paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
100,812,486 | 2009-02-18 | 4,306,463,937 | [] | [
2153877437,
2097845211,
2122122381,
2080620159
] | The creation and maintenance of a healthy surface mining environment require advanced research initiatives for developing powered excavation and haulage technologies. The shovel-truck system is widely used in surface mining due to flexibility, economics and maintainability. Advances in technology have resulted in large... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Intelligent Machine Monitoring and Sensing for Safe Surface Mining Operations |
2,994,457,823 | 2019-12-01 | 64,301,127 | [] | [
2093625674,
1518671722,
4210978293,
2153504150,
4205649593,
1986252415
] | Mineral processing plants generally have narrow tolerances for the grades of their input raw materials, so stockpiles are often maintained to reduce material variance and ensure consistency. However, designing stockpiles has often proven difficult when the input material consists of multiple sub-materials that have dif... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dimensioning a stockpile operation using principal component analysis |
2,228,201,729 | 2013-01-01 | null | [] | [
2069527243,
2170493813,
4376595430
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A contribution to open pit hard coal mine waste rock management : comparing sidehill fill with layered dumping |
4,311,620,474 | 2022-12-05 | 48,643,595 | [
2024060531,
1918344999,
2020999234,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2005615253,
2060929952,
2053920929,
2068546981,
1918344999,
2160763688,
1988115241,
2046010791,
1985080107,
2162145193,
2150593711,
1569990960,
2043345585,
2130796978,
2032331699,
2040870580,
2151675709,
20209992... | Consumption rates of reagents and consumables are typically accounted for in mine production scheduling by simple cost adjustment factors per rock type or mining block, ignoring geological uncertainty, blending, and geometallurgical information. To overcome these limitations, this article first creates empirical geomet... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Utilisation of geometallurgical predictions of processing plant reagents and consumables for production scheduling under uncertainty |
4,236,545,124 | 2013-12-01 | 4,363,607,809 | [
2122203560,
2083259944,
2131116400
] | [
2019291268,
2134675596,
2124289529,
4300580367,
2021595410,
2312970899,
2095769364,
2166117654,
2018044188,
1536615069,
2031279008,
2798344481,
2073262880,
2021472931,
2122203560,
2083259944,
1995285162,
1990275757,
2912522929,
4205210034,
2085300404,
2118578357,
20463967... | A robust simulation-based optimization approach is proposed for truck-shovel systems in surface coal mines to maximize the expected value of revenue obtained from customer trains. To this end, a large surface coal mine in North America is considered as case study, and a highly detailed simulation model of that mine is ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Simulation-based robust optimization for complex truck-shovel systems in surface coal mines |
3,169,385,843 | 2021-06-01 | 38,407,038 | [] | [
4251391716
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Remote sensing image-based mountain land vegetation cover and professional English vocabulary translation |
4,311,106,767 | 2022-12-02 | 198,098,182 | [
2122054842
] | [
2337392266,
2141429008,
4242811155,
2096305430,
2169528473,
1988367613,
2121745948,
2112930335,
2113286054,
2025460523,
2021061679,
2122054842,
2151675709,
1424654272,
2127988032,
1969483458,
1968651586,
2100276679,
2103120971,
2141088850,
2165726932,
2137092694,
19793178... | Unmanned driving technology has always been one focus of mine smart transportation, which is a crucial component of smart mines. However, the descriptions of both the intelligent transportation system and its industrial application are not comprehensive. In order to have an all-encompassing and comprehensive understand... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research Status and Development Trend of Unmanned Driving Technology in Coal Mine Transportation |
2,100,769,519 | 2012-06-01 | 125,775,545 | [
1551276924,
2160763688,
1496852045,
2043345585,
1979015826,
2130796978,
1534941005,
2068546981,
2126895748
] | [
2053920929,
2126895748,
2068546981,
1972121892,
2160763688,
3217061993,
2090359754,
1496852045,
1534941005,
2126258480,
2043345585,
1979015826,
2130796978,
2128208761,
2169528473,
1551276924,
2151675709
] | For the purpose of production scheduling, open-pit mines are discretized into three-dimensional arrays known as block models. Production scheduling consists of deciding which blocks should be extracted, when they should be extracted, and what to do with the blocks once they are extracted. Blocks that are close to the s... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A New Algorithm for the Open-Pit Mine Production Scheduling Problem |
2,949,904,219 | 2018-07-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization of Longwall Parameters in Underground Mining of Thick Methane-Bearing Coal Seam in the Sokolovo Deposit in Kuzbass |
2,619,994,649 | 2017-05-01 | 75,069,817 | [] | [
1978430273,
2008078821,
2158921004,
2122910156,
2145996143,
1914622032,
2051143952,
2046861842,
2073138260,
2152686358,
2086952121,
2127854299
] | Every type of bio-resource has its specific and multi-tier applications. To promote resource efficiency and complete use of bio–resources the simplistic and environmentally less valuable options must be replaced with technological solutions that contribute to the development of high added value products, while ensuring... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimization Methodology for Complete Use of Bio-resources |
2,808,466,042 | 2019-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Time-dependent failure of open stopes at Target Mine |
1,512,163,329 | 2004-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Fuzzy Model for Truck Allocation in Surface Mines |
162,695,185 | 2009-01-01 | null | [
2053920929
] | [
2053920929,
1972121892,
2151675709,
2798344481
] | A lack of suitable software tools capable of providing optimised underground mine production schedules has resulted in the use of manual processes that are time consuming without guaranteeing optimal solutions in meeting operational objectives. Multiple phases to the scheduling process generally involves generating a m... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A New Short-Term Production Scheduling and Machine Allocation Model Using Mixed Interger Programming for Application in Sublevel Stope Mining Operations |
1,972,121,892 | 2007-03-01 | 103,321,696 | [
1551276924,
2043345585,
2126895748
] | [
2126895748,
2090359754,
2043345585,
2128208761,
1551276924
] | The problem of annual production scheduling in surface mining consists of determining an optimal sequence of extracting the mineralized material from the ground. The main objective of the optimization process is usually to maximize the total Net Present Value of the operation. Production scheduling is typically a mixed... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The new Fundamental Tree Algorithm for production scheduling of open pit mines |
2,374,658,573 | 2003-01-01 | 2,764,455,408 | [] | [] | The least economic oil reserves is an important criterion in oil exploration. The field that reserves less than least economic oil reserves is of no value for exploration and exploitation. This paper introduces the theory basis to set least economic oil reserves, the major factors influencing least economic oil reserve... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | LEAST ECONOMIC OIL RESERVES MODEL BASED ON BREAK EVEN METHOD |
105,166,764 | 2015-01-01 | 4,210,215,724 | [
2151675709
] | [
2094039233,
2053920929,
2096305430,
2049176600,
2151675709
] | ARENA simulation software as one of the most comprehensive tools of discrete event simulation modeling has been used in this research for evaluation of the transportation system of the Sungun copper mine. Its user friendly environment makes it easy for the users to construct a representative model of complex systems an... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of ARENA Simulation Software for Evaluation of Open Pit Mining Transportation Systems – A Case Study |
2,195,290,171 | 2015-08-01 | 75,069,817 | [
2140170679
] | [
2130796978,
2010334716,
2140170679
] | The truck dispatching problem in open-pit mines is formulated into an integer programming problem in order to optimally determine the trip numbers of trucks from a shovel (dump site) to a dump site (shovel). The dispatching result aims to answer the question of where should a truck go so that the production target is a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Integer Programming Approach for Truck-Shovel Dispatching Problem in Open-Pit Mines |
2,038,526,998 | 2013-09-01 | 4,306,418,265 | [] | [] | In this paper, we provide the requirements and analysis for the selection of adequate communication infrastructure in managing Remote Monitoring and Diagnostics (RMD) applications in Open Pit Mine (OPM) environments. We have surveyed several different real world mine environments in order to obtain common physical char... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Communication architecture for Remote Monitoring and Diagnostics in Open Pit Mine |
2,182,100,585 | 2006-01-01 | null | [
3217061993
] | [
3217061993
] | There are few algorithms, developed for optimisatio n of ultimate stope limits. These are either heuris tic or rigorous. The rigorous algorithms such as the appli cation of the branch and bound technique and dynamic programming approach do not apply on 3D problems. Heuristic algorithms such as floating stope of Datam i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THE MVN MULTIPLE PASS ALGORITHM FOR OPTIMISATION OF |
2,022,326,149 | 2009-05-01 | 13,144,211 | [] | [] | Cut-off grade for ore drawing is a kind of technological method used to control the process of drawing in sublevel caving with no sill pillar. The cut-off grade for ore drawing means the grade of ore in the last time (current time) of ore drawing. Grade of crude ore is the grade of ore entering the milling workshop aft... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Theory and method of genetic-neural optimizing cut-off grade and grade of crude ore |
2,186,497,123 | 2014-01-01 | null | [] | [
1639032689
] | The cut-off grade is one of the important parameters of mining production. Different material cut-off grade is directed to different destinations. Based on reasonable and optimal cut-off grade, long term mining plan and investment decision analysis can be made for mining managers. In view of multiple metal open-pit, th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Optimization and Application of Cut-off Grades of Multiple Metal Open-pit Mines Based on Equivalent Grade |
2,528,316,319 | 2016-08-01 | 4,306,418,583 | [
2077937117
] | [
1985013794,
2108227458,
2053451460,
2114915621,
1968209099,
2111003787,
2134374287,
1990131025,
2067126321,
2168234067,
2012708277,
2031725528,
2164199163,
2077937117
] | To reduce greenhouse gas emissions and cut the operation cost of large mining trucks, this paper presents a technical feasibility and economic benefit analysis on a hybrid electric mining truck under real world operation cycles. The hybrid electric propulsion system of a typical Diesel-Electric mining haul truck has be... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Performance modeling and cost-benefit analysis of hybrid electric mining trucks |
2,105,409,039 | 2002-11-08 | 4,306,418,636 | [] | [] | This paper reviews how the effective implementation of AC drive systems on mining excavators (shovels and draglines) and haul trucks has led to dramatic increases in productivity. The review focuses on the major factors that influence productivity: production rate; reliability; maintenance cost; power grid compatibilit... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Increased productivity with AC drives for mining excavators and haul trucks |
3,091,073,998 | 2021-05-01 | 33,323,087 | [
1551276924,
2065332058
] | [
1972121892,
2149454052,
2126895748,
2046010791,
2160763688,
1985080107,
1534941005,
2163428398,
2100769519,
2185734033,
1979015826,
2130796978,
2065332058,
1551276924
] | In 1964, Kenneth Lane proposed an algorithm to optimize the production schedule of a single-metal, single-processor open pit mine. For this, he proposed a policy based on varying, over time, the so-called “cutoff grade”—or grade threshold used to determine if extracted material should be ore (processed material) or was... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Lane’s Algorithm Revisited |
3,001,257,770 | 2013-07-31 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | CSMine USER’S GUIDE |
2,947,590,267 | 2019-01-01 | 4,306,523,586 | [] | [
2160763688,
2053920929,
1534941005,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Investment Feasibility Analysis of a Coal Project Related to Improvement Production Capacity |
843,841,003 | 2012-01-01 | null | [] | [] | Large opencast coal mines require a complex infrastructure to fulfill production demand and quality values. The distinct specifications required by each customer are achieved by blending adjustments. There is limited control in variability. With only partial information available, operation controllers blend coal by em... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Measurement of the effectiveness of a decision support system for blending control of large scale coal mines |
2,467,239,625 | 2013-01-01 | null | [] | [] | The electric power price in mining countries such as Australia and South Africa has increased significantly in the past fi ve years and is likely to continue to increase in the foreseeable future. ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ventilation Requirement for ‘Electric’ Underground Hard Rock Mines – A Conceptual Study |
2,029,114,144 | 2007-03-01 | 48,643,595 | [
1534941005
] | [
2126895748,
2032121576,
3217061993,
1534941005,
1551276924
] | The objective in any mining operation is to exploit ore at the lowest possible cost with the prospect of maximizing profits. The planning of an open pit mine is an economic exercise, constrained by certain geological, operating, technological and local field factors. Heuristic methods, economic parametric analysis, ope... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling open pit dynamics using discrete simulation |
4,200,121,158 | 2021-12-03 | 4,210,237,802 | [
1969483356,
2146612430,
1496852045,
2160763688,
2046010791,
1972121892,
1569990960,
1979015826,
2130796978,
2094566145,
2185734033
] | [
1979675141,
1835720201,
2041550349,
1964919311,
2118465040,
2149230623,
1990485541,
2083259944,
2140095548,
2020999234,
1571403844,
2161160262,
1496852045,
2157164625,
1969483356,
2088238688,
4249513058,
2032411249,
2024060531,
2036475510,
1595159159,
2089525884,
20163651... | This paper proposes the use of multi-stage stochastic programming with recourse for optimised strategic open-pit mine planning. The key innovations are, firstly, that a branching tree of geostatistical simulations is developed to take account of uncertainty in ore grades, and secondly, scenario reduction techniques are... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Constructing Branching Trees of Geostatistical Simulations |
1,991,756,499 | 2013-06-01 | 72,171,858 | [
1985080107,
1534941005
] | [
3217061993,
2020999234,
1985080107,
1534941005
] | AbstractThis paper examines the case of a large open pit that is being planned at the site of an existing underground mine. Strategic planning work is undertaken to investigate the project value associated with an expansion of underground operations in conjunction with the proposed pit. Previous analysis by mine planne... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising combined open pit and underground strategic plan |
2,042,726,802 | 2014-08-27 | 72,171,858 | [
1985080107,
1969483356,
2126258480,
2060929952,
2151065060,
2077791698,
4365787967
] | [
2059757952,
2094566145,
2132984323,
2126895748,
3125246470,
3145128584,
3124770064,
3125975571,
1988520084,
1602773783,
2155482907,
2060929952,
1972121892,
59771946,
1985080107,
2126258480,
2043345585,
2126831543,
1586335931,
4365787967,
2020999234,
3123821384,
1995565517... | Mining operations are highly affected by risk, commodity price and geology being acknowledged as the most relevant risk factors. Considering these uncertainties at an early stage is a key element of project success, and doing so by including annual re-evaluations of a project allows for a more realistic approach. A rea... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Joint effect of commodity price and geological uncertainty over the life of mine and ultimate pit limit |
2,479,674,004 | 2004-09-01 | 110,258,470 | [] | [] | Mechanisation of mining operations is not a new concept in the world of mining. Machinery has been developed, manufactured and used for many decades in massive orebodies and coal mines, both locally and abroad. Because of their size and the huge tonnages available, massive orebodies lend themselves very easily to mecha... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Presidential address: The mechanisation of UG2 mining in the Bushveld complex |
4,226,102,113 | 2022-01-02 | 4,210,219,240 | [
2043345585,
1979015826,
1534941005
] | [
2060929952,
2020999234,
1972121892,
1493454437,
2068546981,
2046010791,
2160763688,
3217061993,
1534941005,
2043345585,
1979015826,
2024060531,
2130796978,
1551276924
] | The primary purpose of oil sands mine planning and waste management is to provide ore from the mine pit to the processing plant while containing the tailings in an efficient manner in-pit. Incorporating waste management in the mine plan is essential to maximize the economic potential of the mineral reserve and minimize... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A stochastic mixed integer linear programming framework for oil sands mine planning and waste management in the presence of grade uncertainty |
2,121,643,694 | 2009-12-13 | 4,306,421,180 | [
1512342490
] | [
1554663460,
4211007335,
2066695980,
2119436275,
2124776405,
2133321814,
2066149784,
1512342490,
2140481308
] | As a result of the current economic crisis, which led to metal prices fall, mining company managers have been encouraged to cut costs. Thus, improvement projects to reduce cost has become major interest in the Mongolian mining industry. Mining projects are subject to high risk because of their size, uncertainty, comple... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using simulation analysis for mining project risk management |
2,802,772,052 | 2020-03-01 | 173,256,270 | [
2065332058,
2128208761,
2126895748
] | [
2126895748,
1979015826,
1484040084,
2060929952,
1972121892,
2068546981,
2046010791,
2160763688,
1985080107,
2163428398,
2043345585,
2130796978,
2020999234,
2090359754,
1496852045,
1534941005,
2065332058,
1537810918,
3217061993,
2100769519,
2024060531,
2128208761,
15512769... | The design of pushbacks is essential to long-term open pit mine scheduling because it partitions the pit space into individual units, controlling ore and waste production. In this paper, a new model is proposed for the pushback selection procedure, which consists of characterizing the potential pushbacks based on the c... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new model for automated pushback selection |
2,893,504,437 | 2018-01-01 | 4,210,186,093 | [] | [] | The article presents the stages of technology development and methodology of subsoil development in the postwar years to the modern period, taking into account the transition from planned to market economy. The necessity of new methodological approaches to solving the problems of subsoil development based on the princi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The study of transient processes – a new direction in the development of a methodological approach to the solution of problems of complex development of georesources. |
2,507,148,398 | 2016-08-23 | 139,857,051 | [
2160763688,
2046010791,
1979015826,
2065332058
] | [
2126895748,
1979015826,
2021595410,
2006912660,
2169528473,
1988622494,
2053920929,
1972121892,
2116661285,
2068546981,
2046010791,
2160763688,
2000983337,
2163428398,
2126258480,
2043345585,
2130796978,
2151675709,
1496852045,
1534941005,
2106334424,
2065332058,
14934544... | This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as ‘blocks’, to be extracted in each week ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Short-term scheduling of an open-pit mine with multiple objectives |
2,103,739,427 | 2006-01-01 | null | [
3217061993
] | [
3217061993
] | There are few algorithms, developed for optimisatio n of ultimate stope limits. These are either heuris tic or rigorous. The rigorous algorithms such as the appli cation of the branch and bound technique and dynamic programming approach do not apply on 3D problems. Heuristic algorithms such as floating stope of Datam i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THE MVN MULTIPLE PASS ALGORITHM FOR OPTIMISATION OF STOPE BOUNDARIES |
171,956,918 | 2001-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Assessment of embankment parameters |
119,398,058 | 2007-12-14 | null | [] | [] | Power line communication (PLC) has been available since October 2006 in Japan. Because no investigation has been done on transmission characteristics of PLC when using surge protective devices (SPDs), we examined PLC transmission performances using SPDs such as varistors and gas discharge tubes (GDTs) or a combination ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Influence on transmission characteristics of power line communication when using surge protective devices |
4,386,487,856 | 2023-01-01 | 106,296,714 | [
2160763688,
2167159964,
2065332058
] | [
1497256448,
2094566145,
1969397762,
2893162497,
2126895748,
2107974152,
2020320008,
2097048331,
2123934092,
2074483086,
2185734033,
1979015826,
2090972948,
2169528473,
2167159964,
2017990047,
2090838176,
2060929952,
2053920929,
2158550687,
1972121892,
2116661285,
20685469... | The logistical complication of long-term mine planning involves deciding the sequential extraction of materials from the mine pit and their subsequent processing steps based on geological, geometrical, and resource constraints. The net present value (NPV) of profit over the mine’s lifespan usually forms the sole object... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Carbon-Aware Mine Planning with a Novel Multi-objective Framework |
2,940,773,100 | 2019-01-01 | 107,246,200 | [] | [] | Fully-mobile in-pit crushing and conveying systems have different pit shape requirements to traditional truck haulage systems due to linear bench and flat floor constraints imposed by conveyor systems. As the shape of a pit is largely based on the ultimate pit limit, it is desirable to have the additional shape require... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ultimate pit limit determination for fully mobile in-pit crushing and conveying systems |
2,004,730,722 | 2012-02-01 | 67,425,620 | [] | [] | The harm of coal dust under mining coal is really serious, so how to effectively control it has always been a tough problem. This paper analyzes the cause of creating dust over the coal face, and introduces the application of dust intelligent control in detail based on the reality situation of coal mining. Though the a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Research on Intelligent Control of the Dust in Coal Mining |
2,597,653,457 | 2016-01-01 | 4,210,195,746 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Approaches Towards the Valuation of Mineral Deposits |
3,148,002,031 | 2020-07-30 | 4,210,178,371 | [] | [] | Rare earth elements (REEs) are valuable and strategically important in many high-technology areas, such as laser technology, pharmacy and metallurgy. The main methods of REE recovery are precipitation, extraction and sorption, in particular ion exchange using various sorbents, which allow to perform selective recovery ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sorption of rare earth coordination compounds |
2,494,137,053 | 2002-01-01 | 4,306,463,973 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Westray mine disaster |
3,142,905,072 | 2009-01-01 | 4,306,555,669 | [] | [] | 商品价格由于全球金融危机严厉地下跌了。这不利地影响了一些采矿工程的生存能力,包括导致为一些公司的破产的可能性。这些价格下降反映与采矿工程联系的无常和风险。在最近的年里,许多工作与真实选择定价理论的应用程序有关被出版了响应长期的金融无常和风险珍视 life-of-mine 计划。然而,有无常和风险,与中等 / 短期的采矿操作联系。真实选择理论能也被用于包含无常和风险的战术的决定。这份报纸将在采矿工业调查真实选择的应用程序并且介绍在 Queensland 的大学开发的方法论,澳大利亚,为把真实选择集成到中等 / 短期的矿计划并且生产安排。案例研究将表明方法论的有效性和实用性,技术发展。 | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integration of real options into short-term mine planning and production scheduling |
1,015,399,900 | 2001-01-01 | 4,306,511,618 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Maszyny podstawowe górnictwa odkrywkowego i podejmowane przedsięwzięcia w ich modernizacji i budowie |
4,288,782,889 | 2022-01-01 | null | [] | [] | State-owned utility company that is efficient and green should be the common goal that every country should achieve. In 2020, Perusahaan Listrik Negara (PLN), the state-owned utility, stated their vision to become a lean, green, customer-oriented, and innovative company. However, challenges still lie ahead. The power a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Renewable Energy and Privatization |
2,802,928,036 | 2016-09-06 | 4,210,208,726 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | HARDWARE ELECTRICAL SAFETY PROBLEMS WITH OPERATION OF ELECTROTECHNICAL COMPLEXES WITH REGULATED ELECTRIC DRIVES IN MINING AREA DISTRIBUTION NETWORKS UP TO 1200V |
2,191,189,786 | 2015-12-31 | null | [
2171646358,
2140481308
] | [
2094566145,
2000715618,
4210300258,
1988729251,
2105934661,
1985080107,
2171646358,
1512342490,
2140481308,
2009104157,
1969483356
] | multiple excavators producing multiple products of raw materials are highly complex and exhibit strong interdependencies between constituents. A network of conveyor belts is used for transportation of the extracted materials to different waste dumps or the coal stockpile. Optimal decision-making in short-term planning ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The effect of geological uncertainty on achieving short-term targets: A quantitative approach using Stochastic process simulation |
1,560,855,843 | 2011-01-01 | 4,306,511,618 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Wielkość systemu koparki-wywrotki a wzrastajaca wielkość wyrobiska stożkowego - analiza wstępna |
1,597,128,867 | 2011-01-01 | 12,999,175 | [
3023540311,
1551276924,
1497256448,
2341171179
] | [
1497256448,
1480376833,
2126895748,
2615190415,
2097941400,
2118371226,
2136558239,
2093233187,
2116661285,
2013858742,
2106476087,
3085162807,
2912565176,
2138960193,
2020999234,
2145479420,
1632601927,
1534941005,
1978228947,
3023540311,
1659842140,
4293775970,
20900698... | Determination of cut-off grade strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, environmental, social and political issues in relation to mining operation. Choosing the optimum cut-off grade strategy (C... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of Open Pit Mining Cut-Off Grade Strategy Using Combination of Nonlinear Programming and Genetic Algorithm |
2,987,282,725 | 2019-11-13 | 4,210,195,883 | [] | [
2130796978,
2100769519
] | The purpose of this paper is to analyse the application of fully mobile plants for raw peat crushing, mixing and separating of wood inclusions and for mechanical dewatering in peat open-pit mines to increase the efficiency of mining. In-Pit Crushing and Conveying Systems (IPCC) which characterized by their economic eff... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A potential application of in-pit crushing-conveying and dewatering system in peat mining |
3,217,015,133 | 2021-01-01 | 4,210,186,093 | [] | [
2094566145,
1918344999,
2160763688,
1985080107,
2896416816,
2185734033,
1969483356
] | The paper gives the analysis of the volume of transportation of bulk mineral cargoes by water transport. It is established that the problem of the use of technological processes for sorting non-metallic building materials and coals transported by water transport is relevant. It is revealed that in the applied beneficia... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Increase in the efficiency of water transport of bulk mineral cargo by the segregation of feedstock at the initial technological stage |
2,587,379,575 | 2016-05-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Applications of point cloud technology in geomechanical characterization, analysis and predictive modeling |
4,319,439,802 | 2019-03-05 | null | [] | [
2126895748,
1976122053,
2160763688,
1985080107,
2041085006,
2140170679,
2078286011,
2060852319
] | In-Pit Crushing and Conveying (IPCC) systems are known as a transportation system in mines, which are considered as an alternative for the conventional truck-shovel system. Among different types of IPCCs, Semi Mobile In-Pit Crushing and Conveying (SIMIPCC) system is in a high interest in mining projects because of its ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Scheduling of the location and relocatin of a semi mobile in pit crushing and conveying (SMIPCC) system in mines |
2,031,363,390 | 2014-04-28 | 2,764,510,598 | [
3217061993,
2128208761,
2126895748
] | [
2126895748,
3217061993,
2090359754,
2128208761,
1551276924
] | Open-pit mining is a surface mining operation whereby ore, or waste, is excavated from the surface of the land. The open-pit design problem is deciding on which blocks of an ore deposit to mine in ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A DUALITY-BASED DERIVATION OF THE MAXIMUM FLOW FORMULATION OF THE OPEN-PIT DESIGN PROBLEM |
4,225,155,386 | 2022-04-29 | null | [] | [] | The interlayer bonding treatment technique has an important effect on the performance of double-layer drainage asphalt pavement. Based on the layer-by-layer paving technology, this paper studies the interlayer bonding treatment technology of double-layer drainage asphalt pavement. By changing the specimen preparation t... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Study on interlayer bonding treatment technology of double-layer drainage asphalt pavement |
2,000,956,498 | 2009-03-01 | 72,171,858 | [
1972121892,
1534941005
] | [
1972121892,
2126895748,
3217061993,
1534941005,
2043345585,
1551276924
] | Strategic mine planning is the process of determining the configuration that will optimise project objectives. Current methods for ensuring that objectives are optimised, for a given project configuration, contain a number of limitations. In particular, the strategic mine planning process for a given configuration is o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open pit optimisation – modelling time and opportunity costs |
3,120,771,085 | 2021-10-01 | 103,321,696 | [
2147507583,
2024742034,
1569990960,
2052611179,
2094566145
] | [
2059757952,
2094566145,
2019291268,
1647779468,
2140742285,
2118465040,
2185734033,
2024742034,
1979015826,
2038345112,
2103002522,
2031279008,
1972121892,
2068546981,
4249667877,
1918344999,
2160763688,
1985080107,
1569990960,
2126258480,
2130796978,
4205210034,
21311674... | Underground mine schedules seek to determine start dates for activities related to the extraction of ore, often with an objective of maximizing net present value; constraints enforce geotechnical precedence between activities, and restrict resource consumption on a per-time-period basis, e.g., development footage and e... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Underground mine scheduling under uncertainty |
2,782,648,910 | 2017-12-01 | 2,764,661,512 | [
2101834443,
2151675709
] | [
2101834443,
2151675709
] | The economic growth of a region is strongly influenced by the smooth flow of traffic. The movement of freight by highway in Manado leads to the problem of traffic jams. To solve the congestion, it is necessary to know the traffic characteristics and the pattern of the origin of the destination. Through a curbside surve... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | ANALYSIS OF TRAFFIC CHARACTERISTICS AND GOODS TRANSPORT IN MANADO, INDONESIA |
599,644,942 | 2015-06-20 | 115,925,768 | [
2160763688
] | [
2053920929,
1972121892,
2068546981,
2126895748,
2160763688,
2313274380,
1496852045,
1534941005,
2126258480,
1979015826,
2130796978,
2169528473,
2151675709
] | A gradient-constrained discounted Steiner tree T is a maximum Net Present Value (NPV) tree, spanning a given set N of nodes in space with edges whose gradients are all no more than an upper bound m which is the maximum gradient. The nodes in T but not in N are referred to as discounted Steiner points. Such a tree has c... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Gradient-constrained discounted Steiner trees I: optimal tree configurations |
4,317,877,504 | 2023-01-24 | 4,210,174,504 | [
2160763688,
2123709218
] | [
1480414464,
2055056256,
2126895748,
1979015826,
2736219668,
2169528473,
2083943805,
2060929952,
2053920929,
2123709218,
1972121892,
2756283300,
2068546981,
2160763688,
1484474409,
1985080107,
2126258480,
1569990960,
2130796978,
2140993969,
2112959280,
2140170679,
20953088... | Objetivo: Desarrollar estrategias de planificación minera en el Perú para mejorar los niveles de competitividad y productividad en los siguientes términos: Explotación de recursos con baja ley, obtención de un mayor beneficio económico del sector minero, cumplir los programas de producción para satisfacer la demanda in... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Planeamiento estratégico para la mejora de productividad y competitividad de la minería subterránea en el Perú |
2,342,049,094 | 2016-04-01 | 2,505,686,813 | [] | [
2164502819,
2032132842,
2129911003,
2152123134,
1975780735
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Effect of copper slag recovery on hydrometallurgical cut-off grades considering environmental aspects |
3,194,207,558 | 2021-12-01 | 194,185,345 | [
2738900493,
2000715618
] | [
2169245194,
2738900493,
2091346452,
1999091229,
2116661285,
2106622011,
1977177161,
2164598857,
2155482699,
2067291211,
1496852045,
2002251854,
2007535697,
4234698323,
2493990996,
2163592787,
2121935962,
1969483356,
2902644322,
1484545635,
1981106795,
2337981553,
21044429... | This paper aims at exploring the relationship between production factors, ore grades, and life of mine for forecasting mining capital cost (MCC) for open pit mining projects. Accordingly, the relationship between annual mine and mill production (MineAP, MillAP), stripping ratio (SR), reserve mean grade (RMG), the life ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Exploring the relation between production factors, ore grades, and life of mine for forecasting mining capital cost through a novel cascade forward neural network-based salp swarm optimization model |
2,130,251,291 | 2008-01-01 | null | [
3217061993,
1972121892,
2130796978,
1534941005,
2090359754,
2036112575,
2126895748
] | [
2126895748,
2089269509,
2024742034,
2038345112,
2100440346,
2106622621,
1972121892,
4249667877,
2611147814,
2067462952,
2144946856,
2044560939,
1992710140,
2162508334,
2043345585,
2130796978,
2912522929,
2131167412,
1733489975,
2610857016,
2088304441,
2036112575,
16326019... | Since the initial application of mathematical optimisation methods to mine planning in 1965, the Lerchs-Grossmann algorithm for computing the ultimate pit limit, operations researchers have worked on a variety of challenging problems in the area of open pit mining. This thesis focuses on the open pit mining production ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Solving Large-scale Open Pit Mining Production Scheduling Problems by Integer Programming |
4,324,137,501 | 2023-01-23 | null | [
2767346351
] | [
2029608738,
2033800551,
1977367431,
2070665593,
2111619626,
2038194220,
1981616524,
2507578125,
2767346351,
2114296561,
2131646073,
2044049559,
1560042744,
3123115705,
2074898106,
2058401212,
2169239645
] | IoT has gained a massive prevalence in the last decade. Various businesses are leveraging IoT Applications for industrial and commercial use cases. IoT also presents use cases in research and academia. However, setting up IoT Systems is complex due to the distributed and multi-disciplinary nature of IoT Systems. As a d... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | IoT Cloud Systems: A Survey |
2,315,277,585 | 2012-01-01 | 91,284,046 | [] | [] | The trend in drives for dump trucks used in the mining industry is shifting from mechanical drives toward electric drives because of the increasing efficiency of mining operations. Therefore, we developed an AC drive system for 190-ton-payload mining dump trucks. A hill start is one of the important abilities required ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Method for Controlling Large Torque in the Low-Speed Range of Electrically Driven Mining Dump Trucks |
2,011,127,227 | 2011-05-01 | 206,834,481 | [
1551276924,
1493454437,
2130796978,
1534941005
] | [
1972121892,
1493454437,
2126895748,
3217061993,
1534941005,
2043345585,
2130796978,
1551276924
] | One of the main obstacles in using mixed integer linear programming (MILP) formulations for large-scale open pit production scheduling is the size of the problem. The objective of this work is to develop, implement, and verify deterministic MILP formulations for long-term large-scale open pit production scheduling prob... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mixed integer linear programming formulations for open pit production scheduling |
1,635,027,408 | 2015-01-01 | 4,210,204,610 | [] | [
2126895748,
1992176519,
2147555471,
3088713371,
2140481308,
2133837084,
1972121892,
2160763688,
2130796978,
2134955829,
2129763896,
2151675709,
2113746882,
2076452041,
1979486410,
1534941005,
2093772112,
2041280856,
4211007335,
2066368882,
2024060531,
2082622325
] | Son 30-40 yilda yoneylem arastirmasi hemen hemen pek cok disiplinde genis uygulama alanina sahip bir bilim dali haline gelmistir. Ozellikle II. Dunya Savasi sirasinda Ingiliz askeri birimlerinin karsilastigi bazi problemlerin cozumu icin gelistirilen ve ilerleyen yillarda Yoneylem Arastirmasi Teknikleri olarak isimlend... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Usage of Operational Research for Engineering Applications as an Interdisciplinary Approach |
1,882,789,699 | 2008-01-01 | 17,930,613 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Value creation through strategic mine planning and cutoff-grade optimization |
2,770,024,524 | 2017-11-21 | 2,737,336,974 | [
2053920929,
2151675709,
2169528473
] | [
2160626949,
2050248078,
2169528473,
2058361114,
2053920929,
2798344481,
2124178852,
2008196645,
1918344999,
2160763688,
2127578024,
2136050606,
2140170679,
2151675709,
1981934656,
1969483458,
2020407132,
2146881125,
2024085737,
2164029929,
2082622325,
2170239483
] | A Bluetooth beacon-based underground navigation system (BBUNS) was developed to identify the optimal haul road in an underground mine, track the locations of dump trucks, and display this information on mobile devices. A three-dimensional (3-D) geographic information system (GIS) database of the haul roads in an underg... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | BBUNS: Bluetooth Beacon-Based Underground Navigation System to Support Mine Haulage Operations |
4,242,788,216 | 2013-12-21 | 4,306,463,937 | [] | [] | The estimation of mineral resources is an important task for geoscientists and mining engineers. The approaches to this challenge have evolved over the last 40 years. This book presents an overview of established current practice. The book is intended for advanced undergraduate students or professionals just starting o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Introduction |
2,086,962,145 | 2013-06-01 | 48,643,595 | [
2130796978,
1534941005,
2068546981
] | [
1972121892,
2068546981,
2032121576,
3217061993,
1534941005,
2130796978
] | In an earlier study, the authors introduced the new algorithm that allows for a definition of open pit limits taking into consideration time value of money. This study presents further expansion of this algorithm that allows determining the optimum mining sequence and optimum width of pushbacks, in a manner that maximi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising open pit mine scheduling taking into consideration time value of money and mining restrictions |
2,383,622,512 | 2011-01-01 | 2,765,068,731 | [] | [] | This paper analyzes the exploration and development of China's mineral resources in recent ten years,selects ore-finding potential,exploration investment,drilling quantity,exploration rights trading and newly-found minerals to study the situation of geological exploration,and discusses the developing trend of developme... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | SITUATION AND APPROACHES TO EXPLORATION AND DEVELOPMENT OF CHINA'S MINERAL RESOURCES |
2,276,186,328 | 2014-01-01 | 2,764,472,783 | [] | [
3217061993,
1551276924
] | Long-term planning in the mining industry has one main goal: maximizing the value that is realized by excavation and processing of mineral resources. When designing the open pits, determining the stages of development the mining operations, (eng. Pushback) is one of the important factors in the process of long-term pro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Effect of stage development of mining operations on maximization the net present value in long-term planning of open pits |
2,794,649,180 | 2018-01-01 | 2,738,126,797 | [] | [
2160830391
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THE METHODS OF REACTIVE POWER COMPENSATION IN THE 25 kV, 50 Hz CONTACT NETWORK |
2,413,209,952 | 2015-09-01 | 12,999,175 | [] | [
3217061993
] | Abstract In this study, transition from open pit to block caving has been considered as a challenging problem. For this purpose, the linear integer programing code of Matlab was initially developed on the basis of the binary integer model proposed by Bakhtavar et al (2012). Then a program based on graphical user interf... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Op-Ug TD Optimizer Tool Based on Matlab Code to Find Transition Depth From Open Pit to Block Caving / Narzędzie Optymalizacyjne Oparte O Kod Matlab Wykorzystane Do Określania Głębokości Przejściowej Od Wydobycia Odkrywkowego Do Wybierania Komorami |
2,981,118,931 | 2007-02-27 | null | [] | [] | Esta dissertacao de mestrado intitulada Aplicacao de algoritmos geneticos na determinacao de cava final e sequenciamento de lavra em minas a ceu aberto sumariza o programa de trabalho a ser submetido ao Curso de Pos Graduacao em Engenharia de Metalurgica e de Minas (CPGEM UFMG) em conformidade com os requisitos para di... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Aplicação de algoritmos genéticos na determinação de cava final e sequenciamento de lavra em minas a céu aberto |
96,674,380 | 2013-01-01 | null | [] | [] | This work objectify the implementation of conveyor belt to mine iron ore. The mining operating costs of Vale have a tendency to increase in coming years. This increase is related to the rising price of labor, fuel, tires, maintenance costs and large transport distances. The environmental impacts should also be reduced.... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Estudo de viabilidade econômica para a implantação de correias transportadoras de Rom de minério de ferro : estudo de caso da Mina Fábrica em Congonhas, Estado de Minas Gerais. |
2,203,272,778 | 2000-06-01 | 17,930,613 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Bit geometry effects on failure characteristics of rock |
2,348,570,809 | 2001-01-01 | 2,765,015,236 | [] | [] | According to the task and purpose of the surface mine dispatching, and in order to realize the demand of automatic real time dispatching, conjoining the character of Shovel-Truck technical system, the article analyzes and designs the function structure of the dispatching system, and points out the key technology exploi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The Constitution of the Surface mine Truck Automatic Real Time Dispatching Optimal Decision-making System |
3,191,032,185 | 2021-08-02 | 48,643,595 | [
2053920929,
2151675709
] | [
2053920929,
4251616545,
2798344481,
2068546981,
2046010791,
2160763688,
1551276924,
3217061993,
1496852045,
1534941005,
1979015826,
2130796978,
2140170679,
1969483356,
2151675709,
2036422814
] | This paper deals with optimal decisions regarding truck and shovel scheduling problem in open-pit mines. A mixed-integer linear goal programming model (MILGP) is formulated for solving the problem, aiming at four major goals: (1) maximise production, (b) minimise deviations in head grade, (c) minimise deviations in ton... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A multi-objective model for fleet allocation schedule in open-pit mines considering the impact of prioritising objectives on transportation system performance |
2,978,523,901 | 2018-01-01 | 4,306,514,328 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Zintegrowany System Zarządzania Produkcją i Bezpieczeństwem SILESIA w kontekście nowych wyzwań związanych z ideą Przemysłu 4.0 |
639,543,397 | 2013-09-01 | null | [] | [
2149602337,
2075845155
] | An article published by Global Advanced Research Journal of Physical and Applied Sciences Vol. 2 (2) pp. 039-046, September, 2013 | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine water and the environment: a case study at Central African Gold Bibiani Limited, Ghana |
3,210,018,202 | 2021-01-01 | 4,210,186,093 | [
1985080107,
2053920929,
1979015826,
2151675709
] | [
2053920929,
2020999234,
2798344481,
1972121892,
2046010791,
2160763688,
3217061993,
2123696861,
1985080107,
1534941005,
2100769519,
2043345585,
1979015826,
2065332058,
1969483356,
2151675709
] | For effective planning of coal mining at coal mines, it is necessary to take into account the relationship between internal and external processes that occur from the moment of mining the coal to the moment of its sale to consumers. Internal processes are primarily determined by the coordination of operations for drill... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Planning of coal production taking into account the intensity of shipment and the capacity of transport routes |
2,154,462,916 | 2009-10-01 | 4,306,418,636 | [] | [
2149887014,
2154636565,
2111311558,
2160830391
] | A typical mining facility uses excavation machines like shovels, draglines etc. for removing overburden and ores during the mining process. These machines are characterized by cyclic loads consisting of high peak power demands as well as regenerative energy. The regenerated energy is as high as 60% of the peak motoring... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Regeneration Energy Management in AC Mining Drives for Providing Control Power |
4,295,837,684 | 2022-01-01 | 4,306,463,937 | [
1551276924,
2160763688,
2167159964,
2065332058
] | [
2094566145,
2126895748,
2107974152,
2020320008,
2074483086,
2185734033,
1979015826,
2090972948,
2169528473,
2167159964,
2060929952,
2053920929,
1972121892,
2756283300,
2122244604,
1918344999,
2160763688,
2116661285,
2068546981,
1985080107,
2046010791,
2163428398,
21262584... | Managing the flow of excavated materials from a mine pit and the subsequent processing steps is the logistical challenge in mining. Mine planning needs to consider various geometric and resource constraints while maximizing the net present value (NPV) of profits over a long horizon. This mine planning problem has been ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Carbon-Aware Planning Framework for Production Scheduling in Mining |
2,551,144,310 | 2016-01-01 | 4,210,237,427 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Challenges of Architectural Design in relation to Environment and Air Pollution. A Case study: Prishtina’s first public parking garage |
4,388,297,893 | 2023-11-03 | 48,643,595 | [] | [
2134159265,
1991925250,
2106044708,
2912800036,
2065788296,
2091538025,
1964919311,
1708432661,
2070665593
] | ABSTRACTThe mining sector is facing an immediate challenge to reduce its carbon emissions. The movement of material with mining truck fleets is a critical factor in reducing emissions. As the industry gradually replaces diesel trucks with more environmentally friendly transportation systems, it is important to analyse ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Productivity estimation of battery trolley mining truck fleets |
2,884,334,476 | 2014-01-01 | null | [
2140170679
] | [
2585206336,
2026368098,
1972121892,
2040381573,
2107305576,
1495048553,
2123696861,
2155482699,
2047476236,
2097279435,
2012231377,
2130796978,
2154636565,
2140170679,
2114479834,
2010334716,
2151675709
] | Assuring production forms a crucial part of mining business profitability. Factors related to various mine operations, activities and business processes can threaten required/planned mine productio ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine production index: Development and application |
3,090,019,514 | 2020-09-29 | 10,134,376 | [] | [
2053920929,
2164891879,
2160763688,
1534941005,
2136050606,
2334782222,
2130796978,
2082622325,
2096305430,
2140170679,
2128208761,
2169528473,
2020407132,
2151675709,
2079636926
] | This article is devoted to modelling of the extracted raw material removal from a mining area to the entry point for the next technological process. Two approaches were chosen for the process modelling. The first approach is regarded to traffic modelling by using available mathematical equations, based on capacity conv... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modelling as a Tool for the Planning of the Transport System Performance in the Conditions of a Raw Material Mining |
3,209,165,355 | 2021-11-01 | 4,210,208,616 | [] | [
2150238850,
2071554452,
2011821717,
3124536214,
1964941217,
2076057132,
2012753837,
2081547566,
2144197676,
2029485242,
2060953659,
2127624016,
1978399955,
2057012437,
1490541530,
3151685851,
2121001699,
1982218468,
2106096361,
2078293738,
2164391020,
2122912498,
21622443... | The market of software for automating the processes of mining enterprises is represented by foreign solutions, which increases the dependence of Kazakhstani enterprises on third-party developers. The marketing strategy for promoting the domestic software product focus on conquering the market segment and increasing com... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Web-service promotion of SaaS service for mining design |
2,804,591,257 | 2016-01-01 | null | [] | [
2165775468,
1972121892
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Block-Cave Extraction Level and Production Scheduling Optimization under Grade Uncertainty |
4,230,219,731 | 2001-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The New Programming Languages of IEC 61131-3 |
2,995,332,631 | 2019-12-12 | 12,647,387 | [
1551276924,
2160763688,
1534941005,
2126895748
] | [
2126895748,
1551360398,
1979015826,
1585160083,
2169528473,
2165299997,
2053920929,
1972121892,
2068546981,
2160763688,
2126258480,
2130796978,
2151675709,
2090359754,
1534941005,
2152195021,
1496852045,
3217061993,
2158814833,
4250589301,
2128208761,
1551276924
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimality conditions for the continuous model of the final open pit problem |
3,126,376,199 | 2020-12-11 | 4,306,418,784 | [] | [
2748717829,
2035206741
] | With the development of modern agricultural production technology, intelligent agricultural production has become the development trend of modern agricultural production. This paper designs a smart agricultural greenhouse control system that can collect, display and control the temperature, humidity and light environme... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Design and Experiment of Control System for Intelligent Agriculture based on Arduino |
3,096,920,996 | 2020-11-12 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Supply chain analytics in practice |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.