hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.4.2 Procedure | 1) The RF parameters are set up according to T1.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4.
[Editor's note: subclause 7.3.4 in TS 34.108 (Message sequence chart for Handover Test procedure) is not yet specified]
4) SS shall transmit a MEASUR... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]% of the cases.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2 TDD/FDD Handover for 3,84 Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.1 Definition and applicability | The handover interruption time is defined as the time between the end of the last TTI containing a transport block on the old DPCH and the time the UE starts transmission of the new uplink DPCCH.
The requirements and this test apply to the UTRA TDD / FDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.2 Minimum requirement | The interruption time shall be less than 100 ms in the single carrier case when the cell is known by the UE and the SFN of the target cell does not need to be decoded. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The interruption time is dependent... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.3 Test purpose | The purpose of this test is to verify the requirement for the TDD/FDD handover delay in CELL_DCH state. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in table 8.3.2.1, 8.3.2.2 and 8.3.2.3 below. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1G and 2B shall be used. The... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.4.2 Procedure | 1) The RF parameters are set up according to T1.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4.
[Editor's note: subclause 7.3.4 in TS 34.108 (Message sequence chart for Handover Test procedure) is not yet specified]
4) SS shall transmit a MEASUR... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]%of the cases.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 a... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3 TDD/GSM Handover | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1.1 3,84 Mcps option | The UTRAN to GSM cell handover interruption time is defined as the time from the end of the last TTI containing an RRC message implying hard handover to the transmission on the channel of the new RAT.
The requirements and this test apply to the combined TDD (3,84 Mcps option) and GSM UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1.2 1,28 Mcps option | The UTRAN to GSM cell handover delay is defined as the time from the end of the last TTI containing an RRC message implying hard handover to the transmission on the channel of the new RAT.
The requirements and this test apply to the combined TDD (1,28 Mcps option) and GSM UE |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1.3 7,68 Mcps option | The UTRAN to GSM cell handover delay is defined as the time from the end of the last TTI containing an RRC message implying hard handover to the transmission on the channel of the new RAT.
The requirements and this test apply to the combined TDD (7,68 Mcps option) and GSM UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2.1 3,84 Mcps option | The interruption time shall be less than 40 ms in the case where the UE has synchronised to the GSM cell before the HANDOVER FROM UTRAN COMMAND is received. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The normative reference for this requirement ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2.2 1,28 Mcps option | The handover delay shall be less than 90 ms in the case where the UE has synchronised to the GSM cell before the HANDOVER FROM UTRAN COMMAND is received. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of 95%.
The normative reference for this requirement is TS ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2.3 7,68 Mcps option | The handover delay shall be less than 90 ms in the case where the UE has synchronised to the GSM cell before the HANDOVER FROM UTRAN COMMAND is received. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of 95%.
The normative reference for this requirement is TS ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.3 Test purpose | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.3.1 3,84 Mcps option | To verify that the UE meets the minimum requirement. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.3.2 1,28 Mcps option | To verify that the UE meets the minimum requirement. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.1 3,84 Mcps option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.1.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4 for TDD conditions, and clause A1.2 of TS 51.010-1 [23] for the corresponding GSM conditions.
The test parameters are given in Table 8.3.3.1, 8.3.3.2 and 8.3.3.3 below. In the measurement control information i... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.1.2 Procedure | 1) The RF parameters for cell 1 are set up according to T1.
2) The UE is switched on
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4
4) The RF parameters for cell 2 are set up according to T1 and the SS configures a traffic channel
5) SS shall transmit a MEASUREMENT CONTRO... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.2 1,28 Mcps option | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4 for TDD conditions, and clause A1.2 of TS 51.010-1 [24] for the corresponding GSM conditions.
The test parameters are given in Table 8.3.4.1, 8.3.4.2 and 8.3.4.3 below. In the measurement control information i... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.2.2 Procedure | 1) The RF parameters for cell 1 are set up according to T1.
2) The UE is switched on
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4
4) The RF parameters for cell 2 are set up according to T1 and the SS configures a traffic channel
5) SS shall transmit a MEASUREMENT CONTRO... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.3 7,68 Mcps option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.3.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4 for TDD conditions, and clause A1.2 of TS 51.010-1 [23] for the corresponding GSM conditions.
The test parameters are given in Table 8.3.3.4.1B, 8.3.3.4.2B and 8.3.3.4.3B below. In the measurement control info... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.3.2 Procedure | 1) The RF parameters for cell 1 are set up according to T1.
2) The UE is switched on
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4
4) The RF parameters for cell 2 are set up according to T1 and the SS configures a traffic channel
5) SS shall transmit a MEASUREMENT CONTRO... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5 Test requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5.1 3,84 Mcps option | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5.2 1,28 Mcps option | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5.3 7,68 Mcps option | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4 Cell Re-selection in CELL_FACH | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1 Scenario 1: TDD/TDD cell re-selection single carrier case | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1.1 3,84 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send SYNCH-UL sequence in the UpPTS for sending the CELL UPDATE with cause value "cell reselection".
The requirements and this test apply to the 1,28 Mcps T... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1.3 7,68 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2.1 3,84 Mcps TDD option | The cell re-selection delay shall be less than 2.5 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.2 and A.5.4.1. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 1.6s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.3 and A.5.4.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2.3 7,68 Mcps TDD option | The cell re-selection delay shall be less than 2.5 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.4 and A.5.4.3. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.3 Test purpose | This test verifies that the UE meets the minimum requirement for the cell re-selection delay in CELL_FACH for the single carrier case |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.1 3,84 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.1.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.4.1.1.1, 8.3.4.1.1.2, 8.3.4.1.1.3, and 8.3.4.1.1.4.
Table 8.3.4.1.1.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.1.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for CELL UPD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.2.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.4.1.4.2.1, 8.3.4.1.4.2.2, 8.3.4.1.4.2.3, and 8.3.4.1.4.2.4.
Table 8.3.4.1.4.2.1: General test parameters for 1,28 Mcps Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
initial condition
Active ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.2.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclause s 7.3.3 and 7.4.2 to place the UE in CELL_FACH.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for SYNCH-U... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.3 7,68 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.3.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.4.1.4.3.1, 8.3.4.1.4.3.2, 8.3.4.1.4.3.3 and 8.3.4.1.4.3.4.
Table 8.3.4.1.4.3.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.3.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for CELL UPD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5.1 3,84 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 2.5 s.
3) In step g), the UE shall respond on cell 1 within 2.5 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5.2 1,28 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 1.6 s.
3) In step g), the UE shall respond on cell 1 within 1.6 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5.3 7,68 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 2.5 s.
3) In step g), the UE shall respond on cell 1 within 2.5 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2 Scenario 2: TDD/TDD cell re-selection multi carrier case | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1.1 3,84 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send SYNCH-UL sequence in the UpPTS for sending the CELL UPDATE with cause value "cell reselection".
The requirements and this test apply to the 1,28 Mcps TD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1.3 7,68 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2.1 3,84 Mcps TDD option | The cell re-selection delay shall be less than 3 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.2 and A.5.4.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 2 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.3 and A.5.4.2.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2.3 7,68 Mcps TDD option | The cell re-selection delay shall be less than 3 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.4 and A.5.4.3.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.3 Test purpose | This test verifies that the UE meets the requirement for the cell re-selection delay in CELL_FACH for the multi carrier case. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.1 3,84 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.1.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.4.2.1.1, 8.3.4.2.1.2, 8.3.4.2.1.3, and 8.3.4.2.1.4.
Table 8.3.4.2.1.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.1.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH. If the UE has failed to respond with the correct message within the allowed time, a failure... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.2.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.4.2.4.2.1, 8.3.4.2.4.2.2, 8.3.4.2.4.2.3, and 8.3.4.2.4.2.4.
Table 8.3.4.2.4.2.1: General test parameters for 1,28Mcps Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
initial condition
Active cell
Cell1
Neig... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.2.2 Procedure | The SS activates cell 1-2 with T1 defined parameters;
a) The UE switched on.
b) A RRC connection is set up according the generic set-up procedure specified in TS 34.108[3] clause 7.3.3 and 7.4.2 to place UE in CELL_FACH state;
c) After 15s the parameters changed to those defined for T2;
d) If the UE responds on cell 2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.3 7,68 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.3.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.4.2.4.3.1, 8.3.4.2.4.3.2, 8.3.4.2.4.3.3, and 8.3.4.2.4.3.4.
Table 8.3.4.2.4.3.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cel... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.3.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH. If the UE has failed to respond with the correct message within the allowed time, a failure... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5.1 3,84 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 3 s.
3) In step g), the UE shall respond on cell 2 within 3 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5.2 1,28 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 2 s.
3) In step g), the UE shall respond on cell 2 within 2 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5.3 7,68 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 3 s.
3) In step g), the UE shall respond on cell 2 within 3 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3 Scenario 3: TDD/GSM cell re-selection | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a better ranked cell, and starts to send CHANNEL REQUEST message to perform a Location update to the new cell.
This test is for the case where the UE camps on a 1,28 Mcps TDD ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1.3 7,68 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 5530ms + TBCCH,
NOTE: The cell re-selection delay can be expressed as:
where
: The maximum time allowed to read BCCH data from GSM cell, 1.9s.
: The additional delay caused by the random access procedure, 10ms.
Specified in TS 25.123, here it is 5000ms
: 480ms
This gives ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2.3 7,68 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.3 Test purpose | This test verifies that the UE meets the minimum requirement for the inter-RAT cell re-selection delay in CELL_FACH state. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.2.1 Initial conditions | This scenario implies the presence of one 1.28 Mcps TDD serving cell, and one GSM cell to be re-selected. Test parameters are given in Tables 8.3.4.3.4.1, 8.3.4.3.4.2, 8.3.4.3.4.3, 8.3.4.3.4.4, 8.3.4.3.4.5.
The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304. Cell 1 a... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.3 7,68 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.5 Test Requirements |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.