paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
4,327,963,005 | 2023-03-17 | 4,210,205,812 | [] | [
4251616545,
2053920929,
2122203560,
2083259944,
2131116400,
2140170679,
2151675709
] | The equipment investment is large and the annual operating cost is high in oversized open-pit mines. The rationality of the truck-shovel selection and matching has a more prominent influence on the economic benefit of mines. Therefore, we set up an optimization method of truck-shovel selection for oversized open-pit mi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on Selection and Matching of Truck-Shovel in Oversized Open-Pit Mines |
3,011,271,806 | 2020-01-01 | 4,210,175,061 | [] | [] | The article shows the relevance of outsourcing repair services at machine-building enterprises in conditions of high wear of equipment, the decline in the organization of management of technical and repair services and the effectiveness of this activity. The positive and negative sides of outsourcing, as well as factor... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Outsourcing as a means to improve the efficiency of activity of machinery enterprises |
3,033,654,628 | 2020-06-03 | null | [] | [] | The establishment of One-stop Service in Indonesia is expected to improve the quality of licensing process. In the mining license system, the investors still find some obstacles. Meanwhile the resources of mining area in Indonesia still attractive to the investors. Therefore, it is obvious that there is room for improv... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving Mineral Mining License System in North Sumatera Indonesia |
4,385,759,356 | 2023-08-01 | 194,185,345 | [
1969483356,
2024060531,
1966910378,
1534941005,
2068546981,
2090359754,
2128208761,
2126895748
] | [
2116388354,
2163191305,
3123321876,
2110603299,
2050067494,
2153624615,
4231546411,
1977480757,
2005424182,
2012914747,
2020999234,
1496852045,
3011865677,
1587141723,
1969483356,
3124805728,
3217061993,
2077252204,
2153562738,
2024060531,
1975994995,
1595159159,
21310798... | Commodity price is of paramount importance to mine planning among other stochastic factors such as mining cost and geological uncertainties. Commodity price uncertainty is critical in the determining block values, and it has been incorporated into mine planning by simulation-based methodologies to deal with the effects... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrating stochastic mine planning model with ARDL commodity price forecasting |
2,958,481,423 | 2019-06-28 | 4,210,227,770 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improvement of access methods for ore reserves beyond ultimate limits of open pits |
3,107,069,879 | 2020-11-13 | 4,210,190,616 | [] | [] | ABSTRAKProgram pengabdian kepada masyarakat bertujuan untuk menyelesaikan permasalahan yang dihadapi oleh mitra pengabdian yaitu kelompok usaha kecil rumahan “Poklahsar Mandiri” yang bergerak di bidang produksi kerupuk cumi. Kelompok usaha ini terletak di Desa Karangsari, Sempu, Banyuwangi. Metode pelaksaan pengabdian ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | ALAT SABLON UNTUK MENUNJANG TAMPILAN KEMASAN KRUPUK CUMI PADA KELOMPOK USAHA POKLAHSAR MANDIRI BANYUWANGI |
3,213,076,785 | 2007-01-01 | null | [
2904250082
] | [
2904250082
] | In mining industries, materials handling costs represent a significant
component of the operational cost. A variety of methods have been
applied in surface mine equipment selection in order to select the suitable
loading system with the lowest loading operation cost. These are queuing
theory, bunching theory, l... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising the Loading System of Gol-e-Gohar Iron Ore Mine of Iran by Genetic Algorithm |
4,212,914,193 | 2022-01-01 | 4,306,463,937 | [] | [
1569990960,
1985080107
] | In open-pit mine planning, the determination of optimum cut-off grade is essential for the mine designing process. Selection of the optimum cut-off grade maximizes the net present value (NPV) of an open-pit mining operation subject to the variable mining capacities, milling, smelting, and refining. The cut-off grade of... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Advanced Analytics for Dynamic Programming |
2,152,964,757 | 2008-06-01 | 4,306,421,322 | [] | [
2121766240,
2107941094,
2142183404,
2024060531,
2154929945,
2569549435
] | In this paper we introduce an evolutionary algorithm for solving a copper mine planning problem. In the last 10 years this real-world problem has been tackled using linear integer programming and constraint programming. However, because it is a large scale problem, the model must be simplified by relaxing many constrai... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | EA-MP: An evolutionary algorithm for a mine planning problem |
2,954,345,779 | 2019-06-27 | 178,238,111 | [
4245152641,
2042102899,
4211007335,
1995450389
] | [
4245152641,
2126895748,
2113076747,
1995450389,
2069069851,
2004698524,
1973048734,
1972121892,
2068546981,
2160763688,
194786220,
4365787967,
2585206336,
1996747841,
2062706881,
2157041604,
4292158025,
2090359754,
1534941005,
2065109455,
1748537427,
2099867994,
200161993... | Production planning in an underground mine plays a key activity in the mining company business. It is supported by the fact that mineral industry is unique and volatile environment. There are two uncertain parameters that cannot be managed by planners, metal price, and operating costs. Having ability to quantify and in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Long-Term Room and Pillar Mine Production Planning Based on Fuzzy 0-1 Linear Programing and Multicriteria Clustering Algorithm with Uncertainty |
2,339,840,223 | 2016-04-20 | 2,764,368,258 | [
2151675709
] | [
2164768649,
2072834565,
2169245194,
2151675709
] | This study developed a program to simulate a haulage system with trucks and loaders for an underground mine using the GPSS/H simulation language. The Daesung MDI limestone mine located in Korea was selected as the study area. Using the developed program and parameter values determined by a field survey, simulations of ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of truck-loader haulage systems in an underground mine using simulation methods |
2,226,309,298 | 2015-02-22 | 2,764,358,612 | [] | [
2120688485,
2159265133,
2019207321,
2050462717,
2079325629
] | Optimization of the exploitation operation is one of the most important issues facing the mining engineers. Since several technical and economic parameters depend on the cut-off grade, optimization of this parameter is of particular importance. The aim of this optimization is to maximize the net present value (NPV). Si... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comparison of golden section search method and imperialist competitive algorithm for optimization cut-off grade- case study: Mine No. 1 of Golgohar |
4,235,784,768 | 2010-03-01 | 4,210,223,135 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Errata |
2,911,917,710 | 2019-04-10 | 4,306,463,448 | [
2151675709
] | [
1598993794,
2002424517,
2103553931,
2129466958,
1966814098,
2032777079,
2998574808,
2210278139,
2151675709,
1995341919
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Application of Artificial Intelligence to Reduce Greenhouse Gas Emissions in the Mining Industry |
2,279,261,842 | 2015-12-01 | 4,306,419,530 | [] | [] | To determine maximum demand currently and most widely used method in Australia is to simply follow Australian Standard guidelines and sum together the loads and find a suitable transformer rating. This practice is considered to have many flaws specifically from a construction and financial point of view and it is this ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Use of maximum demand principles for optimizing transformer design of a ship loader |
4,388,722,188 | 2023-11-16 | 48,643,595 | [
1969483356,
2100769519,
2000715618,
2160763688,
2046010791,
1972121892,
1979015826,
2130796978,
1534941005,
2065332058,
2068546981,
2185734033
] | [
2094566145,
2132914434,
2126895748,
2543580944,
2185734033,
1979015826,
2169528473,
2154929945,
2060929952,
2053920929,
1972121892,
2068546981,
2122244604,
2046010791,
2160763688,
1918344999,
2162145193,
1985080107,
1992710140,
2163428398,
2150593711,
2126258480,
20433455... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A heuristic method for production scheduling of an open pit mining operation |
2,333,583,259 | 2016-03-23 | 48,643,595 | [
2100769519,
2160763688,
2046010791,
1972121892,
2130796978,
1534941005,
2065332058,
2068546981,
2126895748
] | [
2094566145,
2126895748,
1979015826,
1484040084,
2125827607,
2169528473,
2118371226,
2019207321,
2033916191,
2060929952,
2053920929,
2150071071,
1972121892,
2068546981,
2046010791,
2160763688,
1982833447,
2162635690,
1985080107,
2163428398,
2126258480,
2043345585,
21307969... | This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit mine production operations including drilling, blasting and excavating under real-time mining constraints. The MMPT problem is formulated as a mixed integer programming model and can be optimally solved for small-size MM... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations |
2,101,731,880 | 2007-01-01 | 30,371,981 | [
2024060531,
2124289529,
2140481308
] | [
2172122819,
2122203560,
1995713768,
2334782222,
2024060531,
2085300404,
1975828823,
2124289529,
2140481308
] | This paper examines a problem related to replenishing inventories at retailers in distribution networks operated under the paradigm of Vendor Managed Inventory (VMI). In the real world, complexity in analysing such systems arises out of numerous factors, including several random variables and a multitude of costs in th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation-based optimisation for material dispatching in Vendor-Managed Inventory systems |
3,189,412,606 | 2021-08-01 | 4,210,207,305 | [
1595159159
] | [
2156194072,
2155529731,
2160763688,
2162145193,
2151554678,
1595159159,
2137340504,
2151675709
] | The allocation of trucks in open pit mines is a field with great potential for optimizing resources and applying advanced computer modeling techniques, mainly because many companies still choose to use manual allocation, which is premised on the decisions made by the operator, being subject to common failures and not r... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of truck allocation in open pit mines using differential evolution algorithm |
4,385,499,696 | 2023-04-01 | 206,834,481 | [] | [] | The authors present the formulation and solution of a problem on the efficient engineering data of multi-drive high-duty belts for bulk coal. The theoretical framework for calculating the belt thrust includes the main equation of the belt conveyor dynamics, and features of calculations in stationary mode and in startin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Justification of Efficient Engineering Data for Multi-Drive High-Duty Belt Conveyors |
1,055,892,412 | 2014-11-01 | 206,834,481 | [
2043345585,
2130796978,
1534941005,
2065332058,
2068546981
] | [
2126895748,
1979015826,
1972121892,
2068546981,
2046010791,
2160763688,
2081278763,
1970101292,
2163428398,
2043345585,
2130796978,
2157846217,
1534941005,
2065332058,
1493454437,
3217061993,
2100769519,
2024060531,
2123871098,
1551276924
] | To improve the quality of decision making in the mining operation, it is essential to find global optimum in problems with large dimensional scales. It is widely accepted that Long-term production scheduling (LTPS) problem is playing key role in mining projects to improve their performance by considering availability c... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization |
985,885,682 | 2014-01-01 | 4,306,507,449 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Porównanie wybranych aspektów techniczno-ekonomicznych udostępnienia złoża szybem pionowym oraz upadową |
2,809,471,537 | 2017-01-01 | 2,738,126,797 | [
2140481308,
2151675709
] | [
2094039233,
2053920929,
2025878787,
2145493798,
2048769967,
2096305430,
2140170679,
2049176600,
2140481308,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | IMPROVING THE ORGANIZATION OF THE SHOVEL-TRUCK SYSTEMS IN OPEN-PIT COAL MINES |
2,329,819,344 | 2006-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Block cave mine infrastructure reliability applied to production planning |
3,149,386,155 | 2019-06-30 | 4,210,201,656 | [] | [] | The present study was carried out in a metal packaging manufacturing company located in Ensenada Baja California. The DMAMC methodology was applied in the "Define and Measure" stages for the analysis and to be able to propose strategies that allow to increase the efficiency, maintain the controls in the client - suppli... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Implementación de las etapas Definir y Medir de la metodología DMAMC en una línea de producción |
2,031,271,668 | 2008-12-07 | 4,306,421,180 | [
1512342490
] | [
1512342490
] | The use of the Operation Process Simulation (OPS) for Six Sigma Projects (SSP) can illustrate visual display of the process by enabling to define, measure, analyze and improve the current process virtually but realistically. This paper investigates the quantitative benefits of using the Design for Six Sigma (DFSS) tech... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using operation process simulation for a six sigma project of mining and iron production factory |
4,220,870,470 | 2022-03-07 | 48,643,595 | [
2100769519,
2130796978,
2151675709
] | [
2000715618,
2126895748,
2068546981,
1972121892,
2046010791,
2160763688,
1496852045,
1534941005,
2100769519,
2043345585,
2130796978,
1979015826,
2140170679,
2065332058,
1551276924,
2151675709
] | The loading and haulage system under six different scenarios was simulated across an eight-hour period with and without the incorporation of a surge loader. Simulations showed that incorporation of the surge loader increases the utilisation of shovels by 11%, which results in a 13% increase in productivity of both shov... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulating the productivity improvements of incorporating a surge loader into the open pit loading and haulage system |
2,327,405,664 | 2015-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The impact of coal quality on the efficiency of a spreader stoker boiler |
1,563,151,236 | 2011-11-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Net present value maximization model for optimum cut-off grade policy of open pit mining operations |
3,127,558,161 | 2018-12-01 | null | [] | [
1981934656,
2053920929,
2136050606,
2082622325,
2169528473,
2058361114,
2020407132,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of a Smartphone Application to Investigate Unsurfaced Road Conditions in Mines |
4,361,831,383 | 2023-01-01 | 4,306,463,230 | [] | [
2105103777,
2246023205,
2038194220,
2172073677,
2134295053,
2136939469,
1970635216,
2801342613,
2156958265
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Advances in coal mining technology and sustainable mining techniques |
2,806,930,768 | 2008-01-01 | 2,764,812,335 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of GIS-based Viewshed Analysis for Selecting optimal Viewpoints and for Evaluating the Sight Distance on a Haul Road in Open-pit mines |
3,210,933,694 | 2021-01-01 | 4,210,186,093 | [
2767346351
] | [
2019291268,
1977367431,
1647779468,
1981616524,
2507578125,
2125417745,
2131646073,
2044049559,
2798344481,
4251616545,
2021472931,
2029608738,
1995285162,
2111619626,
2038194220,
1990275757,
2767346351,
1569990960,
2118578357,
3123115705,
2058401212,
2046396733,
42471659... | At present, the designing of a power supply system for mine sections is performed in accordance with obsolete regulatory documents made in the early 90s of the 20th century. This slows down the implementation of the ‘digital mining operation’ concept and prevents the full potential for energy savings from being realize... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation of the power supply system of the coal mine section |
3,165,804,363 | 2020-10-08 | 4,210,195,746 | [] | [
1972121892,
2068546981,
2160763688,
3217061993,
1496852045,
1534941005,
2100769519,
2043345585,
1979015826,
2130796978,
2128208761,
2149230623
] | Long-term limestone quarry production planning is essential to maintain the supply to the cement plant. In which, quarry planners usually attempt to fulfil the complicated calculations, which ensure a consistent supply of raw materials to the cement plant while guaranteeing technical and operational parameters in minin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Introduction of New Simulation and Optimization Software Application for Long-Term Limestone Quarry Production Planning |
3,037,380,901 | 2020-08-01 | 28,036,099 | [] | [
2142020613,
2008251417,
2086710305,
1966703140,
2081757228,
1977775666,
2070854196,
2032600630,
2169667133,
2171137093,
2160444496,
1492856410,
2098983012,
2099697766,
2168569455,
2164366449,
2131853941,
1972602497,
2168237201,
2312970899,
2046857879,
2124611226,
21133482... | The agricultural sector in the UK is facing unprecedented challenges as a result of changes in the macroeconomic environment and the future of the livestock sub-sector is particularly uncertain. Farmer's businesses and livelihoods are at risk with the planned removal of subsidy payments as a consequence of emerging agr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Discrete event simulation in livestock management |
3,110,519,872 | 2020-06-15 | 4,210,226,828 | [] | [] | Relevance of the work. After the collapse of the USSR, local ferroalloy industry experienced a deficit in certain types of mineral raw materials, in particular in chromium ores. In Perm Krai, in the vicinity of the village Sarany, medium and small-scale deposits of primary magmatic and fragmental slop wash ore of high ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Revaluation of alluvial deposits residual reserves of boulder chrome ores of the Saranovsky ore field |
2,756,658,940 | 2017-09-01 | 4,210,195,883 | [] | [] | Methodological approaches to theoretical substantiation of the structure and parameters of robotic coal mines are outlined. The results of mathematical and numerical modeling revealed the features of manifestation of geomechanical and gas dynamic processes in the conditions of robotic mines. Technological solutions for... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Theoretical approaches to creation of robotic coal mines based on the synthesis of simulation technologies |
2,600,081,296 | 2017-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | 3D geological modelling and resource estimation for a gold deposit in Mali |
4,296,771,186 | 2023-01-01 | 18,051,569 | [] | [
1969397762,
2044055559,
2020828556,
2050557069,
2190698000,
1979015826,
2736219668,
2766736793,
2140481308,
2053920929,
2067965476,
1972121892,
32403112,
2160763688,
1522204718,
2152358062,
2017190577,
2048462006,
2140170679,
1966260411,
2166448956,
2151675709,
2096885696... | In typical mining operations, more than half of the direct greenhouse gas (GHG) emissions come from haulage fuel consumption. Smarter truck fleet dispatching is a feasible and manageable solution to reduce direct emissions with existing equipment. Conventional scheduling-based and human-led dispatching solutions often ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Reinforcement Learning-Based Fleet Dispatching for Greenhouse Gas Emission Reduction in Open-Pit Mining Operations |
2,895,808,930 | 2018-01-01 | null | [] | [
2160763688,
2151675709,
2140170679
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A simulation model for truck-shovel operation |
3,138,338,553 | 2021-08-01 | 194,185,345 | [
2128208761
] | [
3123833473,
1978775682,
2116388354,
1964168965,
1988045831,
3124091918,
2615190415,
2013158160,
2178225550,
3121403162,
2124884000,
1963580067,
2106595237,
1985080107,
1569990960,
2098363826,
2025610165,
2018957623,
2116512828,
1988473795,
2110485445,
2147422150,
21554826... | A very important part of any open-pit mining project is determining the ultimate pit limits and optimizing the pushbacks. Currently, block models are the most widely used for calculating mineral resources and reserves. Block models can define the ultimate pit limits through algorithms like floating cone, Lerchs-Grossma... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Calculating ultimate pit limits and determining pushbacks in open-pit mining projects |
2,032,212,849 | 2009-09-01 | 4,306,420,530 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamic Information Management System of Mining Production in an Open Pit Based on GIS/GPS/GPRS/RFID |
1,812,586,245 | 2012-01-01 | 110,258,470 | [
3217061993
] | [
3217061993
] | Synopsis There are many near-surface deposits with considerable vertical extent that have the potential to be mined by a combined method of open-pit and underground methods. In this regard, there is often a point called ’transition depth’ where a decision has to be made whether to continue deepening the pit or change t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of the transition from open-pit to underground operation in combined mining using (0-1) integer programming |
999,816,261 | 2011-01-01 | 2,764,849,351 | [] | [
2097978133
] | In the paper a problem of determination of basic reliability parameters and characteristics for a system of pair of elements is considered. Different methods of operation of the system are discussed, however one method was chosen for further analysis as the most convenient one from practical point of view. It was presu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Semi-Markov process for a pair of elements |
182,154,836 | 2011-01-01 | null | [
3124407081,
1647779468,
2160763688,
3217061993,
1972121892,
1979015826,
2130796978,
1534941005,
2068546981,
2126895748
] | [
2126895748,
2019291268,
1647779468,
2502254989,
1979015826,
2169528473,
2053920929,
2798344481,
1972121892,
2068546981,
2160763688,
3124407081,
2126258480,
2043345585,
2130796978,
2151675709,
1970162248,
2090359754,
1534941005,
1496852045,
2038865108,
4249513058,
32170619... | Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained in them, and in this process a deeper and deeper pit is formed until the mining operation ends. ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mathematical Optimization Models and Methods for Open-Pit Mining |
4,387,534,569 | 2023-10-11 | null | [
2160763688,
2053920929,
2151675709,
2094566145
] | [
2094566145,
1969397762,
2126895748,
2107974152,
2056246536,
2065788296,
2097048331,
2185734033,
1979015826,
2090972948,
2169528473,
2116859162,
1981703709,
2090838176,
2053920929,
2060929952,
2798344481,
1972121892,
4255833381,
4251616545,
2068546981,
2160763688,
20583942... | Abstract Today, carrying ore from the pit to the unloading sites is very important in open-pit mines. In the mines, due to changes in working conditions such as climate and the physical and mental condition of the workforce, uncertainty in the arrival time of trucks and the rate of ore transport is constantly discussed... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Multi-Objective Fuzzy Robust Optimization Model for Open-Pit Mining Planning under Uncertainty |
2,741,981,241 | 2014-01-01 | null | [
1551276924,
2100769519,
1496852045,
2160763688,
2046010791,
3217061993,
1972121892,
1979015826,
2130796978,
1534941005,
2163428398,
2126895748
] | [
2126895748,
1979015826,
2169528473,
2149230623,
2053920929,
1972121892,
2068546981,
2046010791,
2160763688,
2163428398,
2126258480,
2043345585,
2130796978,
2151675709,
2036112575,
2090359754,
1496852045,
1534941005,
2065332058,
1493454437,
3217061993,
2100769519,
21282087... | Similar to the mixed-integer programming library (MIPLIB), we present a library of publicly available test problem instances for three classical types of open pit mining problems: the ultimate pit limit problem and two variants of open pit production scheduling problems. The ultimate pit limit problem determines a set ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Library of Open Pit Mining Problems |
2,991,355,655 | 2019-11-30 | 4,210,224,691 | [] | [] | Pit slope optimization is a fundamental design requirement for open pit mines. Several input parameters are incorporated into the slope design process including the slope angle, commodity price, recoveries and equipment size among others. The quality of the rock mass determines how steep the slopes should be designed f... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of Synthetic Nets as an Enabler of Optimised Pit Slopes at Skorpion Zinc Mine |
2,562,297,636 | 2016-12-14 | 171,358,856 | [
1985080107
] | [
2018821216,
2105151233,
1965761122,
2073120193,
2020999234,
1608778661,
2022318022,
4237504711,
2083259944,
4249667877,
1985080107,
1551360398,
2160444496,
2134886743,
2001517656,
2089105401,
1971740826
] | Mathematical programming (MP) is fundamental to systems engineering and operations management, but has not been widely adopted by mineral processors. The current paper presents an interdisciplinary approach, using MP to incorporate basic notions of mass balancing into an optimisation framework. The optimisation is typi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A systems approach to mineral processing based on mathematical programming |
2,796,723,851 | 2018-04-01 | 4,210,178,226 | [
2024060531,
2060929952,
1979015826,
2024697317
] | [
2060929952,
2094566145,
2126895748,
2024697317,
2068546981,
1972121892,
2160763688,
1985080107,
1496852045,
1534941005,
2100769519,
2043345585,
1979015826,
2024060531,
2130796978,
2128208761,
1969483356
] | Determination of the best possible ultimate pit for an open pit mine is a fundamental subject that has undergone a highly evolutionary process, reviewed in this study, since the correct choice carries substantial economic impact for the industry. The correct choice can be very beneficial for project analysis, whereas a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Classical and stochastic mine planning techniques, state of the art and trends |
2,366,677,091 | 2008-01-01 | 2,764,929,336 | [] | [] | The work element of hydraulic excavator is designed by Pro/E software.The model is modeled by the use of the Pro/Mechanism.By the excavator scoop in the tooth crown spot as the research object,speed,acceleration, position and time movement simulation analysis result is obtained in an excavation work cycle time.It provi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modeling and Dynamic Simulation Analysis of Backhol Working Equipment of Hydraulic Excavator Based on Pro/E Software |
3,129,348,194 | 2021-02-22 | 4,210,197,456 | [
2126258480,
2146612430,
2043345585,
1979015826
] | [
2059757952,
2094566145,
2126895748,
2138522501,
4236127247,
2615190415,
2185734033,
1979015826,
3125975571,
3124770064,
2158182297,
2060929952,
1995503011,
1972121892,
2068546981,
1918344999,
2046010791,
2114173607,
2126258480,
2043345585,
2130796978,
1971394868,
21185783... | Due to the long life, most mining projects face the risk of the parameters such as mineral price, grade, and cost. Uncertainty can lead to unfavorable results of the decisions made by managers and mining investors. Therefore, this paper aims to determine the Sari Gunay gold mine’s production planning, considering the c... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of optimal production rate under price uncertainty—Sari Gunay gold mine, Iran |
4,285,710,029 | 2020-01-15 | null | [] | [] | Участок Ханнинский находится в пределах Дяхтарской рудно-россыпной зоны и представляет собой конус выноса кимберлитовых минералов с трубки Нюрбинская. Целью нашей работы является построение 3D моделей продуктивных толщ участка Ханнинский средствами ГГИС Micromine, подсчет прогнозных ресурсов и сопоставление полученных ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modeling of terrigenous collectors and assessment of forecast resources of a placer diamondness on the site Hanninsky by means of a mining-and-geological information system (GGIS) Micromine |
2,483,431,626 | 2016-01-01 | 110,258,470 | [] | [] | This paper is based on project work carried out in partial
fulfilment of the degree B Eng (Mining Engineering) | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A critical investigation into tyre life on an iron ore haulage system |
2,887,079,603 | 2007-01-01 | 110,258,470 | [] | [] | Central to the success of any mining company is the ability to manage capital investment effectively so as to ensure acceptable stakeholder returns within an overall strategic context. Critical to this process is the effective selection and implementation of a strategically aligned project portfolio that enables optima... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Project valuation, capital investment and strategic alignment - tools and techniques at Anglo Platinum |
2,795,750,751 | 2018-01-01 | 2,764,831,130 | [
2000715618,
1979015826
] | [
2094566145,
2000715618,
1995503011,
1972121892,
2068546981,
1548953477,
2026992098,
2126311658,
2341171179,
1534941005,
2146612430,
2100769519,
2126258480,
2043345585,
1979015826,
2130796978,
2077791698,
2154929945
] | After designing the final range of open pit mines, one of the first essential decisions to be made in the production planning framework is to determine the cutoff grade. The cutoff grade of mines, due to interconnections with technical and economic parameters, is one of the most important parameters for the design of o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cutoff grade optimization based on maximizing net present value using a computer model |
2,026,484,760 | 2003-09-01 | 88,256,731 | [] | [] | The pit limit optimization is discussed, which is one of the most important problems in the combined mining method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put forward through analyzing the limitations of moving cone method under such conditions. With a view to rec... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization principle of combined surface and underground mining and its applications |
4,366,572,629 | 2023-04-13 | 48,643,595 | [
1969483356,
2060929952,
2100769519,
1496852045,
2046010791,
1918344999,
2130796978,
2068546981,
2185734033
] | [
2094566145,
2126895748,
2140742285,
2543580944,
2185734033,
1979015826,
2038345112,
2165299997,
2060929952,
2053920929,
1972121892,
2068546981,
2046010791,
1918344999,
2160763688,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2151675709,
20361125... | This paper presents an approach to optimise the long-term production scheduling of an open pit mine with multiple processing streams, while accounting for investment decisions under mineral supply uncertainty. The solution approach consists of first solving the linear relaxation using an extension of the Bienstock-Zuck... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty |
2,005,206,933 | 2013-06-01 | 194,185,345 | [
2126311658,
2126258480,
2146612430,
2077791698,
1979015826
] | [
2059757952,
2615190415,
3124770064,
1979015826,
2170444200,
2126258480,
2043345585,
2166116275,
3123821384,
1534941005,
2146612430,
2077791698,
1985018066,
1966119267,
2151065060,
2126311658,
2049606892,
4231057775,
2087076079,
1639032689,
2076057077,
2165201397
] | Cut-off grade strategy (COGS) is a concept that directly influences the financial, technical, economical, and environmental issues in relation to the exploitation of a mineral resource. Despite the simple definition of cut-off grade, the COGS problem is one of the complex and complicated problems in the mine planning p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection |
1,995,995,389 | 2011-01-01 | 4,210,180,762 | [] | [] | AbstractAn essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of the ore. From a production viewpoint, the unit of data collection is generally the input and output data set fo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Predicting finished product properties in mining industry from pre-extraction data |
3,016,799,774 | 2019-01-01 | 2,764,472,783 | [] | [
1534941005
] | This paper describes one of the phases of the technological solution for removal the accumulated material from a part of the Open Pit South Mining District - Copper Mine Majdanpek. It is necessary to clean the material for the purpose of undisturbed further work at the Open Pit. Three layers can be separated in the acc... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Removal of a sludge layer from a part of the Open Pit South Mining District Majdanpek |
2,750,412,173 | 2017-09-01 | 194,185,345 | [
2088025057,
2060929952,
2000715618,
1979015826,
1981106795,
2128208761
] | [
3029645440,
2059757952,
2094566145,
2132984323,
2126895748,
2615190415,
2095800081,
1979015826,
2185734033,
1964635666,
1561941139,
2296319761,
71326613,
2154929945,
2098432798,
2060929952,
1972121892,
2068546981,
1918344999,
1985080107,
2068985771,
2150593711,
2126258480... | Open pit mine planning and determination of mining orientation are a critically important part of a mine opening to its closure. However, an optimal extraction sequences (OES) is identified when an NPV cumulative trend becomes steady. This is controlled manually, typically from a nested pit shell methodology based on t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal modelling for mining strategy selection |
3,149,516,475 | 2021-03-31 | 10,134,376 | [] | [
2060929952,
1972121892,
1985080107,
1988790447,
1569990960,
1551276924
] | The conditions of declining gold grade in the ore, increasing depth of excavation, and de-creasing unallocated stock of deposits make it necessary to develop efficient solutions for the mine-to-mill process, which have to be adapted to each specific mining plant and will optimizes production costs. Current research foc... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Assessing of Losses and Dilution Impact on the Cost Chain: Case Study of Gold Ore Deposits |
3,008,212,581 | 2020-02-29 | 4,306,400,562 | [] | [
2126258480
] | This research project is aimed at applying the proposed methodology to optimize the calculation of mining reserves using an empirical relationship for dilution, as proposed by O'Hara. This methodology uses three key parameters: dilution, mineral value, and total costs. In general, costs include mining costs, processing... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimized Method of Estimating Mineral Reserves Using the O’Hara Mathematical Model for Underground Mining in Peru |
3,044,382,525 | 2020-07-22 | 66,787,172 | [] | [
2094566145,
2166186246,
2009231757,
2032444054,
2019207321,
2128970394,
2075041695,
2060929952,
1992147631,
2032331699,
1996109622,
4238889147,
2585206336,
2048628678,
1977168082,
2046738003,
1999565652,
2089468765,
2107305576,
2148534890,
2080007420
] | Low commodity prices have forced many mining companies to explore new strategies to minimize operating costs. One cost-saving strategy is to increase drilling efficiency and performance, specifically in open pit mines; drilling operations are expensive, and they directly and indirectly affect most aspects of the mining... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Management of Drilling Operations in Surface Mines Using Reliability Analysis and Discrete Event Simulation |
2,964,309,555 | 2019-05-22 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Understanding plan’s priorities: Short term scheduling optimization |
2,055,666,352 | 2006-01-01 | 2,898,246,533 | [] | [] | An integrated model was introduced to manage tailings material distribution in an oilsand mining application. The resulting mathematical formulation of the model is a nonlinear optimization problem with an objective function, and sets of constraints covering tailings material balance, costs, and risk analysis. The mode... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | AN OPTIMIZATION MODEL FOR TAILINGS DISTRIBUTION IN AN OILSAND INDUSTRY |
1,985,080,107 | 2011-03-01 | 206,834,481 | [
2020999234
] | [
2020999234,
4210300258,
1537810918,
3145128584,
1995565517,
4229562638,
2752885492,
2496675188,
1988520084,
2123879611
] | Conventional approaches to estimating reserves, optimizing mine planning, and production forecasting result in single, and often biased, forecasts. This is largely due to the non-linear propagation of errors in understanding orebodies throughout the chain of mining. A new mine planning paradigm is considered herein, in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic optimization for strategic mine planning: A decade of developments |
2,979,586,336 | 2019-04-30 | 4,210,181,684 | [] | [
2160763688,
2137983211,
2038872716,
2140170679
] | The article presents the results of experimental studies on the estimation of electricity consumption levels by iron ore mines in Ukraine. Using the systematic research, and highlighting the strategic goal - the optimal distribution of electricity between subsystems of the production system, proposed decomposition of o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Diagnosis and Forecasting of the Levels of Electrical Consumption of Iron Ore Mines |
2,767,832,151 | 2017-01-01 | 4,210,186,093 | [
2100769519,
2160763688,
2046010791,
2065332058
] | [
2126895748,
1979015826,
2169528473,
2053920929,
1972121892,
2068546981,
2046010791,
2160763688,
2163428398,
2126258480,
2043345585,
2130796978,
2151675709,
1496852045,
1534941005,
2065332058,
2104050785,
3217061993,
2100769519,
1551276924
] | Reducing the cost of resources in solid mineral extraction is an urgent task. For its solution the article proposes logistic approach use to management of mining company all resources, including extraction processes, transport, mineral handling and storage. The account of the uneven operation of mining, transport units... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Logistic Principles Application for Managing the Extraction and Transportation of Solid Minerals |
2,997,397,819 | 2019-12-31 | 90,335,559 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Crack Formation Study in a Dam of a Formed Technogenic Deposit |
2,911,698,661 | 2018-09-26 | 4,210,233,557 | [] | [] | This article describes assessment organoleptic quality in boiling process soybean at production tempe. we proposed the model for selecting boiling process soybean based on quality organoleptic. We used pairwise comparison and SAW the problem. Pairwise comparison used to determine to weigh for organoleptic criteria. SAW... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | PENGGUNAAN SAW UNTUK ANALISIS PROSES PEREBUSAN KEDELAI DALAM PRODUKSI TEMPE |
4,206,353,078 | 2022-01-10 | 72,372,694 | [] | [
2170254912,
2132484323,
2054723044,
2008068453,
2063824742,
2015512134,
2060711624,
1971723555,
2023248330,
2032152396,
1988642637,
2045308943,
2174069807,
2155788949,
2332036250,
1976098013,
2550093246,
2161064703
] | The sublevel caving method without sill pillar is used to improve the cost of mining. The analysis is performed according to unique geographical environment and the current mining technology of the mine. The wireless communication network is used to budget and control the work cost of mining. Simulation operation about... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cost Control of Mining Personnel Based on Wireless Communication Network from the Perspective of Operations Research |
3,212,234,100 | 2021-09-30 | 4,210,223,550 | [] | [] | The relevance of the work is caused by the need to survive the mining industry during the protracted post-reform crisis and to minimize its negative impact on the ecology of the region through the development of technogenic mineral resources. Purpose of work. Substantiation of the possibility of replacing the tradition... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | RESOURCE-SAVING TECHNOLOGIES FOR DEVELOPMENT OF MINERAL DEPOSITS |
2,000,486,684 | 2000-08-01 | 72,171,858 | [] | [] | One of the most important design factors in open-pit mining is determination of the optimal pit. Pits may be redesigned many times during the life of a mine in response to changes in design parameters as more information is obtained and to changes in the values of technical and economic parameters. Over the past 35 yea... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Lerchs–Grossmann algorithm with variable slope angles |
2,891,691,197 | 2012-01-01 | null | [] | [] | The transition from open pit to underground mining involves drastically changes in the production system. The equipment for underground mining will change as well as the logistics and the trans ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Transitional phase for small steeply dipping ore bodies from open pit to underground mining : a case study from Scandinavian mining industry |
2,003,876,055 | 2014-12-01 | 95,999,327 | [
2099867994
] | [
2002683012,
151868298,
2087296271,
1966486805,
1966760988,
2093233187,
2116661285,
1982419623,
2083259944,
1980044969,
1991642024,
2022128172,
2152358062,
2085831731,
4230588984,
4236137412,
2009721924,
1970635216,
2125899728,
1986070354,
2143554521,
2001368153,
209986799... | With the increase in global climate disasters, more and more people have become concerned about developing and maintaining a low carbon economy. Poly-silicon, as a representative industry in a low carbon economy, has become the focus of a low carbon economy. However, its production process consumes a great deal of ener... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation and Optimization of One Low-Carbon Poly-Silicon Industry Production Chains Using SD-FCCM in World Natural and Cultural Heritage Areas: A Case Study in China |
3,032,724,660 | 2020-04-01 | 4,306,418,062 | [] | [
4211007335,
2039048456,
2169245194,
2002772301,
1997875983,
2048769967,
2018957623,
2057300506,
2140481308,
1536615069
] | This paper aims to analyze sugarcane truck system to improve inbound logistics via simulation study. Initially, sugarcane truck system is collected data to analyze receiving sugarcane process for designing alternatives. Traditionally, sugarcane trucks are freedom to unload sugarcane for factory. It affects high waiting... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Simulation Study on Sugarcane Truck System for Inbound Logistics Improvement |
2,149,333,378 | 2010-07-28 | 3,006,183,880 | [
2170444200,
2126258480,
2077791698,
4365787967,
2050067494,
1534941005,
2165201397
] | [
2050067494,
2170444200,
3217061993,
1534941005,
1991113069,
2126258480,
2032316144,
2077791698,
2165201397,
4365787967
] | When a mining company begins extraction from a finite resource, it does so in the presence of numerous uncertainties. One key uncertainty is the future price of the commodity being extracted, since a large enough drop in price can make a resource no longer cost-effective to extract, resulting in the mine being closed d... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The expected lifetime of an extraction project |
4,320,490,800 | 2023-02-10 | 110,258,470 | [] | [] | We present a discrete event simulator, TSJSim (Truck-Shovel JaamSim Simulator), for evaluating the stochastic and dynamic operational variables in a truck-shovel system. TSJSim offers four truck allocation strategies: Fixed truck assignment (FTA), Minimizing shovel production requirement (MSPR), Minimizing truck waitin... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A simulation model to study truck-allocation options |
2,559,807,450 | 2017-07-01 | 103,321,696 | [
1969483356,
2000715618,
2100769519,
1972121892,
1918344999,
2130796978,
1534941005,
2065332058
] | [
2094566145,
2126895748,
1979015826,
2154929945,
2149230623,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
1985080107,
1992710140,
2163428398,
2043345585,
2130796978,
1534941005,
1496852045,
2065332058,
1969483356,
2000715618,
3217061993,
20037594... | The open pit mine production scheduling (OPMPS) problem seeks to determine when, if ever, to extract each notional, three-dimensional block of ore and/or waste in a deposit and what to do with each, e.g., send it to a particular processing plant or to the waste dump. This scheduling model maximizes net present value su... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Linear models for stockpiling in open-pit mine production scheduling problems |
4,386,376,933 | 2023-10-01 | 196,821,226 | [
2000885037
] | [
2170899200,
2599557761,
3121177474,
2039810561,
2963163009,
2162357379,
2607075461,
2503339013,
2100254477,
2122122381,
2388726286,
2507578125,
2166179344,
2061177236,
2154929945,
2128970394,
2151290401,
2029608738,
2597150627,
2526781987,
2963037989,
2020851875,
27882762... | The Fourth Industrial Revolution is no longer a future milestone, but a reality. Companies in different industrial sectors around the world are already incorporating Industry 4.0 skills and technologies into their philosophy and practices. This new industrial era requires universities to adapt and train future engineer... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Training industrial engineers in Logistics 4.0 |
2,432,245,612 | 2016-01-01 | 4,210,226,828 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Survey on underground geotechnology during transition to the development of deep reserves of inclined copper pyrite deposits |
4,387,083,485 | 2023-10-01 | 194,185,345 | [
2043345585,
1918344999,
2094566145,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
1988622494,
2060929952,
2053920929,
1972121892,
2122244604,
2068546981,
1918344999,
2160763688,
1988115241,
2046010791,
1985080107,
2162145193,
2150593711,
1569990960,
2043345585,
2130796978,
2040870580,
21246291... | Connecting short- and long-term production schedules in mining complexes is essential to ensure that the long-term production schedule is achievable at shorter timescales. Previous research that addresses optimizing mining complexes under uncertainty focus on simultaneously optimizing different components in the mining... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Connecting planning horizons in mining complexes with reinforcement learning and stochastic programming |
2,185,958,588 | 2005-12-01 | 17,930,613 | [] | [] | Most discussions of sustainable development (SD) in mining relate to metal mines in rural areas. Industrial minerals (IM) are closer to urban areas primarily owing to a high transport-cost component of delivered cost. This visibility to large populations overshadows IMs relatively small operation size and generally low... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sustainable development and industrial minerals |
2,753,714,831 | 2017-08-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Integrated Robotic System: 2D-Vision Based Inspection Robot with Automated PLC Conveyor System |
2,375,960,026 | 2001-01-01 | 2,764,707,458 | [] | [] | This paper analyzes the exploration wells, deepened drilling data, oil test,production test and seismic data, studies the geologic characteristic and production capability of Fuyu reservoir in the central part of Daqing Placanticline and favorable distribution area and evaluates the potential of Fuyu reservoir. Block T... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | POTENTIAL OF FUYU RESERVOIR IN THE CENTRAL PART OF DAQING PLACANTICLINE |
2,744,265,597 | 2017-01-01 | 4,306,419,298 | [] | [
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using Simulation for Development of Process Control Systems in Mining |
2,900,347,703 | 2018-10-10 | 4,210,241,207 | [] | [
2094055697,
2077095314
] | The effective operating time (EOT) of the equipment in an open pit mine determines the capacity of the mine. Clearly, EOT is only a part of the total calendar time, which also includes various down times or non-productive times, caused by different factors. Therefore, it is important to analyze the components of calend... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling Calendar Time Structure for Open Pit Mining Equipment Performance Calculations |
2,803,942,051 | 2018-03-21 | 4,210,214,917 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Performance assessment of neuro fuzzy based image fusion of satellite images |
2,989,971,300 | 2019-11-01 | 4,210,195,883 | [] | [] | Abstract Through the analysis of winter operation problems in the alpine-cold open pit mine in Mengdong area, the technical and economic feasibility of adopting advanced peeling and winter peeling scheme is demonstrated. For the open-pit mining and transportation equipment in the alpine-cold region, the solutions for t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis on Key Problems of Winter Operation in Alpine-cold Open-pit Mine |
3,110,016,831 | 2021-04-01 | 58,516,903 | [
1966814098
] | [
2126895748,
1509689223,
2111781386,
1995114895,
1966814098,
2084983188,
2147710101,
1994698775,
2766736793,
1964279456,
2053920929,
2013377700,
2057063592,
2160763688,
1985080107,
2130796978,
4255412919,
2140170679,
2078286011,
2166448956,
1976122053,
2026508613,
21170042... | In open-pit mines, the traditional truck-based haulage system has consumed large amounts of energy in the haulage sector for many years. The use of continuous in-pit crushing and conveying (IPCC) systems is a viable option to significantly reduce energy consumption in this sector. Considering the relationship between t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Energy consumption in open-pit mining operations relying on reduced energy consumption for haulage using in-pit crusher systems |
2,076,760,268 | 2012-10-01 | 4,306,419,867 | [] | [] | The structural strength of the executive mechanism of excavator directly determines the whole performance, reliability and safety performance of the excavator. This paper aims to the executive mechanism, and establish the simulation model of excavator by using CAD and ANSYS. Then, the author simulates whole strength an... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strength analysis for executive mechanism of excavator |
2,607,956,481 | 2017-04-17 | 2,764,551,302 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Cutoff evaluation practice in short-term gold mine planning |
2,037,557,935 | 2010-10-01 | 4,210,194,876 | [
1972121892,
2130796978,
1534941005,
2068546981
] | [
1972121892,
2068546981,
2126895748,
3217061993,
1534941005,
2043345585,
2130796978,
1551276924
] | Three important aspects of phase-mining must be optimized: the number of phases, the geometry and location of each phase-pit (including the ultimate pit), and the ore and waste quantities to be mined in each phase. A model is presented, in which a sequence of geologically optimum pits is first generated and then dynami... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamic phase-mining optimization in open-pit metal mines |
2,901,023,241 | 2018-01-01 | 206,834,481 | [] | [
1985080107
] | The problem connected with the optimization of cutting width of a shearer loader based on the maximum capacity criterion with regard to physical properties and fractional composition of coal is formulated and solved. Aimed at calculating shearer loader feed and capacity as function of cutting width, it is proposed to u... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimizing Cutting Width and Capacity of Shearer Loaders in Longwall Mining of Gently Dipping Coal Seams |
4,308,872,806 | 2022-11-06 | 4,210,192,031 | [
1972121892,
2128208761
] | [
1972121892,
636993861,
2126895748,
1534941005,
2043345585,
1979015826,
2130796978,
2128208761,
1551276924
] | This study involves a working limestone mine that supplies limestone to the cement factory. The two main goals of this paper are to (a) determine how long an operating mine can continue to provide the cement plant with the quality and quantity of materials it needs, and (b) explore the viability of combining some limes... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value |
2,732,740,030 | 2009-01-02 | 4,210,217,363 | [] | [] | Fluctuating power generation from renewable energies such as wind and photovoltaic are a technical challenge for grid stability. Storage systems are an option to stabilise the grid and to maximise the utilisation factors of renewable power generators. This paper analyses the state of the art of storage technologies, in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Technical and Economic Assessment of Storage Technologies for Power-Supply Grids |
2,127,316,370 | 2013-12-08 | 4,306,421,180 | [] | [
2000472224,
2013996674,
2124991176,
2075377675,
2168452204,
2057275436,
98076215,
2145595389
] | To fulfill the needs of construction quality, progress control and sustainable development of the underground space, it is desirable to collect and visualize as-built tunnel information in real time. In the current practice, the as-built model of a tunnel is produced either by using advanced technologies like 3D laser ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | As-built modeling and visual simulation of tunnels using real-time TBM positioning data |
114,890,530 | 2010-02-20 | 4,306,419,417 | [] | [] | A disconnector for overvoltage protector (OVP) is equipment which intercepts a circuit safely, when OVP breaks down in short circuit mode. As a disconnector, a Circuit Breaker (CB) is normally used. When a large current such as a lightning surge flows, switchgear of CB comes floating according to the electromagnetic fo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Electromagnetic force analyzed results on switchgear of disconnector for overevoltage protector |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.