hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.1 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.2 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.3 Intra frequency reallocation of CS resources / DTM Assignment Command
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.3.1 Conformance requirements
In dual transfer mode an intracell change of channel can be requested by upper layers for changing the channel type, or decided by the RR sub layer, e.g. for an internal handover or for the reallocation of all the resources of the mobile station. The purpose is to modify completely the physical channel configuration of...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.3.2 Test purpose
To verify that the MS can reallocate both the CS connection and PS resources to different timeslot(s) within the same frequency band, having received the DTM ASSIGNMENT COMMAND message.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.3.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The MS is in GMM Ready state with a P-TMSI allocated and the PDP context 1 activated. Specific PICS statements - PIXIT statements - Test Procedure Once the MS is in DTM, the SS attempts to modify t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.4 Inter frequency reallocation of CS resources / DTM Assignment Command
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.4.1 Conformance requirements
In dual transfer mode an intracell change of channel can be requested by upper layers for changing the channel type, or decided by the RR sub layer, e.g. for an internal handover or for the reallocation of all the resources of the mobile station. The purpose is to modify completely the physical channel configuration of...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.4.2 Test purpose
To verify that the MS, can reallocate both the CS connection and PS resources to a different frequency band, having received the DTM ASSIGNMENT COMMAND message while in DTM.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.1.4.3 Method of test
Initial Conditions System Simulator: 1 cell, Cell A, with both TCH of cell activated and DTM supported. TCH2 allocated in a different frequency band and added to the Cell Channel Description in SI1. Mobile Station: The MS is in the active state (U10) of a call, on cell A, with a TMSI and P-TMSI allocated and the PDP co...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.2 Release of CS resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.2.1 Network originating CS release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.2.1.1 Conformance requirements
When the MS is operating in DTM and RR connection release is requested by the network, the radio resources allocated on a PDCH are released, the MS returns to the PCCCH or CCCH configuration, packet idle mode. The MS shall abort the RR connection by initiating a normal release of the main signalling link, perform a loc...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.2.1.2 Test purpose
To verify that after the network releases the CS connection, the PS resources are correctly re-established
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
57.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The MS is GPRS attached with a P-TMSI allocated and the PDP context 1 activated. Specific PICS statements - PIXIT statements - Test Procedure An MS, in dedicated mode, is triggered to initiate upli...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a Latency reductions
Default Initial conditions: All default conditions, message contents and macros are defined in section 40 and section 50. If a mobile station indicates support of Reduced Latency, then an additional default initial condition used for Latred testcases in this clause is as follows. This condition is not necessary for a m...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1 FANR Fast Ack/Nack reporting
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.1 Uplink TBF, SSN based PAN Format
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.1.1 Conformance Requirements
1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008) and it does not indicate support of Reduced Lat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.1.2 Test Purposes
1. To verify that the mobile station can establish an uplink TBF with FANR activated using the SSN based format. 2. To verify that the mobile station correctly interprets the contents of PAN fields received in downlink data blocks on downlink PDCHs which it is monitoring for USF for the uplink TBF. 3. To verify that t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.1.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.2 Uplink TBF, SSN based PAN Format, with Concurrent Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.2.1 Conformance Requirements
1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008) and it does not indicate support of Reduced Lat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.2.2 Test Purposes
1. To verify that the mobile station can operate a downlink TBF with FANR activated whilst an uplink TBF with FANR activated using the SSN based format is in operation. 2. To verify that the mobile station interprets PAN fields addressed to it via TFI when received in downlink data blocks not belonging to the MS's conc...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.2.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.3 Uplink TBF, Time based PAN Format
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.3.1 Conformance Requirements
1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008) and it does not indicate support of Reduced Lat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.3.2 Test Purposes
1. To verify that the mobile station can establish an uplink TBF with FANR activated using the time based format. 2. To verify that the mobile station correctly interprets the contents of PAN fields received in downlink data blocks on downlink PDCHs which it is monitoring for USF for the uplink TBF.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.3.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.4 Uplink TBF, Time based PAN Format, with Concurrent Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.4.1 Conformance Requirements
1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.4.2 Test Purposes
1. To verify that the mobile station can operate a downlink TBF with FANR activated whilst an uplink TBF with FANR activated using the time based format is in operation. 2. To verify that the mobile station interprets PAN fields from downlink data blocks belonging to it's own and other MS's downlink TBFs.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.4.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.5 Concurrent Uplink and Downlink TBFs, Discrimination of PAN Information from Different PDCH or PDCH Pairs
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.5.1 Conformance Requirements
1. If an uplink TBF is established or reconfigured with FANR activated (see sub-clauses 11.2.29, 11.2.29a, 11.2.31, and 11.2.31a), the mobile station shall monitor for the presence of a PAN field for this TBF on all downlink PDCHs on which it shall monitor the USF for this TBF. The mobile station shall only attempt to ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.5.2 Test Purposes
1. To verify that the mobile station only interprets PAN information received on a PDCH (BTTI configuration) or PDCH pairs (RTTI configuration) which it is required to monitor for USF for uplink TBF and ignores PAN information received on other downlink PDCH or PDCH pairs it may simultaneously be monitoring for downli...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.5.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements • PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.6 Concurrent Uplink and Downlink TBFs, Mobile Coding and Puncturing Schemes
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.6.1 Conformance requirements
1. The presence of the PAN field, is signalled by the PAN indicator bit in the RLC/MAC header. When this bit is set the receiver shall use the corresponding Puncturing Scheme variant of the CPS indicated in the RLC/MAC header to decode the RLC data field. 2. For an EGPRS TBF with FANR activated, a Radio Block for data ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.6.2 Test purpose
1. To verify that mobile station uses the received PAN field correctly for different mobile coding and puncturing schemes. 2. To verify that the MS includes the PAN field in uplink data blocks coded using different commanded MCS when polled for PAN by the network. 3. To verify that initial transmission of RLC data bloc...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.6.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - EGPRS capable of 8PSK in Uplink, of all Multislot classes (TSPC_Type_EGPRS_8PSK_uplink) PIXI...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.7 Concurrent Uplink and Downlink TBFs, Choice of MCS for Uplink Data Block Re-Transmission with PAN Field Present
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.7.1 Conformance Requirements
1. For a TBF with FANR activated, if these rules require a retransmission in MCS-9 and a PAN field is included in an EGPRS RLC/MAC block for data transfer, the mobile station shall use MCS-6. If these rules require a retransmission in MCS-4, a PAN field is to be included in an EGPRS RLC/MAC block for data transfer and ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.7.2 Test Purposes
1. To verify that the mobile station re-transmits a negatively acknowledged uplink data block using MCS-6 when the rules would otherwise require re-transmission using MCS-9, but a PAN field is to be included. 2. To verify that the mobile station re-transmits a negatively acknowledged uplink data block using MCS-1 when ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.7.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.8 Uplink TBF, Handling of Erroneous PAN Fields,SSN Based Format
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.8.1 Conformance Requirements
In the case of a PAN field, the bitmap shall be interpreted in the same way as for the case of PACKET UPLINK ACK/NACK, EGPRS PACKET DOWNLINK ACK/NACK or EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message with the following exceptions: • if the processing of a PAN would cause an element of V(B) to be changed from ACKED or TE...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.8.2 Test Purposes
1. To verify that the mobile station ignores the entire PAN field if a previously positively acknowledged data block is subsequently negatively acknowledged. 2. To verify that the mobile station ignores the entire PAN field if the PAN field positively acknowledges a data block which has yet to be transmitted.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.8.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9 Uplink TBF, Handling of Erroneous PAN Fields,Time Based Format
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9.1 Conformance Requirements
1. In the case of a PAN field, the bitmap shall be interpreted in the same way as for the case of PACKET UPLINK ACK/NACK, EGPRS PACKET DOWNLINK ACK/NACK or EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message with the following exceptions: • if the processing of a PAN would cause an element of V(B) to be changed from ACKED or...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9.2 Test Purposes
1. To verify that the mobile station ignores the entire PAN field if a previously positively acknowledged data block is subsequently negatively acknowledged. 2. To verify that the mobile station ignores the entire PAN field if the PAN field positively acknowledges a data block which has yet to be transmitted. 3. To ver...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10 Downlink TBF, with Concurrent Uplink TBF, Polled FANR
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10.1 Conformance Requirements
1. If the RLC endpoint transmitter is the network and the mobile station has at least one concurrent TBF in the uplink direction, the network may poll the mobile station to trigger the FANR procedure. In this case the mobile station shall answer in a reserved radio block period which is allocated with the polling as de...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10.2 Test purpose
1. To verify that the mobile station shall respond to polling for PAN by including a PAN field in a radio block belonging to a concurrent uplink TBF when a concurrent uplink TBF is established and uplink data is due to be sent.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11 Downlink TBF, with Concurrent Uplink TBF, Event Based FANR, Out of Sequence Condition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11.1 Conformance requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction. 2. For a TBF with FANR activated, the network may poll the mobile station to tri...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11.2 Test purpose
1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled. 2. To verify that the mobile station inserts a correctly encoded PAN field in response to the out of sequence condition in the header of an uplink data block belonging to its concurrent uplink TBF.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12 Downlink TBF, with Concurrent Uplink TBF, Event Based FANR, Corrupted RLC Data Part with Event-based Fast Ack/Nack reporting
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12.1 Conformance requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction.. 2. For a TBF with FANR activated... if enabled at TBF establishment/reconfigura...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12.2 Test purpose
1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled. 2. To verify that the mobile station inserts a sends correctly encoded PAN field into the header of an uplink data block belonging to it's concurrent uplink TBF while receiving upon receipt of an incorrect downlink RLC data ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establish...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13 Downlink TBF, with Concurrent Uplink TBF, Event Based and Polled FANR Combined
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13.1 Conformance requirements
Event-based FANR may be used together with Polled FANR (see sub-clause 9.1.14.2). If the RLC endpoint receiver is the mobile station, event-based FANR is enabled for this TBF and the mobile station has at least one assigned TBF in the uplink direction, the mobile station shall insert one PAN field in an EGPRS RLC/MAC b...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13.2 Test purpose
1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled. 2. To verify that the mobile station inserts a correctly encoded PAN field in response to the out of sequence condition into the header of an uplink data block belonging to it’s concurrent uplink TBF. 3. To verify that the mo...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14 Downlink TBF, with and without Concurrent Uplink TBF, CES/P Polling Response
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14.1 Conformance requirements
For EGPRS when FANR is activated or for EGPRS2, the Combined EGPRS Supplementary/Polling field describes the feedback request and specifies a single uplink block in which the mobile station shall transmit a PACKET CONTROL ACKNOWLEDGEMENT message, a PACCH block or (applicable only if FANR is activated) a radio block con...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14.2 Test purpose
1. To verify that the mobile station responds with the correct polling response when polled with CES/P values 001,010,011,100,101,110 and 111 during concurrent TBF is ongoing. 2. To verify that the mobile station responds with the correct polling response when polled with CES/P values 011 and 100 after the completion...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15 Downlink TBF, with Concurrent Uplink TBF, Transmission of Other Messages in Response to Polling for PAN, PACKET CS REQUEST
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15.1 Conformance Requirements
1. The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. The mobile station is allowed to retransmit the PACKET CS REQUEST message once while timer T3196 is running. The second sending occurrence of this message shall take place at the first suitable oppor...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15.2 Test purpose
2. To verify that the mobile station shall respond to polling for PAN by PACKET CS REQUEST in PACCH when a Mobile Originated call is initiated while downlink with concurrent uplink data transfer is on going.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - Support of Enhanced DTM CS (TSPC_Enhanced_DTM_CS) PIXIT Statement...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16 Downlink TBF, with Concurrent Uplink TBF, Transmission of Other Messages in Response to Polling for PAN, PACKET CELL CHANGE NOTIFICATION
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16.1 Conformance Requirements
Whenever the mobile station receives an RLC data block addressed to one of its TBFs and with a valid RRBP field or with a valid CES/P field in the RLC data block header (i.e. is polled), the mobile station shall transmit one of the following replies in the uplink radio block specified by the RRBP field or CES/P field ,...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16.2 Test purpose
3. To verify that the mobile station shall respond to polling for PAN by PACKET CELL CHANGE NOTIFICATION in PACCH when the RF level of the serving cell is lowered such that it reselects another cell while downlink with concurrent uplink data transfer is on going.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16.3 Method of test
Initial Conditions System Simulator: 2 cells (cell A, cell B), activated at power-on, EGPRS supported, default setting, PBCCH not present, CCN supported. Cell A: RLA_C = -50 dBm Cell B: RLA_C = -65 dBm Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 a...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17 Downlink TBF, with and without Concurrent Uplink TBF, PAN Reaction Time, Polled PANR Polled Fast Ack/Nack reporting
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17.1 Conformance Requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction. 12. If the RLC endpoint transmitter is the network and the mobile station has at...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17.2 Test purpose
1. To verify that the mobile station shall respond to polling (for a PAN) from the network by including a PAN field in a radio block belonging to a concurrent uplink TBF when a concurrent uplink TBF is established and uplink data is due to be sent. 2. To verify that the mobile station shall respond to polling for PAN b...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishment...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18 Downlink TBF, with Concurrent Uplink TBF, PAN Reaction Time, Event Based FANR
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18.1 Conformance Requirements
1. If the RLC endpoint receiver is the mobile station, event-based FANR is enabled for this TBF and the mobile station has at least one assigned TBF in the uplink direction, the mobile station shall insert one PAN field in an EGPRS RLC/MAC block for data transfer transmitted during a given radio block period for that u...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18.2 Test Purposes
1. To verify that when event based FANR is activated for a downlink TBF and a concurrent uplink TBF is established, the MS adheres to the PAN reaction time requirement when a missing or erroneous data block has been detected.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishment of a downlink ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19 Concurrent Uplink and Downlink TBFs, FANR/PAN, RLC Unacknowledged Mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19.1 Conformance Requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction. 2. FANR can be activated for a TBF operated in RLC unacknowledged mode. Referenc...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19.2 Test Purposes
1. To verify that the mobile station operates concurrent uplink and downlink TBFs with FANR enabled in RLC unacknowledged mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfer 1000 octets of us...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2 EGPRS test cases for RTTI Configuration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1 Uplink RTTI TBF/ Default PDCH pair configuration/ Dynamic Allocation / BTTI USF Mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1.1 Conformance Requirements
1. Whenever the mobile station detects an assigned USF value on a monitored downlink PDCH or PDCH-pair, the mobile station shall transmit either a single RLC/MAC block or a sequence of four RLC/MAC blocks on the same PDCH or corresponding PDCH-pair for that TBF except if that TBF is running in extended uplink TBF mode,...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1.2 Test Purposes
To verify: 1. The MS is able to operate in RTTI configuration when receiving the USF in BTTI USF mode. 2. When the mobile station receives an assigned USF on the first PDCH of the downlink PDCH-pair, it transmits uplink radio blocks in the first two TDMA frames of the following radio block period on the corresponding P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS orders the MS to have two-phase access. In PACKET U...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.2 Uplink RTTI TBF/ default PDCH pair configuration/Dynamic Allocation/ RTTI USF Mode