hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4 Abnormal cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.1 T3380 Expiry | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.1.1 Conformance requirement | 1) On the first expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST.
2) On the second expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST.
3) On the third expiry of the timer T3380, the MS shall resend the PDP CONTEXT ACTIVATION REQUEST.
4) On the fourth expir... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.1.2 Test purpose | To test the behaviour of the MS when the network does not reply to PDP CONTEXT ACTIVATION REQUEST |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.1.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A context activation is requested by the user. The MS shall send the ACTIVATE PDP CONTEXT RE... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.2 Collision of MS initiated and network requested PDP context activation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.2.1 Conformance requirement | In the event of collision between MS initiated and network initiated PDP context activation requests, the MS shall discard the REQUEST PDP CONTEXT ACTIVATION message and shall wait for an ACTIVATE PDP CONTEXT ACCEPT message.
Reference
3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.1.5. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.2.2 Test purpose | To test the behaviour of the MS when there is a collision between an MS initiated and network requested PDP context activation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.2.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Case 1
For an MS that supports PDP Context Activation requested by the network.
Test procedure
A context ac... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.3 Network initiated PDP context activation request for an already activated PDP context (on the MS side) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.3.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.3.2 Conformance requirement | If the MS receives a REQUEST PDP CONTEXT ACTIVATION message with the same combination of APN, PDP type and PDP address as an already activated PDP context, the MS shall deactivate the existing PDP context and, if any, all the linked PDP contexts (matching the combination of APN, PDP type and PDP address) locally withou... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.3.3 Test purpose | To test the behaviour of the MS when it detects a network initiated PDP context activation for the PDP context already activated on the MS side. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.3.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
- Network requested PDP context activation supported (TSPC_AddInfo_N_req_PDP_CA)
PIXIT statements:
-
Test procedure
A PDP context... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.4 Network reject with Extended Wait Timer | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.4.1 Conformance requirement | An MS configured for NAS signalling low priority indicates this by including the Device properties IE in the appropriate NAS message and setting the low priority indicator to "MS is configured to NAS signalling low priority" except for the following cases in which the MS shall set the low priority indicator to "MS is n... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.4.2 Test purpose | 1) To verify that the LAP indicator can be set in the UE.
2) To verify that the Delay Tolerant indicator is sent by the UE.
3) To verify that the UE uses the back-off timer if the network reject a request with the T3396 timer. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.4.4.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context activation is requested by the user. The UE shall send the ACTIVATE PDP CONTEX... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5 Secondary PDP context activation procedures | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1 Successful Secondary PDP Context Activation Procedure Initiated by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.1 QoS Offered by Network is the QoS Requested | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.1.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.1.2 Conformance requirement | In order to request a PDP context activation with the same PDP address and APN as an already active PDP context, the MS shall send an ACTIVATE SECONDARY PDP CONTEXT REQUEST message to the network, enter the state PDP-ACTIVE-PENDING and start timer T3380. The message shall contain the selected NSAPI. The MS shall ensure... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.1.3 Test purpose | To test the behaviour of the MS when SS responds to a Secondary PDP context activation request with the requested QoS. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.1.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
-
PIXIT statements:
-
Test procedure
A PDP context activation is requested by the MS and accepted by the SS. Secondary PDP contex... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2 QoS Offered by Network is a lower QoS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.1 QoS accepted by MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.1.1 Definition | - |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.1.2 Conformance requirement | In order to request a PDP context activation with the same PDP address and APN as an already active PDP context, the MS shall send an ACTIVATE SECONDARY PDP CONTEXT REQUEST message to the network, enter the state PDP-ACTIVE-PENDING and start timer T3380. The message shall contain the selected NSAPI. The MS shall ensure... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.1.3 Test purpose | To test the behaviour of the MS when the SS responds to a Secondary PDP context activation request with a lower QoS than that requested. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.1.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
-
PIXIT statements:
-
Test procedure
The requested QoS and Minimum QoS are set. A PDP context activation is requested by the MS a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.2 QoS rejected by MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.2.1 Definition | - |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.2.2 Conformance requirement | In order to request a PDP context activation with the same PDP address and APN as an already active PDP context, the MS shall send an ACTIVATE SECONDARY PDP CONTEXT REQUEST message to the network, enter the state PDP-ACTIVE-PENDING and start timer T3380. The message shall contain the selected NSAPI. The MS shall ensure... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.2.3 Test purpose | To test the behaviour of the MS when the SS responds to a Secondary PDP context activation request with a lower QoS than that requested and not acceptable by the MS. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.1.2.2.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
-
PIXIT statements:
-
Test procedure
The requested QoS and Minimum QoS are set. PDP context activation is requested by the user a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.2 Unsuccessful Secondary PDP Context Activation Procedure Initiated by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.2.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.2.2 Conformance requirement | Upon receipt of an ACTIVATE SECONDARY PDP CONTEXT REQUEST message, the network may reject the MS initiated PDP context activation by sending an ACTIVATE SECONDARY PDP CONTEXT REJECT message to the MS.
Upon receipt of an ACTIVATE SECONDARY PDP CONTEXT REJECT message, the MS shall stop timer T3380 and enter the state PDP... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.2.3 Test purpose | To test the behaviour of the MS when network rejects the MS initiated Secondary PDP context activation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.2.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
-
PIXIT statements:
-
Test procedure
A PDP context activation is requested by the user and accepted by the SS. Secondary context ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.3 Abnormal cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.3.1 T3380 Expiry | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.3.1.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.3.1.2 Conformance requirement | 1) On the first expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQUEST.
2) On the second expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQUEST.
3) On the third expiry of the timer T3380, the MS shall re-send the ACTIVATE SECONDARY PDP CONTEXT REQU... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.3.1.3 Test purpose | To test the behaviour of the MS when the SS does not reply to ACTIVATE SECONDARY PDP CONTEXT REQUEST message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.2.5.3.1.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
-
PIXIT statements:
-
Test procedure
A PDP context is activated by the user and accepted by the SS. Secondary PDP context activat... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3 PDP context modification procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.1 Network initiated PDP context modification | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.1.1 Conformance requirement | 1) Upon receipt of a MODIFY PDP CONTEXT REQUEST message.
- If the MS can accept the modification requested, the MS shall reply with the MODIFY PDP CONTEXT ACCEPT message.
- If the MS is unable to accept the modification requested, the MS shall initiate the PDP context deactivation procedure for the NSAPI that has been ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.1.2 Test purpose | To test the behaviour of the MS upon receipt of a MODIFY PDP CONTEXT REQUEST message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.1.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context is activated by the user and accepted by the SS. A MODIFY PDP CONTEXT REQUEST ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2 MS initiated PDP context modification | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.1 MS initiated PDP Context Modification accepted by network | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.1.1 Definition | - |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.1.2 Conformance requirement | In order to initiate the procedure, the MS sends the MODIFY PDP CONTEXT REQUEST message to the network, enters the state PDP-MODIFY-PENDING and starts timer T3381. The message may contain the requested new QoS and/or the TFT and the requested LLC SAPI (used in GSM).
Upon receipt of the MODIFY PDP CONTEXT REQUEST messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.1.3 Test purpose | To test the behaviour of the MS upon receipt of a MODIFY PDP CONTEXT ACCEPT message from the network with
- Requested QoS; |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.1.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE)
PIXIT statements:
-
Test procedure
For a R97 to R7 MS, MS initiated PDP Co... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.2 MS initiated PDP Context Modification not accepted by the network | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.2.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.2.2 Conformance requirement | In order to initiate the procedure, the MS sends the MODIFY PDP CONTEXT REQUEST message to the network, enters the state PDP-MODIFY-PENDING and starts timer T3381. The message may contain the requested new QoS and/or the TFT and the requested LLC SAPI (used in GSM).
Upon receipt of a MODIFY PDP CONTEXT REQUEST message,... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.2.3 Test purpose | To test the behaviour of the MS upon receipt of a MODIFY PDP CONTEXT REJECT message from the network. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.2.2.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
• MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE)
PIXIT statements:
-
Test procedure
For a R97 to R7 MS, MS initiated PDP ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3 Abnormal cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.1 T3381 Expiry | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.1.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.1.2 Conformance requirement | On the first expiry of timer T3381, the MS shall resend the MODIFY PDP CONTEXT REQUEST message reset and restart timer T3381. This retransmission is repeated four times, i.e. on the fifth expiry of timer T3381, the MS may continue to use the previously negotiated QoS or it may initiate the PDP context deactivation proc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.1.3 Test purpose | To test the behaviour of the MS when SS does not reply to MODIFY PDP CONTEXT REQUEST message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.1.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
• MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE)
PIXIT statements:
-
Test procedure
For a R97 to R7 MS, MS initiated PDP ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.2 Collision of MS and network initiated PDP context modification procedures | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.2.1 Definition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.2.2 Conformance requirement | A collision of a MS and network initiated PDP context modification procedures is identified by the MS if a MODIFY PDP CONTEXT REQUEST message is received from the network after the MS has sent a MODIFY PDP CONTEXT REQUEST message itself, and both messages contain the same TI and the MS has not yet received a MODIFY PDP... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.2.3 Test purpose | To test behaviour of the MS when it identifies collision of the MS and SS initiated PDP context modification with the same TI. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.3.3.2.4 Method of test | Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Specific PICS statements:
MS Higher Layer release (TSPC_MS_HIGHER_LAYER_RELEASE)
PIXIT statements:
-
Test procedure
For a R97 to R7 MS, MS initiated PDP Co... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4 PDP context deactivation procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.1 PDP context deactivation initiated by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.1.1 Conformance requirement | The message contains the transaction identifier in use for the PDP context to be deactivated and a cause code that typically indicates one of the following causes:
- #26: insufficient resources;
- #36: regular PDP context deactivation; or
- #37: QoS not accepted.
Upon receipt of the DEACTIVATE PDP CONTEXT ACCEPT messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.1.2 Test purpose | To test the behaviour of the MS upon receipt of a DEACTIVATE PDP CONTEXT ACCEPT message from the network. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.1.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context is activated by the user and accepted by the SS. The context deactivation is t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.2 PDP context deactivation initiated by the network | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.2.1 Conformance requirement | The MS shall, upon receipt of the DEACTIVATE PDP CONTEXT REQUEST message, reply with a DEACTIVATE PDP CONTEXT ACCEPT message.
- Whenever any session management message except REQUEST PDP CONTEXT ACTIVATION or SM‑STATUS is received by the MS specifying a transaction identifier which is not recognised as relating to an a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.2.2 Test purpose | To test the behaviour of the MS upon receipt of a DEACTIVATE PDP CONTEXT REQUEST message from the network. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.2.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context is activated by the user and accepted by the SS. A DEACTIVATE PDP CONTEXT REQU... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3 Abnormal cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.1 T3390 Expiry | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.1.1 Conformance requirement | 1) On the first expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST.
2) On the second expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST.
3) On the third expiry of timer T3390, the MS shall resend the message DEACTIVATE PDP CONTEXT REQUEST.
4) On the ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.1.2 Test purpose | To test the behaviour of the MS when the network does not reply to a DEACTIVATE PDP CONTEXT REQUEST message from the MS. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.1.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context is activated by the user and accepted by the SS. A context deactivation is the... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.2 Collision of MS and network initiated PDP context deactivation requests | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.2.1 Conformance requirement | If the MS and the network initiated PDP context deactivation requests collide, the MS and the network shall each reply with the message DEACTIVATE PDP CONTEXT ACCEPT and shall stop timer T3390 and T3395, respectively.
Reference
3GPP TS 04.08 / 3GPP TS 24.008 subclause 6.1.3.3.3. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.2.2 Test purpose | To test the behaviour of the MS when there is a collision between an MS initiated and a network initiated context deactivation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.3.2.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context is activated by the user and accepted by the SS. A context deactivation is the... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.4 PDP context deactivation initiated by the network / Tear down indicator | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.4.1 Conformance requirement | The PDP context deactivation may be initiated by the MS or by the network. The tear down indicator information element may be included in the DEACTIVATE PDP CONTEXT REQUEST message in order to indicate whether only the PDP context associated with this specific TI or all active PDP contexts sharing the same PDP address ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.4.2 Test purpose | To test the behaviour of the MS upon receipt of a DEACTIVATE PDP CONTEXT REQUEST message from the network including Tear down indicator IE. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.4.4.3 Method of test | Specific PICS statements:
-
PIXIT statements:
-
Initial conditions
System Simulator:
1 cell, default parameters.
Mobile Station:
The MS is in GMM-state "GMM-REGISTERED, normal service" with valid P-TMSI and CKSN.
Test procedure
A PDP context is activated by the user and accepted by the SS. A Secondary PDP context is ac... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.5 Unknown or Unforeseen Transaction Identifier/Non-semantical Mandatory Information Element Errors | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.5.1 Error cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.5.1.1 Conformance requirement | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 45.5.1.1.1 Conformance requirement for release 98 and earlier MS | The mobile station shall reject a session management message other than SM-STATUS received with TI value "111" by immediately sending an SM-STATUS message with TI value "111". For a session management message received with TI different from "111", the following procedures shall apply:
- Whenever any session management ... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.