paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
2,413,227,238 | 2016-05-31 | 123,994,187 | [] | [
2037351876,
2144144709,
4376595430,
2107941094,
2119969191,
2069527243,
1534941005,
1993885071,
1639032689,
2024060531,
2085237940,
2170493813,
2104851094
] | A Genetic Algorithm (GA) with nested zooming strategy is proposed for the determination of the optimal open pit mine design. Different genetic procedures are applied to increase robustness, namely two typologies of admissible mutations for the elite sub-population subjected to zooming and mutation and reproduction for ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Genetic Algorithm with Zooming for the Determination of the Optimal Open Pit Mines Layout |
2,105,810,036 | 2001-04-01 | 125,775,545 | [] | [] | In many chemical process applications, a large mix of products is produced by blending them from a much smaller set of basic grades. The basic grades themselves are typically produced on the same process equipment and inventoried in batches. Decisions that arise in this process include selecting the set of basic grades... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Grade Selection and Blending to Optimize Cost and Quality |
4,293,817,281 | 2022-08-18 | 4,210,208,383 | [] | [
2899283552,
2158698691,
1837874438,
2160763688,
1988115241,
2160815625,
2137983211,
2261059368,
1524392826,
2064203260,
2004807582
] | The Alhué mining district, Chile, is an example of a high-grade Au-Ag-Zn(-Pb) deposit with mineralized veins that contain variable amounts of copper sulfides, which are detrimental to the cyanidation process. Similar deposits can be found in the central zone of Chile, with polymetallic veins (Au, Ag, Cu, Pb, and Zn) th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Data-Driven Dynamic Simulations of Gold Extraction Which Incorporate Head Grade Distribution Statistics |
2,245,917,260 | 2008-07-01 | 4,306,401,280 | [
3217061993
] | [
2059757952,
3123142049,
3123821384,
3217061993,
2615190415,
2126258480,
2077791698,
2000578291
] | Planning and design procedure of an open pit mining project just can be started after ultimate pit determination. In the carried out study in this paper it was shown that the most important factor in ultimate pit determination and in consequence in the whole planning and design procedure of an open pit mine is the meta... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of Ultimate Pit Limits in Open Mines Using Real Option Approach |
2,370,036,517 | 2002-01-01 | 158,389,693 | [] | [] | The economic evaluation of play in the oil and gas basin is significant for the improvement of the return of exploration and development investment in the oil companies.The paper discusses the method and process about the foundation of reserve model,engineering model,production model and economic model in detail,also t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THE FOUNDATION AND APPLICATION OF THE INTEGRATED MODEL OF ECONOMIC EVALUATION IN EXPLORATION AND DEVELOPMENT |
2,935,935,285 | 2019-04-09 | 4,210,203,134 | [
1551276924,
2160763688,
2057361103,
2090359754
] | [
2126895748,
1979015826,
2169528473,
2060929952,
2053920929,
1972121892,
2068546981,
2160763688,
2129538349,
2126258480,
2043345585,
2130796978,
2151675709,
2036265926,
2090359754,
1518705996,
1496852045,
1534941005,
2057361103,
4300021588,
3217061993,
2128208761,
15512769... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open-Pit Mine Optimization with Maximum Satisfiability |
4,385,243,343 | 2023-01-01 | 4,210,169,156 | [
2151675709
] | [
2151415616,
2053920929,
2029608738,
2150046657,
2112615110,
1918344999,
2160763688,
2051448938,
2068645132,
2144022350,
2152358062,
1979015826,
2140170679,
2169528473,
1662894842,
2151675709,
2098907614
] | The objective of this paper is to understand real-time fleet management problems, its characteristics, and resolution approaches, examine the models and algorithms of existing mining fleet management systems to identify its limitations, and propose a new system architecture that can optimize mine production and efficie... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining Fleet Management System in Real-Time “State of Art” |
3,091,664,857 | 2020-10-28 | 121,210,842 | [] | [
1483512256,
2142353338,
2039713060,
2107848903
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Renewable Energy Research and Applications |
3,124,176,651 | 2020-03-20 | 4,210,228,333 | [] | [
2059757952,
2047134779,
2291288208,
2126258480,
2077791698,
2000578291,
2065198673,
1999972471,
2141209339,
2147324701
] | The purpose of this work is to justify and selection of a safe and effective option of the technology for experimental block during the pilot development of the «Skalistoe» deposit. Based on the researches determined that the projected system for the development of sub-floor caving with the accepted parameters does not... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Survey of underground geotechnology for mining of inclined low thickness ore body |
3,110,252,015 | 2020-11-01 | 4,210,187,594 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Study on seismic behavior of new self-embedded retaining walls |
4,388,343,892 | 2023-11-05 | 4,210,194,614 | [] | [
2010449232,
2155883064,
2083159972,
2115659120
] | Stability of multi-body heavy machinery under dynamic conditions is an important issue for their safe operation and improved productivity. This paper explores the concept of Zero Moment Point (ZMP) to analyze the dynamic stability of an Electric Rope Shovel. A simulation setup of an Industry graded Electric Shovel (Kom... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamic Stability Analysis of an Electric Rope Shovel |
4,382,680,131 | 2023-06-30 | 4,210,217,500 | [
2000715618,
2043345585,
1972121892,
1979015826,
1534941005,
2065332058,
4292083457,
2094566145
] | [
4292083457,
2094566145,
1480376833,
2126895748,
2169245194,
2134807435,
2185734033,
1979015826,
2026645785,
2154929945,
2018044188,
1972121892,
2116661285,
2068546981,
2046010791,
2160763688,
2163428398,
2043345585,
2130796978,
2140170679,
2093625674,
2088765131,
15349410... | Due to the large size of open-pit mines’ long-term production scheduling (OPMPS) problem in large-scale deposits, it is challenging to solve that problem as the mixed integer linear programming (MILP) model. This study used an approach of the genetic algorithm (GA) to tackle this challenge. So, in a small hypothetical ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Genetic algorithm scheme for large scale open-pit mine production scheduling |
2,010,794,396 | 2011-03-01 | 72,171,858 | [] | [] | Most internationally traded iron ore resources are derived from multiple mine sites, transported to a port facility where they are blended and possibly further processed before shipping. Provided the proportion of contributions varies over a number of shipments, an estimate can be made of the bias introduced by mine si... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Estimating sampling and analytical errors of multiple source mine output blended into shipping product |
4,292,074,250 | 2022-11-01 | 100,607,112 | [] | [
2094581504,
2094566145,
2013996674,
2152242052,
2126895748,
2012034308,
1988045831,
2185734033,
1979015826,
2090972948,
1484040084,
2112863519,
2108064160,
2060929952,
1963580067,
1972121892,
2160763688,
1985080107,
2130796978,
1966883898,
566240195,
2090359754,
149685204... | Small-scale mining faces many challenges, such as the proportionally higher costs related to mineral exploration, the time for the results associated with these activities to become available and the difficulties to dispose of waste throughout the mine life. This paper considers three innovative approaches to address s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geoelectrical approach to establishing conceptual pit limits in a barite deposit |
2,777,459,042 | 2017-12-29 | 2,738,972,098 | [] | [] | Este articulo presenta la metodologia e implementacion del modelo Six Sigma en los diferentes tipos de organizaciones. Six Sigma es una herramienta con la finalidad de medir y mejorar la calidad. Se define como una metodologia basada en datos para conseguir la calidad mas cercana a la perfeccion. Esto se consigue exami... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | METODOLOGÍA E IMPLEMENTACIÓN DE SIX SIGMA |
2,087,078,103 | 2012-09-01 | 4,306,417,890 | [] | [] | Scientific reactive power assessment rule could help encourage users to install the compensators of reactive power, which is very meaningful for losses reduction, raising the utilization of the facilities and improving the voltage quality. This paper firstly reviews the currently administrative regulation for the charg... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The comparison, study and proposal for China's reactive power pricing policy |
2,127,135,310 | 2016-02-15 | 72,171,858 | [] | [
2059757952,
2114872079,
2008981917,
1993930401,
1995376165,
2083259944,
2126258480,
2106706098,
2152701363,
2751862591,
1976003395,
2161160262,
3123821384,
2138309709,
2146612430,
1497179728,
2077791698,
2024335963,
2033819227,
4210300258,
2095905764,
2126311658,
20852611... | The authors provide their assessment of current challenges in strategic mine planning and some approaches for addressing them. Challenges covered are quantification of downstream processes and their integration into orebody models; spatial characterisation of geometallurgical variables and their integration into block ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strategic mine planning and design: some challenges and strategies for addressing them |
830,129,388 | 2005-01-01 | 4,306,511,618 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Metoda wyboru pomiędzy modernizacją obecnie użytkowanych z zakupem nowych koparek wielonaczyniowych w kopalniach węgla brunatnego |
4,249,064,903 | 2015-01-01 | 2,764,645,559 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Approximation of the Piecewise Function Using Neural Fuzzy Networks with an Improved Artificial Bee Colony Algorithm |
4,386,527,031 | 2023-10-01 | 2,898,434,319 | [] | [
2025883194
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Fuel Procurement strategies of coastal coal-fired power plants under the carbon peaking and carbon neutrality goals |
3,046,128,356 | 2018-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Financial Management for Local Government |
3,002,998,664 | 2020-05-01 | 58,516,903 | [] | [
1981557392,
2090972948,
2736219668,
2052447638,
2114826007,
2162666018,
1972121892,
2160763688,
2110250287,
2506753585,
2072659764,
2008936765,
2151675709,
2076452041,
2026816730,
2123696861,
1732240353,
2216357226,
2077948915,
2002927225,
2039810046
] | The waste management practices currently applied by the mining industry have been widely questioned regarding safety and efficiency. It is not by chance that the mining industry is considered one of the sectors with less integration in circular value chains. The present work is aimed at identifying the specific blend o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reducing GHG emissions through efficient tire consumption in open pit mines |
3,037,353,338 | 2020-01-01 | 4,210,228,333 | [] | [
1969397762,
1578476034,
2091248362,
2119356110,
65252926
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analyzing energy processes in power line of operating open-pit excavator |
2,915,591,994 | 2011-01-01 | null | [] | [
2030581233
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modeling truck/shovel energy efficiency under uncertainty |
212,273,204 | 2010-10-29 | 4,210,172,275 | [] | [] | Because the domain of waste is one of the most problematic and challenging environmental issues we face today, our paper tried to synthesize a few European reports regarding to Romanian measures and policies taken in the past, but for the future in the improvement and reduction of the growth consumption of waste in the... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Priorities for a Policy and Strategy in Waste Domain for 2030 |
2,494,860,992 | 2000-04-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cycle time and idle time analysis of draglines for increased productivity —A case study |
2,892,343,002 | 2018-01-01 | 4,210,227,780 | [] | [] | W artykule poruszono teoretyczne kwestie pomiaru i sposobu wyznaczania wahan produkcji z uzyciem podejścia decyzyjnego. Problem byl rozwazany w warunkach, gdy produkcja ma charakter masowy. W sytuacji braku mozliwości wyznaczenia średniego poziomu wahan zaproponowano konstrukcje wielorownaniowego modelu ekonometryczneg... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Measurement and attempt of production fluctuations modelling in companies |
3,034,416,563 | 2020-04-02 | 4,210,217,500 | [] | [
2094566145,
1918344999,
2046010791,
1985080107,
1534941005,
2185734033,
1969483356
] | This paper addresses the identification of the optimal draw control strategy for a sublevel caving (SLC) operation at Malmberget mine in Sweden. Two mathematical models, a probability model and an ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of an optimal draw control strategy for a sublevel caving operation at Malmberget mine |
4,385,068,444 | 2023-07-20 | 4,210,192,031 | [] | [
2112796928,
4245152641,
2114747139,
2167036165,
2083689991,
1967509640,
3038067977,
2100495367,
2164727176,
1977698057,
2801490189,
2006746888,
2120390927,
2123845384,
3008827533,
2111107475,
2143474451,
2048665112,
1988918431,
4255833381,
2154326182,
2007221293,
21369226... | With the emergence of big data and the resulting information explosion, computational and mathematical methods provide effective tools to handle the vast amounts of data and information used in big data analytics, knowledge discovery and distillation, and decision-making for solving complex problems in the world [...] | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Preface to the Special Issue on “Computational and Mathematical Methods in Information Science and Engineering” |
3,083,685,648 | 2020-09-03 | 169,988,927 | [
4250589301
] | [
1586409345,
2094566145,
1979015826,
2129241249,
1972121892,
2116661285,
2068546981,
1918344999,
2046010791,
2130796978,
2140170679,
2151675709,
2016211524,
1534941005,
2065332058,
1969483356,
4293775970,
2000715618,
2100769519,
4250589301
] | Coking coal is essential for the production of steel, and the quality of this coal significantly contributes to the quality of the produced steel. High quality coking coal has low ash content and a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal blending strategies for coking coal using chance constraints |
2,964,006,527 | 2017-10-03 | 39,243,548 | [
1973131489,
1488422606,
1551276924,
2100769519,
1496852045,
2160763688,
2140742285,
2038345112,
1979015826,
2130796978,
2065332058,
2036112575
] | [
2126895748,
2089269509,
2000872583,
2152999180,
2313274380,
2140742285,
1979015826,
2024742034,
2038345112,
2169528473,
2103002522,
2106622621,
2053920929,
1972121892,
2068546981,
2046010791,
2160763688,
2067462952,
2163428398,
2126258480,
2043345585,
2130796978,
21311674... | We study a Lagrangian decomposition algorithm recently proposed by Dan Bienstock and Mark Zuckerberg for solving the LP relaxation of a class of open pit mine project scheduling problems. In this study we show that the Bienstock–Zuckerberg (BZ) algorithm can be used to solve LP relaxations corresponding to a much broad... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project scheduling |
2,998,866,831 | 2019-01-01 | null | [] | [
2144846366,
1996058353,
3041149780,
3127288917,
1555104280,
1584162686
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | "TYPICAL FACES PASSPORTS FOR THE DEVELOPMENT OF COAL-BEARING ZONES OF KUZBASS QUARRY FIELDS WITH BACKHOES. PART 2. PASSPORTS OF EXCAVATORS FACES" |
2,138,644,229 | 2004-12-31 | 204,021,516 | [] | [] | In the Netherlands several billion tonnes of mineable coal remained after closure of all mines in 1974. Mining activities in Dutch Limburg were suspended relatively early in comparison to surrounding basins, of which only DSK’s Ruhr mines are still producing. In retrospective this saved the costs of uneconomic exploita... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Coal mining in the Netherlands: The need for a proper assessment |
3,118,352,327 | 2021-01-01 | 4,210,187,594 | [
2065332058
] | [
2126895748,
1972121892,
2046010791,
2160763688,
2090359754,
1534941005,
2163428398,
2100769519,
1979015826,
2130796978,
2128208761,
2065332058
] | One of the main stages in design of mineral development process is solution of finding optimal open pit problem. It is necessary to take into account the spatial distribution of mineral components and the allowable slope angles of the sides during solving this problem. The basis for performing calculations to optimize ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Method for optimizing the shell of open pit mines based on parallel computing |
4,295,168,671 | 2022-01-01 | 4,210,172,589 | [
1969483356,
2094566145,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2053920929,
1972121892,
2068546981,
1918344999,
2160763688,
2083259944,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
2151675709,
2020999234,
2145479420,
1496852045,
15349410... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Integrated Simulation and Optimization Tool for Short-Term Mining Planning Problems With Different Prioritizations Among Competing Plant Targets |
72,227,809 | 2000-01-01 | 4,210,194,219 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A simplified economic filter for underground mining of massive sulfide deposits |
2,007,298,050 | 2013-09-01 | 2,764,755,457 | [
2160763688,
1534941005
] | [
2126895748,
2113076747,
1979015826,
2169528473,
2149230623,
2053920929,
1972121892,
2068546981,
2160763688,
2126258480,
2043345585,
2130796978,
2151675709,
1534941005,
1496852045,
1493454437,
3217061993,
2165775468,
1551276924
] | Production schedules that provide optimal operating strategies while meeting practical, technical, and environmental constraints are an inseparable part of mining operations. Relying only on manual planning methods or computer software based on heuristic algorithms will lead to mine schedules that are not the optimal g... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A multi-step approach for block-cave production scheduling optimization |
2,951,557,109 | 2019-06-17 | 48,643,595 | [
2122244604,
2124629174,
1918344999,
2065682001,
1534941005,
2185734033
] | [
1580906881,
2094566145,
2126895748,
2113536011,
1992252175,
2543580944,
2185734033,
1979015826,
2090972948,
2084983188,
2060929952,
2053920929,
1972121892,
2122244604,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
1569990960,
20433455... | Simultaneous stochastic optimisation manages risk and capitalises on the unique interactions that occur in a mining complex, where materials are transferred between mines, processors, stockpiles, and waste facilities to achieve a marketable product. Typically, when optimising the production schedule, the primary focus ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simultaneous stochastic optimisation of an open-pit gold mining complex with waste management |
4,247,066,832 | 2020-10-10 | 4,210,232,462 | [] | [] | Vietnam's open-pit mines have been exploited deeper and deeper. At the end of exploitation, the bottom of the mine is 300÷400 m lower than the sea level. Mining in the deep layers will face a series of difficulties such as seasonal exploitation, high pit bank, large amount of water mud, limited field size, increasing i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining technology for exploiting deep open-pit mines in Vietnam |
2,040,154,671 | 2007-10-01 | 15,526,297 | [] | [] | The kinetics and equilibrium of sorption of copper(II) ions on natural biopolymer chitosan, activated carbon fiber, and composite materials prepared by electrochemical modification of activated carbon fibers with chitosan were studied. The influence of the conditions of modification of the microporous carbon matrix on ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The sorption properties of chitosan-carbon fibrous materials |
194,242,481 | 2012-01-01 | 4,210,175,646 | [] | [] | Homogenization piles are largely used in the mining industry for variability reduction in the head grades feeding the processing plants. Various methods are found for homogenization piles design and most fail to incorporate the in situ grade variability intrinsic of a mineral deposit. The methodology proposed combines ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Use of Geostatistical Simulation to Optimize the Homogenization and Blending Strategies |
2,946,503,984 | 2019-01-01 | 27,191,780 | [] | [] | Wireless sensor networks have imminent constraints that make security a crucial issue. Transmission starts from a single node and spread in the entire network through wireless communication. This p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An epidemic model for security and performance of wireless sensor networks |
2,992,852,206 | 2019-08-01 | 4,306,498,490 | [
1122589879,
2296228853
] | [
1564768010,
2112731915,
1749494163,
2153504150,
2128672663,
2143864104,
2130422193,
1122589879,
2119851068,
2046053182,
2095614026,
2045222221,
2052789583,
2049981393,
2115579991,
2033819227,
2070164574,
2100816864,
2146881125,
2085261163,
1677409904,
2152864241,
21136348... | This paper presents a method to manage and visualize the point cloud generated by LIDARs mounted on a Bucket Wheel Reclaimer (BWR). BWR's are widely used for stacking and reclaiming bulk materials in stockyards. Currently BWR systems are either manually operated, remotely operated or semiautomated using the point cloud... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Real-time Time-varying Surface Reconstruction and Edge Point Extraction for Bucket Wheel Reclaimers |
2,739,128,705 | 2017-06-01 | 1,003,953,879 | [
3217061993,
2130796978,
1534941005
] | [
3217061993,
2130796978,
1972121892,
1534941005
] | Developing three-dimensional geological and economical models of deposits in combination with deposit economical values calculations, represent fundament for application of contemporary methods in the mining engineering. It is proved that contemporary methods, such are Lerchs-Grossman's method, Method of floating cone ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Floating slopes method application on the coal deposit Kongora |
3,204,027,154 | 2021-07-15 | 4,306,498,799 | [] | [
4211007335,
2119969191,
2089314377,
1992176519,
2069527243,
2792546905,
2165299997
] | With the rapid development and modernization requirement of global coal industry, there is an emerging need for intelligent and unmanned mining systems. In this paper, the Intelligent Mining Operating System (IMOS) is proposed and developed, based on the parallel management and control of mining operating infrastructur... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Parallel Mining Operating Systems: From Digital Twins to Mining Intelligence |
2,213,027,200 | 2015-08-25 | 4,210,211,457 | [
2140170679
] | [
2140170679,
2042986967,
2138029669,
2130796978,
2024060531,
2007401074,
2099942580,
2014856631,
2010334716,
2153638045
] | Este trabalho trata o problema de Planejamento Operacional de Lavra em Minas a Céu Aberto com alocação dinâmica de caminhões (POLAD). Neste problema, há um conjunto de carregadeiras, um conjunto de caminhões, um conjunto de frentes de lavra e uma meta de produção e qualidade requeridos para o material lavrado. O objeti... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Um algoritmo baseado na metaheurística LAHC para resolver o Problema de Planejamento Operacional de Lavra em Minas a Céu Aberto |
2,898,725,777 | 2018-10-30 | 146,233,897 | [
2060929952
] | [
2060929952,
2094566145,
4210300258,
2020999234,
2160763688,
1985080107,
2024060531,
2171646358
] | ABSTRACTThe Simplified Linear Integrated Capacity Estimate model (SLICE) enabled to optimize the production capacity of the Jansen potash project and quantify risks to production. The Jansen chain ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic Optimization of the Jansen Potash Production and Logistics Chain |
1,591,048,263 | 2005-01-01 | 4,210,229,033 | [] | [] | La gestion environnementale et la norme ISO 14 001 par Corinne Gendron, Montréal : Presses de l’Université de Montréal, 2004, 347 p., ISBN 2-7606-1809-9.. Un article de la revue Relations industrielles / Industrial Relations (Volume 60, numéro 2, printemps 2005, p. 213-399) diffusée par la plateforme Érudit. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | La gestion environnementale et la norme ISO 14 001 par Corinne Gendron, Montréal : Presses de l’Université de Montréal, 2004, 347 p., ISBN 2-7606-1809-9. |
4,386,141,294 | 2023-08-24 | 48,643,595 | [
1985080107,
2140170679,
2982316857,
2060929952,
2787894218,
2257979135,
2902907165,
2145339207,
2185734033
] | [
2131223556,
2100495367,
2126316555,
2157803532,
2964043796,
2010334716,
2031236641,
4299542564,
2168359464,
2036004393,
1757796397,
1522301498,
1986530877,
2010319424,
2020999234,
1496852045,
1601649239,
1969483356,
2766447205,
1976554602,
2024060531,
1595159159,
19790158... | Short-term planning typically involves optimising different mining complex components individually, preventing unlocking value from intercorrelated activities. This paper proposes an integrated framework that defines diglines and shovel allocation decisions to improve the operation’s financial performance. This involve... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simultaneous shovel allocation and grade control decisions for short-term production planning of industrial mining complexes – an actor-critic approach |
1,998,328,917 | 2012-05-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of dragline cycle time components |
2,101,507,626 | 2013-06-01 | 72,171,858 | [
2160763688,
1534941005,
2151675709,
2068546981
] | [
2053920929,
2149454052,
2068546981,
2126895748,
1972121892,
2160763688,
3217061993,
1534941005,
1496852045,
2126258480,
1979015826,
2130796978,
2108536179,
2169528473,
2151675709
] | In this paper, a mixed integer programming model for solving the short term planning problem in surface mining is presented. This model will establish the sequence of mining for a period ranging from days to several months. This involves determining which blocks of the geological model will be extracted and in what ord... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mixed integer programming model for short term planning in open-pit mines |
2,158,117,508 | 2007-09-01 | 4,210,210,408 | [] | [] | Electrical arcing injuries are the most common form of electrical injury in mining. MSHA data show that 381 "non-contact electric arc burn" injuries occurred in the mining industry from 1996 - 2005. A more detailed study of data from 1990-2001 showed that five types of apparatus - circuit breakers, conductors, nonpower... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Protecting Miners from Electrical Arcing Injury |
2,923,497,540 | 2017-12-31 | null | [] | [] | The strategic open pit mine production scheduling problem is usually formulated as a large-scale integer programming problem that is very difficult to solve. The life of mine production scheduling problem is currently modeled on a block by block basis in order to decide which blocks should be extracted, when they shoul... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | New integer solution algorithm to solve open-pit mine production scheduling problems, A |
1,513,507,350 | 2014-09-01 | 2,764,816,760 | [
2140170679,
2128361327,
2034960640
] | [
2034960640,
2126895748,
2579555219,
2092553756,
1972121892,
2068546981,
2046010791,
194786220,
2130796978,
2140170679,
2912565176,
2102750402,
2140764876,
1534941005,
2065109455,
2020407132,
2126105956,
3217061993,
2128361327,
2037551729,
2010334716
] | Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable lo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Approach to Locate an In Pit Crusher in Open Pit Mines |
113,709,177 | 2013-08-01 | null | [] | [] | RESUME : Cette recherche est principalement axee sur la planification de la production a tres court terme et
de l’affectation des camions aux pelles dans une mine a ciel ouvert. Les principales lacunes des modeles existants dans la litterature sont: a) la non consideration du temps d'attente et de la file d'attente au... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Comparison Between Linear Programming and SimulationModels for a Dispacthing System in Open Pit Mines |
3,152,243,935 | 2013-01-01 | 4,306,555,668 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constraints |
1,842,109,277 | 2015-01-01 | 110,258,470 | [
2151675709
] | [
2053920929,
2904250082,
2160763688,
1534941005,
2070537839,
1517403092,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A stochastic simulation framework for truck and shovel selection and sizing in open pit mines |
2,593,707,345 | 2017-01-01 | 114,141,714 | [] | [
2026992098,
1963580067,
2126895748,
1988045831,
1981106795,
1964396403,
2039814260,
1551276924
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and Implementation of Non-layered 3-Dimensional Orebody Modeling System |
3,024,218,445 | 2020-05-13 | 4,210,237,802 | [
1969483356,
2060929952,
2160763688
] | [
2094566145,
2091797506,
2076983043,
2011832962,
2126895748,
2168175751,
1979015826,
4233014035,
2169528473,
2103002522,
2060929952,
2053920929,
1972121892,
2480680997,
2068546981,
2160763688,
2171050536,
1985080107,
1992710140,
2038885294,
2126258480,
2043345585,
21307969... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Uncertainty Integration in Dynamic Mining Reserves |
2,739,735,466 | 2017-07-28 | 4,210,187,825 | [] | [
2034960640,
2128361327,
2140170679
] | Mining is a complex, expensive, yet lucrative business. Today’s open-pit mines are huge projects in Australia. To keep the projects profitable, planners and schedulers are under constant pressure to make mine plans that are as accurate as possible and optimize production at all stages, from mine to market. In general, ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open-Pit Mine Production Planning and Scheduling: A Research Agenda |
4,384,706,097 | 2023-04-03 | 4,210,211,339 | [] | [] | Faculty members interested in creating creative scholarship face advancement obstacles due to few known tenure and promotion standards. This study involved qualitative semistructured interviews with U.S. communication and media creative faculty members producing scholarship spanning multiple mediums. Interviewed schola... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reimagining tenure and promotion for creative faculty: the Creative Scholarship Pathways Framework |
2,915,549,949 | 2019-01-01 | null | [
2160763688
] | [
2053920929,
1972121892,
2068546981,
2126895748,
2160763688,
1496852045,
1534941005,
2126258480,
1979015826,
2130796978,
2169528473,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal Selection and Assignment of Loading Equipment for the Compliance of an Open-Pit Production Plan |
2,050,408,004 | 2011-10-01 | 4,306,419,613 | [
2140170679,
2096305430,
2151675709,
2334782222
] | [
32403112,
2337392266,
2334782222,
2080267935,
2130796978,
2113677269,
2096305430,
2140170679,
2010334716,
2151675709,
2107726111
] | Material transportation is one of the most important aspects of open-pit mine operations. The problem usually involves a truck dispatching system in which decisions on truck assignments and destinations are taken in real-time. Due to its significance, several decision systems for material transportation in open-pit min... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A single-dependent agent approach for stochastic time-dependent truck dispatching in open-pit mining |
1,910,147,295 | 2015-07-01 | 48,643,595 | [
2151675709
] | [
2160763688,
3217061993,
1985080107,
1551276924,
2151675709
] | The ground articulating pipeline (GAP) system was developed to transport oil sand using a continuous transport system. This paper proposes a simulation-based optimisation approach to improve the efficiency of oil sand continuous transport systems at the operational level. Based on the analysis of shovel capacity, the a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising design parameters of continuous mining transport systems using discrete event simulation |
4,242,131,879 | 2021-01-01 | 4,306,463,937 | [
2160763688
] | [
2094566145,
2126895748,
1647779468,
2543580944,
2185734033,
1979015826,
2169528473,
2060929952,
2053920929,
1972121892,
2068546981,
1918344999,
2160763688,
1985080107,
2150593711,
1569990960,
2126258480,
2130796978,
2151675709,
2020999234,
1496852045,
1534941005,
19694833... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine Planning |
4,386,821,607 | 2023-07-24 | null | [
2064675550
] | [
2053920929,
2787894218,
1988790447,
2038865108,
4236354166,
2569214105,
4239510810,
2016210396,
2151675709,
2064675550
] | Aiming at the prediction of truck travel time in open pit mines, we established a prediction model based on long short-term memory(LSTM). This model fully accounts for 11 factors, including the nature of trucks, weather, road conditions, and driver's behaviors, as well as the influence of neighbor road segments in the ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Prediction Method of Truck Travel Time in Open Pit Mines Based on LSTM Model |
2,983,872,027 | 2019-09-01 | 4,306,498,499 | [] | [
2038872716
] | The purpose of this work is to develop formalized procedures for determining baseline indicators for electricity consumption for underground iron ore enterprises. Scientific novelty consists in the implementation of methods of economic-statistical analysis to the practice of formalizing the indicators of the level of e... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Introduction to the Formation of the Basic Structure of the Algorithm for the Control of Electric Energy Flows in Iron Ore Mines |
2,130,420,330 | 2013-08-01 | 4,306,419,541 | [] | [
1975348168,
2169528473,
2124344619
] | Using open-pit wireless local area networks (WLAN) as a research environment, the time and spatial characters about the information transmission between the vehicle terminal and the server is in depth analyzed. It describes the spatial distribution of wireless network signal strength. In vehicle terminal program, the s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Wireless data transmission safeguard mechanism based on network status |
2,990,381,357 | 2020-01-29 | 4,210,225,672 | [
1977168082
] | [
2126895748,
2090359754,
2313274380,
1534941005,
1977168082,
2128208761
] | We address the design optimization problem for a mine in which the ore is concentrated in a system of long, thin veins and for which the so-called top-down open-stope mining method is customarily u... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selecting support pillars in underground mines with ore veins |
4,385,575,822 | 2023-08-04 | 4,210,203,134 | [
2049606892
] | [
2094566145,
2126895748,
2313274380,
1647779468,
2185734033,
1979015826,
1993219607,
2060929952,
2068546981,
1918344999,
2169095719,
3124407081,
2160763688,
1985080107,
2043345585,
2130796978,
2118578357,
1988328380,
4292158025,
2090359754,
1496852045,
1534941005,
19771680... | Underground mining operations are sensitive to price fluctuations because they usually perform with a narrow profit margin compared to open-pit mining. Furthermore, the economic evaluations regarding operation are based on estimated or simulated grades rather than actual values. These bring a high degree of uncertainty... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stope Sequencing Optimization for Underground Mines Through Chance-Constrained Programming |
2,986,713,045 | 2019-01-01 | 4,210,206,827 | [] | [] | The necessity of increasing the efficiency of production management systems of titanium sponge by the method of Krol is justified. A system analysis of the joint operation of magnesium electrolysis stage and the reduction of titanium sponge stage is performed. The task to eliminate violations in the provision of the re... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research of Joint Work of Titanium Sponge Plots by a Model |
3,163,816,017 | 2020-12-01 | 4,306,498,622 | [] | [] | Over the past few years, the shortage of coal supply leads to higher coal price, majority of power plants burned blended coal instead of designed coal as the main energy source, which leads to a significant decrease in boiler efficiency and combustion performance. Improving boiler efficiency, reducing coal consumption ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research and application of computer data mining technology in energy saving and emission reduction of thermal power plant |
1,600,756,432 | 2002-11-22 | 4,306,419,399 | [] | [] | This paper describes the general techniques for protection against transient surges as well as continuous over-voltages. It also discusses at length the characteristics of the various protection devices and their influence on each other when used in combination. This paper describes ways in which to increase the reliab... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Protection mechanism for modern telecommunications |
2,902,235,459 | 2017-01-01 | null | [
2164768649,
2133165620
] | [
2164768649,
1979015826,
2312970899,
2611560603,
2140481308,
2021501732,
2068546981,
1972121892,
2160763688,
1985080107,
2130796978,
2133165620,
2140170679,
2151675709,
1496852045,
1534941005,
1512342490,
1969483356,
3217061993,
1968002794,
2100769519,
1993470194,
15512769... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using FlexSim to Simulate the Logistics Relationship between Materials Supplying and Roadway Development |
3,019,110,565 | 2020-01-01 | 2,737,788,663 | [
2060929952
] | [
2060929952,
2094566145,
1972121892,
2068546981,
2126895748,
2046010791,
2090359754,
1985080107,
1534941005,
2100769519,
2126258480,
2130796978,
2140170679,
2128208761
] | Today deposits are often, small in size, with poor quality and with complex structure and geometry, which makes them very difficult to mine. For this reasons, taking into account a wide range of parameters is the most important thing for the successful managing of the economically viable project. The problem is that pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Hybrid model for uncertainty assessment in open pit optimization |
3,166,495,833 | 2021-06-15 | 2,737,336,974 | [
2126258480,
2101320768
] | [
1979015826,
2153504150,
2053920929,
2105103777,
2912800036,
2068546981,
2160763688,
2152358062,
2141975087,
2126258480,
2130796978,
2140170679,
2109026747,
2151675709,
2019400639,
2101320768,
1534941005,
1969483356,
4210300258,
2011430131
] | The frequent best practice for managing large low-grade run-of-mine (ROM) stockpiles is to average the entire stockpile to only one grade. Modern ore control and mineral processing procedures need better precision. Low-precision models hinder the ability to create a digital mine-to-mill model and optimize the holistic ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling Large Heaped Fill Stockpiles Using FMS Data |
4,384,525,017 | 2023-07-08 | 4,210,169,417 | [] | [
2032392871,
2160763688,
2100769519,
2129203575,
2074821977,
2065332058
] | Penelitian ini bertujuan untuk mengoptimalisasi site plan perumahan taman pondok legi VI dengan menggunakan metode integer programming dan goal programming dengan lingo. Berdasarkan hasil penelitian dapat disimpulkan bahwa Keuntungan maksimal yang dapat diperolah pengembang dari analisis model integer dan goal programm... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimasi site plan perumahan taman pondok legi VI menggunakan metode integer programming dan goal programming dengan lingo |
1,969,021,832 | 2014-10-15 | 115,925,768 | [
2313274380,
4250589301
] | [
2313274380,
4250589301,
1971998222
] | In the design of underground tunnel layout, the development cost is often dependent on the direction of the tunnel at each point due to directional ground fracturing. This paper considers the problem of finding a minimum cost curvature-constrained path between two directed points in 3-space, where the cost at every poi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal curvature and gradient-constrained directional cost paths in 3-space |
144,678,738 | 2011-01-01 | null | [] | [] | Reducing truck payload variance in surface mining operations improves productivity by reducing bunching effects and machine wear from overloaded trucks. This paper outlines a Monte-Carlo simulation that has been used to study the effect of bulk density, fill factor, bucket size and number of loading passes on the long ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Monte Carlo simulation for predicting truck payload distribution |
3,135,103,734 | 2021-03-06 | 4,210,205,812 | [] | [
2155482699,
2137983211,
2600092686,
2012231377,
1967377907,
2090972948,
2553249396,
4300402905,
2117181723
] | Among many factors that influence an excavator’s performance and productivity, the volume of the bucket load and duration of the excavator working cycle are crucial. In this paper, both factors were investigated, including the granulometric composition of the excavated material. The volume of material in the bucket was... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Influence of Crushed Rock Properties on the Productivity of a Hydraulic Excavator |
2,319,726,653 | 2000-11-01 | 29,865,586 | [] | [] | Abstract Plane failure in rock and soil slopes is usually caused by the intersection of a discontinuity plane with a slope face. Typically, discontinuities are weaker than the surrounding intact material and provide a surface along which movement can occur. When designing a stable slope, it is often desirable to find t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The effects of water on planar features in compound slopes |
2,377,969,978 | 2012-01-01 | 2,764,468,170 | [] | [] | In this study, we summarized the current status of iron-ore resources in China, and proposed the factors which influence screening object iron geological data based on the iron ore deposit types, mineralization areas (belts) and occurrence characteristics. The results indicate that deposit types of iron deposits in Chi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Current Status of Iron-Ore Resources in China and Screening of Object Iron-Ore Geological Data |
4,025,723 | 2003-01-01 | null | [] | [] | Caving is a mass mining method that is normally applied to large, low grade orebodies because of its low production cost and high capacity. However, equipment breakdown and poor draw management can cause mining costs to exceed that of all other mining methods. One way to minimize the effect of disruptions in the mining... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The use of mixed integer linear programming for long-term scheduling in block caving mines |
2,299,532,521 | 2005-03-15 | 4,306,463,973 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cutoff grade optimization algorithm for open pit mining operations with consideration of dynamic metal price and cost escalation during mine life |
2,769,784,901 | 2017-01-01 | null | [] | [] | Among the underground mining methods available, caving methods are favoured because of their low cost and high production rates. Block caving operations offer a much smaller environmental footprint compared to equivalent open pit operations due to the much smaller volume of waste to be moved and handled. In general, dr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Draw rate optimisation in block cave production scheduling using mathematical programming |
2,556,899,534 | 2015-01-01 | null | [] | [] | The availability and the utilisation of drill rigs have great impact on the output of a mine. These can be optimised by reducing the downtimes and operational delays to ensure high availability and utilisation, and consequently higher productivities. In this paper, the causes of the numerous rig breakdowns at Kanjole M... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | IMPACT OF AVAILABILITY AND UTILISATION OF DRILL RIGS ON PRODUCTION AT KANJOLE MINERALS LIMITED |
2,041,345,778 | 2013-04-01 | 169,988,927 | [
2049606892,
4230588984,
2111398557
] | [
4301347335,
2568283272,
2117995657,
1978025491,
2178011284,
2406470551,
2069069851,
2313563931,
2111398557,
2107604515,
1996706214,
1992890747,
2506768821,
4230588984,
2912565176,
1572480955,
2156577211,
4292158025,
1995565517,
2099867994,
2120688485,
4211007335,
42389199... | The scrap charge optimization problem in the brass casting process is a critical management concern that aims to reduce the charge while preventing specification violations. Uncertainties in scrap material compositions often cause violations in product standards. In this study, we have discussed the aleatory and episte... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strong guidance on mitigating the effects of uncertainties in the brass casting blending problem: a hybrid optimization approach |
2,484,058,126 | 2003-01-01 | null | [
2169528473,
2126895748
] | [
2126895748,
2090359754,
2128208761,
2169528473,
1551276924
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | More about Shortest Paths |
2,027,246,765 | 2014-09-01 | 114,739,668 | [
1985080107,
2160763688
] | [
2053920929,
2020999234,
1972121892,
2068546981,
2126895748,
2160763688,
1985080107,
1496852045,
1534941005,
2126258480,
1979015826,
2130796978,
2169528473,
2151675709
] | Continuous surface mining projects are dynamic and quite complex. They are characterized by geological and spatial variability and several stochastic parameters that affect initial planning and final design. In strategic mine planning and operations management of such projects, the location of the distribution point of... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The optimal location of the distribution point of the belt conveyor system in continuous surface mining operations |
2,781,868,809 | 2017-12-01 | 4,210,194,876 | [
1972121892,
2130796978,
1534941005,
2151675709,
2068546981
] | [
2060929952,
2053920929,
2025878787,
1972121892,
2068546981,
2126895748,
2145493798,
1551276924,
3217061993,
2123696861,
2049606892,
1534941005,
2048769967,
2043345585,
2130796978,
1969483356,
2151675709
] | Abstract A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines. An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain. Then, p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open pit waste removal optimization through equipment fleet scheduling |
385,735,385 | 2011-12-12 | 4,363,604,869 | [] | [
1972121892,
2132693445,
2126895748,
2140764876,
1534941005,
2001598892,
2169927262
] | In minerals supply chains, medium term plans over time horizons from two weeks to two years are used not only to maximise throughput and identify bottlenecks, but also for scheduling crews, production and maintenance. These plans need to observe constraints like maintenance and production requirements, fleet capacities... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Medium-term rail planning at Rio Tinto Iron Ore |
2,738,188,055 | 2017-01-01 | 4,210,193,929 | [
2053920929
] | [
2053920929,
2798344481,
4297744580,
2059057465,
2114173607,
4253262538,
2080905805,
1968490935,
2035236920,
2088304441
] | In this paper, the performance of a waste rock transportation process in an open pit mine was assessed by using cycle time data. A computerized truck-excavator dispatch system was used to record the cycle times. The process was broken into seven steps (or components of the total cycle), durations of which were recorded... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of Waste-Rock Transportation Process Performance in an Open-Pit Mine Based on Statistical Analysis of Cycle Times Data |
2,522,903,275 | 2016-11-01 | 2,764,755,457 | [
2160763688
] | [
2053920929,
2126895748,
2068546981,
1972121892,
2160763688,
1985080107,
1496852045,
1534941005,
2126258480,
2043345585,
2130796978,
1979015826,
2128208761,
2169528473,
3138949179,
1551276924,
2151675709
] | Abstract Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining. This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming (MILP) optimization framework. The MILP formulation maximizes the Net Pre... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strategic mining options optimization: Open pit mining, underground mining or both |
3,156,516,052 | 2010-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A decision support tool for equipment replacement in forestry harvesting operations |
4,388,424,868 | 2023-11-06 | 4,210,203,134 | [
1595159159
] | [
2094566145,
2020320008,
1647779468,
2063375245,
1999284878,
2185734033,
2144317842,
2024742034,
1979015826,
1973656473,
2154929945,
2157098139,
2060929952,
2053920929,
2158708642,
1972121892,
2116661285,
2072955302,
2068546981,
2160763688,
1918344999,
1484474409,
19850801... | Abstract In operations that use the sublevel stoping mining method, production scheduling takes into account factors, including ore reserve envelopes, ore grade averages, equipment capacity, feed controls to the mill, and geotechnical restrictions, across the scheduling horizon. Mathematical programming is one of the m... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Environmental, Social, and Governance Considerations in Production Scheduling Optimisation for Sublevel Stoping Mining Operations: a Review of Relevant Works and Future Directions |
1,828,747,613 | 2015-08-25 | 2,737,336,974 | [
2105934661,
2043345585
] | [
2094566145,
3145128584,
2179860363,
2046372107,
1988520084,
2171646358,
2157098139,
2140481308,
2098981021,
2009104157,
2060929952,
1988729251,
2103720101,
2122203560,
1985080107,
2043345585,
1507209783,
2112440119,
2105934661,
1995565517,
4210300258,
2024060531,
27528854... | This contribution presents an innovative and integrated framework for real-time-process reconciliation and optimization (RTRO) in large continuous open pit coal mines. RTRO-Coal is currently developed, validated, tested and implemented as part of a multi-national multi-partner European Union funded R&D project. The key... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | RTRO–Coal: Real-Time Resource-Reconciliation and Optimization for Exploitation of Coal Deposits |
3,175,421,411 | 2021-03-01 | 206,834,481 | [
1551276924,
2060929952,
2043345585,
1972121892,
1534941005
] | [
2060929952,
1972121892,
2126895748,
3217061993,
1985080107,
1534941005,
2043345585,
1551276924
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of Open Pit Gold Mine Design Capacity Using Lag Modeling Approach |
2,378,280,775 | 2006-01-01 | 2,764,651,309 | [] | [] | Fengshang International Apartment is the first case of advanced apartment buildings in China that largely adopts healthy building technology of high comfort and low energy consumption in design and construction.Low temperature ceiling heating system and fresh air replacement system were developed for this project.And t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | STRUCTURE AND CONSTRUCTION OF HEALTHY BUILDING OF HIGH COMFORT AND LOW ENERGY CONSUMPTION |
2,506,008,531 | 2016-01-01 | 45,645,249 | [] | [] | Abstract This paper substantiates application of pit conveyors at the stages of pit rework and underground mining beyond-edge reserves. Heavy pit lift transport is not efficient under conditions of the low enterprise output capacity. Thus, variants of further increasing its efficiency shall be stipulated. The paper con... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Increasing the Work Scope of Conveyor Transport at Mining Companies |
3,165,381,728 | 2021-10-01 | 194,185,345 | [
1969483356,
1918344999,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
2150071071,
2060929952,
2033916191,
1972121892,
1918344999,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2031545009,
2130796978,
2020999234,
1496852045,
1995565517,
1534941005,
2159875930,
1969483356,
20185776... | Industrial mining complexes can be optimized using simultaneous stochastic optimization (SSO), which manages the risks associated with meeting production targets while capitalizing on the synergies that exist between the various components of the related mineral value chain. This paper introduces an extension of past S... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simultaneous production scheduling and transportation optimization from mines to port under uncertain material supply |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.