hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.7.2 Test purpose | This test will verify that the MS can correctly handle an unknown RATSCCH REQ message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.7.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
-
PIXIT statements:
-
Foreseen Final State of the MS
Idle Updated, TMSI allocated and camped on cell A.
Test Procedure
1) User... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.8 Ignore subsequent REQ prior to expiry of REQ_Activation counter | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.8.1 Conformance requirements | If another REQ message is received by the MS before the REQ_Activation counter has elapsed, the MS shall ignore the message.
Reference:
3GPP TS 45.009 sub-clause: 3.2.2.2 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.8.2 Test purpose | This test will verify that the MS ignores a REQ message which is received before the REQ_Activation counter has elapsed. The test will verify that both the following conditions are satisfied:
- the MS ignores a subsequent REQ message received after it has sent the ACK_OK but before the REQ_Activation counter has elapse... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.8.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
-
PIXIT statements:
-
Foreseen Final State of the MS
Idle Updated, TMSI allocated and camped on cell A.
Test Procedure
1) User... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.9 Initiation of Transaction with ACK_ERR or ACK_UNKNOWN | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.9.1 Conformance requirements | If at either side an ACK_ERR or ACK_UNKNOWN is received although no corresponding REQ has been sent before, the ACK message shall be ignored.
Reference:
3GPP TS 45.009 sub-clause: 3.2.2.2 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.9.2 Test purpose | This test will verify that the MS ignores any ACK_ERR or ACK_UNKNOWN which is received without a corresponding REQ having been sent. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.9.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
-
PIXIT statements:
-
Foreseen Final State of the MS
Idle Updated, TMSI allocated and camped on cell A.
Test Procedure
1) User... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.10 Inversion of the Phase of the CMR/CMI | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.10.1 Conformance requirements | The phase of the Codec Mode Indication in the downlink can be changed during a call by using a CMI_PHASE_REQ message sent on the RATSCCH.
The CMI_PHASE_REQ message may be sent by the BTS during a call to change the phase of the Codec Mode Indication in the downlink without interruption of the speech transmission.
The A... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.10.2 Test purpose | This test shall verify that the MS is able to change the phase of the Codec Mode Indication in the downlink using the RATSCCH protocol. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.10.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
-
PIXIT statements:
-
Foreseen Final State of the MS
Idle Updated, TMSI allocated and camped on cell A.
Test Procedure
1) User... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.11 Change of Active Codec Set | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.11.1 Conformance requirements | AMR codec mode adaptation is done within a set of 4 codec modes. The codec mode set (Active Codec Set) to be used by the BSS and the MS is defined during call setup and/or handover by layer 3 signalling. The ACS can be changed during a call using an AMR_CONFIG_REQ message sent on the RATSCCH.
The AMR_CONFIG_REQ message... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.11.2 Test purpose | This test shall verify that the MS is able to change its Active Codec Set using the RATSCCH protocol, with change of thresholds, and with non-specification of thresholds. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.9.11.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
-
PIXIT statements:
-
Foreseen Final State of the MS
Idle Updated, TMSI allocated and camped on cell A.
Test Procedure
1) User... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.10 8-PSK AMR HR signalling/ test of the channel mode modify procedure | NOTE: This test is derived from the test in sub-clause 26.16.10 entitled "AMR signalling/ test of the channel mode modify procedure ". |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.10.1 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.10.2 8-PSK AMR HR signalling/ test of the channel mode modify procedure/ half rate | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.10.2.1 Conformance requirement | The MS with a TCH/H allocated acknowledges a CHANNEL MODE MODIFY message by sending a CHANNEL MODE MODIFY ACKNOWLEDGE message specifying the new mode and by switching to this mode.
References
3GPP TS 04.08 / 3GPP TS 44.018, subclauses 3.4.6.1.1 and 3.4.6.1.2 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.10.2.2 Test purpose | To verify that the MS with a TCH/H allocated acknowledges a CHANNEL MODE MODIFY message by sending a CHANNEL MODE MODIFY ACKNOWLEDGE message specifying the new mode and by switching to this mode. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.17.10.2.3 Method of test | Initial Conditions
System Simulator: 1 cell, default parameters.
Mobile Station: The MS is "idle updated", with TMSI allocated.
Specific PICS statements:
-
PIXIT statements:
-
Foreseen Final State of the MS
"Idle, updated", with TMSI allocated.
Test procedure
A Mobile Terminated call is initiated, however following the... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.18 Dynamic ARFCN mapping tests | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.18.1 Control of dynamic ARFCN mapping with SI14 and SI15 | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.18.1.1 Conformance Requirement | The dynamic mapping of ARFCN to carrier frequencies is specified as follow in 3GPP TS 45.005:
“The carrier frequency is designated by the absolute radio frequency channel number (ARFCN). If we call Fl(n) the frequency value of the carrier ARFCN n in the lower band, and Fu(n) the corresponding frequency value in the upp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.18.1.2 Test Purpose | To verify that for the frequencies bands for which Dynamic ARFCN mapping is mandatory, the MS:
1) detects that dynamic ARFCN mapping is supported in the cell (signalled via the DN-IND field of the Cell Options (BCCH) IE in the SI3)
2) decodes and interprets correctly the parameters x = ARFCN_FIRST, y = BAND_OFFSET an... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.18.1.3 Method of Test | Initial Conditions
MS:
Switched off
MS operating in a band for which support of Dynamic ARFCN mapping is mandatory.
System Simulator:
1 cell, default setting for the frequency band to be tested.
Cell Options (BCCH) IE shall indicate that Dynamic ARFCN is supported
Specific PICS statements:
-
PIXIT statements:
-
Test Pr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19 AMR WB - signalling | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.1 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.2 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.3 Reserved for future use | 26.19.3a WB AMR / Structured procedures / MS terminated call / early assignment / specified initial codec mode
NOTE: this test is derived from the one described in subclause 26.16.3a and entitled: "Structured procedures / MS terminated call / early assignment/ specified initial codec mode"
26.19.3a.1 Conformance requir... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.4 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.5 WB AMR / Adaptive Multi Rate Signalling / AMR signalling / Handover / active call / successful case | NOTE: This test is derived from 26.16.5 – AMR signalling / Handover / active call / successful case. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.5.1 Conformance requirements | The MS shall correctly apply the handover procedure in the non-synchronised case when:
- a call is in progress; and
- handover is performed from a TCH/F with/without frequency hopping towards a TCH/F with/without frequency hopping;
- the mode of either the current or the target channel is set to full rate speech versi... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.5.2 Test Purpose | To test that the MS shall correctly apply the handover procedure in the non-synchronized case when:
- a call is in progress; and
- handover is performed from a TCH/F with/without frequency hopping towards a TCH/F with/without frequency hopping; and
- the mode of either the current or the target channel is set to full r... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.6 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.7 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.8 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9 WB AMR RATSCCH Protocol | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.1 WB AMR Configuration Change (normal) | NOTE: this test is derived from the one described in subclause 26.16.9.1 and entitled: "AMR Configuration Change (normal)" |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.1.1 Conformance requirements | The AMR_CONFIG_REQ message may be sent by the BTS during a call to change the AMR WB configuration on the radio interface without interruption of the speech transmission.
The ACK_OK message serves as an acknowledgement that a RATSCCH REQ message has been detected, correctly decoded (no CRC error) and that it is defined... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.1.2 Test purpose | This test will verify that the MS is able to handle a properly formatted AMR_CONFIG_REQ message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.1.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM speech Half rate version 4 (O-TCH/WHS).
- Support of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.2 AMR WB Configuration Change (abnormal) | NOTE: this test is derived from the one described in subclause 26.16.9.2 and entitled: "AMR Configuration Change (abnormal)
26.19.9.2.1 Conformance requirements
The AMR_CONFIG_REQ message may be sent by the BTS during a call to change the AMR WB configuration on the radio interface without interruption of the speech t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.2.2 Test purpose | This test will verify that the MS is able to handle an improperly formatted AMR_CONFIG_REQ message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.2.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM speech Half rate version 4 (O-TCH/WHS).
- Support of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.3 Codec Mode Phase Change (normal) | NOTE: this test is derived from the one described in subclause 26.16.9.3 and entitled: "Codec Mode Phase Change (normal)" |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.3.1 Conformance requirements | The CMI_PHASE_REQ message may be sent by the BTS to change the phase of the Codec Mode Indication in downlink.
The ACK_OK message serves as an acknowledgement that a RATSCCH REQ message has been detected, correctly decoded (no CRC error) and that it is defined for the Addressee. It defines the exact activation time in ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.3.2 Test purpose | This test will verify that the MS can correctly handle a properly formatted CMI_PHASE_REQ message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.3.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM speech Half rate version 4 (O-TCH/WHS).
- Support of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.4 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.5 Threshold Change (normal) | NOTE: this test is derived from the one described in subclause 26.16.9.5 and entitled: “Threshold Change (normal)" |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.5.1 Conformance requirements | The THRESH_REQ message may be sent by the BTS to change the thresholds in the DL Mode Request Generator.
The ACK_OK message serves as an acknowledgement that a RATSCCH REQ message has been detected, correctly decoded (no CRC error) and that it is defined for the Addressee. It defines the exact activation time in direct... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.5.2 Test purpose | This test will verify that an RATSCCH capable MS is able to handle a properly formatted THRESH_REQ message |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.5.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM speech Half rate version 4 (O-TCH/WHS).
- Support of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.6 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.7 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.8 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.9 Reserved for future use | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.10 Inversion of the Phase of the CMR/CMI | NOTE: this test is derived from the one described in subclause 26.16.9.10 and entitled: “Inversion of the Phase of the CMR/CMI" |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.10.1 Conformance requirements | The phase of the Codec Mode Indication in the downlink can be changed during a call by using a CMI_PHASE_REQ message sent on the RATSCCH.
The CMI_PHASE_REQ message may be sent by the BTS during a call to change the phase of the Codec Mode Indication in the downlink without interruption of the speech transmission.
The A... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.10.2 Test purpose | This test shall verify that the MS is able to change the phase of the Codec Mode Indication in the downlink using the RATSCCH protocol. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.10.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM speech Half rate version 4 (O-TCH/WHS).
- Support of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.11 Change of Active Codec Set | NOTE: this test is derived from the one described in subclause 26.16.9.11 and entitled: "Change of Active Codec Set” |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.11.1 Conformance requirements | AMR codec mode adaptation is done within a set of 4 codec modes. The codec mode set (Active Codec Set) to be used by the BSS and the MS is defined during call setup and/or handover by layer 3 signalling. The ACS can be changed during a call using an AMR_CONFIG_REQ message sent on the RATSCCH.
The AMR_CONFIG_REQ message... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.11.2 Test purpose | This test shall verify that the MS is able to change its Active Codec Set using the RATSCCH protocol, with change of thresholds, and with non-specification of thresholds. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.9.11.3 Method of test | Initial Conditions
System Simulator:
1 cell with default parameters
Mobile Station:
The MS is in the "idle, updated" state, with a TMSI allocated and camped on cell A.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM speech Half rate version 4 (O-TCH/WHS).
- Support of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.10 AMR signalling/ test of the channel mode modify procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.10.1 WB AMR signalling test of the channel mode modify procedure / full rate | NOTE: this test is derived from the one described in subclause 26.16.10.1 and entitled: "AMR signalling/ test of the channel mode modify procedure/full rate” |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.10.1.1 Conformance requirement | The MS with a TCH/F allocated acknowledges a CHANNEL MODE MODIFY message by sending a CHANNEL MODE MODIFY ACKNOWLEDGE message specifying the new mode and by switching to this mode.
References
3GPP TS 04.08 / 3GPP TS 44.018, subclauses 3.4.6.1.1 and 3.4.6.1.2 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.10.1.2 Test purpose | To verify that the MS with a TCH/F allocated acknowledges a CHANNEL MODE MODIFY message by sending a CHANNEL MODE MODIFY ACKNOWLEDGE message specifying the new mode and by switching to this mode. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.19.10.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is "idle updated", with TMSI allocated.
Specific PICS statements:
- Support of GSM speech full rate version 4 (O-TCH/WFS).
- Support of GSM Speech Full Rate version 5 (TCH/WFS).
PIXIT statements:
-
Foreseen Final State of the MS
"Id... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.20 Enhanced Power Control | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.20.1 Enhanced Power Control / MS Supports EPC | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.20.1.1 Conformance requirements | The purpose of the Mobile Station Classmark 3 information element is to provide the network with information concerning aspects of the mobile station. The contents might affect the manner in which the network handles the operation of the mobile station. The Mobile Station Classmark information indicates general mobile ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.20.1.2 Test purpose | To verify that a MS that supports EPC indicates to the network that it supports GERAN feature package 2.
To verify that when commanded to do so the MS shall configure the assigned TCH or O-TCH channel in EPC mode.
To verify that when on a channel in EPC mode the MS ignores the EPC Uplink Power Control command if the si... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.20.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, default parameters except IMSI Attach-detach shall be applied.
Mobile Station:
MS is switched off.
Specific PICS Statements:
-
PIXIT Statements:
-
Test Procedure
The MS is switched on (or its power is re-applied). After the start of the LOCATION UPDATING procedure the SS ini... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21 VAMOS Signalling | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.0 General | VAMOS signalling test cases in this section are performed with SCPIR = 0 if not otherwise defined in the test case.
VAMOS signalling test cases are performed in VAMOS I mode for MS supporting VAMOS I, VAMOS II mode for MS supporting VAMOS II and in VAMOS III mode for MS supporting VAMOS III. VAMOS II and VAMOS III mode... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.1 VAMOS Signalling / MS originated call FR / TSC assignment in ASSIGNMENT COMMAND | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.1.1 Conformance requirements | 1) VAMOS allows multiplexing of two users simultaneously on the same physical resource in the circuit switched mode both in downlink and in uplink, using the same timeslot number, ARFCN and TDMA frame number. Hence, a basic physical channel capable of VAMOS supports up to 4 TCH channels along with their associated cont... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.1.2 Test purpose | To verify for MO call setup procedure that the MS applies the correct VAMOS TSC set allocated by ASSIGNMENT COMMAND message for full rate speech channels. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.1.3 Method of Test | Initial Conditions
System Simulator:
1 cell, default parameters, TSC as defined in table 26.21-1 Cell A TSC set for execution counter M.
Mobile Station:
in MM-state "idle, updated" with valid TMSI and CKSN
Specific PICS statements:
- VAMOS II supported ( TSPC_VAMOS_Type2)
- VAMOS III supported (TSPC_VAMOS_Type3)
- Spee... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.2 VAMOS Signalling / MS Terminated call / Channel mode assignment in Channel Mode Modify | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.2.1 Conformance requirements | 1) VAMOS allows multiplexing of two users simultaneously on the same physical resource in the circuit switched mode both in downlink and in uplink, using the same timeslot number, ARFCN and TDMA frame number. Hence, a basic physical channel capable of VAMOS supports up to 4 TCH channels along with their associated cont... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 0 TSC Set 1 shall be used | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 1 TSC Set 2 shall be used | All other values are reserved.
References
3GPP TS 45.001 subclause 13.1.
3GPP TS 44.018 subclauses 10.5.2.5
3GPP TS 44.060 subclauses 7.1, 8.9.2.1
3GPP TS 45.002 subclauses 6.4.2.3 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.2.2 Test purpose | To verify for MT call setup procedure that the MS applies the correct VAMOS TSC Set allocated by IMMEDIATE ASSIGNMENT message also check that channel mode modify configure a VAMOS II and VAMOS III channel correctly. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.2.3 Method of Test | Initial Conditions
System Simulator:
1 cell, default parameters, TSC as defined in table 26.21-1 Cell A TSC set for execution counter M.
Mobile Station:
in MM-state "idle, updated" with valid TMSI and CKSN
Specific PICS statements:
- VAMOS II supported ( TSPC_VAMOS_Type2)
- VAMOS III supported (TSPC_VAMOS_Type3)
- Spee... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.4 VAMOS Signalling / MS terminated call / Handover to VAMOS mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.4.1 Conformance requirements | 1) VAMOS allows multiplexing of two users simultaneously on the same physical resource in the circuit switched mode both in downlink and in uplink, using the same timeslot number, ARFCN and TDMA frame number. Hence, a basic physical channel capable of VAMOS supports up to 4 TCH channels along with their associated cont... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.4.2 Test purpose | To verify for mobile terminated call setup procedure (late assignment) and handover procedure that the MS applies correctly the assigned VAMOS TSC set. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.4.3 Method of Test | Initial Conditions
System Simulator:
2 cells, default parameters.
Cell A: TSC as defined in table 26.21-1 Cell A TSC set for execution counter M.
Cell B: TSC as defined in table 26.21-1 Cell B TSC set for execution counter M.
Mobile Station:
in MM-state "idle, updated" with valid TMSI and CKSN
Specific PICS statements:... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.5 VAMOS Signalling / MT VAMOS call / TSC assignment in DTM Assignment Command | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.5.1 Conformance requirements | 1) VAMOS allows multiplexing of two users simultaneously on the same physical resource in the circuit switched mode both in downlink and in uplink, using the same timeslot number, ARFCN and TDMA frame number. Hence, a basic physical channel capable of VAMOS supports up to 4 TCH channels along with their associated cont... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.5.2 Test purpose | To verify that a VAMOS mobile is able to operate in DTM mode and packet data traffic channels together with associated control channels shall have the same TSC as TSC of the traffic channel together with associated control channels and shall be selected from TSC set 1 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.5.3 Method of Test | Initial Conditions
System Simulator:
1 cell, default parameters, DTM supported, TSC as defined in table 26.21-1 Cell A TSC set.
Mobile Station:
MS is GPRS attached and PDP Context 2 activated.
Specific PICS statements:
- VAMOS II supported ( TSPC_VAMOS_Type2)
- VAMOS III supported (TSPC_VAMOS_Type3)
PIXIT statements:
-... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.21.6 VAMOS Signalling / MS originated call / Handover between different traffic rates |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.