File size: 3,382 Bytes
bcbeda2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
eb14f7a
 
bcbeda2
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
# Asset Readiness Classification

This document defines how to judge whether an asset is ready for robotics placement-task data generation.

Readiness must be evaluated against a target task, robot embodiment, simulator, policy, reset logic, success verifier, and data-recording pipeline. File format alone is not enough: an asset with `URDF` or `MJCF` files may still be missing collision, dynamics, semantic frames, or policy-compatible task definitions.

## Levels

| Level | Meaning | Typical required work before production |
| --- | --- | --- |
| L0 | Production-ready for the target task and policy. The asset loads, simulates stably, passes strict success verification, and can generate replayable episodes. | Register provenance, add to the correct environment/task bucket, run batch physics, policy, verifier, and replay acceptance tests. |
| L1 | Complete simulation asset in its original simulator, but not yet adapted to this repository's downstream task contract. | Convert/adapt format, normalize scale and coordinates, map joints/sites/actuators/sensors to policy inputs and task semantics, then run L0 acceptance. |
| L2 | Articulated structure exists, but physics or task information is incomplete. | Validate joint origin/axis/range, collision, mass/inertia, damping/friction, handles/grasp frames, actuator/sensor definitions, task success/failure conditions. |
| L3 | Movable parts are separated, but no reliable joint model exists. | Build body/link tree, infer or author pivot/axis/range, create collision proxies and dynamics, then complete L2/L1 work. |
| L4 | Complete static object, but movable parts are not separated. | Segment movable parts, repair holes, rebuild local frames and pivots, then complete L3/L2/L1 work. |
| L5 | Raw, incomplete, unassembled, or inconsistent static meshes. | Audit source/license, repair geometry, deduplicate, recover scale/orientation, assemble parts, then progressively upgrade. |

## Rules

- Assign the highest level the asset currently satisfies, not the level it could reach after future work.
- Unknown information counts as not satisfied.
- Technical readiness and license readiness are separate. An asset can be technically L1 but blocked from redistribution or production by license terms.
- Every upgrade should preserve:
  - source asset ID
  - source URL
  - license and license snapshot if available
  - conversion tool/version
  - conversion parameters
  - generated file hashes
  - validation results

## Current repository status

| Source | Stored asset group | Current technical level | Notes |
| --- | --- | --- | --- |
| RoboCasa | `assets/robocasa/raw/fixtures/dishwashers/` | L1 candidate | Complete MJCF dishwasher fixtures used by RoboCasa/robosuite. Still needs downstream task/policy-specific L0 validation. |
| DISCOVERSE | `assets/discoverse/raw/collections/models/discoverse_models/` | L1/L2 candidate by subasset | Preserved upstream `models/` tree. Some files are complete task environments; individual MJCF/URDF assets should be promoted individually after task-specific validation. |
| TinyForge | link-only placeholder | not classified | No physical asset imported yet. |
| Hunter | link-only placeholder | not classified | No physical asset imported yet. |
| Third-party sites | link-only candidates | not classified | Import only exact used assets after license/provenance review. |