hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6 Demodulation of DCH in downlink Transmit diversity modes
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1 Demodulation of DCH in open-loop transmit diversity mode
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.1 Definition and applicability
The receive characteristic of the Dedicated Channel (DCH) in open loop transmit diversity mode is determined by the Block Error Ratio (BLER). DCH is mapped into in Dedicated Physical Channel (DPCH). The requirements and this test apply to all types of UTRA for the FDD UE.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.2 Minimum requirements
For the parameters specified in table 7.6.1.1 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.6.1.2. Table 7.6.1.1: Test parameters for DCH reception in a open-loop transmit diversity scheme (Propagation condition: Case 1) Parameter Test 1 Unit Phase reference P-CPICH ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.3 Test purpose
To verify that UE reliably demodulates the DPCH of the Node B while open loop transmit diversity is enabled during the connection.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multi-path fading simulators and an AWGN source to the UE antenna connector as shown in figure A.12. In case of UE-receive diversity connect according to figure A.22. 2) Set up a call according t...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.4.2 Procedure
1) Measure BLER in points specified in table 7.6.1.5.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.1.5 Test Requirements
For the parameters specified in table 7.6.1.4 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.6.1.5. Table 7.6.1.4: Test parameters for DCH reception in a open-loop transmit diversity scheme (Propagation condition: Case 1) Parameter Test 1 Unit Phase reference P-CPICH ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2 Demodulation of DCH in closed loop transmit diversity mode
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.1 Definition and applicability
The receive characteristic of the dedicated channel (DCH) in closed loop transmit diversity mode is determined by the Block Error Ratio (BLER). DCH is mapped into in Dedicated Physical Channel (DPCH). The requirements for Closed loop mode 1 and test 1 apply to all types of UTRA for the FDD UE. The requirements for Clos...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.2 Minimum requirements
For the parameters specified in table 7.6.2.1 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.6.2.2. Table 7.6.2.1: Test Parameters for DCH Reception in closed loop transmit diversity mode (Propagation condition: Case 1) Parameter Test 1 (Mode 1) Test 2 (Mode 2) Unit 9...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.3 Test purpose
To verify that UE reliably demodulates the DPCH of the Node B while closed loop transmit diversity is enabled during the connection.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multi-path fading simulators and an AWGN source to the UE antenna connector as shown in figure A.12. In case of UE-receive diversity connect according to figure A.22. 2) Set up a call according t...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.4.2 Procedure
1) Measure BLER in points specified in table 7.6.2.2.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.2.5 Test Requirements
For the parameters specified in table 7.6.2.4 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.6.2.5. Table 7.6.2.4: Test Parameters for DCH Reception in closed loop transmit diversity mode (Propagation condition: Case 1) Parameter Test 1 (Mode 1) Test 2 (Mode 2) Unit 9...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3 Demodulation of DCH in Site Selection Diversity Transmission Power Control mode
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.1 Definition and applicability
The bit error characteristics of UE receiver is determined in Site Selection Diversity Transmission Power Control (SSDT) mode. Two Node B emulators are required for this performance test. The delay profiles of signals received from different base stations are assumed to be the same but time shifted by 10 chip periods. ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.2 Minimum requirements
The downlink physical channels and their relative power to Ior are the same as those specified in clause E.3.3 irrespective of Node Bs and the test cases. DPCH_Ec/Ior value applies whenever DPDCH in the cell is transmitted. In Test 1 and Test 3, the received powers at UE from two Node Bs are the same, while 3dB offset ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.3 Test purpose
To verify that UE reliably demodulates the DPCH of the selected Node B while site selection diversity is enabled during soft handover.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect two SS's, multi-path fading simulators and an AWGN source to the UE antenna connector as shown in figure A.11 In case of UE-receive diversity connect according to figure A.24. 2) Activate one of two ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.4.2 Procedure
Measure BLER in points specified in table 7.6.3.4.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.6.3.5 Test Requirements
For the parameters specified in table 7.6.3.4 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.6.3.5. Table 7.6.3.4: DCH parameters in multi-path propagation conditions during SSDT mode (Propagation condition: Case 1) Parameter Test 1 Test 2 Test 3 Test 4 Unit Phase ref...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7 Demodulation in Handover conditions
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1 Demodulation of DCH in Inter-Cell Soft Handover (Release 5 and earlier)
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.1 Definition and applicability
The bit error ratio characteristics of UE is determined during an inter-cell soft handover. During the soft handover a UE receives signals from different Base Stations. A UE has to be able to demodulate two P-CCPCH channels and to combine the energy of DCH channels. Delay profiles of signals received from different Bas...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.2 Minimum requirements
For the parameters specified in table 7.7.1.1 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.7.1.2. Table 7.7.1.1: DCH parameters in multi-path propagation conditions during Soft Handoff (Case 3) Parameter Test 1 Test 2 Test 3 Test 4 Unit Phase reference P-CPICH and 0...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.3 Test purpose
To verify that the BLER does not exceed the value at the DPCH_Ec/Ior specified in table 7.7.1.2.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.4.2 Procedures
1) Connect the SS, multi-path fading simulator and an AWGN noise source to the UE antenna connector as shown in figure A.11. In case of UE-receive diversity connect according to figure A.24. 2) Set up the call according to the Generic call setup procedure specified in TS 34.108 [3] clause 7.3.2. 3) Set the test paramet...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.1.5 Test requirements
For the parameters specified in table 7.7.1.3 the average downlink power ratio shall be below the specified value for the BLER shown in table 7.7.1.4. Table 7.7.1.3: DCH parameters in multi-path propagation conditions during Soft Handoff (Case 3) Parameter Test 1 Test 2 Test 3 Test 4 Unit Phase reference P-CPICH and 0...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2 Combining of TPC commands from radio links of different radio link sets
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.1 Definition and applicability
When a UE is in soft handover, multiple TPC commands may be received in each slot from different cells in the active set. In general, the TPC commands transmitted in the same slot in the different cells may be different and need to be combined to give TPC_cmd as specified in TS 25.214 [5], in order to determine the req...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.2 Minimum requirements
Test parameters are specified in table 7.7.2.1. The delay profiles of the signals received from the different cells are the same but time-shifted by 10 chips. For Test 1, the sequence of uplink power changes between adjacent slots shall be as shown in table 7.7.2.2 over the 4 consecutive slots more than 99% of the time...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.3 Test purpose
To verify that the combining of TPC commands received in soft handover results in TPC_cmd being derived so as to meet the requirements stated in tables 7.7.2.2 and 7.7.2.3.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect two SS's to the UE antenna connector as shown in figure A.13. In case of UE-receive diversity connect according to figure A.27. In test 1 the AWGN generators in figure A.13 and A.27 are switched off....
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.4.2 Procedures
1) Before proceeding with paragraph (2), set the output power of the UE to be in the range -10 ± 9 dBm. This may be achieved by setting the downlink signal (Îor) to yield an appropriate open loop output power and/or by generating suitable downlink TPC commands from the SSs. 2) Send the following sequences of TPC comman...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.2.5 Test requirements
Test parameters are specified in table 7.7.2.4. The delay profiles of the signals received from the different cells are the same but time-shifted by 10 chips. Table 7.7.2.4: Parameters for TPC command combining Parameter Test 1 Test 2 Unit Phase reference P-CPICH - DPCH_Ec/Ior -11,9 dB and -60 -59.4 dBm / 3,84 MHz - -6...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3 Combining of reliable TPC commands from radio links of different radio link sets
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.1 Definition and applicability
When a UE is in soft handover, reliable TPC commands may be received in each slot from different cells in the active set. In general, the TPC commands transmitted in the same slot in the different cells may be different and need to be combined to give TPC_cmd as specified in TS 25.214 [5], in order to determine the req...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.2 Minimum requirements
Test parameters are specified in Table 7.7.3.1. Before the start of the tests, the UE transmit power shall be initialised to -15 dBm. An actual UE transmit power may vary from the target level of -15 dBm due to inaccurate UE output power step. Test 1 verifies that the UE follows only the reliable TPC commands in soft h...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.3 Test purpose
To verify that the combining of reliable TPC commands received in soft handover results in TPC_cmd being derived so as to meet the requirements stated in tables 7.7.3.2 and 7.7.3.3.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.4.1 Test 1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect three SS's to the UE antenna connector as shown in figure A.18. In case of UE-receive diversity connect according to figure A.28. 2) Activate Cell 1.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.4.2 Test 1 Procedures
1) Set up a call according to the Generic Call Setup procedure TS34.108 [3] sub clause 7.3.2. Signal the uplink DPCH power control parameters to use Algorithm 1 and a step size of 1dB. Enter the UE into loopback test mode and start the loopback test. 2) Activate the other two cells (Cell 2 and Cell 3) on the other SS...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.4.3 Test 2 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect two SS's to the UE antenna connector as shown in figure A.13. In case of UE-receive diversity connect according to figure A.27. 2) Activate Cell 1.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.4.4 Test 2 Procedures
1) Set up a call according to the Generic Call Setup procedure TS34.108 [3] sub clause 7.3.2. Signal the uplink DPCH power control parameters to use Algorithm 1 and a step size of 1dB. Enter the UE into loopback test mode and start the loopback test. 2) Activate the other cell (Cell 2) on the other SS 3) Set the test p...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.7.3.5 Test requirements
Test parameters are specified in Table 7.7.3.3. Before the start of the tests, the UE transmit power shall be initialised to -15 dBm. An actual UE transmit power may vary from the target level of -15 dBm due to inaccurate UE output power step. Table 7.7.3.3: Parameters for reliable TPC command combining Parameter Unit ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8 Power control in downlink
Power control in the downlink is the ability of the UE receiver to converge to required link quality set by the network while using as low power as possible in downlink. If a BLER target has been assigned to a DCCH (See clause C.3), then it has to be such that outer loop is based on DTCH and not on DCCH. Note: The abov...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1 Power control in the downlink, constant BLER target (Release 5 and earlier)
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.1 Definition and applicability
Power control in the downlink is the ability of the UE receiver to converge to required link quality set by the network while using as low power as possible in downlink. If a BLER target has been assigned to a DCCH (See clause C.3), then it has to be such that outer loop is based on DTCH and not on DCCH. The requiremen...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.2 Minimum requirements
For the parameters specified in table 7.8.1.1 the downlink power ratio measured values, which are averaged over one slot, shall be below the specified value in table 7.8.1.2 more than 90% of the time. BLER shall be as shown in table 7.8.1.2. Power control in downlink is ON during the test. Table 7.8.1.1: Test paramete...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.3 Test purpose
To verify that the UE receiver is capable of converging to required link quality set by network while using as low power as possible.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multipath fading simulator and an AWGN source to the UE antenna connector as shown in figure A.10. In case of UE-receive diversity connect according to figure A.21. 2) Set up a call according to ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.4.2 Procedure
1) After call set up, the SS waits 15 seconds. 2) After this period, BLER is measured. Simultaneously the downlink power ratio averaged over one slot is measured.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.1.5 Test Requirements
The test parameters are specified in table 7.8.1.3. Table 7.8.1.3: Test parameter for downlink power control, constant BLER target Parameter Test 1 Test 2 Unit 9,6 -0,4 dB -60 dBm / 3,84 MHz Information Data Rate 12,2 kbps Target quality on DTCH 0,01 BLER Propagation condition Case 4 Maximum_DL_Power (note) 7 dB Minimu...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2 Power control in the downlink, initial convergence
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.1 Definition and applicability
This requirement verifies that DL power control works properly during the first seconds after DPCH connection is established. The requirements and this test apply to all types of UTRA for the FDD UE.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.2 Minimum requirements
For the parameters specified in table 7.8.2.1 the downlink DPCH_Ec/Ior power ratio measured values, which are averaged over 50 ms, shall be within the range specified in table 7.8.2.2 more than 90 % of the time. T1 equals to 500 ms and it starts 10 ms after the uplink DPDCH physical channel is considered established. T...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.3 Test purpose
To verify that DL power control works properly during the first seconds after DPCH connection is established.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS and an AWGN source to the UE antenna connector as shown in figure A.9. In case of UE-receive diversity connect according to figure A.26.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.4.2 Procedure
1) Enter the UE into loopback test mode according to the Generic call setup procedure specified in TS 34.108 [3] clause 7.3.2, with the exception of the information element of Target quality on DCCH as 1(100%) in the RRC CONNECTION SETUP message. With this exception, the outer loop is based on DTCH and not on DCCH. Sys...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.2.5 Test Requirements
The test parameters are specified in table 7.8.2.3. Table 7.8.2.3: Test parameters for downlink power control, initial convergence Parameter Test 1 Test 2 Test 3 Test 4 Unit Target quality value on DTCH 0,01 0,01 0,1 0,1 BLER Initial DPCH_Ec/Ior -5,9 -25,9 -3 -22,8 dB Down Link Information Data Rate 12,2 12,2 64 64 kbp...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3 Power control in the downlink, wind up effects (Release 5 and earlier)
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.1 Definition and applicability
This requirement verifies that, after the downlink maximum power is limited in the UTRAN and it has been released again, the downlink power control in the UE does not have a wind up effect, i.e. the required DL power has increased during time period the DL power was limited. The requirements and this test apply to all ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.2 Minimum requirements
This test is run in three stages where stage 1 is for convergence of the power control loop, in stage two the maximum downlink power for the dedicated channel is limited not to be higher than the parameter specified in table 7.8.3.1. All parameters used in the three stages are specified in table 7.8.3.1. The downlink p...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.3 Test purpose
To verify that the UE downlink power control does not require too high downlink power during a period after the downlink power is limited by the UTRAN.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multipath fading simulator and an AWGN source to the UE antenna connector as shown in figure A.10. In case of UE-receive diversity connect according to figure A.21. 2) Set up a call according to ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.4.2 Procedure
1) RF parameters are set up according to table 7.8.3.3. Stage 1 is used for the power control to converge and during Stage 2 the maximum downlink power is limited by UTRAN. 2) SS will vary the physical channel power in downlink according to the TPC commands from UE during stages 1, 2, and 3. Downlink power control mode...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.3.5 Test Requirements
The test parameters are specified in table 7.8.3.3. Table 7.8.3.3: Test parameter for downlink power control, wind-up effects Parameter Test 1 Unit Stage 1 Stage 2 Stage 3 Time in each stage >15 5 0,5 s 5,6 dB -60 dBm/3,84 MHz Information Data Rate 12,2 kbps Quality target on DTCH 0,01 BLER Propagation condition Case 4...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4 Power control in the downlink, different transport formats
7.8.4.1 Definition and applicability This requirement verifies that UE outer loop power control has proper behaviour with different transport formats. The requirements and this test apply for Release 5 and later releases to all types of UTRA for the FDD UE.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4.2 Minimum requirements
Test 1 verifies that UE outer loop power control has proper behaviour with different transport formats. The downlink reference measurement channel used in this subclause shall have two different transport formats. The different transport formats of the downlink reference measurement channel used shall correspond to the...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4.3 Test purpose
To verify that the UE outer loop power control works properly with different transport formats.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multipath fading simulator and an AWGN source to the UE antenna connector as shown in figure A.10. In case of UE-receive diversity connect according to figure A.21 2) Set up a call according to t...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4.4.2 Procedure
1) RF parameters are set up according to table 7.8.4.3. 2) SS will vary the physical channel power in downlink according to the TPC commands from UE during stage 1 and 2. 3) Stage 1. The SS waits 15 seconds before it performs the measurement in step 4. 4) Measure quality on DTCH according to statistical significance in...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.4.5 Test Requirements
The test parameters are specified in table 7.8.4A.6 Table 7.8.4A.6: Parameters for downlink power control in case of different transport formats Parameter Unit Test 1 Stage 1 Stage 2 Time in each stage s Note 1 Note 1 dB 9.6 dBm/3.84 MHz -60 Information Data Rate kbps 12.2 0 DCCH Presence No Quality target on DTCH BLER...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5 Power control in the downlink for F-DPCH
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.1 Definition and applicability
Power control in the downlink is the ability of the UE receiver to converge to required link quality set by the network while using as low power as possible in downlink. The requirements and this test apply to release 6 and later releases for all types of UTRA for the FDD UE that support F-DPCH and HSDPA.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.2 Minimum requirements
For the parameters specified in table 7.8.5.1 the downlink power ratio measured values, which are averaged over TPC symbols of the F-DPCH frame, shall be below the specified value in table 7.8.5.2 more than 90% of the time. TPC Command Error Ratio shall be in the limits given by table 7.8.5.2. Power control in downlin...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.3 Test purpose
To verify that the UE receiver is capable of converging to required link quality set by network while using as low power as possible.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multipath fading simulator and an AWGN source to the UE antenna connector as shown in figure A.10. In case of UE-receive diversity connect according to figure A.21. 2) The Fixed Reference Channel...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.4.2 Procedure
1) After call set up generate suitable TPC commands from the SS to set the output power of the UE, measured at the UE antenna connector, to be in the range 0 dBm +-2 dB. This is a nominal setting and not part of the test requirements. 2) SS waits 15 seconds and then sends repetitive UP/DOWN/UP/DOWN TPC pattern to the U...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.8.5.5 Test Requirements
The test parameters are specified in table 7.8.5.3. Table 7.8.5.3: Test parameter for downlink power control for F-DPCH Parameter Test 1 Test 2 Unit 9,6 -0,4 dB -60 dBm / 3,84 MHz Spreading Factor (SF) 256 Target quality value on Fractional DPCH (F-DPCH) 0,01 0,05 - Propagation condition Case 4 Maximum_DL_Power (note) ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9 Downlink compressed mode
Downlink compressed mode is used to create gaps in the downlink transmission, to allow the UE to make measurements on other frequencies.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1 Single link performance (Release 5 and earlier)
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1.1 Definition and applicability
The receiver single link performance of the Dedicated Traffic Channel (DCH) in compressed mode is determined by the Block Error Ratio (BLER) and transmitted DPCH_Ec/Ior power ratio in the downlink. If a BLER target has been assigned to a DCCH (See clause C.3), then it has to be such that outer loop is based on DTCH and...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1.2 Minimum requirements
For the parameters specified in table 7.9.1 the downlink power ratio measured values, which are averaged over one slot, shall be below the specified value in table 7.9.2 more than 90% of the time. The measured quality on DTCH shall be as required in table 7.9.2. Downlink power control is ON during the test. Uplink TPC...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1.3 Test purpose
The purpose of this test is to verify the reception of DPCH in a UE while downlink is in a compressed mode. The UE needs to preserve the BLER using sufficient low DL power. It is also verified that UE applies the Delta SIR values, which are signalled from network, in its outer loop power control algorithm.
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1.4 Method of test
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1.4.1 Initial conditions
Test environment: normal; see clauses G.2.1 and G.2.2. Frequencies to be tested: mid range; see clause G.2.4. 1) Connect SS, multipath fading simulator and an AWGN source to the UE antenna connector as shown in figure A.10. In case of UE-receive diversity connect according to figure A.21. 2) Set up a call according to ...
19eaceb417a28bf040422bcad9ef7619
34.121-1
7.9.1.4.2 Procedure
1) Test 1: Measure quality on DTCH and power ratio values averaged over one slot. 2) Test 2: Measure quality on DTCH and quality of compressed and recovery frames. 3) Test 3: Measure quality on DTCH and power ratio values averaged over one slot. 4) Test 4: Measure quality on DTCH and quality of compressed and recover...