id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
6e62a9f9-7a5d-4e17-88da-a997058ed54b
AIK 11.2 : Cryogenic Distribution System for the Spoke Linac (CDS -SL) ❖Status of the installation: •All components of the CDS -SL delivered, installed and connected together in 2021 -2022 •Pressure tests performed in September 2021 and in April 04th2022 •Final leak tests of the circuits performed in September -Octobe...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
32
b055b9dd-b1ae-4dbc-9629-5a352cf69632
oacoustic impedance is to be added at room temperature ➢Second cool down is planned for June 2023 Patxi Duthil 33 April 27th2023 Reminder :CNRS contract isto deliver and install cryogenic distribution system for the Spoke linac section (CDS -SL) + 1 End Box + header unit 14
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
32
d5a213d5-0b35-40d2-ada1-2ff29fc96acf
SCL 34CM Installation
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
33
c7f24036-3100-47d8-aa27-1edf6e7b8ee0
PRESENTATION TITLE/FOOTER 35Spoke RF system ▪The spoke section is fed by 26 RF chains (400 kW , 352 MHz), IKC by Elettra (Italy) based on tetrode technology. ▪Elettra is supporting the ESS team for the installation in Lund of the RFPS and actively collaborating to assess tetrode performance and long -term reliabi...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
34
6dff8bf1-81aa-4051-b977-96ad01aa0497
Normal conducting linac The NC linac, operating at 352.2 MHz , is a highly integrated system, IKC from France, Italy and Spain (as IFMIF -EVEDA project, started few years before ESS, but with few permutations in the responsibilities). In this part of the linac most of the beam dynamics happens, being written once fo...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
35
2ed1af2e-4ea0-4110-8795-1d2fb035b82b
Ion source and LEBT PRESENTATION TITLE/FOOTER 37High intensity microwave discharge ion source (MDIS) IKC of INFN LNS completed ❑The RF ion -source and the LEBT, is the only part that had the possibility to be beam tested at IK contributor lab; ❑an initial discrepancy between the specified beam emittance measured ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
36
dacb4a30-2f8c-43a5-a1e9-bfe329a5f5a0
LEBT chopper (Prototype tested on BETSI) Microwave to plasma coupling (3D Full wave simulation code) Defocusing chopper (Comsol, TraceWin) 2011 Strat of the design at LNS 2015 Start of the construction at LNS 25/05/2017 ESS visit for requirement verification 12/09/2017 ESS visit for requirement verification 17/1...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
36
5128b26e-48f3-4839-92c9-d7642aae0c96
The NC linac RF system PRESENTATION TITLE/FOOTER 38The accelerating structures are fed by 6 klystrons operating at 352.2 MHz, 3 MW each, with 3 modulators. 3.3 ms14 Hz the high -power RF system (ESS Bilbao IKC together with the MEBT) 5 chains are in operation, and also the last one has been commissioned. 2023 -05...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
37
165e91f6-cd61-48ee-998d-32e97a7ff2ec
In-Kind Contributions to ESS MODULATORS ❖3 x MODULATORS delivered and under operations at ESS Lund RF SYSTEMS FOR RFQ & DTL, and SPOKE LLRFIn-Kind Contributions to ESS HIGH POWER AMPLIFIERS ❖2x Klystrons from CPI -reconditioned by ESS Bilbao -and 3x Klystrons by Thales delivered. ❖Last Klystron being reconditioned ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
38
8bc32607-bbb9-45f8-9a56-a2f0ed3d5839
In-Kind Contributions to ESS MEBTSECTION ❖Consisting of quadrupoles, cavities, beam chopper + beam dump, beam instrumentation, vacuum,… delivered and installed in tunnel. ❖Buncher cavities RF conditioned in Bilbao and re -conditioned in Lund. ❖Beam commissioning is progressing well so far. MEDIUM ENERGY BEAM TR...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
39
b0368fe0-cdcb-4952-825d-5a4fdd2635eb
The RFQ PRESENTATION TITLE/FOOTER 410.70-3.6 MeV, 70 mA, 6%, 1.6 Ekp ▪The RFQ and the DTL are both composed by long cavities (approx . 6 land 9lin the two cases), so that, due to severe geometrical tolerances, the assembly, tuning and RF conditioning had to be done at ESS, as part of the IK contribution. ▪Concerni...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
40
5f4832bf-255e-4ced-89c8-b08ad72f4076
consequent copper tuner machining. ▪The RFQ was successfully assembled, tuned and RF conditioned in 2021. The beam transmission achieved in 2022 is above 90%. 2023 -05-15
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
40
4133d2be-6f16-4b33-88d1-bfe1c03206bf
Disposition : Titre et contenu 42RFQDESIGN: 2013 -2016 Proton beam : 70 mA -75keV to 3.6MeV F = 352.21 MHz Pulsed mode: 4% duty cycle (14Hz et 3.2ms) Transmission > 90% Beam parameters : Detrans≤5%, elong< 0.15 p.deg.MeV 4 vanes at 30µm Sinusoïdale modulation of the vanes 2 loop power couplers : Pmax= 800kW each 4...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
41
bca5b229-a475-4e07-bc83-deb71240f9ad
The drift tube linac PRESENTATION TITLE/FOOTER 43INFN LNL and Torino IK contribution 5/15/2023 call tematica acceleratori alpha-DTL Drift Tube Linac for alpha particle acceleration and medical radioisotope production Area di ricerca PARTICLE ACCELERATORS Responsabile nazionale Andrea Pisent Unità ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
42
73870179-13ed-49b0-99df-362efe418bc1
transversally better than 0.1 mm to beam axis. ▪For the DTL the RF cavity is stabilized by resonant post couplers, mainly with stubs for fine field level regulation this makes the RF tuning achieved more robust against perturbations ,
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
42
9c92282a-ff77-41bc-b65b-c0c1536e028c
PRESENTATION TITLE/FOOTER 44Cooling distributiontuner Intertank transition with BI ports and valveVacuum port Post coupler with stub Slot coupler with circular brazed RF windowDrift tube (with PMQ, steerers or BPM)Dynamic tuner Isostatic supportHigh precision reference girder ▪Consists in 5 RF tanks, 4 under bea...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
43
7f4234bd-158a-42bb-8f00-35e5acf42393
T ank tuning principle PRESENTATION TITLE/FOOTER 45Example of complete tank 4 simulation for stabilization and tuning ▪Simply: Tuners for frequency , Post coupler insertion for stabilization , rotation for fine tuning of field flatness ▪The problem is intrinsically 3d with mode coupling effects; simulations extremel...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
44
8f770ec2-abf3-4c8e-a1da-b717ff14513a
T ank tuning principle PRESENTATION TITLE/FOOTER 46Example of complete tank 4 simulation for stabilization and tuning ▪Simply: Tuners for frequency , Post coupler insertion for stabilization , rotation for fine tuning of field flatness ▪The problem is intrinsically 3d with mode coupling effects; simulations extremel...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
45
081b4cad-4079-4323-9081-91e98133f1ee
PRESENTATION TITLE/FOOTER 47▪In the last ten years the INFN group (LNL and Torino ) implemented activities of the various (overlapping) phases. ▪The whole process was INFN responsibility, but was followed by ESS, with reviews and weekly meetings. ▪In particular the most critical production choices were analyzed toge...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
46
db7f3f3f-f21e-4820-86a7-63508cd18edb
PRESENTATION TITLE/FOOTER 48▪In the last ten years the INFN group (LNL and Torino ) implemented activities of the various (overlapping) phases. ▪The whole process was INFN responsibility, but was followed by ESS, with reviews and weekly meetings. ▪In particular the most critical production choices were analyzed toge...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
47
bf6d518f-d031-42a9-9cf9-a715c1f4613e
organization, and perfect harmonization with ESS staff to integrate complementary activities. ▪In the following phases, integration in the tunnel, conditioning and beam commissioning, this aspect of common work was more and more important, with the consolidation of a composite INFN -ESS team that is now commission...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
47
ade9ea36-978f-4914-a0b0-0b8958751c9a
DTL installation, conditioning and beam ISrc LEBT RFQ MEBT HEBT DumpTarget 75 keV 3.6 MeV 21 MeV 216 MeV 571 MeVMBL SPK DTL HBL 90 MeV DTL1 DTL2 DTL3 DTL43MV/m 3MV/m 3MV/m 3MV/m1.0e -6 mbar 1.0e -6 mbar 1.0e -6 mbar 1.0e -6 mbar60 kW 60 kW 60 kW 60 kW F. Grespan et al. MOPL127
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
48
42934e50-177c-4585-b223-90bc67b1fc6e
DTL installation, conditioning and beam ISrc LEBT RFQ MEBT HEBT DumpTarget 75 keV 3.6 MeV 21 MeV 216 MeV 571 MeVMBL SPK DTL HBL 90 MeV
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
49
fae520ac-1171-4f2a-82cb-2f02795daf1b
In kind model analysis ❑In the last year there has been a quite intense analysis, between ESS ERIC and IK partners, about the collaboration model we implemented. This analysis was triggered by the necessity to master various quality and schedule issues , only partly related to the consequences of the limitations due...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
50
8ba65a87-c836-47e6-aad2-c7442efbcae7
between European institutes, while at the beginning the number of accelerator experts in Lund was very limited. The recruitment happened in parallel with the IKC hardware development. ❑In kind provides access to intellectual property, competence and qualified manpower (including procurement staff) at partner labs.In...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
50
883719dd-3c68-4b75-8cf5-2bd757e5015e
In kinder advantages 52❑For the member countries, it is a way to get local return on investment in a facility located in a different country. ❑Direct return in the labs, with the possibility to hire and train new staff on frontier topics, and a potential industrial return for the IKC country. ❑for INFN the participa...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
51
b7ee2cac-f7b3-49b2-8e98-4c2f28989ced
quality development, with required the flexibility. This is particularly important in countries like Italy where small and medium -sized enterprises (SME) are important part of the ecosystem.
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
51
e2664295-77c6-4e0a-bd91-ec2d99bb0b53
In kind Challenges 53Scope sometimes divided based on partner lab preferences and interest rather than according to functional breakdown . Can lead to complicated interfaces (and problems tend to happen at the interfaces) Partner lab priorities may change after agreements signed Partner labs may lose critical compe...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
52
f70575e0-515e-43ff-b375-b0daa53b5e26
IK that works 54Works best when it is a team effort between partner and host. −Partnership rather than subcontracting Need a clearly defined recipient (person or group) of the IK scope at host lab. Jointly developed high level functional requirements and and interfaces descriptions Cost book principle: jointly agr...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
53
ee4cf882-4f9e-4590-a746-f72b469aeeae
Summary PRESENTATION TITLE/FOOTER 55▪Good progress for completion of first phase of the ESS accelerator (550 MeV) in Q3 2024 ▪DTL 1, 2, 3 and 4 beam commissioning now ▪First CDS cool down performed ▪The 2 MW accelerator to be completed for the Start of the User Program ▪The in -kind model made it possible to build t...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
54
f8ea28b6-bd50-4022-bd8d-7dfbbe5eb358
End of presentation PRESENTATION TITLE/FOOTER 56 2023 -05-15
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG1_talk.pdf
55
03eeef73-b5b8-4fe8-86e1-bef2b6a941b2
ACCELERATOR DRIVEN SYSTEM – A SOLUTION TO MULTIPLE PROBLEMS OF SOCIETY * Yuan He†1, Huan J ia1, Xunchao Z hang1, Hanjie C ai1, Neng P u, Zhijun W ang1, Weiping D ou, Jianqiang W u, Youxin C hen1, Guirong H uang1, Jonathan C. Wong , Hongwei Z hao1, Institute of Modern Physics, Chinese Academy of Sciences, Lanzhou...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
2b02b87c-7e3f-4ba0-93d7-ddcb2dfe188d
criticality and high net neutron production, ADS is con- sidered as a perfect solution to burning of nuclear waste and efficient utilization of fission resources. Since its proposal 3 decades ago , many problems and challenges about ADS have been solved by researches and develop- ment s around world , especia...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
e3400e8e-1149-4510-9fb9-6c96aa336c37
INTRODUCTION Along with the increasing urgency of a stable, secure and decarbonized energy system, nuclear energy is gain- ing support after years of decline. Countries, international organizations, scientists, and other members of society are more unequivocal than ever about the key role that nucle- ar energy ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
31632fb9-66bd-409b-ad8d-303ef8edb817
front these barriers, especially the environment al risk of radioactive contamination and spread of nuclear waste, should be considered carefully. SUSTAINABLE DEVELOPMENT OF NUCLEAR ENERGY AND SPENT FUEL ISSUES There are currently about 440 nuclear reactors in the world, which provide about 10% of the world's ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
3a6f1ceb-e24e-42e0-8f34-73d660f99b4d
the problem of large amount accumulation of spent fuel. By the end of 2019, there were ~433,000 tons of spent fuel unloaded globally, with an average of ~11,300 tons of spent fuel unloaded annually from nuclear power plants worldwide. By 2035, it is estimated that spent fuel emis- sions w ill be close to 618,000 to...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
3e592898-06ba-4ea1-af91-e1bfdf2480a8
years , a time scale even longer than that of the known human h istory . Until now, all spent fuels are stored on -site or off -site in engineered storage facilities, pending final decisions on its disposition. Although the scientific and technical problems of deep geological disposal have been widely studied...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
60c3b2eb-0ab5-46b0-85b7-cf41c928b2e8
these resources can be fission ed to generate energy in tens of years to maximize the utilization of fission resources while minimiz ing the amount of nuclear waste. To effi- ciently burn fission resources, fast neutron s are demanded for large fission cross section, high neutron yield per fission and low cap...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
0
3e8ece02-5a09-421c-b04b-13846af6858a
neutro ns, an ADS with thermal neutron spectrum can be used to transmute LLFP. ACCELERATOR DRIVEN SUB -CRITICAL SYSTEM AND CLEAN NUCLEAR ENERGY ADS consists of an accelerator, a spallation target, a subcritical reactor, and an energy production system. Accelerated beam (usually proton) bombard s the spall...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
1
4a566f3e-59ec-4362-a612-bd7ac5dcb11a
Partitioning and Transmutation ( P&T ) was studied by ANL and ORNL in US [7], JAERI in Japan [8], GRCK in German [9], CEA in France [10] et al since 1970s. H. Takahashi at BNL proposed Cyclotron Transmutation in 1986 [11]. “OMEGA” R&D program was started at JAERI in 1988 [12]. In 1990 H. Takahashi wrote ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
1
df0cfa7f-b753-40a0-8cb4-c7e316628036
1998, ADONIS changed its name to MYRRHA [19]. After different version upgrad es, MYRRHA was ap- proved in 2018 [20]. EUROTRANS program start ed with EURATOM since 2005 [21]. The concept of ADANES was proposed by W. L. Zhan from IMP in China in 2010 to fully utilize nuclear fuel with only partial removal ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
1
df885a04-3109-4691-baec-b7cf162feed2
structur al material s. The major challenges of ADS are the beam power and beam reliability requirements of a con- tinuous wave ( CW) accelerator , heat removal and window lifetime of the target , and coupling of accelerator , target and reactor. Challenges of Accelerator – Beam Current There have been...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
1
0bd253f2-ba5f-4d53-b268-0d38530031d8
current and power. At the 3rd High Power Proton Acceler- ator (HPPA) workshop, it was concluded that “Only SC-Linac suited for full scale ADS and (existing) Cyclo- tron for preliminary experiments ” [26]. The Spallation Neutron Source (SNS) in US achieved 1.4 MW proton beam in last decade, with average beam curr...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
1
9f32b2ba-2fab-41c8-830e-3fe24ad3aaa0
current challenge of industrial scale ADS can be over- come. Challenges o f Accelerator – Beam Trip From design studies of JAEA and MYRRHA, the beam trip requirements are strict and time related [28][29]. Beam trips lead to power transients of reactor and target, inducing thermal stress of structure components....
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
1
0f0900e9-a775-41ef-92a8-a9f59c2d3157
Table 1: Beam Trip Requirements of Industrial Scale ADS [30] Beam Trip Duration Industrial Scale Transm utation Remarks T<1sec <25000 Target window lifetime 1sec<T<10sec <2500 Fatigue failure of fuel cladding 10sec<T<5min <2500 Fatigue failure of inner barrel and reactor vessel T>5 min <50 S...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
2
0dda0f03-fd0c-4ec4-b068-d4fbbcb21f7b
celerator, target and reactor . The other is to demonstrate the transmutation of M As. It is expected to solve many problems about ADS, like system operation, accelerator reliability , etc., from design, construction, and commis- sioning of CiADS . Table 2: Main parameters of CiADS Parameter Value Beam E...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
2
226b8ea2-0065-49b1-abcb-025fd7ff1167
fuel of the reactor is UO 2 with 235U enrichment of 19.75% wt. The secondary loop is also LBE, operating with lower temperature . The SC linac of CiADS is designed to demonstrate the high reliability and safety of the accelerator . To achieve this goal, several design principles are adopted . 1. Control beam...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
2
4884de03-727d-4311-abc3-98b7851ee23a
Several new techniques are under development to achieve high reliability in the SC linac. T he RF power supply and magnet power supply are de signed to combi ne standard ized modules with hot -spare redundant. A hybrid compensation method is proposed for cavity or magnet failure , in which beam energy comp...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
2
75835912-819d-41db-8bec-fe5f9421b97b
2017 [32, 33]. The target successfully sustained 800 kW beam power with maximum current density of 28 uA/cm2. The target window materia l - T91, shows good perfor- mance under lead bismuth corrosion and proton beam irradiation of 7 dpa [34]. For industrial scale ADS target, heat removal up to 10~30 MW is nee...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
2
a57f465d-6a5c-4661-b5f2-0080e1b6cf08
efforts are needed. CONCLUSION ADS is a solution to multiple problems of society but carries big challenges. Fortunately, China (CiADS), E u- rope (MYRRHA), India and Japan have taken the first steps . Hopefully, we can demonstrate the concept of ADS in the next decade to pave the way towards efficient an...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
2
fa91d26f-f079-4240-bc8f-56898e41ea66
REFERENCES [1] M. Cometto et al., “Climate Change and Nuclear Power 2022”, Rep, IAEA , Vienna , Austria , 2022 . https://www.iaea.org/resources/brochure/clim ate-change-and-nuclear-power-2022 [2] A. Espartero, "Trends in Spent Fuel Management World- wide and Associated Challenges", presented at Technical Meeti...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
8155fe6c-e1cd-40c6-acd0-74830e6943ee
Waste Management”, Rep, IAEA Nuclear Energy Series, No. NW -T-1.14 (Rev. 1), 2022. [6] Van Atta, C.M., “A brief History of the MTA Project”, in Proc. ERDA Information, Meeting on Accelerator Breed- ing, New York, US, Jan. 1977. [7] J.C. Claiborne, “Neutron -induced transmutation of high - level nuclear waste”, R...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
3eb39ca7-56b6-4183-b745-9da7beaff773
[11] H.Takahashi, “Actinide Transmutation by the Spallation Process”, in Proc. Workshop Feasibility of Res earch Pro- gram in Actinide Transmuta tion by Spallation Process , Is- pra, Varese, Italy, June . 1985 . [12] IAEA, “ Accelerator Driven Systems: Energy Generation and Transmutation of Nuclear Waste: Status Re...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
e6db1cd9-41be-4e44-bb66-410d8f5197b6
[15] C. D. Bowman, “Basis and objectives of the Los Alamos Accelerator -Driven Transmutation technology project”, in AIP Conference Proceedings 346, pp. 22 –43, 1995 . [16] Aldhous, P. , “Rubbia floats a plan for accelerator power plants ”, SCIENCE , vol. 262, no. 5138, p. 1368, Nov. 1993. [17] G.Van Tuyle, M....
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
bdc2a86b-027a-4955-a326-9444df026707
facility , Rep, IAEA -CN-115-85. 2005. [20] Funding for Myrrha, https://world -nuclear- news.org/Articles/Belgian -government - approves -funding-for-Myrrha [21] J Knebel et al ., “European Research Programme for the Transmutation of High Level Nuclear Waste in an Acceler- ator Driven System : Eurotrans ”, in P...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
b7128af4-40cd-4b76-9ca7-3a6f36ac2f31
missioning Results”, presented at HB'21, Batavia, IL, USA, Oct. 2021, paper WEIPI1, unpublished. [24] K. TSUJIMOTO, T. SASA, K. NISHIHARA, H. OIGA- WA, and H. TAKANO, “Neutronics Design for Lead - Bismuth C ooled Accelerator -Driven System for Transmu- tation of Minor Actinide”, Journal of Nuclear Science and Techn...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
5deffd7b-409d-4c32-b033-a5b25974156a
[27] A. Aleksandrov, “Warm and cold SNS LINAC commis- sioning ”, presented at ARIES -ADA Topical Workshop - Experiences during Hadron LINAC Commissioning , on line, Jan. 2021 . [28] Hayanori Take i et al., “Estimation of acceptable beam -trip frequencies of accelerators for accelerator -driven systems and comparis...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
dc7d1445-7639-4289-8ded-2089b2c78dab
vol. 13, no. 22, 12643 , 2021 . [31] Y. H e et al. , “Development of Accelerator Driven Ad- vanced Nuclear Energy and Nuclear Fuel Recycling”, in Proc. IP AC'19 , Melbourne, Australia, May 2019, pp. 4389 - 4393. doi:10.18429/JACoW -IPAC2019 -TUYPLS2 [32] F. Groesche et al, “MEGAPIE - irradiation experience of ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
3
179a28d9-889d-4225-9080-340fa581fa35
bility of High Power Proton Accelerator s (HPPA5) , Mol, Belgium , May . 2007. [33] Yong Dai, Final Report on MEGAPIE Target Irradiation and Post -Irradiation Examination , Rep, 2015 . doi:10.2172/1188406 [34] F. Groeschel , “MEGAPIE – A liquid Pb -Bi target at SINQ ”, presented at Workshop on High -Power Targe...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2.pdf
4
ead09cce-14f6-4893-b37c-936b478176df
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Accelerator Driven Systems —— A Solution to Multiple Problems of Society Yuan HE, Huan JIA, Xunchao ZHANG, Hanjie CAI, Neng PU, Zhijun WANG, Weiping DOU, Jianqiang WU, Youxin CHEN, Guirong HUANG, Hongwei ZHAO and CiADS...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
0
57cc193b-2141-4baf-a3ad-b6e21d63cec2
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Contents •Climate change: humanity’s greatest challenge •Problems of existing nuclear energy •Why ADS is a solution to nuclear energy •Challenges facing accelerator for ADS •Project plan of CiADS •Conclusion 2
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
1
21b412a7-8164-4b50-8562-b877d01d7694
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Contents •Climate change: humanity’s greatest challenge •Problems of existing nuclear energy •Why ADS is a solution to nuclear energy •Challenges facing accelerator for ADS •Project plan of CiADS •Conclusion 3
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
2
c53b07ce-5587-452a-8de7-b81d6eaef741
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Threat of Climate Change Since the 1850s, human activities have caused climate change unprecedented in recorded history • Last decade is the warmest in the last 100,000 years. • Global temperature rise is speeding up....
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
3
f7c293ee-07e3-47f8-956c-5bbe4747cda7
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice • To achieve carbon neutrality in the coming decades, a key to avoiding global warming of more than 1.5 ℃, investment in the energy sector must be scal ed up and directed towards cleaner and more sust ainable technologi...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
4
eb8c6f57-c694-4321-a434-236a50e11c2c
efforts to limit the temperature increase to 1.5°C above pre-industrial levels.” —— The Paris AgreementShares of nuclear and renewable energy in the electricity generation mix and corresponding climate warming across IPCC AR6 scenarios. Greenhouse gas emissions from elect ricity generation technologies.
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
4
a9c7ee9b-86c3-4590-9598-c3b3289b93be
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Public Opinion Wary of Nuclear Energy 6Anti-nuclear movement supporters gather to celebrate the shuttering of Germany’s last three nuclear power plants on April 15, 2023 in Munich, Germany. ——Johannes Simon | Getty Image...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
5
f133b7cd-c641-4dc0-8ecc-f2378a11be2f
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Nuclear Power Making a Comeback 7Nuclear power is gaining support after years of decline: • 52 more reactors under construction, 2/3 in Asia.• ~30 new countries are looking at nuclear energy to meet their power and clim...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
6
76697322-6e6c-49c3-9229-825fd7e37b3b
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Contents •Climate change: humanity’s greatest challenge •Problems of existing nuclear energy •Why ADS is a solution to nuclear energy •Challenges facing accelerator for ADS •Project plan of CiADS •Conclusion 8
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
7
fa5773c0-ac9a-499c-a81e-59451cfb8191
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Problems Facing Nuclear Energy Today 9 • 450 nuclear reactors operating in 30 countries • >10% of global electricity, 1/3 of low-carbon electricity• ~700 reactors (commercia l, experimental, prototype or research reactor...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
8
f0e65604-d41f-44c0-9f51-d63c47097ee7
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Problem of Thermal Nuclear Reactor Current technology: 8 tons of natura l uranium -> 1 ton of nuclear fuel -> only 50 kg is burnt up into fission products Reusable fuel (950kg) + depleted uranium (7 tons) has huge u...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
9
86a16651-0137-4ed7-9947-d8716174a6e5
238U4 . 4 6 ×109 1.2×103 243Am 7380 1.3 ×106 238Pu 87.7 1.5 ×108 242Cm 0.446 2.8 ×104 239Pu 24110 7.1 ×106 243Cm 28.5 5.8 ×105 240Pu 550 1.1 ×107 244Cm 18.1 6.3 ×107 241Pu 14.4 3.0 ×107 245Cm 8500 2.7 ×104 242Pu 3.7 ×105 8.9×104 99Tc 2.1 ×105 1.1×103 237Np 2.14 ×106 7.3×103 129I1 . 5 7 ×107 5.9×102 241Am 432.6 7.9 ×107...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
9
c20c5ec9-7225-4ea6-a47f-8f86922440ce
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Where is the Spent Fuel? 11 Carlyn Greene ,《Global Spent Fuel Overview 》 Pool storage Dry storageSpent fuel: reusable fuel + fission products (w aste), extremely difficult to partition By the end of 2019, there were ~...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
10
ff673779-585d-4a1c-beba-6e9cc6217052
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice 12Where will the Spent Fuel go? “Until now, all spent fuels are stored on-site or off-site in engineered storage facilities, pending final decisions on its disposition . No country has a geological repository for spent ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
11
52b9730a-733a-4d5b-8a40-6557d7a69b20
2022. SKB company website • Yucca Mountain in Nevada state of USA, 500~800 m underground, planned to dump 70 000 t HLW. • 2500 scientists and 10.5 Billion dollars in 1983~2009. • North Mountain in Gansu province of China, 560 m underground, planned to dump HLW. • Lab construction started in 2021. Ju Wang, Liang Ch...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
11
d3a3b7bd-aa65-4559-bf12-c8f8e9ff4493
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Geological Disposal Not Fail-Safe Solution 13Site requires :geological stability for millions of years, low underground water content, small flow, ……. Disposal warehouses of disposal systems must stay safe over hundre...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
12
5aa5068e-68b2-4da5-a07e-d75442e859fa
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Summary of Current Nuclear Energy Uranium resource utilization effi ciency as a function of consumed natural uranium “mass-in” Samuel Bays Steven Piet , The Effect of Burnup and Separation Efficiency on Uranium Utilizat...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
13
06b74b2e-4d78-4abe-8acd-067f7636e00b
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Contents •Climate change: humanity’s greatest challenge •Problems of existing nuclear energy •Why ADS is a solution to nuclear energy •Challenges facing accelerator for ADS •Project plan of CiADS •Conclusion 15
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
14
eee00a02-ea07-4d8c-a195-5390cdf4775f
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Under irradiation by high-flux neutrons in the reactor, fuel nuclides are converted into vari ous transuranic nuclides through n eutron reaction and decay. After long-term irradi ation, the final spent fuel will cont ai...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
15
cadc92d8-96bb-4c9e-9b98-1fb7e538976d
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Disposal: Spent Fuel Undergoes Decay 17 Half-life (Year) 432 2.1×106 1.5×105 7204 Transuranium elements d ecay Decay Energy ~ 60MeV 24125 7×108 21772 32760Transuranium elements in geologically buried spent fuel can on...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
16
c563d787-e021-4375-b3e2-5adf92f64f43
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Incinerator: Spent Fuel Undergoes Fission 18 Energy~ 200MeV Fission products Actinides in spent fuel can be efficiently and effectively utilized through fission, ultimately being converted intofission fragments. Fissio...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
17
a7e7be75-2372-46be-a34f-b75537fb5890
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice 19 Neutron spectrum Thermal VS Fast ThermalFast Fisson N-Yield with absorbed neutron energyFast neutrons ideal for burning transuranium elements Larger fission cross section Produces more neutrons per reaction Captu...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
18
6bf3f4fd-b843-4881-bb13-29bc1409aaca
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice 20Drawbacks of Fast Neutron Reactors Relative variations of core par ameters as a function of the MAs’fraction in the fuelHow to maintain a reactor unde r critical neutron balance: Two types of neutrons: prompt and dela...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
19
acefbbc9-1049-4c57-a09b-c556d1da4dee
Van den Eynde, G. ARCAS, ADS and Fast Reactor comparison St udy in Support of Strategic Research Agenda of SNETPMAs incineration rate should be at leas t less than 2.5% in fast reactors (even 2.5% is considered very risky)Fast reactor is still not a solution to co mplete utilization of nuclear fuel or the minimizatio...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
19
cdb0943f-f9ab-4531-92a3-08fafa5a090c
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Promising Solution: Accelerator-Driven System Proton~1 GeV Spallation neutrons ~20 n/protonFission neutrons >1000 n/proton Accelerator Subcritical reactorEnergy productionHow does ADS work safelyADS consists of acceler...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
20
95deffb4-939f-420f-9b43-c62cb51811d5
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Merits of ADS Great flexibility with respect to fuel composition For a subcritical reactor Keff< 0.98, prompt neutrons have no influence on the safety control of the reactor. This means that the reactor can accommoda...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
21
93c58029-4d10-4983-8c82-4a75e0beee50
Such prototypes could allow studies of corrosion, radiation defects and fuel evolution in realisti c conditions with less stringent criticality control-related constraints.
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
21
a69b1fc8-df11-4586-8aef-7285d2e58125
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Evolution of ADS 231970s ~1983 1988 ~now19941996 ~20034 201319921999 ~20032010~ 20121990 1986 1993EURATOM EUROTRANS (European Research Program for the TRANSmutation of High-level Nuclear Waste in an Accelerator-driven S...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
22
dc77f66f-792e-4040-8ca4-e16d42426291
Hiroshi Takahashi ADEP Phoenix ADPF 1986JP-AEC-JAERI +JNC+CRIEPI Takakazu Takizuka “OMEGA” R&D program1992 1988 Russia-ITEP ENNG-XADS =HWR+Linac(ISTRA-36)1992EC-CERN Carlo Rubbia EA (Energy Amplifier) China-CIAE Venus 1 (propose)1993 1994 CERN + Italy- ENEA+INFN+CIRTEN LBE-XADS EAP801996Belgium- SCK•CENMYRRHA1999US-DOE...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
22
c8197bd8-eb1e-465e-b380-efef823140c8
The China initiative Accelerator Driven System ( CiADS )US GEM*STAR Russia-INR 5-10MW LBE ADS2012 2013 China-CIAE Venus 1 (Project start)2000China 10 MW CiADSstart building 2021 2014-15B e l g i u m- SCK•CEN MYRRHA (approval)2018-19Aka rev.1.4 ADONIS →FAst Spectrum Transmutation Experimental Facility France-CEA MASURC...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
22
9832363e-d327-48f3-a696-22d138063966
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Evolution of ADS 241970s ~1983 1988 ~now1994 4 2013 19921999 ~20032010~ 20121990 1986 19931950s US-BNL-Hiroshi Takahashi Accelerator driven energy producer ( ADEP ) Phoenix concept Accelerator driven particle fuel transm...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
23
dcea313b-cd71-4537-916a-695fc42d9e5f
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Nuclear System with an Ideal Fuel-Cycle 25Accelerator Driven Advanced Nuclear Energy System •Renewable fuel —— Partially removes fission fragments from spent fuel •Robust fuel (PUMA=Pu+U+MA): fine separation of uranium...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
24
df7cf123-cf3e-405d-aa1a-a7bbad304c91
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Contents •Climate change: humanity’s greatest challenge •Problems of existing nuclear energy •Why ADS is a solution to nuclear energy •Challenges facing accelerator for ADS •Project plan of CiADS •Conclusion 26
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
25
6ab77456-d313-462f-89c8-10315a2cc1c9
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Challenges of ADS 27Accelerator Target ReactorCoupling of Accelerator, Target and ReactorFuel RecycleHigh power (tens of MW) accelerator CW beam 10-30mA ,Energy: 0.8-2GeV High availability High power (tens of MW)...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
26
93a4d5a7-3274-49f7-9716-dee45c722b17
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Major Challenges of ADS Accelerators 28Takahashi, 1990 2 GeV, 15 mAJAEA ADS 1.5 GeV, 15 mA MTA, 1950 0.5 GeV, 250 mAEFIT 0.8 GeV, 20 mAParameters Value Beam Power 10~60 MW Proton Energy 0.8~2 GeV Beam Current 10~30 mA ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
27
69bc02ef-e449-4694-b855-614938026185
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Power and Current Ramping of SC Linacs A. Aleksandrov, Warm and cold SNS LINAC commissioning, ARIES workshop, Jan 25 - 29, 2021Spallation Neutron Source Ramping power to 1.4 MW from 2008 to 2021Iave=1.4 mA Zhijun Wang...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
28
18350d82-f6e4-44fe-b6aa-fab0da85762f
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Major Challenges of ADS Accelerators 30For an industrial scale ADS, beam trip requirements are strict and time related. Beam Trip duration (s)Industrial Scale Transmutation (num/year )Remarks T<1sec <25000Target window ...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
29
3d8feefa-d03f-41b1-824e-a358a0111d4d
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice ADS-Oriented SC Linac: General Features •Overall system design ------ disturbance isolation :shut down the machine less than two times per year –Each cavity or solenoid quench is isolated from any other, the cooling sys...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
30
4eb1b95d-7460-4d97-b182-e85511d08694
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice ADS-Oriented SC Linac: Hardware Design •Modularization –Topology of high power components: multi-m odule in parallel, easy to plug and pull •Redundancy –A redundancy of at least one module or pelle t supports hot-swap w...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
31
a61512c5-31a0-4d24-a6fd-a14c7b990d3a
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice High Reliability Design of SSAMP 33Design goal: 24*365 non-stop, maintenance-free operation Reliability :simplified structure, segregation between electrical and cooling elements, fixed connections Availability :mod...
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
32
c710e51a-c946-48a1-92df-ab14333205b8
Accelerator Driven Systems - A Solution to Multiple Problems of Society, Yuan He, IPAC2023, Venice Hot-swap Test -for hot-swap, we measured a 6-w ays combiner with a RT-cavity. -for fluctuations of 0.63dB and 4.2°, LLRF can recovery in 100m s. -more technologies for hot-swap are under development. 34
d:\Daily_ihep\Weekly Progress Report\20260425\41_IPAC'23\FRYG - Friday Plenary\FRYG2_talk.pdf
33