hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.2.1 Conformance Requirement | Whenever the mobile station detects an assigned USF value on a monitored downlink PDCH or PDCH-pair, the mobile station shall transmit either a single RLC/MAC block or a sequence of four RLC/MAC blocks on the same PDCH or corresponding PDCH-pair for that TBF except if that TBF is running in extended uplink TBF mode, in... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.2.2 Test Purposes | To verify:
1. The MS is able to operate in RTTI configuration when receiving the USF in RTTI USF mode.
2. When the mobile station receives an assigned USF on a monitored downlink PDCH-pair in the first reduced radio block of a given basic radio block period, it transmits uplink RTTI radio blocks in the second reduced r... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and test PDP Context 3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to perform uplink packet transfer. In the PACKET UPLINK ASSIGNMENT message sent... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.3 Uplink RTTI TBF/default PDCH pair configuration/Extended Dynamic Allocation /BTTI USF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.3.1 Conformance Requirements | The PACKET UPLINK ASSIGNMENT and MULTIPLE TBF UPLINK ASSIGNMENT messages assign to the mobile station a subset of 1 to N uplink PDCHs (when the uplink TBF operates in BTTI configuration) or uplink PDCH-pairs (when the uplink TBF operates in RTTI configuration), where N depends on the mobile station multislot class.
The... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.3.2 Test Purposes | To verify:
1. When the mobile station receives an assigned USF on the first PDCH of the downlink PDCH-pair, it transmits uplink radio blocks in the first two TDMA frames of the following radio block period on the corresponding PDCH-pair and all assigned uplink PDCH-pairs with higher numbered timeslots.
2. When the mobi... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.3.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, Extended dynamic allocation supported, PBCCH not present
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated and the test PDP context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS orders the MS to have two-pha... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.4 Uplink RTTI TBF/default PDCH pair configuration/Extended Dynamic Allocation /RTTI USF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.4.1 Conformance Requirement | The PACKET UPLINK ASSIGNMENT and MULTIPLE TBF UPLINK ASSIGNMENT messages assign to the mobile station a subset of 1 to N uplink PDCHs (when the uplink TBF operates in BTTI configuration) or uplink PDCH-pairs (when the uplink TBF operates in RTTI configuration), where N depends on the mobile station multislot class.
The... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.4.2 Test Purposes | To verify:
1. When the mobile station receives an assigned USF on a monitored downlink PDCH-pair in the first reduced radio block of a given basic radio block period, it transmits uplink PDCH-pair and all assigned PDCH-pairs with higher numbered timeslots in the second reduced radio block period starting in the same ba... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.4.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, Extended dynamic allocation supported, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated and the test PDP context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to perform upli... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.5 Uplink RTTI TBF/Default PDCH pair configuration/Dynamic Allocation/USF Mode reconfiguration | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.5.1 Conformance Requirement | The network may, at any time during uplink packet transfer, change the TTI configuration or USF mode (BTTI USF mode or RTTI USF mode) as well as the corresponding downlink PDCH-pairs of an already established uplink TBF by sending on the downlink PACCH, an uplink TBF assignment message (e.g. PACKET UPLINK ASSIGNMENT, M... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.5.2 Test Purposes | To verify:
1. When using BTTI USF mode, if the MS is granted the allocated USF in basic radio block period B(n) on the first of the two downlink timeslots corresponding to an uplink PDCH pair, the MS shall transmit an uplink radio block in reduced radio block period B(n+1)a occurring in the first two TDMA frames of bas... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.5.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP Context 3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to perform uplink packet transfer. In the PACKET UPLINK ASSIGNMENT message ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.6 Uplink RTTI TBF / One Phase Access Request by Reduced Latency MS / CCCH Case / Contention Resolution | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.6.1 Conformance requirements | EGPRS TBF mode capable mobile stations shall monitor the GPRS Cell Options IE on the BCCH (SI13) for the cell's EGPRS capability and, if the mobile station is also Reduced Latency capable, the cell’s Reduced Latency Access capability. In the GPRS Cell Options IE it is also indicated if the EGPRS PACKET CHANNEL REQUEST ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.6.2 Test purpose | 1. To verify that the MS uses the Access Type “One Phase Access Request by Reduced Latency MS” when appropriate.
2. To verify that the MS is able to utilise a PDCH pair assigned via the IMMEDIATE ASSIGNMENT message.
3. To verify that the MS completes the one phase access contention resolution procedure upon receipt of ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.6.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to initiate u... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.7 Concurrent RTTI TBF / Channel Quality Reporting | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.7.1 Conformance requirements | In case of EGPRS the MS shall report the overall MEAN_BEP and CV_BEP for the modulations, GMSK and/or 8-PSK (i.e. GMSK_MEAN_BEP, GMSK_CV_BEP; and/or 8PSK_MEAN_BEP, 8PSK_CV_BEP respectively) for which it has received blocks on at least one allocated channel (timeslot or timeslot pair) since it last sent a measurement re... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.7.2 Test purpose | To verify that the MS is able to report the Channel Quality Report of the downlink RTTI Channels when operating in a RTTI configuration. The mean bit error probability value measured per RTTI channel basis shall be reported on GMSK_MEAN_BEP_TNx/8PSK_MEAN_BEP_TNx or MODULATION_1_MEAN_BEP_TNx/ MODULATION_1_MEAN_BEP_TNx w... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.7.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to perform up... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.8 Downlink RTTI TBF / default PDCH pair configuration/CCCH case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.8.1 Conformance requirements | The network initiates the packet downlink assignment procedure by sending an IMMEDIATE ASSIGNMENT message in unacknowledged mode on the CCCH timeslot corresponding to CCCH group the mobile station belongs to.
On receipt of an IMMEDIATE ASSIGNMENT message or, in case of a two-message assignment, a matching pair of IMMED... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.8.2 Test purpose | To verify that the MS is able to operate in RTTI configuration when assigned a Downlink RTTI TBF with default PDCH pair configuration by a IMMEDIATE ASSIGNMENT. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.8.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS sends an IMMEDIATE ASSIGNM... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.9 Concurrent RTTI TBFs / Explicit PDCH Pair Configuration | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.9.1 Conformance Requirement | If the default single carrier PDCH pair configuration is indicated, then the assignment is for resources on a subset of the PDCH pairs comprising timeslots 0 and 1, 2 and 3, 4 and 5, and 6 and 7 in both the uplink and on the downlink. If the default dual carrier PDCH pair configuration is indicated, then the assignment... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.9.2 Test Purposes | To verify that the MS can operate concurrent uplink and downlink TBFs where the PDCH pairs have been explicitly assigned using the Downlink_PDCH_Pairs_C1 and Uplink_PDCH_Pairs_C1 fields for the following PDCH pair configurations :-
1. The assigned downlink PDCH pair uses the same timeslots as the corresponding downlink... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.9.3 Method of Test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and the test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to perform... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.10 Concurrent RTTI TBF / Change in TTI configuration | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.10.1 Conformance requirements | The network may, at any time during uplink packet transfer, change the TTI configuration or USF mode (BTTI USF mode or RTTI USF mode) as well as the corresponding downlink PDCH-pairs of an already established uplink TBF by sending on the downlink PACCH, an uplink TBF assignment message (e.g. PACKET UPLINK ASSIGNMENT, M... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.10.2 Test purpose | To verify:
1. The MS is able operate in the new TTI configuration when the TTI configuration (BTTI to RTTI and vice-versa) of an ongoing RTTI or BTTI TBF is changed.
2. The MS is able to perform TTI mode reconfiguration during an ongoing uplink packet transfer and shall respond to the new parameters within the reaction... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.10.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to perform up... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.11 Concurrent RTTI TBF / Downlink Dual Carrier configuration | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.11.1 Conformance requirements | If the default dual carrier PDCH pair configuration is indicated, then the assignment is for resources on a subset of the PDCH pairs comprising timeslots 0 and 1, 2 and 3, 4 and 5, and 6 and 7 on both carriers in both the uplink and on the downlink. Otherwise, the assignment is for resources on a subset of the PDCH pai... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.11.2 Test purpose | To verify that:
- the MS is able to operate a RTTI TBF in Downlink Dual Carrier configuration
- the MS is able to change from concurrent RTTI in DLDC mode to Single Carrier BTTI mode and back to concurrent RTTI in DLDC mode
- PDCH pairs on each of the downlink are different from each other
- the PDCH pair Timeslots are... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.11.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, Downlink Dual Carrier configuration, PBCCH not present.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated
Specific PI... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.12 Concurrent RTTI TBF / Dual Transfer Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.12.1 Conformance requirements | The RR connection establishment procedure is initiated by the RR entity of the mobile station. Initiation is triggered by request from the MM sublayer to enter dual transfer mode. The request from the MM sublayer to establish the RR connection specifies an establishment cause.
While in dedicated mode, the establishment... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.12.2 Test purpose | To verify that the MS is able to operate a RTTI TBF in Dual Transfer Mode with DTM Command message. The following parts are verified:
MS is in active state of a call and MS initiates the data.
MS is in active state of a call and the network initiates the data.
MS is in a packet transfer mode and user is made to initia... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58a.2.12.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, DTM supported, default setting, PBCCH not present.
Mobile Station:
The MS is in the active state (U10) of a call.
Support for Dual Transfer Mode indicated in MS Radio Access Capabilities IE.
The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b Downlink Dual Carrier and Downlink Multi Carrier | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1 Downlink Dual Carrier Reconfiguration | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.1 Single Carrier Uplink TBF with no Downlink TBF/ DLDC TBF established / No change in Uplink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.1.1 Conformance requirement | If the network and mobile station both support Downlink Dual Carrier, the network may send a packet assignment message to a mobile station specifying packet resources for one or more TBFs on two carriers (referred to as carrier 1 and carrier 2) and thereby establish a Downlink Dual Carrier configuration. If this messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.1.2 Test purpose | To verify that the MS:
- decodes correctly the Packet downlink Assignment that assigns dual downlink carrier
- is able to correctly receive data simultaneously on both the carriers assigned |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP context 2 activated.
Sp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.2 Single Carrier concurrent TBF to DLDC TBF/ Uplink DLDC TBF (on both carrier 1 and carrier 2)/ Reconfigured back to single Carrier Concurrent TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.2.1 Conformance requirement | When a mobile station has resources assigned on only one carrier then, for the purposes of subsequent assignment messages, that carrier shall be considered carrier 1. A subsequent assignment message may assign resources on a second carrier, thereby establishing a Downlink Dual Carrier configuration; in this case, the a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.2.2 Test purpose | To verify that:
- the MS is able to change from single carrier concurrent TBF to dual carrier configuration and operate downlink dual carrier downlink and uplink TBF.
- the MS is able to change from single carrier concurrent TBF to dual carrier configuration and operate downlink dual carrier downlink and uplink TBF.
- ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP context 2 activated.
Sp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.3 Single Carrier Concurrent TBF/Downlink TBF reconfigured to DLDC configuration / Uplink single carrier TBF reallocated to Carrier 2/Uplink modified to Dual Carrier | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.3.1 Conformance requirement | If the network and mobile station both support Downlink Dual Carrier, the network may send a packet assignment message to a mobile station specifying packet resources for one or more TBFs on two carriers (referred to as carrier 1 and carrier 2) and thereby establish a Downlink Dual Carrier configuration. If this messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.3.2 Test purpose | To verify that:
- the MS can change from single carrier concurrent TBF to a DLDC TBF with the uplink reallocated to carrier 2.
- re-assignment with different Assignment type for downlink and uplink.
58b.1.3.3. Method of test
Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported.
... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.4 Single Carrier Uplink TBF with no Downlink TBF / DLDC TBF established / Uplink DLDC TBF (on both carrier 1 and carrier 2)/ Uplink TBF Reconfigured to Single Carrier TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.4.1 Conformance requirement | If the network and mobile station both support Downlink Dual Carrier, the network may send a packet assignment message to a mobile station specifying packet resources for one or more TBFs on two carriers (referred to as carrier 1 and carrier 2) and thereby establish a Downlink Dual Carrier configuration. If this messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.4.2 Test purpose | To verify that the MS:
-the MS can change from single carrier uplink TBF to (with no downlink TBF) to downlink dual carrier TBF with additional resources on new frequency and resources for uplink TBF being allocated on both carriers.
-the MS is able to change from dual carrier configuration in uplink and downlink direc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.5 Single Carrier Downlink TBF with No Uplink TBF/ Downlink reconfigured to DLDC TBF/ Uplink TBF established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.5.1 Conformance requirement | If the network and mobile station both support Downlink Dual Carrier, the network may send a packet assignment message to a mobile station specifying packet resources for one or more TBFs on two carriers (referred to as carrier 1 and carrier 2) and thereby establish a Downlink Dual Carrier configuration. If this messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.1.5.2 Test purpose | To verify:
The MS is able to change from Single Carrier downlink TBF (no uplink TBF in process) to operate a DLDC TBF.
- new (additional resources) frequency parameters can be allocated to both carriers
- when frequency parameters are allocated for only one carrier the other carrier remain unchanged.
58b.1.5.3. Method ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2 Concurrent Downlink Dual Carrier TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.1 Concurrent Downlink Dual Carrier TBF/ Reconfigure Frequency Parameters | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.1.1 Conformance requirement | Frequency parameters may be included in the packet assignment messages (i.e., PACKET DOWNLINK ASSIGNMENT, MULTIPLE TBF DOWNLINK ASSIGNMENT, PACKET UPLINK ASSIGNMENT, MULTIPLE TBF UPLINK ASSIGNMENT, PACKET TIMESLOT RECONFIGURE, MULTIPLE TBF TIMESLOT RECONFIGURE or PACKET CS RELEASE INDICATION messages) and define the ra... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.1.2 Test purpose | To verify that the MS is able to change and operate concurrent downlink dual carrier TBF on different frequency resources. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP context 2 activated.
Sp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.2 Concurrent Downlink Dual Carrier TBF/ Change in Modulation and Coding Schemes | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.2.1 Conformance requirement | In the case of a Downlink Dual Carrier configuration the commanded MCS shall apply to both of the carriers.
References
3GPP TS 44.060; subclause 8.1.1 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.2.2 Test purpose | To verify that the MS is able to operate in different modulation and coding schemes while operating in a downlink dual carrier configuration on different carrier. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP context 2 activated.
Sp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.3 Concurrent Downlink Dual Carrier TBF/ Frequency Hopping | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.3.1 Conformance requirement | The Frequency Parameters information element is defined in sub-clause 12.8 and the Dual Carrier Frequency Parameters information element is defined in sub-clause 12.8.2. The frequency parameters may use an ARFCN defining a non-hopping radio frequency channel, or use the indirect encoding, direct encoding 1 or direct en... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.3.2 Test purpose | To verify that the MS is able to operate a downlink dual carrier TBF with frequency hopping enabled on one or both carriers. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.3.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported,
• For GSM 900, CA in SI1includes the frequencies:
(8, 10, 15, 37, 39, 40, 45, 50)
• For DCS 1800 and PCS 1900, CA in SI1 includes the frequency:
(518, 520, 525, 530, 535, 540, 545, 550)
• For GSM 700, T-GSM810, CA in SI1 incl... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.4 Concurrent Downlink Dual Carrier TBF/ Downlink Dual Carrier Configuration / Channel Quality Reporting | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.4.1 Conformance requirement | In a downlink dual carrier configuration, channel quality measurements shall be performed for each radio frequency channel independently. Depending on the amount of information requested by the network (e.g. whether or not per-timeslot information is required) the MS may not be able to include channel quality measureme... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.4.2 Test purpose | To verify that the MS performs Channel Quality Reporting in a Downlink Dual Carrier configuration. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.4.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported. PBCCH not present
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP cont... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.5 Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration in Dual Transfer Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.5.1 Conformance requirement | A mobile station in dual transfer mode in a Downlink Dual Carrier configuration shall respond in the
uplink radio block on the timeslot or on the PDCH pair indicated by the RRBP field or by the CES/P field, on the uplink
radio frequency channel where the dedicated resource is assigned regardless of which downlink radio... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.5.2 Test purpose | To verify that:
The MS receives downlink data blocks on the time slots assigned on the two carriers in the DLDC configuration. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.5.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported and DTM supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
Support for Downlink Dual carrier for DTM capability in MS Radio Access Capabilities IE.
Support of DTM is indi... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.6 Concurrent Downlink Dual Carrier TBF/ Extended Dynamic Allocation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.6.1 Conformance requirement | If a mobile station supports Downlink Dual Carrier, the PACKET UPLINK ASSIGNMENT or MULTIPLE TBF UPLINK ASSIGNMENT message may assign PDCHs (corresponding to any given uplink TBF) on more than one carrier frequency. If this occurs, the Extended Dynamic Allocation procedures shall operate independently on each of the tw... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.6.2 Test purpose | To verify that:
The Extended Dynamic allocation procedures work independently on each of the two carriers for a MS configured in DLDC. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.6.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported, Extended Dynamic allocation supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE nego... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.7 Concurrent Downlink Dual Carrier TBF / Downlink Dual Carrier Configuration/ Extended RLC/MAC control message segmentation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.7.1 Conformance requirement | A mobile station supporting Downlink Dual Carrier shall also support the extended RLC/MAC control message segmentation as defined in sub-clause 9.1.12a.
In the case of a Downlink Dual Carrier configuration, all segments belonging to each RLC/MAC control message shall be sent on PACCH blocks belonging to the same carrie... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.7.2 Test purpose | To verify that:
This MS is able to operate in a DLDC TBF with Extended RLC/MAC control message segmentation. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.7.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported, Extended RLC/MAC control message segmentation supported.
For GSM 900, CA in SI1includes the frequencies:
(10, 30, 50, 60, 70, 80, 90, 100, 110, 120)
For DCS 1800 and PCS 1900, CA in SI1 includes the frequency:
(520, 530, 540,... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.8 Concurrent Downlink Dual Carrier TBF/ Dual Carrier Uplink TBF/ USF granularity 4 | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.8.1 Conformance requirement | In a Downlink Dual Carrier configuration, one or more PDCHs are assigned to a single mobile station on each of two different radio frequency channels. A mobile station with a Downlink Dual Carrier configuration shall not be allocated radio blocks on both radio frequency channels during any given radio block period.
The... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.8.2 Test purpose | To verify that the MS:
When USF_GRANULARITY is set to four blocks allocation, MS sends uplink data blocks as per the USF_GRANULARITY parameter. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.8.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Dual Carrier supported.
Mobile Station:
Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE.
The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP context 2 activated.
Sp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.9 Concurrent Downlink Multi Carrier TBF / Frequency Hopping, Carrier selection | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.9.1 Conformance requirement | The Frequency Parameters information element is defined in sub-clause 12.8 and the Dual Carrier Frequency Parameters information element is defined in sub-clause 12.8.2 and the DLMC Frequency Parameters information element is defined in sub-clause 12.8.4. The frequency parameters may use an ARFCN defining a non-hopping... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.9.2 Test purpose | To verify that the MS is able to operate a downlink multi carrier TBF with frequency hopping enabled on 4 carriers with 16 Ts checking carrier selection . |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.9.3 Method of test | Initial Conditions
System Simulator:
1 cell, EGPRS supported, Downlink Multi Carrier supported,
- For GSM 900, CA in SI1includes the frequencies:
(8, 10, 15, 37, 39, 40, 45, 50)
- For DCS 1800 and PCS 1900, CA in SI1 includes the frequency:
(518, 520, 525, 530, 535, 540, 545, 550)
- For GSM 700, T-GSM810, CA in SI1 inc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 58b.2.10 Concurrent Downlink Multi Carrier TBF / Downlink Multi Carrier Configuration / Channel Quality Reporting with UFPS |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.