aloha_transfer_cube_isr_lam0 — ALOHA transfer-cube human demos, isr_lam0 frame selection
Derived from lerobot/aloha_sim_transfer_cube_human (50 human teleop episodes, 50 Hz, 14-D, top cam 480×640). Frame selection: ISR d_target=1.81°, λ_acc=0 (no acceleration term) — 8,206 frames (41 %). Re-stamped on a uniform 50 fps grid, state/action in degrees (convert rad↔deg at deployment), LeRobot v3.0, task string "Pick up the cube with the right arm and transfer it to the left arm.".
Part of the ISR closed-loop study: results, code, checkpoints and the other arms in Kavin60606/isr-aloha-transfer-cube-experiment. Kept-frame indices per episode: keeps/aloha_transfer_cube_isr_lam0/ep*.npy there.
- Downloads last month
- 146