paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
4,293,064,347 | 2022-01-01 | 4,210,172,589 | [
1969483356,
1551276924,
2043345585,
1979015826,
1534941005,
2065332058
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2060929952,
2053920929,
1972121892,
2122244604,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
2163428398,
2043345585,
2130796978,
2124629174,
2151675709,
1551276924,
1534941005,
1496852045,
20656820... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Review of Open Pit Mine Waste Dump Management Planning |
2,013,843,189 | 2011-04-01 | 4,306,419,295 | [] | [] | A basic structure of excavator anti shovel device is introduced. The digging resistance force graph of the rotating bucket is drawn, and the calculation method of digging resistance is analyzed. Besides, the calculation diagram of the theoretical digging force of the bucket arm cylinder is given, the calculation method... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Excavating force analysis and calculation of dipper handle |
2,786,101,220 | 2012-01-01 | null | [] | [] | The core justification of this thesis was to delay expected failures by means of studying different sequencing patterns. This thesis reviews, analyzes and compares some of extraction methods and se ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Numerical studies of mining geometry and extraction sequencing in Lappberget, Garpenberg |
2,943,273,648 | 2019-04-01 | 4,210,170,318 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving the efficiency of using dump trucks under conditions of career at open mining works |
4,320,492,394 | 2023-02-13 | 10,134,376 | [
1969483356,
2000715618,
2130796978,
2094566145,
2185734033
] | [
2094566145,
2126895748,
1976744965,
2124289529,
2543580944,
2185734033,
2154929945,
2060929952,
2053920929,
1972121892,
2131613989,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
21516757... | In the production process of open-pit mines, trucks are applied in the production process of open-pit mines for transporting ores and rocks. Most open-pit mines are equipped with dozens of trucks. It is important to plan the dispatch of trucks in the production process so that the transportation process can be the shor... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open-Pit Mine Truck Dispatching System Based on Dynamic Ore Blending Decisions |
4,379,797,685 | 2023-06-07 | 10,134,376 | [] | [
2128990851,
2086623749,
1975302410,
2090972948,
2038223765,
2160763688,
2083259944,
1985080107,
2000359213,
1984103729,
2140170679,
2141592893,
2151675709,
2127160769,
2103120971,
2131281108,
2138913627,
1969483356,
2135298789,
2136904423,
2108196201,
2077948915
] | Production scheduling management is crucial for optimizing mine productivity. With the trend towards intelligent mines, a lean scheduling management mode is required to align with intelligent conditions. This paper proposes a lean scheduling framework, based on short interval control as an effective tool to adapt intel... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Lean Scheduling Framework for Underground Mines Based on Short Interval Control |
2,781,565,910 | 2015-09-01 | 4,210,219,240 | [] | [] | In an environment of rising energy prices and mining at greater depths, cost-efficient loading and hauling equipment is essential. Conducted at an underground mining operation, this study analyzes ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analyzing energy consumption and gas emissions of loading equipment in underground mining |
3,167,484,710 | 2021-06-11 | 4,210,217,500 | [] | [
2053920929,
1918344999,
2160763688,
2140170679,
1969483356,
2151675709
] | Complex load and haul cycles in mining are composed of individual steps, whose times could be better described by a statistical distribution than by the average value. In order to evaluate how loading times and dumping times behave, this paper tested a large dataset of loading and dumping times measured at an open pit ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Non-deterministic load and dump behaviour in mining haul trucks: a case of study |
2,531,607,988 | 2011-12-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a real-time adherence to mine plan tools as part of an integrated remote mine control centre |
2,082,519,024 | 2011-02-01 | 128,754,310 | [] | [] | Using GIS(Geographic Information System), GPS(Global Positioning System), GPRS(General Packet Radio Service) and RFID(Radio Frequency Identification), an intelligent control mining management system in an open pit has been designed and developed. A linear programming model is set up in a practical application. By the m... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Intelligent Control Mining Management System in an Open Pit Based on GIS/GPS/GPRS/RFID |
3,213,403,033 | 2021-11-16 | 4,210,203,533 | [] | [] | The gradual elimination of rich and surficial-located Ni reserves mandates the assessment regarding the gradual switch from open-pit mines to underground mining schemes. This could allow for the continuation of the steady ore supply and furthermore could assist in minimizing the environmental footprint of the exploitat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Going Underground for Ferronickel Mining in Greece: Preliminary Feasibility and Potential Benefits |
2,145,829,564 | 2011-05-01 | 103,321,696 | [
1992710140,
2003759470,
1979015826,
2130796978,
2126895748
] | [
2126895748,
2313274380,
1979015826,
2103002522,
1972121892,
2009923109,
1992710140,
2043345585,
2130796978,
2088304441,
1988328380,
2090359754,
1534941005,
2121766240,
1967073510,
2003759470,
4250589301,
2128208761,
1985123706,
1551276924
] | We present a mixed-integer program to schedule long- and short-term production at LKAB’s Kiruna mine, an underground sublevel caving mine located in northern Sweden. The model minimizes deviations from monthly preplanned production quantities while adhering to operational constraints. Because of the mathematical struct... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A solution approach for optimizing long- and short-term production scheduling at LKAB’s Kiruna mine |
3,093,982,125 | 2020-05-14 | 4,210,230,698 | [] | [] | Introduction. This paper presents the results of research on ore pit depth justification in relation to mining transport parameters. Research theory. Features of the current state and further development of deep pits are considered. There is also the classification of fields by relative excavation difficulty depending ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Economic and technological aspects of interrelation between open pit mine depth and mining transport parameters |
2,389,790,172 | 2005-01-01 | 2,764,522,685 | [] | [] | This paper introduces an approach to porting embedded Linux OS with root file system to ARM9-based AT91RM9200 platform. Briefly depicting the characteristics and composing of Linux OS,we present the method including the configuration of U-boot, the customization and porting of Linux,and the building of ramdisk filesyst... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Approach to Porting Embedded Linux OS and Building Root File System |
2,398,321,017 | 2016-04-30 | 4,210,186,421 | [] | [
2164768649,
2151675709,
2072834565
] | Abstract We developed a Windows-based program for discrete event simulation of truck-loader haulage systems in an underground mine. The Daesung MDI limestone mine located in Samcheok City, Gangwon Province, Korea was selected as the study area to design the program. The developed program is composed of the graphic user... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a Windows-based Program for Discrete Event Simulation of Truck-Loader Haulage Systems in an Underground Mine |
4,310,860,251 | 2023-01-01 | 194,185,345 | [
2122203560,
2076587863,
2568772110,
2890904471,
1979015826,
2029608738,
2151675709
] | [
2910597635,
2100495367,
2000425991,
2568772110,
4300580367,
4236127247,
3106445841,
2026136083,
2001771035,
2788276261,
2083259944,
2149003305,
2111619626,
2141975087,
2135463994,
2159271996,
1633869374,
2620084289,
1496852045,
2159456336,
2493990996,
2080499797,
21486009... | The weaknesses of conventional simulations and ever-increasing capabilities offered by technological trends have compressed the spring of the surface mining industry for a giant leap towards Mining 4.0. Dynamicity and autonomy are two features that ordinary simulation models fail to address. That's why the Digital Twin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The advent of digital twins in surface mining: Its time has finally arrived |
1,514,256,849 | 2005-01-01 | 4,306,511,618 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Odkrywka Drzewce - najnowocześniejszy zakład wydobywczy w KWB "Konin". Odkrywka XXI wieku |
2,766,120,735 | 2017-01-01 | 2,764,472,783 | [] | [] | This work analyzes the quality of coal in the function level selection for exploitation. A detailed analysis was carried out for the main coal seam, the first floor seam, the second floor seam and the overlying coal series of the coal deposit Gacko of 0.5 and 1 m. The analysis was carried out within the Strategy of min... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of coal quality in a function of selection level for mining at the open pit Gacko |
2,026,809,880 | 2008-11-15 | 107,214,695 | [] | [] | In this study, in order to determine OP to Ug mining TD of tabulate deposits, through various states some formulas were concluded. These formulas resulted based on the allowable and overall stripping ratios. For this objective, an analytical procedure was served. The contemplated states are variously combined from the ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Approach Towards Ascertaining Open-Pit to Underground Transition Depth |
2,368,387,406 | 2004-01-01 | 130,598,786 | [] | [] | Taking the mineral resources programming information system of Xuzhou city as example, this paper discusses how to achieve the scientific and automatic management of mineral resources programming using the advanced geography information system (GIS) technique and computer technique. The system goal, the system collecti... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Programming Information System of Mineral Resources Based on GIS |
2,763,432,560 | 2017-10-01 | 17,930,613 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Risk management and long-term production schedule optimization at the LabMag iron ore deposit in Labrador, Canada |
1,964,922,653 | 2012-08-12 | 4,306,503,443 | [] | [] | For traditional 2-DoF excavating mechanism of electric mining shovel, the log spiral trajectory is regarded as the optimal digging trajectory with less energy consumption. The design of new 3-DoF excavating mechanism is aimed for a mechanism more dexterous than the traditional 2-DoF one, thus reduces the digging energy... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digging Trajectory Optimization for a New Excavating Mechanism of Electric Mining Shovel |
2,275,837,133 | 2015-09-01 | 4,306,518,497 | [
1551276924,
2140170679,
1569990960,
3138949179,
2151675709
] | [
2094566145,
2126895748,
2068546981,
2160763688,
1534941005,
1569990960,
2130796978,
2140170679,
3138949179,
1551276924,
2151675709,
2010334716
] | Short-term mine production scheduling optimization is developed as a single formulation where mining considerations, production constraints, uncertainty in the orebody metal quantity and quality as well as fleet availability are evaluated together to define a well-informed sequence of mining that results in high perfor... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | All-inclusive stochastic short-term production scheduling approach of an iron-ore deposit with future multi-element ore control data |
1,669,602,901 | 2013-07-07 | 4,306,420,949 | [
2752128027
] | [
1512342490,
2752128027,
2151675709
] | This paper presents a practical application of simulation modeling approach to the design of a constrained haulage system of Sarcheshmeh open-pit copper mine located in the Kerman Province of Iran. The management of Sarcheshmeh copper complex desired to enhance the available resources of the haulage system so that this... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation and optimization of haulage system of an open-pit mine |
3,191,959,277 | 2021-01-01 | null | [] | [
2154376416,
1986078433,
2053920929,
2168175751,
3098096425,
2036424138,
2177295793,
2070722739,
2140170679,
2049176600,
2766736793,
4301861531,
2166448956,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Haul Truck Speed Analysis and Effect on Fleet Optimization |
967,061,177 | 2015-12-01 | 194,185,345 | [
2032132842
] | [
1969397762,
2073650054,
2164946207,
2060929952,
2128614305,
2039546784,
2164502819,
1525171360,
2097428263,
2040324527,
2157081519,
2126258480,
2035880114,
3123821384,
2117719113,
2146612430,
2065198673,
2065682001,
2164174683,
2067904349,
2032132842,
2149010029,
21652013... | Optimum cut-off grades with different types of objective functions are determined by optimization algorithms which recognized as the one of the basis of sustainable development indicators of mining. As different mineral processing methods are applied in mines, it is very essential to choose the most appropriate cut-off... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects |
2,006,211,433 | 2011-10-01 | 4,306,418,636 | [] | [
2154636565
] | AC drive systems have gained popularity in multi-motor applications including mining industry because the production rate of mines increases by almost 20% compared to DC drive systems. Typically, to supply the AC drive systems several Active Front Ends (AFE) with DC choppers are used to insure a reliable and acceptable... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Enabling energy storage integration in high power multi-motor applications with active filter solutions |
2,144,447,313 | 2011-11-01 | 172,073,041 | [
2058361114,
2151675709,
2169528473
] | [
2100986500,
1987349636,
2169245194,
4240518936,
2169528473,
2003586202,
2058361114,
2024417959,
1975325613,
2136050606,
1613795631,
4233857083,
2151675709,
2146948159,
2020407132,
1979987551,
2163105760,
1483854707,
2082622325,
1561169397
] | This study presents new software, called Google Earth-based Optimal HAulage RouTing System (GEOHARTS), to improve the functionality of Google Earth for optimal haulage routing of off-road dump trucks in construction and mining sites. A modified least-cost path algorithm, which is applicable to working areas with both p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm |
2,616,225,452 | 2016-01-01 | 2,764,472,783 | [] | [] | This work presents a method of determining the dynamics of development the open pit Gacko in the zone roof coal series with the annual capacity 3∙106 t/year of run-of-mine coal using the module cut evaluation of the software package Gemcom Gems. Defining the dynamics was preceded by optimization of the open pit that is... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamics of development the works of roof coal series of the open pit Gacko by the software Gemcom Gems: Module cut evaluation |
3,040,136,479 | 2020-06-01 | 4,210,187,594 | [] | [
2094566145,
1999478155,
1979015826,
2090972948,
1990916761,
2053920929,
1972121892,
1918344999,
2088049833,
2130796978,
2048628678,
2097117768,
2102605133,
1534941005,
2168356304,
2065198673,
2065332058,
1969483356,
2000715618,
2108598243,
2041711461,
2100769519,
21558932... | In the rapid economic development today, accelerating coal mining to ensure energy supply is an important guarantee for the healthy and stable development of the economy. Compared with underground mining, open-pit coal mine is of relatively low technical difficulty and mining cost. Through high-efficient, environment-f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Informationization and Big Data Technology in Management and Maintenance of Mining Equipment in Large Open Pit Mines |
1,927,225,537 | 2012-11-01 | 135,704,260 | [] | [] | This paper presents the implementation of the MineSight® tools in a hypothetical project upon which the Las Cuevas mine will be based. The project relies on conventional modeling, project configuration, deployment, drilling handling and the creation of the geological and block models that make it possible to reliably d... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | IMPLEMENTATION OF THE MINESIGHT® TOOLS IN THE LAS CUEVAS MINE OF VALE COAL COMPANY IN COLOMBIA |
2,073,298,432 | 2012-05-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Lag modeling and design capacity optimization at operating diamond placer mines “Solur” and “Vostochny,” Republic of Sakha (Yakutia) |
3,149,639,732 | 2021-06-01 | 4,210,178,226 | [
1969483356,
1534941005,
2065332058
] | [
2126895748,
1979015826,
2060929952,
1972121892,
2046010791,
2160763688,
1985080107,
2163428398,
2043345585,
2130796978,
2506768821,
2151675709,
2020999234,
1551276924,
2090359754,
1534941005,
2065332058,
1969483356,
3217061993,
2100769519,
2024060531,
2128208761,
21222446... | Waste management and environmental aspects are progressively gathering attention in the mining industry. Mine planners must deal with increasingly complex tasks to balance between ore block schedules, waste disposal, operational cost and environmental reclamation. The mine incomes are generally related to mining and pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Multi-stage dumping sequence - a feasible waste management alternative for open pit mining |
2,125,819,678 | 2012-03-09 | 109,525,458 | [] | [
2050067494,
2170444200,
1534941005,
2126258480,
2077791698,
2165201397,
4365787967
] | A new uranium supply and usage analysis takes into account growth in physical demand for electricity, both before and after decarbonization. It also models the economic willingness of investors to build the required reactors as a profit-maximizing decision. The analysis computes the optimum path of investment and disin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Joint economic and physical constraints on nuclear power: how much uranium would be needed to decarbonize electricity supply? |
2,134,696,241 | 2009-05-01 | 13,144,211 | [
2019207321
] | [
2167036165,
2050288270,
2016207894,
2019207321,
1998727969,
1837558564,
1554663460,
2489782956,
2155907120,
2156060469,
2912565176,
2062706881,
2038281539,
3011865677,
2148154194,
2056651346,
2098914003,
2114001875,
2133321814,
2124428761,
1500325215,
3125388642,
19960213... | The aim of this study is to investigate a new method for generating scenarios in order to cope with the data shortage and linguistic expression of experts in scenario planning. The proposed hybrid intelligent scenario generator uses an Adaptive Neuro-Fuzzy Inference System (ANFIS) to deal with uncertain inputs. In this... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Hybrid intelligent scenario generator for business strategic planning by using ANFIS |
3,198,028,962 | 2021-01-01 | 4,306,523,577 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Metodología De Toma De Decisión De Un Sistema De Drenaje De Aguas Subterráneas Utilizando El Proceso Analítico Jerárquico (AHP) Simplificado En Minería Superficial |
1,996,953,252 | 2014-09-01 | 4,210,223,158 | [
1972121892,
1534941005
] | [
1972121892,
2126895748,
3217061993,
1534941005,
2043345585,
1551276924
] | This paper deals with a study conducted in a limestone mine located in Caçapava do Sul in the state of Rio Grande do Sul. Themes related to short-term operational planning and unit operations are discussed. We conducted a diagnosis of the practices observed in the mining company under study and recommendations were pro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Short-term mining operations in limestone mines - diagnosis and proposition for improvement |
2,516,255,278 | 2016-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Multiple cut-off grade optimization by genetic algorithms and comparison with grid search method and dynamic programming |
2,284,527,273 | 2015-09-01 | 4,306,518,497 | [
1969483356,
1569990960,
1534941005,
3138949179,
2068546981
] | [
2094566145,
2126895748,
2060929952,
1972121892,
2068546981,
2160763688,
1985080107,
2162508334,
1569990960,
2043345585,
2130796978,
3138949179,
1534941005,
1496852045,
2111581650,
1601649239,
1969483356,
3217061993,
2007401074,
2108536179,
2128208761,
1551276924
] | This paper presents a new mathematical formulation to address mine production scheduling with multiple processing streams, under mineral supply uncertainty, and where the destination is formulated as a variable for each block. The proposed mathematical model maximizes discounted cash flows and penalizes deviations from... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Long-term mine production scheduling with multiple processing destinations based on multi-neighbourhood tabu search |
3,082,478,370 | 2020-08-28 | 11,732,831 | [
2000715618,
2100769519,
2595861342,
2046010791,
1972121892,
1534941005,
2143560894,
2094566145
] | [
2094566145,
1969397762,
2126895748,
2113536011,
1979015826,
2154929945,
2165299997,
1972121892,
2122244604,
2068546981,
2046010791,
1918344999,
2160763688,
2031003438,
2043345585,
2130796978,
2140170679,
2151675709,
2048661822,
2143560894,
222919112,
1534941005,
149685204... | Block sequencing is of great importance in an open-pit mining operation. Sequencing is usually performed to maximize the net present value (NPV). Also, from the environmental viewpoint, the sequence of dumping mined materials is of significant value in the sulfide mines. The potential acid-forming (PAF) waste rocks in ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a MIP model to maximize NPV and minimize adverse environmental impact—a heuristic approach |
2,780,978,454 | 2017-12-01 | 4,210,195,883 | [] | [
2126895748,
2090359754,
2313274380,
1534941005,
2128208761
] | The underground mine planning and design optimisation process have received little attention because of complexity and variability of problems in underground mines. Although a number of optimisation studies and software tools are available and some of them, in special, have been implemented effectively to determine the... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of Three Existing Stope Boundary Optimisation Methods in an Operating Underground Mine |
4,225,117,530 | 2023-01-18 | 4,306,463,448 | [] | [
1969397762,
2615190415,
2169528473,
1966910378,
2136050606,
2017190577,
2151675709,
1963697600,
2115768128,
2119356110,
2065198673,
1659842140,
2020407132,
2060852319,
2004014822,
2091248362,
1997466867,
2082622325,
2097580026
] | This chapter aims to provide an overview of energy efficiency in the mining industry with a particular focus on the role of fuel consumption in hauling operations in mining. Moreover, as the most costly aspect of surface mining with a significant environmental impact, diesel consumption will be investigated in this cha... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Energy Efficiency Improvement in Surface Mining |
2,032,680,842 | 2010-01-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Methodical principles for planning the mining and loading equipment capacity for open cast mining with the use of dumpers. Part III: Service capacity determination |
2,278,040,100 | 2015-01-01 | 4,306,463,937 | [
2000715618,
2160763688
] | [
2094566145,
2126895748,
1979015826,
2154929945,
2169528473,
2053920929,
1972121892,
2068546981,
2160763688,
1985080107,
2126258480,
2043345585,
2130796978,
2151675709,
2020999234,
2090359754,
1496852045,
1534941005,
2000715618,
2100769519,
2024060531,
4250589301,
21282087... | In this paper, we are interested in the tactical planning problem of mines and smelting furnace. The problem concerns a set of mines with one smelting furnace. We are faced to a multi-actor’s context for which a global optimization is not possible due to the independence of the services. This problem is solved using a ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Collaborative Planning Model to Coordinate Mining and Smelting Furnace |
846,155,387 | 2012-01-01 | 2,765,023,979 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | OPTIMIZATION OF MINERAL PROCESSING PLANT THROUGH ROM ORE SIZE |
4,281,297,875 | 2022-05-23 | 4,210,203,134 | [
2160763688
] | [
2094566145,
2126895748,
2086623749,
2156524938,
2140742285,
2543580944,
2185734033,
1979015826,
2024742034,
1973369232,
2038345112,
2169528473,
2167159964,
2053920929,
1972121892,
2116661285,
2068546981,
1918344999,
2160763688,
2083259944,
2764796714,
1985080107,
19927101... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA-II |
1,970,178,705 | 2014-10-31 | 48,643,595 | [
2160763688
] | [
1973131489,
2053920929,
2140190241,
2126895748,
2966207845,
2068546981,
1972121892,
2160763688,
2148602057,
1496852045,
1534941005,
2126258480,
1979015826,
2130796978,
2169528473,
2151675709,
2159306398
] | Several underground cave mining operations have realised benefits in development rates when an extraction level layout is designed according to the El Teniente style. Geotechnical benefits may accrue in adopting the advance undercut technique in which extraction drift development lags the undercut development directly ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A comparison between Offset Herringbone and El Teniente underground cave mining extraction layouts using a discrete event simulation technique |
2,336,507,016 | 2016-01-01 | 110,258,470 | [] | [
2119256515
] | The purpose of this study was to establish the impact of discount rates on cut-off grades for narrow tabular gold deposits as characterized by the goldfields of the Witwatersrand Basin in South Africa. There are various methods available for determining the cut-off grade, from simple breakeven calculations to sophistic... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Impact of discount rates on cut-off grades for narrow tabular gold deposits |
2,419,339,918 | 2016-01-01 | 2,764,515,337 | [] | [
2162774880,
1856219842,
1977431633,
1631820701,
2100634462,
1512608287
] | Iron ore is necessarily basic raw material for industrialization and urbanization and related to the industrial distribution and development programming. The lean iron ore resource in our country is high-cost and low-efficiency, which cannot meet the demand of iron and steel industry, and even endanger the safety of in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digital Mine Research and Practice Based on Mining and Metallurgy System Engineering |
3,098,863,035 | 2001-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining shaft construction method at Fazenda Brasileiro gold mine-CVRD |
2,291,615,399 | 2013-01-01 | null | [
2111563176
] | [
2111563176
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | HME Management in Mega Mining: Sishen Mine – South Africa |
2,489,052,510 | 2016-06-03 | 57,667,410 | [
2100769519,
2065332058
] | [
2126895748,
4301347335,
1979015826,
2096305430,
2036234778,
1972121892,
2068546981,
2046010791,
2160763688,
2163428398,
2084977713,
2130796978,
2043345585,
4256185527,
2101285186,
2172122819,
1496852045,
1534941005,
1999829841,
1748537427,
2065332058,
2146870367,
20116780... | Many countries produce significant quantities of nuclear waste which will have to be permanently and safely placed in a repository. We develop a mixed integer program that determines where to place each waste package of a specific waste type in a given time period with the goal of minimizing heat load concentration wit... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimizing high-level nuclear waste disposal within a deep geologic repository |
2,324,206,985 | 2015-01-01 | null | [] | [] | Avon Products Inc. is one of the oldest beauty manufacturing companies today in the United States. The company has expanded its operations throughout the world including the Philippines. The manufacturing plant is located at Calamba Premiere International Park (CPIP) at Brgy. Batino, Calamba City, Laguna. The study was... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improvement of Productivity Rate of JIT #262, Creams, Liquids, Lotions Department of Avon Products Manufacturing Inc. |
2,971,662,772 | 2019-01-01 | 4,210,228,333 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Influence of access road pattern on mine rock volume within the ultimate pit limit |
2,074,103,620 | 2011-10-01 | 104,568,202 | [
4298413470
] | [
2141951329,
2115497642,
4244985803,
4298413470
] | Recently, institutes of higher education (universities) have shown a renewed interest in organisational structures and operating methodologies that generate productivity and innovation; responsibility centre budgeting (RCB) is one such process. This paper describes the underlying principles constituting RCB, its origin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Implementing responsibility centre budgeting |
2,028,891,751 | 2014-12-01 | 4,210,223,158 | [] | [] | Although mine haul roads only provide support for mining activities, their role can be quite significant in any effort to optimize transportation with trucks in open pit mining. In 2009, an inventory about the design, construction and maintenance conditions of these structures in mines in the Quadrilátero Ferrífero was... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Diagnosis about iron ore mine haul roads in the Quadrilátero Ferrífero: Itabira Complex case |
2,930,835,082 | 2019-01-01 | 114,355,575 | [
1551276924,
2160763688
] | [
2053920929,
2126895748,
1493454437,
2068546981,
2046010791,
2160763688,
1972121892,
1990485541,
1496852045,
1534941005,
2126258480,
2043345585,
2130796978,
1979015826,
2169528473,
1551276924,
2151675709
] | In oil sands open-pit mining, further processing of the extracted oil sands generates massive volumes of tailings. To save space, the tailings are deposited in in-pit tailings containments constructed by internal dykes using mine waste material. In this paper, an integrated mine planning framework is proposed and imple... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management |
2,155,829,488 | 2010-11-01 | null | [
2126258480,
2077791698,
2050067494,
1534941005
] | [
1967344706,
2126105956,
2050067494,
2170444200,
3217061993,
2151238122,
1534941005,
2126258480,
2032316144,
2077791698,
3021444882,
1988520084,
1510052597,
2076057077,
2165201397,
2018044188,
4365787967
] | Mining companies world-wide are faced with the problem of how to accurately value and plan extraction projects subject to uncertainty in both fu- ture price and ore grade. Whilst the methodology of modelling price uncertainty is reasonably well un- derstood, modelling ore-grade uncertainty is a much harder problem to f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Measurement and Inclusion of a Stochastic Ore -Grade Uncertainty in Mine Valuations Using PDEs |
2,971,865,425 | 2019-12-01 | 63,392,143 | [] | [] | In a typical software defined network (SDN), switches report the Packet-In messages of newly arrived flows to the controllers. With more and more flows arriving at a network, the controller load significantly increases, which may lead to long (or even unacceptable) controller response time. Though previous solutions, s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Computer networks special issue on intelligent and connected transportation systems |
2,007,929,089 | 2013-12-01 | 4,210,180,762 | [] | [] | This study considers realistic data for a planned open-pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block model. Each block’s grade vector has components for each analyte (chemical element or compound) influencing ore value. Der... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimised ore selection from conditionally simulated block models |
4,236,286,206 | 2016-01-29 | 2,764,551,302 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Substantiation of efficient parameters for hybrid open pit/underground mining of coal |
1,988,026,352 | 2013-03-01 | 72,171,858 | [] | [] | Dragline productivity is strongly influenced by swing cycle times, comprising between 60–70% of all dragline operational time. The ability to classify and report on dragline swing cycles according to their limiting motion is essential for identifying performance losses and deriving continuous improvements. This paper p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Classifying dragline swing dependencies using coincident limit graphs |
2,045,705,270 | 2012-07-24 | 3,394,804 | [] | [
2082405251,
1974970149,
2138520198,
2065649191,
1993533895,
2103680519,
2068540555,
2000088683,
2055552433,
2127888210,
2001156023,
1977457396,
2086492725,
1969859799,
2082751518
] | We present a review of literature on the methods for rhenium determination published from 2000 to 2010. | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Up-to-date methods for the determination of rhenium |
2,491,555,660 | 2016-07-01 | 2,764,816,760 | [] | [] | Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty |
2,992,407,128 | 2018-01-01 | 2,764,420,890 | [] | [] | A mine planning team is tasked among other duties with designing a feasible mine plan which in turn maps out the daily running of the mining project. A mine plan revolves around a cut-off grade which is thoughtfully and uniquely selected while considering various aspects such as grade tonnage distribution, economic and... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Computer-Aided Cut-off Grade Optimisation for Open Pit Mines |
2,990,065,104 | 2018-01-01 | null | [
3217061993
] | [
2025069281,
2053920929,
1972121892,
1918344999,
2160763688,
3217061993,
2123696861,
2126385963,
1966554507,
2008668719,
2140170679,
2151675709
] | This thesis looks at the medium term mine planning process and tools in the Leveaniemi open pit mine operated by LKAB Svappavaara. The current planning process uses software, Chronos, which was pre ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Medium term planning with Evolution : Comparison with current method at LKAB Svappavaara |
2,762,435,994 | 2017-01-01 | 106,296,714 | [
2140170679,
2160763688
] | [
2053920929,
2126105956,
1972121892,
2068546981,
2126895748,
2160763688,
1496852045,
1534941005,
2126258480,
1979015826,
2130796978,
2140170679,
2169528473,
2010334716,
2151675709
] | This paper describes an approach to optimising processing and stockpiling decisions in an open pit mine in order to minimise the deviation from production targets. The solution involves determining decisions on the destination of ore as it is mined: whether to use ore in a product directly as it is extracted from the g... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evolutionary Computation to Determine Product Builds in Open Pit Mining |
2,766,676,929 | 2017-11-02 | 4,306,463,937 | [] | [
2051709477,
2166186246,
4211007335,
2130983366,
1992176519,
2090132397,
2150593711,
2062613656,
2056581810,
2091346452,
2041280856,
2071455833,
2156267802,
2146948159,
1570321471
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Energy Efficiency in Cable Shovel Operations |
3,116,003,334 | 2020-12-31 | 4,210,189,194 | [
1490670090
] | [
1490670090
] | This study is an observation and analysis about automatic assembling gear shaft output as car gearbox part that made at PT. Matahari Megah as a result of research. That automation product can reduce the assembly time from about 5 minutes to less than 45 seconds. Then the objectives in this case study are to describe as... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Automation systems in automatic assembling gear shaft output as car gearbox part at PT. Matahari Megah |
2,710,072,598 | 2006-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Multi-Objective Quality Control in Iron Ore Mining |
3,033,206,430 | 2020-01-01 | 2,764,900,261 | [
2151675709
] | [
1586409345,
1979015826,
2169528473,
2140481308,
2053920929,
1918344999,
2160763688,
2111563176,
2152358062,
2163428398,
2140170679,
2168210873,
2151675709,
2011039300,
2111581650,
1601649239,
2116675171,
2024060531,
2029681015
] | The use of an optimized dispatching system for the haul trucks in an open-pit mine plays a crucial role to increase the production, especially with the introduction of autonomous trucks into the mine. This involves managing the entire transport system in order to reduce the mine’s operating costs and enhance the mine e... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of Truck-Shovel Allocation Problem in Open-Pit Mines |
2,990,262,011 | 2019-11-30 | 4,210,224,691 | [] | [
2000715618,
1972121892,
1918344999,
1534941005,
2100769519,
2130796978,
2065332058,
1969483356
] | Open pit mine production scheduling (OPMPS) is a decision problem which maximizes net present value (NPV) by determining the extraction time and destination of each block of ore and/or waste in a deposit. Stockpiles can be used to maintain low-grade ore for future processing, to store extracted material until processin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open Pit Mine Scheduling Model Considering Blending and Stockpiling |
2,955,909,121 | 2019-03-01 | 4,306,423,759 | [] | [
1969397762,
1964946787,
1578476034,
2130983366,
2091248362,
2119356110,
2065198673,
2090972948,
65252926
] | The results of the analysis and experimental study of power consumption during the operation of an electric excavator in a quarry are proposed. The features of accounting for electricity consumption in the mechatronic complex with a complex power consumption mode, including energy recovery, are considered. The costs of... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Investigation of Electric Power Processes During Mining Excavator Operation |
2,537,834,497 | 2016-10-18 | 48,643,595 | [
1985080107,
2041085006,
1976122053,
2140170679,
2160763688,
2078286011,
2126895748
] | [
2126895748,
1647779468,
1979015826,
2169528473,
2010334716,
2004698524,
2053920929,
1972121892,
2068546981,
2093228967,
2160763688,
1984953641,
1985080107,
2126258480,
2133676848,
4240491954,
2130796978,
2127859636,
2506768821,
4238714550,
2140170679,
2118578357,
20782860... | Cost efficiency and high reliability of In-Pit Crushing and Conveying (IPCC) system make it more appealing to be used in deeper open-pit mining activities. Determination of the optimum time and location (OT–OL) for applying the IPCC system were always a challenge. Application of mathematical programming approaches suff... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining |
2,067,064,273 | 2000-02-01 | 112,051,168 | [] | [] | Abstract It is needless to mention that coal will definitely occupy a dominant and important position among natural resources in the future. However, the load subjected on environment by coal is far greater than other fossil fuels. Therefore, it is necessary to work out measures to reduce the load before using the coal... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | R&D of coal utilization technology in Japan |
4,240,393,497 | 2013-06-01 | 4,210,180,762 | [
2013821356
] | [
2013821356
] | As an external consultant advising industry (mainly the mining industry), two contrasting experiences are frequent. One is that the industry practitioners have strong domain knowledge that the consultant lacks. The other is that the industry practitioners often suffer from paradigm paralysis, using models of thinking t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Paradigm lost |
2,169,825,170 | 2001-01-01 | 191,798,613 | [
2090359754,
2128208761,
2126895748
] | [
1551276924,
2128208761,
2090359754,
2126895748
] | We present an algorithm for solving the minimum-cut problem on closure graphs without maintaining flow values. The algorithm is based on an optimization algorithm for the open-pit mining problem that was presented in 1964 (and published in 1965) by Lerchs and Grossmann. The Lerchs—Grossmann algorithm (LG algorithm) sol... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new?old algorithm for minimum-cut and maximum-flow in closure graphs |
1,516,304,863 | 2011-01-01 | 12,999,175 | [
3217061993
] | [
2144219012,
2098631313,
2112246162,
2103496339,
2128084896,
65738273,
2104550562,
2134383396,
2093829413,
2145085734,
1597286183,
2085831731,
2040870580,
1586335931,
2020999234,
2142752589,
2138484437,
2041280856,
4300402905,
2021218138,
1994410331,
1995341919,
2101927907... | Determination of the pit limits is a vital task in the designing process of a mine. While overestimation increases stripping ratio, underestimation can result in loss of economic ore. The available methods of pit limit optimization are mostly based on the programming approaches (linear and/ or dynamic) and graph theory... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open pit optimization in 3D using a new artificial neural network |
4,312,514,391 | 2022-01-01 | 4,210,169,103 | [] | [
2101719234,
1982218468,
1989853704,
2078293738,
2001890098
] | Abstract The paper considers issues related to the development of technology for the use of spinning waste in the production of cotton yarn. The process of forming a column of cotton fibers with included waste in an improved feeder-hopper of a loosening-scutching unit designed for cleaning from foreign impurities and d... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of Technology for the Use of Spinning Waste in Yarn Production |
1,928,216,909 | 2015-07-08 | 107,246,200 | [] | [] | The economics of today's mining industry requires more efficient usage of truck-shovel systems. In this paper, a discrete-event simulation model is developed, implemented, and verified to analyse the behaviour of a stochastic truck-shovel materials-handling and haulage system in open-pit mining. A mixed integer linear ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A linkage of truck-and-shovel operations to short-term mine plans using discrete-event simulation |
2,765,672,300 | 2017-01-01 | 2,764,472,783 | [] | [] | This paper gives the selection of the optimal model of trucks for transport of coal, and seam waste at the OP Gacko in terms of selective exploitation. Mining of coal and seam waste is carried out in two exploitation zones, the central and roof zone, and the coal and waste transport and disposal is carried out to the d... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Selection the rational model of transport truck by the selective coal mining at the open pit Gacko |
3,130,797,307 | 2021-06-01 | 194,185,345 | [
2024060531,
2000715618,
2100769519,
1496852045,
2043345585,
1979015826,
1534941005,
2065332058,
2094566145,
2068546981
] | [
2094566145,
2126895748,
2185734033,
1979015826,
2154929945,
2060929952,
1972121892,
2068546981,
2046010791,
2160763688,
1985080107,
2163428398,
2043345585,
2130796978,
2140170679,
2143560894,
1496852045,
1534941005,
2065332058,
1969483356,
2595861342,
2000715618,
14934544... | Production scheduling plays a pivotal role in successfully executing any open-pit mining operation. It defines the most profitable extraction sequence of mineralized material from the ground subject to various physical and operational constraints. Different mathematical formulations have been proposed to achieve this g... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A simulated annealing based approach for open pit mine production scheduling with stockpiling option |
2,153,025,204 | 2006-10-01 | 4,210,210,408 | [
2154636565
] | [
2154636565
] | Mining draglines have been powered by multiple motor-generator (M-G) sets for nearly one century and have been one of the last hold outs of this aged technology. A new technology with all alternating current (AC) static drives using insulated gate bipolar transistors (IGBT) and gearless synchronous ring motors has been... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A New All AC Gearless Drive System for Large Mining Draglines |
835,336,610 | 2011-01-01 | 4,306,520,473 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modernizacja mechanizmu napędu układu urabiania koparek wielonaczyniowych kołowych |
2,549,865,795 | 2016-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty |
249,177,188 | 2011-11-25 | null | [
2126258480,
1995503011
] | [
1978153729,
2157509893,
2163504005,
2063214469,
2321957512,
2140664585,
3124914565,
2087332622,
2067477904,
2047582865,
2118889105,
2046126098,
3021444882,
2108491286,
1967985564,
2103948957,
2131041950,
2019876639,
3125521824,
1525260320,
1983156129,
1995503011,
16082349... | We present a quantitative method to find jointly optimal strategies for an industry regulator and a firm, who operate under exogenous uncertainty. The firm controls its operating policy in order to maximize its expected future profits, whilst taking account of regulatory fines. The regulator aims to control the probabi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Regulating Industries under Exogenous Uncertainty |
2,911,776,422 | 2019-04-01 | 181,849,944 | [
2160763688
] | [
2094566145,
2126895748,
2073650054,
2185734033,
1979015826,
2005615253,
2169528473,
2165394332,
2048799772,
2060929952,
2053920929,
1972121892,
2068546981,
1918344999,
2160763688,
2036004393,
1985080107,
2126258480,
2023918002,
2130796978,
2141771453,
2151675709,
20223180... | Geological variation may be managed by alternating between modes of operation. These modes provide an integrated response to changes in feed mineralogy, and other operational conditions within the mineral value chain. The decision to alternate between modes depends on current and forecasted stockpile levels. Moreover, ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Concentrator operational modes in response to geological variation |
2,094,311,069 | 2007-02-20 | 267,729 | [
2313274380
] | [
2313274380
] | Abstract The dominant working structure of an underground mine is a set of interconnected tunnels which provides access to ore zones and haulage of ore from the designated ore zones to the mill. This set of interconnected tunnels forms a network. We describe a mathematical network model and the modelling features of ou... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Network modelling of underground mine layout: two case studies |
2,152,936,635 | 2011-01-01 | 45,645,249 | [] | [] | According to shortcomings of short-distance signal recognition, low signal transmission reliability, high rate of leakage reading and single function that exist in current underground personnel orientation system, a new system based on Synchronous Signal Sensei with initiative RFID technology has been designed. The sys... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research of Initiative Personnel Orientation and Rescue System in Mine based on Synchronous Signal Sensei Technology |
4,366,228,252 | 2023-01-01 | 50,979,996 | [] | [
2060929952,
2000715618,
2039238531,
2098395403,
2007221293,
2738900493,
2090132397,
2120390927,
2104442994,
4239510810
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Prediction Model of Drilling Costs for Ultra-Deep Wells Based on GA-BP Neural Network |
2,492,140,225 | 2005-03-15 | 4,306,463,973 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Intelligent optimal production scheduling estimator |
2,900,443,936 | 2018-01-01 | 2,737,788,663 | [] | [
2150036352,
2130745192,
2565537996,
2097609230,
2043133488,
2167630521,
2123179704,
2110171129,
1982137082,
1557496348,
2063052894
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Automatic control of haul truck travel speed on open pits |
1,995,549,207 | 2010-05-19 | 4,210,189,946 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining production information management system in an open pit based on GIS/GPS/GPRS/RFID |
4,210,846,320 | 2021-12-31 | 110,258,470 | [] | [] | The mine production scheduling problem (MPSP) has been studied since the 1960s, and remains an active area of computational research. In extending the concepts of the MPSP, the automated mine may now be regarded as a hierarchical intelligent agent in which the bottom layer consists of distributed robotic equipment, whi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integration of strategic open-pit mine planning into hierarchical artificial intelligence |
1,985,427,463 | 2012-04-29 | 40,280,859 | [
1993023795
] | [
2135374241,
4292811746,
2049410986,
2135255056,
1993023795,
2042623444
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The effect of the operator, the mine room and their interaction on the measured vibration level of a scaling machine |
26,743,015 | 2002-01-01 | 2,764,949,791 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Coal Movement by Railroad in the Powder River Basin |
3,176,589,374 | 2021-01-01 | 4,210,186,093 | [
2011430131
] | [
2151936673,
1596790722,
2134383396,
2015245929,
2118769226,
2141362318,
2150593711,
2121947440,
1990368529,
2011430131,
2108182844,
2069429561,
2102897370,
2140095548,
2111993661,
2151103935
] | Objective: to understand the development level of digital inclusive finance in 31 provinces in China in recent years, so that the areas with poor development level can speed up the development. Methods: the data of Peking University Digital inclusive Financial Index from 2012 to 2018 were collected, and the optimal clu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on the difference of Digital inclusive Finance-based on Multi-index Panel data clustering |
3,007,495,241 | 2020-06-01 | 4,306,401,280 | [
3217061993,
2126895748
] | [
2126895748,
1972121892,
3217061993,
2090359754,
2128208761,
1551276924
] | In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open pit limit optimization using dijkstra’s algorithm |
1,225,380,441 | 2012-01-01 | 4,306,511,618 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analytical modeling of an on-road in-pit heavy traffic situation |
2,979,877,840 | 2019-07-01 | 177,067,490 | [] | [
2164768649,
1985080107,
2072834565
] | This paper presents a comprehensive simulation model of underground coal mining processes in a fully mechanized longwall mining face. A number of simulation experiments were performed. The face productivity is estimated as a function of various factors such as the technical parameters of mining machines, face length, g... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modeling of Underground Coal Mining Processes |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.