hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.1.25 Acknowledged Mode/ Uplink TBF/ TBF Reallocation/Window Size | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.1.25.1 Conformance requirement | For EGPRS the window size (WS) shall be set by the network according to the number of timeslots allocated in the direction of the TBF (uplink or downlink). The allowed window sizes are given in Table 9.1.9.2.1.
MS shall support the maximum window size corresponding to its multislot capability.The selected WS shall be i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.1.25.2 Test purpose | To verify that if an uplink TBF is reallocated reducing the number of timeslots so that the RLC window size becomes larger than the maximum window size for the new resources, the MS retains the old window size. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.1.25.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
An uplink TBF allocating two ti... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2 Acknowledged Mode/ Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.1 Acknowledged Mode/ Downlink TBF/ Receive State Variable V(R) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.1.1 Conformance requirements | 1. In RLC acknowledged mode, each RLC endpoint receiver shall have an associated receive state variable V(R). The receive state variable denotes the BSN of the next in-sequence RLC data block expected to be received.
2. The BOW bit shall be set if SSN = [V(Q) + 1] modulo SNS, the EOW bit shall be set if [V(R) -1] modul... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.1.2 Test purpose | 1. To verify the receive state variable, V(R) is set to the next in-sequence RLC data block expected to be received. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.2 Acknowledged Mode/ Downlink TBF/ Receive Window State Variable V(Q) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.2.1 Conformance requirements | 1. In RLC acknowledged mode, each RLC endpoint receiver shall have an associated receive window state variable, V(Q). The mobile station shall set V(Q) to the value 0 at the beginning of each TBF in which the RLC endpoint is the receiver.
2. The value of V(Q) shall be updated when the RLC receiver receives the RLC data... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.2.2 Test purpose | 1. To verify the correct initialisation of the receive state variable V(Q).
2. To verify that V(Q) is not updated when data blocks with BSN not equal to V(Q) are received. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.3 Acknowledged Mode/ Downlink TBF/ Window Size/ Default Value | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.3.1 Conformance requirements | In case a PACKET TIMESLOT RECONFIGURE is sent to the MS without any window size for a specific TBF, then any previous value received for the specific TBF shall be used or, if no previous value has been received for the specific TBF, default window size shall be used.
References
3GPP TS 04.60, subclause 9.1.9.2. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.3.2 Test purpose | 1. To verify that MS use a default WS value when a PACKET TIMESLOT RECONFIGURE is sent to the MS without downlink window size indication to establish a downlink TBF.
2. To verify that MS use the previous WS value received for the Downlink TBF when a PACKET TIMESLOT RECONFIGURE without downlink window size indication i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.3.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS establishes an Uplink TB... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.4 Acknowledged Mode/ Downlink TBF/ Window Size/ Assigned Value | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.4.1 Conformance requirements | 1. For EGPRS the window size (WS) shall be set by the network according to the number of timeslots allocated in the direction of the TBF (uplink or downlink).
2. MS shall support the maximum window size corresponding to its multi timeslot capability.
3. The selected WS shall be indicated within PACKET UL/DL ASSIGNMENT ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.4.2 Test purpose | 1. To verify that the MS correctly interprets the window size indication in PACKET DOWNLINK ASSIGNMENT.
2. To verify that the MS correctly interprets the window size indication in PACKET TIMESLOT RECONFIGURE during downlink TBF.
3. To verify that the MS supports the maximum window size corresponding to its multi timesl... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.4.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.5 Acknowledged Mode/ Downlink TBF/ BOW | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.5.1 Conformance requirements | 1. For downlink TBF, the reported bitmap is sent using the EGPRS PACKET DOWNLINK ACK/NACK message corresponding to the used RB size.
2. The BOW bit shall be set if SSN = [V(Q) + 1] modulo SNS is explicitly included in the bitmap.
References
3GPP TS 04.60, subclause 9.1.8.2.4. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.5.2 Test purpose | 1. To verify the BOW bit is set to '1' when SSN = [V(Q) + 1] modulo SNS is explicitly included in the bitmap.
2. To verify the BOW bit is set to '0' when SSN = [V(Q) + 1] modulo SNS is not explicitly included in the bitmap. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.5.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
- EGPRS Multislotclass (TSPC_Type_EGPRS_Multislot_ClassX where X = ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.6 Acknowledged Mode/ Downlink TBF/ EOW | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.6.1 Conformance requirements | 1. For downlink TBFs, the reported bitmap is sent using the EGPRS PACKET DOWNLINK ACK/NACK message corresponding to the used RB size.
2. The EOW bit shall be set if [V(R) -1] modulo SNS is explicitly included in the bitmap.
References
3GPP TS 04.60, subclause 9.1.8.2.4. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.6.2 Test purpose | 1. To verify the EOW bit is set to '0' when [V(R) - 1] modulo SNS is not explicitly included in the bitmap.
2. To verify the EOW bit is set to '1' when [V(R) - 1] modulo SNS is explicitly included in the bitmap. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.6.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
- EGPRS Multislotclass (TSPC_Type_EGPRS_Multislot_ClassX where X = ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.7 Acknowledged Mode/ Downlink TBF/ Measurement Report | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.7.1 Conformance requirements | 1. In PACKET DOWNLINK ACK/NACK message, if the reported bitmap is shorter than the requested bitmap size, the MS shall include a measurement report if there is room enough.
References
3GPP TS 04.60, subclause 9.1.8.2.3. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.7.2 Test purpose | 1. To verify that if the reported bitmap is shorter than the requested bitmap size, the MS shall include a measurement report if there is room enough. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.7.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS establishes an acknowled... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.8 Acknowledged Mode/ Downlink TBF/ Generation of Bitmap | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.8.1 Conformance requirements | 1. For uplink TBFs, the reported bitmap is sent using the PACKET UPLINK ACK/NACK message corresponding to the used RB size.
2. First, a Full Received Bitmap (FRB) is built from the receive state array V(N) by extracting the part between V(Q) and V(R) similar to the GPRS case: it is assigned the elements whose indices i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.8.2 Test purpose | 1. To verify that the mobile station correctly formulates the EGPRS DL Ack/Nack message when the condition of V(Q) = V(R) is met. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.8.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS transmits N RLC data blo... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.9 Acknowledged Mode/ Downlink TBF/ Interpretation of BSN2 | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.9.1 Conformance requirements | 1. Each RLC data block contains a block sequence number (BSN) field that is 11 bits in length. At the time that an in‑sequence RLC data block is designated for transmission, the value of BSN is set equal to the value of the send state variable V(S).
2. The transfer of RLC data blocks in the RLC acknowledged mode uses r... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.9.2 Test purpose | 1. To verify that the mobile station correctly interpret the value of BSN 2. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.9.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
SS transmit an RLC radio block ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.10 Acknowledged Mode/ Downlink TBF/ Split RLC Data Block | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.10.1 Conformance requirements | 1. When an RLC data block is received with BSN within the active window i.e. such that [V(Q) <=BSN < V(Q) + WS] modulo SNS, the corresponding element in V(N) is set to the value RECEIVED (the RLC data block has passed FCS).
2. If the RLC data block is split over two radio blocks, the element shall be set to the value R... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.10.2 Test purpose | To verify that in case an RLC data block is split over two radio blocks:
1. The corresponding V(N) element shall not be marked as RECEIVED if any of the two radio blocks is not received.
2. The corresponding V(N) element shall be marked as RECEIVED if both of the radio blocks are received. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.10.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS establishes a downlink E... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.11 Acknowledged Mode/ Downlink TBF/ First Partial Bitmap and Next Partial Bitmap | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.11.1 Conformance requirements | 1. In EGPRS downlink TBFs, an additional poll bit is added to the S/P field in every downlink RLC block so that the network can request the following:
- First Partial Bitmap (FPB) segment with SSN = (V(Q) + 1) mod 2048 where SSN denotes the Starting Sequence Number.
- Next Partial Bitmap (NPB) segment with SSN = (PBSN ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.11.2 Test purpose | 1. To verify the correct generation of SSN and RB in the First Partial Bitmap.
2. To verify the correct generation of SSN and RB in the Next Partial Bitmap. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.11.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS establishes a downlink E... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.12 Acknowledged Mode/ Downlink TBF/ Decoding of Coding Schemes | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.12.1 Conformance requirements | 1. In EGPRS TBF mode, the transfer of RLC Data Blocks in the acknowledged RLC/MAC mode can be controlled by a selective type I ARQ mechanism, or by type II hybrid ARQ (Incremental Redundancy: IR) mechanism, coupled with the numbering of the RLC Data Blocks within one Temporary Block Flow.
2. According to the link quali... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.12.2 Test purpose | To verify that the mobile station correctly decode RLC data blocks sent using different coding schemes (MCS-1 to MCS-9). |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.12.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS establishes a Downlink E... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.13 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.14 Acknowledged Mode/ Downlink TBF/ Received Bitmap/ Compressed | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.14.1 Conformance requirements | 1. A Full Received Bitmap (FRB) is built from the receive state array V(N) by extracting the part between V(Q) and V(R) similar to the GPRS case.
2. From the FRB, a reported bitmap (RB) shall then be generated. The FRB shall be recalculated before each RB is generated. For downlink TBFs, the network may order the MS to... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.14.2 Test purpose | 1. To verify the Compression Bit is set to '1' when compressed RB is sent.
2. To verify that if the compressed reported bitmap covers more blocks than the uncompressed reported bitmap, and the FRB length is larger than the RB size, the receiver shall send the compressed reported bitmap. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.14.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
- EGPRS Multislotclass (TSPC_Type_EGPRS_Multislot_ClassX where X = ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.15 Acknowledged Mode/ Downlink TBF/ Received Bitmap/ Uncompressed | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.15.1 Conformance requirements | 1. A Full Received Bitmap (FRB) is built from the receive state array V(N) by extracting the part between V(Q) and V(R) similar to the GPRS case.
2. From the FRB, a reported bitmap (RB) shall then be generated. The FRB shall be recalculated before each RB is generated. For downlink TBFs, the network may order the MS to... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.15.2 Test purpose | 1. To verify the Compression Bit is set to '0' when uncompressed RB is sent.
2. To verify that if the compressed reported bitmap does not covers more blocks than the uncompressed reported bitmap, the receiver shall send the uncompressed reported bitmap.
53.1.2.15.3 Method of test
Initial Conditions
System Simulator:
1... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.16 Acknowledged Mode/ Downlink TBF/ Received Block Bitmap/ Compressed Bitmap Starting Colour Code | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.16.1 Conformance requirements | 1. In RB compression, no special code words are used either at the beginning of the bitmap or the end of a bitmap. A one bit indicator (i.e., Compressed Bitmap Starting Colour Code) is used to indicate whether the compressed bitmap starts with a run length of zeros or a run length of ones.
References
3GPP TS 04.60, sub... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.16.2 Test purpose | 1. To verify the correct coding of Compressed Bitmap Starting Colour Code bit field in Packet Downlink ACK/NACK. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.16.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
SS initiates the establishment ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.17 Acknowledged Mode/ Downlink TBF/ Received Block Bitmap/ Terminating Code and Make-up Code | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.17.1 Conformance requirements | 1. The T.4 procedure for encoding run lengths is as follows. Runs of ones and zeros alternate, and the run lengths are represented by the code words listed in the tables below. The code words for run lengths of zeros and ones are as described in T.4 except for one minor modification: the terminating code words used for... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.17.2 Test purpose | 1. To verify that run lengths in the range 0-63 bits are encoded with their appropriate terminating code word.
2. To verify the correct use of make-up code word for run lengths in the range 64 and above. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.17.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
- EGPRS Multislotclass (TSPC_Type_EGPRS_Multislot_ClassX where X = ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.18 Acknowledged Mode/ Downlink TBF/ Retransmission/ Padding | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.18.1 Conformance requirements | According to the link quality, an initial Modulation and Coding Scheme (MCS) is selected for an RLC block (see note). For the retransmissions, the same or another MCS from the same family of MCSs may be selected. E.g. if MCS-7 is selected for the first transmission of an RLC block, any MCS of the family B may be used f... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.18.2 Test purpose | 1. To verify that the MS correctly decodes the CPS field of Downlink Egprs RLC Data Block header.
2. To verify that the MS correctly decodes a retransmitted data block which contains first six octets of padding. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.18.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
- EGPRS Multislotclass (TSPC_Type_EGPRS_Multislot_ClassX where X = ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.19 Acknowledged Mode/ Downlink TBF/ TBF Reallocation/Window Size | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.19.1 Conformance requirements | For EGPRS the window size (WS) shall be set by the network according to the number of timeslots allocated in the direction of the TBF (uplink or downlink). The allowed window sizes are given in Table 9.1.9.2.1.
MS shall support the maximum window size corresponding to its multislot capability.The selected WS shall be i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.19.2 Test purpose | To verify that if a downlink TBF is reallocated reducing the number of timeslots so that the RLC window size becomes larger than the maximum window size for the new resources, the MS retains the old window size. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.1.2.19.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
SS establishes a downlink TBF allocating two times... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2 Unacknowledged Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1 Unacknowledged Mode/ Uplink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.1 Unacknowledged Mode/ Uplink TBF/ Stall Indicator | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.1.1 Conformance requirements | The transfer of RLC data blocks in the RLC unacknowledged mode does not include any retransmissions, except during the release of an uplink TBF where the last transmitted uplink block may be retransmitted (see sub-clause 9.3.3.3).
The network shall send PACKET UPLINK ACK/NACK messages when needed.
The mobile station sh... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.1.2 Test purpose | To verify that the MS sets SI to ‘0’ in all RLC data blocks |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.1.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
An uplink TBF in unacknowledged... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.2 Unacknowledged Mode/ Uplink TBF/ RBB and SSN | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.2.1 Conformance requirements | The transfer of RLC data blocks in the RLC unacknowledged mode does not include any retransmissions, except during the release of an uplink TBF where the last transmitted uplink block may be retransmitted (see sub-clause 9.3.3.3).
The SSN and RB are transmitted in both RLC acknowledged and RLC unacknowledged mode (note... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.2.2 Test purpose | To verify that the MS ignores SSN and RB included in Packet Uplink Ack/Nack message when in RLC unacknowledged mode. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.1.2.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
An uplink TBF in unacknowledged... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.2 Unacknowledged Mode/ Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.2.1 Unacknowledged Mode/ Downlink TBF/ V(R) and V(Q) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.2.1.1 Conformance requirements | In RLC unacknowledged mode, all values of BSN are within the transmit window.
In RLC unacknowledged mode, V(R) shall be set to [ BSN' + 1 ] modulo SNS, where BSN' is the BSN of most recently received RLC data block.
In RLC unacknowledged mode, if [V(R) - V(Q)] modulo SNS > WS after updating V(R), then V(Q) is set to [V... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.2.1.2 Test purpose | To verify that in RLC unacknowledged mode, the MS correctly sets V(R) and V(Q) depending upon the BSN of the data block received. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.2.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell with EGPRS support, default setting, PBCCH not present.
Mobile Station:
The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS initiates the establishm... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.3 Default Message Contents and Macros | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.3.1 Message Contents | none |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.3.2 Macros | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.3.2.1 Macro for uplink dynamic allocation two phase access | Step
Direction
Message
Comments
{Uplink dynamic allocation two phase access}
Macro parameters:
N: the number of data octets to be transferred,
USF_GRANULARITY: 1 or 4 blocks,
RLC_DATA_BLOCKS_GRANTED: 9-261 (close-end) or absent (open-end),
EGPRS Channel Coding Command: MCS-1, -2, -3, -4, -5, -6, -6, -7, -8, -9 or MCS-5... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.3.2.2 Macro for downlink TBF establishment (PBCCH not present) | Step
Direction
Message
Comments
{Downlink TBF establishment}
Macro parameters:
TBF_STARTING_TIME
1
SS -> MS
PAGING REQUEST
Page info contains P-TMSI of the MS. Sent on PCH.
2
MS -> SS
CHANNEL REQUEST
ACCESS TYPE = "One phase packet access". Received on RACH.
3
SS -> MS
IMMEDIATE ASSIGNMENT
Random Reference = pertaining... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 53.3.2.3 Macro for downlink TBF establishment using ACCESS TYPE = "signalling" (PBCCH not present) | The following table describes a signalling sequence performing a downlink TBF establishment procedure.
The macros in the test cases refer to the table below starting at the step required for the particular sequence.
These steps are only applicable to mobiles that support EGPRS Packet Channel Request with Establishment ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57 EGPRS Dual Transfer Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 57.1 Reallocation of CS resources |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.