hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.1 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.2 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.3 Intra frequency reallocation of CS resources / DTM Assignment Command | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.3.1 Conformance requirements | In dual transfer mode an intracell change of channel can be requested by upper layers for changing the channel type, or decided by the RR sub layer, e.g. for an internal handover or for the reallocation of all the resources of the mobile station. The purpose is to modify completely the physical channel configuration of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.3.2 Test purpose | To verify that the MS can reallocate both the CS connection and PS resources to different timeslot(s) within the same frequency band, having received the DTM ASSIGNMENT COMMAND message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.3.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the active state (U10) of a call.
The MS is in GMM Ready state with a P-TMSI allocated and the PDP context 1 activated.
Specific PICS statements
-
PIXIT statements
-
Test Procedure
Once the MS is in DTM, the SS attempts to modify t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.4 Inter frequency reallocation of CS resources / DTM Assignment Command | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.4.1 Conformance requirements | In dual transfer mode an intracell change of channel can be requested by upper layers for changing the channel type, or decided by the RR sub layer, e.g. for an internal handover or for the reallocation of all the resources of the mobile station. The purpose is to modify completely the physical channel configuration of... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.4.2 Test purpose | To verify that the MS, can reallocate both the CS connection and PS resources to a different frequency band, having received the DTM ASSIGNMENT COMMAND message while in DTM. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1.4.3 Method of test | Initial Conditions
System Simulator:
1 cell, Cell A, with both TCH of cell activated and DTM supported. TCH2 allocated in a different frequency band and added to the Cell Channel Description in SI1.
Mobile Station:
The MS is in the active state (U10) of a call, on cell A, with a TMSI and P-TMSI allocated and the PDP co... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.2 Release of CS resources | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.2.1 Network originating CS release | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.2.1.1 Conformance requirements | When the MS is operating in DTM and RR connection release is requested by the network, the radio resources allocated on a PDCH are released, the MS returns to the PCCCH or CCCH configuration, packet idle mode. The MS shall abort the RR connection by initiating a normal release of the main signalling link, perform a loc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.2.1.2 Test purpose | To verify that after the network releases the CS connection, the PS resources are correctly re-established |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the active state (U10) of a call.
The MS is GPRS attached with a P-TMSI allocated and the PDP context 1 activated.
Specific PICS statements
-
PIXIT statements
-
Test Procedure
An MS, in dedicated mode, is triggered to initiate upli... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a Latency reductions | Default Initial conditions:
All default conditions, message contents and macros are defined in section 40 and section 50. If a mobile station indicates support of Reduced Latency, then an additional default initial condition used for Latred testcases in this clause is as follows. This condition is not necessary for a m... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1 FANR Fast Ack/Nack reporting | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.1 Uplink TBF, SSN based PAN Format | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.1.1 Conformance Requirements | 1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008) and it does not indicate support of Reduced Lat... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.1.2 Test Purposes | 1. To verify that the mobile station can establish an uplink TBF with FANR activated using the SSN based format.
2. To verify that the mobile station correctly interprets the contents of PAN fields received in downlink data blocks on downlink PDCHs which it is monitoring for USF for the uplink TBF.
3. To verify that t... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.1.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.2 Uplink TBF, SSN based PAN Format, with Concurrent Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.2.1 Conformance Requirements | 1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008) and it does not indicate support of Reduced Lat... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.2.2 Test Purposes | 1. To verify that the mobile station can operate a downlink TBF with FANR activated whilst an uplink TBF with FANR activated using the SSN based format is in operation.
2. To verify that the mobile station interprets PAN fields addressed to it via TFI when received in downlink data blocks not belonging to the MS's conc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.2.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.3 Uplink TBF, Time based PAN Format | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.3.1 Conformance Requirements | 1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008) and it does not indicate support of Reduced Lat... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.3.2 Test Purposes | 1. To verify that the mobile station can establish an uplink TBF with FANR activated using the time based format.
2. To verify that the mobile station correctly interprets the contents of PAN fields received in downlink data blocks on downlink PDCHs which it is monitoring for USF for the uplink TBF. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.3.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.4 Uplink TBF, Time based PAN Format, with Concurrent Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.4.1 Conformance Requirements | 1. If a mobile station indicates support of Reduced Latency (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (see sub-clause 9.1.14), either in BTTI configuration or in RTTI configuration. If a mobile station indicates support of FANR (see 3GPP TS 24.008), it may be assigned TBFs with FANR activated (s... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.4.2 Test Purposes | 1. To verify that the mobile station can operate a downlink TBF with FANR activated whilst an uplink TBF with FANR activated using the time based format is in operation.
2. To verify that the mobile station interprets PAN fields from downlink data blocks belonging to it's own and other MS's downlink TBFs. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.4.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.5 Concurrent Uplink and Downlink TBFs, Discrimination of PAN Information from Different PDCH or PDCH Pairs | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.5.1 Conformance Requirements | 1. If an uplink TBF is established or reconfigured with FANR activated (see sub-clauses 11.2.29, 11.2.29a, 11.2.31, and 11.2.31a), the mobile station shall monitor for the presence of a PAN field for this TBF on all downlink PDCHs on which it shall monitor the USF for this TBF. The mobile station shall only attempt to ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.5.2 Test Purposes | 1. To verify that the mobile station only interprets PAN information received on a PDCH (BTTI configuration) or PDCH pairs (RTTI configuration) which it is required to monitor for USF for uplink TBF and ignores PAN information received on other downlink PDCH or PDCH pairs it may simultaneously be monitoring for downli... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.5.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
•
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.6 Concurrent Uplink and Downlink TBFs, Mobile Coding and Puncturing Schemes | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.6.1 Conformance requirements | 1. The presence of the PAN field, is signalled by the PAN indicator bit in the RLC/MAC header. When this bit is set the receiver shall use the corresponding Puncturing Scheme variant of the CPS indicated in the RLC/MAC header to decode the RLC data field.
2. For an EGPRS TBF with FANR activated, a Radio Block for data ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.6.2 Test purpose | 1. To verify that mobile station uses the received PAN field correctly for different mobile coding and puncturing schemes.
2. To verify that the MS includes the PAN field in uplink data blocks coded using different commanded MCS when polled for PAN by the network.
3. To verify that initial transmission of RLC data bloc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.6.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated.
Specific PICS Statements
- EGPRS capable of 8PSK in Uplink, of all Multislot classes (TSPC_Type_EGPRS_8PSK_uplink)
PIXI... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.7 Concurrent Uplink and Downlink TBFs, Choice of MCS for Uplink Data Block Re-Transmission with PAN Field Present | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.7.1 Conformance Requirements | 1. For a TBF with FANR activated, if these rules require a retransmission in MCS-9 and a PAN field is included in an EGPRS RLC/MAC block for data transfer, the mobile station shall use MCS-6. If these rules require a retransmission in MCS-4, a PAN field is to be included in an EGPRS RLC/MAC block for data transfer and ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.7.2 Test Purposes | 1. To verify that the mobile station re-transmits a negatively acknowledged uplink data block using MCS-6 when the rules would otherwise require re-transmission using MCS-9, but a PAN field is to be included.
2. To verify that the mobile station re-transmits a negatively acknowledged uplink data block using MCS-1 when ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.7.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.8 Uplink TBF, Handling of Erroneous PAN Fields,SSN Based Format | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.8.1 Conformance Requirements | In the case of a PAN field, the bitmap shall be interpreted in the same way as for the case of PACKET UPLINK ACK/NACK, EGPRS PACKET DOWNLINK ACK/NACK or EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message with the following exceptions:
• if the processing of a PAN would cause an element of V(B) to be changed from ACKED or TE... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.8.2 Test Purposes | 1. To verify that the mobile station ignores the entire PAN field if a previously positively acknowledged data block is subsequently negatively acknowledged.
2. To verify that the mobile station ignores the entire PAN field if the PAN field positively acknowledges a data block which has yet to be transmitted. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.8.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.9 Uplink TBF, Handling of Erroneous PAN Fields,Time Based Format | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.9.1 Conformance Requirements | 1. In the case of a PAN field, the bitmap shall be interpreted in the same way as for the case of PACKET UPLINK ACK/NACK, EGPRS PACKET DOWNLINK ACK/NACK or EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message with the following exceptions:
• if the processing of a PAN would cause an element of V(B) to be changed from ACKED or... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.9.2 Test Purposes | 1. To verify that the mobile station ignores the entire PAN field if a previously positively acknowledged data block is subsequently negatively acknowledged.
2. To verify that the mobile station ignores the entire PAN field if the PAN field positively acknowledges a data block which has yet to be transmitted.
3. To ver... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.9.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfe... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.10 Downlink TBF, with Concurrent Uplink TBF, Polled FANR | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.10.1 Conformance Requirements | 1. If the RLC endpoint transmitter is the network and the mobile station has at least one concurrent TBF in the uplink direction, the network may poll the mobile station to trigger the FANR procedure. In this case the mobile station shall answer in a reserved radio block period which is allocated with the polling as de... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.10.2 Test purpose | 1. To verify that the mobile station shall respond to polling for PAN by including a PAN field in a radio block belonging to a concurrent uplink TBF when a concurrent uplink TBF is established and uplink data is due to be sent. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.10.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.11 Downlink TBF, with Concurrent Uplink TBF, Event Based FANR, Out of Sequence Condition | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.11.1 Conformance requirements | 1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction.
2. For a TBF with FANR activated, the network may poll the mobile station to tri... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.11.2 Test purpose | 1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled.
2. To verify that the mobile station inserts a correctly encoded PAN field in response to the out of sequence condition in the header of an uplink data block belonging to its concurrent uplink TBF. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.11.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.12 Downlink TBF, with Concurrent Uplink TBF, Event Based FANR, Corrupted RLC Data Part with Event-based Fast Ack/Nack reporting | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.12.1 Conformance requirements | 1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction..
2. For a TBF with FANR activated... if enabled at TBF establishment/reconfigura... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.12.2 Test purpose | 1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled.
2. To verify that the mobile station inserts a sends correctly encoded PAN field into the header of an uplink data block belonging to it's concurrent uplink TBF while receiving upon receipt of an incorrect downlink RLC data ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.12.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establish... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.13 Downlink TBF, with Concurrent Uplink TBF, Event Based and Polled FANR Combined | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.13.1 Conformance requirements | Event-based FANR may be used together with Polled FANR (see sub-clause 9.1.14.2).
If the RLC endpoint receiver is the mobile station, event-based FANR is enabled for this TBF and the mobile station has at least one assigned TBF in the uplink direction, the mobile station shall insert one PAN field in an EGPRS RLC/MAC b... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.13.2 Test purpose | 1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled.
2. To verify that the mobile station inserts a correctly encoded PAN field in response to the out of sequence condition into the header of an uplink data block belonging to it’s concurrent uplink TBF.
3. To verify that the mo... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.13.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.14 Downlink TBF, with and without Concurrent Uplink TBF, CES/P Polling Response | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.14.1 Conformance requirements | For EGPRS when FANR is activated or for EGPRS2, the Combined EGPRS Supplementary/Polling field describes the feedback request and specifies a single uplink block in which the mobile station shall transmit a PACKET CONTROL ACKNOWLEDGEMENT message, a PACCH block or (applicable only if FANR is activated) a radio block con... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.14.2 Test purpose | 1. To verify that the mobile station responds with the correct polling response when polled with CES/P values 001,010,011,100,101,110 and 111 during concurrent TBF is ongoing.
2. To verify that the mobile station responds with the correct polling response when polled with CES/P values 011 and 100 after the completion... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.14.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.15 Downlink TBF, with Concurrent Uplink TBF, Transmission of Other Messages in Response to Polling for PAN, PACKET CS REQUEST | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.15.1 Conformance Requirements | 1. The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. The mobile station is allowed to retransmit the PACKET CS REQUEST message once while timer T3196 is running. The second sending occurrence of this message shall take place at the first suitable oppor... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.15.2 Test purpose | 2. To verify that the mobile station shall respond to polling for PAN by PACKET CS REQUEST in PACCH when a Mobile Originated call is initiated while downlink with concurrent uplink data transfer is on going. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.15.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
- Support of Enhanced DTM CS (TSPC_Enhanced_DTM_CS)
PIXIT Statement... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.16 Downlink TBF, with Concurrent Uplink TBF, Transmission of Other Messages in Response to Polling for PAN, PACKET CELL CHANGE NOTIFICATION | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.16.1 Conformance Requirements | Whenever the mobile station receives an RLC data block addressed to one of its TBFs and with a valid RRBP field or with a valid CES/P field in the RLC data block header (i.e. is polled), the mobile station shall transmit one of the following replies in the uplink radio block specified by the RRBP field or CES/P field ,... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.16.2 Test purpose | 3. To verify that the mobile station shall respond to polling for PAN by PACKET CELL CHANGE NOTIFICATION in PACCH when the RF level of the serving cell is lowered such that it reselects another cell while downlink with concurrent uplink data transfer is on going. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.16.3 Method of test | Initial Conditions
System Simulator:
2 cells (cell A, cell B), activated at power-on, EGPRS supported, default setting, PBCCH not present, CCN supported.
Cell A: RLA_C = -50 dBm
Cell B: RLA_C = -65 dBm
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.17 Downlink TBF, with and without Concurrent Uplink TBF, PAN Reaction Time, Polled PANR Polled Fast Ack/Nack reporting | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.17.1 Conformance Requirements | 1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction.
12. If the RLC endpoint transmitter is the network and the mobile station has at... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.17.2 Test purpose | 1. To verify that the mobile station shall respond to polling (for a PAN) from the network by including a PAN field in a radio block belonging to a concurrent uplink TBF when a concurrent uplink TBF is established and uplink data is due to be sent.
2. To verify that the mobile station shall respond to polling for PAN b... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.17.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishment... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.18 Downlink TBF, with Concurrent Uplink TBF, PAN Reaction Time, Event Based FANR | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.18.1 Conformance Requirements | 1. If the RLC endpoint receiver is the mobile station, event-based FANR is enabled for this TBF and the mobile station has at least one assigned TBF in the uplink direction, the mobile station shall insert one PAN field in an EGPRS RLC/MAC block for data transfer transmitted during a given radio block period for that u... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.18.2 Test Purposes | 1. To verify that when event based FANR is activated for a downlink TBF and a concurrent uplink TBF is established, the MS adheres to the PAN reaction time requirement when a missing or erroneous data block has been detected. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.18.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishment of a downlink ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.19 Concurrent Uplink and Downlink TBFs, FANR/PAN, RLC Unacknowledged Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.19.1 Conformance Requirements | 1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction.
2. FANR can be activated for a TBF operated in RLC unacknowledged mode.
Referenc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.19.2 Test Purposes | 1. To verify that the mobile station operates concurrent uplink and downlink TBFs with FANR enabled in RLC unacknowledged mode. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.1.19.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to transfer 1000 octets of us... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2 EGPRS test cases for RTTI Configuration | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.1 Uplink RTTI TBF/ Default PDCH pair configuration/ Dynamic Allocation / BTTI USF Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.1.1 Conformance Requirements | 1. Whenever the mobile station detects an assigned USF value on a monitored downlink PDCH or PDCH-pair, the mobile station shall transmit either a single RLC/MAC block or a sequence of four RLC/MAC blocks on the same PDCH or corresponding PDCH-pair for that TBF except if that TBF is running in extended uplink TBF mode,... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.1.2 Test Purposes | To verify:
1. The MS is able to operate in RTTI configuration when receiving the USF in BTTI USF mode.
2. When the mobile station receives an assigned USF on the first PDCH of the downlink PDCH-pair, it transmits uplink radio blocks in the first two TDMA frames of the following radio block period on the corresponding P... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS orders the MS to have two-phase access. In PACKET U... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.2 Uplink RTTI TBF/ default PDCH pair configuration/Dynamic Allocation/ RTTI USF Mode |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.