hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.1 E-GSM or R-GSM or ER-GSM signalling / RR / Measurement | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.1.1 Conformance requirements | The MS shall continuously send MEASUREMENT REPORT messages on every SACCH blocks and the measurement valid indication shall be set to valid (0) within the second block at the latest. After 20 s the values in the MEASUREMENT REPORT message shall contain measurement results for the 6 th strongest cells belonging to the s... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.1.2 Test purpose | To test that, when the SS gives information about neighbouring cells indicated either in SI5 and SI5bis messages or in SI5 and SI5ter messages, the MS reports appropriate results. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.1.3 Method of test | Initial Conditions
System Simulator:
8 cells with the following settings:
E-GSM:
Transmitter
Level
NCC
BCC
ARFCN
Cell Identity
Serving, S1
‑60
1
3
002
0001H
Neighbour, N1
‑85
1
5
990
0002H
Neighbour, N2
‑80
1
7
1005
0003H
Neighbour, N3
‑75
1
1
000
0004H
Neighbour, N4
‑55
1
3
026
0005H
Neighbour, N5
‑50
1
5
1020
0006H
N... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.2 E-GSM or R-GSM or ER-GSM signalling / RR / Immediate assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.2.1 Conformance requirement | Following a PAGING REQUEST message, the MS shall correctly set up an RR connection on a supported channel described in the IMMEDIATE ASSIGNMENT message, using some E-GSM or R-GSM or ER-GSM frequency.
Reference(s)
3GPP TS 04.08 / 3GPP TS 44.018 subclause 3.3.1.1.2. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.2.2 Test purpose | To verify that the MS can correctly set up a dedicated control channel when E-GSM or R-GSM or ER-GSM frequencies are used.
This tested for a SDCCH/8. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell.
E-GSM:
CCCH-CONF is set to "1 basic physical channel used for CCCH not combined with SDCCHs".
SYSTEM INFORMATION type 1 message contains the following frequencies in the Cell Channel Description IE: 0, 30, 40, 66, 80, 1 005, 1 010, 1 015 (use range 1 024 to encode).
BCCH car... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.3 E-GSM or R-GSM or ER-GSM signalling / RR / channel assignment procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.3.1 Conformance requirements | 1. Upon receipt of the ASSIGNMENT COMMAND message, the mobile station initiates a local end release of link layer connections, disconnects the physical channels, commands the switching to the assigned channels and initiates the establishment of lower layer connections (this includes the activation of the channels, thei... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.3.2 Test purpose | 1. To verify that upon receipt of an ASSIGNMENT COMMAND, the MS switches to the channel defined in the ASSIGNMENT COMMAND, establishes the link and sends an ASSIGNMENT COMPLETE message.
2. To verify that an MS, having received an ASSIGNMENT COMMAND, is able in case of frequency hopping to decode the mobile allocation a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.3.3 Method of test | Initial Conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in the "idle, updated" state with a TMSI allocated.
Specific PICS statements:
- R-GSM Band (TSPC_Type_GSM_R_Band)
- ER-GSM Band (TSPC_Type_ER_GSM_Band)
- TSPC_AddInfo_Full_rate_version_1
PIXIT statements:
-
Foreseen Final State o... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4 E-GSM or R-GSM or ER-GSM signalling / RR / Handover | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.1 E-GSM or R-GSM or ER-GSM signalling / RR / Handover / Successful handover | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.1.1 Conformance requirements | The MS shall correctly apply the handover procedure from a channel without frequency hopping in the primary band to a channel with frequency hopping using P-GSM and E-GSM or P-GSM and R-GSM or ER-GSM frequencies whatever the coding used for the frequency hopping description.
References
3GPP TS 04.08 / 3GPP TS 44.018, s... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.1.2 Test purpose | To check that the MS correctly performs a non-synchronized handover, from a non hopping primary band SDCCH to a hopping TCH or SDCCH using E-GSM or R-GSM or ER-GSM frequencies, whatever the coding used for the hopping sequence description and that it activates the new channel correctly.
This is tested in the following ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.1.3 Method of test | Initial Conditions
System Simulator:
E-GSM:
2 cells A and B with same LAI, default parameters;
except for Cell A: the broadcasted Cell Channel Description in SYSTEM INFORMATION type 1 message contains the following frequencies: 20, 40, 66, 73, 74, 75, 76, 77, 78, 79, 108, 114 (encoded using Bit Map 0 format);
The broad... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.2 E-GSM or R-GSM or ER-GSM signalling / RR / Handover / layer 1 failure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.2.1 Conformance requirements | During a handover from a channel in the E-GSM or R-GSM or ER-GSM band to a channel in the P-GSM band, or the contrary, the MS shall correctly return to the old channel in the case of an handover failure caused by a layer 1 failure on the target cell.
References
3GPP TS 04.08 / 3GPP TS 44.018 subclause 3.4.4. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.2.2 Test purpose | To check that the MS correctly returns to the old channel in the case of a handover failure caused by a layer 1 failure on the target cell, even if the origin is in the P-GSM band and the target in the E-GSM or R-GSM or ER-GSM band. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.4.2.3 Method of test | Initial Conditions
System Simulator:
E-GSM:
2 cells with same LAI, default parameters.
Cell A: The broadcasted BCCH frequency list for Cell A in SYSTEM INFORMATION type 2 and 5 contains the following frequencies: 10, 20, 40, 80, 90, 100, 110 and 120 (encoded in Bit Map 0 format).
The BCCH carrier number of Cell B is 40... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.5 E-GSM or R-GSM or ER-GSM signalling / RR / Frequency Redefinition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.5.1 Conformance requirements | 1) To verify that the MS, after receiving a FREQUENCY REDEFINITION message, correctly starts using the new frequencies, and hopping sequence when some E-GSM or R-GSM or ER-GSM frequencies are used.
2) The last received Cell Channel Description information element is used to decode the Mobile Allocation IE received on t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.5.2 Test purpose | 1) To verify that the MS, after receiving a FREQUENCY REDEFINITION message, starts using the new frequencies and hopping sequence when some E-GSM or R-GSM or ER-GSM frequencies are used.
2) To check that the last received Cell Channel Description information element is used to decode the Mobile Allocation IE received i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.2.5.3 Method of test | Initial conditions
System Simulator:
1 cell; default parameters.
Mobile Station:
The MS is in "idle, updated" state with TMSI allocated.
Specific PICS statements:
- R-GSM Band (TSPC_Type_GSM_R_Band)
- ER-GSM Band (TSPC_Type_ER_GSM_Band)
- TSPC_AddInfo_Full_rate_version_1
PIXIT statements:
-
Foreseen final state of the ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3 E-GSM or R-GSM or ER-GSM signalling / Structured procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.1 E-GSM or R-GSM or ER-GSM signalling / Structured procedure / Mobile originated call | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.1.1 Conformance requirement | 1) An MS in MM state "idle, updated" and in RR idle mode with a TMSI assigned, when made to initiate a call for a selected teleservice that is supported by the MS , shall start to initiate an immediate assignment procedure by sending the CHANNEL REQUEST message with correct establishment cause.
2) Upon receipt of the A... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.1.2 Test purpose | 1) To verify that the MS in MM state "idle, updated" and in RR idle mode with a TMSI assigned, when made to initiate a call for a selected teleservice that is supported by the MS as declared in a PICS/PIXIT statement, starts to initiate an immediate assignment procedure by sending the CHANNEL REQUEST message.
2) To ver... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.1.3 Method of test | Specific PICS statements:
- R-GSM Band (TSPC_Type_GSM_R_Band)
- ER-GSM Band (TSPC_Type_ER_GSM_Band)
- TSPC_AddInfo_Full_rate_version_1
PIXIT statements:
- Way to indicate mobile originated alerting.
-. Way to display the called number
Initial Conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.2 E-GSM or R-GSM or ER-GSM signalling / Structured procedures / emergency call | Emergency call establishment can be initiated by an MS whether location updating has been successful or not and whether a SIM is inserted into the MS or not; but only if the MS is equipped for speech.
This subclause is only applicable to an MS supporting speech. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.2.1 Conformance requirement | 1) The MS in the "idle, updated" state, as after a successful location update, after the number 112 has been entered by user, shall send a CHANNEL REQUEST message with correct establishment cause ("emergency call").
2) After assignment of a dedicated channel the first layer message sent by the MS on the assigned dedica... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.2.2 Test purpose | 1) To verify that the MS in the "idle, no IMSI" state (no SIM inserted) when made to call the number 112, sends a CHANNEL REQUEST message with establishment cause "emergency call".
2) To verify that after assignment of a dedicated channel the first layer message sent by the MS on the assigned dedicated channel is a CM ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.2.3 Method of test | Specific PICS statements:
- R-GSM Band (TSPC_Type_GSM_R_Band)
- ER-GSM Band (TSPC_Type_ER_GSM_Band )
- TSPC_AddInfo_Full_rate_version_1
PIXIT statements:
-
Initial Conditions
System Simulator:
1 cell, default parameters except:
See Table 26.1
Mobile Station:
The MS is in MM-state "idle, no IMSI", no SIM inserted.
Fores... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.3.3 Default contents of messages | Same as in subclause 26.9.7 except for the following.
ASSIGNMENT COMMAND
E-GSM:
Information element
Value/remark
Description of the first channel
describes non-hopping Bm+ACCHs or Lm+ACCHs as appropriate for the test
ARFCN = 990
Power Command
-
Chosen arbitrarily but within the range supported by the MS.
Frequency list... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.10.4 E-GSM or R-GSM or ER-GSM signalling / Default message contents | Default SYSTEM INFORMATION:
NOTE: SYSTEM INFORMATION 7, and SYSTEM INFORMATION 8 messages are not used.
SYSTEM INFORMATION type 1 message
Information elements
Value/Remark
Cell Channel Description
For Cell A
- Format identifier
Bit Map 0
- Cell Allocation ARFCN
Channel Numbers 20, 30, 50 and 70.
For Cell B
- Format ide... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11 Multiband signalling | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.1 General considerations | This subclause applies only to Multiband mobile stations, as defined in 3GPP TS 02.06 subclause 3.2.1.
Conformance requirements of clause 26 fully apply to any Multiband MS in the whole supported band(s) of operation of the mobile station.
A Multiband mobile station has the functionality to perform handover, channel as... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2 Multiband signalling / RR | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.1 Multiband signalling / RR / Immediate assignment procedure | To inform the multiband network of the MSs additional frequency and power capability, the multiband MS has to send a CLASSMARK CHANGE as soon as possible in a connection establishment. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.1.1 Conformance requirement | Following a PAGING REQUEST message, the MS shall correctly set up an RR connection on a supported channel described in the IMMEDIATE ASSIGNMENT message. On the MS side, the procedure is terminated when the establishment of the main signalling link is confirmed. When the ES bit is set to 1 in the Classmark 1 or the Clas... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.1.2 Test purpose | To verify that the MS can correctly set up a dedicated control channel and that a multi band MS is able to perform early sending of CLASSMARK CHANGE.
To verify the performance requirement on early sending of the CLASSMARK CHANGE message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.1.3 Method of test | Initial Conditions
System Simulator:
For 450/900 MS:
1 cell.
CCCH-CONF is set to "1 basic physical channel used for CCCH not combined with SDCCHs".
BCCH carrier number 263.
For 480/900 MS:
1 cell.
CCCH-CONF is set to "1 basic physical channel used for CCCH not combined with SDCCHs".
BCCH carrier number 310.
For 450/1 8... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2 Multiband signalling / RR / Handover | This subclause applies to any multiband mobile stations.
The purpose of this extra section is to test the handover where the target cell uses frequencies outside the frequency band of the serving cell. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.1 Multiband signalling / RR / Handover / successful / active call / non-synchronized | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.1.1 Conformance requirements | The MS shall correctly apply the handover procedure in the non-synchronized case when a call is in progress and when handover is performed from a TCH/F without frequency hopping in one band towards a TCH/F without frequency hopping in another band.
When the MS releases a TCH or SDCCH and returns to idle mode, it shall,... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.1.2 Test purpose | To test that when the MS is ordered to make a non-synchronized handover it continuously sends access bursts on the main DCCH (and optionally on the SACCH) until it receives a PHYSICAL INFORMATION message from the SS. To test that the MS correctly handles the Timing Advance IE in the PHYSICAL INFORMATION message. To tes... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.1.3 Method of test | Initial Conditions
For execution counter M =1, 2
System Simulator:
For 450/900 MS: 2 cells, A and B with same LAI, default parameters except:
Cell A has:
BCCH ARFCN = 263
Cell Allocation = (259, 261, 263, 265, 267, 269, 271, 273, 275, 277, 279, 281, 283, 285, 287, 289, 291)
Cell B has:
BCCH ARFCN = 20
Cell Allocation =... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.2 Multiband signalling / RR / Handover / layer 1 failure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.2.1 Conformance requirements | During a handover from a channel in the lower band to a channel in the upper band, or the contrary, the MS shall correctly return to the old channel in the case of an handover failure caused by a layer 1 failure on the target cell.
References
3GPP TS 04.08 / 3GPP TS 44.018 subclause 3.4.4. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.2.2 Test purpose | To check that the MS correctly returns to the old channel in the case of an handover failure caused by a layer 1 failure on the target cell, if the origin is in the lower band and the target is in the upper band or the contrary. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.2.3 Method of test | Initial Conditions
System Simulator:
For 450/900 MS: 2 cells, A and B with same LAI, default parameters except:
Cell A has:
BCCH ARFCN = 263.
Cell B has:
BCCH ARFCN = 20.
For 480/900 MS: 2 cells, A and B with same LAI, default parameters except:
Cell A has:
BCCH ARFCN = 310.
Cell B has:
BCCH ARFCN = 20.
For 450/1 800 M... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.3 Multiband signalling / RR / Handover / Multiband BCCH / successful / active call / non synchronized | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.3.1 Conformance requirements | This test relates to cells supporting frequencies in GSM 400, GSM 710, GSM 750, GSM 850, GSM 900, DCS 1800 and PCS 1900 bands.
The MS shall correctly apply the handover procedure in the non synchronized case when a call is in progress and when handover is performed from a TCH/F without frequency hopping in one band tow... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.3.2 Test purpose | To test that when the MS is ordered to make a non synchronized handover it sends continuously access bursts on the main DCCH (and optionally on the SACCH) until it receives a PHYSICAL INFORMATION message from the SS. To test that the MS correctly handles the Timing Advance IE in the PHYSICAL INFORMATION. To test that t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.3.3 Method of test | Initial Conditions
For execution counter M =1, 2.
System Simulator:
For 450/900 MS: 2 cells, A and B with same LAI, default parameters except:
Cell A has:
BCCH ARFCN = 263
GSM 450 frequencies: 259, 263, 267, 271, 275, 279, 283, 291.
GSM 900 frequencies: 10, 20, 34, 45, 52, 66, 74, 114.
Cell B has:
BCCH ARFCN = 268
GSM ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.4 Multiband signalling / RR / Handover/ Multiband BCCH / Intracell Handover - Interband Assignment | In case of multi-band networks, an intracell change of channel can be requested by upper layers in order to change the channel type (Directed Retry from a channel belonging to one frequency band to a channel belonging to another frequency band), or it may be initiated by the RR-sublayer for an intra cell and inter-band... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.4.1 Dedicated assignment / successful case | This test is only applicable to an MS supporting a TCH. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.4.1.1 Conformance requirements | 1. Upon receipt of the ASSIGNMENT COMMAND message, the mobile station initiates a local end release of link layer connections, disconnects the physical channels, commands the switching to the assigned channels and initiates the establishment of lower layer connections (this includes the activation of the channels, thei... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.4.2 Test purpose | 1. To verify that upon receipt of an ASSIGNMENT COMMAND, the MS switches to the channel defined in the ASSIGNMENT COMMAND, establishes the link and sends an ASSIGNMENT COMPLETE message. This is tested for an MS supporting TCH in the special cases of a transition.
NOTE: in all cases the old and the new channel assigned ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.2.4.3 Method of test | Initial Conditions
System Simulator:
For 450/900 MS: 1 cell with GSM 450 and GSM 900 frequencies, using a BCCH in the GSM 450 band, default parameters except:
BCCH ARFCN =263.
System Information 1 Cell Allocation = 259, 263, 267, 271, 275, 279, 283, 291, 10, 20, 34, 45, 52, 66, 76, 114.
For 480/900 MS: 1 cell with GSM ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.3 Multiband signalling / RR / Measurement reporting | This test applies to any multiband MSs supporting simultaneous multiband operation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.3.1 Conformance requirements | The MS shall continuously send MEASUREMENT REPORT messages on every SACCH blocks and the measurement valid indication shall be set to valid (0) within the second block at the latest. After 20 s the values in the MEASUREMENT REPORT message shall contain measurement results for up to the 6 strongest BCCH carriers among t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.3.2 Test purpose | To test that, when the SS gives information about neighbouring cells, the MS reports the appropriate results and correctly orders the BA list made from System Information 5 and System Information 5ter. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.2.3.3 Method of test | Initial Conditions
System Simulator:
For 450/900 MS: 8 cells with the following settings:
Transmitter
Level
NCC
BCC
ARFCN
Cell identity
Serving, S1
‑60
1
3
259
0001H
Neighbour, N1
‑85
1
5
002
0002H
Neighbour, N2
‑79
1
7
261
0003H
Neighbour, N3
‑75
1
1
263
0004H
Neighbour, N4
‑55
1
3
088
0005H
Neighbour, N5
‑50
1
5
274
... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3 Multiband signalling / MM | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1 Multiband signalling / MM / Location updating | This procedure is used to register the MS in the network. If it is not performed correctly, no call can be established. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.1 Location updating / accepted | This test is applicable for any Multiband MSs supporting simultaneous multiband operation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.1.1 Conformance requirement | If the network accepts a location updating from the Mobile, the Mobile Station shall, after receiving a Location updating Accept message, store the received LAI, stop timer T3210,reset the attempt counter and set the update status in the SIM to updated.
A mobile station that makes use of System information 2ter (to cho... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.1.3 Method of test | Initial conditions:
System Simulator:
Two cells, A and B, belonging to different location areas with location area identification a and b of the same PLMN and using frequencies from different frequency bands.
IMSI attach/detach is allowed in both cells.
The T3212 time-out value is 1/10 hour in both cells.
Mobile Statio... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.2 Location updating / periodic | This test is applicable for any Multiband MSs supporting simultaneous multiband operation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.2.1 Conformance requirement | 1) If the Mobile Station is in service state NO CELL AVAILABLE, LIMITED SERVICE, PLMN SEARCH or PLMN SEARCH-NORMAL SERVICE when the timer expires the location updating procedure is delayed until this service state is left.
2) The T3212 time-out value shall not be changed in the NO CELL AVAILABLE, LIMITED SERVICE, PLMN ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.2.2 Test purpose | 1) To check that if the PLU timer expires while the MS is out of coverage, the MS informs the network of its return to coverage, irrespective of frequency band used.
2) To check that the PLU timer is not disturbed by cells of forbidden PLMNs.
3) To check that if the PLU timer does not expire while out of coverage and i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.3.1.2.3 Method of test | Initial conditions
System Simulator:
Two cells, A and B, belonging to the same location area but using different frequency bands.
Cell A is switched on and cell B is switched off.
T3212 is set to 12 minutes on cell A and cell B.
IMSI attach is allowed in both cells.
Mobile Station:
The MS has a valid TMSI. It is "idle ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.4 Multiband signalling / CC | Reserved for future use. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5 Multiband signalling / Structured procedures | These tests applies only to multiband mobile stations. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.1 Multiband signalling / Structured procedures / MS originated call / early assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.1.1 Conformance requirements | 1) An MS in MM state "idle, updated" and in RR idle mode, when made to initiate a call, if it provides a human interface, shall display the dialled number.
2) An MS in MM state "idle, updated" and in RR idle mode, when made to initiate a call for a selected teleservice that is supported by the MS, shall start to initia... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.1.2 Test purpose | 1) To verify that the MS in MM state "idle, updated" with a TMSI assigned, when made to initiate a call for a selected teleservice that is supported by the MS as declared in a PICS/PIXIT statement, displays the dialled number in the way described in a PICS/PIXIT statement.
2) To verify that the MS in MM state "idle, up... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.1.3 Method of test | Initial Conditions
System Simulator:
For 450/900 MS:
2 cells, A and B, with same LAI.
Cell A is a GSM 450 cell with default parameters.
Cell B is a GSM 900 cell with default parameters.
For 480/900 MS:
2 cells, A and B, with same LAI.
Cell A is a GSM 480 cell with default parameters.
Cell B is a GSM 900 cell with defau... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.2 Structured procedures / MS terminated call / late assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.2.1 Conformance requirement | 1) After the initial message the multiband MS shall send a CLASSMARK CHANGE message in the uplink block followed direct after Layer 2 UA message sent from the network.
2) The MS shall acknowledge the SETUP message with a CALL CONFIRMED message, if compatibility checking was successful, the MS is not busy, and the user ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.2.2 Test purpose | 1) To verify that a multiband MS is able to send an early CLASSMARK CHANGE message on the DCCH uplink.
2) To verify that the MS in "Idle, Updated" state with a TMSI assigned, after being paged by the network on the correct paging subchannel, after initiating the immediate assignment procedure by sending the CHANNEL REQ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.5.2.3 Method of test | Initial Conditions
System Simulator:
For 450/900 MS:
2 cells, A and B, with same LAI.
Cell A is a GSM 450 cell with default parameters.
Cell B is a GSM 900 cell with default parameters.
For 480/900 MS:
2 cells, A and B, with same LAI.
Cell A is a GSM 480 cell with default parameters.
Cell B is a GSM 900 cell with defau... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.11.6 Multiband signalling / Default messages contents | Default SYSTEM INFORMATION
The following parameters shall be coded into the system information messages. Parameters shall be coded according to 3GPP TS 04.08 / 3GPP TS 44.018.
SYSTEM INFORMATION TYPE 2bis, SYSTEM INFORMATION TYPE 5bis, SYSTEM INFORMATION TYPE 7 and SYSTEM INFORMATION TYPE 8 messages are not used.
For 4... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12 Enhanced Full Rate signalling | This subclause only applies to MS supporting enhanced full rate speech.
As an EFR mobile station necessarily supports the speech full rate version 1 or both speech full rate version 1 and speech half rate version 1, conformance requirements of clause 26 fully apply to this mobile.
The purpose of this extra section ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.1 EFR signalling/ test of the channel mode modify procedure | NOTE: This test is derived from the tests in subclauses 26.6.7.1 and 26.6.7.2 respectively entitled "Test of the channel mode modify procedure / full rate" and "Test of the channel mode modify procedure / half rate". |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.1.1 Conformance requirement | The MS with a TCH/F allocated acknowledges a CHANNEL MODE MODIFY message by sending a CHANNEL MODE MODIFY ACKNOWLEDGE message specifying the new mode and by swithcing to this mode when this one is set to:
- speech full rate or half rate version 1.
- speech full rate or half rate version 2.
- any other mode declared su... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.1.2 Test purpose | To verify that the MS with a TCH/F allocated acknowledges a CHANNEL MODE MODIFY message by sending a CHANNEL MODE MODIFY ACKNOWLEDGE message specifying the new mode and by swithcing to this mode when this one is set to:
- speech full rate or half rate version 1.
- speech full rate or half rate version 2.
- any other m... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is "idle updated", with TMSI allocated.
Specific PICS statements:
- Speech supported for Full rate version 3 (TSPC_AddInfo_Full_rate_version_3)
- 2.4 k full rate data mode (TSPC__AddInfo_24DataF)
- 4.8 k full rate data mode. (TSPC__... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.2 EFR signalling/ tests of handover | With the Handover procedure, it is possible to completely alter the channels allocated to a MS. This makes it possible in particular to switch a call in progress from one cell to another. The procedure is always initiated by the network and with the MS in a dedicated mode.
Subclause 26.12.2.1 contains generic test proc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.2.1 EFR signalling / Handover / active call / successful case | NOTE: This test is derived from the one defined in subclause 26.6.5.1 "Handover/successful/active call/non‑synchronized".
This test only applies for MS supporting full rate speech version 2 (enhanced full rate speech). |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.2.1.1 Conformance requirements | The MS shall correctly apply the handover procedure in the non-synchronized case when:
- a call is in progress; and
- handover is performed from a TCH/F with/without frequency hopping towards a TCH/F with/without frequency hopping; and
- the mode of either the current or the target channel is set to full rate speech v... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.2.1.2 Test purpose | To test that the MS shall correctly apply the handover procedure in the non-synchronized case when:
- a call is in progress; and
- handover is performed from a TCH/F with/without frequency hopping towards a TCH/F with/without frequency hopping; and
- the mode of either the current or the target channel is set to full r... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.2.1.3 Method of test | Initial Conditions
System Simulator:
2 cells, A and B with same LAI, default parameters except.
Band
Cell A
Cell B
Both Cells
BCCH ARFCN
Cell Allocation
BCCH ARFCN
Cell Allocation
Format
GSM 450
263
259, 261, 263, 265, 267, 269, 271, 273, 275, 277, 279, 281, 283, 285, 287, 289, 291
274
260, 262, 264, 266, 268, 270, 272... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.3 EFR Signalling / Structured procedures / MS originated call / late assignment | NOTE: this test is derived from the one defined in subclause 26.9.3 and entitled "Structured procedures / MS originated call / late assignment". |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.3.1 Conformance requirement | 1) The MS shall indicate and include in the mobile originating SETUP for speech call all the speech versions that it supports.
2) Upon receipt of the ASSIGNMENT COMMAND message specifying either speech full rate version 1 or speech full rate version 2 or speech half rate version 1 (for an MS also supporting half rate... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.3.2 Test purpose | 1) To verify that the MS indicates and includes in the mobile originating SETUP for speech call all the speech versions that it supports.
2) To verify that subsequently after receipt of an IMMEDIATE ASSIGNMENT message allocating an SDCCH, after completion of establishment of the main signalling link, after having sent ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.3.3 Method of test | Specific PICS statements:
- Speech supported for Half rate version 1 (TSPC_AddInfo_Half_rate_version_1)
PIXIT statements:
- Way to indicate mobile originated alerting.
-. Way to display the called number
Initial Conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in MM-state "idle, update... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 26.12.4 Structured procedures / MS terminated call / l early assignment | NOTE: this test is derived from the one described in subclause 26.9.4 and entitled "Structured procedures / MS terminated call / early assignment". |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.