hash
stringlengths
32
32
doc_id
stringlengths
7
13
section
stringlengths
3
121
content
stringlengths
0
2.2M
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5 Test Purposes (TP)
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.1 Introduction
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.1.1 TP definition conventions
The TP definition is built according to ETSI EG 202 798 [i.1].
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.1.2 TP Identifier naming conventions
The identifier of the TP is built according to table 2. Table 2: TP naming convention Identifier: TP/<root>/<gr>/<x>/<nn> or TP/<root>/<gr>/<x>/<nn>-<v> <root> = root DEN <gr> = group MSGF Message transmission - Message format EVGN Message transmission - Event Generation EVUP Message transmission - Event Update EVTR Me...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.1.3 Rules for the behaviour description
The description of the TP is built according to ETSI EG 202 798 [i.1]. ETSI EN 302 637-3 [1] does not use the finite state machine concept. As consequence, the test purposes use a generic "Initial State" that corresponds to a state where the IUT is ready for starting the test execution. Furthermore, the IUT shall be le...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.1.4 Sources of TP definitions
All TPs have been specified according to ETSI EN 302 637-3 [1].
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.1.5 Mnemonics for PICS reference
To avoid an update of all TPs when the PICS document is changed, table 3 introduce mnemonics name and the correspondence with the real PICS item number. The PICS item column refers to tables and items of ETSI TS 102 869-1 [2]. The 'PICS item' as defined in ETSI TS 102 869-1 [2] shall be used to determine the test appli...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2 Test purposes for DEN
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1 Message Transmission
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.1 Message Format
TP Id TP/DEN/ MSGF/BV-01 Test objective Check that protocolVersion is set to 2 and messageID is set to 1 Reference ETSI EN 302 637-3 [1], clause B.1 PICS Selection PICS_DENM_GENERATION Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { when { the IUT receives an AppDENM_Tr...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.2 Event Generation
TP Id TP/DEN/EVGN/BV-01 Test objective Check that DEN Basic Service generates a new DENM on reception of a valid AppDENM_Trigger request Reference ETSI EN 302 637-3 [1], clause 6.1.2.1 PICS Selection PICS_DENM_GENERATION Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { w...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.3 Event Update
TP Id TP/DEN/EVUP/BV-01 Test objective Check that DEN Basic Service generates an update DENM on reception of a valid AppDENM_update request Reference ETSI EN 302 637-3 [1], clause 6.1.2.2 PICS Selection PICS_DENM_UPDATE Initial conditions with { the IUT being in the "initial state" and the IUT having generated an event...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.4 Event Termination
TP Id TP/DEN/EVTR/BV-01 Test objective Check that DEN Basic Service generates a cancellation DENM when application indicates the premature termination of an event for which it is the originator Reference ETSI EN 302 637-3 [1], clauses 6.1.2.4 and 8.2.1.3 PICS Selection PICS_DENM_CANCELLATION Initial conditions with { t...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.5 Message Repetition
TP Id TP/DEN/EVRP/TI-01 Test objective Check that DEN Basic Service repeats DENM transmission according to repetitionInterval parameter provided by application Reference ETSI EN 302 637-3 [1], clauses 6.1.2.3, 8.2.2 and 5.4.1.2 PICS Selection PICS_DENM_REPETITION Initial conditions with { the IUT being in the "initial ...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.6 Lower-layer parameters
TP Id TP/DEN/PAR/BV-01 Test objective Check that DENM is encapsulated in BTP type B packet Reference ETSI EN 302 637-3 [1], clause 5.4.2.2 PICS Selection PICS_DENM_GENERATION Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { when { a DENM is generated } then { the IUT sen...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.1.7 Service specific permissions
TP Id TP/DEN/SSP/BV-01-X Test objective Check that IUT does not send a DENM if it is not permitted by signing certificate Reference ETSI EN 302 637-3 [1], clause 8.4.2 and CR#0002 for ETSI EN 302 637-3 [1] ("Type of ServiceSpecificPermissions in the DENM standard") (see note). PICS Selection PICS_DENM_GENERATION AND PI...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.2 Message Reception
TP Id TP/DEN/MSRV/BV-01 Test objective Check that receiving ITS-S transmits DENM to application if it concerns an unknown ActionID and if it is not a termination DENM Reference ETSI EN 302 637-3 [1], clause 8.4.2 PICS Selection PICS_DENM_RECEPTION Initial conditions with { the IUT being in the "initial state" having se...
bcd93705ec6b9b66f71d4375393cf241
102 869-2
5.2.3 Keep-Alive Forwarding
TP Id TP/DEN/KAFW/BV-01 Test objective Check that forwarding ITS-S forwards DENM if no DENM with same ActionId has been received during forwarding delay Reference ETSI EN 302 637-3 [1], clause 8.3.3 PICS Selection PICS_DENM_KAF Initial conditions with { the IUT being in the "initial state" and the IUT having received a...
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
1 Scope
The present document provides the Protocol Implementation Conformance Statement (PICS) pro forma for Conformance test specification for Decentralized Environmental Notification Basic Service (DEN) as defined in ETSI EN 302 637-3 [1] in compliance with the relevant requirements and in accordance with the relevant guidan...
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
2 References
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
2.1 Normative references
References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the referenced document (including any amendments) applies. Referenced documents which a...
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
2.2 Informative references
References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the referenced document (including any amendments) applies. NOTE: While any hyperlinks i...
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
3 Definition of terms, symbols and abbreviations
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
3.1 Terms
For the purposes of the present document, the terms given in ETSI EN 302 637-3 [1], ISO/IEC 9646-1 [i.1] and ISO/IEC 9646-7 [i.2] apply.
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
3.2 Symbols
Void. ETSI ETSI TS 102 869-1 V1.6.1 (2020-04) 6
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
3.3 Abbreviations
For the purposes of the present document, the abbreviations given in ETSI EN 302 637-3 [1] and the following apply: CAN Controller Area Network DE Data Element DEN Decentralized Environmental Notification Basic Service DENM DEN Message ITS Intelligent Transportation Systems IUT Implementation Under Test PICS Protocol I...
48f266f6f5c2b41838424eae9bc5ed5b
102 869-1
4 Conformance requirement concerning PICS
If it claims to conform to the present document, the actual PICS pro forma to be filled in by a supplier shall be technically equivalent to the text of the PICS pro forma given in annex A, and shall preserve the numbering, naming and ordering of the pro forma items. A PICS which conforms to the present document shall b...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
1 Scope
The present document describes the specification for a high performance External Power Supply Unit for powering the Customer Premises Equipment to a maximum voltage rating of 12 V dc. The specifications define the input, output characteristics and performance requirements for a switching mode AC to DC CPS rated to a ma...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
2 References
References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the reference document (including any amendments) applies. Referenced documents which ar...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
2.1 Normative references
The following referenced documents are necessary for the application of the present document. [1] Commission Regulation (EC) No 278/2009 of 6 April 2009 implementing Directive 2005/32/EC of the European Parliament and of the Council with regard to ecodesign requirements for no-load condition electric power consumption ...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
2.2 Informative references
The following referenced documents are not necessary for the application of the present document but they assist the user with regard to a particular subject area. [i.1] ETSI ES 202 874-1 (V1.1.1): "Access, Terminals, Transmission and Multiplexing (ATTM); External Common Power Supply for Customer Premises Network and A...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
3 Definitions and abbreviations
8c6d66486a40b6ec40941e9760a00f02
102 874-5
3.1 Definitions
For the purposes of the present document, the following terms and definitions apply: Customer Network (CN): in-house network composed by home gateway, end devices, network segments (physical wired or wireless connections between customer network elements), home network infrastructure devices such as network adapters (p...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
3.2 Abbreviations
For the purposes of the present document, the following abbreviations apply: ABS Acrylonitrile Butadiene Styrene AC Alternating Current CE Commission Europeans CND Customer Network Device CNG Customer Network Gateway CPE Customer Premises Equipment CPN Customer Premises Network CPS Common Power Supply DC Direct current...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4 Electrical Specifications
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.1 Input Requirements
The CPS shall be designed to meet the requirements and limits given in table 2. Table 2: Input voltage and frequency Normal Voltages (Vac) Voltage Variation Range (Vac) Normal Frequency (Hz) Frequency Variation Range (Hz) 100 to 240 90 to 264 50 to 60 47 to 63 The AC input current shall not exceed 1,5 A, when operated ...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.2 Output Requirement
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.2.1 Output Voltage, Current And Ripple
Table 3: Output voltage, current and ripple Input normal voltage (Vac) Output Nominal Voltage (V dc) Output Regulation Minimum Load (A) Maximum Load (A) Maximum ripple (mVp-p) Output power (W) 100 to 240 12 ±5 % 0,0 5,0 120 60 NOTE 1: Output voltages shall be measured at the output connector. NOTE 2: Measurements shall...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.2.2 Short Circuit Protection And Over Current Protection
The CPS shall be protected from damage of a short circuit at the output or too high output current, irrespective of the duration of the existence of the fault and shall auto-recover when the fault is removed. The CPS shall not activate the over current protection at start up, while the output is connected to a 2 200 μF...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.2.3 Output Over Voltage Protection
When 12 V output voltage reaches to its over - voltage protection trigger point the CPS shall be shutdown and output voltage shall not exceed 16 V Max. This include Control Loop failure. Output Polarity PIN# Output Level 1 RTN(-) 2 +12 V Figure 1: Output polarity
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3 Performance Requirement
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.1 Efficiency
The power supply shall comply with the European Commission Regulation No 278/2009 [1]. That means: • No-load conditions shall not exceed 0,3 W. • The CPS shall provide an efficiency of at least 87 %, measured as the average of the efficiencies at 25 %, 50 %, 75 % and 100% of the rated load. In addition, the CPS must pr...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.2 Turn On Delay Time
The CPS shall switch on in less than 2 s at maximum load and both 110 Vac/60 Hz and 220 Vac/50 Hz inputs. The measurement shall be made from the start of the input voltage, up to the moment the rated output voltage has been reached.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.3 Hold-up Time
The hold-up time shall be a minimum of 10 ms at maximum load and both 110 Vac/60 Hz and 220 Vac/50 Hz. The measurement shall be made following AC voltage interrupt from the moment at which the input current ceases, to the moment the output voltage drops below the rated voltage minus 5 %.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.4 Brown-out and recovery
Figure 2: Input voltage brown-out and recovery CPS must have clean ON/OFF and OFF/ON transition, maintaining the compliance to specification and without any permanent damage after the application of different voltages as described in figure 2. Input voltage will be reduced from 90 V to 0 Vac in 30 s, then immediately i...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.5 Dynamic Load
The CPS must be capable of a higher output current than the rated output current during a time interval as given below: • High Load: 250 %/30 ms of the rated load. • Low Load: 100 %/1 s of the rated load. • Slew Rate: 0,1 A/μs.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.6 Max Open Circuit Voltage
When the circuit of over voltage protection is invalidated, the output voltage must be 16 V maximum.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.7 Overshoot at turn on/Turn off
The overshoot at turn on and turn off shall not exceed 10 % of the nominal voltage value. time - s Vac 90 or 200 0 0 40 30 70 ETSI ETSI TS 102 874-5 V1.2.1 (2012-03) 15
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.8 Output transient response/Transient load slew
With an input voltage, output load, ambient temperature and slew rate as given below, the undershoot or overshoot of output shall be not less than 5 % of the output voltage. • Input voltage: 90 V ~ 264 Vac/47 ~ 63Hz. • Output Load: 20 % to 80 %, 80 % to 20 %. • Ambient temperature: 25 ºC ± 3 ºC. • Slew rate: 1,0 A/μs. ...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
4.3.9 Rise time
Rise time shall be less than 50 ms when measured from 10 % to 90 % of the output voltage at normal input voltage. 5 Operational, Storage and Transportation Requirements
8c6d66486a40b6ec40941e9760a00f02
102 874-5
5.1 Temperature And Humidity
The CPS shall be able to operate in the following environmental conditions: • Temperature: 5 °C to +40 °C. • Relative humidity: 5 % to 95 %. This corresponds to Class 3.1 "Temperature-controlled locations" of EN 300 019-1-3 [16]. The CPS shall be withstand the storage conditions defined in EN 300 019-1-1 [15].and relat...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
6 EMC, safety and Environmental requirements
8c6d66486a40b6ec40941e9760a00f02
102 874-5
6.1 Product EMC
As this CPS is intended to be used for Information Technology Equipment (ITE), they should be tested with the associated telecommunication equipment according to the following EMC standards for ITEs: • CISPR 22 [3], or EN 55022 [2], for the emission requirements. • CISPR 24 [28], or EN 55024 [23] for the immunity requi...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
6.2 Product Safety
The power supply must meet the requirements of IEC 60950-1 [29] or EN 60950-1 [10] and equivalent safety standards for use in information technology equipment.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
6.3 Environmental and Eco-Design Requirements
The following Ecodesign rules must be applied when manufacturing the CPS: • The external case of the CPS shall be manufactured using recyclable plastic. • The external case of the CPS should be manufactured using at least 50 % recycled plastic (preferred choice: ABS). The cables of the CPS should be manufactured using ...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
7 Reliability
8c6d66486a40b6ec40941e9760a00f02
102 874-5
7.1 Burn-in
All power supplies shall be burned-in for 2 hours under nominal input and 70 % ~ 80 % load at an ambient temperature of 40 ºC.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
7.2 MTBF Calculation
The MTBF, Mean-Time-Between-Failures, shall be calculated and reported for each quality class offered. The provisional model adopted is referring to the "bathtub curve" defining the behaviour of the failure rate as function of the time. While in the first part of the useful life the failure rate is higher, then it decr...
8c6d66486a40b6ec40941e9760a00f02
102 874-5
8 Mechanical Specification
8c6d66486a40b6ec40941e9760a00f02
102 874-5
8.1 AC plug
The 230 Vac plug must form part of the main housing of the CPS or be part of a fixed cord of the main housing of the CPS. The AC plug of the CPS shall comply with EN 50075 [11], but without the cord.
8c6d66486a40b6ec40941e9760a00f02
102 874-5
8.2 DC cord
The DC cord must comply with the data below with typical cord length of 2 meters. NOTE 1: Cable: UL 2 468 style: 80 ºC, 300 V, 2 conductors. NOTE 2: Plug: Ø 6,5 x 3,0 x 9,5 mm (tuning fork cannelure entire insulation) black. Figure 3: DC cord
8c6d66486a40b6ec40941e9760a00f02
102 874-5
8.3 Label specification
The CPS shall be affixed with a label, with appropriate wording in the language specific for the intended country for deployment, stating the CPS compliance with the appropriate European regulations. ETSI ETSI TS 102 874-5 V1.2.1 (2012-03) 18 Annex A (informative): Details on Test Procedures This annex is containing no...
36247635b8c5eeca328c2e0ad519307c
102 868-2
1 Scope
The present document provides the Test Suite Structure and Test Purposes (TSS & TP) for Cooperative Awareness Basic Service (CA) as defined in ETSI TS 103 900 [1] in compliance with the relevant requirements and in accordance with the relevant guidance given in ISO/IEC 9646-7 [i.4]. The ISO standards for the methodolog...
36247635b8c5eeca328c2e0ad519307c
102 868-2
2 References
36247635b8c5eeca328c2e0ad519307c
102 868-2
2.1 Normative references
References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the referenced document (including any amendments) applies. Referenced documents which a...
36247635b8c5eeca328c2e0ad519307c
102 868-2
2.2 Informative references
References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the referenced document (including any amendments) applies. NOTE: While any hyperlinks i...
36247635b8c5eeca328c2e0ad519307c
102 868-2
3 Definition of terms, symbols and abbreviations
36247635b8c5eeca328c2e0ad519307c
102 868-2
3.1 Terms
For the purposes of the present document, the terms given in ETSI TS 103 900 [1], ISO/IEC 9646-1 [i.2] and ISO/IEC 9646-7 [i.4] apply.
36247635b8c5eeca328c2e0ad519307c
102 868-2
3.2 Symbols
Void.
36247635b8c5eeca328c2e0ad519307c
102 868-2
3.3 Abbreviations
For the purposes of the present document, the following abbreviations apply: ACC Adaptive Cruise Control ATS Abstract Test Suite BTP Basic Transport Protocol BTP-B Basic Transport Protocol Type B BV Valid test events for Behaviour tests CA Cooperative Awareness CAM Cooperative Awareness Messages FMT Message Format GFQ ...
36247635b8c5eeca328c2e0ad519307c
102 868-2
4 Test Suite Structure (TSS)
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.1 Structure for CA tests
Table 1 shows the CA Test Suite Structure (TSS) including its sub-groups defined for conformance testing. Table 1: TSS for CA Root Group Sub-Group Category CAM Message Dissemination Message format Valid Information adaptation Valid Generation frequency Valid and Timer Lower-layer parameters Valid Message processing Val...
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.2 Test groups
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.2.1 Introduction
The test suite has a total of four levels. The first level is the root. The second level separates the root into various functional areas. The third level is the sub-functional areas if necessary. The fourth level is the standard ISO conformance test categories.
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.2.2 Root
The root identify the Co-operative Awareness Basic Service (CA) given in ETSI TS 103 900 [1].
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.2.3 Groups
This level contains two functional areas identified as: • Message Dissemination • Message Processing
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.2.4 Sub-Groups
This level contains four sub-functional areas identified only for the Message Dissemination group and defined as: • Message format • Information adaptation • Generation frequency • Lower-layer parameters
36247635b8c5eeca328c2e0ad519307c
102 868-2
4.2.5 Categories
This level contains the standard ISO conformance test categories limited to the behaviour valid event and Timer. ETSI ETSI TS 102 868-2 V2.1.1 (2025-07) 8
36247635b8c5eeca328c2e0ad519307c
102 868-2
5 Test Purposes (TP)
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.1 Introduction
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.1.1 TP definition conventions
The TP definition is built according to ETSI EG 202 798 [i.1].
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.1.2 TP Identifier naming conventions
The identifier of the TP is built according to table 2. Table 2: TP naming convention TP/<root>/<gr>/<sgr>/<x>/<nn> or TP/<root>/<gr>/<x>/<nn> or TP/<root>/<gr>/<x>/<nn>-<v> Abbreviation Description <root> = root CAM Cooperative Awareness Message <gr> = group MSD Message Dissemination MSP Message Processing <sgr> =sub-...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.1.3 Rules for the behaviour description
The description of the TP is built according to ETSI EG 202 798 [i.1]. The base standards are not using finite state machine concept. As a consequence, the test purposes use a generic "Initial State" that corresponds to a state where the IUT is ready for starting the test execution. Furthermore, the IUT shall be left i...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.1.4 Sources of TP definitions
All TPs have been specified according to ETSI TS 103 900 [1].
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.1.5 Mnemonics for PICS reference
To avoid an update of all TPs when the PICS document is changed, table 3 introduces mnemonics name and the correspondence with the real PICS item number. The 'PICS item' column refers to tables and items of ETSI TS 102 868-1 [3]. The 'PICS item' as defined in ETSI TS 102 868-1 [3] shall be used to determine the test ap...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2 Test purposes for CA
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.0 Radio communication support
In all the clauses below, if neither PICS_G5_RADIO_COMM nor PICS_CV2X_RADIO_COMM is indicated, the test purpose shall apply for both ITS-G5 and LTE-V2X.
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1 Message dissemination
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.1 Message format
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.1.1 Message format for CAMv1
TP Id TP/CAM/MSD/FMT/BV-01 Test objective Check that protocolVersion is set to 2 and messageID is set to 2 Reference ETSI TS 103 900 [1], Annex B PICS Selection PICS_CAM_GENERATION AND NOT PICS_IS_IUT_SECURED Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { when { a CAM ...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.1.2 Message format for CAMv2
TP Id TP/CAM/MSD/FMT/BV-06 Test objective Check that VeryLowFrequency container is included in the second CAM since CA basic service activation Reference ETSI TS 103 900 [1], clause 6.1.3 PICS Selection PICS_CAM_GENERATION AND NOT PIC_RSU AND PICS_EXTENSIONSCONTAINER AND PICS_RELEASE2 Initial conditions with { the IUT ...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.2 Information adaptation
TP Id TP/CAM/MSD/INA/BV-01-X Test objective Check that latest value of in-vehicle data is included in CAM Reference ETSI TS 103 900 [1], clause 5.2 and clause 7.1 PICS Selection PICS_CAM_GENERATION AND NOT PIC_RSU Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { when { t...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.3 Generation frequency
TP Id TP/CAM/MSD/GFQ/TI-01 Test objective Check that CAMs are not generated more frequently than T_GenCamMin Reference ETSI TS 103 900 [1], clause 6.1.3 PICS Selection PICS_CAM_GENERATION AND NOT PIC_RSU AND NOT PICS_CV2X_RADIO_COMM Initial conditions with { the IUT being in the "initial state" } Expected behaviour ens...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.4 Lower-layer parameters
TP Id TP/CAM/MSD/PAR/BV-01 Test objective Check that CAM is encapsulated in BTP type B packet Reference ETSI TS 103 900 [1], clause 5.3.4.1 PICS Selection PICS_CAM_GENERATION AND NOT PICS_IS_IUT_SECURED Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { when { a CAM is gen...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.5 Service specific permissions
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.5.1 Service specific permissions for CAMv1
TP Id TP/CAM/MSD/SSP/BO-01-X Test objective Check that the IUT does not send a CAMv1 when its content is not permitted by signing certificate Reference ETSI TS 103 900 [1], clause 6.2.2.1 PICS Selection PICS_CAM_GENERATION AND PICS_IS_IUT_SECURED AND PICS_X Initial conditions with { the IUT being in the "initial state"...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.1.5.2 Service specific permissions for CAMv2
TP Id TP/CAM/MSD/SSP/BO-02-X Test objective Check that the IUT does not send a CAMv2 when its content is not permitted by signing certificate Reference ETSI TS 103 900 [1], clause 6.2.2.1 PICS Selection PICS_CAM_GENERATION AND PICS_IS_IUT_SECURED AND PICS_EXTENSIONSCONTAINER AND PICS_RELEASE2 Initial conditions with { ...
36247635b8c5eeca328c2e0ad519307c
102 868-2
5.2.2 Message processing
TP Id TP/CAM/MSP/BV-01 Test objective Check that content of received CAM is transmitted to applications and other facilities Reference ETSI TS 103 900 [1], clause 4.4 PICS Selection PICS_CAM_RECEPTION Initial conditions with { the IUT being in the "initial state" } Expected behaviour ensure that { when { the IUT receiv...
2bb8f9d34677b9df6f11faf6ccfbb4b8
102 868-1
1 Scope
The present document provides the Protocol Implementation Conformance Statement (PICS) pro forma for Conformance test specification for Cooperative Awareness Basic Service (CA) as defined in ETSI TS 103 900 [1] in compliance with the relevant requirements and in accordance with the relevant guidance given in ISO/IEC 96...
2bb8f9d34677b9df6f11faf6ccfbb4b8
102 868-1
2 References