id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
f198fd29-6ed8-4726-a83b-916d17f7a8d7
Thermosetting epoxy coating containing aluminum flake over zinc platingMagnigard Silver 17 Magni Industries, Inc. 1000–10,000 — 42 Phenoxy topcoat over organic, zinc-rich film over zinc phosphated steelMagnigard-Black Magni Industries, Inc. 100–1000 — 42 Aqueous coating dispersion containing chromium, proprietary organ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
431
47e0d015-dbc1-43f6-b221-6f9edd1a5abb
that are available, in most cases, from many sources (addresses for the suppliers are listed in Table 16.3). The buildup of composites is shown in Figure 16.18. There’s some buildup in thread roots, but much less than is (sometimes) the case with organic coatings. There’s also somebuildup on sharp edges but, unlike the...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
432
6948c13e-838e-4f35-a43e-a2656924ad0d
Fel-Pro Skokie, Illinois (N5000, C5A) G* Chemical Corporation Wayne, New Jersey (Pepcoat) MacDermid Inc. Waterbury, Connecticut (mechanical Al plus Zn) Magni Industries, Inc. (Magnigard) Birmingham, Michigan Metal Coatings International (Dacrotizing, Dacrosealing) Chardon, Ohio Never Seez Compound Corp. Broadview, Illi...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
432
031adc5d-3f6f-444f-acfa-abeed4ebb7f6
16.6.5 R ATING CORROSION RESISTANCE One of the columns in Table 16.2 gives the resistance of various coatings to salt spray. Many different types (e.g., concentrations) of salt spray are possible; I believe that most, if not all, of the data given in Table 16.2 came from use of the ASTM B-117 procedure. Resistance is g...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
433
dc0c99a0-2af8-41e7-9650-29d2c628e017
ASTM Standard B-117 is not the only possible way to test for corrosion, of course. Many manufacturers have developed special procedures appropriate for the environments seen bytheir products. Another published standard is the German DIN 50018, called the ‘‘Kesternichtest.’’ These tests, which are also specified in the ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
433
17b57a81-9bbe-41a2-85b2-766e69e43742
not chunks of metal with bolts stuck in them. Better yet, find a way to conduct tests in the field, on the actual job sites, if possible. And remember that past experience, recorded inmaintenance records or the like, may be a more accurate way to evaluate a corrosion-resistantmaterial or coating than a quick and dirty ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
433
a67a13d6-7702-4425-aef3-93207437fa29
FIGURE 16.18 Composite coatings build up in crevices and on sharp edges. The crevice buildup, however, is usually less than that encountered with organic coatings; and the edge buildup breaks off easily.Bickford/Introduction to the Design and Behavior of Bolted Joints 8176_C016 Final Proof page 387 26.7.2007 1:53pm Com...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
433
c9858486-fa7a-4657-bc90-8d4a0a4737eb
substitutes found so far match all of cadmium’s characteristics, they’re close enough to be acceptable. Here are some of the coatings which have been adopted as substitutes. (See Table 16.3 for trade names and sources.) .Solid-film organics. Fluorocarbons or molybdenum disulfide in resin binders has beenused by some of...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
434
fc047cb6-e89b-4a4a-bbe6-a3c0923843c3
.IVD aluminum is being used in place of cadmium in many high-performance applications [8]. .Tin flash over electroplated zinc. The zinc provides galvanic protection; the tinprevents galling. .Yellow bronze chromate over zinc. This coating has been adopted by the DefenseIndustrial Supply Center (DISC) as a substitute fo...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
434
f1c41c26-61a7-4ce3-a4c8-1b39fc854773
5. What is the most common source of absorbed hydrogen?6. Which is more apt to fail by hydrogen embrittlement, an SAE J429 Grade 5 or a Grade 8 fastener and why? 7. Name at least three ways to reduce the possibility of hydrogen embrittlement.8. What are the essential conditions for stress corrosion cracking (SCC)?9. Na...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
434
cac79a4d-6898-4d15-a696-592a8ec03287
2. Neill, W.K., Corrosion prevention—basic theory and practical design pointers, Presented at the Using Threaded Fasteners seminar, University of Wisconsin-Extension, Madison, WI, May 9, 1978. 3. Latanision, R., O.H. Gastine, and C.R. Compeau, Stress corrosion cracking and hydrogen embrittlement—differences and similar...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
434
3b8db058-f0fb-4d88-95fc-ab3f0c6fe90b
7. Emrich, M., Corrosion protection for fasteners, part 1, Assembly Engineering , pp. 36–40, October 1982. 8. Emrich, M., Corrosion protection for fasteners, part 2, Assembly Engineering , pp. 17–21, November 1982. 9. 1984 fastening and joining reference issue, Machine Design , pp. 50, 52–53, November 15, 1984. 10.Fast...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
435
cb77be4b-588c-4245-93ad-dbbaa70cb5bb
Research Council on Structural Connections, Miami, FL, June 8, 1988. 14. From a speech given by A.E. Simmons, Jr., of the SermaGard Division of Teleflex, Inc. (USA) at the 1988 Annual Meeting of the Industrial Fastener Institute, Laguna Niguel, CA, February 22, 1988. 15. From a speech given by T. Dorsett of Metal Coati...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
435
46840cc1-0b8e-4e36-b478-1bc7d05afdc3
Technical Report no. 0284-03 EV, Bechtel Group, San Francisco, April 1984. 18. Light, G.M., H.R. Joshi, and S.-N. Liu, Detection of stress corrosion cracks in reactor pressure vessel and primary coolant system anchor studs, Southwest Research Institute, San Antonio, TX,about 1985. 19. Rungta, R. and B.S. Majumdar, Stre...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
435
0eecd5cb-a38a-42cc-aaf6-5a9250063c2c
22. Rowland, M.C and T.C. Rose, Tests on thread lubricants for use in nuclear reactors, Report APED-4422, R63APE 29, General Electric Co., San Jose, CA, December 1963. 23. Hughel, T.J., Delayed fracture of Class 12.8 bolts in automotive rear suspensions, Fastener Tech- nology , pp. 36–38, April 1982. 24. Blake, A., Wha...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
435
60e16227-8b8a-408c-8beb-82d652975e1a
27. Greenslade, J., Hydrogen embrittlement testing requirements for bolts per ASTM F606-90, section 7, American Fastener Journal , pp. 8ff, January =February 1993. 28. Raymond, L., Hydrogen embrittlement of fasteners: problems and solutions, American Fastener Journal , pp. 85ff, May =June 1993. 29. Grobin, A.W., Jr., H...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
435
bd81c197-49fe-4031-9ffa-9ac188766038
33. Raymond, L., Aluminum alloys, American Fastener Journal , pp. 40ff, January =February 1993. 34. Raymond, L., Copper alloys =steels, American Fastener Journal , pp. 12ff, March =April 1993. 35. Faller, K. and W.A. Edmonds, The incentives for titanium alloy fasteners in the Navy =marine environment, American Fastener...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
435
3e319331-4627-4b3e-8a35-1bb861002873
36. Notes prepared for a bolting seminar by Raymond Tootsky of McDonnell Douglas Corp., Long Beach, CA, December 1991. 37. Greenslade, J., Zinc plating socket head cap screws is a risky business, American Fastener Journal , pp. 33ff, March =April 1993. 38. Greenslade, J., Military hydrogen embrittlement requirements, A...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
436
91e8586a-809e-4a8f-96bf-08f51688a4fe
1989. 42. From a brochure published by Magni Industries, Inc., Birmingham, MI, 1993. 42. From information provided by John Dutton of Metal Coatings International, Chardon, OH, September 1993. 43. From a brochure provided by Prosper Engineering, Ltd., Irvine, Ayshire, UK, 1993.44. Willis, D.P. Jr., Engineered coatings f...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
436
534dbf5f-d3b5-4334-bd27-cca17a51389f
17Selecting Preload for an Existing Joint We have reviewed all of the main topics which concern the beginner who wants to learn about the design and behavior of bolted joints. Even though this was only an introduction, it hasbeen a long and sometimes complex story. It’s often difficult for the novice to decide howmuch ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
437
fd61d5b8-ea1a-4b52-aa77-2d7054d0756e
estimate the combined impact of the chosen factors in order to make better design or assembly decisions. This first chapter will help you decide how much preload you should use in an existing joint, or ‘‘what torque?’’ as the question is usually stated. To answer this question we mustbriefly review many of the topics w...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
437
38ac4845-2d1e-4115-8d95-f71d0bd7fed0
available to those who must deal with existing joints. In fact, in many (most?) situations you won’t even need most of the procedures to be described in this chapter. You’ll be able to usethe simple ways to select preload described in Section 17.2. If you’ve had problems with ajoint, however, or have failure or economi...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
437
be4963cf-7ee3-4d76-b52f-73a62eb1e20a
In picking preload or torque for such a joint we should answer two questions: ‘‘How much initial, assembly clamping force do we want in this joint, considering the service loads and conditions the joint will face?’’ and ‘‘How much clamping force—and scatter in clampingforce—can we expect from the assembly torques, tool...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
437
e137f167-1e0f-4f2b-bbdd-324f4161e5ed
the initial assembly preloads. This initial clamp must be high enough to compensate for all of the mechanisms which may reduce the clamping force to the in-service level, including: Embedment relaxation Elastic interactions Creep of metal parts, gaskets, etc.External tensile loadsHole interferenceResistance of joint me...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
438
cc339394-c7f2-494a-abd6-b2b361d2f744
17.1.1.1 Joint Slip This is a key one because slip can cause a lot of problems. It can cause unfortunate stress concentrations in a slip-distorted structure. It can cause fretting corrosion or fatigue of jointmembers. It can cause self-loosening, or misalign and cramp bearings, etc. It’s relatively easyto calculate the...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
438
49a33e9e-1bf9-4e5a-b44a-7f0e22be6d68
We learned in Chapter 14 that self-loosening will occur when transverse loads cause slip between joint members and thread surfaces. Although it is often difficult to quantify the vibratory or other forces creating self-loosening, the joint slip equation above could be used to estimate the point at which the joint membe...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
438
619e1511-0457-418e-96a1-3a535d0f838b
17.1.1.3 Pressure Loads The influence of pressure loads on bolted joints is complex and is discussed in detail in Volume 2. One way to quantify the required initial and in-service clamping forces is to usethe equations of the boiler and pressure vessel code. The equations found in the Code atpresent areBickford/Introdu...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
438
61fce1aa-1ff5-4197-95e8-73476417c504
WM1¼pG2 4Pþ2pGbmP (17:2) WM2¼pbGy (17:3) where WM1¼tension in the bolts in service (lb, N) WM2¼initial tension in the bolts at assembly (lb, N) G¼diameter of gasket (in., mm) P¼contained pressure (psi, Pa) b¼effective width of the gasket (in., mm) m¼gasket maintenance factor y¼initial gasket stress at assembly These eq...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
439
62c705ea-df15-4b44-b5c7-52beb4143afd
17.1.1.4 Joint Separation In some applications, a noncritical foundation bolt is an example; gravity holds the joint in place and it is sufficient for the bolts merely to maintain alignment. In this situation, clampingforce could be as low as zero without risk of joint failure. Even here, however, some clampwould be us...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
439
8427c84f-a655-4574-984a-4de54e82fccd
for all of the clamp loss factors listed a minute ago and still leave some residual in-service clamp. A margin of safety, if you will. 17.1.1.5 Fatigue Although joint separation can reduce the fatigue life of bolts by a substantial amount it is not, as some handbooks imply, the only cause of fatigue failure. Too little...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
439
b081abf5-2a7c-4532-a6f3-cec7aca55b29
is at least acceptable. You might remember that another early theme we addressed was ‘‘We always want the maximum clamping force the parts can stand.’’ There is, however, alwayssome upper limit on that clamping force. If that weren’t the case, we could simply tightenthem a lot more to avoid failures. Instead, we must d...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
439
f4ccc662-865c-4181-9fa5-2902bea97544
In fact, this is one of two key issues we first addressed in Chapters 10 and 11. Remember our attempts to identify the maximum tension which will be seen by some of the bolts and the minimum clamping force we can expect in some joints. Well, in Section 17.1.1 we discussedthe minimum clamping force requirements for a jo...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
440
7467a712-feb0-4199-9ccc-68e183bd6f99
17.1.2.1 Yield Strength of the Bolt There is a good deal of debate about this in the bolting world at the present time, but most people feel that it is unwise to tighten bolts past yield in most applications. There are manyexceptions, with structural steel being the most obvious. As we saw in Chapter 8, torque–turnequi...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
440
472b5a1c-ba09-49a7-8638-616dda10a8fb
17.1.2.3 Design-Allowable Bolt Stress and Assembly Stress Limits We always want to identify any limits placed on bolt stress by codes, company policies, standard practices, personal bias, or the like. Both structural steel and pressure vessel codes,for example, define maximum design allowable stresses for bolts. It’s n...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
440
f5321bdf-0da8-4c93-a001-59874cdd8179
vessel bolts are commonly tightened to twice the design allowable, as explained in Chapter 19. Aerospace, auto, and other industries may also impose more stringent limits on designstresses than on actual stresses to force the designer to use more or larger bolts than hemight otherwise select (and, therefore, to introdu...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
440
4bba666b-e5ec-4e1a-ba51-3ec3b6d28dd8
it’s pertinent to reduce the maximum tensile stresses allowed at assembly by a torquing factor, which makes room for the torsional stress. If as-received steel-on-steel bolts are used, then areduction in the allowable tensile stress of 10% is probably reasonable. If the fasteners are tobe lubricated, you might use 5%. ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
440
a86043b5-7f17-4476-b55b-8d20ec56f133
Anyway, 5%–10% will probably be acceptable in most applications. Most people don’t tighten bolts to the yield point anyway. 17.1.2.5 Shear Stress Allowance If the bolts will also be exposed to shear stress we must take that into account in defining maximum assembly preloads and the resulting in-service clamping force, ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
441
53d98fce-0b30-4e3a-ae2b-ae669b6dd23e
more complete definition of this important upper limit. 17.1.2.7 Combined Loads As we try to determine the maximum stress the parts can stand, to avoid damage to the parts, stresscorrosioncracking(SCC),orotherproblems,wemust evaluateour estimates inlightoftheanticipated service loads on the bolts. Most of these service...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
441
a8e5751e-1835-406d-8b76-ff23230efdf9
clamping force available for the joints the bolts are used in. There are also a few joint factorsthat can limit clamping force. Here are some of the most common ones. 17.1.2.8 Damage to Joint Members Too much tension in a bolt can cause its head and nut to embed themselves into the surfaces ofthe joint,not just byanorm...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
441
0affb483-c43d-4689-b4f5-2bee8f171b70
The 0.9 is added as a safety factor. 17.1.2.9 Distortion of Joint Members Joint members can sometimes be distorted by excessive bolt loads. For example, the outer ends of raised face flanges can be pulled toward each other—perhaps bent—by too muchpreload. This can unload the ID of a gasket, opening up a leak path, for ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
441
4cc7b074-2e7d-4a86-bcd2-3cda075d6d58
17.1.2.10 Gasket Crush Excessive preload can so compress a gasket that it will not be able to recover when internal pressure or a thermal cycle partially unloads it. Contact the gasket manufacturer for upper limits. Note that these will be a function of service temperatures. 17.1.3 S UMMARIZING CLAMPING FORCE LIMITS Le...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
442
63875c7c-976b-4fdb-be07-7e9787424aed
bolts. It suggests that bolt tension above about 80% of ultimate would take the bolts past yield, and assumes that we don’t want to do that in our application: this region is considered ‘‘unusable.’’ The chart suggests that we subtract about 5% from the tensile yield strength of the bolts to account for torsional stres...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
442
2ce70f9c-9369-4823-acd3-0bfab7d64872
90 80 70 60 50 40 30 20 10 FIGURE 17.1 Chart summarizing the clamp load decisions made for a hypothetical joint. See text for a detailed discussion.Bickford/Introduction to the Design and Behavior of Bolted Joints 8176_C017 Final Proof page 396 26.7.2007 5:59pm Compositor Name: BMani 396 Introduction to the Design and ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
442
661cb33f-d551-4db8-9f93-ef8ccac8afc9
specification limit. And it further reduces the limit by a 5% safety factor to acknowledge that our data are limited or that we haven’t included such factors as external loads or differentialexpansion, which can add to bolt tension. The final result is a suggested upper limit on desiredclamp force equal to 62% of the u...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
443
7e1ec66f-a074-492e-af33-c38f8a39d993
The chart also defines an acceptable lower limit on clamping force; suggesting that we want a clamp equivalent to at least 30% of ultimate to make sure the nuts don’t fall off andthat, more seriously, we want a clamp equivalent to as much as 42% of ultimate to preventthat failure mode (or modes) we’re most concerned ab...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
443
6a84acdf-7e37-4fad-abe5-4ea8cdfcd7a6
All of which is very broad-brush and seat-of-the-pants, but that’s the way most assembly preload or torque decisions are made in the field. The principal advantage of the procedure is that it forces us to consider separately, and assign at least gut-feel values to, those factors wethink might affect our joint. The char...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
443
4442a6a0-700e-46d6-885e-57decb8702d8
joint, a range defined in part by limitations in the strength of the bolts. Now we want to pick a target preload to specify for assembly purposes. If dealing with a problem joint we’ll also want to estimate the range of clamping force we can expect to achieve during assembly, takingour choice of preload plus our assemb...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
443
104d1c07-7f53-4d49-a313-11c5670a84bc
Before proceeding, let’s acknowledge, once again, that it usually won’t be necessary for us to go through the full procedure I’ll describe in a minute. If service conditions are reasonableand we have no safety concerns, we can choose a preload or torque by some of the very simpleways described next. We’ll want to go be...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
443
7009abac-33ad-4504-a5c8-2d0875757d32
17.2.1 B ESTGUIDE:PASTEXPERIENCE If you’ve had previous experience assembling this joint, and the results have been acceptable,don’t change your procedures or tools. As we’ve seen, bolting involves more variables than wecan cope with. We can never predict results with perfect accuracy; so prior experience, ifsatisfacto...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
443
144c20a0-8f73-4751-bfd5-c3047f0d8408
Note that you won’t usually be able to identify a successful preload per se in situations such as those we’re discussing. You’ll know what torque the mechanics have used, or which size of tool, or which procedure. Note that even if we know exactly which torque has been used on this joint we don’t know the preload creat...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
444
4b3c0fcd-e207-4e43-9323-72765352d26f
17.2.2 S ECOND BEST:ASK THE DESIGNER If you’ve had no prior experience with this joint, or have had some problems, your best sourceof information is the man who designed the joint. As we’ve seen, many factors must be considered in the design of a successful joint. It’s a rare customer or user or assembler who knows eno...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
444
5f5291e2-1998-41a6-8381-dc23a6a16663
even here he may have been guided by the past experience of other customers, or by general experience with this type of product. Even if he hasn’t made an analysis, therefore, he may be able to recommend a preload—again, specified as a torque in most situations. Note that thedesigner’s recommendations can sometimes be ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
444
15a7b9f7-2d90-4ece-bc0b-00967df28157
of failure, then the normal procedure is to pick a torque from a suitable table. You might use that in Appendix F of this book, for example. Picking a torque (and a tool and a procedure)determines the range of preload you’ll achieve at assembly, even if you won’t be able toquantify this range with any precision. Most j...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
444
e32aa700-e580-4c7f-8b0a-f9be5efbeec4
Determine the yield strength ( S y) of the bolt material at the operating temperature of the joint (data on yield strengths will be found in Chapter 2). Pick a target percentage of yield ( P) from Table 17.1. Determine the tensile stress area of the bolt ( As) (see Appendix F or H). Estimate the lubricity of the fasten...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
444
d7a2a74c-9804-4746-b00b-b1e9384e5e54
factor ( K) from Table 7.1 in Chapter 7. Now use the following version of the short-form, torque–preload equation to compute an assembly torque ( T) in in.-lb. T¼KDPS yAs (17:5) Dis the nominal diameter of the bolt in inches. Why is a computed torque better than a torque taken from a table? The computation takes specif...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
445
939068e5-667f-433d-b170-3e4e669afa52
.Percentage of yield strength as a preload (not torque) target .Lubricant we’re planning to use .Operating temperature of the joint In addition, or instead, you could base the desired preload on such things as the fatigueendurance limit of the bolts or on the limitations suggested by SCC concerns instead ofbasing it on...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
445
f0416c12-7663-4476-bd25-7636ec3f2a38
started with values found in Novak and Patel [3], then made tests to confirm or refute thesedata. Fasteners used in their experiments were defined as ‘‘a new 5=8in., new3=4in., old3=4in., and new7=8in.’’ Results were well scattered and I don’t have all of their data. The nut factor for all bolts coated with a thick lay...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
445
44fafada-b8d8-4bde-b789-1d0e9587c5ec
40 Gasketed joints in routine service, including those covered by the ASME Code, which have not given problems 50–60 Average non-gasketed joint, with normal safety or performance concerns, where past experience does not suggest higher or lower preloads; a good place to start a searchfor the optimum preload when some tr...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
445
d9761f20-fcdb-463e-a0d8-6e47102e32e8
control, and where service loads (or ignorance of service loads) make it unwise to take the fasteners any closer to the yield point 100 Structural steel bolts tightened by turn-of-nut procedures; also high-performance or problem joints facing self-loosening, fatigue, or other low preload problems, but where service loa...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
445
23aecf1e-6975-4b5d-b64e-512c0265ddab
maximum =minimum range reported in Novak and Patel [3], but the maximum Kof that range is essentially double the minimum K. This would mean that twice as much torque would be required to create a given preload in one bolt as in others. Furthermore, the scatter in results with thinly lubricated bolts was greater than th...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
446
e2b06cba-68d0-4128-81d5-ecbf527e4c1b
17.2.5 I FIMPROVEMENTS AREREQUIRED If you’ve used a torque based on past experience, or picked from a table, or computed withthe short-form equation, and have had nuisance problems, and can’t get any help from thepeople who designed the equipment, you might want to try a different torque. Eureka!Seriously, trying a dif...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
446
1d5977c0-7cbe-4e8f-af7f-def5600c99da
If the problem has involved stress corrosion, stripped threads, crushed gaskets, or excessive flange rotation, try 10% less preload or torque the next time. In either case, keep good records so that you can benefit fully from your experiments and ultimately find the optimum preload, torque, procedure, etc. Note that pi...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
446
3d9147e4-d53e-4296-936f-a5ae8f1a7a01
will frequently solve a problem. 17.2.6 S ELECTING PRELOAD FOR CRITICAL JOINTS The procedures described above can be used in most applications. Obviously they can’t be applied—except perhaps as a first step—to critical or safety-related joints. A good designengineer must then be called upon to select a preload and an a...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
446
4b232923-2c71-4005-ad5a-c281edd4364c
Let’s assume that we’ve used the quick-and-dirty procedures described above to pick a target preload, which we’ll use to specify an assembly torque. We know that this preload willresult in a range of residual preload, and that range will be further modified by serviceconditions to give us a still wider in-service range...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
446
26364b85-eeb5-4e90-9b3a-1798445b8b88
17.3 ESTIMATING THE IN-SERVICE CLAMPING FORCE Placing exact limits on the in-service clamping force will usually be impossible. There are toomany variables, and we’ll rarely have good data with which to define their exact effect on theoverall results. We can, however, often use the procedure I’m about to describe, plus...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
446
8acc48d0-43e8-491b-b4d3-b12da1c6dfc8
knowledge of typical values, to give us some idea as to the possible range. The answers we get will be good enough for most applications. The procedure we’ll follow is this. We’ll list the variables, or groups of variables, which we think will affect the preload achieved at assembly and the stability of that preload in...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
447
5f1ec1aa-c649-494f-84d1-824c1fe23d30
Next we’ll estimate the contribution which each key variable, or group, might make to the preload scatter experienced during assembly, or might contribute to the subsequent instabi- lity. We’ll deal with the key variables one at a time, or one group at a time, as we make these estimates. Then we’ll use the chart shown ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
447
2f1bbdc8-c68d-4491-ba58-315b699e7909
Nominal preload Less clamping force on jointMore tension in bolt0% 50% 100% 150% 200% FIGURE 17.2 Chart used to summarize the results of scatter in the major variables, which affect the amount of bolt tension and interface clamping force expected during assembly and when the joint is put into service.Bickford/Introduct...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
447
22e63bc9-57da-4b24-9ed5-eafe23e2c606
make the experiments or analyses required to obtain hard data. Nevertheless, the proposed process will take us well beyond the usual procedure for estimating in-service bolt loads orclamping force on the joint. What is the usual procedure? Most people seem to base their estimates of assembly accuracy—or in-service prel...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
448
80f729bb-c88a-4a10-9ae1-d4dd474e06d8
target value of tension. But the group of variables which create the uncertainty in the torque–tension relationship for single bolts is only one of the many groups of variables whichcan affect assembly or in-service results. Elastic interactions, relaxation effects, thermaleffects, and many other things can also play a...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
448
b1e6bce7-bc9b-4e6b-aabf-d6bf370df80d
of the factors we think will affect the outcome in a particular application. Let’s work an example to see how it’s used. 17.3.1 B ASICASSUMPTIONS Let’s assume that we’ll use a torque wrench to tighten the bolts on a straightforward, non-gasketed joint. We’ll also assume that we’ve used the procedure described in Sectio...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
448
164757a7-176d-4cdf-826e-5239a682c12f
other factors we might have considered. We’ve picked the five factors listed below. We could have picked more—or less. There’s nothing magic about five. The following list, however, includes several different types ofproblem or variables; some assembly, some in-service; some introducing plus or minusscatter, others bia...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
448
f6b78c44-a142-48e0-b159-8081465837ff
We start with the concept that there is an ideal in-service tension for this joint. If we could always introduce that tension at assembly, and if subsequent load and environmental factors never altered it, we’d have achieved perfection. We would have ‘‘hit the bull’s eye’’ 100% of the time. We represent this ideal tens...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
448
fdcc9016-2750-4113-bd76-d1dc4e475081
Now we introduce our first factor of concern—the accuracy of the tools to be used at assembly. Note that anything which reduces the preload or service tension in the bolts also reduces the all-important clamping force on the joint, making it less than our ideal or targetvalue. Anything which increases the preload or te...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
449
57102b4a-072a-4595-be2f-a3eb7ad4bcf1
to produce. In this example, the tool produces torque and we’ll assume that it does this with an accuracy of +5%. (We’ll consider the accuracy with which that torque creates preload in a minute.) We’ll assume that this 5% (and the other percentages to follow) are ‘‘three sigma’’values, and represent the worst-case erro...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
449
8372ab04-5b3f-436f-a6c5-1c141d3c43db
sigma (99%) for now. In the real world, would we really consider tool accuracy to be a key variable? Sure. It’s not uncommon to believe (sometimes correctly) that a more accurate tool can make a significant difference. For our example, let’s pretend that a torque wrench salesman hasheard that we’ve had vibration loosen...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
449
6b3f7859-e047-4774-a0ed-a2d798642ff7
We said that we expected the torque accuracy of this tool to be +5%. Since torque is linearly related to preload (see the short-form equation in Chapter 7), this means that toolinaccuracies, worst case, will introduce as much as 5% more tension in some of our bolts thanwe’d like to see, or create, in other assemblies, ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
449
affdea82-5e32-491d-bce6-e77b724bf54f
scatter at this point is, of course, just +5%. Now we introduce the second factor of concern: operator accuracy. (By ‘‘operators’’ I mean the mechanics or assemblies or others who operate the tools, use the wrenches,and tighten the bolts.) This factor defines the amount of scatter introduced by operatorerrors, operator...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
449
efab6ef7-89f1-433b-a461-2ba38ecf8a0e
are difficult. Even with a perfectly accurate torque wrench they won’t always be able to applythe ideal or target torque to each nut. Note that this contribution to the scatter will be especially difficult to quantify. Our procedure, however, makes our guess more realistic by isolating it from the other variables wemus...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
449
079ddaf5-83d9-42ae-8a89-d08c17de8916
combined error by taking the square root of the sum of the squares of the two error percentages, as follows: /C6VT¼/C6[V2 TLþV2 OP]1=2(17:6) where VT¼the total three sigma scatter VTL¼the three sigma scatter contributed by the tool VOP¼the three sigma scatter contributed by the operator So the combined effect of these ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
450
90c80df5-3060-4525-a98c-13ec4c3bd0e6
and say that the torque–tension scatter will be +30%. We could introduce elastic interactions as an additional variable affecting the bolt tension achieved at assembly, but won’t for this first example. We’ll assume a fairly rigid joint with metal-to-metal contact and insignificant interactions.Bolt tension scatter Nom...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
450
aa098e95-4f97-4d26-8ae7-6bdabd0193ed
Bolt tension scatter Nominal preload Operator accuracy (±10%) Less clamping force on jointMore tension in boltTool accuracy (±5%) 0% 50% 100% 150% 200%−11%1. 2. 3. +11% FIGURE 17.4 The second variable studied in the example given in the text is operator accuracy, and is assumed to contribute +10% of scatter. The accumu...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
451
61a6792e-35b4-4c8d-8f90-547cf4a98050
Swaged lockbolts +5 Air-powered impact wrench /C0100 to þ150 Hydraulic tensioners with vernier gage readout +20 Operator feel +35 Bolt stretch ( mm) +3t o1 5 Ultrasonic control +1t o1 0 Source : All values come from the author’s own experiences; Shigley, J.R. and Mischke, C.R. (Eds.), in Standard Handbook of Machine De...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
451
c8998b2a-3500-4cea-83d0-489c2287878d
We take the square root of the sum of the squares again, taking three variables into account this time, and now find a cumulative scatter of +32% (Figure 17.5). Our next variable, short-term relaxation, is handled the same way; but now we have to compute positive and negative errors since they’re different. Let’s assum...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
452
b84568ac-8d8b-452c-a2ac-db00546b9740
joints (Figure 17.6). This summarizes the situation at the end of assembly. Note that the +30% torque–tension variable has dominated the results so far (justifying those who often assume that it’s the only variable!). It wouldn’t have dominated results if we had included elastic interactions in our analysis, or had ass...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
452
f685831e-9531-4d0a-a6d0-36d72a031aa6
bolt tension and /C020% in clamping force on the joint when the load is applied. This factor differs from the others we’ve considered in several ways. First, it simultan- eously affects both bolt tension and clamping force. Most of the previous variables would affect both, but not in the same assembly. Second, the exte...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
452
919e2e72-da76-4b3b-8a81-5bfca782e94a
scatter to +32%.Bickford/Introduction to the Design and Behavior of Bolted Joints 8176_C017 Final Proof page 406 26.7.2007 5:59pm Compositor Name: BMani 406 Introduction to the Design and Behavior of Bolted Joints
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
452
924594ea-e3b0-4d4f-bca9-847d5b952361
in some assemblies at least, but all assemblies have been designed to carry an external load. When we combine this certain variation with the earlier ‘‘probabilistic’’ ones, therefore, we’re adding apples to oranges and will undoubtedly distress our neighborhood expert on probability. But I think the procedure is usefu...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
453
fdcfad22-7d5c-48d7-b6fc-a7f109909530
equation. The accumulative worst-case errors now stand at þ34% and /C039%, as in Figure 17.7. Let’s pause at this point and see what those errors suggest. Plus 34% means that some of our bolts will experience 134% of ideal or optimum tension because of the combined assembly and service factors considered so far. Minus ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
453
a93037ba-ccf8-47ef-b97a-d5f2ff853fb9
will probably be required for this joint. This means, presumably, that a 11=8in. bolt can withstand the maximum 134% of ideal stress experienced by bolts in this application. But we can only count on 61% of the ideal clamping force. We could get that much clamp from a perfectly tightened3=4in. bolt.Bolt tension scatter...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
453
69247804-515b-4050-9293-f90aa0a091cc
This demonstrates a phenomenon that we’ve mentioned several times. Bolted joints are usually overdesigned to compensate for uncertainties in assembly results or in-service condi- tions. Designers know that they have to use lots of big bolts to avoid problems. If the assembly and service variations could be reduced, les...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
454
6e4310ec-118b-461e-b420-ba0f23d4f3a7
count on and the force the parts must support is over 2:1. Many additional variables will have to be included in some applications, often increasing the ratio well beyond 2:1. Table 17.3 shows how the ratio affects the amount of overdesign required in a joint. In Section 17.5 we’ll try to answer the question, ‘‘Which v...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
454
e32d2c09-1b72-4685-84bc-0b1eca777e2f
We estimated the range of bolt tension we wanted in Section 17.1 and the range we can expect above. Now we will combine our two analyses. To do this we turn the target of our last worksheet on its side and hold it up against the ‘‘desired tension’’ summary of Figure 17.1.Bolt tension scatter Nominal preload Operator ac...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
454
62dd708c-3a60-44b4-89cf-b7ed46060c26
that the accumulated scatter can now be defined as /C039% to þ34% of the desired or target tension, or it can be defined as 61%–134% of the desired tension.Bickford/Introduction to the Design and Behavior of Bolted Joints 8176_C017 Final Proof page 408 26.7.2007 5:59pm Compositor Name: BMani 408 Introduction to the Des...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
454
d242b078-73d4-4710-8c39-f28daa95e98e
The results are shown in Figure 17.8. In doing this we have to convert the scatter percentages of Figure 17.7 to percentages of ultimate strength. The target or ideal preload was 55% of ultimate. On the downside, then, we’d expect a worst-case 61% of 55% or 34% of ultimate. On the upper end, we’d expect 134% of 55% or ...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
455
3fadcc4b-b2b6-416a-b96e-c192f8f02ed9
assemblies will still lie outside the desired range. Going to a still better torque tool ( +2% is also available) obviously wouldn’t provide sufficient improvement. The scatter in anticipated results could be narrowed considerably by going to a computerized torque–turn system, and reduced even further by ultrasonic con...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
455
1669b996-b358-4b6a-bac1-73e16d7d3b80
90 80 70 60 50 40 30 20 10Rupture Yield in pure tensionUnusable Effect of Lx on bolt tension + Scatter − ScatterTarget preload Effect of Lx on clamp forceTorsion loss SCC concern? Safety factor? Safety factor? Minimum clamp required for vibration or fatigue or leaks Usually unusable (foundation bolts?) Job restraints B...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
455
3d67dfce-197f-4822-b54e-eb97fc999d3a
anticipated range fall within the desired range. I’m sure, in this example, that they would. But this much improvement in assembly accuracy may be economically unattractive for you.Fortunately, there are other options. If the consequences of failure aren’t too great, you can shrug your shoulders and accept the fact tha...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
456
bd1b6abf-6cc6-4ce3-9a09-d688ade40e5f
Note that your estimates of the bolt tension desired may involve as much uncertainty as your estimates of expected tension. In our example, we estimated maximum and minimum tensions desired—then a couple of safety factors. Maybe that was unnecessarily conservative. So, all is not lost if ‘‘expected’’ exceeds ‘‘desired....
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
456
4d5fa911-5211-496b-af62-010ac8bd2ca0
The desired range can also be opened up by other fastener-related changes. You may have selected a relatively high minimum tension to fight vibration loosening. Perhaps you can use ananaerobic adhesive or a prevailing torque fastener to reduce minimum tension requirements. The maximum desired (acceptable) tension might...
d:\Zotero\sync\storage\ZHFGBDWY\Bickford和Faulkner - 1995 - An Introduction to the Design and Behavior of Bolted Joints, Revised and Expanded 97.pdf
456