paper_id int64 391 4.39B | publication_date stringlengths 10 10 | journal_id int64 61.7k 4.39B ⌀ | final_level_0_links listlengths 0 1.06k | final_level_1_links listlengths 0 9.76k | abstract stringlengths 1 58k ⌀ | micro_cluster_id int32 1 4.52k | short_label stringlengths 3 47 | long_label stringlengths 23 102 | keywords stringlengths 84 335 | new_title stringlengths 0 18.2k |
|---|---|---|---|---|---|---|---|---|---|---|
1,788,294,596 | 2015-09-01 | 2,764,755,457 | [] | [
2060929952,
2094566145,
1972121892,
2126895748,
2090359754,
1985080107,
1496852045,
1534941005,
2043345585,
2130796978,
2128208761,
3138949179,
1969483356
] | Abstract An optimal layout or three-dimensional spatial distribution of stopes guarantees the maximum profitability over life span of an underground mining operation. Thus, stope optimization is one of the key areas in underground mine planning practice. However, the computational complexity in developing an optimal st... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Designing an optimal stope layout for underground mining based on a heuristic algorithm |
957,043,116 | 2006-01-01 | 4,306,524,771 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Zwałowiska na przedpolu - konkurencja dla metod tradycyjnych na przykładzie KWB "Konin" |
3,215,355,726 | 2021-01-01 | 4,306,499,340 | [] | [
2094566145,
2000715618,
2126895748,
2145479420,
2160763688,
2083259944,
1985080107,
2100769519,
2126258480,
2185734033,
1979015826,
2140170679,
2128208761,
1969483356,
2151675709
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comparative study of cut-off grade optimization methods in underground gold mining |
2,171,442,839 | 2010-01-01 | 2,764,958,728 | [] | [] | Applying the classic method of of soils Romanian system of soil evaluation the anthropic soils from mining quarries (sterile dumps) are considered to have almost the same productive potential with a natural soil as well as the marks. The goal of the present paper is to identify and adjust these indicators of the romani... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A new method of evaluating the anthropic soils from sterile dumps. |
2,996,040,918 | 2019-12-01 | 2,737,646,863 | [] | [
1503436739,
1968051268,
2033943395,
2008441192,
2913758505,
1791587663,
2168569455,
2342091124,
2034785598,
2611369375
] | The use of Campus Management Systems (CMSs) has increased dramatically in Pakistani universities, a huge amount of money has been invested in its development and deployment. The CMS provides an integrated platform for managing academic activities, controlling process flows and provide online access to related informati... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Survey on the Adaption of CMS in Pakistani Universities |
4,324,359,144 | 2023-03-15 | 4,210,205,812 | [] | [
2112315008,
2053920929,
2157289187,
2145339207,
1594031697,
2010221273,
2104237724,
2151675709
] | Mining is a crucial industry for our modern society, providing valuable resources that fuel our economies and drive technological progress [...] | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Recent Advances in Smart Mining Technology |
3,038,114,359 | 2020-06-15 | 4,210,227,656 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | COMPARATIVE ANALYSIS OF THE APPLICATION OF STEEP CONVEYOR LINES ON QUARRIES |
4,241,723,593 | 2000-09-01 | 28,359,369 | [] | [] | Mineral Resources EngineeringVol. 09, No. 03, pp. 301-311 (2000) No AccessPLANNING OF PRODUCTIVITY OF THE OPEN-PIT'S MINING-TRANSPORT SYSTEMSSEITGALY ZH. GALIYEV, DAULET SH. AKHMEDOV, and AIDARKHAN KH. JAXYBAYEVSEITGALY ZH. GALIYEVThe Scientific Centre "Mining Technology", Kazakhstan Search for more papers by this auth... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | PLANNING OF PRODUCTIVITY OF THE OPEN-PIT'S MINING-TRANSPORT SYSTEMS |
435,894,290 | 2016-01-02 | 72,171,858 | [
1985080107,
1969483356,
2009104157,
2105934661,
2000715618,
1988729251,
2094566145
] | [
2139004160,
2094566145,
2147119488,
2132355204,
2126895748,
2012052869,
1996707465,
2179860363,
2041109651,
2083846806,
2179584279,
2154929945,
2157098139,
2140481308,
2009104157,
2060929952,
2091019041,
1988729251,
1972121892,
2103720101,
2036029990,
2068546981,
21222035... | The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition, due to the uncertain nature of the knowledge about deposits and the inherent spatial distribution of material character... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sensor-based real-time resource model reconciliation for improved mine production control – a conceptual framework |
4,320,535,888 | 2023-03-01 | 4,210,178,226 | [
2060929952
] | [
2060929952,
2077791698,
2126258480,
2069527243
] | An economic feasibility study must consider the uncertainties inherent to a mining project, whose risks must be quantified properly to enable accurate decision-making. Studies previously carried out through the Discounted Cash Flow (DCF) methodology in the project evaluated here - a quarry whose operations are currentl... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic economic feasibility assessment and risk analysis of a quarry mine focusing on the Brazilian tax system |
2,077,727,403 | 2009-01-01 | 2,737,633,377 | [] | [] | Determination of Solid Particle Concentration at coal Transshipment siteCoal handling and grinding processes are associated with significant particulate matter emissions into the atmosphere. This problem is particularly urgent when a coal-processing company is located in or nearby a densely populated city. To quantitat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of Solid Particle Concentration at coal Transshipment site |
2,057,048,716 | 2012-01-01 | 67,425,620 | [] | [] | Faced with the difficult situation of the joint operation of open pit and underground mining in transition period in Shirengou Iron Mine, a suitable linear programming mathematical model of mining plan was established and synthesis optimization results were obtained, which would increase the overall economic effect of ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine |
2,091,421,600 | 2012-10-31 | 2,946,866,068 | [] | [] | 본 연구에서는 지반시추용 드릴비트의 설계를 검증하기 위해 유한요소 해석을 수행하였다. 드릴비트 해석결과와 실제 굴진시험장비의 실험결과와 비교하여 해석의 타당성을 검증하였다. 본 연구를 통해 드릴비트의 다양한 형상, 재료 물성치 선정을 위해 유한요소해석을 활용하여 실제 실험에 소요되는 시간 및 비용 절감이 가능할 것으로 기대된다. In this study, we carried out finite element analysis for drill bit design on ground boring. We verified analysis between drill bit ana... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Study on Penetration Performance of Bit Design Geometry |
3,127,642,075 | 2021-02-07 | 2,737,336,974 | [
1969483356,
2024060531,
1918344999,
2185734033
] | [
2094566145,
2126895748,
2543580944,
2185734033,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
2046010791,
2162145193,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2124629174,
2020999234,
2145479420,
1551276924,
1496852045,
1995565517,
15349410... | The simultaneous stochastic optimization of mining complexes optimizes various components of the related mineral value chain jointly while considering material supply (geological) uncertainty. As a result, the optimization process capitalizes on the synergies between the components of the system while not only quantify... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | An Application of Simultaneous Stochastic Optimization at a Large Open-Pit Gold Mining Complex under Supply Uncertainty |
3,040,724,209 | 2020-01-01 | 4,210,186,093 | [] | [
3020982786,
3124914565,
2117178635,
2047582865,
2136120210,
2107802909,
1995834279,
3123068586,
3021190191,
2113208252,
4236584637,
2019222975,
2104795328,
3125000257,
2010681793,
3121401171,
4248503640,
2028995298,
2108818539,
3124837614,
2123518587
] | The article provides a comparative analysis of discount rates for the largest companies in the mineral resources sector of Russia, which are calculated on the basis of statistical data from the US and Russian securities markets. Using the CAPM model (Capital Asset Pricing Model) for each selected company, various ruble... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of computed discount rates for the largest companies of the mineral resources sector of Russia |
4,383,618,661 | 2023-07-08 | 4,210,203,134 | [
2160763688
] | [
2094566145,
2126895748,
2185734033,
1979015826,
2169528473,
2053920929,
1972121892,
2068546981,
2122244604,
1978907431,
2160763688,
2126258480,
2043345585,
2130796978,
2151675709,
1496852045,
1534941005,
2065332058,
2000715618,
2100769519,
1551276924
] | Area mining is a surface mining method that allows for efficient mining and contemporaneous reclamation of tabular or bedded deposits, e.g., coal. Mine planning methods for area mines differ from those of open pit metal mines. Area mines in the Powder River Basin (PRB) use various processes for mine planning at both th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Review of Current Scheduling and Design Practices in the Powder River Basin |
1,985,087,428 | 2013-11-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Calculation procedure for permissible coal breakage face output by gas factor |
2,623,821,374 | 2017-06-07 | 48,643,595 | [
2140170679,
2152358062,
2160763688,
2053920929,
1979015826,
2151675709
] | [
2094566145,
2025878787,
2126895748,
1979015826,
2096305430,
2169528473,
2010334716,
2053920929,
2798344481,
1972121892,
2068546981,
2145493798,
1918344999,
2160763688,
2152358062,
2048769967,
2126258480,
2043345585,
2130796978,
2140170679,
2151675709,
1496852045,
15349410... | The objective of this paper is to review and document the mine fleet management systems’ models and algorithms. The purpose is to understand the algorithms behind the fleet management systems and the proposed academic solutions in this area to identify any gaps in the current literature and to open up opportunities to ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mining fleet management systems: a review of models and algorithms |
4,210,823,474 | 2006-12-09 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Interior-Point Methods for Nonlinear Programming |
2,913,043,742 | 2019-01-31 | 2,764,551,302 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Development of the Bozshakol and Aktogay copper ore deposits in Kazakhstan |
3,118,150,329 | 2020-12-23 | 4,210,181,906 | [] | [] | In this article, focus on the simulation of a three-phase perishable product inventory system of a SMEs selling fresh and processed milkfish. This research was conducted to simulate a perishable product inventory system to understand and analyze the problems that occur then propose solutions to fix them. The simulation... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Three-Phased Perishable Inventory Simulation Model with Quality Decrease Consideration |
3,211,844,717 | 2021-07-30 | null | [] | [] | The Ria home industry has experienced many problems in the production and management processes. In the production process, it has limitations in packaging. In addition, the business financial management aspect is still mixed with household finances. Marketing is done traditionally and has not been effective. This PKM p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Pendampingan Manajemen Pemasaran pada Industri Olahan Pertanian di Mojokerto |
1,957,557,923 | 2016-03-10 | 72,171,858 | [
1985080107,
1969483356,
2094566145
] | [
2060929952,
2094566145,
2020999234,
2126895748,
2068546981,
1972121892,
2160763688,
1551276924,
1985080107,
2313274380,
1534941005,
2043345585,
2024060531,
2108536179,
2140170679,
2128208761,
1969483356
] | A stochastic integer programming (SIP) model is presented to optimise long-term scheduling of underground mine operations while considering geological uncertainty. To integrate this uncertainty, a set of stochastic simulations is generated, corresponding to representations of the deposit, and is used as primary inputs ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Underground long-term mine production scheduling with integrated geological risk management |
4,312,950,612 | 2022-01-01 | 4,210,169,103 | [] | [
1982218468,
2078293738,
2144197676,
2012753837,
2081547566,
2127624016,
2065198673,
2065682001,
1978399955,
2162244340,
2071554452,
3124536214,
1490541530
] | Abstract The software market for computerization of modelling and design processes of mining enterprises is represented by American, Australian and Russian solutions, which increases the dependence of Kazakhstani enterprises on third-party developers. Kazakhstani cloud service, scalable according to selected solutions,... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Promotion of the EIA Subsystem of the 3D-Quarry Web Application |
2,808,704,290 | 2017-01-01 | 4,210,210,113 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Digitization of Polish mining industry by reducing costs and improving safety and quality of finished product |
2,906,201,164 | 2018-12-20 | 4,210,195,883 | [] | [] | In a metal mine, there was a great risk of mining hidden resources due to unreasonable mining in the early stage. In order to effectively and safely mine this part of the resources, with the displacement as the objective function, a preliminary optimal dynamic programming model for the mining sequence of the unstable c... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Numerical Optimization of Hidden Edge Stope Mining in Underground Metal Mines |
2,963,145,411 | 2019-05-22 | 4,306,463,075 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Parametric analysis of the optimal depth of an open-pit gold mine |
2,032,225,692 | 2010-03-01 | 72,171,858 | [] | [] | AbstractSome mining companies are investigating the use of road trains to increase productivity in underground mines. Road trains require dedicated passing bays in declines. The spacing of these passing bays can have a significant impact on haulage productivity. This technical note describes the use of simulation to fi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Passing bays in an underground mine |
2,062,810,534 | 2011-03-01 | 206,834,481 | [] | [
2060929952,
3123142049,
4210300258,
1972121892,
1537810918,
1551276924,
1995565517,
4229562638,
1534941005,
2155907120,
2126258480,
2077791698,
1971394868,
2496675188,
2123879611,
1574089532
] | The risk associated with a mining project comes from the uncertainties involved in the industry. Mining companies endeavouring to maximize their return for shareholders make important strategic decisions which take years or even decades to “play out”. However, many mining companies feel comfortable with point estimates... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Flexible open-pit mine design under uncertainty |
2,708,347,044 | 2017-06-20 | 4,306,402,512 | [
1551276924,
2098432798,
1496852045,
2160763688,
2341171179,
3125634603,
2126895748
] | [
2126895748,
1979015826,
2169528473,
2098432798,
2060929952,
2053920929,
1972121892,
2068546981,
2160763688,
3125634603,
2126258480,
2043345585,
2130796978,
2151675709,
2090359754,
1496852045,
1534941005,
3217061993,
2341171179,
4250589301,
2128208761,
1551276924
] | Within the mining discipline, mine planning is the component that studies how to transform the information about the ore resources into value for the owner. For open-pit mines, an optimal block scheduling maximizes the discounted value of the extracted blocks (period by period), called the net present value (NPV). Howe... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Adaptive Strategies for The Open-Pit Mine Optimal Scheduling Problem |
1,978,261,506 | 2009-11-01 | 206,834,481 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Outlook for the enhanced safety and improved efficiency of diamond deposit mining |
2,370,816,052 | 2013-01-01 | 2,764,513,735 | [] | [] | The model of articulated motor-wheeled vehicle is co-simulated with hydraulic steering mechanics and multi-body dynamics.The relationships between tires and the ground were proposed while the articulated vehicle turning at standstill.The structural parameters,such as center mass location and load of rear body,were disc... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Co-simulation Analysis of In-situ Steering Dynamics of Articulated Motor-driven Vehicle |
2,005,490,335 | 2015-03-01 | 2,764,755,457 | [] | [
2065198673,
2001973589,
2066218102
] | Transportation accounts for 80% of open-cut coal mine carbon emissions. With regard to the energy consumption and carbon emissions of transportation within an open-cut mine, this paper systematically compared the work and energy consumption of a truck and belt conveyor on a theoretical basis, and constructed a model to... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A comparison of the energy consumption and carbon emissions for different modes of transportation in open-cut coal mines |
3,046,047,107 | 2020-07-28 | 4,210,229,995 | [
2000715618,
2130796978
] | [
2094566145,
2126895748,
2185734033,
1979015826,
2154929945,
4300395170,
1972121892,
2068546981,
2122244604,
2046010791,
2160763688,
2043345585,
2130796978,
2140170679,
2151675709,
2090359754,
1496852045,
1534941005,
2054644951,
1995945562,
2065332058,
1969483356,
20007156... | Globalization of the energy feedstock market has led to the fact that, in recent decades, parameters of the thermal coal market significantly changed. Depletion of “rich” deposits implies development of new deposits of more complicated structure and characteristics. The paper proposes a new approach to managing quality... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Marketable Product Quality Management in Conditions of Coal Mining at a Deposit of Complicated Structure |
1,984,120,333 | 2010-12-01 | 2,764,647,083 | [] | [] | AbstractThe optimum plant capacity for a new mine is usually based on empirical studies or 'rules of thumb', subject to confirmation by detailed scheduling of the proposed mining operation. Historically the mining industry has a record of poor returns on investment and a high rate of project failure using these methods... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Setting plant capacity |
2,937,241,000 | 2019-03-19 | 4,210,185,376 | [] | [] | Kegiatan ini dilaksanakan di Kelurahan Bakalankrajan Kecamatan Sukun Kota Malang. Mitra dari kegiatan PKM ini adalah UKM tempe “Londho”. Masalah yang terjadi di mitra adalah usaha belum membuat standart prosedur produksi yang jelas. Sehingga terkadang kualitas tempe tidak terjaga. Kegiatan ini bertujuan meningkatkan ma... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Penguatan Aspek Manajemen Produksi dan Kualitas Tempe Pada UKM Tempe |
2,019,895,143 | 2014-04-01 | 140,455,145 | [
2160763688,
2053920929,
2151675709,
1534941005
] | [
2126895748,
1647779468,
1979015826,
2312970899,
2038345112,
2169528473,
2100440346,
2053920929,
2798344481,
1972121892,
2068546981,
4249667877,
2160763688,
2144946856,
2162508334,
2126258480,
2130796978,
4238714550,
2018957623,
2912565176,
2151675709,
2040678783,
42921580... | One of the challenging problems for surface mining operation optimization is choosing the optimal truck and loader fleet. We refer to this problem as the equipment selection problem (ESP). In this paper, we describe the ESP in the context of surface mining and discuss related problems and applications. Within the scope... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Equipment Selection for Surface Mining: A Review |
173,928,906 | 2006-01-01 | null | [] | [] | Short-term scheduling manages the quality and quantity of ore to be processed given operational and access constraints. To deliver the forecasted project performance it needs to track the long-term schedule, which defines the extraction sequence that maximises project value. The effect of grade uncertainty on project p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | MODELLING GEOLOGICAL UNCERTAINTY FOR STOCHASTIC SHORT-TERM PRODUCTION SCHEDULING IN OPEN PIT METAL MINES |
2,189,558,712 | 2011-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Modeling of Age Specific Fertility Rates of Jakarta in Indonesia: A Polynomial Model Approach |
3,026,113,159 | 2020-04-01 | 194,672,249 | [
1985080107,
1551276924,
2060929952,
1569990960
] | [
2060929952,
2020999234,
2126895748,
2024697317,
2160763688,
2090359754,
1985080107,
1569990960,
1979015826,
2024060531,
2140170679,
2128208761,
2065332058,
1551276924,
2151675709
] | Operational dilution in open-pit mining can influence short-term mine planning and affect the adherence between designed and executed plans, impacting the reconciliation results. This type of dilution may occur due to several reasons, such as erroneous assumptions regarding contacts, inefficient mining performance, and... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Accounting for operational dilution by incorporating geological uncertainties in short-term mine planning |
2,004,951,269 | 2004-01-01 | 46,124,462 | [
1639032689
] | [
1639032689
] | One of the most difficult problems in mining operation is how to determine optimum cutoff grades of ores at different periods over the lifespan of the mine that will maximize the net present value (NPV) of the mine. Maximizing the NPV of a mining operation, subject to different constraints is a non-linear programming p... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits |
2,890,881,651 | 2018-09-17 | 4,210,206,007 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A System for Diagnosis of Coronary Artery Disease based on Neural Networks and Machine Learning Algorithms |
2,996,226,918 | 2019-12-13 | 2,738,503,445 | [] | [
1974564128,
3121940608,
2132454116,
2126895748,
2160763688,
2126258480,
1995328083,
2144380346
] | Abstract Dynamic simulations are powerful tools, but only if they are developed using the correct methodology, and with information that has been verified. Mining houses rely on simulation to confirm that complex, integrated systems can achieve design capacity before investment decisions are made. Work conducted in the... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dynamic simulation of an opencast coal mine: a case study |
4,319,288,661 | 2023-02-06 | 10,134,376 | [
2160763688,
1918344999
] | [
2094566145,
1969397762,
3114113539,
2056621186,
2126895748,
2107974152,
2020320008,
2063353996,
3123282572,
2071863310,
1990021135,
1979015826,
2806569362,
2736219668,
2164703638,
2135526934,
2169528473,
2053147164,
2099670044,
2053920929,
2023596193,
2164284962,
19721218... | Nowadays, the mining industry actively advocates and practices the concept of green and integrated exploitation to realize the sustainable development of resources with low-carbon emissions. The certain carbon quota for mining companies limits the production capacity and resource utilization efficiency. The integrated ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production Strategy Optimization of Integrated Exploitation for Multiple Deposits Considering Carbon Quota |
4,386,337,557 | 2023-01-01 | 4,210,169,156 | [] | [
1543929008
] | The technological process of electricity production is designed for the known characteristics of coal, and the energy efficiency and economy of the production process depend on those coal characteristics. Coal of lower calorific value requires larger quantities for the technologically necessary amount of heat in the pr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Influence of Coal Mixing Process on the Performance of the Steam Boiler |
2,971,044,486 | 2019-09-01 | 2,765,010,971 | [
1985080107
] | [
2060929952,
2020999234,
1969397762,
2160763688,
1985080107,
1593163947,
1496852045,
1534941005,
2100769519,
2065198673,
2043345585,
2103348307,
1484040084,
2017190577,
2128208761,
2041757785,
1551276924
] | Abstract Some mines use shafts to outflow the material mined by surface methods aiming to reduce the average distance of haulage. However, this application is restricted due to the unavailability of a methodology devoted to integrating the underground structures with surface mining plans. This mismatch implies an inten... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Sequential glory hole approach as a new mining method for sustainable operations |
3,021,180,697 | 2020-10-01 | 2,764,958,490 | [
2140481308,
2151675709
] | [
2343601797,
2113076747,
1979015826,
2519881875,
2102365077,
2140481308,
1536615069,
2018044188,
2073262880,
2053920929,
2122203560,
2160763688,
4256436395,
2152358062,
4205210034,
2115385268,
2085300404,
2140170679,
1997127736,
2151675709,
2037728958,
2150046657,
15589191... | One of the key issues in mining is the hauling system. Truck and shovels are the most widely used transportation equipment in mines. In this paper, a two-phase simulation-based optimization is presented to maximize utilization of hauling system in the largest Iranian open-pit copper mine. In the first phase, The OptQue... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Two-Phase Simulation-Based Optimization of Hauling System in Open-Pit Mine |
2,727,987,014 | 2017-07-04 | 48,643,595 | [
2151675709
] | [
2094039233,
2053920929,
2025878787,
2004789284,
2145493798,
2048769967,
2096305430,
2049176600,
2151675709
] | AbstractBunching usually occurs when faster trucks and slower trucks are mixed in a truck-shovel mining system. This paper presents the development of discrete-event simulation model to estimate the impacts of bunching on the productivity and efficiency of a truck-shovel system. The bunching effect on production, BEP, ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A simulation model to study bunching effect of a truck-shovel system |
2,736,971,409 | 2017-07-23 | 4,210,205,812 | [
1981934656
] | [
2168354561,
2094566145,
2126895748,
2149752076,
2011293069,
1978939541,
2169528473,
2058361114,
2146377630,
1973749534,
1972121892,
2068546981,
2046010791,
2136050606,
2316371504,
2130796978,
2140170679,
2151675709,
1981934656,
1969483458,
1534941005,
2091202128,
20204071... | The design of a haul road for an open-pit mine can significantly affect the cost associated with hauling ore and waste to the surface. This study proposes a new method for haul road design in open-pit mines to support efficient truck haulage operations. The road layout in open-pit mines was optimized by using raster-ba... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A New Method for Haul Road Design in Open-Pit Mines to Support Efficient Truck Haulage Operations |
2,135,737,365 | 2006-08-16 | 4,306,463,519 | [
2126895748
] | [
2126895748,
2090359754,
2140764876,
2128208761,
1551276924
] | LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 million tons of iron ore yearly using an underground mining method known as sublevel caving. To aid in its ore mining and processing system, Kiruna has adopted the use of several types of multi-period production scheduling models that have some distingui... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Review of Long- and Short-Term Production Scheduling at Lkab’s Kiruna Mine |
2,597,443,199 | 2017-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Characterizing a mining production system for decision-making purposes in a platinum mine |
2,801,183,850 | 2017-01-01 | null | [
2160763688,
2151675709
] | [
2094566145,
2126895748,
1979015826,
2169528473,
2752128027,
2053920929,
1972121892,
2068546981,
2160763688,
2126258480,
2130796978,
2140170679,
2059057465,
2151675709,
4297744580,
1496395723,
1496852045,
1534941005,
1512342490,
1969483356
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Open Pit Mine Loading and Haulage Simulation |
2,036,537,329 | 2014-04-01 | 11,825,495 | [] | [
2019856397,
1970380565,
2127195548,
2125353502,
1827167646,
2022256544,
2146469537,
3124094248,
2025610165,
2144705212,
3122947389,
2012135746,
2146411203,
2020272840,
2032014665,
2094425945,
3124127210,
3121991018,
2081553388,
133780848,
3121586043,
2035554302
] | In Chile there are strong societal demands. However, there exists a lack of scholarly research regarding possible sources of fiscal revenue for social investment. This paper proposes taxes on multinational mining companies that would allow to transfer to the state their above-normal returns. Additionally, this work est... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Tasas óptimas para el Impuesto a la Minería del Cobre en Chile |
2,114,487,145 | 2010-07-07 | 4,306,418,476 | [
2126105956,
1534941005
] | [
1558919105,
2126105956,
2116661285,
3217061993,
1534941005,
2125899728,
2145479420
] | With many years of research and application to real-world problems, evolutionary algorithms (EAs) have solved various problems having thousands of variables, hard heuristic constraints, and complex evaluation procedures. This paper reports another successful application of EAs in open pit mine scheduling. Typically an ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Evolutionary algorithms in large-scale open pit mine scheduling |
4,362,645,295 | 2022-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Financial Management for Local Government |
82,363,476 | 2018-01-01 | 4,306,463,937 | [] | [
2126895748,
3145128584,
1995565517,
2752885492,
1988520084,
1551276924
] | Conventional approaches to optimising open pit mine design and production scheduling are based on a single estimated orebody model, which does not account for geological variability. Conditional simulation can be employed to quantitatively address the resulting grade uncertainty. Multiple simulated orebody models provi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Stochastic Optimisation of Long-Term Production Scheduling for Open Pit Mines with a New Integer Programming Formulation |
3,194,229,249 | 2003-01-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Dual energy X-ray transmission imaging for concentration and control of solids |
2,028,466,170 | 2000-09-01 | 28,359,369 | [] | [] | Mineral Resources EngineeringVol. 09, No. 03, pp. 313-321 (2000) No AccessA PRACTICAL APPROACH FOR OPEN PIT DESIGN AND VISUALISATIONKAAN ERARSLANKAAN ERARSLANDepartment of Mining Engineering, Dumlupinar University, 43100, Kütahya, Turkey Search for more papers by this author https://doi.org/10.1142/S0950609800000238Cit... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Practical Approach for Open Pit Design and Visualisation |
2,140,159,621 | 2014-01-01 | 177,423,656 | [] | [] | The power plant owner is interested to know in advance the quality of coal to be burnt which should meet maximal efficiency of power plant and the environmental regulations. There is the need to control and to predict the quality of coal at the mine site to meet sulfur emission requirements. Coal quality control betwee... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Application of stochastic models for mine planning and coal quality control |
2,529,757,709 | 2010-01-01 | 4,306,529,967 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Konumsal Karar Problemlerinde Analitik Hiyerarşi Yönteminin Kullanılması |
2,978,756,901 | 2020-12-17 | 4,306,463,075 | [] | [] | Mine production schedules are commonly based on block model estimates which only provide a single expected value realisation of deposit characteristics, and cannot account for the true variability of the deposit's characteristics. Production schedules based on a weighted average estimator cannot predict the true deviat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrating conditional simulation and stochastic programming: An application in production scheduling |
2,782,994,701 | 2017-01-01 | null | [
1576818901,
1659842140
] | [
2060929952,
2094566145,
2020999234,
1985080107,
2024060531,
1576818901,
1659842140,
1969483356
] | Mine design and mine planning are essential to a mining operation as they do not only dictate the outline of the mine, but essentially determine the financial robustness and success of the mining operation. However, as mining is a conservative business mine design is still mostly done by hand. To indicate the effect of... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Using Genetic Algorithms for Underground Stope Design Optimization in Mining: A Stochastic Analysis |
2,605,669,455 | 2004-09-06 | 4,306,401,271 | [] | [] | Competitive pressures on power plants have seen them attempting to reduce their operating expenses for profitable operations. In India, the plants use wagons of the Indian Railways to transport coal from the mines (in case of domestic coal) or from the ports (in case of imported coal). Once these loaded railway wagons ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mathematical Modeling for Demurrage Reduction in Coal Transportation for an Indian Thermal Power Plant |
2,740,394,726 | 2008-01-01 | null | [
2313274380,
3217061993
] | [
3217061993,
2313274380
] | The access infrastructure of an underground mine can be viewed as a network of interconnected declines and shafts that provides access to designated orebodies and a means of transporting ore from these zones to the mill. In this paper we give an overview of new optimal mine planning access design tools for finding an e... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Access Layout Optimisation for Underground Mines |
2,603,273,276 | 2007-02-01 | 110,258,470 | [] | [] | One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cutoff grade policy. The cut-off grade strategy for an open pit mine influences the annual cash flows and affects the net present... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor |
3,081,736,317 | 2020-03-01 | 206,834,481 | [] | [] | The statistical analysis results on methane release in coal faces in Kuzbass are presented. The parabolic curves of methane release have maximums as regard to feed velocity and productivity of shearer. Methane release from broken coal is an inverse proportional function of linear hyperbolic dependence and has maximum a... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analysis of Statistics on Methane Release in High-Production Coal Faces in Kuzbass |
1,963,943,357 | 2014-07-01 | 72,171,858 | [
2090132397
] | [
2048116825,
2041280856,
2012757283,
2166186246,
4211007335,
1992176519,
2090132397,
2056581810,
2032331699,
2091346452,
2139594840,
2071455833,
2158524254
] | Research has recognised operators' skill as important factors affecting performance and energy efficiency of mining equipment. Modern monitoring tools generate large, highly variable, and, often, skewed energy efficiency data sets. Well-conceived statistical tests should be used to assess the effect of operators on ene... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Statistical methods for evaluating the effect of operators on energy efficiency of mining machines |
2,012,878,792 | 2012-12-01 | 4,306,419,585 | [] | [] | Combined GPRS network data transmission, the advanced GPS satellite positioning and other key technologies, an embedded vehicle intelligent monitoring system could be achieved. This paper introduced the development of main device driver, application program design of embedded video capture card, GPS, and GPRS. This bui... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Study on Embedded Software Applied to Vehicle Intelligent Monitoring System |
2,566,418,972 | 2016-06-01 | null | [
2140170679,
2053920929
] | [
2053920929,
1969397762,
2798344481,
1972121892,
2166448956,
2160763688,
2123696861,
2002251854,
2065198673,
2130796978,
2017190577,
2140170679,
2766736793,
2078286011,
2010334716,
2151675709
] | This paper presents a decision-support model aiming, primarily, at maximizing the productivity of surface coal mining activities through operational planning and management. The model is formulated based upon mixed integer programming, and it determines the optimal production plan of the shovels and allocation plan of ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A decision-support model for operational planning of surface coal mining considering equipment failure |
2,307,347,584 | 2015-01-01 | 110,258,470 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Haul roads can make money! |
4,245,084,988 | 2015-12-01 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Improving quality in an electrical safety testing laboratory by using a simulation-based tool |
4,386,778,923 | 2023-09-14 | 4,210,192,031 | [
1985080107,
1647779468,
2060929952,
2100769519,
1979015826,
2065332058,
2185734033
] | [
2094566145,
2019291268,
2126895748,
1647779468,
2313274380,
4236127247,
2543580944,
2185734033,
1979015826,
1484040084,
2060929952,
2798344481,
1972121892,
2068546981,
1918344999,
2078327207,
3124407081,
2160763688,
1985080107,
2046010791,
2162145193,
2163428398,
21505937... | The strategic planning of open pit operations defines the best strategy for extraction of the mineral deposit to maximize the net present value. The process of strategic planning must deal with several sources of uncertainty; therefore, many authors have proposed models to incorporate it at each of its stages: Computat... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Multi-Stage Methodology for Long-Term Open-Pit Mine Production Planning under Ore Grade Uncertainty |
2,020,430,205 | 2003-12-01 | 72,171,858 | [
2313274380
] | [
2313274380
] | This paper describes a method for optimising the layout of a decline in an underground mine. It models a decline as a mathematical network connecting the access points at each level of the proposed mine to the surface portal. A feasible decline is one satisfying all operational constraints such as gradient and turning ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimising declines in underground mines |
25,798,980 | 2014-01-01 | 4,306,463,937 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Comparative Study on the Standardization System Construction in Coal Industry between China and Abroad |
4,247,231,807 | 2018-01-01 | 107,246,200 | [] | [] | Optimisation techniques have been used effectively in the open pit mine planning. However, they are incorporated more slowly in the optimal solution of mine-to-mill blending. Specifically, no contributions are observed from the multi-objective approach. This work shows the application of a multi-objective genetic algor... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Mine-to-mill multi-objective optimal blending with technical and economic constraints using a modified genetic algorithm |
3,135,006,106 | 2021-03-03 | 4,210,217,500 | [
1569990960,
2094566145
] | [
2094566145,
2126895748,
2543580944,
2185734033,
1979015826,
2149230623,
2060929952,
1972121892,
2068546981,
1918344999,
2160763688,
1985080107,
2150593711,
1569990960,
2043345585,
2130796978,
2140170679,
2020999234,
1496852045,
2143022286,
1534941005,
1969483356,
14934544... | The success of a cement production project depends on the supply of raw materials. Long-term quarry production scheduling (LTQPS) based on resource models is essential to maintain a consistent supp... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Optimisation of long-term quarry production scheduling under geological uncertainty to supply raw materials to a cement plant |
139,391,793 | 2005-03-15 | 4,306,463,973 | [
2032121576
] | [
2032121576
] | This paper offers a solution of the production sequencing optimization of an open pit mine through the investigation of the time aspect of the problem. The solution is obtained with the use of the author’s method of production scheduling optimization with multi-stage stabilization of the mining rate and incorporation o... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A model of discounted profit variation of open pit production sequencing optimization |
2,149,458,155 | 2011-03-01 | 206,834,481 | [] | [
2016365185,
4210300258,
1537810918,
4229562638,
2121947440,
2496675188,
2123879611,
2140095548
] | Quantification, assessment and management of orebody uncertainty is critical to strategic mine planning. A method consisting of a series of steps for uncertainty quantification and risk assessment in pit design optimization is outlined here. Multiple simulated scenarios of an orebody’s grade distribution are processed ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A risk quantification framework for strategic mine planning: Method and application |
2,592,010,998 | 2016-01-01 | 4,306,517,849 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Maszyny załadowcze w odkrywkowym górnictwie skalnym |
2,520,034,560 | 2004-01-01 | null | [] | [] | The trend for using larger equipment in open pit mining to achieve cost effectiveness raises the question about the optimum economic point of scale in the current world of globalization. The present paper treats this question through the prism of a new methodology of assessing the impact of the size of production equip... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The optimum production equipment scale for open pit coal mining |
2,280,015,264 | 2008-08-27 | null | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Integrated data environment for analysis and control of energy consumption (IDE-ACE) in surface coal mining |
4,205,906,506 | 2022-01-05 | 2,737,336,974 | [] | [
1966089218,
2074506246,
1928585742,
2185734033,
1903029394,
2053920929,
2031236641,
2027254180,
1918344999,
1988115241,
2126258480,
2017190577,
3198350258,
2040870580,
2219903032,
2982316857,
2151675709,
2151103935,
2101320768,
2051434435,
2145339207,
1502922572,
21221319... | This is an exciting time for the mining industry, as it is on the cusp of a change in efficiency as it gets better at leveraging data [...] | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Introduction to the Special Issue “Advances in Computational Intelligence Applications in the Mining Industry” |
2,121,335,759 | 2014-10-26 | 38,407,038 | [
2164502819,
2129911003,
2032132842
] | [
2164174683,
2164502819,
4210300258,
2115035590,
2073650054,
2097428263,
2141447208,
2032132842,
2114939879,
2117719113,
2157081519,
2157423028,
2129911003,
2024520223
] | The average grades of copper mines are dropped by extracting high-grade copper ores. This matter has drawn considerations to processing methods which not only extracts low-grade copper ores but also decreases adverse environmental impacts. Hydrometallurgical methods are the most applicable ones which affect the optimum... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Considering environmental costs of copper production in cut-off grades optimization |
2,184,316,593 | 2008-01-01 | null | [
3217061993
] | [
3217061993
] | Mining production planning is a very important subject of mine design process. One of the most important issues in mine production planning is the cutoff grade which is simply a grade used to distinguish between ore and waste. Waste materials may either be left in place or sent to waste dump. Ore is sent to the mill fo... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Determination of the Optimum Cutoff Grade Considering Environmental Cost |
2,951,716,636 | 2013-11-13 | null | [] | [] | Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp's flagship operation is Penasquito, a world-class, poly-metallic deposit and one of the largest mines in Mexico that started production in 2010. Since the early stages of the project, Goldcorp has used... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | AN INTEGRATED MINE PLAN - CONNECTING LONG, MEDIUM AND SHORT TERM PLANNING STRATEGIES AT GOLDCORP PENASQUITO |
2,913,394,097 | 2019-03-01 | 4,210,178,226 | [] | [] | The aim of the study was to analyze the impact on the strip ratio (SR) through varying haul road geometric parameters in two types of deposits, namely one with a steeper dip and a second one with a more equidimensional horizontal behavior. The SRs and the overall slope angle were compared with a base scenario, where th... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | The impact of haulroad geometric parameters on open pit mine strip ratio |
2,541,637,435 | 2008-11-01 | null | [] | [
2149887014,
2154636565,
2111311558,
2160830391
] | A typical mining facility uses excavation machines like shovels, draglines etc. for removing overburden and ores during the mining process. These machines are characterized by cyclic loads consisting of high peak power demands as well as regenerative energy. The peak power demand is often as high as double the average ... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Energy Budget Reduction by Using Ultracapacitors in Mining Converters |
2,565,797,659 | 2016-07-29 | 4,306,531,978 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Analyzing drilling machine in aid to improve open pit mining operations |
252,860,964 | 2014-01-01 | 4,306,463,937 | [
2160763688
] | [
2115570304,
2137653635,
2126895748,
2313274380,
2148317584,
1979015826,
2169528473,
2103002522,
2053920929,
1972121892,
2068546981,
2160763688,
2126258480,
2130796978,
1988328380,
2151675709,
1496852045,
1534941005,
2142183404,
1639032689,
2024060531,
2047205370
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | A Modern Tool for Modelling and Optimisation of Production in Underground Coal Mine |
1,873,309,832 | 2010-01-01 | null | [] | [] | The Nautanen Cu-Au deposit is located 75 km north of the Arctic circle, and 10 km northeast of the town of Gallivare in northern Sweden. Nautanen is just 8 km west of the giant Malmberget apatite-iron ore deposit and 15 km north of one of Europe’s largest copper producers, the Aitik Cu (Au) porphyry deposit. Nautanen i... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Petrology and lithogeochemistry of the host rocks to the Nautanen Cu-Au deposit, Gällivare area, northern Sweden |
2,323,737,225 | 2015-07-01 | 206,834,481 | [] | [
1985080107
] | The article focuses on ecologically balanced and complete extraction of coal reserves, with minimized impact exerted on human environment by gas emissions. It is found that geometrical design of extraction panels should be based on modeling of oxygen distribution in mined-out stopes and then calibration of the model us... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Substantiation of extraction panel parameters in ecologically balanced coal mining cycle |
93,635,295 | 2014-01-01 | 4,306,463,937 | [
2009104157,
2105934661,
4210300258,
1988729251
] | [
2139004160,
2147119488,
2094566145,
2012052869,
1996707465,
2179860363,
2041109651,
2179584279,
2157098139,
2140481308,
2009104157,
2060929952,
2091019041,
1988729251,
1972121892,
2103720101,
2018194343,
2122203560,
2006105001,
1985080107,
1512208174,
2134673975,
21731904... | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Moving towards Real-Time Management of Mineral Reserves – A Geostatistical and Mine Optimization Closed-Loop Framework |
4,220,746,570 | 2022-02-18 | 4,210,206,186 | [] | [] | This article presents the results of the analysis of the study of the working process of dump trucks and the factors that affect the fuel consumption of dump trucks in the process of unloading bulk cargo, with further development of principles and methods for determining optimal (rational) modes of dump trucks. special... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | THEORETICAL JUSTIFICATION OF FACTORS OF INFLUENCE ON FUEL CONSUMPTION OF DUMP TRUCKS IN THE PROCESS OF UNLOADING BULK CARGO |
2,603,512,348 | 2016-01-01 | 107,246,200 | [] | [] | Cut-off grade is the lowest grade above which the mined material is considered as ore. Volatility of the parameters involved in its calculation affects the mine operation and economics. For example, the sold products under a highly volatile commodity prices leads to sub-optimal cut-off grade strategies. The paper descr... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Effects of the volatility of input parameters on cut-off grade optimisation, a case study of Sungun copper mine |
2,159,653,261 | 2005-01-01 | null | [] | [
2032121576,
3138949179,
2171646358
] | Open pit gold mining is an important sector of the Australian mining industry. It uses large amounts of investments, which need to be managed efficiently under conditions of great uncertainty that are inherent for any mine project. The sources of uncertainty are price volatility and variability of geological, technolog... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Risk Model of Long-Term Production Scheduling in Open Pit Gold Mining |
3,020,234,154 | 2019-09-01 | 206,834,481 | [] | [
2104050785,
2019291268,
2160763688,
3217061993,
2113076747,
1647779468,
2049606892,
2165775468,
1534941005,
1979015826,
2130796978,
1969483356
] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Production Scheduling with Horizontal Mixing Simulation in Block Cave Mining |
1,722,311,740 | 2012-01-01 | 110,258,470 | [] | [] | For a minerals and metal company to create sustainable value from mineral assets, it is necessary to: Optimize the composition of the mineral asset portfolio to align with strategic and business objectives Create and operate long term assets within an anticipated long term business environment Create and retain flexibi... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Strategic long term planning in mining |
2,137,005,743 | 2015-01-01 | 4,210,240,779 | [] | [] | null | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Discussion on the Application of Mathematical Statistics in Construction Quality Control |
4,319,439,605 | 2019-09-03 | null | [] | [] | The impact to water resources is a critical issue in mining. The exploitation of a mine can influence surface water systems, like rivers, lakes, swamps, and groundwater systems, like aquifers, seriously. The impact concerns and the pumping of water out of the mining area, relocation of water bodies, changes in water qu... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | "Innovative approach to reduce acid mine water drainage (AMD) and dump failures on example of German lignite mining " |
4,385,067,387 | 2023-07-20 | 2,737,336,974 | [
2185907055,
1979015826
] | [
2160763688,
2090359754,
1496852045,
1534941005,
2185907055,
2043345585,
1979015826,
1551276924
] | Three-dimensional block models are the most widely used tool for the study and evaluation of ore deposits, the calculation and design of economical pits, mine production planning, and physical and numerical simulations of ore deposits. The way these algorithms and computational techniques are programmed is usually thro... | 3,065 | Mine Planning | Operations Research in Mine Planning | Open Pit Mining; Production Scheduling; Optimization; Uncertainty; Algorithm; Truck Dispatching; Geological Uncertainty; Stochastic Optimization; Equipment Selection; Strategic Planning | Ultimate Pit-Limit Optimization Algorithm Enhancement Using Structured Query Language |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.