paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
3,166,206,299 | 2021-01-01 | 4,306,463,937 | [
2109101401,
2105002757
] | [
2128990851,
2105002757,
2086623749,
2076958472,
2080007420,
2096305430,
2128970394,
2113348250,
2049287714,
2148673189,
2111174053,
2149929637,
2067462952,
2160763688,
2088304441,
2017932090,
2045599420,
1424654272,
2161455936,
2471190594,
1977319619,
2006389447,
19810975... | Coordinating the mobile production fleet in underground mines becomes increasingly important as the machines are more and more automated. We present a scheduling approach that applies to several of the most important production methods used in underground mines. Our algorithm combines constraint programming with a larg... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Short-Term Scheduling of Production Fleets in Underground Mines Using CP-Based LNS |
3,037,706,572 | 2020-09-01 | 4,210,178,226 | [] | [
1969397762,
2005144066,
1581030558,
2011092516,
2142822317,
1574235309,
2162106818,
1990513740,
2121995980,
2119356110,
1791587663,
2100379340,
2099697766,
2008441192,
2091248362,
2066823663,
1994494838,
1527165181,
2108752510
] | Abstract Small and medium-sized mining represent an important part of a country's min eral economy. These companies, although substantial and numerous, have low invest ment potential in their development through new technologies. One of the problems small and medium mining companies face is the ore hauling production m... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a low-cost alternative for the monitoring of the ore hauling production indicators in small-scale mining |
2,010,685,830 | 2003-08-01 | 181,849,944 | [] | [] | One of the most important aspects of mine design is to determine the optimum cut-off grades. Material grading above and below the cut-off is directed to different destinations. Optimization of cut-off grade is now an accepted principle for open pit planning studies. The most commonly criteria used in cut-off grade opti... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using equivalent grade factors to find the optimum cut-off grades of multiple metal deposits |
3,027,991,830 | 2020-01-01 | 4,210,170,318 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of economic and mathematical modeling of industrial enterprise functioning at multicollinearity based on parameterization |
4,360,993,875 | 2023-01-01 | 4,210,169,156 | [] | [
2151675709,
3011865677,
1970537494
] | This work focused on solving the Dump Truck problem, which is a discrete-event simulation, by finding the average loader and scale utilizations. This was accomplished by using the MATLAB Simulink. The output of the simulation clearly shows how a real-world Dump-Truck system will perform over time and better utilize its... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling and Simulation of the Dump-Truck Problem Using MATLAB Simulink |
3,151,807,185 | 2010-12-01 | 4,363,608,948 | [] | [] | This paper describes the benefits of integrating optimization formulations within simulation models. Two different case studies in mining are presented, both requiring a blending optimization. The primary problem at hand is to model a complex supply chain involving blending of multiple inputs to produce a number of pot... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrating optimization and simulation - A comparison of two case studies in mine planning |
2,023,762,072 | 2013-10-01 | 128,754,310 | [] | [] | In order to improve the efficiency of metrological ordinary work in water pollution source online monitor instrument and reduce the measurement personnel's labor intensity. 3G technology has been used to connect test instrument with the client's network through the study of the STM32 type microprocessor and analog-to-d... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Remote Metrology of Water Pollution Source Online Monitor Based on 3G Technology |
4,231,954,622 | 2008-12-01 | 4,363,608,392 | [] | [] | One of the most important challenges for mining engineers is to correctly analyze and generate short-term planning schedules, or simply month mining plan. The objective is to demonstrate how simulation and optimization models were combined, with simultaneous execution, in order to achieve a feasible, reliable and accur... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Concurrent simulation and optimization models for mining planning |
2,475,312,802 | 2001-01-01 | null | [] | [] | The limestone quarry is the major source of raw materials for the cement manufacturing operation. Cement production involves the processing of raw materials—SiO2, Al2O3, Fe2O 3, CaO, MgO, LOI, SO3, K2O, Na2O, TiO 2, P2O5, and Cl—to produce the synthetic mineral mixture called “clinker”. The use of additional additives—... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of optimum blend/minimum cost scheduling algorithm for cement quarry operations |
4,311,598,779 | 2022-12-15 | 4,306,402,450 | [
2000715618
] | [
2094566145,
2019291268,
1976744965,
2126895748,
1647779468,
2143426320,
2185734033,
1979015826,
2543580944,
2154929945,
2012079387,
2060929952,
1999029409,
1979575715,
1972121892,
2071602085,
2072955302,
1918344999,
2160763688,
2068546981,
2046010791,
1985080107,
20589984... | Abstract As an important link in the complex system engineering project of open-pit mining, the quality of boundary determine the performance of the project to a large extent. However, the traditional design method cannot effectively measure the impact of uncertainties on the realm optimisation process. In this article... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of coal price prediction method based on ISSA-LSSVR method in state optimization design of inclined seam open-pit mine |
2,901,920,582 | 2018-01-01 | 4,210,190,841 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Compensation of Voltage Loss in the Power Line |
3,047,504,650 | 2020-08-04 | 43,510,877 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using an Arduino in physics teaching: LDR as a simple light sensor |
2,786,490,613 | 2017-12-01 | 4,306,418,876 | [] | [
2050067494,
2160763688,
2274815048,
2126311658,
3217061993,
1534941005,
2146612430,
2126258480,
2043345585,
1979015826,
2130796978,
2077791698,
2124629174,
2122244604
] | Cut-off grade is one of the decision variables that must be determined correctly by the open pit mining company in order to generate the maximum total profit. This study develops a cut-off grade determination model by using analytical solution approach by considering cost and revenue components such as mining cost, was... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A cut-off grade optimization model in the open pit mining considering reclamation and valuable waste materials |
156,934,406 | 2017-12-13 | 4,210,183,950 | [] | [] | - | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Contaminación de los alimentos durante los procesos de origen y almacenamiento |
2,188,381,225 | 2015-01-01 | null | [] | [
2106639360,
2039546784,
1484474409,
3125364203,
3122287281,
2154820854,
2131461943
] | This paper analyzes the presence of economies of scale in gold mining in Africa. It uses mine level data between 2005 and 2010 and the data is collected from countries that account for 83% of the continent’s gold production. Our analysis shows that the gold mining industry in Africa exhibits significant economies of sc... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Economies of Scale in Gold Mining |
4,224,234,925 | 2022-03-31 | 110,258,470 | [] | [] | Fragmentation analysis is an essential part of the optimization process in any mining operation. The costs of loading, hauling, and crushing the rock are strongly influenced by the size distribution of the blasted rock. Several direct and indirect methods are used to analyse or predict fragmentation, but none is entire... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Predicting rock fragmentation based on drill monitoring: A case study from Malmberget mine, Sweden |
3,022,271,253 | 2003-01-01 | 4,306,463,230 | [
2169528473,
2126895748
] | [
2126895748,
2090359754,
2128208761,
2169528473,
1551276924
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Travelling Salesperson |
1,880,724,550 | 2001-02-01 | 17,930,613 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | APPLICATION OF ECONOMIC PARAMETERS AND CUT-OFFS DURING AND AFTER PIT OPTIMIZATION |
4,312,133,711 | 2022-12-09 | 197,975,706 | [] | [] | Wydawnictwo SIGMA-NOT wydaje czasopisma fachowe informujące swoich czytelników o najnowszych osiągnięciach naukowych i nowoczesnych rozwiązaniach technicznych w Polsce i na świecie, popularyzuje problemy techniczne oraz poszerza wiedzę i kulturę techniczną. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Electric Vehicles in Mining for the Aspect of Operational Safety |
2,411,425,559 | 2016-01-22 | 48,643,595 | [
2151675709
] | [
3217061993,
1551276924,
2151675709
] | This paper presents an approach for handling correlated input variables in discrete event simulation (DES) modelling of truck–shovel systems using commercial DES software and uses a case study to investigate the effect of ignoring correlation between input variables. Multivariate random vectors, instead of independent ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Effect of ignoring input correlation on truck–shovel simulation |
4,220,919,125 | 2022-08-01 | 194,185,345 | [
2100769519,
1972121892,
2126895748
] | [
2060929952,
2126895748,
1972121892,
1493454437,
2068546981,
2160763688,
2046010791,
2090359754,
1496852045,
1534941005,
2100769519,
2043345585,
1979015826,
2130796978,
2128208761,
2065332058,
3138949179,
1551276924
] | Generally, shallow deposits are mined through open-pit mining and where the deposits are extended to a substantial depth, there is a potential for a combination of open-pit and underground mining methods. In this case, mine planning and optimisation play a significant role in the decision-making. This paper proposes a ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Timing of transition from open-pit to underground mining: A simultaneous optimisation model for open-pit and underground mine production schedules |
2,945,196,999 | 2019-10-09 | 179,157,397 | [] | [
2094566145,
2126895748,
2153985161,
2091991433,
2037528844,
2086656914,
2140899224,
2084894745,
2004698524,
1970130975,
1972121892,
2068546981,
1982833447,
2160763688,
2046010791,
2130796978,
2506768821,
1934469433,
2078936766,
2032152396,
1534941005,
1511506129,
19873479... | The BP neural network algorithm is used to construct a stable slope angle prediction model for open-pit mines, which can successfully predict the ultimate slope angle of the mine. At the same time, ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The influence factors of the stability of tailings dam based on multi-source information fusion method |
2,212,462,978 | 2002-05-24 | 4,210,181,015 | [] | [] | The aim of Monte Carlo simulation is to provide the probability distribution of possible outcomes. The simulation can be used as a computational method for mineral project evaluation, The input for the analysis consists of a distribution of values for each uncertain variable in discounted cash flow analysis. Thus the p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic analysis as a risk-assessment technique in mineral projects evaluation |
2,803,411,367 | 2018-05-27 | 58,516,463 | [] | [] | In multi-element deposits, the quality of mining production is impressed by multiple inter-correlated elements and there is an essential task of blending the run-of-mine materials in such a way that the resulting mix meets the required specifications. Generally, blending plans are established based on one destination f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimizing mine production scheduling for multiple destinations of ore blocks |
2,020,095,696 | 2011-02-01 | 75,411,654 | [] | [] | Using GIS(Geographic Information System), GPS(Global Positioning System), and GPRS(General Packet Radio Service), an digital mining control management system in an open pit has been designed and developed. A linear programming model is set up in a practical application. By the model, the system can automatically draw u... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digital Mining Control Management System in an Open Pit Based on GIS/GPS/GPRS |
3,083,197,368 | 2020-01-01 | 2,764,734,164 | [] | [
2119866123,
2154636565,
2153292828,
2135178654,
4241079583,
2160763688,
2130055347,
2001965107,
2140170679,
2108326722,
2130358341,
2014366918,
1994959046,
10127431,
2124708943,
2132755931,
2169239645,
4292363360,
1966322913,
2151903076,
1504052325,
2068060907,
2137983211... | The authors express gratitude to employees of energy service of Kryvorizkyi Zalizorudnyi Kombinat PJSC for their engineering support while carrying out the experiments under the conditions of the Integrated Works mines and to the authorities of Kryvorizelectromontazh Ltd as the leading enterprise engaged in the design,... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Certain aspects concerning the development of a functioning scheme of the auto-mated system to control energy flows of underground iron-ore enterprises |
2,053,946,198 | 2009-03-01 | 206,834,481 | [] | [
2126895748,
3145128584,
1995565517,
2752885492,
1988520084,
1551276924
] | This paper adopts risk-based concepts developed in open pit mining to the underground stoping environment and shows examples using data from Kidd Creek Mine, Ontario, Canada. Risk is quantified in terms of the uncertainty a conventional stope design has in expected: contained ore tones, grade and economic potential. In... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stope design and geological uncertainty: Quantification of risk in conventional designs and a probabilistic alternative |
2,884,885,037 | 2018-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of optimized models through direct block scheduling in traditional mine planning |
2,353,015,391 | 2003-01-01 | 4,306,542,080 | [] | [] | The evaluation system for coal resources was established and a related software was programmed based on some former achievements and actual situation of the research area. And the evaluating calculation and data processing were also conducted. The result indicates that in the research area, the resource condition of th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comprehensive Evaluation of Coal Resource of Two Coal Mines in Jining |
2,548,195,531 | 2015-01-01 | 2,764,472,783 | [] | [] | Analyzing the slope stability of work levels, final slopes and slope system was carried out in the area of the open pit 'Gacko' according to the criteria required by the law of the Republic Srpska. This paper presents a comparative analysis of slope stability with three numerical methods by Bishop, Yanbu and Morgenster... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis and relationship of safety coefficient (Fs) and critical factor of influence the stress reduction (SRF) in the case of external waste dump of the east waste dump - profile III-III open pit 'Gacko' Gacko |
4,212,808,739 | 2022-01-01 | 4,306,463,937 | [
2160763688,
2018083109,
2151675709
] | [
4250955649,
2069479298,
2094566145,
2126895748,
2060475014,
2063978378,
2045186954,
2185734033,
159873042,
1979015826,
2090972948,
2083442964,
1563088657,
2169528473,
2113348250,
2166742043,
2496717212,
1570089119,
2053920929,
1988050849,
1972121892,
2018083109,
206854698... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Advanced Analytics for Mine Materials Handling |
2,911,165,846 | 2019-01-18 | 2,475,542,964 | [
2032331699,
2000715618,
2094566145
] | [
2094566145,
2126895748,
2154929945,
1972121892,
2068546981,
2160763688,
2043345585,
2130796978,
2032331699,
2140170679,
2070143291,
2024276542,
1534941005,
1999565652,
2000715618,
1968098666,
2100769519,
2024060531,
2108536179,
1978772984,
2128208761
] | Problem statement: Increasing efficiency and performance of bench drilling in open-pit mines has the potential to generate considerable savings. This increase can be realized by monitoring the drilling operation, analyzing monitoring data with statistical tools and optimizing operational variables. Finding the best con... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cost optimization of drilling operations in open-pit mines through parameter tuning |
2,598,646,164 | 2017-03-01 | 2,738,573,275 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Estimation of efficiency of develop-ment of copper and gold deposits of Krasnoyarsk North |
2,156,245,093 | 2010-06-01 | 1,254,427 | [
1972121892,
1534941005,
2126895748
] | [
2126895748,
636993861,
1972121892,
3217061993,
2090359754,
1534941005,
2043345585,
2128208761,
2103002522,
1551276924
] | A limestone quarry is the major source for supplying raw materials for cement manufacturing operations. Depending upon the available reserves, a quarry is divided into thousands of mineable blocks. Hence, raw materials inventory is identified in terms of a block model projecting the quantity and quality of critical che... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS |
2,885,162,717 | 2013-05-28 | 4,210,181,965 | [] | [] | The actuality of the problem is connected with the need to implement the innovative methods of information supervision for all geological activity areas. As a result of author's developments in this research area the methodology for digital structural-lythological modelling of placers mineral, modified for the titanium... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | DIGITAL STRUCTURAL-LYTHOLOGICAL MODELS FOR ZLOBYCHY AND MOTRONA-ANNYVSKE PLACER TITANIUM-ZIRCONIUM DEPOSITS |
4,205,821,020 | 2022-01-13 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Method to Support Circular Economy of aggregates (Sand / Gravel) |
3,136,419,909 | 2020-12-01 | 14,913,209 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determining the Minimum Number of Technological Bases in Machining |
2,291,327,651 | 2015-11-19 | 4,210,234,084 | [] | [] | Continuing his new series of articles on character education, expert Matt Bawden discusses a method by which teachers might develop effective character-based resources for their subjects | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Caterpillar Process |
2,990,126,532 | 2019-11-30 | 4,210,224,691 | [
2160763688
] | [
2053920929,
2126895748,
2068546981,
1972121892,
2046010791,
2160763688,
4206027559,
1496852045,
1534941005,
2126258480,
2130796978,
1979015826,
2169528473,
2151675709
] | Presented is an automated short-term scheduling for underground mines which is an important part of the overall mining process. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Developing a Tool for Automatic Mine Scheduling |
2,589,657,100 | 2006-03-01 | 110,258,470 | [
1639032689
] | [
1639032689,
2136885855
] | The efficiency of an ore-processing unit depends on the consistency of the characteristics of raw material entering the plant. When the mined ore is highly variable in quality, the only way to ensure consistency is to homogenize the ore prior to feeding to the processing plant. The homogenization can generally be achie... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Bed blending design incorporating multiple regression modelling and genetic algorithms |
3,109,125,093 | 2007-01-01 | 2,764,812,335 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of Optimal Haulage Routes for Dump Trucks in Large Open Pit Mines |
4,285,058,341 | 2022-01-01 | 4,210,172,589 | [] | [
1972121892,
2126895748,
2046010791,
2160763688,
1534941005,
2003759470,
1979015826,
2130796978,
2103002522,
1992710140
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Long Term Production Scheduling Optimization in Sublevel Caving Mining Method |
2,585,882,245 | 2017-01-30 | 72,171,858 | [] | [
2060929952,
2059757952,
1972121892,
2126311658,
2146612430,
2126258480,
2077791698,
2165201397
] | AbstractRecent studies have demonstrated the utilisation of stochastic simulation to quantify uncertainty in mineral deposits and allowing better management of the geological risk during mining scheduling. This paper describes an approach to evaluate the suitability of stochastically simulated models to characterise th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation-based risk quantification: a reconciliation-based performance analysis |
2,442,958,018 | 2016-12-01 | 103,321,696 | [
1969483356,
2140170679,
2151675709,
2094566145
] | [
2094566145,
2126895748,
1979015826,
2010334716,
2053920929,
1972121892,
2068546981,
2160763688,
1985080107,
2043345585,
2130796978,
2140170679,
2136625467,
2151675709,
1496852045,
1534941005,
1969483356,
2123696861,
2108536179,
1551276924
] | A new short-term mine production scheduling formulation is developed herein based on stochastic integer programming. Unlike past approaches, the formulation simultaneously optimizes fleet and mining considerations, production extraction sequence and production constraints, while accounting for uncertainty in both orebo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions |
2,907,827,191 | 2018-11-01 | 4,306,425,313 | [] | [
4245152641,
1978775682,
2094566145,
2126895748,
4301347335,
2568283272,
2615190415,
4300580367,
2033816465,
1979015826,
2406470551,
3121403162,
2123343520,
3209416867,
1972121892,
2068546981,
2046010791,
2126258480,
2130796978,
2025610165,
2140170679,
3125649736,
20821495... | The modeling of an entire mining deposit is the interpretation of a whole series of data captured in a simulation. This process is executed as part of project planning and is critical before the mining phase begins. Nowadays, modeling is restricted for different mining companies because obtaining data sometimes require... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Viability Analysis Method Based on the Mineral Prices for the Exploitation of Peruvian Mineral Resources |
4,206,641,747 | 2022-01-04 | 4,210,185,304 | [] | [
2094566145,
2033609349,
883434633,
2149706766,
4236127247,
2068852367,
1999284878,
3149164053,
2143775898,
2526202524,
2147405597,
4213147678,
4241079583,
2060929952,
2962804513,
2290883490,
3122087971,
1972121892,
2169969573,
2068546981,
1918344999,
2085407655,
204601079... | Recently, Intelligent Backtracking can be defined as a method used in constrained programming to minimize search results in the resolution of combinatorial problems. The technology utilizes information from limited collections of infeasible restrictions in one search area to discourage searching in other related areas.... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | RETRACTED ARTICLE: Constraint Programming with Intelligent Backtracking using Artificial Intelligence |
2,786,299,835 | 2018-01-23 | null | [] | [] | We apply genetic algorithms (GAs) to evolve cyclic finite automata for scheduling the dispatch of trucks in mines. The GA performs well generally, and on problems which include one-lane roads, the GA was able to find solutions that utilised shovels very well, with low contention and using fewer trucks than both the wid... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Genetic Algorithm for Truck Dispatching in Mining |
3,208,076,453 | 2021-01-01 | 4,210,186,093 | [] | [] | The field of study of autonomous trucks especially in open pit mines has been the subject of considerable research over the past three decades. In the last ten years in particular, interest in this area has improved considerably. The implementation of autonomous systems is an integral organizational and cultural change... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Infrastructural requirements for the implementation of autonomous trucks in open-pit mines |
2,277,393,363 | 2000-01-01 | null | [
3217061993
] | [
3217061993
] | east Azarbaigan province of Iran. The total geological ore deposit is estimated to be 740 million tons. In this study using all information from exploration and geotechnical studies of the area, final pit limits of Sungun copper deposit is designed by the 2-D Lerchs & Grossmann Algorithm. By this method, from 740 milli... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | USING 2D LERCHS AND GROSSMANN ALGORITHM TO DESIGN FINAL PIT LIMITS OF SUNGUN COPPER DEPOSIT OF IRAN |
2,216,308,381 | 2015-10-01 | 4,306,421,137 | [] | [
2126620870,
2161768424,
2507034709,
2129104824,
2116444921
] | In this paper the common rectifier, connected to the diesel-generator used in the drivetrain of large off-road vehicles, is omitted in favour of an inverter with field-oriented control. The generator in casu is a salient-pole wound-rotor synchronous machine. The FOC allows fast and accurate control of the power deliver... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Series-Hybrid Drivetrain with FOC Salient-Pole Synchronous Generator and Supercapacitor Storage for Large Off-Road Vehicle |
2,590,381,181 | 2010-02-16 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Test of an Innovative Stochastic Design System on an Open Pit |
2,057,113,081 | 2005-12-01 | 46,124,462 | [] | [] | In this paper, the philosophy, methodology, objectives, mining process logic, program structure and its state-of-the-art for our recently developed mine simulation model (a decision-making tool for mine design and production) are discussed. This simulation model is a detailed 3D model that can be used for many differen... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A 3D mine simulation model for decision-making in mine design and production |
2,895,083,987 | 2018-10-04 | 4,210,179,954 | [
2165835468
] | [
2165232124,
2011430131,
2165835468,
2153233077
] | This paper is concerned with the driving cycle construction for the electric drive mining truck based on travelling analysis method. Firstly, the complete operation data of the dump truck is collected, which is based on the continuous transportation test on an open pit road. Secondly, according to the travelling analys... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research of Driving Cycle Construction for Electric Drive Mining Truck Based on Travelling Analysis Method |
4,311,387,325 | 2022-11-25 | 4,210,198,073 | [] | [
2101939392,
2005129162,
2086497677,
1437849903,
1512711506,
2088764339,
2021865972,
2033090463,
2096305430,
2033002423,
4241286296,
2151675709,
2116855422,
4297688511
] | This study aims: To determine the direction and strength of the effect of preventive maintenance on the performance of K3 transportation at Mining Service Company PT. To determine the direction and strength of the influence of traffic management on the performance of K3 transportation at the PT. To determine the direct... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THE EFFECT OF PREVENTIVE MAINTENANCE, TRAFFIC MANAGEMENT, TECHNOLOGY AND COMMUNICATION SUPPORT AND OPERATOR CARE ON OSH PERFORMANCE TRANSPORTATION OF TRUCK UNITS IN THE MINING SERVICE COMPANY PT. XYZ |
2,809,292,375 | 2018-06-20 | null | [] | [
2273297058
] | In this paper we compare these three methods for testing accuracy of height using a variety of geodetic devices. Each method and device used allows for some precision results. This article examines the extent to which the accuracy of measurements is obtained theoretically, by choosing different measurement methods and ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | TESTING ACCURACY OF HEIGHT USING A VARIETY OF GEODETIC DEVICES |
2,612,930,051 | 2004-09-27 | 4,306,402,512 | [] | [] | Hazardous material (hazmat) transportation trucks represent far more danger than any other truck in the event of an accident. In addition to normal consequences, the potentially harmful properties of the substance being carried represents a major risk. It is therefore important to know when such vehicles travel near ke... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technological risks management: automatic detection and identification of hazardous material transportation trucks |
3,215,011,369 | 2021-09-17 | 110,258,470 | [] | [] | One of the most challenging aspects in semi-mobile in-pit crushing and conveying (SMIPCC) system design is determining the optimum depth at which to change from a purely truck-based haulage system to a conveyor-based haulage system. We used scenario analysis to determine the optimum transition depth between a truck and... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of the optimal transition point between a truck and shovel system and a semi-mobile in-pit crushing and conveying system |
1,542,451,532 | 2014-07-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Current trends in the development of new or optimization of existing diamond processing plants, with focus on beneficiation |
4,384,662,182 | 2023-07-18 | 4,210,229,995 | [
2794083519
] | [
1608019363,
2097854981,
2071636135,
1989159851,
2032411249,
2170480532,
2162643797,
2007260247,
2131343962,
2604273659,
1976240542,
2794083519
] | At the present stage, most oil and gas condensate fields in the southern part of the East Siberian oil and gas province are characterized by an increasing proportion of difficult oil reserves in tight reservoirs. Multistage hydraulic fracturing (MHF) is proposed for the offshore Challenger Sea field (Southeast Dome). T... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Estimation of multistage hydraulic fracturing parameters using 4D simulation |
2,470,330,964 | 2016-05-31 | 2,764,551,302 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evaluation of transportation flow charts with open-pit hoisting systems in open pit/underground mining |
1,971,250,610 | 2013-04-01 | 45,356,120 | [] | [] | Homogenization piles are largely used in the mining industry for variability reduction in the head grades of the ore feeding the processing plants. Various methods are used when designing homogenization piles, and most fail to incorporate the in situ grade variability that is intrinsic to the mineral deposit. The metho... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An algorithm to simulate ore grade variability in blending and homogenization piles |
2,367,549,519 | 2014-01-01 | 2,764,922,013 | [] | [] | In view of the complexity of the production process,large mining equipment system and harsh work environment in fully-mechanized coal mining face in China,this paper proposed the intelligent mining model based on fully investigation and research on the intelligent level in fully-mechanized coal mining face at present,a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of intelligent technology and equipment in fully-mechanized coal mining face |
4,385,320,018 | 2023-07-28 | 4,210,181,610 | [
1985080107
] | [
2094566145,
2000715618,
2020999234,
2967769829,
2046010791,
2160763688,
1985080107,
1969287756,
2185734033,
1969483356,
2032100925
] | Purpose The purpose of this study is to develop a novel general mathematical model to find the optimal product mix of commercial graphite products, which has a complex production process with alternative sub-processes in the graphite mining production process. Design/methodology/approach The network optimization was ad... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Network optimization for optimal product mix decisions in a graphite mining production process |
2,165,909,629 | 2009-01-30 | 2,764,600,758 | [] | [
2615190415
] | In 1977, Taylor proposed a constant elasticity model relating capacity choice in mines to reserves. A test of this model using a very large (n = 1,195) dataset confirms its validity but obtains significantly different estimated values for the model coefficients. Capacity is somewhat inelastic with respect to reserves, ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Test and Re-Estimation of Taylor’s Empirical Capacity–Reserve Relationship |
2,073,873,193 | 2014-01-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Appraisal and exploitation of mining and dressing waste at dredge sites |
2,482,260,390 | 2015-06-09 | 4,210,221,869 | [] | [] | Author Summary: The use of pre-crusher stockpiles to store ore and buffer short-term fluctuations in production processes is generally well recognised and accepted. However, the potential to reduce short-term grade variation of ore entering the crusher is rarely recognised and generally poorly understood. Pre-crusher s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Pre-crusher stockpile modelling to minimise grade variability |
2,461,268,582 | 2016-06-20 | 4,210,180,762 | [] | [] | ABSTRACTMaximising ore tonnage at a selected target grade requires that appropriate ore identification criteria be established. Iron ore mining block models may consist of many millions of estimated blocks, each block corresponding to the smallest mining unit, with grade interpolated from drill-hole data. Each block ca... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Block model data reduction and sensitivity analysis |
2,003,862,218 | 2013-05-01 | 4,306,417,895 | [
2140170679
] | [
2130796978,
2010334716,
2140170679
] | For transportation Networks that can be staging, we suggest a combination optimization model of multiple transportation modes. By constructing a virtual transportation networks, the original problem is converted to a specific shortest path problem. First optimize the network, and then this paper gives the application o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The application of genetic algorithm on combination optimization model of multiple transportation model |
3,023,174,517 | 2002-01-01 | 4,306,463,230 | [
2158822657,
1518997214,
2101121254,
1493472778,
1625797753,
1774151066,
1986280275
] | [
2158822657,
1971440513,
1493472778,
2601578636,
1974718993,
2146536851,
2337454357,
2160152341,
1774151066,
2332951586,
2140937253,
2036891077,
2312388685,
2133671888,
1986280275,
2001619934,
1518997214,
38523360,
2158245987,
2188846692,
1988744163,
2101121254,
4233562854... | This chapter introduces the gist of the complete book as well as the particular topic discussed in each chapter. All living cells contain proteins that carry out specialized functions within various subcellular membrane or aqueous spaces. Bacterial cells have at least one membrane that separates the inside of the cell ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Introduction/Overview |
1,604,265,422 | 2014-11-01 | 2,764,755,457 | [
2060929952,
2094566145
] | [
2060929952,
2094566145,
2020999234,
1972121892,
2068546981,
2160763688,
1534941005,
2024060531,
2108536179,
2140170679
] | Optimization of long-term mine production scheduling in open pit mines deals with the management of cash flows, typically in the order of hundreds of millions of dollars. Conventional mine scheduling utilizes optimization methods that are not capable of accounting for inherent technical uncertainties such as uncertaint... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic optimization of mine production scheduling with uncertain ore/metal/waste supply |
2,544,675,362 | 2016-10-28 | 51,113,653 | [] | [
2145837764
] | Selection of the optimal material handling system is one of the most significant decisions to be made in mineral industries. Rapid economic changes and technological improvements make cost analysis a complicated process. On the other hand, current low commodity prices have put a greater emphasis on cost reduction and p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cost analysis of material handling systems in open pit mining: Case study on an iron ore prefeasibility study |
2,917,084,507 | 2019-01-01 | 4,306,463,937 | [
1985080107,
2130796978
] | [
2094566145,
2126895748,
2060929952,
1972121892,
1985080107,
2126258480,
2130796978,
2020999234,
3123821384,
2090359754,
1534941005,
2146612430,
2077791698,
1969483356,
2000715618,
2024060531,
2165201397,
2128208761,
1551276924
] | In the planning of any mining operation, the main objective is the maximization of the profits. However, at the moment of performing this task, a series of assumptions are made, which, in some cases, are far from reality, such as the estimation of the sale price and the ore concentrations inside the deposit. In the pre... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Use of Genetic Algorithms for Optimization of Open-Pit Mining Operations with Geological and Market Uncertainty |
2,740,640,925 | 2016-11-01 | 4,306,401,280 | [] | [] | To study stochastic mining technical systems of opencast mines, where parallel to clearly defined values random and indefinite factors operate, probabilistic and statistical techniques are mostly used nowadays. Formally, the task of producing a design solution may, under the conditions of indeterminacy be transformed i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Foundations for technical solutions in organizing excavation of open ore pits |
2,169,394,458 | 2005-01-01 | 2,764,854,370 | [] | [] | This article focuses on many of the issues and problems associated with rough order of magnitude estimating. How do you prepare an estimate when there is very little information on which to base the estimate? While teaching at the University of Chicago, physicist Enrico Fermi had a reputation for asking his students, w... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | So You Think You're an Estimator? |
3,013,934,605 | 2020-03-01 | 4,220,650,861 | [] | [] | Information about the paper titled "ECONOMICS 4.0: A PROPOSAL OF A TRAINING COMPLEMENT FOR THE DEVELOPMENT OF FINAL DEGREE PROJECTS IN INDUSTRIAL ENGINEERING PROGRAMS AT UNIVERSIDAD DE CASTILLA-LA MANCHA IN THE NEW INDUSTRY 4.0 ERA" at IATED Digital Library | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | ECONOMICS 4.0: A PROPOSAL OF A TRAINING COMPLEMENT FOR THE DEVELOPMENT OF FINAL DEGREE PROJECTS IN INDUSTRIAL ENGINEERING PROGRAMS AT UNIVERSIDAD DE CASTILLA-LA MANCHA IN THE NEW INDUSTRY 4.0 ERA |
2,899,054,007 | 2018-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geological mapping and modelling training in the University of the Witwatersrand Mine Tunnel, South Africa |
2,015,029,927 | 2000-01-01 | 46,124,462 | [
3217061993
] | [
3217061993
] | ABSTRACT This paper describes the structure and operation of an interactive Windows software package for determining optimum open pits with variable slope angles. It is based on the Lerchs-Grossmann algorithm and is capable of taking advantage of all available computer memory thus allowing the design of optimum pits fo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Windows program for optimal open pit design with variable slope angles |
2,521,062,015 | 2002-07-01 | 110,258,470 | [] | [] | The DEEPMINE Collaborative Research Programme was established to create the technological and human resources platform that would make it possible to mine gold safely and profitably at depths of 3 to 5 km. The DEEPMINE Programme has four goals: to acquire knowledge of and develop appropriate technology for new ultradee... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The transfer of knowledge produced by the DEEPMINE Research Programme: A critical evaluation |
4,381,950,278 | 2023-11-01 | 114,739,668 | [] | [
2094566145,
2126895748,
2185734033,
1979015826,
2053920929,
2068546981,
1918344999,
2160763688,
2032392871,
2043345585,
2140170679,
2151675709,
1551276924,
1534941005,
2000715618,
2164891879,
2100769519,
2128208761,
2145479420
] | A new conceptual mining method called the near-face stockpile (NFS), which combines the in-pit crushing and conveying IPCC system with a pre-crusher stockpile, has recently been proposed for large open pits with sufficient pit bottom width. In the past, stockpiles mainly act as a "buffer" to improve the stability of th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrated simulation and optimization framework for quantitative analysis of near-face stockpile mining |
2,272,810,793 | 2014-01-01 | 2,765,063,755 | [
2092150674
] | [
2092150674,
2081768791
] | Underground coal mining operations continue to increase production as mining equipment and practices are improved. Unfortunately, increased production also results in the potential for increased Respirable dust generation and worker exposure. In response, operations are applying basic controls at elevated levels and lo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of stresses produced and dust generation during rock cutting by ANSYS software |
2,488,668,402 | 2013-05-13 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Rocks, minerals and mineral inventory evaluation |
2,497,914,227 | 2005-03-15 | 4,306,463,973 | [] | [] | While commercial systems are available for optimizing open cut design and production schedules, no similar system is available for underground mining. The opportunity for improving the economics of selective operations is especially attractive due to the complex interaction between the cut-off grade, mine plan and prod... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The connection between production schedule and cut-off optimization in underground mines |
116,437,848 | 2010-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Payload variance effects on truck bunching |
3,127,946,144 | 2020-12-11 | 4,306,418,784 | [] | [
2004716724
] | The intelligent logistics vehicle is a logistics system product with information, automation and intelligence, which can realize intelligent sorting of goods in the warehouse and automatic transportation in logistics area. In this paper, a sensor circuit of intelligent logistics vehicle based on Arduino is designed, wh... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and Experiment of Sensor Circuit for Intelligent Logistics Vehicle |
4,252,989,873 | 2015-08-20 | 4,210,224,374 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comparative Study of Subgrade Soil Strength Estimation Models Developed Based on CBR, DCP and FWD Test Results |
2,013,050,978 | 2010-05-18 | 4,210,230,633 | [] | [] | It is related to the realization of the benefit of state-owned resources and the long retainable development of thecountry to evaluate the mining property rights to improve the using rate of the mineral resources. Guided by theprinciple of prospective return, a method for evaluating geological potential value was put f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evaluation Method on Geological Deposit Potential Value |
4,362,637,397 | 2023-04-05 | 155,209,994 | [
2071666535,
2162437324,
1987258130
] | [
2152501249,
1969397762,
4213388807,
2169365000,
2169245194,
2600092686,
4236127247,
2746485780,
2139416101,
2076706855,
2024509488,
2126186544,
2039810046,
2036670520,
2114058809,
2038621246,
2126164548,
4246474313,
1496852045,
2065198673,
2065682001,
1748537427,
19694833... | The purpose of the paper is to identify factors associated with operational factor (OF), geo-environmental factor (GEF), and managerial factor (MF) from the literature. After identification, the study intended to assess the impact of geo-environmental factors and managerial factors on operational factors of the mining ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geo-environmental factors’ influence on mining operation: an indirect effect of managerial factors |
2,004,957,992 | 2015-02-18 | 202,628,778 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Critical Investigation of Digging Time Segment of Draglines in a Large Surface Mine |
2,030,252,883 | 2009-07-01 | 127,769,916 | [] | [] | We studied equilibrium and kinetic characteristics of rhenium sorption by Busofit-based fibrous carbon materials (FCMs) treated electrochemically with recovery potentials varying from −900 to +600 mV from aqueous solutions in the presence of natural biopolymer chitosan. Materials obtained in the anodic potential region... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Rhenium sorption by fibrous chitosan-carbon materials |
2,377,808,744 | 2005-01-01 | 2,765,015,236 | [] | [] | The deficiency of traditional method which is used to build truck link travel time model is analyzed. The theory and method of neural network, and the feasibility and superiority of forecasting the travel time are also discussed. The open mining transportation system of great non-liner relation distinguish from highway... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Real-time dynamic forecast of truck link travel time |
33,819,377 | 2009-01-01 | null | [
1551276924,
2160763688,
2043345585,
3217061993,
1979015826,
2130796978,
1534941005,
2068546981,
2126895748
] | [
2053920929,
2126895748,
2068546981,
1972121892,
2160763688,
3217061993,
2090359754,
1534941005,
1496852045,
2126258480,
2043345585,
1979015826,
2130796978,
2128208761,
2169528473,
1551276924,
2151675709
] | For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new algorithm for the open-pit mine scheduling problem |
2,942,217,264 | 2019-03-01 | 2,505,686,813 | [
2787894218,
2011832962
] | [
2101874561,
2011832962,
2087101057,
2168175751,
1975120776,
2109363337,
2135000328,
1964635666,
2147246240,
2135187880,
2038885294,
2014554031,
2137971377,
2106706098,
2109820980,
2069360055,
2112440119,
1977556410,
2047555270,
2787894218,
1534941005,
2166325326,
19671170... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Lithological classification of cement quarry using discriminant algorithms |
2,024,524,254 | 2010-09-01 | 4,210,180,762 | [] | [] | In late 2003 Fortescue Metals Group Ltd commenced exploration for iron ore in the Pilbara region of WA using a new exploration model. This paper describes the steps from exploration discovery in 2004 of the Cloudbreak and Christmas Creek deposits to the rapid establishment of an integrated iron mining, processing and i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Fortescue story – from exploration to the third largest iron ore producer in Australia |
2,325,436,185 | 2013-03-15 | 112,686,501 | [] | [
2132984323
] | To ensure the mixing uniformity of the raw material during the batching process of sintering burden for steelmaking, CFW (Constant Feed Weigher) cut-out control system is studied. Therefore, the relationship between the content of r in SiO2,p in TFe of blending materials, and the content SiO2 and TFe in the raw materia... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on the Ore Blending Method and Spreading Control System |
2,028,271,648 | 2011-01-01 | 4,210,180,762 | [] | [
2126105956,
1534941005
] | AbstractA block model of the ore body is used to plan a mine. The first requirement is to identify ore to be extracted and discard waste, so as to meet target grade, generally in multiple analytes. Commonly, cut-off values are set for each analyte, so as to distinguish ore from waste. It will be shown that, if more tha... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ore selection and sequencing |
2,916,114,567 | 2019-01-01 | null | [] | [
2130796978,
1966814098,
2100769519
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Truck-and-Loader Versus Conveyor Belt System: An Environmental and Economic Comparison |
1,897,003,435 | 2015-01-01 | 2,764,346,231 | [] | [] | The project is focused on the design and fabrication of ANFO mixing machine for safety and proper homogenization of ammonium nitrate and fuel oil in order to increase its production rate. The ANFO mixing machine is a replacement for the manual mixing of fuel oil (Diesel) and ammonium nitrates in bays or on concrete flo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and Fabrication of ANFO Mixing Machine for Safety and Proper Homogenization |
1,501,603,867 | 2010-05-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Plan compliance process for underground coal mines |
47,074,444 | 2008-07-23 | 4,306,419,201 | [] | [] | In the paper of WSEAS Dec.2007 [1], we proposed that Surge Protection Devices, such as varistor type SPDs, degraded the transmission rate of Power line communication modem. By the research after that, not only the capacitance of the varistor but also the inductance of the varistor and wiring of SPD causes resonance. In... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Transmission degradation in the frequency band of power line communication caused by resonant circuit consisting of surge protective devices |
4,318,203,738 | 2023-01-26 | 4,210,201,879 | [
1985080107,
1969483356,
2160763688,
1918344999,
2094566145,
2185734033
] | [
2094566145,
2126895748,
2143242500,
2073650054,
2140742285,
2543580944,
2185734033,
1979015826,
2038345112,
2169528473,
2060929952,
2053920929,
2007873570,
1972121892,
2089507620,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
21262584... | Mineral and metallurgical processing are crucial within the mineral value chain. These processes involve several stages wherein comminution is arguably the most important due to its high energy consumption, and its impact on subsequent extractive processes. Several geological properties of the orebody impact the effici... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Geometallurgical Detailing of Plant Operation within Open-Pit Strategic Mine Planning |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.