894 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | |
3,208,163,652 | 2022-06-01 | 153,485,742 | [] | [
1970848641,
1882911873,
2045564168,
2056775433,
2129261459,
2090972948,
2130042267,
3154881185,
2089190693,
1484474409,
2775185835,
2158996140,
1977480757,
2054653365,
2144289211,
1535129021,
1966268097,
3094521286,
1967117012,
2020407132,
2011608289,
2056944867,
21261059... | Indonesian coal is distributed in several islands, such as Sumatra, Kalimantan, Sulawesi, and Papua. Most of them are classified as low and medium rank coal, which is very suitable for coal-fired power plants. In the future, domestic coal demand will increase, driven by the government plans to increase the electricity ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Multi-objective optimization on total cost and carbon dioxide emission of coal supply for coal-fired power plants in Indonesia |
1,973,565,041 | 2013-09-01 | 12,999,175 | [
2143040521
] | [
2101285186,
2128985829,
4255833381,
2143040521,
1557923305,
2069527243,
2150375089,
2143451122,
2340020088,
2912565176,
1997362234,
2136850043,
1591618909
] | Abstract Flotation tailings dumps represent a potential threat to the environment. To corroborate this, numerous environmental disasters have occurred worldwide in the past. Pollution caused by breaking of tailings dump dams and overflowing of hazardous materials is still present, after several decades, and continue to... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of Rough Set Theory for Choosing Optimal Location for Flotation Tailings Dump / Zastosowanie Teorii Zbiorów Przybliżonych Do Wyboru Optymalnej Lokalizacji Składowiska Odpadów Poflotacyjnych |
1,983,237,142 | 2013-01-01 | 2,764,755,457 | [] | [
2130388500,
2727420541,
2168504156
] | We present a novel system productivity simulation and optimization modeling framework in which equipment availability is a variable in the expected productivity function of the system. The framework is used for allocating trucks by route according to their operating performances in a truck–shovel system of an open-pit ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constraints |
3,087,546,375 | 2020-09-14 | 65,690,446 | [
2003777645,
4251616545
] | [
2169245194,
1993885071,
1988429718,
4239510810,
2053432604,
2010334716,
1988622494,
2031279008,
4251616545,
1981401379,
2611147814,
2160763688,
2144946856,
1995285162,
2505585705,
2118578357,
4237504711,
2155900361,
1601649239,
2134886743,
2026816730,
2065332058,
20854781... | In the OCP phosphate supply chain, source ores (SOs) are extracted according to a tactical extraction programme, constrained by geological conditions that constantly limit and modify the variety of available SOs. Then SOs are blended to get merchantable ores (MOs) respecting composition constraints and ordered by inter... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Flexibility of dynamic blending with alternative routings combined with security stocks: a new approach in a mining supply chain |
2,391,594,266 | 2011-01-01 | 4,306,504,513 | [] | [] | The explosive materials is very important in mining operations,especially the management of mine explosives storage and distribution.Take the Sijiaying iron mine in Tangshan as examples,the technique of object-oriented and modularization programming method was adopted to do digital processing of mine area map.Based on ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technical Framework Research on Safety and Management of Mine Explosive Storage and Distribution System |
4,289,280,700 | 2022-01-01 | 4,210,212,033 | [] | [] | Purpose. Improving the efficiency and safety of mining operations in the process of preparatory-rifled risers, through the use of rational technological schemes of borehole hydraulic technology. Methods. Analysis of literary sources, design documentation and practice of developing mineral deposits by underground method... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | SUBSTANTIATION OF RATIONAL TECHNOLOGIES FOR CARRYING OUT PREPARATORY-THROWED RAIS IN THE MINING BLOCKS OF IRON MINES, WHICH ENSURE INCREASED STABILITY OF THE MASSIF EXPOSURES |
2,013,065,416 | 2007-10-01 | 184,816,971 | [] | [] | Iron ore is railed to port, crushed to lump and fines, stockpiled and shipped. Product quality requires consistent composition, in iron and other minerals. Decision support systems described here aid daily ore selection, to maintain target composition. The method evolved from a batch system, building each stockpile to ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Computer aids for production systems management in iron ore mining |
1,485,153,459 | 2015-05-01 | 2,764,755,457 | [] | [
2060929952,
2094566145,
1972121892,
2126895748,
2160763688,
1534941005,
1979015826,
2128208761,
2103002522
] | Fluctuations in commodity prices should influence mining operations to continually update and adjust their mine plans in order to capture additional value under new market conditions. One of the adjustments is the change in production sequencing. This paper seeks to present a method for quantifying the net present valu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evaluation of the impact of commodity price change on mine plan of underground mining |
1,980,181,057 | 2013-12-01 | 194,185,345 | [
2615190415
] | [
2615190415
] | Abstract This study presents a probabilistic approach to the assessment of mineral deposits availability. This approach takes into account the joint influence of decision making involving deposits in development and the difficulty in formalizing socio-economic factors. Using this approach, we designed a model for estim... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Influence of the time factor on the availability of deposits of nonferrous metals |
4,313,016,825 | 2022-01-01 | 2,898,405,271 | [
1969483356,
1918344999,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
2060929952,
1972121892,
1918344999,
2160763688,
1988115241,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2040870580,
2020999234,
2051434435,
1496852045,
1534941005,
2065332058,
1969483356,
20007156... | This article presents a new geometallurgical framework that builds empirical prediction models of key performance indicators of the processing plant and integrates them into a simultaneous stochastic optimization model for mine production scheduling. The prediction models are created by tracking blended rock properties... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geometallurgical prediction models of processing plant indicators for stochastic mine production scheduling |
4,206,396,255 | 2022-01-14 | 4,210,180,259 | [
1985080107,
1969483356,
2060929952,
2000715618,
2160763688,
1979015826,
2094566145,
2185734033
] | [
2094566145,
2126895748,
2169245194,
4236127247,
2543580944,
2185734033,
1979015826,
2169528473,
2154929945,
2060929952,
2053920929,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
2126258480,
2043345585,
1569990960,
21307969... | Open pit mine production scheduling is a computationally expensive large-scale mixed-integer linear programming problem. This research develops a computationally efficient algorithm to solve open pit production scheduling problems under uncertain geological parameters. The proposed solution approach for production sche... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrated Parametric Graph Closure and Branch-and-Cut Algorithm for Open Pit Mine Scheduling under Uncertainty |
2,915,186,434 | 2019-02-27 | 48,643,595 | [
1979015826
] | [
2053920929,
1493454437,
2160763688,
2113076747,
2313274380,
1534941005,
2043345585,
1979015826,
2130796978
] | A review of general optimization studies that have been proposed for underground mining shows that previous works lack flexibility, operability and practicality in relation to cut-and-fill mining production scheduling. This paper presents a robust mixed integer linear programming (MILP) formulation for underground cut-... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A robust mixed integer linear programming framework for underground cut-and-fill mining production scheduling |
4,385,163,857 | 2023-07-01 | 2,764,891,560 | [] | [
2100495367,
2163121678,
4241653265,
2060817938,
2048665112,
2070383642,
2053186076,
2027349022,
2139416101,
2038720550,
4231546411,
2136922672,
2156909104,
2085831731,
2121069620,
4238380085,
1993284672,
2738226240,
2034846276,
2050133572,
2097117768,
1977177161,
21645988... | Ore production is usually affected by multiple influencing inputs at open-pit mines. Nevertheless, the complex nonlinear relationships between these inputs and ore production remain unclear. This becomes even more challenging when training data (e.g. truck haulage information and weather conditions) are massive. In mac... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using deep neural networks coupled with principal component analysis for ore production forecasting at open-pit mines |
1,413,399,995 | 2010-01-01 | 4,306,511,616 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Studium optymalizacji scenariuszy technologicznych kopalni węgla brunatnego Legnica |
2,623,722,883 | 2017-06-06 | 48,643,595 | [] | [
2126895748,
2090359754,
2313274380,
1534941005,
2128208761
] | Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploited. Consequently, the mining industry is being forced to extract minerals from deeper deposits using underground mining methods. This increased the demand for underground mine planning and optimization techniques. Stope b... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Implementation and comparison of four stope boundary optimization algorithms in an existing underground mine |
70,225,742 | 2014-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Use of Simulation in Fleet Selection and Equipment Sizing in Mining |
3,016,780,612 | 2020-04-02 | 4,210,217,500 | [
2160763688,
2043345585,
1979015826,
2130796978,
1534941005
] | [
2094566145,
2126895748,
2185734033,
1979015826,
2169528473,
2060929952,
2053920929,
1972121892,
2068546981,
2122244604,
1918344999,
2160763688,
1569990960,
2043345585,
2130796978,
2126258480,
2151675709,
1534941005,
1496852045,
1969483356,
2000715618,
1537810918,
32170619... | In oil sands mining, bitumen and fines contents are used to predict ore processability. However, experimental results show that certain solid fractions known as Organic Rich Solids (ORS) negatively... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An automated production targeting goal programming framework for oil sands mine planning considering organic rich solids |
2,742,697,806 | 2017-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of fuzzy linear programming for short-term planning and quality control in mine complexes |
1,987,098,664 | 2007-10-10 | 607,880 | [] | [
1639032689
] | Purpose This paper sets out to propose a new cut‐off optimization algorithm for effective decision making at the open pit mine planning stage. Design/methodology/approach The determination of optimum cut‐off grade to maximize the net present value of an open pit mining operation is influenced by the economic parameters... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation |
2,480,817,586 | 2005-03-15 | 4,306,463,973 | [] | [] | submitted to APCOM 2005, Arizona Enrique Rubio PhD Candidate, University of British Columbia W Scott Dunbar Associate Professor, University of British Columbia | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrating uncertainty in block cave production scheduling |
3,023,125,475 | 2019-06-30 | 2,764,734,164 | [] | [
2113442785,
2131022626,
1498436455,
2089892649,
2143956139,
2171277043,
2157154835
] | We express our profound gratitude to A.B. Naizabekov for his assistance in scientific research, to A.F. Tsekhovoy, P.A. Tsekhovoy, D.Sh. Akhmedov, V. V. Yankovenko and D.V. Nikitas for scientific advice in implementation of the program code. The research was carried out within the framework of the initiative research t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digital system of quarry management as a SAAS solution: Mineral Deposit Module |
2,507,155,831 | 2017-04-01 | 103,321,696 | [
1969483356,
2140170679,
2100769519,
2160763688,
3217061993,
1918344999,
1534941005,
2094566145,
2128208761,
2126895748
] | [
2094566145,
2126895748,
1979015826,
2169528473,
2010334716,
2053920929,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
2126258480,
2043345585,
2130796978,
2140170679,
2151675709,
2090359754,
1534941005,
1496852045,
2065332058,
1969483356,
20007156... | Abstract A decomposition method is developed to optimize a mineral value chain composed of multiple mines and a material flow circuit. In the proposed decomposition method, the upstream mine production schedule and the downstream material flow plan are optimized simultaneously to maximize the expected NPV of the entire... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty |
2,918,908,138 | 2018-09-15 | 4,306,521,646 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation Based Optimization of Haulage System of an Open-Pit Mine: Meta Modeling Approach |
2,551,863,464 | 2016-12-01 | 194,185,345 | [
1537810918,
2068985771,
2106622011,
1972121892,
1918344999,
2150593711
] | [
2094566145,
2126895748,
2143284884,
2060929952,
1972121892,
1918344999,
2068985771,
1985080107,
2150593711,
2126258480,
2043345585,
3138949179,
2106622011,
2112794046,
1967829443,
2040689732,
2067050450,
2104674007,
3022339544,
2162593497,
1969483356,
2112374372,
15378109... | Complex polymetallic mining projects with multiple processing streams tend to require tight blending constraints, with different operational and processing targets. These blending requirements are generally not focused solely on metal grade, but rather on a set of geometallurgical variables that affect the performance ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A multivariate destination policy for geometallurgical variables in mineral value chains using coalition-formation clustering |
4,312,710,418 | 2022-09-26 | 4,363,608,616 | [] | [
2094566145,
2000715618,
1972121892,
2046010791,
1918344999,
1534941005,
2100769519,
1979015826,
2006751452,
2130796978,
2065332058,
1551276924,
1969483356
] | The trend towards the promotion of technological complexes of large unit capacity and the transition to robotic mining are fundamentally changing the requirements for geomechanical support for mining operations.At the same time, the well-known methodologies used, which are limited to obtaining constant physical charact... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digital Transformation of Operational Data of Intelligent Hardware and Software Systems for Automation and Robotization of Mining Operations |
2,610,141,378 | 2017-06-01 | 4,210,178,226 | [] | [] | This article aims to review the issues to be considered in choosing primary access and transportation options for underground mines. The main accesses to underground orebodies are declines or vertical shafts. They serve both as a way to transport ore or waste, and move people, equipment or supplies. In underground mine... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of options of production and access ways in underground mines |
2,126,895,748 | 2000-12-01 | 125,775,545 | [
1551276924,
2090359754,
2128208761
] | [
2128208761,
2090359754,
1551276924
] | The open-pit mining problem is to determine the contours of a mine, based on economic data and engineering feasibility requirements, to yield maximum possible net income. This practical problem needs to be solved for very large data sets. In practice, moreover, it is necessary to test multiple scenarios, taking into ac... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem |
2,525,056,414 | 2016-08-31 | 4,306,533,421 | [
2164029929
] | [
2117307746,
2164029929,
2169245194,
4235547147,
2058549005,
2136050606,
2082622325,
2133659287,
2169528473,
2058361114,
2020407132,
2151675709
] | 본 연구에서는 reverse RFID 시스템을 이용하여 지하광산 현장에 투입되는 장비들의 이동시간을 측정하였다. Reverse RFID 시스템에서는 리더기와 안테나가 광산 장비에 탑재되며 태그는 지하광산의 갱도에 부착된다. 실내 모사실험을 통해 장비에 설치되는 RFID 리더기의 송출 전력 크기에 따라 상이하게 나타나는 태그 인식범위와 태그 인식률의 변화를 파악하였다. 그 결과 리더기의 송출 전력 크기가 작아질수록 태그 인식 범위가 좁아져 정밀한 이동시간 측정이 가능해졌으나, 태그 인식률은 떨어지는 것을 확인할 수 있었다. 현장실험 결과 본 연구에서 사용한 RFID 장... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Collecting Travel Time Data of Mine Equipments in an Underground Mine using Reverse RFID Systems |
1,497,435,334 | 2013-11-27 | null | [
1972121892,
2018691481,
1534941005,
2228007358
] | [
1972121892,
2126895748,
3217061993,
1534941005,
2043345585,
2024060531,
2018691481,
1551276924,
2228007358
] | Loading operations and transportation are important steps in the mining process. Factors such as production volume and operating conditions directly affect the equipment selection and sizing fleets, always with a view to lower operating costs. The constant quest for increased productivity and reduced operating costs re... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Análise dos custos operacionais de produção no dimensionamento de frotas de carregamento e transporte em mineração. |
2,476,918,324 | 2010-05-26 | 4,306,463,409 | [
2140764876,
3217061993,
2053920929,
1972121892,
1979015826,
2130796978,
2151675709,
1534941005,
2128208761,
2126895748
] | [
2021450881,
2126895748,
4252999557,
1979015826,
2160449301,
2158182297,
2053920929,
2164284962,
2798344481,
1972121892,
2128026023,
2072979369,
2143956139,
2095090606,
2126258480,
2043345585,
2130796978,
2068370738,
1995063858,
4256185527,
2078286011,
1988328380,
21516757... | The present chapter discusses the application of intelligent decision-support systems – mathematical programming-based in particular – to operations management within the mining industry. The underlying production and distribution planning and scheduling problems have often been addressed individually, in disregard of ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mathematical Models for Optimizing the Global Mining Supply Chain |
3,004,782,386 | 2020-06-01 | 194,185,345 | [] | [
2139212933,
2087347434,
2166778064,
2104442994,
2083127319,
2091875228
] | Frontier mineral exploration is often exclusively focused on assessing geological potential without consideration for the economic viability of resource development. This strategy may overlook potentially prosperous zones for more geologically-favoured but financially-disadvantageous regions, or conversely, may introdu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Bluecap: A geospatial model to assess regional economic-viability for mineral resource development |
2,789,220,524 | 2018-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open Pit Transition Depth Determination Through Global Analysis of Open Pit and Underground Mine Production Scheduling |
4,210,518,783 | 2021-06-30 | 4,210,227,770 | [] | [] | Today, digital planning of mining operations has become one of the most in-demand tools for solving technological problems of industry. A set of tools for planning underground mining operations has been developed based on the MGIS MINEFRAME software. The tools were designed taking into account the geological and geotec... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digital tools for underground mine planning: Cut-and-fill mining |
2,917,097,600 | 2019-01-01 | 2,764,900,261 | [] | [
2072834565,
2164768649,
2060123467,
1985080107,
2591717879
] | The paper presents mathematical and simulation models of the technological process of underground coal mining in one of the coal mines in Kuznetsk Coal Basin. The simulation model is developed with the help of our own simulation system MTSS, which contains a specialized library of mining equipment models and a coal sea... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling of Technological Processes of Underground Coal Mining |
2,057,852,522 | 2005-09-01 | 41,354,672 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Book Review: "A Community Guide to Social Impact Assessment, 3rd Edition", Rabel J. Burdge |
1,973,414,373 | 2008-03-01 | 72,171,858 | [] | [] | AbstractAt BHP Billiton Iron Ore Newman Joint Venture (NJV) ore is railed, from four separate mine operations in the Newman area to Port Hedland, where the ore is screened, crushed and blended to produce lump and fines NJV products. Each mine's grade varies separately, so it is important that a centralised system is in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Maintaining product grade from diverse mine sites at BHP Billiton Iron Ore Newman Joint Venture |
2,055,341,244 | 2008-04-03 | 183,492,911 | [] | [] | This paper discusses the ongoing development of a compact, unattended low-power radiation detection system designed for autonomous operation in regions with limited or no supporting infrastructure. This application motivates our focus on two of the more challenging system development problems: (1) the development of co... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Unattended sensors for nuclear threat detection |
1,980,245,918 | 2013-11-01 | 67,425,620 | [] | [] | It was incomplete and may have missed some dangerous working conditions to select several typical working conditions only in traditional strength analysis of hydraulic excavator. Therefore, the paper proposes a strategy that takes the working conditions when the load at each hinge of working device reaches largest into... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strategy for Determining Analysis Working Conditions of Hydraulic Excavator |
2,991,093,376 | 2019-11-20 | 48,643,595 | [
1985080107,
1969483356,
2024060531,
2060929952,
2043345585,
1918344999,
2094566145,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2060929952,
2053920929,
2017001763,
1972121892,
2122244604,
2068546981,
1918344999,
2160763688,
2162145193,
2046010791,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2124629174,
2140170679,
21516757... | This paper presents an application of a stochastic framework that simultaneously optimises mining, destination, processing and tailings management decisions for a multi-pit gold mining complex. The application explicitly accounts for supply uncertainty via stochastic orebody simulations. The tailings management compone... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An application of simultaneous stochastic optimisation of an open-pit mining complex with tailings management |
2,358,594,933 | 2006-01-01 | 142,630,227 | [] | [] | The theory of real option derived from the financial world could better take into account the financial value of adaptability and strategy of the petroleum exploration and development projects.The commercial strategy sequence of oil companies managing the petroleum exploration and development projects is a kind of opti... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Real option characters of petroleum exploration and development projects |
2,524,955,284 | 2016-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and implementation of steeper slope angles on a kimberlite open pit diamond operation-a practical approach |
2,785,506,546 | 2018-02-01 | 140,455,145 | [
2160763688
] | [
2053920929,
2126895748,
2068546981,
2072834565,
1972121892,
2160763688,
2164768649,
2126311658,
1496852045,
1534941005,
2126258480,
2130796978,
1979015826,
2169528473,
2151675709
] | BHP plans to enter the bulk fertilizer market by developing its first potash operation, the Jansen Potash Mine, in Saskatchewan, Canada. In conjunction with Amec Foster Wheeler, the Jansen project team developed a model of the Jansen production and logistics chain to understand the drivers of production capacity. The D... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Discrete-Event Simulation Modeling Unlocks Value for the Jansen Potash Project |
2,085,232,755 | 2007-06-11 | 4,210,181,015 | [] | [] | Iron ore is railed several hundred kilometres from inland mines to port, where it is crushed and separated into lump and fines products for shipment to customers. During crushing, each trainload is sampled and assayed to measure the grade, in iron, phosphorus, silica, alumina and a number of other minerals. Trainloads ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Calculating the dilution between successive trainloads of iron ore during processing |
4,384,209,817 | 2023-01-01 | 4,210,175,116 | [
2160763688
] | [
2094566145,
2126895748,
1647779468,
2543580944,
2185734033,
1979015826,
2169528473,
2060929952,
2053920929,
1972121892,
2068546981,
1918344999,
2160763688,
1985080107,
2150593711,
1569990960,
2126258480,
2130796978,
2151675709,
2020999234,
1496852045,
1534941005,
19694833... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine Planning |
3,126,768,138 | 2021-02-10 | 4,306,400,194 | [
1551276924,
2049606892,
1979015826
] | [
2126895748,
4300580367,
1979015826,
2024742034,
1536615069,
2798344481,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
2043345585,
2130796978,
2016770622,
2150046657,
2108732866,
2145479420,
2143381319,
1551276924,
1496852045,
1534941005,
19976007... | Heuristic algorithms have shown a good ability to solve a variety of optimization problems. Stockpile blending problem as an important component of the mine scheduling problem is an optimization problem with continuous search space containing uncertainty in the geologic input data. The objective of the optimization pro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Heuristic Strategies for Solving Complex Interacting Stockpile Blending Problem with Chance Constraints |
2,852,138,416 | 2018-06-29 | 2,764,551,302 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Solution of the problem of ecological balance in open pit mineral mining |
2,006,777,573 | 2011-02-01 | 42,602,170 | [] | [
2032797438
] | Problem statement: Bulldozers consume a large amount of diesel fuel and consequently produce a significant quantity of CO2. Environmental and economic cost issues related to fuel consumption and CO2 emission represent a substantial challenge to the mining industry. Approach: Impact of engine load conditions on fuel con... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Impact of Bulldozer's Engine Load Factor on Fuel Consumption, CO<sub>2</sub> Emission and Cost |
1,537,561,481 | 2012-01-01 | 110,258,470 | [] | [
2615190415
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal cut-off grade determination based on variable capacities in open-pit mining |
2,941,134,644 | 2019-03-01 | 11,296,630 | [] | [] | Currently, passive acoustic monitoring (PAM) becomes a more useful tool to record and analyze cetacean’s calls, such as beaked whales and sperm whales. To study the regional population variability of beaked whales in the northern Gulf of Mexico, the acoustic data were collected by the Littoral Acoustic Demonstration Ce... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Detection and classification beaked whale vocalization calls based on unsupervised machine learning algorithm |
4,306,409,538 | 2022-10-17 | 4,210,203,134 | [] | [] | Abstract Sublevel caving operation relies on the estimation of ore grade at drawpoints, as the mine management uses grade to decide whether the material at a certain ring should be loaded or abandoned. Grade is estimated in various ways, including visual estimation, density-based calculation, and sampling and assay met... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Challenges with Density-Based Grade Estimation at LKAB’s Underground Iron Ore Mines |
1,986,734,483 | 2014-01-01 | 2,764,515,337 | [] | [
2615190415
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrated Optimization and Management of Mining Engineering─Coordinative Operation and Optimal Management of Five processes in Mining Engineering |
2,954,029,537 | 2019-06-29 | 4,210,205,812 | [] | [
2261525379,
2160626949,
1564768010,
2018543755,
2134295053,
2050248078,
2169528473,
2128339739,
2053920929,
2105103777,
2124178852,
2111619626,
2169164332,
2038194220,
2104846640,
2012462772,
2170102584,
2151675709,
2168811232,
1966272358,
2164029929,
2168452204,
21095741... | Information communication technology (ICT)-based mine safety management systems are being introduced at numerous mining sites to track the location of equipment and workers in real time and monitor environmental changes. This paper presents the results of a case study in which the big data created by an ICT-based mine ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation of Truck Haulage Operations in an Underground Mine Using Big Data from an ICT-Based Mine Safety Management System |
2,773,311,771 | 2017-01-01 | null | [
1969483356,
3217061993,
1979015826
] | [
1972121892,
2126895748,
1537810918,
3217061993,
2090359754,
1985080107,
2165775468,
1534941005,
2043345585,
1979015826,
2128208761,
1551276924,
1969483356
] | The current trend of deeper and lower-grade deposits makes open pit mining less profitable. Mass mining alternatives have to be developed if mining at a similar rate is to be continued. Block cave mining is becoming an increasingly popular mass mining method, especially for large copper deposits currently being mined w... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An application of mathematical programming and sequential Gaussian simulation for block cave production scheduling |
2,736,709,649 | 2017-07-03 | 4,210,180,762 | [] | [] | An iron ore mine prepares pre-crusher stockpiles, feeding the processing plant with ore at target composition, in grade (iron and multiple contaminants) and physical and source characteristics. Weekly, ore blocks to be mined are allocated to the previous stockpile, or to a new stockpile. By week end, the previous stock... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Building iron ore stockpiles to target grade and composition |
1,597,963,763 | 2015-07-01 | 4,306,420,824 | [] | [] | Modern users of the simulation modeling systems pose to these programming environments the following requirements: Automation of the entire action of the simulation study (or at least the majority); Maintenance of the modern information technology for storing and processing data for organizing the calculations the coll... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Options of the extended editor of GPSS world for creating demonstration models in operating systems |
2,980,881,441 | 2017-01-01 | 2,764,472,783 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Landfill stability analysis at the open pit 'Gacko', Bosnia and Herzegovina - Republic of Srpska |
2,963,605,743 | 2019-05-22 | 4,306,463,075 | [] | [
3217061993
] | The strategic decisions to exploit a mineral deposit extending from the surface to great depth are essential to the financial and sustainability benefits of any mining project. Mining option strategies for resource extraction include: (a) independent open pit mining; (b) independent underground mining with crown pillar... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | MILP framework for open pit and underground mining transitions evaluation |
2,794,899,316 | 2016-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Aplicación de software minero Surpac-Mineshed para el diseño de la mina de caliza "Peña Blanca" |
2,377,455,325 | 2013-01-01 | 2,764,672,716 | [] | [] | In order to improve the resource mining rate of the thin seam and the mining efficiency,based on the practices on the mining in the thin seam coal mining face,the theoretical analysis and the industrial trial were applied to study the mining equipment selection for the automatic coal mining face in thin seam.The hydrau... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Automatic Matching Equipment and Technology of Fully Coal Mining Face in Thin Seam |
2,946,587,734 | 2018-12-09 | 4,306,421,180 | [] | [] | Simulation modelling has long been used to support operations strategy decisions in the mining industry. Recently, the commodity cycle and push for lower costs has driven efforts to improve operations efficiency. The use of simulation has typically been challenging in the operational time horizon due to the difficulty ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Short-term forecasting in open pit mining using simulation modelling |
2,754,373,852 | 2011-01-01 | null | [] | [] | Financial risk analysis is often conducted at the end of a feasibility study, after a project strategy has already been selected. Thus, risk (quantitatively at least) and uncertainty has limited influence in the decision making process. This paper proposes a simple and efficient process to consider risk in the decision... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Robust mine planning |
2,991,295,686 | 2019-11-19 | 4,210,195,883 | [] | [
2130983366,
1969397762,
2091248362,
2119356110
] | The main directions of increasing the efficiency of using energy resources in mechatronic systems of mining excavators are considered. The main factors affecting the energy efficiency of excavators in quarries are the characteristics of the rock, the quality of the explosive preparation, the organization of the mining ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | On improving the energy efficiency of electric mining excavators |
4,240,064,038 | 2009-02-01 | 74,082,208 | [] | [] | Overexpression of aquaporin 2 (AQP2) was observed and suggested to be involved in fluid secretion leading to cyst enlargement in polycystic kidney disease (PKD). The cyst expansion deteriorates the renal function and, therefore, therapies targeting cyst enlargement are of clinical interest. Of note, inhibition of vasop... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Pall Corp, USA |
2,961,180,358 | 2019-01-01 | 4,210,186,093 | [] | [] | The conclusion has been made about the necessity to choose the optimal strategies for management by geotechnical systems, based on the analysis of geological faults, which are the main indicator of the mining and geological conditions that characterize the mineral deposits, as well as on the parameters for the infrastr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving the criteria for choosing the strategies in management by geotechnical systems |
1,906,528,818 | 2016-01-02 | 72,171,858 | [
1969483356,
2024060531,
1918344999,
2020999234,
2094566145
] | [
2094566145,
2126895748,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
1985080107,
2043345585,
2130796978,
2140170679,
2020999234,
2090359754,
1496852045,
1534941005,
1969483356,
1537810918,
2024060531,
2108536179,
2128208761,
1551276924
] | A mining complex may be comprised of multiple components, including open-pit and underground operations. Traditional approaches in mine planning do not account for the various components simultaneously leading to under-value solutions. Over the last decade, some methods have been developed to incorporate multiple compo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Globally optimising open-pit and underground mining operations under geological uncertainty |
2,065,058,220 | 2013-05-01 | 2,764,755,457 | [
1534941005,
2128208761
] | [
2060929952,
2045523936,
1972121892,
2126895748,
3217061993,
2076452041,
1496852045,
1534941005,
2043345585,
2130796978,
2118578357,
2128208761
] | This paper attempts to optimize optimal capacities, block routing and mine sequencing problems in a mining system. The solution approach is based on a heuristics and the mixed integer programming (MIP). Unlike previous sequential solution approaches, the problems are herein solved at the same time. Furthermore, the pro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Multi-period mine planning with multi-process routes |
2,744,316,446 | 2017-07-01 | 4,210,191,540 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geological-Mathematical and Economic Informations in Geological-Economic Study of Mineral Resources |
4,280,604,246 | 2022-05-09 | 4,220,651,530 | [] | [] | With the increasing demand for mineral resources in China, how to manage mineral resources scientifically, efficiently and intelligently has become a practical problem faced by relevant governments, enterprises and academia. As the most advanced technology of GIS in recent years, Web GIS can collect, store, process, an... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and Implementation of Mine Information Management System Based on Wireless Network |
2,604,759,377 | 2013-10-01 | 2,764,949,634 | [] | [] | The Lerchs-Grossman algorithm, often referred to as just LG or Whittle, has become synonymous with the process of calculating ore reserves for surface mining. This article looks at the history of why and how pit optimisation has become such a useful tool for converting resources into reserves within the JORC guidelines... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Lerchs Grossman - contribution to reliable reserve estimates in surface mining |
2,376,503,221 | 2001-01-01 | 2,764,870,838 | [] | [] | The paper discusses how to develop GIS appliction software by using MapX on the basis of spatial technology and accomplish the basic function of editing, analyzing and querying the spatial data and attributive data. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Development of GIS Application Software on the Basis of MapX Control in VC |
2,964,368,969 | 2019-06-20 | 4,220,650,844 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A NEW APPROACH FOR SOLVING THE OPEN PIT MINES LONG-TERM PRODUCTION SCHEDULING PROBLEM OPTIMIZATION BY BAT ALGORITHM |
2,952,618,722 | 2019-01-01 | 4,210,186,093 | [
2053920929
] | [
2053920929,
2798344481,
2160763688,
1534941005,
2151675709
] | Loading and transport operations at open-pit mines are performed mainly by heavy loading & transport systems (LTS). One of the main problems of the LTS is a rather low level of its operation quality, mainly due to the imbalanced influence of various factors on the efficiency of the joint operation of shovels and tr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Quality Criterion of the Loading and Transport System Operation at Open-Pit Mines |
2,586,658,783 | 2007-12-01 | null | [] | [] | In most surface mining operations, waste rocks are removed from the pit and deposited on adjacent areas. Mine optimization is a key step in the viability of a surface mining project. Definition of approaches for selection of haulage tracks and waste distribution to dumps on the basis of minimizing the haulage cost is o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | General Approach to Distribute Waste Rocks Between Dump Sites in Open Cast Mines |
4,313,333,348 | 2022-12-30 | 2,764,734,164 | [] | [
2160763688,
2053920929,
1534941005,
2151675709
] | Purpose is to substantiate the use of an in-pit crushing and conveying technology at the open pits with complex structure of the working zone, which technological complex includes inclined and steeply inclined conveyors for improved economic efficiency of mineral mining at deep levels. Methods. The study applies a comp... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Features of using equipment for in-pit crushing and conveying technology on the open pit walls with complex structure |
2,094,566,145 | 2012-11-01 | 103,321,696 | [
2140170679,
2160763688,
1972121892,
1534941005,
2108536179,
2068546981
] | [
2016365185,
2126895748,
1979015826,
2169528473,
2010334716,
2053920929,
1972121892,
2068546981,
2148673189,
2160763688,
1984953641,
2163428398,
2126258480,
2043345585,
2121947440,
2130796978,
2140170679,
2140095548,
2151675709,
1534941005,
1496852045,
1995565517,
20429869... | This paper presents a metaheuristic solution approach based on Tabu search for the open-pit mine production scheduling problem with metal uncertainty. To search the feasible domain more extensively, two different diversification strategies are used to generate several initial solutions to be optimized by the Tabu searc... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty |
4,205,266,978 | 2022-01-11 | 4,210,197,456 | [
2160763688
] | [
2059757952,
2126895748,
1999918735,
3124770064,
1979015826,
2169528473,
2060929952,
2053920929,
1995503011,
1972121892,
2068546981,
1918344999,
2160763688,
1985080107,
2126258480,
2130796978,
1971394868,
2151675709,
3123821384,
1496852045,
2146612430,
1534941005,
14971797... | Abstract Price uncertainty is one of the major uncertainties in the life of mine (LOM) planning process which can have a decisive effect on the overall profitability. Today’s mine planning software tools provide block-sequencing optimisation for a given static price assumption that is then used as a basis of managerial... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation-based decision-making system for optimal mine production plan selection |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.