id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
7d988788-d5ea-4dd0-9850-58fb23df3b8f
5/12/2023 Grassellino - Keynote 15 Quantum computing with superconducting circuits • Recent demonstration of quantum supremacy • Josephson-junction based qubits• 2D architectures use nearest neighbor coupling –Coherence ~20-40 us in multiqubit chips • 3D architectures – Coherence can be significantly enhanced
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
14
e83f2820-2f95-45da-8ecd-295f560c7154
5/12/2023 Grassellino - Keynote 16Superconducting Qubits have two main components 2D “Transmon” qubits1. LC circuit with Josephson junction2. Resonators (cavities) 3D Rigetti 8-qubit processor 3D transmon+ The main challenge is improving the coherence of both key components while also scaling up to larger combined...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
15
aaeab356-3230-439f-83d1-5502f0cc28a6
5/12/2023 Grassellino - Keynote 17SRF Quantum Computing – where are the “bits”? • How to encode a qubit (|0> and |1>) inside the cavity? – Example 1: Call the ground state ( no photons ) as |0>, one single photon present as |1> (Fock state) – Example 2: Call an even number of photons as |0>, odd number as |1> • NOT...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
16
c7702ad5-6952-42ca-b686-b5eabcfa9484
5/12/2023 Grassellino - Keynote 18• Qubit approach = two states used • In the qu dit approach, more than 2 (d>2) levels are used for quantum computing • Example (let’s take d = N energy levels in a single mode of SRF cavity): – | qudit state > = a0 |0> + a1 |1> + a2 |2> + … + aN|N> , |a0|2+ … + |aN|2= 1 –Qudits allow...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
17
6cf02480-1152-4e69-99f6-92d68a7a5d9d
5/12/2023 Grassellino - Keynote 19 • Long coherence makes multiphoton states of a large size and qudit approach viable • Very minimal wiring – 1 transmon to convert the 9-cell into a 100+ qubit -equivalent QPU – The more levels can be controlled in each SRF cavity mode (qudit), the less wiring is neededWhat does SRF...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
18
845a61d0-0146-4e84-a7be-2584b918b16c
5/12/2023 Grassellino - Keynote 20Fermilab superconducting cavities: highest coherence quantum resonators ever demonstrated 200x •2 seconds of coherence demonstrated • Oxide dissolution cavity surface processing developed for quantum led to the discovery of how mid-T bake improves SRF accelerator performance (Posen et...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
19
a0d19f0a-621f-4152-99bc-812ea60ca818
Grassellino - Quantum10 yr plan to accelerate the development of quantum information science & technology applications . “ DOE shall carry out a basic research program in QIS; DOE Office of Science shall establish and operate NQI Science Research Centers to conduct basic research to accelerate scientific breakthrou...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
20
0cfe10d7-655c-4585-aa51-46ac39179eb9
5/12/2023 Grassellino - Keynote 22In 2019 Congress mandated the creation of five Dept. of Energy national quantum centers ~$600M over five years to develop quantum computers, quantum sensors, and quantum communicationsU.S. National Quantum Initiative Goal is transformational advances in quantum science and technolog...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
21
df2c7478-7e32-40a6-bda5-024aefd67bc1
5/12/2023 Grassellino - Keynote 23 A mission driven , multi-institutional and multidisciplinary collaboration leveraging investments at DOE national labs, academia, industry and several other federal and international entitiesA DOE National Quantum Information Science Research Center, led by Fermilab28 Partner Institu...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
22
9b0153c9-bacb-4ccf-9635-31df27c26060
24 SQMS Mission “bring together the power of nation al labs, industry and academia to achieve transformational advances in the QIS major cross-cutting challenge of understanding and eliminating the decoherence mechanisms in superconducting 2D an d 3D devices, with the goal of enabling construction and deployment of s...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
23
a3ada23d-729d-4d0c-b0ee-6a76e8a608a9
25 Material sHigh-coherence devicesSystems integrationNew platforms for quantum computing & sensingQuantum advantage SQMS Goals and Science & Technology Innovation Chain SQMS bridges the gap between ideas and large-scale realizations via the unique center-wide, multidisciplinary coordinated approachesDeveloping a f...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
24
c3c3732b-049f-48f4-bfa1-e7afd627347f
Advanced material analysis of qubit fragmentsDiscovery of nanostructural features limiting qubit performanceQubit fabrication process modifications guided by materials knowledge Quantum processor built with qubits of improved performance SRF MATERIALS EXPERTISE CRUCIAL Exporting SRF methodologies to the quantum worl...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
25
998fc90e-9b1e-4c29-bca8-3f5e0770dcc7
5/12/2023 Grassellino - Keynote 27Superconducting Materials team and capabilitie s to identify qubits sources of decoherenceSQMS theorists and experimentalist ‘co-design’ to target decoherence First-principles Materials Superconductivity Disorder and Dynamics Magneto-Optical Scanning Tunneling Point Contact Tunneling...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
26
81e51df4-5002-4e33-b441-e8dc2dd96a82
5/12/2023 Grassellino - Keynote 28• SQMS coordinated study/process flow across FNAL-UChicago, NIST, Rigetti, Northwestern foundries to address material losses • Demonstrate reproducibility of improved qubit coherence 5/12/2023Grassellino - SQMS Akshay Murthy FermilabMustafa Bal Fermilab Pete Hopkins, NISTElla Lac...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
27
5792d45c-ba39-4854-85fe-0619ede58bc3
5/12/2023 Grassellino - Keynote 29x3-5 improvement in transmon coherence times via Nb surface encapsulation, at both Fermilab and Rigetti, up to ~0.45 millisecondsProgress Highlight: from Materials to Device Coherence FNAL: Rigetti: https://arxiv.org/pdf/2304.13257.pdf
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
28
998adae6-29c1-4def-bc40-a3ece35924da
5/12/2023 Grassellino - Keynote 30Round Robin - Launched the first systematic cross-institutional benchmarking study of qubit performance INFN/Gran Sasso UColorado/NISTRigetti Fermilab
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
29
5c835d47-5b9d-4f00-94dc-71c6f8eda85f
5/12/2023 Grassellino - Keynote 31Novel QPU architectures •Long coherence allows going from qubit to “qudit” approach (use denergy levels instead of traditional 2) –All-to-all qubit connectivity Scalability •> 100 qubits with just few input/output linesSQMS 3D SRF approach – unique benefits of the world’s best cohere...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
30
ffe97941-1864-4d0c-a538-7c39ee5fc51c
5/12/2023 Grassellino - Keynote 32Fock states generation demonstrated Quantum Operation of the SRF Cavity- Milestone Achieved 5/12/2023 Romanenko | Technology 𝛿𝑓௤௨௕௜௧గൌ𝜒஼ 𝜏ൎ 1 ms
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
31
bcb58829-0556-4d92-bc45-4f60f74ff210
5/12/2023 Grassellino - Keynote 33Quantum Computing Platform: world record-sized dilution fridge at FNAL Ambient 80-K (Liquid Nitrogen) 4-K (Liquid Helium) 2-K (Superfluid Helium) 1-K (DR Still) 20-mK (MC 2)100-mK (MC 1) 2m diameter volume x 1m high Capitalizing on millions of dollars in previous invest ments in cryog...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
32
0226c9e5-e127-4ac7-9a7a-8c21435ee184
5/12/2023 Grassellino - Keynote 34SQMS Quantum Computing Platforms: towards quantum advantage Coherence Limit (# Gates) System Size (# Qubits)10 102 103 104102103104Superconducting Qubits Classically IntractableQuantum Advantage?Fault Tolerant Quantum Computers105 Leading US testbeds: Google Sycamore Rigetti Aspen ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
33
114bf198-0aa2-4094-b39e-36093cc41e17
5/12/2023 Grassellino - Keynote 35Goal: Harness SQMS technological advancements for fundamental physics discovery Deliverables/metrics: Develop and deploy search schemes with detection sensitivity orders of magnitude compared to state-of-the-artScience Thrust - Focus Area Quantum Sensing for Fundamental Physics DarkSR...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
34
ed3a1399-3ae2-47f4-9e70-00b785ccd9b9
5/12/2023 Grassellino - Keynote 3636•Axion haloscope : search for dark matter with high Q cavity in multi-tesla magnetic fields •Two SQMS designs substantially outperform state of the art copper cavities (and these ideas can be combined!) •N o w partnering with ADMX team for first demonstration of a hybrid supercon...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
35
21ca24cf-9bc0-4ee0-adb5-390cd34577dd
5/12/2023 Grassellino - Keynote 37SRF + QIS capabilities enable new particle searches of unprecedented sensitivity and precisionSQMS theorists and experimentalist ‘co-design’ to develop new experiments Options for mode setups + sensitivity Systems design, testing (measure cross-talk, Q for various modes, readout) ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
36
6ae2a3c0-c0cd-4801-8b83-4760d9dd8553
5/12/2023 Grassellino - Keynote 38SQMS facilities: deployed fleet of new quantum testbeds and capabilities Grassellino - Quantum
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
37
599ac53d-ed77-4610-be0c-8a1dcfcf18bd
39Growing an Ecosystem and a Diverse Quantum Workforce Centers encouraging collaborative approach, mission focus; exciting mission and national breadth helps attracting young and diverse talent to the lab
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
38
13b2d2df-68d8-4e18-88d4-95ae2521d5f8
5/12/2023 Grassellino - Keynote 40• SRF Technology holds the potential to revolutionize the world of quantum • World leading coherence (Q) of our SRF resonators can enable quantum computers and sensors of record performance and capabilities • The expertise and methodologies that we hav e developed in the accelerator f...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRXG - MC08.2 - Applications of Accelerators, Technology Transfer and Industrial Relations and Outreach (Invited)\FRXG3_talk.pdf
39
5190cc06-14b0-4696-adcd-c68b9081ac10
EUROPEAN COLLABORATION FOR THE R EALIZATION OF ESS A. Pisent , INFN -LNL , Legnaro , Italy On behalf of ESS collaboration Abstract The European Spallation Source (ESS) linear accelera- tor, one the largest scientific equipment under realisation in Europe, is now in the beam commissioning stage. The pro- ject is ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
0
43983fc8-8f09-46a4-835b-a72593c8eb86
ing accelerating structures, ion sources, magnets, power converters, RF systems, controls, diagnostics as well as the participation to design, installation, and commissioning of the linac. Results of this collaborative effort will be sh own in details. INTRODUCTION The European Spallation Source in Lund (Sweden...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
0
9e0f27ae-80e9-4790-91eb-31ef8bab32dc
the use of the high flux even for the slowest/coldest neu- trons in large demand [1]. The first requirement sets the average beam power of 5 MW (for a proton energy above a GeV) , the second one results in an energy per pulse of 357 kJ . Therefore, the proton beam pulse length is three orders of magnitude longe...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
0
b5e93b31-1b48-4e08-8957-10ea320d082d
mounted on a rotating w heel of approx. 2.5 m diameter, cooled by helium gas. Initially one moderator above the target wheel will be used. A second one can be installed below it, and it can have a different design. For instance, it can be optimised for high flux rather than high brilliance. ESS, recognized by ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
0
1810c796-dfd8-4d70-9f72-147617d11135
tion budget 16 (22) Number of neutron ports 42 Average separation between ports Degs 6 The Accelerator The ESS accelerator was designed and is built by a col- laboration of 22 institutions and university in Europe. More than 50% of the total budget is delivered as i n-kind (IK) with most systems being I...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
0
5ae52b86-7ef6-41b5-b7e1-351c20a6a50e
ing reprocessing. For End -Of-Construction in 2027, additional cryomod- ules will be installed and powered enabling operation at 2 MW, 870 MeV with nominal duty cycle . The remaining cryomodules will be installed in the tunnel during shut- downs but not powered with RF. Control and operation of e.g. tuners and cry...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
0
8ee1b8d0-3e98-4cd9-ade7-ba447c6611fc
Figure 1: Block diagram of the ESS accelerator. From above, present beam phase (70 MeV), beam on target (BOT), end of construction phase and full linac implementation (5 MW). Table 2: List of the M ain IK Contributions for ESS L inac Institution Main Contribution Status Aarhus Univ (DK) Rastering system Com...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
1
7bbc25be-3626-46ae-a393-b3b9d843e480
IFJ PAN (PL) Manpower for testing and installation Ongoing INFN Catania (IT) Ion source, LEBT Completed INFN Legnaro and Torino (IT) Drift tube linac 4/5 tanks delivered INFN Milan (IT) Medium -beta elliptical cavities 28/36 cavities delivered IPN Orsay (FR) Spoke c avities, cryo distribution 13/14 cr...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
1
a75387f8-8e7d-4e01-9325-291c466904b4
Warsaw Univ of Techn (PL) Phase -reference line, low -level RF Phase -reference line delivered, Low -level RF ongoing Wroclaw Univ of Techn (PL) Cryogenic distribution Delivered quality of the hardware realization, although tests at nomi-nal beam power cannot be performed until the spallation target is availa...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
1
61ae2877-f8d5-4df7-82f2-89c50e511e0b
erator in kind contributions are listed in Table 2, and will be detailed in the following sections. European C ollaboration D evelopment The construction of an accelerator with the contribution of different laboratories is not a new concept but so far the laboratories were controlled by the same government (e.g...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
1
7ef0a35a-74c5-400e-819b-80e4ac1007bb
nity in Europe was very active, with access to various fa- cilities based on nuclear reactors (like ILL in France) and accelerators (like ISIS in UK), and with the ambition for a new European Spallation Source. The first ESS proposal dates 1992 and is based on a NC coupled cavity linac, fol- lowed by a pulse compre...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
1
6a567a10-3a9b-492a-9c9a-5071106d5db0
For a spallation neutron source various accelerator solu- tions (proton current -energy) are possible; provided that proton energy is in the GeV region, the neutron production is mainly proportional to beam power (about 2 1011 n s-1 W- 1). At high duty cycle (20- 30 mA cw) the optimization of power conversion effici...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
a55f9372-5d40-4a92-9b45-95a86776a32a
ration. Prototype 5- cell elliptical cavities at beta = 0.5 by INFN [5] and CEA followed a few years later . At the same time ( 1999) the approved SNS in USA steered from nNC to SC; then other European collaborations were estab- lished, for a multidisciplinary spallation source (CON- CERT) [6], radioactive ion be...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
4fcb9665-c3e1-46bc-8df9-55c1e350e128
centered on intermediate energy sections of the linac; many ideas, both for NC and SC structures (in the 3-200 MeV range), were developed and tested, including for example piezo tuner system for low beta ellipticals and MEBT with associated chopping systems; these results were beneficial for CERN Linac4 and then f...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
79aa3f84-bebc-410b-beda-ccd7d88fb125
most of the beam -physics happens , it supplies less than 5% of the particle en ergy ( using 10% of the tunnel length). Most of the acceleration is given by the SC main linac, with three families of cavit y over a length of approximately 300 m , all operating with superfluid helium at 2 K. The two families of...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
d6f349d4-f22d-4753-bcc5-2b6ef0b178bb
bution of France, CEA Saclay in collaboration with CNRS Orsay; it includes the procurement of all the components, the assembly of the 30 units (with critical activities in Clean Room), the realization and qualification of ma ny high technology devices like power couplers (including High Power Processing) and frequ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
d448b802-e56b-4ad9-b918-8a3aed2899b3
In both cases the IK C includes the procurement of high pu- rity Niobium and NbTi material; moreover it was required to m anage cavity manufacturing with a well recognized vendor (different in the two cases), to qualify all manufac- tured cavities to ESS specifications and to deliv er them to CEA for integratio...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
ea1c6dba-bf8f-459f-bd4f-50795e2d3016
section (1500 kW each) we re procured by ESS (not IK), while the RF distribution is a UK IK contribution from Huddersfield University [18]. The 90 - 216 MeV section is composed by 13 spoke cry- omodules, IK contribution of IPN Orsay [19], together with the cryogenic distribution line s of this section; each cryom...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
2
d73f51c4-9083-4470-b79d-86621a604a90
duction of spoke cavities is a major technological break- through. The high-power coupler ar e also part of Orsay IKC. Cryomodules are being tested and qualified at Upp- sala University, in a new ded icated area that is part of Swe- den IK contribution (Fig. 2 right) ; at the moment 12/13 cry- omodules are qualifie...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
daa28365-12e7-452a-9719-eb85fc8f2749
Univ of Techn.). The installation in the tunnel of various systems involved highly specialized technical work, and part of the person- power was provided as IKC. Now the tunnel is divided by a temporary shielding wall, up to DTL4 to allow beam tests; in the second part of the tunnel cryomodules are being stepwise...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
7f1b949c-49cf-4f44-89cb-b4440af849b4
at 352.2 MHz , 3 MW each, with 3 modulators . The NC linac, operating at 352.2 MHz, is a highly inte- grated system, IKC from France, Italy and Spain (as IFMIF -EVEDA project, started few years before ESS, but with few permutations in the responsibilities). In this part of the linac most of the beam dynamics ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
2433da86-bb2e-434a-9e6d-08c117be22c4
RFQ beam commissioning [22]. As for the high-power RF system (ESS Bilbao IKC to- gether with the MEBT) 5 chains are in operation, and also the last one has been commissioned. The MEBT bunchers , fed by solid state amplified, were conditioned at Bilbao and then successfully operated at ESS [23]. The RF Q and th...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
967bafa6-287c-4f15-aa6e-a58ccc43c9ca
sembled in the accelerator tunnel. A key point of this pro- cess is the use of slug tuners that can be adjusted in place , with the possibility to regulate the tuner length on the final devices (cooled and vacuum tight) ; this is an innovative so- lution that avoids the usual tuning with dummy tuners and conseque...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
149d2dde-43df-454e-9659-5e18fcab80e3
the RF tuning achieved more robust against perturbations , while the permanent magnets housed in the drift tubes need to be aligned transversally better than 0.1 mm to beam axis. It was therefore chosen to assemble , tune (aluminum and then copper tuners and post couplers) and vacuum test each tank at ESS, in a...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
c6066cf1-3fcf-41ae-8d20-3b0dea05b643
IK (close to completion) ; in the last ten years the INFN group (LNL and Torino) implemented activities of the var- ious ( overlapping) phases of ( a) design ( physical and engi- neering), (b) prototyping, (c) tendering of the main pro- curements , (d) interna l and industrial production in Italy, (e) assembly in ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
1bb198c4-77e6-4ed6-94c8-868cebb1b2a5
dows at Orsay and then at Saclay, to organize the DTLW at ESS. The DTL assembly period at DTLW happened in the three pandemic years , with INFN staff travelling from It- aly; it required excellent and flexible organization , and per- fect harmonization with ESS staff to integrate complemen- tary activities . In t...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
3
691d3942-9b92-41b1-bb24-af05bfab129e
consolidation of a composite INFN -ESS team that is now commissioning the machin e (Fig. 4). Figure 4: View of the nc linac. FINAL CONSIDERATIONS In the last year there has been a quite intense analysis , between ESS ERIC and IK partners, about the collabora- tion model we implemented. This analysis w...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
f48a00ad-4248-4b19-a5ce-18193d58ec9b
from g reen field site and almost no existing organization. As discussed in the previous section ESS started after a decade of intense work and intermediate results diffused and shared between European institutes , while at the be- ginning the number of accelerator experts in Lund was very limited. The recruitme...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
c68449f2-ca1b-41e1-beab-d5ce8b4911e1
in a different country. The return is direct in the labs, with the possibility to hire and t rain new staff on frontier topics , and a potential industrial re turn for the IKC country. The in-kind contribution is generally in a sector where the local industry is well developed and in close contact with na- tion...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
95835b1d-ccf4-4f4b-942f-cd4780aeb2ac
to smaller size industrial partners , able to perform high quality development , with require d the flexibility . This is particularly important in countries like Italy where small and medium -sized enterprises (SME) are important part of the ecosystem. There are of course challenges related to IKC. The s cope ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
c6708ac5-2beb-453c-a418-7ee90b965532
petence, which may not be replaced in time. For scope that is procured from industry, adding another communication layer can be challenging in case issues with vendor need to be resolved . IK works best when it is a team effort between partner and host , partnership rather than sub- contracting . This mode need...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
9234b880-6e3f-4160-a8ff-b007c543e864
ACKNOWLEDGEMENTS This paper summarizes, from the point of view of an IK contributor, the work of a large community I had the pleas- ure to work with in the last decade. I particularly thank M. Lindroos, H Danared, F. Grespan, D. Sertore, P, McIntosh and P. Bosland for very fruitful discussions during prepa- r...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
6fae2925-7c2e-438b-997f-7633ae6f0ceb
Proc. Cyclotrons'95, Cape Town, South Africa, Oct. 1995, paper L -02, pp. 598 -605. [4] D. Barni et al. , “Upgrade of the TRASCO SC Linac Design at 700 MHz”, in Proc. EP AC'00 , Vienna, Austria, Jun. 2000, paper THP7B07, p. 957, 2000. [5] A. Bosotti et al. , “RF Tests of the Beta=0.5 Five Cell TRASCO Cavities”,...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
4
b9cf0c25-761f-464c-9aae-989ef0fa1951
[7] J.-L. Biarrotte, T. Junquera, A. C. Mueller, H. Safa, J. Cor- nell, and A. Pisent, “High -Intensity Driver Accelerators for EURISOL”, in Proc. EP AC'02 , Paris, France, Jun. 2002, pa- per THPLE039, p. 1007 [8] F. Gerigk et al. , “Layout and Machine Opt imisation for the SPL at CERN”, in Proc. LINAC'10 , Tsukuba...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
5
05726e1c-32c4-45a1-9a9d-285416335074
Germany, Aug. 2004, paper TH102, p. 559. [12] A. Mosnier et al. , “Present Status and Developments of the Linear IFMIF Prototype Accelerator (LIPAc)”, in Proc. IP AC'12 , New Orleans, LA, USA, May 2012, paper THPPP075, pp. 3910 -3912. [13] G. Olivier, J. P. Thermeau, P. Bosland, and C. Darve, “ESS Cryomodules f...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
5
594ec758-00aa-4d4b-9214-a16f165a5c52
doi:10.18429/JACoW- IPAC2016- WEPMB011 [16] P. A. Smith et al. , “ESS High -beta Cavity Test Preparations at Daresbury Laboratory”, in Proc. SRF'17 , Lanzhou, China, Jul. 2017, pp. 137-140. doi:10.18429/JACoW- SRF2017- MOPB040. [17] D. Castronovo and R. Visentini, “On ESS LWU quadrupoles QC6 and QC7: DC and ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
5
5994f953-ff4a-460b-9964-a7b31a4655b0
paper TUAA06, pp. 474- 480. [21] L. Celona et al. , “Preliminary Commissioning Results of the Proton Source for ESS at INFN -LNS”, in Proc. IP AC'16 , Busan, Korea, May 2016, pp. 2628-2631. doi:10.18429/JACoW- IPAC2016- WEPMY035 [22] L. Bellan et al. , “Space Charge and Electron Confinement in High Current Low...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
5
61b3b5c7-0a6d-4d6b-8391-8d9ffe176f1e
IP AC'16 , Busan, Korea, May 2016, pp. 974-976. doi:10.18429/JACoW- IPAC2016- MOPOY054 [25] P. Hamel et al. , “ESS RFQ: Installation and Tuning at Lund”, in Proc. IP AC'21 , Campinas, Brazil, May 2021, pp. 1372- 1374. doi:10.18429/JACoW- IPAC2021- TUPAB016 [26] F. Grespan, M. Comunian, A. Pisent, M. Poggi, C...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1.pdf
5
d5e9baf5-574e-4d63-a967-14f9d3713815
European collaboration for the realization of ESS accelerator IPAC 2023 May 2023 ANDREA PISENT INFN LABORATORI NAZIONALI DI LEGNARO ON BEHALF OF THE ESS ACCELERATOR COLLABORATION
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
1
15754760-5a08-4a38-916b-e15d99813f69
General plan ❑ESS introduction, status ❑European collaboration for the superconducting linac ❑European collaboration for the normal conducting linac ❑Comment on the in -kind model and conclusions ESS October 2021Parameter Unit Value Average beam power MW 5 Proton kinetic energy GeV 2.0 Pulse repetition rate Hz 14 Energ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
2
4d19322d-1f23-4f8f-a8ca-58594193a5b4
acknowledgements PRESENTATION TITLE/FOOTER 4This paper summarizes, from the point of view of an IK contributor, the work of a large community I had the pleasure to work with in the last decade. ESS Aarhus Univ (DK) Atomki (HU) Bergen University (NO) CEA Saclay (FR) DESY (DE) Elettra (IT) ESS-Bilbao (ES) Huddersfield ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
3
1a1791b3-d6ba-4cb5-84de-0ce66af68d25
High Power 5MW Proton Accelerator ▪The linac shall in the full scope deliver 5 MW at 2 GeV, 14 Hz with 2.86 mslong pulses (357 kJ) be available for all cryomodules.ISrc LEBT RFQ MEBT HEBT DumpTarget 75 keV 3.6 MeV 90 MeV 216 MeV 571 MeVMBL SPK DTL HBL 2 GeV
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
4
f0448e8a-9568-4eeb-8dd6-623249369bdc
High Power 5MW Proton Accelerator ▪The linac shall in the full scope deliver 5 MW at 2 GeV, 14 Hz with 2.86 mslong pulses (357 kJ) ▪In this moment the linac is under beam commissioning at 70 MeV low duty cycle. ▪For Beam on Dump and Ready for Beam on target the accelerator will operate at 572 MeV able to put 1.4 MW on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
5
fbe4d277-edc2-4bfc-bcae-101caa49e3be
High Power 5MW Proton Accelerator ▪The linac shall in the full scope deliver 5 MW at 2 GeV, 14 Hz with 2.86 mslong pulses (357 kJ) ▪In this moment the linac is under beam commissioning at 74 MeV low duty cycle. ▪For Beam on Dump and Ready for Beam on target the accelerator will operate at 572 MeV able to put 1.4 MW on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
6
1dc1d2c4-e2f5-47d7-b20a-dd80d9f92d05
High Power 5MW Proton Accelerator ▪The linac shall in the full scope deliver 5 MW at 2 GeV, 14 Hz with 2.86 mslong pulses (357 kJ) ▪In this moment the linac is under beam commissioning at 74 MeV low duty cycle. ▪For Beam on Dump and Ready for Beam on target the accelerator will operate at 572 MeV able to put 1.4 MW on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
7
1bda843f-0479-4b76-8abc-854da34d68aa
RF. Control and operation of e.g. tuners and cryogenics will be available for all cryomodules.ISrc LEBT RFQ MEBT HEBT DumpTarget 75 keV 3.6 MeV 21 MeV 216 MeV 571 MeVMBL SPK DTL HBL 90 MeV 21 April 2023, first 4 mAbeam accelerated up to 74 MeV (after DTL4 seeR. Myamoto et al WE0GB2)
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
7
2b7723ad-3778-4691-adef-17fb5534e0fa
High Power 5MW Proton Accelerator ▪The linac shall in the full scope deliver 5 MW at 2 GeV, 14 Hz with 2.86 mslong pulses (357 kJ) ▪In this moment the linac is under beam commissioning at 74 MeV low duty cycle. ▪For Beam on Dump and Ready for Beam on target the accelerator will operate at 572 MeV able to put 1.4 MW on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
8
017f2364-f11f-4d38-a877-e86f90d4a423
High Power 5MW Proton Accelerator ▪The linac shall in the full scope deliver 5 MW at 2 GeV, 14 Hz with 2.86 mslong pulses (357 kJ) ▪In this moment the linac is under beam commissioning at 74 MeV low duty cycle. ▪For Beam on Dump and Ready for Beam on target the accelerator will operate at 572 MeV able to put 1.4 MW on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
9
5f23031c-7dbf-4ee2-932d-331ffe8a8e23
From Green Field to ESS 11May 2014 vs April 2022
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
10
5687d6ab-b24a-4b56-973a-1359d2eed747
Tunnel and klystron gallery view PRESENTATION TITLE/FOOTER 12 2022 -06-15 Parts of Normal Conducting Linac Under commissioning Cryo Distribution Line Testing underway , followed by cryomodule installation
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
11
33528693-68fb-446e-97d0-a56ebf5b473d
Accelerator Collaboration Collaboration -Accelerator ▪The ESS accelerator was designed and is built by a collaboration of 22 institutes and universities in Europe ▪More then 50% of the total budget is delivered as In -kind with most systems being IK deliveries . The main exceptions are the cryo plants, the 704 M...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
12
69aa65cf-7204-446c-95e6-66e79728edc6
Accelerator Collaboration -Accelerator 14 Spokes Medium β High β DTL MEBT RFQ LEBT Source HEBT & Contingency Target2.4 m 4.6 m 3.8 m 39 m 56 m 77 m 179 m 75 keV 3.6 MeV 90 MeV 216 MeV 571 MeV 2000 MeV352.21 MHz 704.42 MHz 14 Institution main contribution Status Aarhus Univ (DK) Rastering system Completed Atomki (HU) R...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
13
897d25f0-58f6-46dd-bf83-4727f3e3c7ff
INFN Catania (IT) Ion source, LEBT Completed INFN Legnaro and Torino (IT) Drift tube linac 4/5 tanks delivered INFN Milan (IT) Medium-beta elliptical cavities 28/36 cavities delivered IPN Orsay (FR) Spoke cavities, cryo distribution 13/14 cryomodules delivered, cryo distribution delivered Lodz Univ of Techn (PL) Low-le...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
13
cc7a4377-3684-4062-baf9-b7a2b97d45a3
EUROPEAN COLLABORATION 15European collaboration development ▪ESS linac design, construction and commissioning was possible thanks to a large collaboration of European universities and research institutes ▪The construction of an accelerator with the contribution of different laboratories is not a new concept but so ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
14
bb159699-b292-4b68-bcbe-0f25cabacbf9
16Fists ideas for a European Spallation Source ▪Back in the eighties of last century the neutron com-munity in Europe was very active, with access to various facilities based on nuclear reactors (like ILL in France) and accelerators (like ISIS in UK ), and with the ambition for a new European Spallation Source . ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
15
cda85e46-5e3e-4627-87e0-891766ad79dc
European collaboration 17the superconducting linac ▪At high duty cycle (20 -30 mA cw) the optimization of power conversion efficiency was extremely critical and the NC virtually impossible. ▪Conversely the high Q factor of a SC cavity made it possible to achieve superb efficiencies and to use the large beam cleara...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
16
9b787a94-a4cf-4033-8347-511daf1a470b
European collaboration 18the superconducting linac ▪At high duty cycle (20 -30 mA cw) the optimization of power conversion efficiency was extremely critical and the NC virtually impossible. ▪Conversely the high Q factor of a SC cavity made it possible to achieve superb efficiencies and to use the large beam cleara...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
17
57aff301-9bf7-49d6-9465-54f69f720549
19▪European collaborations were established, for a multidisciplinary spallation source (CONCERT), radioactive ion beam and muon factory (EURISOL) and SPL (CERN LHC upgrade and EURISOL). ▪Also in the normal conducting and lower energy part of the linac there was an active contact and collaboration between European ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
18
6268b555-c4b1-42a5-8d0b-f80dbb60cb74
ESS Linac structure While the normal -conducting front end provides 80% of the longitudinal phase advance of the entire linac, and thus is highly demanding from a beam -physics point of view, It supplies less than 5%of the particle energy ( 10% of tunnel length). The rest of the energy is given by three families of ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
19
dcae3c70-38e3-45c1-8035-60cc94000a2d
Superconducting linac PRESENTATION TITLE/FOOTER21Elliptical cavity cryomodule ▪The two families of elliptical cavities, operating at 704.4 MHz , medium beta ( MB, 6 cell, beta = 0.67 and 16.7 MV/m ) and high beta ( HB, 5 cell, beta = 0.86 and 18.2 MV/m ), have approximately the same length and are hosted in the same...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
20
b256297f-fade-4c9d-a5d1-8dd33f0a2076
technology devices like power couplers (including High Power Processing) and frequency tuners, and tests of three cryomodules per each cavity shape. ▪This very demanding activity re -quires a high -level of coordination and takes place in a dedicated infrastructure previously developed for XFEL cryomodules assembl...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
20
84c5172c-e052-4b0d-8158-9c6c1eb7a891
PRESENTATION TITLE/FOOTER 22Elliptical cavities The cryomodule integrates the cavities delivered by INFN Milano for the MBand STFC Daresbury for the HB. In both cases the IKC includes the procurement of high purity Niobium and NbTi material; to manage cavity manufacturing with a well recognized vendor (different i...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
21
bf055740-f12b-4378-8c27-29733c0e968c
PRESENTATION TITLE/FOOTER 23Elliptical cavities The cryomodule integrates the cavities delivered by INFN Milano for the MBand STFC Daresbury for the HB. In both cases the IKC includes the procurement of high purity Niobium and NbTi material; to manage cavity manufacturing with a well recognized vendor (different i...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
22
76e80b71-23b7-4a6e-9653-9505a236bb5c
H032 H034 H035 H036 H037 H039 H040 H041 H043 H045 H048 H050 H051 H052 H053 H054 H056 H060 H061 H064 H065 H066 H067 H068 H069 H071 H072 H073 H074 H075 H076 H077 H078 H080 H082 H083 H085 H087 H088 INFN Milano 28/36 cavities delivered to CEASTFC Daresbury 55/84 cavities delivered to CEA
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
22
29fb2618-0bd2-44fb-830a-96f552102d99
Disposition : Titre et contenu 24Status of the Elliptical cryomodules Cryomodule assembly oB&S International Company in charge of the CM assembly: 9 persons on site. oIn CEA infrastructure. oSupervision by CEA. All components provided by CEA except the cavities: •36 M -beta cavities: LASA •84 H -beta cavities: STFC ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
23
6c251056-0539-4775-9fe1-827b1fdbdffb
MB Cavities Status 28 cavities qualified and delivered to CEA for assembling into cryomodule. All cavities well above specifications with very limited field emission. Q0 between two to four times the ESS specifications. Vertical Test at DESY for series and at INFN LASA for special cases requiring advanced quench and...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
24
141e1ca7-d92f-431f-b219-87c0bd7c4ee8
HBC Delivery Status Qualified cavities at STFC Daresbury Laboratory ready for shipment To date, have delivered 55 qualified cavities to CEA. Tests conducted at STFC Courtesy of P , McIntosh
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
25
ecdaae16-1674-4f04-8059-79b95c68cd09
PRESENTATION TITLE/FOOTER 27Warm sections The warm section quadrupole magnets all over the linac, and the associated power converters, were delivered by Elettra and integrated in the Linac Warm Units by STFC at Daresbury. 2023 -05-15 Courtesy of A. Fabris -P , McIntosh
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
26
a37feea5-9458-4238-8e90-b8a7342a10a6
Alessandro Fabris ESS Accelerator Collaboration Board, 9thNovember, 2022 AIK 17.2 –POWER CONVERTERS FOR MAGNETS ❑All284 power converters delivered ❑Accredited ❑Involvement for firmware upgrade andtests incourseSTATUS OF ELETTRA IN -KIND CONTRIBUTIONS 28AIK 7.4 –WIRE SCANNERS ACQUISITION SYSTEM ❑Allcomponents, softwa...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
27
c5243b5d-a10f-47a1-9b34-b5ca5d052aad
PRESENTATION TITLE/FOOTER 29RF distribution lines The RF amplifiers for the elliptical cavity section (1500 kW each) were procured by ESS (not IK), while the RF distribution is a UK IK contribution from Huddersfield University. 2023 -05-15 Spoke systemsMedium and High Beta Systems STFC in collaboration with Hud...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
28
fe1b05c7-dd60-443b-a922-23a837e20e3f
Spoke cavity section PRESENTATION TITLE/FOOTER 30cryomodule ▪The 90 -216 MeV section is composed by 13 spoke cryomodules, IK contribution of IPN Orsay , together with the cryogenic distribution lines of this section; ▪each cryomodule hosts two double spoke (three gap, beta = 0.5) cavities, and is alternated with...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
29
1db74226-52ce-480c-a231-715cde6b32d1
AIK 4.1 –Single Spoke cryomodule production 31 28/05/2023❖13/13 Cryomodules completed ➢12 CM (CM01 to CM12 tested and qualified at Uppsala) have been delivered to Lund. ➢1 CM (CM04) is presently being installed into the tunnel and wait for its first cool -down in June. ➢Last CM (CM13) has been delivered to Uppsala on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
30
8e635a0d-5840-4cdb-8d96-03060440e379
❖Issue under investigation on motor reliability of the cold tuning systems ➢4 motors stuck during CM testing at Uppsala (replaced by brand new ones and tested and qualified again) ➢Root cause not yet found ( Hyp: Surface treatment of the pinions of the gearbox may play a major role) ➢Intensive test campaign at IJCLAB h...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
30
2e20514b-7371-4bcd-8c05-ea5a68bb4e4d
Spoke Cryomdoule testing in Uppsala 32 ▪Cryomodules are being tested and qualified at Uppsala University , in a new dedicated area that is part of Sweden IK contribution ▪13 module already delivered by CNRS ▪12/13 cryomodules are qualified for installation on line . ▪Cryomodule 14th is a spare (in addition res...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
31