hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.2.2.10.2 Conformance requirement | TS 24.008 4.1.1.5
- For location updating and routing area updating the mobile station shall evaluate the control information for common access control (as specified in 3GPP TS 44.018 [84], 3GPP TS 44.060 [76], and 3GPP TS 25.331 [23c]), domain specific access control (as specified in 3GPP TS 25.331 [23c]), and the spe... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.2.2.10.3 Test purpose | Test purpose
To test the behaviour of the UE in case of paging permission with access control.
The following cases are identified:
1) To verify that, when a combined attach procedure is triggered and SIB3 indicates that the “Location/Registration Restriction Indicator” is set to “All” and all access classes in “Locatio... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.2.2.10.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode I.
“Location/Registration Restriction Indicator ” IE in SIB3 is set to “All”.
All access classes in “Location/Registration Access Class Barred List ” IE in SIB3 are set to barred.
User Equipment:
The UE is equipped with a USIM programmed w... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.2.2.10.5 Test requirements | 1) At step 3 the UE shall not transmit any ATTACH REQUEST message.
2) At step 7 the UE shall transmit an ATTACH REQUEST message. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3 PS detach procedure | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1 UE initiated PS detach procedure | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.1 PS detach / power off / accepted | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.1.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.1.2 Conformance requirement | The UE detaches the IMSI for PS services if the UE is switched off.
Reference
3GPP TS 24.008 clause 4.7.4.1 |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.1.3 Test purpose | To test the behaviour of the UE for the detach procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.1.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode II.
The SIB1 IE "CN domain specific NAS system information", for the CS Domain, is set to value "00 00" (T3212 value is set to 0 and ATT flag is set to FALSE to prevent repeated CS domain registration and/or IMSI Detach by UEs in operation... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.1.5 Test requirements | At step 2a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Registration".
At step 6a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Detach".
At step3, when the UE is powered up or switched on, UE shall:
- initiate the PS attach pro... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.2 PS detach / accepted | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.2.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.2.2 Conformance requirement | 1) The GPRS detach procedure is initiated by the UE by sending a DETACH REQUEST message. The detach type information element may indicate "GPRS detach with switching off", "GPRS detach without switching off", "IMSI detach", "GPRS/IMSI detach with switching off" or "GPRS/IMSI detach without switching off".
The UE shall ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.2.3 Test purpose | To test the behaviour of the UE for the detach procedure, including treatment of P-TMSI signature. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.2.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode II.
The SIB1 IE "CN domain specific NAS system information", for the CS Domain, is set to value "00 00" (T3212 value is set to 0 and ATT flag is set to FALSE to prevent repeated CS domain registration and/or IMSI Detach by UEs in operation... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.2.5 Test requirements | At step 2a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Registration".
At step 6a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Detach".
At step3, when the UE is powered up or switched on, UE shall:
- initiate the PS attach pro... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.3 PS detach / abnormal cases / attempt counter check / procedure timeout | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.3.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.3.2 Conformance requirement | 1) When a T3321 timeout has occurred during a PS detach procedure with the attempt counter less than five, the User Equipment shall repeat the PS detach procedure.
2) When a T3321 timeout has occurred during a PS detach procedure with the attempt counter five, the User Equipment shall not repeat the procedure.
Referenc... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.3.3 Test purpose | To test the behaviour of the UE with respect to the attempt counter. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.3.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode II.
The SIB1 IE "CN domain specific NAS system information", for the CS Domain, is set to value "00 00" (T3212 value is set to 0 and ATT flag is set to FALSE).
User Equipment:
The UE has a valid P-TMSI-1 and RAI-1.
The UE has been register... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.3.5 Test requirements | At step3, when the UE is powered up or switched on, UE shall:
- initiate the PS attaché procedure with the information elements specified in the above Expected Sequence.
At step9, 12, 15 and 18, when a T3321 expires with the attempt counter less than five, UE shall:
- initiate the new PS detach procedure.
At step19, wh... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.4 PS detach / abnormal cases / GMM common procedure collision | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.4.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.4.2 Conformance requirement | When any of the GMM common messages P-TMSI REALLOCATION COMMAND, GMM STATUS or GMM INFORMATION is received by the UE while waiting for a DETACH ACCEPT message with detach cause different from "power off", the UE shall ignore the GMM common message.
Reference
3GPP TS 24.008 clause 4.7.4.1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.4.3 Test purpose | To test the behaviour of the UE in case of procedure collision. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.4.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode II.
The SIB1 IE "CN domain specific NAS system information", for the CS Domain, is set to value "00 00" (T3212 value is set to 0 and ATT flag is set to FALSE).
User Equipment:
The UE has a valid IMSI.
The UE has been registered in the CS d... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.4.5 Test requirements | At step3, when the UE is powered up or switched on, UE shall:
- initiate the PS attach procedure with the information elements specified in the above Expected Sequence.
At step 10A, 10B, 10C and 13, when any of the GMM common messages P-TMSI REALLOCATION COMMAND, GMM STATUS or GMM INFORMATION is received by the UE whil... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.5 PS detach / power off / accepted / PS/IMSI detach | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.5.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.5.2 Conformance requirement | The UE detach the IMSI for PS and non-PS services.
Reference
3GPP TS 24.008 clause 4.7.4.1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.5.3 Test purpose | To test the behaviour of the UE for the detach procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.5.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode I.
User Equipment:
The UE has a valid IMSI.
Related ICS/IXIT statements
Support of PS service Yes/No
UE operation mode A Yes/No
Switch off on button Yes/No
Automatic PS attach procedure at switch on or power on Yes/No
Test procedure
T... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.5.5 Test requirements | At step 2a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Registration".
At step 6a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Detach".
At step3, when the UE is powered up or switched on, UE shall:
- initiate the combined PS a... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.6 PS detach / accepted / PS/IMSI detach | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.6.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.6.2 Conformance requirement | The UE detach the IMSI for PS and non-PS services.
Reference
3GPP TS 24.008 clause 4.7.4.1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.6.3 Test purpose | To test the behaviour of the UE for the detach procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.6.4 Method of test | Initial condition
System Simulator:
- One cell operating in network operation mode I.
User Equipment:
The UE has a valid IMSI.
Related ICS/IXIT statements
- Support of PS service Yes/No
UE operation mode A Yes/No
Switch off on button Yes/No
Automatic PS attach procedure at switch on or power on Yes/No
User request... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.6.5 Test requirements | At step 2a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Registration".
At step 6a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Detach".
At step3, when the UE is powered up or switched on, UE shall:
- initiate the combined PS a... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.7 PS detach / accepted / IMSI detach | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.7.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.7.2 Conformance requirement | The UE shall detach for CS services.
Reference
3GPP TS 24.008 clause 4.7.4.1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.7.3 Test purpose | To test the behaviour of the UE for the detach procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.7.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode I.
User Equipment:
- The UE has a valid IMSI.
Related ICS/IXIT statements
- Support of PS service Yes/No
UE operation mode A Yes/No
Switch off on button Yes/No
Automatic PS attach procedure at switch on or power on Yes/No
User request... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.7.5 Test requirements | At step3, when the UE is powered up or switched on, UE shall:
- initiate the combined PS attach procedure with the information elements specified in the above Expected Sequence.
At step10, after the detach procedure (Detach type = 'normal detach, IMSI detach') is completed, UE shall:
- respond to the paging message for... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.8 PS detach / abnormal cases / change of cell into new routing area | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.8.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.8.2 Conformance requirement | When a change of cell into a new routing area is performed before DETACH ACCEPT message is received by the UE, the UE shall abort the PS detach procedure and re-initiate it after the routing area update procedure.
Reference
3GPP TS 24.008 clause 4.7.4.1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.8.3 Test purpose | To test the behaviour of the UE in case of procedure collision. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.8.4 Method of test | Initial condition
System Simulator:
Two cells (not simultaneously activated), cell A in MCC1/MNC1/LAC1/RAC1 (RAI-1) and cell B in MCC1/MNC1/LAC1/RAC2 (RAI-4).
Both cells are operating in network operation mode I.
User Equipment:
The UE has a valid IMSI.
Related ICS/IXIT statements
Support of PS service Yes/No
UE opera... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.8.5 Test requirements | At step4, when the UE is powered up or switched on, UE shall:
- initiate the combined PS attach procedure with the information elements specified in the above Expected Sequence.
At step12, when a change of cell into a new routing area is performed before DETACH ACCEPT message is received by the UE, UE shall:
- abort a ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.9 PS detach / abnormal cases / PS detach procedure collision | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.9.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.9.2 Conformance requirement | When a DETACH REQUEST is received by the UE while waiting for a DETACH ACCEPT message, the UE shall answer the network initiated GPRS detach procedure.
Reference
3GPP TS 24.008 clause 4.7.4.1. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.9.3 Test purpose | To test the behaviour of the UE in case of procedure collision. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.9.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode I.
User Equipment:
The UE has a valid IMSI.
Related ICS/IXIT statements
Support of PS service Yes/No
UE operation mode A Yes/No
Switch off on button Yes/No
Automatic PS attach procedure at switch on or power on Yes/No
User requested c... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.9.5 Test requirements | At step3, when the UE is powered up or switched on, UE shall:
- initiate the combined PS attach procedure with the information elements specified in the above Expected Sequence.
At step9, when the UE receives DETACH REQUEST message from SS before UE initiated GPRS detach procedure has been completed, UE shall:
- send t... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.10 UE initiated detach/abnormal case/ Not authorized for this CSG | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.10.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.10.2 Conformance requirement | The following abnormal cases can be identified:
a) CSG ID of the CSG cell is not in the Allowed CSG list of the MS which sends the detach request
If the MS initiates a detach procedure in a CSG cell the CSG ID of which is not in the MS's Allowed CSG list and the detach procedure is not due to "switch off", the network ... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.10.3 Test purpose | To test the behaviour of the MS if the MS initiates a detach procedure in a CSG cell not due to "switch off", and the network send a DETACH REQUEST message including the GMM cause value #25 "not authorized for this CSG". |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.10.4 Method of test | Initial condition
System Simulator:
Two cells cell A with MCC1/MNC1/LAC1/RAC1 (RAI-1), cell B in MCC1/MNC1/LAC1/RAC1 (RAI-1)/CSG1.
Both cells are operating in network operation mode I.
Both Cell A and Cell B belong to PLMN 1.
The cell B shall also include:
-"CSG Indicator" in its Master Information Block
-"CSG Identity... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.1.10.5 Test requirements | At step 1-12, UE Allowed CSG List shall contain only CSG 1.
At step 13, when the UE receives DETACH REQUEST, UE shall:
- delete the CSG1 from the Allowed CSG List.
At step 14, the UE shall continue the network initiated detach procedure.
At step 16, when the UE camps on a suitable cell in the same PLMN, UE shall:
- per... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2 Network initiated PS detach procedure | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.1 PS detach / re-attach not required / accepted | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.1.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.1.2 Conformance requirement | The UE detach the IMSI for PS services.
Reference
3GPP TS 24.008 clause 4.7.4.2. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.1.3 Test purpose | To test the behaviour of the UE for the detach procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.1.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode II (in case of UE operation mode A).
The SIB1 IE "CN domain specific NAS system information", for the CS Domain, is set to value "00 00" (T3212 value is set to 0 and ATT flag is set to FALSE to prevent repeated CS domain registration and/o... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.1.5 Test requirements | At step 3a the UE shall send an RRC CONNECTION REQUEST message with the IE Establishment cause set to "Registration".
At step4, when the UE is powered up or switched on, UE shall:
- initiate the PS attach procedure with the information elements specified in the above Expected Sequence.
At step9, when the UE receives th... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.2 PS detach / rejected / IMSI invalid / PS services not allowed | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.2.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.2.2 Conformance requirement | 1) If the network performs a PS detach procedure with the cause 'GPRS services not allowed', the User Equipment shall consider USIM invalid for PS services until power is switched off or USIM is removed.
2) If the network performs a PS detach procedure with the cause 'GPRS services not allowed' the User Equipment shall... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.2.3 Test purpose | To test the behaviour of the UE if the network orders a PS detach procedure with the cause 'GPRS services not allowed' (no valid PS-subscription for the IMSI). |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.2.4 Method of test | Initial condition
System Simulator:
Two cells (not simultaneously activated), cell A in MCC1/MNC1/LAC1/RAC1 (HPLMN, RAI-1) and cell B in MCC2/MNC1/LAC1/RAC1 (RAI-2).
Both cells are operating in network operation mode II.
NB: i) Cell B will be mapped to Cell 4 as found in TS 34.108 clause 6.1.4.1.
User Equipment:
The UE... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.2.5 Test requirements | At step4 and 15, when the UE is powered up or switched on, UE shall:
- initiate the PS attach procedure with the information elements specified in the above Expected Sequence.
At step8, when the UE receives the DETACH REQUEST message (Detach type = 're-attach not required', Cause = 'GPRS services not allowed') from SS,... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.3 PS detach / IMSI detach / accepted | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.3.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.3.2 Conformance requirement | The UE detach the IMSI for PS services.
Reference
3GPP TS 24.008 clause 4.7.4.2. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.3.3 Test purpose | To test the behaviour of the UE for the detach procedure. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.3.4 Method of test | Initial condition
System Simulator:
One cell operating in network operation mode I.
User Equipment:
The UE has a valid IMSI.
Related ICS/IXIT statements
Support of PS service Yes/No
UE operation mode A Yes/No
Switch off on button Yes/No
Automatic PS attach procedure at switch on or power on Yes/No
Test procedure
T... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.3.5 Test requirements | At step3, when the UE is powered up or switched on, UE shall:
- initiate the combined PS attach procedure with the information elements specified in the above Expected Sequence.
At step8, when the UE receives the DETACH REQUEST message with Detach type = 'IMSI detach', UE shall;
- send the DETACH ACCEPT message to SS.
... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.4 PS detach / re-attach requested / accepted | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.4.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.4.2 Conformance requirement | When receiving the DETACH REQUEST message and the detach type IE indicates "re-attach required", the UE shall deactivate the PDP contexts and deactivate the logical link(s), if any. The UE shall then send a DETACH ACCEPT message to the network and shall change state to GMM-DEREGISTERED. The UE shall, after the completi... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.4.3 Test purpose | To test the behaviour of the UE for the detach procedure in case automatic re-attach. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.4.4 Method of test | Initial condition
System Simulator:
One cell in operating in network operation mode I.
User Equipment:
The UE has a valid TMSI, P-TMSI and RAI.
Related ICS/IXIT statements
Support of PS service Yes/No
UE operation mode A Yes/No
Switch off on button Yes/No
Automatic PS attach procedure at switch on or power on Yes/... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.4.5 Test requirements | At step3, when the UE is powered up or switched on, UE shall:
- initiate the combined PS attach procedure with the information elements specified in the above Expected Sequence.
At step8, when the UE receives DETACH REQUEST message with Detach type = 're-attach required', UE shall;
- send DETACH ACCEPT message to SS.
A... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.5 PS detach / rejected / location area not allowed | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.5.1 Definition | |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.5.2 Conformance requirement | 1) If the network performs a PS detach procedure with the cause 'location area not allowed' the User Equipment shall:
1.1 not perform combined PS attach when in the same location area.
1.2 delete any RAI or LAI, P-TMSI, P-TMSI signature and PS ciphering key sequence number
.
1.3 store the LAI in the list of the 'forbid... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.5.3 Test purpose | To test the behaviour of the UE if the network orders the PS detach procedure with the cause 'Location Area not allowed'.
To test that the UE deletes the list of forbidden LAs when power is switched off. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.5.4 Method of test | Initial condition
System Simulator:
Three cells (not simultaneously activated), cell A in MCC2/MNC1/LAC1/RAC2 (RAI-2, Not HPLMN), cell B in MCC2/MNC1/LAC1/RAC2 (RAI-7, Not HPLMN), cell C in MCC2/MNC1/LAC2/RAC1 (RAI-6, Not HPLMN).
All cells are operating in network operation mode I.
User Equipment:
The UE has a valid IM... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.5.5 Test requirements | At step4, when the UE is powered up or switched on, UE shall:
- initiate the PS attach procedure with the information elements specified in the above Expected Sequence.
At step8, when the UE receive the DETACH REQUEST message (Detach type = 're-attach not required', Cause = 'Location Area not allowed') from SS, UE sha... |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.6 PS detach / rejected / No Suitable Cells In Location Area | 12.3.2.6.1 Definition |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.6.2 Conformance requirement | 1. If the network performs a PS detach procedure with the cause 'No Suitable Cells In Location Area', the User Equipment shall:
1.1 delete the stored LAI, CKSN, TMSI, RAI, PS-CKSN, P-TMSI and P-TMSI signature.
1.2 store the LA in the 'forbidden location areas for roaming'.
Reference
3GPP TS 24.008 clauses 4.7.4.2. |
4251e2eb3ecde7c73983ce7a4175ddf3 | 34.123-1 | 12.3.2.6.3 Test purpose | To test the behaviour of the UE if the network sends the DETACH REQUEST message with the cause 'No Suitable Cells In Location Area'. |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.