paper_id
int64
391
4.39B
publication_date
stringlengths
10
10
journal_id
int64
61.7k
4.39B
⌀
final_level_0_links
listlengths
0
1.06k
final_level_1_links
listlengths
0
9.76k
abstract
stringlengths
1
58k
⌀
micro_cluster_id
int32
1
4.52k
short_label
stringlengths
3
47
long_label
stringlengths
23
102
keywords
stringlengths
84
335
new_title
stringlengths
0
18.2k
4,293,064,347
2022-01-01
4,210,172,589
[ 1969483356, 1551276924, 2043345585, 1979015826, 1534941005, 2065332058 ]
[ 2094566145, 2126895748, 2543580944, 2185734033, 1979015826, 2060929952, 2053920929, 1972121892, 2122244604, 2068546981, 1918344999, 2160763688, 2046010791, 1985080107, 2163428398, 2043345585, 2130796978, 2124629174, 2151675709, 1551276924, 1534941005, 1496852045, 20656820...
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A Review of Open Pit Mine Waste Dump Management Planning
2,013,843,189
2011-04-01
4,306,419,295
[]
[]
A basic structure of excavator anti shovel device is introduced. The digging resistance force graph of the rotating bucket is drawn, and the calculation method of digging resistance is analyzed. Besides, the calculation diagram of the theoretical digging force of the bucket arm cylinder is given, the calculation method...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Excavating force analysis and calculation of dipper handle
2,786,101,220
2012-01-01
null
[]
[]
The core justification of this thesis was to delay expected failures by means of studying different sequencing patterns. This thesis reviews, analyzes and compares some of extraction methods and se ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Numerical studies of mining geometry and extraction sequencing in Lappberget, Garpenberg
2,943,273,648
2019-04-01
4,210,170,318
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Improving the efficiency of using dump trucks under conditions of career at open mining works
4,320,492,394
2023-02-13
10,134,376
[ 1969483356, 2000715618, 2130796978, 2094566145, 2185734033 ]
[ 2094566145, 2126895748, 1976744965, 2124289529, 2543580944, 2185734033, 2154929945, 2060929952, 2053920929, 1972121892, 2131613989, 2068546981, 1918344999, 2160763688, 2046010791, 2162145193, 1985080107, 2150593711, 1569990960, 2043345585, 2130796978, 2140170679, 21516757...
In the production process of open-pit mines, trucks are applied in the production process of open-pit mines for transporting ores and rocks. Most open-pit mines are equipped with dozens of trucks. It is important to plan the dispatch of trucks in the production process so that the transportation process can be the shor...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Open-Pit Mine Truck Dispatching System Based on Dynamic Ore Blending Decisions
4,379,797,685
2023-06-07
10,134,376
[]
[ 2128990851, 2086623749, 1975302410, 2090972948, 2038223765, 2160763688, 2083259944, 1985080107, 2000359213, 1984103729, 2140170679, 2141592893, 2151675709, 2127160769, 2103120971, 2131281108, 2138913627, 1969483356, 2135298789, 2136904423, 2108196201, 2077948915 ]
Production scheduling management is crucial for optimizing mine productivity. With the trend towards intelligent mines, a lean scheduling management mode is required to align with intelligent conditions. This paper proposes a lean scheduling framework, based on short interval control as an effective tool to adapt intel...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A Lean Scheduling Framework for Underground Mines Based on Short Interval Control
2,781,565,910
2015-09-01
4,210,219,240
[]
[]
In an environment of rising energy prices and mining at greater depths, cost-efficient loading and hauling equipment is essential. Conducted at an underground mining operation, this study analyzes ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Analyzing energy consumption and gas emissions of loading equipment in underground mining
3,167,484,710
2021-06-11
4,210,217,500
[]
[ 2053920929, 1918344999, 2160763688, 2140170679, 1969483356, 2151675709 ]
Complex load and haul cycles in mining are composed of individual steps, whose times could be better described by a statistical distribution than by the average value. In order to evaluate how loading times and dumping times behave, this paper tested a large dataset of loading and dumping times measured at an open pit ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Non-deterministic load and dump behaviour in mining haul trucks: a case of study
2,531,607,988
2011-12-01
null
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Development of a real-time adherence to mine plan tools as part of an integrated remote mine control centre
2,082,519,024
2011-02-01
128,754,310
[]
[]
Using GIS(Geographic Information System), GPS(Global Positioning System), GPRS(General Packet Radio Service) and RFID(Radio Frequency Identification), an intelligent control mining management system in an open pit has been designed and developed. A linear programming model is set up in a practical application. By the m...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Intelligent Control Mining Management System in an Open Pit Based on GIS/GPS/GPRS/RFID
3,213,403,033
2021-11-16
4,210,203,533
[]
[]
The gradual elimination of rich and surficial-located Ni reserves mandates the assessment regarding the gradual switch from open-pit mines to underground mining schemes. This could allow for the continuation of the steady ore supply and furthermore could assist in minimizing the environmental footprint of the exploitat...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Going Underground for Ferronickel Mining in Greece: Preliminary Feasibility and Potential Benefits
2,145,829,564
2011-05-01
103,321,696
[ 1992710140, 2003759470, 1979015826, 2130796978, 2126895748 ]
[ 2126895748, 2313274380, 1979015826, 2103002522, 1972121892, 2009923109, 1992710140, 2043345585, 2130796978, 2088304441, 1988328380, 2090359754, 1534941005, 2121766240, 1967073510, 2003759470, 4250589301, 2128208761, 1985123706, 1551276924 ]
We present a mixed-integer program to schedule long- and short-term production at LKAB’s Kiruna mine, an underground sublevel caving mine located in northern Sweden. The model minimizes deviations from monthly preplanned production quantities while adhering to operational constraints. Because of the mathematical struct...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mine
3,093,982,125
2020-05-14
4,210,230,698
[]
[]
Introduction. This paper presents the results of research on ore pit depth justification in relation to mining transport parameters. Research theory. Features of the current state and further development of deep pits are considered. There is also the classification of fields by relative excavation difficulty depending ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Economic and technological aspects of interrelation between open pit mine depth and mining transport parameters
2,389,790,172
2005-01-01
2,764,522,685
[]
[]
This paper introduces an approach to porting embedded Linux OS with root file system to ARM9-based AT91RM9200 platform. Briefly depicting the characteristics and composing of Linux OS,we present the method including the configuration of U-boot, the customization and porting of Linux,and the building of ramdisk filesyst...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
The Approach to Porting Embedded Linux OS and Building Root File System
2,398,321,017
2016-04-30
4,210,186,421
[]
[ 2164768649, 2151675709, 2072834565 ]
Abstract We developed a Windows-based program for discrete event simulation of truck-loader haulage systems in an underground mine. The Daesung MDI limestone mine located in Samcheok City, Gangwon Province, Korea was selected as the study area to design the program. The developed program is composed of the graphic user...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Development of a Windows-based Program for Discrete Event Simulation of Truck-Loader Haulage Systems in an Underground Mine
4,310,860,251
2023-01-01
194,185,345
[ 2122203560, 2076587863, 2568772110, 2890904471, 1979015826, 2029608738, 2151675709 ]
[ 2910597635, 2100495367, 2000425991, 2568772110, 4300580367, 4236127247, 3106445841, 2026136083, 2001771035, 2788276261, 2083259944, 2149003305, 2111619626, 2141975087, 2135463994, 2159271996, 1633869374, 2620084289, 1496852045, 2159456336, 2493990996, 2080499797, 21486009...
The weaknesses of conventional simulations and ever-increasing capabilities offered by technological trends have compressed the spring of the surface mining industry for a giant leap towards Mining 4.0. Dynamicity and autonomy are two features that ordinary simulation models fail to address. That's why the Digital Twin...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
The advent of digital twins in surface mining: Its time has finally arrived
1,514,256,849
2005-01-01
4,306,511,618
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Odkrywka Drzewce - najnowocześniejszy zakład wydobywczy w KWB "Konin". Odkrywka XXI wieku
2,766,120,735
2017-01-01
2,764,472,783
[]
[]
This work analyzes the quality of coal in the function level selection for exploitation. A detailed analysis was carried out for the main coal seam, the first floor seam, the second floor seam and the overlying coal series of the coal deposit Gacko of 0.5 and 1 m. The analysis was carried out within the Strategy of min...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Analysis of coal quality in a function of selection level for mining at the open pit Gacko
2,026,809,880
2008-11-15
107,214,695
[]
[]
In this study, in order to determine OP to Ug mining TD of tabulate deposits, through various states some formulas were concluded. These formulas resulted based on the allowable and overall stripping ratios. For this objective, an analytical procedure was served. The contemplated states are variously combined from the ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
An Approach Towards Ascertaining Open-Pit to Underground Transition Depth
2,368,387,406
2004-01-01
130,598,786
[]
[]
Taking the mineral resources programming information system of Xuzhou city as example, this paper discusses how to achieve the scientific and automatic management of mineral resources programming using the advanced geography information system (GIS) technique and computer technique. The system goal, the system collecti...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Programming Information System of Mineral Resources Based on GIS
2,763,432,560
2017-10-01
17,930,613
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Risk management and long-term production schedule optimization at the LabMag iron ore deposit in Labrador, Canada
1,964,922,653
2012-08-12
4,306,503,443
[]
[]
For traditional 2-DoF excavating mechanism of electric mining shovel, the log spiral trajectory is regarded as the optimal digging trajectory with less energy consumption. The design of new 3-DoF excavating mechanism is aimed for a mechanism more dexterous than the traditional 2-DoF one, thus reduces the digging energy...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Digging Trajectory Optimization for a New Excavating Mechanism of Electric Mining Shovel
2,275,837,133
2015-09-01
4,306,518,497
[ 1551276924, 2140170679, 1569990960, 3138949179, 2151675709 ]
[ 2094566145, 2126895748, 2068546981, 2160763688, 1534941005, 1569990960, 2130796978, 2140170679, 3138949179, 1551276924, 2151675709, 2010334716 ]
Short-term mine production scheduling optimization is developed as a single formulation where mining considerations, production constraints, uncertainty in the orebody metal quantity and quality as well as fleet availability are evaluated together to define a well-informed sequence of mining that results in high perfor...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
All-inclusive stochastic short-term production scheduling approach of an iron-ore deposit with future multi-element ore control data
1,669,602,901
2013-07-07
4,306,420,949
[ 2752128027 ]
[ 1512342490, 2752128027, 2151675709 ]
This paper presents a practical application of simulation modeling approach to the design of a constrained haulage system of Sarcheshmeh open-pit copper mine located in the Kerman Province of Iran. The management of Sarcheshmeh copper complex desired to enhance the available resources of the haulage system so that this...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Simulation and optimization of haulage system of an open-pit mine
3,191,959,277
2021-01-01
null
[]
[ 2154376416, 1986078433, 2053920929, 2168175751, 3098096425, 2036424138, 2177295793, 2070722739, 2140170679, 2049176600, 2766736793, 4301861531, 2166448956, 2151675709 ]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Haul Truck Speed Analysis and Effect on Fleet Optimization
967,061,177
2015-12-01
194,185,345
[ 2032132842 ]
[ 1969397762, 2073650054, 2164946207, 2060929952, 2128614305, 2039546784, 2164502819, 1525171360, 2097428263, 2040324527, 2157081519, 2126258480, 2035880114, 3123821384, 2117719113, 2146612430, 2065198673, 2065682001, 2164174683, 2067904349, 2032132842, 2149010029, 21652013...
Optimum cut-off grades with different types of objective functions are determined by optimization algorithms which recognized as the one of the basis of sustainable development indicators of mining. As different mineral processing methods are applied in mines, it is very essential to choose the most appropriate cut-off...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects
2,006,211,433
2011-10-01
4,306,418,636
[]
[ 2154636565 ]
AC drive systems have gained popularity in multi-motor applications including mining industry because the production rate of mines increases by almost 20% compared to DC drive systems. Typically, to supply the AC drive systems several Active Front Ends (AFE) with DC choppers are used to insure a reliable and acceptable...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Enabling energy storage integration in high power multi-motor applications with active filter solutions
2,144,447,313
2011-11-01
172,073,041
[ 2058361114, 2151675709, 2169528473 ]
[ 2100986500, 1987349636, 2169245194, 4240518936, 2169528473, 2003586202, 2058361114, 2024417959, 1975325613, 2136050606, 1613795631, 4233857083, 2151675709, 2146948159, 2020407132, 1979987551, 2163105760, 1483854707, 2082622325, 1561169397 ]
This study presents new software, called Google Earth-based Optimal HAulage RouTing System (GEOHARTS), to improve the functionality of Google Earth for optimal haulage routing of off-road dump trucks in construction and mining sites. A modified least-cost path algorithm, which is applicable to working areas with both p...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm
2,616,225,452
2016-01-01
2,764,472,783
[]
[]
This work presents a method of determining the dynamics of development the open pit Gacko in the zone roof coal series with the annual capacity 3∙106 t/year of run-of-mine coal using the module cut evaluation of the software package Gemcom Gems. Defining the dynamics was preceded by optimization of the open pit that is...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Dynamics of development the works of roof coal series of the open pit Gacko by the software Gemcom Gems: Module cut evaluation
3,040,136,479
2020-06-01
4,210,187,594
[]
[ 2094566145, 1999478155, 1979015826, 2090972948, 1990916761, 2053920929, 1972121892, 1918344999, 2088049833, 2130796978, 2048628678, 2097117768, 2102605133, 1534941005, 2168356304, 2065198673, 2065332058, 1969483356, 2000715618, 2108598243, 2041711461, 2100769519, 21558932...
In the rapid economic development today, accelerating coal mining to ensure energy supply is an important guarantee for the healthy and stable development of the economy. Compared with underground mining, open-pit coal mine is of relatively low technical difficulty and mining cost. Through high-efficient, environment-f...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Informationization and Big Data Technology in Management and Maintenance of Mining Equipment in Large Open Pit Mines
1,927,225,537
2012-11-01
135,704,260
[]
[]
This paper presents the implementation of the MineSight® tools in a hypothetical project upon which the Las Cuevas mine will be based. The project relies on conventional modeling, project configuration, deployment, drilling handling and the creation of the geological and block models that make it possible to reliably d...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
IMPLEMENTATION OF THE MINESIGHT® TOOLS IN THE LAS CUEVAS MINE OF VALE COAL COMPANY IN COLOMBIA
2,073,298,432
2012-05-01
206,834,481
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Lag modeling and design capacity optimization at operating diamond placer mines “Solur” and “Vostochny,” Republic of Sakha (Yakutia)
3,149,639,732
2021-06-01
4,210,178,226
[ 1969483356, 1534941005, 2065332058 ]
[ 2126895748, 1979015826, 2060929952, 1972121892, 2046010791, 2160763688, 1985080107, 2163428398, 2043345585, 2130796978, 2506768821, 2151675709, 2020999234, 1551276924, 2090359754, 1534941005, 2065332058, 1969483356, 3217061993, 2100769519, 2024060531, 2128208761, 21222446...
Waste management and environmental aspects are progressively gathering attention in the mining industry. Mine planners must deal with increasingly complex tasks to balance between ore block schedules, waste disposal, operational cost and environmental reclamation. The mine incomes are generally related to mining and pr...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Multi-stage dumping sequence - a feasible waste management alternative for open pit mining
2,125,819,678
2012-03-09
109,525,458
[]
[ 2050067494, 2170444200, 1534941005, 2126258480, 2077791698, 2165201397, 4365787967 ]
A new uranium supply and usage analysis takes into account growth in physical demand for electricity, both before and after decarbonization. It also models the economic willingness of investors to build the required reactors as a profit-maximizing decision. The analysis computes the optimum path of investment and disin...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Joint economic and physical constraints on nuclear power: how much uranium would be needed to decarbonize electricity supply?
2,134,696,241
2009-05-01
13,144,211
[ 2019207321 ]
[ 2167036165, 2050288270, 2016207894, 2019207321, 1998727969, 1837558564, 1554663460, 2489782956, 2155907120, 2156060469, 2912565176, 2062706881, 2038281539, 3011865677, 2148154194, 2056651346, 2098914003, 2114001875, 2133321814, 2124428761, 1500325215, 3125388642, 19960213...
The aim of this study is to investigate a new method for generating scenarios in order to cope with the data shortage and linguistic expression of experts in scenario planning. The proposed hybrid intelligent scenario generator uses an Adaptive Neuro-Fuzzy Inference System (ANFIS) to deal with uncertain inputs. In this...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Hybrid intelligent scenario generator for business strategic planning by using ANFIS
3,198,028,962
2021-01-01
4,306,523,577
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Metodología De Toma De Decisión De Un Sistema De Drenaje De Aguas Subterráneas Utilizando El Proceso Analítico Jerárquico (AHP) Simplificado En Minería Superficial
1,996,953,252
2014-09-01
4,210,223,158
[ 1972121892, 1534941005 ]
[ 1972121892, 2126895748, 3217061993, 1534941005, 2043345585, 1551276924 ]
This paper deals with a study conducted in a limestone mine located in Caçapava do Sul in the state of Rio Grande do Sul. Themes related to short-term operational planning and unit operations are discussed. We conducted a diagnosis of the practices observed in the mining company under study and recommendations were pro...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Short-term mining operations in limestone mines - diagnosis and proposition for improvement
2,516,255,278
2016-01-01
110,258,470
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Multiple cut-off grade optimization by genetic algorithms and comparison with grid search method and dynamic programming
2,284,527,273
2015-09-01
4,306,518,497
[ 1969483356, 1569990960, 1534941005, 3138949179, 2068546981 ]
[ 2094566145, 2126895748, 2060929952, 1972121892, 2068546981, 2160763688, 1985080107, 2162508334, 1569990960, 2043345585, 2130796978, 3138949179, 1534941005, 1496852045, 2111581650, 1601649239, 1969483356, 3217061993, 2007401074, 2108536179, 2128208761, 1551276924 ]
This paper presents a new mathematical formulation to address mine production scheduling with multiple processing streams, under mineral supply uncertainty, and where the destination is formulated as a variable for each block. The proposed mathematical model maximizes discounted cash flows and penalizes deviations from...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Long-term mine production scheduling with multiple processing destinations based on multi-neighbourhood tabu search
3,082,478,370
2020-08-28
11,732,831
[ 2000715618, 2100769519, 2595861342, 2046010791, 1972121892, 1534941005, 2143560894, 2094566145 ]
[ 2094566145, 1969397762, 2126895748, 2113536011, 1979015826, 2154929945, 2165299997, 1972121892, 2122244604, 2068546981, 2046010791, 1918344999, 2160763688, 2031003438, 2043345585, 2130796978, 2140170679, 2151675709, 2048661822, 2143560894, 222919112, 1534941005, 149685204...
Block sequencing is of great importance in an open-pit mining operation. Sequencing is usually performed to maximize the net present value (NPV). Also, from the environmental viewpoint, the sequence of dumping mined materials is of significant value in the sulfide mines. The potential acid-forming (PAF) waste rocks in ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Development of a MIP model to maximize NPV and minimize adverse environmental impact—a heuristic approach
2,780,978,454
2017-12-01
4,210,195,883
[]
[ 2126895748, 2090359754, 2313274380, 1534941005, 2128208761 ]
The underground mine planning and design optimisation process have received little attention because of complexity and variability of problems in underground mines. Although a number of optimisation studies and software tools are available and some of them, in special, have been implemented effectively to determine the...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Application of Three Existing Stope Boundary Optimisation Methods in an Operating Underground Mine
4,225,117,530
2023-01-18
4,306,463,448
[]
[ 1969397762, 2615190415, 2169528473, 1966910378, 2136050606, 2017190577, 2151675709, 1963697600, 2115768128, 2119356110, 2065198673, 1659842140, 2020407132, 2060852319, 2004014822, 2091248362, 1997466867, 2082622325, 2097580026 ]
This chapter aims to provide an overview of energy efficiency in the mining industry with a particular focus on the role of fuel consumption in hauling operations in mining. Moreover, as the most costly aspect of surface mining with a significant environmental impact, diesel consumption will be investigated in this cha...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Energy Efficiency Improvement in Surface Mining
2,032,680,842
2010-01-01
206,834,481
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Methodical principles for planning the mining and loading equipment capacity for open cast mining with the use of dumpers. Part III: Service capacity determination
2,278,040,100
2015-01-01
4,306,463,937
[ 2000715618, 2160763688 ]
[ 2094566145, 2126895748, 1979015826, 2154929945, 2169528473, 2053920929, 1972121892, 2068546981, 2160763688, 1985080107, 2126258480, 2043345585, 2130796978, 2151675709, 2020999234, 2090359754, 1496852045, 1534941005, 2000715618, 2100769519, 2024060531, 4250589301, 21282087...
In this paper, we are interested in the tactical planning problem of mines and smelting furnace. The problem concerns a set of mines with one smelting furnace. We are faced to a multi-actor’s context for which a global optimization is not possible due to the independence of the services. This problem is solved using a ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A Collaborative Planning Model to Coordinate Mining and Smelting Furnace
846,155,387
2012-01-01
2,765,023,979
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
OPTIMIZATION OF MINERAL PROCESSING PLANT THROUGH ROM ORE SIZE
4,281,297,875
2022-05-23
4,210,203,134
[ 2160763688 ]
[ 2094566145, 2126895748, 2086623749, 2156524938, 2140742285, 2543580944, 2185734033, 1979015826, 2024742034, 1973369232, 2038345112, 2169528473, 2167159964, 2053920929, 1972121892, 2116661285, 2068546981, 1918344999, 2160763688, 2083259944, 2764796714, 1985080107, 19927101...
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA-II
1,970,178,705
2014-10-31
48,643,595
[ 2160763688 ]
[ 1973131489, 2053920929, 2140190241, 2126895748, 2966207845, 2068546981, 1972121892, 2160763688, 2148602057, 1496852045, 1534941005, 2126258480, 1979015826, 2130796978, 2169528473, 2151675709, 2159306398 ]
Several underground cave mining operations have realised benefits in development rates when an extraction level layout is designed according to the El Teniente style. Geotechnical benefits may accrue in adopting the advance undercut technique in which extraction drift development lags the undercut development directly ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A comparison between Offset Herringbone and El Teniente underground cave mining extraction layouts using a discrete event simulation technique
2,336,507,016
2016-01-01
110,258,470
[]
[ 2119256515 ]
The purpose of this study was to establish the impact of discount rates on cut-off grades for narrow tabular gold deposits as characterized by the goldfields of the Witwatersrand Basin in South Africa. There are various methods available for determining the cut-off grade, from simple breakeven calculations to sophistic...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Impact of discount rates on cut-off grades for narrow tabular gold deposits
2,419,339,918
2016-01-01
2,764,515,337
[]
[ 2162774880, 1856219842, 1977431633, 1631820701, 2100634462, 1512608287 ]
Iron ore is necessarily basic raw material for industrialization and urbanization and related to the industrial distribution and development programming. The lean iron ore resource in our country is high-cost and low-efficiency, which cannot meet the demand of iron and steel industry, and even endanger the safety of in...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Digital Mine Research and Practice Based on Mining and Metallurgy System Engineering
3,098,863,035
2001-01-01
null
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Mining shaft construction method at Fazenda Brasileiro gold mine-CVRD
2,291,615,399
2013-01-01
null
[ 2111563176 ]
[ 2111563176 ]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
HME Management in Mega Mining: Sishen Mine – South Africa
2,489,052,510
2016-06-03
57,667,410
[ 2100769519, 2065332058 ]
[ 2126895748, 4301347335, 1979015826, 2096305430, 2036234778, 1972121892, 2068546981, 2046010791, 2160763688, 2163428398, 2084977713, 2130796978, 2043345585, 4256185527, 2101285186, 2172122819, 1496852045, 1534941005, 1999829841, 1748537427, 2065332058, 2146870367, 20116780...
Many countries produce significant quantities of nuclear waste which will have to be permanently and safely placed in a repository. We develop a mixed integer program that determines where to place each waste package of a specific waste type in a given time period with the goal of minimizing heat load concentration wit...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Optimizing high-level nuclear waste disposal within a deep geologic repository
2,324,206,985
2015-01-01
null
[]
[]
Avon Products Inc. is one of the oldest beauty manufacturing companies today in the United States. The company has expanded its operations throughout the world including the Philippines. The manufacturing plant is located at Calamba Premiere International Park (CPIP) at Brgy. Batino, Calamba City, Laguna. The study was...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Improvement of Productivity Rate of JIT #262, Creams, Liquids, Lotions Department of Avon Products Manufacturing Inc.
2,971,662,772
2019-01-01
4,210,228,333
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Influence of access road pattern on mine rock volume within the ultimate pit limit
2,074,103,620
2011-10-01
104,568,202
[ 4298413470 ]
[ 2141951329, 2115497642, 4244985803, 4298413470 ]
Recently, institutes of higher education (universities) have shown a renewed interest in organisational structures and operating methodologies that generate productivity and innovation; responsibility centre budgeting (RCB) is one such process. This paper describes the underlying principles constituting RCB, its origin...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Implementing responsibility centre budgeting
2,028,891,751
2014-12-01
4,210,223,158
[]
[]
Although mine haul roads only provide support for mining activities, their role can be quite significant in any effort to optimize transportation with trucks in open pit mining. In 2009, an inventory about the design, construction and maintenance conditions of these structures in mines in the Quadrilátero Ferrífero was...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Diagnosis about iron ore mine haul roads in the Quadrilátero Ferrífero: Itabira Complex case
2,930,835,082
2019-01-01
114,355,575
[ 1551276924, 2160763688 ]
[ 2053920929, 2126895748, 1493454437, 2068546981, 2046010791, 2160763688, 1972121892, 1990485541, 1496852045, 1534941005, 2126258480, 2043345585, 2130796978, 1979015826, 2169528473, 1551276924, 2151675709 ]
In oil sands open-pit mining, further processing of the extracted oil sands generates massive volumes of tailings. To save space, the tailings are deposited in in-pit tailings containments constructed by internal dykes using mine waste material. In this paper, an integrated mine planning framework is proposed and imple...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management
2,155,829,488
2010-11-01
null
[ 2126258480, 2077791698, 2050067494, 1534941005 ]
[ 1967344706, 2126105956, 2050067494, 2170444200, 3217061993, 2151238122, 1534941005, 2126258480, 2032316144, 2077791698, 3021444882, 1988520084, 1510052597, 2076057077, 2165201397, 2018044188, 4365787967 ]
Mining companies world-wide are faced with the problem of how to accurately value and plan extraction projects subject to uncertainty in both fu- ture price and ore grade. Whilst the methodology of modelling price uncertainty is reasonably well un- derstood, modelling ore-grade uncertainty is a much harder problem to f...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
The Measurement and Inclusion of a Stochastic Ore -Grade Uncertainty in Mine Valuations Using PDEs
2,971,865,425
2019-12-01
63,392,143
[]
[]
In a typical software defined network (SDN), switches report the Packet-In messages of newly arrived flows to the controllers. With more and more flows arriving at a network, the controller load significantly increases, which may lead to long (or even unacceptable) controller response time. Though previous solutions, s...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Computer networks special issue on intelligent and connected transportation systems
2,007,929,089
2013-12-01
4,210,180,762
[]
[]
This study considers realistic data for a planned open-pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block model. Each block’s grade vector has components for each analyte (chemical element or compound) influencing ore value. Der...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Optimised ore selection from conditionally simulated block models
4,236,286,206
2016-01-29
2,764,551,302
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Substantiation of efficient parameters for hybrid open pit/underground mining of coal
1,988,026,352
2013-03-01
72,171,858
[]
[]
Dragline productivity is strongly influenced by swing cycle times, comprising between 60–70% of all dragline operational time. The ability to classify and report on dragline swing cycles according to their limiting motion is essential for identifying performance losses and deriving continuous improvements. This paper p...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Classifying dragline swing dependencies using coincident limit graphs
2,045,705,270
2012-07-24
3,394,804
[]
[ 2082405251, 1974970149, 2138520198, 2065649191, 1993533895, 2103680519, 2068540555, 2000088683, 2055552433, 2127888210, 2001156023, 1977457396, 2086492725, 1969859799, 2082751518 ]
We present a review of literature on the methods for rhenium determination published from 2000 to 2010.
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Up-to-date methods for the determination of rhenium
2,491,555,660
2016-07-01
2,764,816,760
[]
[]
Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
2,992,407,128
2018-01-01
2,764,420,890
[]
[]
A mine planning team is tasked among other duties with designing a feasible mine plan which in turn maps out the daily running of the mining project. A mine plan revolves around a cut-off grade which is thoughtfully and uniquely selected while considering various aspects such as grade tonnage distribution, economic and...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Computer-Aided Cut-off Grade Optimisation for Open Pit Mines
2,990,065,104
2018-01-01
null
[ 3217061993 ]
[ 2025069281, 2053920929, 1972121892, 1918344999, 2160763688, 3217061993, 2123696861, 2126385963, 1966554507, 2008668719, 2140170679, 2151675709 ]
This thesis looks at the medium term mine planning process and tools in the Leveaniemi open pit mine operated by LKAB Svappavaara. The current planning process uses software, Chronos, which was pre ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Medium term planning with Evolution : Comparison with current method at LKAB Svappavaara
2,762,435,994
2017-01-01
106,296,714
[ 2140170679, 2160763688 ]
[ 2053920929, 2126105956, 1972121892, 2068546981, 2126895748, 2160763688, 1496852045, 1534941005, 2126258480, 1979015826, 2130796978, 2140170679, 2169528473, 2010334716, 2151675709 ]
This paper describes an approach to optimising processing and stockpiling decisions in an open pit mine in order to minimise the deviation from production targets. The solution involves determining decisions on the destination of ore as it is mined: whether to use ore in a product directly as it is extracted from the g...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Evolutionary Computation to Determine Product Builds in Open Pit Mining
2,766,676,929
2017-11-02
4,306,463,937
[]
[ 2051709477, 2166186246, 4211007335, 2130983366, 1992176519, 2090132397, 2150593711, 2062613656, 2056581810, 2091346452, 2041280856, 2071455833, 2156267802, 2146948159, 1570321471 ]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Energy Efficiency in Cable Shovel Operations
3,116,003,334
2020-12-31
4,210,189,194
[ 1490670090 ]
[ 1490670090 ]
This study is an observation and analysis about automatic assembling gear shaft output as car gearbox part that made at PT. Matahari Megah as a result of research. That automation product can reduce the assembly time from about 5 minutes to less than 45 seconds. Then the objectives in this case study are to describe as...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Automation systems in automatic assembling gear shaft output as car gearbox part at PT. Matahari Megah
2,710,072,598
2006-01-01
null
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Multi-Objective Quality Control in Iron Ore Mining
3,033,206,430
2020-01-01
2,764,900,261
[ 2151675709 ]
[ 1586409345, 1979015826, 2169528473, 2140481308, 2053920929, 1918344999, 2160763688, 2111563176, 2152358062, 2163428398, 2140170679, 2168210873, 2151675709, 2011039300, 2111581650, 1601649239, 2116675171, 2024060531, 2029681015 ]
The use of an optimized dispatching system for the haul trucks in an open-pit mine plays a crucial role to increase the production, especially with the introduction of autonomous trucks into the mine. This involves managing the entire transport system in order to reduce the mine’s operating costs and enhance the mine e...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Optimization of Truck-Shovel Allocation Problem in Open-Pit Mines
2,990,262,011
2019-11-30
4,210,224,691
[]
[ 2000715618, 1972121892, 1918344999, 1534941005, 2100769519, 2130796978, 2065332058, 1969483356 ]
Open pit mine production scheduling (OPMPS) is a decision problem which maximizes net present value (NPV) by determining the extraction time and destination of each block of ore and/or waste in a deposit. Stockpiles can be used to maintain low-grade ore for future processing, to store extracted material until processin...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Open Pit Mine Scheduling Model Considering Blending and Stockpiling
2,955,909,121
2019-03-01
4,306,423,759
[]
[ 1969397762, 1964946787, 1578476034, 2130983366, 2091248362, 2119356110, 2065198673, 2090972948, 65252926 ]
The results of the analysis and experimental study of power consumption during the operation of an electric excavator in a quarry are proposed. The features of accounting for electricity consumption in the mechatronic complex with a complex power consumption mode, including energy recovery, are considered. The costs of...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Investigation of Electric Power Processes During Mining Excavator Operation
2,537,834,497
2016-10-18
48,643,595
[ 1985080107, 2041085006, 1976122053, 2140170679, 2160763688, 2078286011, 2126895748 ]
[ 2126895748, 1647779468, 1979015826, 2169528473, 2010334716, 2004698524, 2053920929, 1972121892, 2068546981, 2093228967, 2160763688, 1984953641, 1985080107, 2126258480, 2133676848, 4240491954, 2130796978, 2127859636, 2506768821, 4238714550, 2140170679, 2118578357, 20782860...
Cost efficiency and high reliability of In-Pit Crushing and Conveying (IPCC) system make it more appealing to be used in deeper open-pit mining activities. Determination of the optimum time and location (OT–OL) for applying the IPCC system were always a challenge. Application of mathematical programming approaches suff...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining
2,067,064,273
2000-02-01
112,051,168
[]
[]
Abstract It is needless to mention that coal will definitely occupy a dominant and important position among natural resources in the future. However, the load subjected on environment by coal is far greater than other fossil fuels. Therefore, it is necessary to work out measures to reduce the load before using the coal...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
R&D of coal utilization technology in Japan
4,240,393,497
2013-06-01
4,210,180,762
[ 2013821356 ]
[ 2013821356 ]
As an external consultant advising industry (mainly the mining industry), two contrasting experiences are frequent. One is that the industry practitioners have strong domain knowledge that the consultant lacks. The other is that the industry practitioners often suffer from paradigm paralysis, using models of thinking t...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Paradigm lost
2,169,825,170
2001-01-01
191,798,613
[ 2090359754, 2128208761, 2126895748 ]
[ 1551276924, 2128208761, 2090359754, 2126895748 ]
We present an algorithm for solving the minimum-cut problem on closure graphs without maintaining flow values. The algorithm is based on an optimization algorithm for the open-pit mining problem that was presented in 1964 (and published in 1965) by Lerchs and Grossmann. The Lerchs—Grossmann algorithm (LG algorithm) sol...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A new?old algorithm for minimum-cut and maximum-flow in closure graphs
1,516,304,863
2011-01-01
12,999,175
[ 3217061993 ]
[ 2144219012, 2098631313, 2112246162, 2103496339, 2128084896, 65738273, 2104550562, 2134383396, 2093829413, 2145085734, 1597286183, 2085831731, 2040870580, 1586335931, 2020999234, 2142752589, 2138484437, 2041280856, 4300402905, 2021218138, 1994410331, 1995341919, 2101927907...
Determination of the pit limits is a vital task in the designing process of a mine. While overestimation increases stripping ratio, underestimation can result in loss of economic ore. The available methods of pit limit optimization are mostly based on the programming approaches (linear and/ or dynamic) and graph theory...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Open pit optimization in 3D using a new artificial neural network
4,312,514,391
2022-01-01
4,210,169,103
[]
[ 2101719234, 1982218468, 1989853704, 2078293738, 2001890098 ]
Abstract The paper considers issues related to the development of technology for the use of spinning waste in the production of cotton yarn. The process of forming a column of cotton fibers with included waste in an improved feeder-hopper of a loosening-scutching unit designed for cleaning from foreign impurities and d...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Optimization of Technology for the Use of Spinning Waste in Yarn Production
1,928,216,909
2015-07-08
107,246,200
[]
[]
The economics of today's mining industry requires more efficient usage of truck-shovel systems. In this paper, a discrete-event simulation model is developed, implemented, and verified to analyse the behaviour of a stochastic truck-shovel materials-handling and haulage system in open-pit mining. A mixed integer linear ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation
2,765,672,300
2017-01-01
2,764,472,783
[]
[]
This paper gives the selection of the optimal model of trucks for transport of coal, and seam waste at the OP Gacko in terms of selective exploitation. Mining of coal and seam waste is carried out in two exploitation zones, the central and roof zone, and the coal and waste transport and disposal is carried out to the d...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Selection the rational model of transport truck by the selective coal mining at the open pit Gacko
3,130,797,307
2021-06-01
194,185,345
[ 2024060531, 2000715618, 2100769519, 1496852045, 2043345585, 1979015826, 1534941005, 2065332058, 2094566145, 2068546981 ]
[ 2094566145, 2126895748, 2185734033, 1979015826, 2154929945, 2060929952, 1972121892, 2068546981, 2046010791, 2160763688, 1985080107, 2163428398, 2043345585, 2130796978, 2140170679, 2143560894, 1496852045, 1534941005, 2065332058, 1969483356, 2595861342, 2000715618, 14934544...
Production scheduling plays a pivotal role in successfully executing any open-pit mining operation. It defines the most profitable extraction sequence of mineralized material from the ground subject to various physical and operational constraints. Different mathematical formulations have been proposed to achieve this g...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A simulated annealing based approach for open pit mine production scheduling with stockpiling option
2,153,025,204
2006-10-01
4,210,210,408
[ 2154636565 ]
[ 2154636565 ]
Mining draglines have been powered by multiple motor-generator (M-G) sets for nearly one century and have been one of the last hold outs of this aged technology. A new technology with all alternating current (AC) static drives using insulated gate bipolar transistors (IGBT) and gearless synchronous ring motors has been...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
A New All AC Gearless Drive System for Large Mining Draglines
835,336,610
2011-01-01
4,306,520,473
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Modernizacja mechanizmu napędu układu urabiania koparek wielonaczyniowych kołowych
2,549,865,795
2016-01-01
110,258,470
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty
249,177,188
2011-11-25
null
[ 2126258480, 1995503011 ]
[ 1978153729, 2157509893, 2163504005, 2063214469, 2321957512, 2140664585, 3124914565, 2087332622, 2067477904, 2047582865, 2118889105, 2046126098, 3021444882, 2108491286, 1967985564, 2103948957, 2131041950, 2019876639, 3125521824, 1525260320, 1983156129, 1995503011, 16082349...
We present a quantitative method to find jointly optimal strategies for an industry regulator and a firm, who operate under exogenous uncertainty. The firm controls its operating policy in order to maximize its expected future profits, whilst taking account of regulatory fines. The regulator aims to control the probabi...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Regulating Industries under Exogenous Uncertainty
2,911,776,422
2019-04-01
181,849,944
[ 2160763688 ]
[ 2094566145, 2126895748, 2073650054, 2185734033, 1979015826, 2005615253, 2169528473, 2165394332, 2048799772, 2060929952, 2053920929, 1972121892, 2068546981, 1918344999, 2160763688, 2036004393, 1985080107, 2126258480, 2023918002, 2130796978, 2141771453, 2151675709, 20223180...
Geological variation may be managed by alternating between modes of operation. These modes provide an integrated response to changes in feed mineralogy, and other operational conditions within the mineral value chain. The decision to alternate between modes depends on current and forecasted stockpile levels. Moreover, ...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Concentrator operational modes in response to geological variation
2,094,311,069
2007-02-20
267,729
[ 2313274380 ]
[ 2313274380 ]
Abstract The dominant working structure of an underground mine is a set of interconnected tunnels which provides access to ore zones and haulage of ore from the designated ore zones to the mill. This set of interconnected tunnels forms a network. We describe a mathematical network model and the modelling features of ou...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Network modelling of underground mine layout: two case studies
2,152,936,635
2011-01-01
45,645,249
[]
[]
According to shortcomings of short-distance signal recognition, low signal transmission reliability, high rate of leakage reading and single function that exist in current underground personnel orientation system, a new system based on Synchronous Signal Sensei with initiative RFID technology has been designed. The sys...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Research of Initiative Personnel Orientation and Rescue System in Mine based on Synchronous Signal Sensei Technology
4,366,228,252
2023-01-01
50,979,996
[]
[ 2060929952, 2000715618, 2039238531, 2098395403, 2007221293, 2738900493, 2090132397, 2120390927, 2104442994, 4239510810 ]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Prediction Model of Drilling Costs for Ultra-Deep Wells Based on GA-BP Neural Network
2,492,140,225
2005-03-15
4,306,463,973
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Intelligent optimal production scheduling estimator
2,900,443,936
2018-01-01
2,737,788,663
[]
[ 2150036352, 2130745192, 2565537996, 2097609230, 2043133488, 2167630521, 2123179704, 2110171129, 1982137082, 1557496348, 2063052894 ]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Automatic control of haul truck travel speed on open pits
1,995,549,207
2010-05-19
4,210,189,946
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Mining production information management system in an open pit based on GIS/GPS/GPRS/RFID
4,210,846,320
2021-12-31
110,258,470
[]
[]
The mine production scheduling problem (MPSP) has been studied since the 1960s, and remains an active area of computational research. In extending the concepts of the MPSP, the automated mine may now be regarded as a hierarchical intelligent agent in which the bottom layer consists of distributed robotic equipment, whi...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Integration of strategic open-pit mine planning into hierarchical artificial intelligence
1,985,427,463
2012-04-29
40,280,859
[ 1993023795 ]
[ 2135374241, 4292811746, 2049410986, 2135255056, 1993023795, 2042623444 ]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
The effect of the operator, the mine room and their interaction on the measured vibration level of a scaling machine
26,743,015
2002-01-01
2,764,949,791
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Coal Movement by Railroad in the Powder River Basin
3,176,589,374
2021-01-01
4,210,186,093
[ 2011430131 ]
[ 2151936673, 1596790722, 2134383396, 2015245929, 2118769226, 2141362318, 2150593711, 2121947440, 1990368529, 2011430131, 2108182844, 2069429561, 2102897370, 2140095548, 2111993661, 2151103935 ]
Objective: to understand the development level of digital inclusive finance in 31 provinces in China in recent years, so that the areas with poor development level can speed up the development. Methods: the data of Peking University Digital inclusive Financial Index from 2012 to 2018 were collected, and the optimal clu...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Research on the difference of Digital inclusive Finance-based on Multi-index Panel data clustering
3,007,495,241
2020-06-01
4,306,401,280
[ 3217061993, 2126895748 ]
[ 2126895748, 1972121892, 3217061993, 2090359754, 2128208761, 1551276924 ]
In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital i...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Open pit limit optimization using dijkstra’s algorithm
1,225,380,441
2012-01-01
4,306,511,618
[]
[]
null
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Analytical modeling of an on-road in-pit heavy traffic situation
2,979,877,840
2019-07-01
177,067,490
[]
[ 2164768649, 1985080107, 2072834565 ]
This paper presents a comprehensive simulation model of underground coal mining processes in a fully mechanized longwall mining face. A number of simulation experiments were performed. The face productivity is estimated as a function of various factors such as the technical parameters of mining machines, face length, g...
3,065
Mine Planning
Operations Research in Mine Planning
Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning
Modeling of Underground Coal Mining Processes